ADDENDUM TO PRELIMINARY SOILS INVESTIGATION REPORT
Of
LOT 431, MAP 7950 CARLSBAD, CALIFORNIA
For
MR. JOHN LEMKEY
BY
SAN MARCOS ENGINEERING, INC. 370 MULBERRY DRIVE SUITE E SAN MARCGS, CALIFORNIA 92069 (619) 744-0111
ENGINEERING DEPT. LIBRARY city ot Carlsbad
2075 Las Palmas Drive
Carlsbad, CA920094859
- SAN MARCOS ENGINEERING, INC
-
370 MULBERRY DRIVE SUITE E
SAN MARCOS. CA 92069
(6191 744-0111
_- Clvll Engineemg . Plannnmg l Land Developing l Suweytng l SCNIS and Foundatton Engineerr
- January 22, 1988 JN 87118
Mr. John Lemkey 3230 Venado Carlsbad, California 92008
Re: Preliminary Soils Investigation Lot 431, Map 7950 Carlsbad, California -
-
-
-
-
-
-
-
Addendum to the above report dated September 3, 1987:
1. No groundwater was encountered in the three test
pits, although the soils were moist. At test pit
T-3, the wet trace of roots and organics appears to
be isolated.
2. It is our opinion that the existing fill soils is
of low potential expansion, having an E.I. of 48.
The foundation foc.:ings are recommended to be
designed for 24" depths.
3. Slope stability analysis indicates a safety factor
of 1.87 for the slope section taken at the deepest
condition shown as l-l in the enclosed analysis.
The following assumptions were used for worst
conditions:
-
SAN MARCOS ENGINEERING, INC. civil soils foundations
- Lemkey Addendum to Soils Report, cont'd...
a. Phreatic surface at about 2 to 10 feet along
the inclination of the original ground surface.
b. Seismic load of 0.27 for Zone 3 of the Seismic
zone map of the United States. (After
Algermissen, 1969)
4. Direct shear test results of two samples remolded
to 90% of maximum dry density shows the following:
a. Existing natural soils:
4 = 30 degrees
c = 500 psf
b. Existing fill soils:
+ = 32 degrees
c = 600 psf.
-
-
-
-.
If you have any questions regarding this addendum,
please call at (619) 744-0111 and mention job number
87118.
Very truly yours,
SAN MARCOS ENGINEERING, INC.
-
-
SAN MARCOS ENGINEERING, INC. civil soils foundations
Lemkey Addendum to Soils Report, cont'd...
_-
-
-
-
-
-
Enclosures:
Enclosure 1. Stability Analysis
Enclosure 2. Preliminary Soils Report dated g/3/87
Distribution: (2) Addressee
-
-
-
-
-
3
-
_-
-
-
-
-
-
-
-
-
-
-
-
-
ENCLOSURE 1. SLOPE STABILITY ANALYSIS
-
i
, j ,L
j
J
! .-
,i
_:
J
2
-,
-
i
_’
i
-
-
-
SE:-SLl:!FE
5imci i+ied E:i:sh,2p 5 i. cm,C e :Si ::+.‘:a i 1 i t ‘3 <:tn*. i a;~:% i 5
F’V,-,.,F,-‘T - ,._. __._ . :.?“+! L.C!‘“.~:E’~(.’
L!.!I..M I 1. !-I?, . . C:;i;:l-$jT&~,
l-7, c. I ILL.
I I
I -I
415 .I-> -+ :~.:1 ‘f
._/
,:- T, ,:g c, -:
-!
07,:r’l 0 r~,-,r.,c~l c-rc Cl >r,rzIC ,--L,,-,.Li- CcI-,T, Th, I_. i L. A . . . ,_,,-.I >, LL L .-,L,-,> . ,.,.,,_ /_,,_. ~..-...,> ,.,,,
1:: 1 F:,:. . . E ::t 7 &;&I,pjc; iq;‘_:
1 ‘7.3 . .a,.-,7 c + ,-A-? .‘C. ,.. I’ _ -+ * ‘II ,.’ ” .:. .; . .,y.; ,;;
.-. i ::; 7: . :+; +‘;‘+I _ :z I‘?.?. cl , !::!~:I
i’ i
)
i : : j i
:15 -“- )’ ! 1 ,‘,I: .I mTw- LZ/
) r’ -,7 17) . LO ..;-----‘E: .Ly-..’ -,_L::.,
1’3 ~_ ““~-L%+ ,.... - r~--‘:--‘----.----.-
.- 1
-LX ~_, ,_,_ ..?. i.
