Subject: Project No. 64-6-18D
Final Report on
Gentlemen:
This is to report the results of tests and observations made in order to inspect the compaction
of filled ground placed on certain oreas of the following locations in or adjacent to La Costa
Valley Unit Nos. 1 and 2, Son Diego County, California.
-
,-
,-
-
-
-
,-
Unit No. 2 Lots 1, 2, 3, 5, and 6
Unit No. 1 Lots 45 to 50, inclusive
Lots 56 to 60, inclusive -:t /
,‘, ,-cm xr’
9
‘,Y
Lob 66 to 88, inclusive ’ ,~~~..
Lots 95 to 101. inclusive
~- i+’
Lots 110 and 111 </ I
Lots 113 to 119, inclusive
Lots 130 to 133, inclusive
Apartment Sites A, B, E, F, H, I, and J
Additional Lots below Lots 85 to 50, inclusive*
New Cabana Area odjocent to old Cabana Area No. 1”
Estrello De Mar Road opposite Lots 48, 49, 66, 67, 80, 95, 96, 97, 116,
118, and 120
Corocol Court opposite Lots 71, 73, 77, 78, 80, and
El Cunino Real opposite Lot 98, in the Encinitas area of Son Diego County
The fills were placed during the period between April 20, 1964 and October 19, 1964.
The approximate areas and depths of filled ground placed under our inspection in accordance
with the approved specifications are shown on the ottoched Drawing No. 1, entitled, “Locotidn
- of Ccmpocted Filled Ground”. The grading plan used for the placement of filled ground was
prepared by Engineering Service Corporation.
- The classification of the Lots with regard to expansive characteristics ore summarized on page 21.
* This area is not delineated on Drawing No. 1 because the limits of its extent ore not known. -
SlOlO
.16.28
i- ,;,‘w
-
Project No. 64-6-18D
Lo Costa Volley Unit Nos. 1 and 2
-2- November 25, 1964
The opproximote locations at which the tests were token and the final test results ore
presented on pages 3 to 17, inclusive, under “Table of Test Results*‘. In the tabulation,
Test Nos. 1 to 407, inclusive, refer to proposed building locations, Street Test Nos. I
to 35, inclusive, refer to proposed street locations, and Surplus Xoil Area Test Nos. 1 to
19, inclusive, refer too proposed surplus soil storage area at the extension of Algo Road.
The loboratory determinations of the maximum dry densities and optimum moisture contents
of the maior fill materials ore presented on pages 18 and 19, under “Laboratory Test Results”.
The tests were taken during the weekly periods indicated below:
-
-
-
-
-
-
-
-
-
-
-
-
-
Test Number Week Ending
1 to 10, inclusive, and Street Tests 1 to 3, incl’urive
11 to 21, inclusive, and Street Tests 4 to 7, inclusive
22 to 27, inclusive
28 to 60, inclusive
61 to 134, inciusive, and Street Tests 8 to 13, inclusive
135 to 183, inclusive, Street Tests 14 to 17and 20 to 22,
inclusive
184 to 234, inclusive, Street Tests 18, 19 and 23, inclusive
235 to 281, inclusive, Street Tests 24 to 26, inclusive
282 to 338, inclusive, Street Tests 27, 28 and 29
Surplus Soil Area Tests 1 to 4, inclusive
339 to 367, inclusive, Street Tests 30 to 35, inclusive
Surplus Soil Areo Tests 5 to 19, inclusive
368 to 405, inclusive
406 and 407
April 25, 1964
May 2, 1964
June 27, 1964
July 4, 1964
July 11, 1964
July 18, 1964
July 25, 1964
August 1, 1964
August 8, 1964
August 8, 1964
August 15, 1964
August 15, 1964
August 22, 1964
October 24, 1964
The final results of tests and observations indicate that the compacted filled ground has been
placed ot 90% of ,the maximum dry density a greater. It has been determined that the fill
materials, compacted to 90% of the maximum dry density, have a safe bearing value of at
least 1050 pounds per square foot for one foot wide continuous footings founded at a minimum
depth and placed five feet or more inside the top of compacted filled ground slopes. If
footings are placed closer to the exposed slopes than 5 feet inside the tq, of compacted filled
ground slopes, these should be deepened one foot below a 1 l/2 horizontal to 1 vertical line
projected outward and downward from a point 5 feet horizontally inside the tap of compacted
filled ground slopes.
Respectfully submitted,
BENTON ENGINARING, INC.
M. V. Pothier
cc: (2) Building Inspector
BENTON ENOINEERING, INC.
-
-
-
.-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costo Volley Unit Nos. 1 and 2
-3-
Approx-
imate
Location
or Lot No.
Depth
of Fill
at Test
in Feet
Field
Moisture
% dry wt
Test
No.
Density
lb/w ft
Maximum
Dry
Density
lb/w ft
Percent
Compaction Remarks
1 48 2 11.0 101.8 109.4 93.0
2 49 4 7.4 101.9 109.4 93.1
3 48 6 5.7 109.1 116.3 93.8
4 49 8 11.1 109.4 116.3 94.0
5 48 10 10.1 106.4 116.3 91.4
6 49 12 14.2 99.8 109.4 91.2
7 47 12 12,5 105.9 116.3 91.0
8 48 14 12.3 106.7 116.3 91.6
9 Apt. Site J 2 10.4 110.3 119.1 92.6
10 Apt, Site J 4 11*9 107.4 112.1 95.7
11 Apt. Site J 6 II,9 97.8 119.1 82.2
12 Apt. Site J 6 11.2 107.9 119.1 90.5
13 Apt, Site J 8 12.6 105.5 116.3 90.6
14 Apt, Site J 10 12,2 103.9 112.1 92.6
15 Apt. Site J 12 13.9 98.8 109.4 90.3
16 Apt. Site J 12 12.9 104.6 116.0 90.2
17 Apt. Site J 2 10.2 108.4 114.0 95.1
18 47 16 10.9 109"O 119.1 91,4
19 49 16 10.6 110.4 119.1 92.7
20 Apt. Site J 4 10.4 107,7 112.1 95-9
21 Apt. Site J 6 12.6 110.8 119.1 93.0
22 130 2 11.0 115.4 121.3 95.1
23 131 4 8.7 104.0 113.6 91.6
24 130 6 9.3 106.3 113.6 93.6
25 131 8 11.4 105.5 113.6 93.0
26 132 2 10.8 105.0 113.6 92.5
27 130 10 9.9 105.3 113.6 92.8
28 133 4 13,7 94.2 108.2 87.0
29 119 2 15.0 99,5 108-2 9108
30 133 4 16.1 98-9 108.2 91,4
31 118 4 10.7 108.0 119.4 90.4
32 119 6 14.1 101.1 111.3 90.9
33 117 6 10.3 108.9 119.4 91.0
34 118 8 11.3 106.4 117.3 90.6
35 96 2 10.4 109.5 121.9 90.0
36 96 4 15.4 100.8 108.2 93.2
37 96 6 15.5 99.7 108.2 92.0
38 95 8 19.3 104.2 111.3 93.6
TABLE OF TEST RESULTS
November25, 1964
Reworked
Check ar'#ll
Reworked
Check on #28
BENTON ENGINEERINO. INC.
