HomeMy WebLinkAbout; La Costa Plaza Shopping Center; Soils Report - Field Density Tests; 1973-01-17qeDIl,:,e ,
-.
,-
,-
.-
-
.-
.-
.-
.-
-
-
BENTON ENGINEERING, INC.
APPUED SOIL MECIIIN,CS .-~- FO”NO*TIONs
6717 C”N”O” COURT
SAN DIEGO. C*L,FORNIA 02111
P”lLlP HENKING BENTON
PIESlDLNT ClYlL LHGINLLII January 17, 1973 TELEPMONE ,714, 565.1856
La Cost0 Land Company
Costa Del Mar Road
Ranch0 La Costa, Collfornia 92008 RECEIVED
Subject: Project No, 69-12-23D
Fourth Interim Report JAN 1 9 1973
Results of Field density Tests
Taken in Trench Rackfill CITY OF CARLSBAD
La Costa Plaza Shopping Center Engineering DeWment
Northeast of El Carnina Real and La Costa Avenue
Carlsbad, California
Gentlemen:
This is to report the results of field density tests taken in soils placed as backfill over electrical
and sewer lines at the subject site. The tests were taken during the period between August 88
and August 17, 1972.
The approximate locations at which the tests were taken are shown an Drawing No. 1A and the
finol test results are presented as fallows:
Test.
No.
Depth
of Fill
at Test
In Feet
Maximum
Field DV DV
Moisture Denslty Density Percent
% dry wt lb/cu ft Ib/cu ft Compaction
Tests Taken in Backfill Over Electrical Duct
Remorks
1A
2A
1.0. 10.8 102.8 113.1 90.7
1.0* 8.7 102.5 113.1 90.5
l Indicates depth of fill over electrical duct or sewer pipe
-
.-
- SlOlO
.16.24
_~ _-
-
-
-
-
-
-
-
-
.-.
-
-
-
-
-
Proiect No. 69-12-230
La Costa Plaza Shopping Center
-2- Jonuary 17, 1973
Test
No.
Depth
of Fill
at Test
In Feet
Maximum
Field W DV
Moisture Density Density Percent
% dry wt Ib/cu ft Ib/cu ft Compaction
Tests Taken in Backfill Over Sewer Lines
1 2.0. 15.6 108.7 116.8 93.0
2 3.0* 16.1 110.4 119.1 92.8
3 4.0. 13.8 103.2 114.4 90.2
4 4.0. 15.5 104.1 113.9 91.4
5 6.0 l 13.1 107.7 116.8 92.2
6 5.0. 16.3 112.5 116.8 96.4
7 8.0. 14.3 110.7 118.2 93.6
8 6.0 e 16.2 108.5 118.2 91.7
9 9.0’ 15.6 103.3 114.4 90.2
10 10.0.. 12.7 98.8 116.8 84.5
11 5.0” 13.3 114.4 121.4 94.3
12 10.0 l * 15.7 98.3 113.9 86.4
13 10.0 ** 20.2 100.8 111.1 90.7
14 6.0. 12.5 107.4 119.1 90.2
15 4.0. 14.3 101.2 114.1 88.6
16 4.0. 16.7 103.7 114.1 90.7
17 4.0 14.8 102.6 114.1 90.0
18 8.0.. 12.3 111.6 116.8 95.6
19 6.0 l * 13.0 101.9 113.1 90.0
Remarks
Reworked
Reworked
Ck on 110 8 12
Reworked
Ck an f 15
* Indicates depth of fill aver electrical duct or sewer pipe
l ’ Indicates finished grade
LABORATORY TEST RESULTS
The maximum dry densities and optlmum moisture contents of the major fill materials as determined
by the A.S.T,M. D 155766T method, that uses 25 blows of a 10 pound mmmer falling from a
height of 18 inches on each of 5 layers in a 4 inch diameter l/30 cubic foot compaction cylinder,
are presented as followr:
Soil Description
Slightly clayey very fine sand, light brown and yellowish
Clayey very fine sand with clay binder, light gmy
Clayey very fine to fine sand, light brown ond light gmy
Slightly clayey very fine ta fine sand, light gray with
reddfsh brown
Maximum Optimum Mois-
Dry Density turn Content
Ib/cu ft % dry wt
114.4 13.1
116.8 12.5
115.0 13.1
121.4 10.6
Clayey very fine sond, Ilght gray and light brown
Clayey very fine sand yellowish brown
Clayey very fine sand, I ight yellowish brown
111.1 12.0
114.1 13.5
113.1 14.7
BENTON ENGINEERING. INC.
--
Project No. 69-12-23D
La Costa Plaza Shopping Center
Repectfully submitted,
- BENTON ENGINEERING, INC.
-
-
-
-
-3- January 17, 1973
BY&L!&
R. C. Rdmer
Reviewed by nd
V Pothier, Civil Engineer ” .
Distr: (4) La Costo Land Company
La Costa Land Company
(1) Attention: Mr. Burton L. Kmmer
(1) Attention: Mr, Irv Roston
(1) George R. Saunders 8 Associates
(2) Rick Englneerfng Company, Carlsbad
(1) City of Carlsbad
Engineering Dept.
RCR/PHB/prw
BENTON ENGINEERING. INC.