-_ -..--... , / I I / --i----- 513 ;;-;, ;. LJ r::, j, i::* L :) i:, L ;..‘Z, ‘2 c, c, ;, .> + -_._
::.; ,- e::.<; I :3
- ._.._ --...- --._-._ .:,,+.,-, p::+.i~.,:>::,z. ,E,-,g ir!*r?p I:‘,3 -, :5?n P’>.rr>.:,;, cc, .,_,, ,,,,,.._
I
! ! / I
I
I
!
f
,
,
I /
I /
,
,
I
/
I
I
1 I
/
,
/
-.
WOJECT DFITQ
I ‘oJectr JOtiN LEMKEV
Lacatinn: CARLSH!2D
Fi 1 enamr: 87018 Drscr i -
UQLYSIS DGTQ
Line
-3.
1
2
-3
4
5
6 - 7
a
9
-10
11
12
-13 14
15
16
.-- 17
1.9
19
-20
21 ;-;-
23 -~
Left
X
0.0
15.0
50.0
50.0
80.0
80.0
110.0
lliTl.0
140.0
140.0
170.0
170.0
200.0
200.0
208.0
35.0
140.0
170.0
15.0
50.0
60.0
110.0
122.0
Left Right Right
Y X Y
375.0 15.0 3h@. 0
360.0 50.0 380.0
360.0 50.0 367.0
307.0 YO.O 367.0
387.0 80.0 332. p
352.0 110.0 332.0
392.0 110.0 336.0
398.0 140.0 336.0
338.0 140.0 402.0
402.0 170.0 402.0
402.0 170.0 407.0
407.0 C-00.0 407.0
407.0 200.0 409.0
409.0 208.0 412.0
412.0 230.0 412.0
36’3.0 140.0 402.0
402. 0 170.0 407.0
407.0 200.0 409.0
300.0 50.0 334.0
394.0 60.0 401.0
401.0 110.0 40?.0
401.0 122.0 403.0
409.0 200.0 409.0
Dtionx JOHN LEMKEY - CRRLSHRD
kwizantal earthquake cueffici@nt = 0.27
Vertical earthquake coefficient = 0.1
distributed lnads
IJO. Left x Right X Load (lbf/ft)
1 65.0 105.0 sO.O -.
2 128.0 168.0 1800.0
Density
wf
100.0
100.0
1a0.0
100,B
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
110.0
110.0
li0.0
110.0
lL0.0
110.0
1:0.0
110.0
Cohesi cm F’hi
psf Deg
500 30
500 30
530 30
500 30
500 30
500 30
500 30
SW 30
500 30
500 30
500 30
500 30
500 30
500 30
500 30
600 22
600 32
600 32
600 32
600 j,?
600 -22
6@0 32
600 32
Pnreat ic
Line
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Y
Y
Y
N
N
N
N
Y
-
87018 - JOHN LEMKEY - CFIYLSBQD
SINGLE CEN.TER RNQLYSIS
ppronimtely 40 slices selected
Circlr center at X= 64.0, Y= 494.0
-‘S= 1. 877 at R= 109.0
X= 84.0 Y= 494.0 R= 10’3.0
*LICE X-LEFT DX TFIN TQN [IOHESIOY !JERTICRL PORE WFITEH RESISTING DRIVING
1
2
3
4
5
- 6
7
a
- 9
10
11
12 - 13
14
15
~- 16
17
10
.- 13 20
21 22 ,.- 23
24
Ig
i ilj
1. ;;
_.
34
1
35
36
37
1~ ::
40
-
-
-.