-
-.
-
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costa Volley Unit Nos. 1 end 2
-4-
Approx-
imate
Location
OT Lot No.
Depth
of Fill
at Test
in Feet
Field
Moisture
% dry wt
Maximum
Dry
Test
NO.
Density
lb/w ft
Density
lb/w ft
Percent
Compaction Remarks
39 96 10 9.7 103.5 111.3 93.0
40 113 2 10-2 102,o 113.6 90.0
41 95 12 9.9 102.7 111.3 9202
42 II3 4 14.3 106.4 117.3 90.6
43 96 I4 13.2 loo.0 110.3 90.6
44 95 16 12.6 101.2 105.2 96.2
45 97 16 13-7 102,l 113.6 90.0
46 96 18 9.9 105.6 113.6 93.0
47 95 20 13.0 100.6 111.3 90.5
48 97 20 12.6 101-9 113.6 90.0
49 96 22 9.3 115.6 121.9 94.9
50 95 24 12.3 102.3 113.6 90.2
51 97 24 12.3 loo.2 109.8 91.3
52 95 26 10.4 104.6 113.6 9201
53 96 26 14.2 101.9 111.3 91.6
54 87 2 10.5 103.9 113.6 91.4
55 82 2 12.8 106.2 113.6 93.6
56 87 4, 13.5 97.4 108.2 90.0
57 82 4 13.3 103.7 113.6 91-4
58 76 2 1 1-o 109.2 119.4 91.5
59 119 10 12.7 111.9 119.4 93.7
60 117 10 10.9 102.2 113.6 90.0
61 116 4 8.0 101.0 108.2 93.2
62 115 2 9.1 103.0 108.2 95.1
63 114 2 9.9 97.8 108.2 90.4
64 115 4 15.4 107.9 119.1 90.4
65 116 6 Il.3 109.0 119.1 91.3
66 1 2 12.2 103,3 113.6 91.1
67 131 12 11.5 108.8 119.1 91.2
68 2 4 10.2 104.6 '113.6 92.0
69 130 12 13.6 103.3 113.6 91.1
70 115 8 8.8 110.1 119.1 92.5
71 5 1 9.0 116.6 119.1 97.8
72 6 3 8.7 109.4 119.1 91.9
73 133 4 12.9 97.5 108.2 90.1
74 133 6 11.1 97.7 108.2 90.3
75 133 8.2 9.0 107.5 119.1 90.2
76 5 5.5 8.3 109.6 116.2 94.3
TABLE OF TEST RESULTS(CONT.)
November 25, 1964
At Grade
At Grade
BENTON ENGINEERING. IN‘
Project No. 64-6-18D
Lo Costo Valley Unit Nos. 1 and 2
-5-
Test
No.
Approx-
imate
Location
or Lot No.
Depth
of Fill
at Test
in Feet
Field
Moisture
% dry wt
Dry
Density
Ib/‘cu fi
Maximum
Dry
Density
Ib/cu ft
Percent
Compact ion
77 6 5.8 7.7 117.8 121.2 97. 1
78 87 6 11.8 102.0 108.2 94.2
79 88 10 9.2 99.0 108.2 91.4
80 88 13.3 11.4 105.7 116.2 90.9
81 132 7 8.3 10805 119. I 91.2
82 118 12 8.7 117.8 119.1 98.8
83 117 12 11.1 105.2 113.6 92.8
84 97 28 10.1 loo,3 108.2 92.8
85 98 2 9.6 101.2 105.2 96.2
86 77 10 11.1 106.1 113.6 93.5
87 99 4 16.2 93.4 105.2 88.6
88 98 6 10.5 98.0 113.6 86.2
89 98 6 16.4 96.1 105.2 91.5
90 98 8 11.2 107.9 119.1 90.5
91 83 2 13.2 99.0 108.2 91.5
92 81 4 14.6 50.7 116.2 78.0
93 81 4 7.4 116.0 121.2 95.7
94 82 6 8.8 111.2 121.2 91.7
95 84 4 9.3 117.2 121.2 96.7
96 78 4 12.8 9%.‘1 108.2 90.6
97 76 4 7.1 107.0 116.2 92.0
98 83 8 9.8 121.7 125.2 97.2
99 81 8 8.0 113.7 121.2 93.8
100 77 6 9.9 105.5 116.2 90.8
101 84 8 9.2 109.5 116.2 94.2
102 83 12 9.8 114.5 121.2 94.4
103 85 2.2 9.3 11.4 121.2 92.0
104 75 2 8.6 99.1 108.2 91.6
105 83 16 10.3 105.9 116.2 91.1
106 72 2 12.5 111.0 116.2 95.5
107 74 2 8.3 115.5 121.2 95.3
108 77 IO 10.8 106.3 116.2 91.4
109 76 8 8.3 112.9 121.2 92.9
110 75 6 9.4 109.7 116.2 94.3
111 74 6 7.9 114.9 116.2 98.8
112 76 12.8 11,l 109.6 121.6 90.0
113 77 12.5 13,6 loo.7 108.2 92.8
114 78 8.1 11.5 97.7 108.2 90.3
TABLE OF TEST RESULTS (CONT.)
