HomeMy WebLinkAbout; La Costa South Unit 2; Soils Report Final; 1970-02-24PHILIP HENKINa BENTON
PRL(IIDINT ClYlL IZNGINIC”
BENTON ENGINEERING. INC.
APPLIED SOIL MECliAN,C* - FO”No*TIONS
6745 EL CAJON BOULEVARD *AN DIEGO. C&LIFDRNIA es?,,5
February 24, 1970 *AN DILGO: 11*3-56m L* MESA: 468.se54
Ranch0 Lo Costa, Inc.
Route I, Box 2550
Encinitas, California 92024 -
Subject: Project No. 69-lo-ID
&d Rem&n
- Compacted Fii’led Ground
Lok 186 to 191, inclusive, ond
Lots 195 to 205, inclusive - La Costa South Unit No. 2 *
0
- Gentlemen:
This is to report the resul k of tests and observations mode in order to inspect the compaction
of fllled ground placed on certain areas of Lok 186 to 191, inclusive, ard 195 to 205,
Inclusive, of La Costa South Unit No. 2, San Diego County, California. The fills were
placed during the period between October 2 and October 24, 1969, with some final cleanup
In February, 1970.
The approximate oreas ond depths of filled ground placed under our inspection in occwdance - with the approved specificotlons ore shown on the attached Drawirg No. 1, entitled “Location
of Compacted Filled Ground.” The grodirg plan used for the placement of filled ground ~(1s
prepared by Rick Ergineeriw Company and dated August 12, 1969. -
The approximate locations at which the tesk were token and the final test resulk are presented
on pages 3 and 4, under the “Table of Test Resulk.” The laboratory determination of the
maximum dry demities and optimum moisture contenk of the major fill materials are presented
on poge 5, under the “Laboratory Test Resulk.” Sane of the maximum dry densi ties shown in
the “Table of Test Resulk” were combinations of these. The tests were taken during the weekly
periods indicated below:
Test Number Week Endig
1 October 4, 1969
2 to 31, inclusive October 11, 1969
32 to 54, inclusive October 18, 1969
55 to 70, inclusive October 25, 1969
71 February 20, 1970
SlOlO
.I?.87
-
-
-
-
-
Project No. 69-lo-1D
La Costa South Unit No. 2
-2- February 24, 1970
The final resulk of tesk and observations indicate that the ccmpacted filled grwnd has been
placed at 90 percent of the maximum dry demity or greater. it has been determined that the
fill moterlols, compacted to 90 percent of the maximum dry denlty, hove a safe bearlrg value
of at least 2090~pauds per square foot for one foot wide continuous footings founded at o
minimum depth and pieced five feet or more imide the top of compacted filled ground slopes.
If footigs ore pieced closer to the exposed slopes than 5 feet lmide the top of ccmpacted filled
ground slopes, these should be deefmned one foot below a 1 l/2 horlrontal to 1 vertical line
projected wtword and domward fra Q polnt 5 feet horizontally imlde the top of compacted
filled ground slopes. Tesk indicate that the compacted filled ground is adequate to satisfactorily
support the propceed one or two story wood frame dweliirgs without detrimental settlemenk.
In our report of the original Investigation conducted at this subdivision, (Proiect No. 69-3-24BC
doted May 22, 1969), w stated that sane “expansive” soils existed on the site and if they were
oiiowad to remain In the upper 3 feet below finished gmde sane of the iok would require
speclolly designed footirgs ard slobs. We further stated that these lok would be listed upon the
completion of gradig . &.&be lok were found to hove critically expamive roll remoinirg in
the upper 3 feet. -
It is recommended that the following spsciai design precautlom be token for the hwses to be
constructed in the subject subdivision.
1. Isolated interior piers shwld not be used. Continuous footings should be used
throughout, and these should be placed ct a minimum depth of two feet below the
lowest adjacent exterior final ground surface.
2. Reinforce and Interconnect c0ntinuousiy with steel bars all interior and exterior
footigs with two @4 bars at 3 inches above the bottan of oil footlgs and two 14
bon placed 1 l/Z inches below the top of the stems of the footings.
3. Use raised wood floors that span betwen contlnuws footings, or reinforce all
concrete slobs with 6 x 6 - lO/‘lO woven wire fabric and provide o minimum of
4 inches of clean sand beneoth all concrete slobs. Rovide a moisture barrier
2 inches below slobs under living areas.
4. Separate garage slabs frun perimeter footlrgs by l/2 inch thickness of construc-
tion felt or equivalent, to allow independent movement of garage slobs relative
to perimeter footirgs.
5. Provide positive droinoge awuy from ail perimeter footiqs to o horizontal distonce
of at least 6 feet wklde the house walls.
The safe bearing value for footigs on ~tural~+~rciii&B?s~%~pwrs& per square foot.
Respectfully submitted,
BENTON ENGINEERING, INC.
William G. Catlin, Civil Ergineer
BENTON ENGINEERING. INC.