45. 3
49.1
50.0
50.0
53.3
56.7
60.0
63.2
65.0
60.0
71.0
74.0
77.0
aO.O
0’3. 0
34.0
87.0
90.0
33.0
36.0
33.0
102.0
105.0
110.0
110.0
113.0
116.0
117.0
122.0
125.0
128.0
131.6
135.6
140.0
140.0
140.0
142.5
143.3
146.3
143.3
THETQ PHI
3. a -0. 353 0. 625
0.3 -0. 333 0.625
0.0 -0 .32:8 0. 62-5
3.3 -0.3?1 0.625
3. 3 -0.276 0. E.,?S
3.3 -0.242 0.625
3.2 -0.210 0.625
1.B -0.lA6 0.577
3.0 -0. 163 0.577
3.0 -0.134 0.577
3.0 -0.1@6 0.577
3.0 -0.070 0.577
3.0 -0.051 0.577
0.0 -0.037 0.577
4.0 -0.018 0.577
3.0 0.@14 0.577
3.0 0.041 0.577
3.0 0.069 0.577
3.0 0.0137 0.577
3.0 0.125 0.577
3.0 0.153 0.577
3.0 0.182 0.577
s. 0 0.221 0.577
0.0 0.246 0.577
3.0 0.261 0.577
3.0 0.292 0.577
3.0 0.323 0.577
3.0 0.355 0.577
3.0 0.389 0.577
3.0 0.423 0.577
3. a 0.464 0.577
3.8 0.513 0.577
4.4 0.568 0.62S
0.0 0.539 0.577
0.0 0.539 0.577
2.4 0.617 0.577
0.9 0.642 0.625
3.0 0.672 0.625
3.0 0.722 0.625
3.0 0.775 0.625
600
600
600
600
6.00
600
EZl0
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
600
500
500
500
600
600
600
600
FORCE FORCE TERM
545 0 3168
233 12 553
4 0 10
1732 23A 3424
2923 527 3921
3876 732 4.393
4343 134 4422
2501 643 2120
4448 1212 3532
4569 1365 3525
4666 1502 345.3
4741 1623 3331
4793 172’9 3325
16 6 11
6235 2436 4213
4632 1915 3031
4670 1369 3023
4625 2008 2356
4558 2031 2’887
4469 2038 281’7
4356 2030 2747
4220 2005 2675
643.3 3239 4168
12 6 a
3741 1858 2474
4111 1772 2723
4455 1670 2370
4774 1544 3215
4773 1411 3296
4444 1252 3212
11301 1330 7333
iy1662 939 7265
11316 673 8968
15 1 11
10 0 7
562 1 146 4443
1968 11 1703
6420 0 5706
5810 0 5383
5155 0 5033
TERM
-31
-11
-0 -30
32
1 54
301 2 32
476
619
763
908
1052
4
1563
1331
1453
1565
1666
1753
:1E!25
ias1
3155
6
1961 zz52
2545
2838
2355
2067
6a57
5963
6634
3
6
3512
1203
3369
3637
3237
-
-
.-
-
-
._
SAN MARCOS ENGINEERS Civil Engineers
370 Mulberry Dr. Suite E
SAN MARCOS, CALIFORNIA 92069 (610)74‘%0111
JO8 cfl L /dew
SHEET NO. OF
CALCULATED BY DATE
WEWED 8” OATS
SCILE H: /s’-’ l+ /“= 20’
-.
-
-
-~
-
-
-
-
ENCLOSURE 2. PRELIMINARY SOILS INVESTIGATION REPORT DATED g/3/87
-
.I -
I
J -
I
I
I
-
I
iI --
I ‘k -
I 1
-
I I
PRELIMINARY SOILS INVESTIGATION REPORT
Lot 431, La Costa Vale No. 3, Map 7950 CARLSBAD, CALIFORNIA
For
John Lemkey
BY
SAN MARCOS ENGINEERING, INC. 370 MULBERRY DRIVE, SUITE E SAN MARCOS, CA. 92069
-
/
-
/
:_
I 1 ,._
SAN MARCOS ENGINEERING, INC.
370 MULBERRY DRIVE. SUITE E
SAN MARCOS. CA 92069
(619) 744-0111
C,v,l Eng,neerq . Plannnmg . l.and ~eve,op,ng . Suweytng . Sods and Foundanon EngIneerr
Septmher 3, 1987 Job Nwker 87118
MK. John Lenkey 3230 Venado Carlsbd, CA 92008
i I-
i I- 1~
I-’
/_
j/
I
i ,+ r -
Re: Preliminary Soils Investigation of Lot 431, Map 7950 Carl&ad, California
Dear Mr. Lemkey,
As you requested, we have conducted a preliminary soils investigation of Lot
431, Map 7950, Carlsbad, California located at the vicinity of Cadencia and
Piraqua Streets in Carlsbad, California.
Purpose
Cur investigation was conducted to assess the geologic and qeotechnical
conditions at and near the site which rray affect the proposed development and to
gather soils data on which to base foundation recomnendations. This report
describes the investigation of surfxe and near surface soil conditions,
provides conclusions regarding the resident soils, and makes 'foundation
recanrendations for a proposed residential structure.