November 25, 1964
Remarks
At Grade
At Grade
At Grade
At Grade
At Grade
Reworked
Reworked
Check on #88
Rewaked
Check on #92
At Grade
At Grade
At Grade
At Grade
BENTON ENOINEERING. INC.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costa Volley Unit No:. 1 and 2
-6-
Approx- Depth
imate of Fill
Test Location at Test
No. or Lot No. in Feet
115 73
116 79
117 80
118 80
119 75
120 72
121 97
122 99
123 Apt. Site E
Opp. Lot 96/97
124 Apt, Site E
opp. Lot 95
I25 Apt. Site A
Opp, Lot 98
126 Apt. Site E
Opp. Lot 96
127 Apt, Site A
Opp. Lot 98
128 Apt. Site E
Opp. Lot 96
129 Apt. Site A
Opp. Lot 98
130 74
131 80
132 73
133 79
134 Apt. Site E
Opp. Lot 96
135 74
136 84
137 82
138 83
139 82
140 82
141 72
142 87
143 95
144 70
6 8.5 102.2 108.2 94,4
4 8.7 109.3 121.6 90.0
2 8.9 111.2 116.2 95.6
4 10.8 102.0 116.2 87.8
9.6 9.7 106.7 116.2 91.8
6 6.7 109.7 116.2 94.3
30 8.4 111.1 119.1 93.2
4 12.9 99.8 116.2 85.9
2 18.5 98.4 108.2 90.6
2 9.6 99.4 105.2
2 12.5 102.5 113.6
94.4
90.3
4 13.5 107.2 119.1
4 11.2 99.3 110.3
90,O
90.0
6 10.3 96.6 105.2 91.6
6 17.6 106.1 116.2 91.5
10 6”6 110.1 121.2 90.8
A 7.8 112.5 116.2 96.7
10 11.7 105.9 116.2 91.1
6 11.0 101.9 110.3 92.3
8 7.4 102-4 116.3 88.1
12.2 9.5 105.2 110.3 95.3
12.6 9.3 107.7 116.2 92.5
10 8.2 Ill.4 116.2 95,9
20.8 11.6 112.8 116.2 97.0
14 10.9 99.6 108.2 92.0
16 9.7 108.2 119.1 90%.7
8 13.3 102.5 113.6 90.2
8 10.3 1 lo,2 118.2 93.2
24 12.2 11203 118.2 95.0
2 9.7 115.0 124.9 92.0
TABLE OF TEST RESULTS (CONT.)
Field
Moistlxe
% dry wt
Dry
Density
lb/w ft
Maximum
Dry
Density
lb/c” ft
November 25, 1964
Percent
Compaction Remarks
Reworked
At Grade
Reworked
Check on #l I8
Reworked
At Grade
At Grade
At Grade
At Grade
BENTON ENGINEERING. INC.
-
,-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-I8D
La Costa Valley Unit Nos. 1 anr: 2
-7-
Approx-
imate
Test Location
No. or Lot No.
Depth
of Fill
ot Test
in Feei
Field
Moisture
% dry WI
Dry
Maximum
Dry
Density
Ib/cu ft
Density
Ib/cu ft
Percent
Compact ion
I45 71 4 12.4 110.8 118.2 93.7
146 86 3 7.1 110.1 118.2 93.1
147 72 12 9,3 Ill.4 119.0 93.6
148 70 6 10.0 113.5 119.0 95.3
149 79 8 11.9 93.8 113.6 82.5
150 Apt. Site E 8 10.6 96.1 113.6 84.5
151 Apt. Site E 8 17.1 107.2 119.1 90.1
152 Apt. SiteE 8 12.2 100,.3 110.3 91.0
153 Apt. Site E 8 16.6 99.2 110.3 90.0
154 Apt. Site E 10 8.6 109.4 121.8 90.0
155 Apt. Site E 10 12.7 104.7 113.6 92.2
156 Apt. Site E 10 10.1 102.9 110.3 93.2
157 Apt. Site E 12 12.0 110.1 119.1 92.5
158 Apt- Site E 12 16.7 103.1 113.2 91.2
159 Apt. Site E 12 17.4 99.4 110.3 90.0
l&l 79 8 8.6 108.6 113.6 95.6
161 72 14 10.0 117.2 123.2 95.1
162 72 16 10.0 111.4 123.2 90.4
163 73 12 14.6 loo.5 108.2 92.8
164 71 6 13.0 114.7 123.2 93.1
165 72 20.1 10.2 121.1 123.2 98.2
166 80 8 10.0 112.3 115.7 97.0
167 79 .I2 13.3 104.4 115.7 90.2
I68 80 12 12.9 111.2 123.2 90.2
169 79 14 13.0 107.8 115.7 93.1
170 Apt. Site E 14 12.6 105.2 116.2 90.5
171 Apt. Site E 14 16.1 100.4 110.2 91.0
172 Apt. Site B 14 8.4 108.6 115.2 94.1
173 Apt. SiteE 16 12.6 110.0 117.6 93.5
I74 Apt. Site E I6 13.3 107. I 119.1 90.0
175 Apt. Site A I6 12.2 103.6 113.6 91.1
176 99 4 13.3 102.2 113.6 90.0
177 99 8 8.1 104.2 113.6 91.7
178 99 10 12.3 105.8 116.2 91.0
1~79 99 12 12.1 114.2 123.2 92.8
180 99 14 13.4 103.4 113.2 91.3
181 99 16 17.6 106.2 113.6 93.5
TABLE OF TEST RESULTS (CONT.)
November 25, 1964
Remarks
At Grade
Reworked
Reworked
Check On #134
Check on #150
Check on #149
At Grode
Check on @7
and #I22
BENTON ENGINEERING. INC.
-
-
-
,-
,-
-
,-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costa Valley Unit Nos. 1 and 2
-8- November25, 1964
Approx-
imate
Test Location
No. or Lot No.
182 99
183 3
184 101
185 113
186 111
187 109
188 110
189 101
19U 113
191 100
,192 80
193 79
194 70
195 71
196 70
197 80
I98 69
199 67
200 68
201 71
202 81
203 67
204 69
205 70
206 80
207 Apt. Site A
208 Apt. Site B
209 68
210 Apt. Site A
211 71
212 Apt. Site B
213 Apt. Site A
214 Apt. Site A
215 Apt. SiteB
216 Apt. Site A
217 66-67
218 69
219 70
TABLE OF TEST RESULTS(CONT.)
