Subject: Project No. 65-3-l 9D
Final Report on
Compacted Filled Ground
Swimming Pool Areos Between
Conduninium Sites B and E, and Between
Condcminium Sites C and D, ond
Reor Portions of L
Gentlemen:
This is to report the results of tests and observations made in order to inspect the ccmpaction
of filled ground placed on certain portions of the swimming pool oreos between Condominium
sites B and E, between Condominium sites C and D, and on rear pations of Lots 45 ond 46,
Lo Costa Volley Unit No. 1, San Diego County, Colifomio.
The fil Is were placed during the period between March 1, 1965 and March 8, 1965.
The approximate areas and depths of filled ground placed under our inspection, in accordance
with the approved specifications, ore shown on the attached Drawing No. 1, entitled,
“Location of Compacted Filled Ground. ” The grading plan used fa the placement of filled
ground was prepared by Edward H. Fickett, A. I.A., Architect.
The approximate locations at which the tests were taken and the final test results are presented
on page 3 under the “Table of Test Results. ” The lobaatory determinations of the maximum
dry densities and optimum moisture contents cf the major fill materials ore presented on page 4
under “Laboratory Test Results. ” The tests were taken on the dotes indicated below:
Test Number Dote
1 to 4, inclusive March 1, 1965
5 to 7, inclusive March 3, 1965
8 to 12, inclusive March 4, 1965
13 to 17, inclusive March 8, 1965
SlOlO
.16.29
-
-
-
Project No. 65-3-19D
Lo Costa Volley Unit No. 1
-2- May 6, 1965
The final results of tests and cbservotions indicate that the compacted filled grwnd has been
placed at 90 percent of the maximum dry density or greoter. It has been determined that the
fill materials, compacted to 90 percent of the maximum dry density, hove o safe bearing value
of at least 1050 pounds per square foot for one foot wide continuous footings founded ot o
minimum depth and placed five feet or mere inside the top of compacted filled ground slcpes.
If footings ore placed closer to the exposed slopes than 5 feet inside the top of compacted
filled ground slopes, these shwld be deepened one foot below o 1 l/2 haizontol to 1 vertical
I ine projected outward and downward from o point 5 feet horizcntal I y inside the top. of com-
pacted filled ground slopes. Tests indicate that the ccmpacted filled ground is odequote to
satisfactorily support the proposed one-story wood-frame dwellings without detrimental
settlements.
Respectfully submitted,
BENTON ENGINEERING, INC.
By
M. V. Pothier, Civil Engineer
Distr. : (4) Addressee
(2) Directcr of Building Inspection .-
-
.-
-
-
BENTON ENGINEERINO. INC
Project No. 65-3-19D
La Costa Volley Unit No. 1
Test
No.
-
1
- 2
3 -
4
.- 5
6 -
7
- 8
9 -
10
- 11
12
13 - 14
15
16 - 17
-
-
-
-
Approx-
imate
Location
Swimming Pool
Area Ccnd. Site E
Swimming Pool
Areo Cond. Site E
Swimming Pool
Area Cond. Site D
Swimming Pool
Area Cond. Site D
Swimming Pool
Areo Ccnd. Site E
Swimming Pool
Areo Cond. Site E
Swimming Pool
Area Cond. Site E
Swimming Pool
Area Ccnd. Site E
Swimming Pool
Areo Cond. Site E
Swimming Pool
Areo Cond. Site E
Lot 46
Lot 45
Lot 45
Lot 46
Lot 46
Lot 45
Lot 45
-3- May 6, 1965
TABLE OF TEST RESULTS
Depth
of Fill Field
ot Test Moisture
in Feet o/o dry wt
1.0 16.6
3.0 13.7
2.0 15.4
4.0 15.4
2.0 16.6
.4.0 13.0
6.0 11.5
8.0 13.2
9.0 13.9
10.0 13.7
2.0 14.9
2.0 15.4
4.0 15.1
6.0 15.4
8.0 16.0
6.0 15.5
8.0 1 17.0
Dry
Density
I b/cu ft
Maximum
Dry
Density
Ib/cu ft
102.2 112.4
Percent
Compaction
90.8
110.8 116.0 95.4
108.4 115.8 93.6
109.8 115.8 94.8
105.6 117.1 90.0
116.0 118.2 98.1
105.5 117.1 90.0
113.4 118.2 95.8
109.2 118.2 92.3
109.5 118.2 92.7
111.2 118.2 94.1
112.2 118.2 94.8
107.8 118.2 91.2
107.2 118.2 90.6
108.7 118.2 92.0
106.9 118.2 90.4
109.9 118.2 92.9
BENTON ENOINEERING. INC.
Project No. 65-3-19D
Lo Costa Volley Unit No. 1
-4-’ May 6, 1965
LABORATORY TEST RESULTS
The maximum dry densities and optimum moisture contents of the major fill materials OS deter-
mined bye the A.A. 5. H. 0. T9957 method, modified to use 26 blows of o 10 pound hammer
falling from o height of 18 inches on each of 3 layers in o 4 inch diameter l/30 cubic foot - compaction cylinder, ore presented OS follows:
Maximum Optimum Mois- - Dry Density ture Con tent
Soil Type Ib/cu ft % dry wt
- Light groy silty fine sand 115.8 14.7
Olive fine sandy silt 109.1 18.5
Brown silty medium to coarse sand, 116.0 13.7 - scattered grovel
Light groy silty fine to medium sand, 118.2 12.8
cloy binder - Yellow-grey-brown clayey fine sond 119.4 12.3
-
-
-
-
BENTON ENOINEERING. INC.
--
-
-
-
-
-
.~
-
-
-
-
-
-
- -
-
4 ,i, NORTH -
L EGt-ND
O- hd;cofes Approrimofe “ert,Co, Depth OF Fi.//rd Ground ,n Feet
e - hdicotes Cut- f-,,‘N Line
/nd;cots Top of F,/‘Ned S/ape m; : /nd,cotrr Arpo 01 FiNed S,op~ /nd/cofes Toe of fi//rd S/we
@- /nd/cot@s Arro of Comporfrd FirNed Ground
sco/e : /X=80
LOCA~/ON Of COMPACTED F/f L ED GROUNL
A Porfion Of
RANCH0 LA COSTA Son Diryo COUS?t,V, Co/;Forn;o
PROJECT NO. DRAWING NO.
65-3-190 BENTON ENGINEERING, INC. /A