Project k-cation and Description -
Lat 431 is located at the vicinity of the northeasterly comer of intersection
of Cadencia and Piraqua Streets, in Carl&ad, California. The lot is
rectangular in shape and has ken graded sametime in July 1986 to accomate
1
I i
Lemkey Geotechnical Investigation, cont'd...
-
-
I-
;-
i
i-
I
j-
I I
!
I.-
i . . - .--
I
I
, .*
the construction of a residential house therein. It is proposed
at this time to regrade the entire pad for the construction of a
residential structure. Plate 1 show the Vicinity Map.
Regional Geology
Carlsbad, California lies on the coastal plain of northern San
Dieqo County and the adjoining low rolling foothills of the
Peninsular Range of Southern California. Marine conglomerates,
sandstones and shales of Eocene to Pleistocene age underlie the
coastal plain while metasediments and metavolcanics of the
Santiago Peak Formation intruded by Cretaceous batholithic rocks
make up the foothills. Lot 697 is underlain by a northwesterly
trending belt of the Juro-Triassic Peak Formation which consists
of metavolcanic and metasedimentary rock.
Although a number of small faults have been reported in the
surrounding area, none are known to be active. The nearest known
active faults are the Elsinore Fault Zone located 24 miles to the
northeast and the offshore extension of the Rose Canyon-
Newport/Indlewood Fault Zone which lies from 6-8 miles offshore
beneath the Pacific Ocean approximately 10 miles to the
southwest. Both faults have been active in recorded history and
are acknowledged of being capable of producing earthquakes up to
Richter Magnitude 7.0 (M7.0).
Soils Investigation
Four (41 test pits were excavated at site at the approximate
locations indicated in Plate 2. The test pits are indicated as
2
1 ,’ -
i,l
.-
.-
t
;- . I
1.1 i-. ! 1
61 j-
i i i j ,=: !-
Li -
i -
Lemkey Geotechnical Investigation, cont'd...
T-l to T-4, inclusive.
Log of the soil samples encountered are shown in Appendix b.
Findings
The fill material imported to form the existing qraded pad
consist of brown to light brown silty sand. The native soils is
brown to reddish brown sandy clay with broken or fractured rock.
At test pit T-l, very hard, dense rock fracture was encountered
at bottom of test pit at -- 3.5 feet.
At T-2, native reddish brown clay was encountered at -- 4 feet
from existing surface, while at T-3, the reddish brown Sandy Clay
material was encountered at -- 7 feet below surface.
The fill material overlying the graded pad was compacted and 13
tests were taken at the locations indicated in Plate 1. The test
results are shown in Appendix B.
Laboratory Soils Testinq
Maximum dry density test of the prevailing fill material was made
and the test result is shown below:
SAMPLE OPTIMUM MOISTURE CONTENT
T-l @ -2.5': Brown Silty Sand 127.5 pcf 9.6%
Expansion Index Test per UBC Standard No. 29-l indicate the soils
to have an E.I. of 48 which is of low potential expansion.
3
1, I_
I
,
-
j,:
10, t I !‘, I‘
L, ,.- -
Lemkey Geotechnical Investigation, cont'd...
Conclusions and Foundation Recommendations -
1. It is our opinion that the existing site soils can safely
support the project proposed to be constructed at site
provided the recommendations presented herein are observed
and followed during the design and construction of the
structure proposed to be built.
2. The Earthwork Specifications found in Appendix A forms part
of these recommendations. If there are conflicts in the
provisions between the Earthwork Specifications and these
specific recommendations, the latter provisions shall
prevail.
3. We recommend an allowable soil bearing pressure of 1500 psf
for standard spread footings. Bottom of footings should be
at least 24" below adjacent finish grade or natural grade.
4. All exterior and interior wall footings should be
continuously reinforced with 2 -#5 bars placed 3 " above
bottom of footing and 2 -#5 bars placed 2" below top of
footing.
5. Concrete slabs on grade should be at least 4" thick and
reinforced with welded wire mesh placed at mid-thickness of
slab. The slab should be underlain by 4" sand and vapor
barrier. Prior to placing the sand and vapor barrier, the
subgrade soils should be wetted to at least 4% above
optimum moisture content.
L. - 4 / 11
i.
1,
.-.
I 1
1,
-
1 ’ .-
-
I u
Lemkey Geotechnical investigation, cont'd...