Depth
of Fill
at Test
in Feet
Field
Moisture
% dry wt
I8 10.8
2 12.7
1 18.9
6 10.0
1 11.4
1 13.9
2 9.7
3 9.6
8 16.7
2 17.5
16 11.6
18 8.8
8 14-o
10 8.0
12 10.6
20 12.3
2 11.6
2 12.9
4 15.3
I4 13.5
10 15.3
6 16.7
6 17.3
16 14.0
22 19.0
10 16.9
16 16.7
8 18.3
12 13.0
18 16.1
18 18.1
14 14.7
14 14.0
20 13.3
16 7.8
10 13,4
10 12.5
18 14.1
Dry
Density
Ib/cu ft
100.9
112.6
93.0
106.8
101.2
94.1
98.8
100.8
101.9
100.6
114.7
105.8
111.5
111.0
113.5
119.6
113.9
102.5
109.4
115.0
107.2
106.9
103.8
103.7
106.5
104.0
102.5
105.2
107.3
102.7
104.0
97.3
112.8
10600
115.2
103.2
110.1
111.0
Maximum
Dry
Density Percent
Ib/cu ft Compaction Remarks
110.3 91.5
123.2 91.3
99.3 93.6
116.2 91.8
110.3 91.8
99.3 94.8
104.8 94.3
104.8 96.0
113.2 9Q,O
110.2 91.2
123.2 93.0
115.7 91.3
123.2 90.5
115.7 95.8
123.2 92.1
123.2 97.0
120.0 94.7
113.5 90,2
116.0 94.3
123.2 93.3
116.0 92.4
111.3 96.0
111.3 93.2
111.3 93.0
Ill.3 95.6
111.3 93.5
113.6 90.2
112.6 93-5
115.1 93.2
111.3 92,2
111.3 93.3
111.3 87.4
114.0 98.7
115.1 92.0
120.0 96.0
113.6 90.7
120.0 91.7
120,o 92.4
At Grade
Rewrwked
Check on #213
BENTON ENGINEERING. INC.
,-
-
.-
-
-
-
-
-
-
-
-
-
-
Project No, 64-6-18D
Lo Costa Valley Unit Nos. 1 and 2
-9-
Approx- Depth
imate of Fill
Test Location at Test
NO. or Lot No. in Feet
Field
Moisture
% dry wt
Dry
Maximum
Dry
Density
lb/w ft
Density
I b/w ft
Percent
Compaction Remarks
220 81 14 11.0 109” 1 115.1 94.8
221 Apt. Site 8 22 10.6 106.9 117.1 91.2
222 Apt. Site A 18” 11,9 109,5 117.3 93.2
223 82 18 16. 1 109.4 115.8 94.4
224 68 12 14.3 110.0 119,l 92.4
225 66-67 14 15.4 103.1 110.3 93.4
226 69 14 14.4 111.8 119.1 93.7
227 Apt. Site F 2 12.6 105.2 115.8 90.8
228 Apt. Site F 4 13-o 109.2 115.8 94.3
229 Apt. Site F 6 13.5 110.7 115.8 95.5
230 68 16 12.8 104,2 115.1 90.4
231 70 20 13,9 107.7 115.1 93.5
232 Apt. Site F 8 12.4 105.0 111.3 94.3
233 Apt. Site F 2 13.7 112.1 115.1 97.3
234 81 16 17.8 106.5 115.1 92.5
235 Apt. Site F 10 17.3 108.0 114.0 94.6
236 Apt. Site F 4 14.1 106.7 114.0 93.5
237 68 18 18.8 103.6 114.0 90.9
238 69 18 w.5 103.8 115.1 90. I
239 Apt. Site F 12 14.5 103.8 114.0 91.0
240 Apt. Site H 2 15.6 102.3 115.6 88.5
241 66-67 20 11.4 111.5 114.0 97,7
242 Apt. Site F 14 12.5 103.8 114.0 91.0
243 71 20 13.2 110.1 119.0 92.4
244 Apt. Site F 16 13-I 106.2 111.3 95.4
24.5 70 22 16.7 101.5 112.4 90.3
246 69 20 16.2 108.7 116.6 93.1
247 Apt. Site F 18 12.6 104.0 112.4 92.5
248 68 20 11.6 104.3 116.0 90.0
249 Apt. Site H 2 11.6 102.8 114.0 90.2
250 Apt. Site J 16 10.6 loo.7 116.2 86.6
251 Apt. Site J 14 10.3 105.0 116.2 90.4
252 Apt. Site J 16 ,13.7 104.5 116.2 90.0
253 Algo Street 8 14.1 10308 111.9 92.6
254 Apt. Site F 2 14.3 107.3 115.2 93.0
255 Apt. Site F 4 17.3 106.0 111.9 94.6
256 Apt. Site J 18 11.8 101.7 111.9 90.8
257 Apt. Site J 16 8.6 103.9 108.2 96.0
TABLE OF TEST RESULTS (CONT.)
November 25, 1964
At Grade
Reworked
Check QI #24U
Reworked
Check on #250
BENTON ENGINEERINO. INC.
.-
.-
-
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
Lo Costa Volley Unit Nos. 1 and 2
-lO-
Approx- Depth
imnte of Fill
Test Location at Test
No. or Lot No. in Feet
Field
Moisture
% dry wt
258 Apt. Site J 10 10.7
259 Apt. Site J 20 9.0
2&l Apt. Site J 18 12.9
261 Apt. Site J 12 11.4
262 Apt. Site H 4 16.2
263 Apt. Site F 6 12.5
264 Apt. Site H 6 13.4
265 73 14 8-O
266 Apt. Site H 8 10.2
267 Apt. Site J 22 7.7
268 Apt. Site J 20 9.8
269 Apt. Site J 14 9.2
270 Apt. Site F 8 15.6
271 Apt. Site H 10 14.2
272 Apt. Site H 12 14.0
273 Apt. Site J 24 12-2
274 Apt. Site J 22 11.6
275 Apt. Site J 16 7.7
276 Apt. Site H 14 1801
277 Apt. Site H 16 11-9
278 Apt. Site J 26 12.1
279 Apt. Site J 24 11.0
280 Apt. Site J 18 9.9
281 Apt. Site H 18 17.6
282 Apt. Site H 20 17,o
283 Apt. Site H 22 9.4
284 Apt. Site J 28 13.8
285 ‘Apt. Site J 26 11,2
286 Apt. Site J 20 9.8
287 48 18 9.6
288 57 2 8.9
289 70 * 24 13.1
290 47 20 10.4
291 49 20 10.8
292 46 2 10.9
293 57 4 12.8
294 57 6 17.2
295 57 8 16.0
* Swell
TABLE OF TEST RESULTS (CONT.)