-
-
-
-
-
-
-
-
-
Project No. 69-lo-1D
Roncho La Costo Swth Unit No. 2
-3-
TABLE OF TEST RESULTS
Test
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Approx- Depth
imate of Fill
Location ot Test
Lot No. inFeet
199
204F'
200F
203 F
199
199
199
204 F
200 F
203 F
199
200 R *
202R
199
201 R
186
186
187
186
200 R
202 R
203 F
189
188
190
189
188
190
189
187
186
187
Novorro Dr.
opp. 190
186
187
186
187
190
187
191
2.0 12.5 114.4 123.1 93.0
1.0 12.0 113.6 123.1 92.2
1.0 12.6 118.0 123.1 95.9
o-o.5 11.6 116.0 123.1 94.3 Natural Ground
4.0 11.9 113.5 123.1 92.3
6.0 13.9 113.3 122.8 92.3
8.0 15.2 113.8 122.5 92.9
3.0 13.2 117.2 122.8 95.6
3.0 14.3 115.2 122.8 93.8
1.0 14.6 111.8 122.5 91.3
10.0 10.3 120.1 126.3 95.1
2.0 10.2 110.4 122.5 90.2
2.0 10.0 116.0 123.0 94.3
12.0 12.6 124.5 129.6 96.1
2.0 11.5 120.2 129.6 92.8
2.0 12.7 118.2 129.6 91.3
4.0 12.3 119.2 129.6 92.0
2.0 10.9 116.2 126.5 91.9
8.0 10.8 117.2 126.5 92.7
6.0 9.8 125.7 129.6 97.0
6.0 9.0 126.1 129.6 97.3
3.0 13.9 117.8 122.5 96.1
2.0 8.4 116.0 126.5 91.7
4.0 9.5 119.5 129.6 92.3
3.0 8.3 111.1 123.5 90.1
6.0 8.3 122.8 129.6 94.9
8.0 8.4 111.8 123.1 90.7
7.0 15.7 112.1 123.1 91.0
10.0 14.2 113.2 122.5 92.5
6.0 6.6 111.7 122.8 91.0
12.0 7.1 111.1 122.5 90.7
8.0 a.7 109.8 119.0 92.3
1.0 13.9 119.9 129.6 92.6
14.0 8.2 115.8 123.5 93.7
10.0 7.5 116.5 123.5 94.4
16.0 8.2 123.4 129.6 95.2
12.0 8.7 119.2 125.4 95.2
11.0 18.7 108.5 119.9 90.5
14.0 14.2 112.5 123.1 91.3
1.0 13.3 104.8 114.6 91.5
* F= Front Lot
R= Rear Lot
Field DV Moisture Density
%dry wt Ib/cu ft
BENTON LNOINEERING. INC.
fibruory24, 1970
Maximum
DV Demity
Ib/cu ft
Percent
Compaction Remarks
-
-
-
-
-
-
-
-
-
-
-
Project No. 69-lo-1D
Ranch0 La Costa South Unit No. 2
-4-
Test
No.
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
Approx-
imote
Location
Lot No.
205
195 R l
196 F *
197 R
190
189
0 201 R
198
188
190
204F
189
Novarro Dr.
opp. 190
l F = Front Lot
R= f&or Lot
TABLE OF TEST RESULTS(CONT.)
Depth
of Fill
ot Test
in Feet
Maximum
Field
Moisture
% dry wt Ib/cu it
Dry Density
Ib/cu ft
Percent
Compaction Remarks
1.0 11.7 112.3 123.1 91.2
1.4 ** 13.7 117.5 123.1 95.5
2.4+* 13.5 110.0 122.5 90.0
2.5** 14.5 110.7 122.5 90.5
12.0 11.2 117.5 126.3 93.1
18.0 10.4 126.1 129.6 97.3 ,-
14.0 13.3 116.3 126.3 92.2
15.0 14.3 122.7 129.6 94.7
18.0 12.9 125.9 129.6 97.2
20.0 11.9 125.8 129.6 97.1 -
6.0 9.2 125.1 129.6 96.5
2.0 13.8 113.9 119.7 95.3
16.0 15.3 110.4 122.5 90.0
5.0 14.7 111.3 123.1 90.4
24.0 13.0 116.5 126.0 92.5 -
18.0 13.2 109.2 116.8 93.6
19.0 il.7 111.7 123.5 90.5
4.4 ** 11.2 117.3 126.0 93.0
10.0 ** 8.6 114.9 122.5 93.8
9.0** 9.7 128.0 129.6 98.8
15.0** 11.9 125.7 129.6 97.0
6.0** 11.2 116.1 124.7 93.2
28.0 13.3 111.8 123.1 90.8-
22.0 12.7 111.1 123.1 90.2-
20.5 ** 7.5 121.5 129.6 93.7
22.5** 13.2 113.9 124.7 91.4
22.0** 11.2 120.5 129.6 93.0
24.0'* 11.8 121.3 129.6 93.6-
31.0** 10.0 121.3 129.6 93.6 c
9.0** 12.3 119.2 129.6 92.0
5.0** 17.8 110.9 115.6 95.8
l + Finished Grade
BENTON ENGINEERING. INC.
February24, 1970
-
-
-
-
-
Proiect No. 69-lo- 1D
Ranch0 La Costa Swth Unit No. 2
-5- February 24, 1970
LABORATORY TEST RESULTS
The maximum dry demities and optimum moisture contenk of the major fill moterlals o deter-
mined by the A.S.T.M. D 155758T method, that uses 25 blow of CI 10 pound hammer follirrg
from a height of 18 inches on each of 5 loyen in a 4 inch diometer l/30 cubic foot ccmpoction
cylinder, ore presented os follow:
Soil Type
Brown silty cloy
Brown fine sandy cloy
Brown gravelly clayey fine to coarse sand
Brown gravelly slightly silty flne to coarse sand
Olive gray silty cloy
Maxlmum Optimum Mois-
Dry Density ture Content
Ib/cu ft % dry wt
123.1 10.9
122.5 11.4
129.6 8.9
123.5 8.0
110.6 15.7
-
BENTON ENGINEERING. INC