6. The following soil parameters are recommended for use in
the design of retaining walls:
Active equivalent fluid pressure = 36 pcf, No surcharge backfill
Active equivalent fluid pressure = 59 pcf, 2:l slope backfill i-
Passive Equivalent fluid pressure = 330 pcf,
No surcharge
Passive Equivalent fluid pressure = 164 pcf 2:l Backfill slope
Coefficient of friction between soils and masonry = 0.33
7. To minimise differential settlement inherent in cut and
fill situation of graded pads, it is recommended that the
pad soils in the cut area should be undercut by 36 inches.
8. A soils engineer should inspect the foundation trench soils
prior to poring of concrete for the footings to see to it
that the recommendations presented herein are followed.
9. .Reconunend slope ratios for cut and fill not to exceed as
shown:
cut: 2 horizontal to 1 vertical
Fill: 2 horizontal to 1 vertical
10. All surface water runoff should be directed away from the
foundation system positively.
11. This firm should be contacted if soils d
soils presented in this report are found
grading and construction operations
.ifferent from the
at site during the
so that a proper
‘-
/
I *
j ,
1~1
,-
I.
-
i.
j.-
9 1
i-,
L ,
i-~
83, in-
1,
;-
;>
‘-
!-
i-
‘a
L
k:
/-
kl
Ls
-
k.
-
Lemkey Geotechnical Investigation, cont'd...
evaluation and recommendations of the soils can be made.
Limitation of Report -
This report is based upon surficial and limited subsurface
observations and logical projections inferred from observed
conditions. Should conditions varying from those reported be
found during development, a qualified soils engineer should
inspect the site and evaluate the potential effect of our
recommendations. The report has been prepared in accordance with
generally accepted soils and foundation engineering practice. No
other warranties expressed or implied are made as to the
professional advice and recommendations contained. This report
is provided for the exclusive use of the client or his authorised
agents.
Should you have any questions regarding this report, please call
us at 744-0111 and mention Job #87118.
Very truly yours,
SAN MARCOS ENGINEERIN
BY
6
Lemkey Geotechnical Investigation, cont'd...
-
j> ,-
1,: , .~ I
I
1:
Enclosures:
Appendix A --Earthwork Specifications
Appendix B --Boring Logs & Laboratory Test Results
Appendix C --Unified Soils Classification System
Plate 1 --Vicinity Map
Plate 2 --Test Pit Location
t
L i
L
7
-
-
-
-
-
-
I
-
.-
,
APPKNDIX 4 RECONNENDED EARTHWORK SPECIFICATIONS
-
-
I-
i
/ - I
-
I r ’
APPENDIX A RXCONNCNDID CARTHWORK SPSCIfICATIONS
l.- CEWER& Q~$ERIpT~Q$- Thr ob]ec-tive ia to obtain ~- ----- --- uniforaity P adequate internal strength in filled
ground by proven engineering procedure8 end teat8 eo
th.t the propoacd atructurre mey be safely supported.
The procedurer include the clearing end grubbing, removal of l rieting rtructurem, prep.r.tion of lend to
bo filled, proce..ing the fill .oil., filling of thr land, and the spreading and compaction of the filled .re.. to conform with the line., gredee, and aloper BP
ahovn on the approved planu.
The owner nh.11 retain . Civil Engineer qu.lified in Soil Nech.nic. (herein referred to e. Engineer) to
inapect and te.t the filled ground .I placed to verify thr uniformity of compaction of filled ground to the
specified 90 percent of raxinua dry den.ity. The
Engineer .h.ll edvlee the owner end grading contractor inaedi.tely if .ny unratiafactory conditions .ere
observed to exist .nd ah.11 heve the authority to relect the compacted filled ground until such that 8. corrective me..ure. .re taken, neceaaory to comply with thr .pecific.tiono. It shnll be the sole rerpon.ibility of the grading contractor to achieve the
apeclfied degree of compaction.
Em!!u!!L 2iw!, E!?!!Pw!!L 4!!P IIREPERI!!G 4mrra IQ BL
(a> All bru.h, vegetation, and any biodegradable refuse mhall be removed, piled, and burned or
otherulae di.po.ed of .a to leave the .re.. to be
filled free of vegetation and debrir. Any uncompacted filled ground or loose compressible natural ground, ah.11 be removed unlear the report recommends
otherulae. Any unatoble, .u.rPY, or otherwlme
unmuiteble area* ehall be corrected by draining or removal, or both.