Dry
Maximum
Dry
Density
Ib/cu ft
Density
lb/w ft
Percent
Compaction Remarks
107.8 113.6 94.7
106.8 113.6 94-o
105.9 113.6 93.2
100.6 108.2 92.8
107.8 114.0 94.5
107.8 115.8 93*0
10408 114.0 91.8
95.5 103.4 92-2
101.8 111.3 91.4
101 :o 108.2 93,3
101.9 108.2 94.0
105.7 116.2 90.8
108.2 115.8 93,4
108.3 115.8 93.5
110.2 115.8 95.1
106.8 115.8 92.0
110.5 118.7 93.0
101.5 107.4 94.4
102.3 113.5 90.3
107.5 114.9 93.5
104.3 115.2 90.5
10402 115.8 90.0
111.3 113.6 97.9
101 .o 109.1 92.5
108.6 114.2 95.0
114.0 121.6 93.8
108.7 116.2 93,s
101.2 108.7 93.1
98.4 108.7 90.3
100.4 109.4 91.8
10708 114.0 94.5
102.9 114.0 90.2
98.4 108.2 PO.8
99,o 108.2 91.5
104.0 108.2 96.0
108.9 119.0 91”4
102.5 110.0 93.0
106.6 114.0 93.4
November 25, 1964
At Grade
BENTON ENGINEERING. INC
.-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
Lo Costa Volley Unit Nos. 1 and 2
-ll-
Approx-
imate
Test Location
No. or Lot No.
296 48
297 56
298 48
299 49
300 Apt. Site J
301 Apt. Site J
302 Apt, Site J
Alga Street
303 57
304 56
305 57
306 Apt. Site J
307 Apt. Site J
308 Apt. Site J
309 56
310 56
311 57
312 56
313 Apt, Site J
314 Apta Site J
315 Apt. Site J
316 58
317 Apt. Site J
318 Apt. Site I
319 58
320 59
321 Apt, Site 1
322 Apt. Site I
323 80
324 80
325 80
326 Apt. Sit:: I
327 Apt. Site I
328 Apt” jite J”
329 Apt. Site J
330 Apt. Site I
331 Apt0 Site I
*Swell
TABLE OF TEST RESULTS (CONT.)
Depth
of Fill
at Test
in Feet
Field
Moisture
%drywt
Dry
Density
I b/cu ft
Maximum
Dry
Density
Ib/cu ft Compaction Remarks
22 800 102.9 113.6 90.5
10 16.1 104.3 112.0 93.1
24 13.9 108.0 119.0 90.7
26 8.8 104.7 113.6 92.1
30 13,7 101.7 110.0 92,3
28 11.7 102.6 113.6 90.3
22 12-l 100.7 107.4 93.7
12 16.4 106.8 115.8 92.0
14 16-4 105.0 115.8 90.5
16 15.7 100.3 107.4 93.3
32 11 .o 110.0 115.8 95.0
30 lo,4 107.2 115.8 9205
24 17,3 102,o 111.3 91.6
18 14.2 95.8 104.6 91.6
20 10.0 99.1 104.6 94.7
22 10.7 97.6 104.6 93.4
24 11,2 112.3 123.2 91.1
34 11.4 107”5 119.1 90.1
32 8.6 99” 4 108.8 91.2
26 11.8 107.3 119.1 90.0
2 14.2 9808 119.1 83.0
36 8,8 103.2 113.6 90,8
2 11.1 102.5 110.3 92.9
2 6.4 109,o 119.1 91.4
4 5-9 111.3 119.1 93.4
4 13.9 101.1 111,2 90.8
2 14.7 100.4 115.3 87.0
2 15.0 108.4 118-2 91.7
4 14.2 107.6 118.2 91.0
6 13.7 106.4 109.1 97.4
2 14.9 105.2 111.3 94.4
6 12.4 105.9 117.4 90.2
33 13.2 109.5 119.1 91.9
38 8.8 109.6 119.1 92.0
t: 13.4 109.3 120.0 91.2
8 12-8 108.3 120.0 90.2
November 25, 1964
Reworked
Check on $316
Reworked
Check on #322
BENTON ENGINEERINO. INC
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costa Volley Unit Nos. 1 and 2
-12-
Approx-
imgte
Test Location
No. or Lot No.
332 Apt, Site H
333 87
334 82
335 81
336 79
337 79
338 71
339 Apt, Site I
340 Apt. Site I
341 57
342 58
343 58
344 56*
345 57
346 Apt. Site H
347 Apt. Site H”
348 Apt. Site J*
349 Apt. Site J
350 Apt. Site J
351 Apt. Site I
352 Apt. Site I
353 Apt. Site I
354 Apt. Site I
355 Apt, Site I’
356 Apta Site I
357 Additional Lots
Behind 85 -90
358 Additional Lots
Behind 85-90
359 Additional Lots
Behind 85-90
360 Additional Lots
Behind 85-90
361 Additional Lots
Behind 85-90
*Swells
TABLE OF TEST RESULTS (CONT.)
Depth
of Fill
at Test
in Feet
Field Dry
Moisture Density
% dry wt lb/w ft
Maximum
Dry
Density Percent
I b/cu ft Compaction
24 10.3 104.6 113.6 92.0
10.9 16.9 104.1 115.8 90,o
23.5 12.2 99.0 116.1 85.3
17.8 10.7 111.7 119.1 93.7
2c lC.7 104.5 110.5 94-4
22 10.6 95.4 99.3 96.0
22.3 14.9 106.4 115.8 91.8
10 13.7 110.2 119.5 92.2
10 11.4 104.5 115.8 90.2
26 11.5 116.2 123.2 94.4
6 11.8 104.5 115.8 90.2
8 12.7 99.8 110.0 90.7
28 12.4 113.3 123.2 92.0
30 13.8 112.7 121.1 93.0
24 14,4 109.2 121.1 90.1
26 13.9 114.0 123.2 92.4
40 12.3 110.3 121.1 91.0
40 12.1 107.7 119.1 90.4
34 10.6 115.5 123.2 93.6
12 18.8 103.2 111.3 92.7
12 13.9 112.5 123.2 91.2
14 15.4 101.1 112.4 90.0
14 8.1 104.5 115.8 90.2
16 2004 101.3 109.1 92.7
16 14.3 114.3 124.9 91.5
2 8.7 109.3 118.6 92.2
2 11.8 109.6 118.6
4 13.7 112.4 123.2
4 11.2 105.2 114.0
2 12.0 119.0 124.9
92.4
91.1
92.2
95.3
November 25, 1964
Remarks
At Grade
At Grade
At Grode
At Grade
At Grade
At Grade
At Grade
BENTON ENGINEERING. INC
-
.-
-
-
-
-
-
-
-
-
Project No, 64-6-18D
Lo Costa Valley Unit Nca. 1 and 2
-13-
Approx- Depth
imate of Fill
Test Location at Test
No. or Lot No. in Feet
362 Additional Lots 2
Behind 85-90
363 Additional Lots 4
Behind 85-90
364 Additional Lots 4
Behind 85-90
365 Additional Lots 6
Behind 85-90
366 Apt. Site I* 18
367 Apt. Site I* 18**
368 Additional Lots 6
Behind 85-W
369 Additional Lots 6
Behind 85-90
370 Additional Lots 8
Behind 85-90*
371 Additional Lots 8
Behind 85-90
372 Additional Lots 1C
Behind 85-90
373 Additional Lots 6
Behind 85-90*
374 Additional Lots 10
Behind 85-90
375 Apt. Site J’ 42
376 Apt. Site J* 42
377 Apt. Site J’ 36
378 70* 26
379 6P 22.4
380 68* 22.9
381 67* 22
382 66* 18.5
383 59* 6
384 50 2
335 49 28
386 48 26
*Swells
**At Grade
TABLE OF TEST RESULTS (CONT.)
Field
Moisture
o/c dry wt
Dry
Maximum
Dry
Density
lb/w ft
Density
lb/w ft
Percent
Compaction Remarks
14.5 103.2 111,3 92.7
16.2 107.9 119.1 90.5
9.7 106.2 115.8 91.6
14.2 106.8 116.5 91.6
16.3 102.5 116.5 87.9
16.3 112.5 119.1 94.3
10.7 106.2 114.0 93.1
19.2 99.0 109.6 90.3
13.6 119.2 123.2 96.7
11.1 lC5.8 115.8 91.5
12.7 lC3.0 111.1 92.6
13.1 108.6 115.8 93.8
10.7 101.8 111.1 91.5
15.8 106.5 115.7 92.0
15.1 101.4 112.4 90.2
23.0 94.5 108.2 87.4
14.3 107.0 111.3 96.0
16.3 105.8 111.3 94.9
15.c ICY.0 114.1 95.5
14.5 105.7 111.5 94.8
17.3 106.0 109.1 97.0
11.7 102.3 115.8 88.3
11.3 107.9 116.2 92.7
11.0 103.1 114.0 90.4
11.1 104.0 113.6 91.5
November 25, 1964
Reworked
Check on #366
At Grade
At Grade
At Grade
Reworked
At Grade
At Grade
At Grade
At Grade
At Grade
Reworked
At Grade
At Grade
BENTON ENGINEERING. INC.
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costa Valley Unit Nos., 1 and 2
-14-
Approx-
imoto
Test Location
No. or I.,ot No.
387 47
388 45
389 46
390 46
391 Apt. Site B
392 Apt. Site H
393 Apt. Site H
394 Apt. Site J
395 Apt. Site I
396 Apt. Site F
397 Apt. Site F
398 Apt. Site F
399 Apt. Site F
400 New &bona
Area Adi. to
Old #I
401 New Cabana
Area Adi. to
Old #I
402 New Cabana
Area Adi. to
Old 81
403 New Cabano
Area Adi. to
Old #I
404 New Cabono
Area Adi. to
Old #l
405 New Cabana
Area Adj. to
Old #l
406 59
407 82 1
**At Grade
TABLE OF TEST RESULTS (CONT.)
Depth
of Fill
at Test
in Feet
Dry
Density
lb,‘cu ft
111.8
104.5
107.5
109.7
107.1
,109.9
102.5
109.3
113.5
107.7
109.8
106.6
98.2
110.0
Maximum
Dry
Density
Ib/cu ft
22
4
6
8
24
28
28
36*’
18**
IO
12
14
20
1
Field
Moisture
% dry WI
9.8
8.4
12.0
11.3
11.0
14.6
11.7
18.1
16.4
13.1
12.1
15.7
14.5
9.5
119.1
113.6
119.1
119.1
117.3
120.2
113.2
118.2
118.2
119.0
119.0
116.0
108.2
119.0
Percent
Compaction Remarks
93.8
91.9
90.2
91.9
91.3
91.3 At Grade
90.4 At Grade
92.4 Check on ff377
96.0
90.4
92.0
91.8 At Grade
90.7 At Grade
92.4
3 9.1 95.6 104.8 91.3
5 10.5 98.0 104.8 93.4
5 10.7 94.9 104.8 90.5
7 8.8 110.3 114.0 96.7
7 8.5 114.5 123.2 93.0
6 ** 10.5 99.0 106.7 92.8 Check on #383
23.5” 14.5 104.2 114.0 91.3 Check on #334
November 25, 1964
BENTON ENGINEERINO. INC.
-
-
-
-
-
-
-
-
.-
-
-
-
-
Project No, 64-6-18D
Lo Costa Valley Unit Nos. 1 and 2
-15-
Street
Test
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Approx- Depth
imate of Fill
Locat ion at Test
or Lot N,. in Feet
Eztrelio De Mar
opp. Lot 48
Eztrello De Mar
opp. Lot 48
Estrella De Mar
opp. Lot 48
Estrello De Mar
opp. Lot 48
Estrella De Mor
opp. Lot 48
Estrella De Mar
opp. Lot 48
Estrello De Mor
opp. Lot 48
Opp. Lot 96
Opp. Lot 96
Carcol Court
opp. Lot 78
Corcol Court
Opp. Lot 80
County No, 1
Estrella De Mar
opp. Lot 97
County No. 2
Estrella De Mar
opp. Lot 95
Estrello De Mar
Opp. Lot 116
Estrella De Mar
Opp. Lot 118
Estrella De Mar
opp. Lot. 170
Estrella De Mar
opp. Lot 98
El Comino Real
opp. Lot 98
2
4
6
8
10
12
14
2
2
2
2
Field Dry
Moisture Density
% dry wt Ib/cu ft
10.9 104.1
9.7 106.3
11.3 106.7
10.9 111.0
11.5 101.0
13.9 107.3
13.2 104.3
8.6 90.9
9.7 100.2
10.0 112.2
12.6 108.5
11.1 103.9
Maximum
Dry
Density
I b/cu ft
113.6
116.3
116.3
119.1
110.6
119.1
112.1
105.2
105.2
119.1
113.6
114.6
Percent
Compaction Remarks
91.6
91.3
91.7
93-2
91.3
90.1
93.0
86.3 Reworked
95.1 Check on #8
94.2
95.5
90.7
14.4 105.5 116.2 90.7
2 14.8 103.3 113.6 91.1
2 12.8 102.3 113.6 90.1
2 10.4 110.2 119.1 92.5
2 16.4 100.2 111.3 90.0
4 14.4 99.3 110.2 90.1
TABLE OF TEST RESULTS
November 25, 1964
BENTON ENGINEERING. IN.2
-
,~
-
-
-
-
-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
Lo Costa Volley Unit Ncs* 1 and 2
-16- November 25, 1964
Approx-
Street itiatc
Test
NO.