I. 1 ’
-
-
-
,-
-
-
)
-
I 1 -
I, -.
i.
I L
I
I
I
-
l
-
I’ c . .
SAN RARCOS ENGINEERING civil, foundation8 L l oila
Cb) thr natural ground which la deterained to b. a.tiafactory for the l upport of the filled ground ahall
then be ploued or scarified to a depth of at leoat mix
incher (6"), and until the l urfaco if free from ruta,
humocka, or other uneven footurea which would tend to
prevent unifora compaction by the equipment to be used.
Cc) After the natural ground haa beon propored, it ahall then k brought to the proper aoiature content end co8pacted to not leas.than 90 percent of ~&Xi&U.
density in accordance with the A.S.T.M. 01557-70 method which urn.8 26 blowr of a 10 pound r.a.er falling 18
inch.8 on oath of 5 layerr in a a-inch dioaeter l/30
cubic foot cylindrical aold.
(d) Wharo filla are aado on hillaidea or l rpoaed alope areaa, with gradionta greatbr than 10 percent, horizontal bencher ah.11 be cut into firm undiaturbed n.tural ground in order to provide both l&era1 and vertical l t.bility. this la to provide a horizontal boar l o that l ech layer ia placed and coepected on a
horizontal plane. The initial bench at the to. of the
fill ahall be at leoat 10 feet in width on firm
undisturbed natural ground at the elevation of the too l takr pl.ced at the n.tur.1 .ngle of repose or deaign alop.. Thr Engineer ahall determine the width and
frequency of all rucceeding benches which will v.ry
with the aoil conditiona end the ateepneaa of .lope.
3. "4'f~~f~L~co~~atQ~QQX8L ELQYXMUElSQr The fill aoila of aelect .ateri*la free from veget.blo aatter, and other deleterious l ub.t.ncca, .nd ahall not contain rocka or lurpa greotor than 6 inches in dimeter. Thir may be obtained from the excavation of banka. borrow pita or .ny other approved l ourcea and
by mixing aoila from one or morn l ourcem. If exceaaive v.g.trtion, rockr. or l oile with in.dequ.te .trength or
other unacceptable physical charectrriatica or* encountered, theme ah.11 bo diapoaed of in u&ate areaa
. . ahoun on the plrna or ma directed by the Engineer.
If, during grading operationa, l oila ore found which
uere not encountered end trmtrd in the preliainory
invamtigation, terta on there l oila ah.11 b. perforred
to deterxine their phy.ic.1 ch.r.cteriatica. Any
.p.cial treatment recommended in the preli.in.ry or
l ubaequent aoil reporta not covered herein oh.11 beco.0
an l ddondua to them 8pecific8tion8.
2'
-
SAN MARCOS ENGINEERING civil, foundations I l oila
-
-
-
-
t
-
-
,
-
,
_~_ . .
;;,eLanran, EE%nbPxEQA m EQEUKIXEQ EXLL n4mzbLaI When the l oiaturr content of the fill material i8
below that specified by the Engineer, umter ah811 be
l dded in the borrow pit until the moiature.content ie
near 0Qtimur to l mmure uniform 8ixing mnd l ffectivr
compection.
(b> When the moieturr content of the fill material ir
above that l pecified by the Engineer, resulting in
inadequate compaction or unatablo fill, the fill -. --material ahall bo l ermted by blading and ccerifyinp.-bar
other l mtimfactory methoda until the l oimturr content
i8 near optimum am mpecified.
cc) Aftor proceraing, the l uitablr fill material rhmll
be placed in lmyorr which, uhon compacted, shall not l XC*d mix inchom (6" .) Each layer ahall be spread evenly and ahall bo throughly mixed during thr l prmading to l aure uniformity of m8terial and moiaturr
in each layer.
Cd) After l mch lmyer haa been placed, mixed l nd mpremd
evenly, it *hall be throughly compmctod to not lmmr
thmt the density met forth in paragraph Z(c) above.
Compmction ahall bo l ccompllmhed with l heepmfoot
rollerm, multiple-wheel pneumatic-tired rollerm, or other approved type- of compaction equipment, much am
vibratory equipment that im l pecimlly demigned for certmin mail typer. Rollerm l hmll br of such demign
and maintained to much l level thmt they will be able
to compmct the fill material to the specified denmity. Tamping foot of l heepmfoot follorr l hall be maintained much that the mail will be compacted rmther than l hemrrd by thr roll-r. Rolling ahall be l ccomplimhed uhilo the fill l mteriml im at the epwified moimturr content.