Location
or Lot No.
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Depth
of Fill
at Test
in Feet
El Comino Real
opp. Lot 98
Carocol court
opp. Lot 73
Caracol court
opp. Lot 77
Coracol court
Opp. Lot 80
Caracol court
opp. Lot 71
El Camino Real
Opp. Lot 98
Estrella De Mar
Opp. Lot 81
Estrella De Mar 5
opp, Lot 66/67
Estrello De Mar 18
opp. Lot 48
opp. Lot 47 18
Alga street 14
Algo Street 13
Alga Street 4
Alga Street 4
Alga Street 8
Alga Street 12
Alga Street 8
TABLE OF TEST RESULTS (CONT.)
Field
Moisture
o/ dry WI
Dry
Maximum
Dry
Density Density Percent
lb/w ft I b/w ft Compact ion RemUrk,
13,4 111.5 119.1 93.5
10.7 110.0 118.2 93.0
9.1 111.8 118.2 94.4
10.0 113.5 119.0
19.1 102.3 111.3
95.3
91.9
14.1 107.5 114.5 93.8
13.9 105.0 111.3 94.2
13.5 105.2 112.6 93.4
15.4, 96.6 108.8 88.6 Reworked
13.7 108.2 113.6 95.3 check on #27
11.6 102.9 113.6 90.5 sto. 8+78
13.5 107.c 116.1 92.1 sta. 7+65
16.8 105.5 109.1 96.6 sta. 7+65
13.6 108.2 114.0 94.9 sta. 8+50
14.6 111.1 114.0 97.5 sto. 71-M)
14.5 109.2 119.4 91.5 sto. 7+60
14.6 103.0 109.1 94.4 sto. SW
-
BENTON ENGINEERING. INC
-
-
-
-
-
-
-
-
-
-
-
-
-
-. -
-
Project No. 64-6-180
Lo Costa Volley Unit Nos. 1 and 2
-17- November 25, 1964
TABLE OF TEST RESULTS
Surplus
Soil
Area
Test
No.
Approximate Depth
Distance From of Fill Field
East End of at Test Moisture
Alga Rood
1 300’ E. 50’ S.
2 300’ E. 170’S,
3 200’ E. 150’ S.
4 200’E. 60’ S.
5 250’ E. 50’ 5.
6 250’ E. 160’ 5.
7 190’ E. 150’ 5.
8 250’ E. 71)‘s.
9 125’ E, 90’ S.
10 300’ E, 50’s.
11 125’ E. 100’s.
12 250’ E. 140’ 5.
13 200’ E, 60’ 5.
14 250’ E. 100’ S.
15 300’ E. 40’ S.
16 300’ E. 200’S,
17 200’ E. 100’s.
18 200’ E. 60’ S.
19 150’ E, 75’ S.
in Feet % dry wt
2 15.8
2 13.6
2 11.9
2 10.7
4 15.7
4 17,2
4 17.3
4 14.9
4 17.9
6 13.6
6 15.4
6 15.9
6 17.7
6 13.6
8 21.1
8 14.1
8 17.3
8 9.6
8 19.4
Dry
Density
lb/w ft
Maximum
Dry
Density
Ib/cu ft
Percent
Compaction
103.3 110.0 93.9
107.1 114.5 93.4
105.9 114.5 92.4
104.0 114.5 90.8
108.0 119.1 90.7
105.2 110.0 95.7
103.7 114.5 90.5
111.0 119.1 93.1
102.1 113.6 90.0
107.1 114.5 93.5
105.2 114.0 92.3
105.6 114.0 92.6
101.5 111.9 90.7
105.2 115.6 90*9
99.5 108.2 92.0
110.7 123.2 90.0
107.7 119.5 90.0
108.0 119.5 90.3
102.6 113.6 90.2
BENTON ENGINEERING. INC.
-
-
.-
”
-
-
-
-
-
-
-
-
,-
-
-
-
-
Project No. 64-6-18D
La Costa Volley Unit Nos. 1 ond 2
-18- November 25, 1964
LABORATORY TEST RESULTS
The maximum dry densities ond optimum moisture contents of the maim fill materials OS deter-
mined by the A.A.S.H.O. T99-49 method, modified to use 26 blows of o 10 pwnd hommer
falling from o height of 18 inches on each of 3 layers in a 4 inch diometer l/30 cubic foot
compaction cylinder, ore presented OS fallows:
Soil Type
Brown silty fine sand, cloy binder
Light yellow grey fine sandy silt
Light brown grey silty fine sand
Medium brown, red brown silty fine sand
Light grey slightly silty fine to coarse sand and
10% grovel
Medium brown, red brown slightly silty fine to
coarse sand, cloy binder, few grovel
Medium brown, red brown silty fine sand
Dark gioy clayey silt, lime streaks
Light brown grey silty fine sand, cemented lumps
Gray yellow slightly silty very fine sand
(slightly micaceous)
Brown, red brown silty cloy
Medium brown slightly silty medium to coarse sand
(few grav&l)
Light brown clayey fine to medium sand (lime streaks)
Yel I ow grey brown clayey fine sand
(% expansion = 5.6%)
Groy brown silty cloy (% expansion = 12.4%)
Light brown silty fine sond with cloy binder
Dark brown silty fine sand (topsoil)
Yellow ton silty very fine sand
Light brown silty fine sand, sea shells
Light brown silty fine to medium to coarse sand
Light brown, yellow brown silty fine to medium sand
and chunks grey silt
Light brown very fine sandy silt
Dark brown silty fine to medium sand, cloy binder,
few grovel
Brown clayey fine to coarse sond
Light yellow gray silty very fine sand
Light grey fine sandy cloy
Light yellow and grey clayey very fine to fine sond
Maximum Optimum Mois-
Dry Density ture Content
I b/cu ft % dry wt
123.2 10.5
114.2 15.4
117.3 13.2
121.9 11.6
121.2 12.5
121.8 10.2
121.3
105.2
11.4
19.5
13.5
17.6
1 13.6
99.3
14.0 15.4
16.0 13.7
19.1 13.0
19.4 12.3
11.3 14.8
16.2 13.2
21.6 10.9
10.3 16.7
19.0 12.8
20.0 11.0
19.5 12.3
108.2 16.7
124.9 10.4
123.2 11.4
108.8 15.6
108.2 15.2
107.4 18.5
BENTON ENOINEERING. INC.