Rolling of l mch lmyer l hall bo continuous over itr
entire l rom l nd thr roller mhmll make l efficient tripr
to inmure that the specified density ham been obtained.
Rolling l hall br l ccorplfmhed in l planned procrduro
much that the entire areas to be filled l hall receivr uniform compmctive effort.
Ce) Thm l rfacrr of the fill mlopoa ahrll bo corpmcted
by rranr of mhmepmfoot rollera or other muitablr
equipment. Compacting operationm mhall be continured
- 3'
SAN RARCOS ENCINPERINC civil, foundmtiona I l oilm
-
-
-
mQQrmcimbl0 amount of loomo mail on the mloprm. Comp8cting of the l loprm l hmll bo l ccomplimhrd by bmckrolling the l loQem in incrrmentr of 3 to 5 fret in
l levmtion gain or by other aethoda producing
l mtimfmctory remultr.
(f> Field drnmity trmta l hmll bo tmken for
l QQroximmt*ly arch foot in l lovmtion gmin l f tar compmction, but not to rwcred two fert in vmrticml .hright b&wren trmtr. Field drnoity temtm uy br taken
,at i-ntervmlm of 6 inchem in rlovmtion .gmin if requirea-
by the Engineer. The locmtion of the tarta in plan mhall bo mo mpmced to givr the brmt Qommiblo covormgm
l nd l hmll bo tmkrn no fmrther l pmrt thmn 100 feet.
Teata l hmll be tmkm on corner l nd torrece lob for each two fort in l levmtion gmin. fhr Engineer mmy tmke additional temtm ma conmidered neceammry to check on the uniformity of compaction. Whore l hmepmfoot rollerr arm umed, thr trrtm l hmll be tmken in the compmcted matori below the dimturbed murfaco. No l dditionml lmyrrr of fill l hmll be l prmmd until the field denmity temtm indicmto thrt the l pocifird denmity hmm born
obtmined.
(9) The fill operrtion l hmll bo continured in mix inch (6") compmcted lmyerm mm mpecified l bove, until the fill hmm beon brought to the finimhed l lopea l nd grmdem
am l hewn on the Weepted plane.
S m;rmll hMZ,Qf~Qllr SUfficient inmpmction by the Enginrq
be mmintmined during the filling l nd compmcting opermtionm l o that he cm verify that the fill warn conmtructed in l ccordmnce with thr l ccmptmd
l prcificmtionm.
6. z,a#~arA LAa&$aI No fill mmtrriml l hmll be plmcf;: mprmmd, or rolled if vcrthrr conditionm incremrr
moiaturr content l bove Q8rmimmiblO limitm; When the
work ia interrUQtOd by rmin, fill opermtionm l hmll not
be remummd until field temtm by thr l oilm engineer
indicmte thmt the moimturr content and denmity of fill
arm am QrmViOUmly l pacified.
4 .
-
-
-
, -
-
1
-
r-
1
i
-
*
i
-
I
-
,-
B
I- ,
I
-
SAN RARCOS ENGINEERING civil, foundmtionm L l oilm
7. LiE'ifi!lS !!SAYJII Qi flQQ¶RRandYR EQihr Thomr
l oilm thmt rxpmnd 3.0 percent or lemm from air dry to
l mturmtion under l unit lomd of 150 QOUndm prr l quare
foot l re conmiderrd to bo nonrxpmnmive.
8. All recommrndmtionm Qremented in the mttmched report
l ro l part of theme mprcificmtionm.
I --
i- . I I :- - I /- i- I .!-
1 j- i I- I I I;
1: I ‘2
1 t
r i’ I- I
I
APPENDIX B LABORATORY TEST RESULTS
-
i-
-
f
1 _- 1 t-
I - I - 1
B - , - 1
SAN MARCOS ENGINEERIN
CWL c..o,.* . . . . ,*a. . ceY.o..Io”
3.0 UUL.‘... O..... . ..*. . Boring NO.
.A” “1.55.. 5. .a=.. 1.8.8 ‘l...ot*, Skeet NO.- of-
CCluTRACT NO. PGRPCSE
Ualatial 6 Rcr3arhs
-.
-
--
-
-
/ -
I i
/ !
I
I
j ~-
I
,
I
1
I I
I
>
I
-
-
l
-
SAN MARCOS ENGINEERIN
Cl”.. L..*I** L... l 01L. . .0”“0.1’01.
aa0 “U,.*.l o..**. .c... . Boring No.=
..r. rr.CC*. c1 .,E.. 1.1.1 7... OS,, Sbeat No./ofL
C-TRACT NO. PC;RPCSE
Ur:arirl & Remark4
-
,- : .
L
i
-,
,
SAN MARC05 ENGINEERINO
ClWL Cr.01.,S... se!&. . co*.o.I~o-
,a* YUL...I O..“.. .r... . Boring NO. x
..I “..SS., 5. .I<.. 5.8.. ,.l.os*, Shot No.+OfA
CChtTRACt NO. PURPCSE J
aiarr 8lWS cm El**. on Spoon for a” 0 Casing Pa.7etrrtim “0.1 C*pth Lo9 Va!arirl A Ref7WCS
- ! n /a// r I .#a , : rsAnoh/ d//M w ,
-
I ’ I_
I-
L
I-
SAN MARCOS ENGINEERING CWlC Ll.Ol.l I... ,01L. . CObrD.IIe-
I.0 “UC...” O.,... .r.*. . Boring NO. .*
..” “..SC., S. .a=.. I.,.. ,...os*, sh*t No./of/
t
l
i
i
I, 4
I , i- I -~, I,
-~ I , - 1,
SAN MARCOS ENGINEERING, INC.
Job No. 875w 370 MULBERRY DRIVE SUITE E
Le3keq
SAN MARCQS. CA 92069
Project: 16191 744-0111
, ~~~~
Sample ID; Dry Density vs. Water Content
Curve. Test Per ASTM D1557-78
,
150
4
:
:: 2 130
2
," .r(
z ; 120
," P
110
100
Calculat Q e :
Maximum Dry Density: /wYpcf
Optimum Moisture Content '----+t x
90 8 12 16 20 24
Water Content, Percen.t
Page
-
.-
-
-~
-
-
TEST NOMBE!!
1
2
.3
4
5
6
7
8
9
10
11
12
13
APPROX ------: ELEVA- ------ TIONCFT) --------
t399
z401
2402
5405
2410
2412
+4oe
$408
2416
ys19
2413
2387
2400
ERY RELAIZV~ REII_A_RKS DErlsJTY C@!P~CTION (PCF) (X) ----- ---
121.07 93.1 Driveway
120.82 92.9 Pad
122.42 34.2 Slope
127.17 97.8 Pad
109.20 92.5 Pad
120.00 32.3 Pad
118.65 91.3 Pad
120.64 32.8 Pad
115.12 91.6 Pad
120.91 93.0 Pad
124.21 95.6 DriVeWay
110.32 85.0 Slope
111.77 86.0 Slope
j-
-
I I-
i_
I- ,
I
\- I ,- /
j-
‘-
d I :-
F c i- ) - I - a
APPENDIX C UNIFIED SOILS CLASSIFICATION
- I;, l
1,
-
1.
- . \
I :
t-
I 1
i- I
I :
j’-
I I i- i
, I
~1
i- j I- :I, 1_~
1
I -
I
I d -
I
I*
APPENOIX C
U?dlFlEO SOIL CLASSIFICATION SYSTEM
l 4 l :wm
lwfv: mu& -cc lumarr -IN* a>rr cL*IemmaT 48
KEV TO SAMPLE MT&
oww 0R rLtwmm’WEn) ’ * .. (P INMCATES PUSED)
541iQlE l?lxaaY SAMRER NRL 6RmiIC Loo
H) - S INCH SPLIT
TU8E SAMPLER
l-w - S IN04 THIN WAU OlSTINCT CONTACT ‘. SAMPLER n0 REWERY BETWEEN SOIL STRATI, ST - 2 INCH SIT
m SAMPLEll CPrOJK ~MAHCZ
C - ROCK CORE- 8E’MEEN SOL STRATI,
8 . - 8$KR~STURBE0 ’ WTTW OF 8ORlHO
__-- -__-- -- -~ -.~ ~~~. ,,y,clcm CA., e. .-es.-se..-.--. ---.-
!-
- /
;-
1 i- ,
I 1 ~--
1
-
-
I
i
/ -,
I
,-
j-
1
/
l
iL
-
,-
.
-:
I
‘.__ I \ ‘i VISTA