,-
.-
-
.-
-
-
-
-
-
-
-
-
Project No. 64-6-18D
La Costa Volley Unit Nos, 1 and 2
-19- November 25, 1964
LABORATORY TEST RESULTS (CONT)
Soil Type
Light yellow brown very fine to fine sandy cloy
Silty fine to coarse sand
Yellow very fine sondy silt
Olive fine sandy silt
Light grey silty fine to medium sond, cloy binder
Light brown to yellow brown silty fine to coarse sand
Light grey silty fine sand
Maximum
Dry Density
I b/‘cu ft
Optimum Mois-
ture Content
% dry wt
107.9 18.1
111.9 11.7
110.0 16.5
109.1 18.5
118.2 12.8
125.2 9.8
115.8 14.7
In addition to the above loboratory tests, expansion tests were performed cn some of
the clayey soils encountered to determine their volumetric change characteristics with
change in moisture content. The recorded expansions of the samples ore presented OS
follows:
Location
Depth of Sample
Below Grade
Percent Expansion Under Unit
Lmd of 500 Pounds per Square
Foot from Air Dry to Saturation
Lot 5 Grade 2.99
Lot 6 - - 6.89
Lot 48 1.5 3.19
Lot 48 2.0 3.92
Lot 51 Grode 0.97
Lot 56 2.0 3.07
Lot 58 1.0 2.90
Lot 59 1.0 4.49
Lot 60 1.0 4..84
Lot 62 1.0 3.64
Lot 66 0.5 7.84
Lot 67 0.5 5.81
Lot 68 0.5 5.99
Lot 69 0.5 7.99
Lot 69 2.0-2.5 4.01
Lot 70 0.5 8.10
Lot 70 1.5-2.0 7.09
Lot 70 2.0 8.00
Lot 72 2.0 1.28
Lot 73 1.0 1.10
Lot 74 2.0 3.81
Lot 75 1.0 1.51
BENTON ENGINEERING. INC
Project No. 64-6-18D -2O-
La Costa Volley Unit Noz. 1 and 2
-
-
-
-
-
-
-
-
-
,-
-
-
Location
Lot 76
Lot 77
Lot 79
Lot 80
Lot 83
Lot 84
East of Lot 85
Lot 87
East of Lots 85-89
Lots 90-91
Lot 95
Lot 97
Lot 98
Lot 104
Lot 113
Lot 131
Lot 132
Lot 133
Apt. Site F
Apt. Site H
Apt. Site I, N.E.
Comer
Apt. Site I, S.E.
Corner
Apt. Site I, N.E.
Corner
Apt. Site J, S.W.
Corner
Apt. Site J, Center
Apt. Site J, N.E.
Corner
Apt. Site J, N.E.
Corner
Apt. Site F
Street Opposite Lots
103 & 104
Depth d Sample
Below Grade
1.5
2.0
2.0-2.5
1.5-2.0
2.0-2.5
1 .o-2.0
1.0
1.5
1.0
--
2.0
1 .o-2.0
2.0-3.0
Grade
Grade
1.0
1 .o-2.0
1.5-2.5
2.0
2.0
2.0
1.0
1.0
1.0
1.0
1.5
2.0
2.0
- -
November 25, 1964
Percent Expansion Under Unit
Load of 500 Pounds per Square
Foot from Air Dry to Saturation
2.33
1.52
1.25
2.64
5.49
0.91
13.25
2.39
5.54
3.30
2.30
2.89
2.86
5.82
5.73
4.59
4.12
5.86
5.42
4.03
6.23
5.91
6.62
1.88
9;69
8.32
3.92
5.42
27.09
-
BENTON ENGINEERING, INC.
- ._ ~~.,. v-..-;
./-~
.-
-
-
-
-
-
-
-
-
,-
Project No. 64-5-18D -21- November 25, 1964
La Costa Volley Unit Nos. 1 ond 2
Samples of notural soils token from locations designated by o representative of Paradise
Homes, Incarporoted, were remolded to 92 percent of maximum density and then subjected
to expansion tests. The recorded expansions of the three samples ore presented as follows:
,, . .
Sample
Sample 1
Sample 2
Sample 3
Percent Expansion Under Unit
Load of 500 Pounds per Square
Soil Description Foot from Air Dry to Saturation
Groy brown silty clay 13.38
Light brown silty fine sand 3.82
with cloybinder
Yellow brown clayey fine sand 5.61
Finally, a groin sire analysis was performed on o sample of soil, OS designated by a
representative of Paradise Homes, Incorporated fa the purpose of comparing its grain sizes
with those of decomposed granite being considered for import. The results of the analysis
were OS follows:
Sieve No.
Cumulative % at
Total Passing
3/8 inch 100
No. 4 91.7
No. 10 75.9
No. 30 34.0
No. 40 23.3
No. 60 16.1
No. 100 11.0
No. 200 7.3
Based upon the above tabulated results of expansion tests, and on other previously conducted
expansion tests, the following table summorizes oil of the areas covered by this report,
together with other oreos OS totheir clarification with regard to expansion:
Marginally Expansive Expansive
Unit No. 1 - Unit No. 1 -
Lots 47, 48, 49, and .52,53,54,55,
and 56, 60, 72, 73, ond 74, 76,
79, 80, and 81, 84 to 89, inclusive,
93, 95, 96, 99, 100, and 101, 106,
108, 109, 110, 111, 127, 128, and
131, Condominium Areas C and D
Lots 44, 45, 46, 50, 51, 57, 58, and ‘,.
59, 61 to 71, inclusive, 75, 77, ond 78,
82, 83, 90, 91, and 92, 94, 97, 98, 102
to 105, inclusive, 107, 112 to 119, inclusive,
130, 132, and 133, Male1 Lots 122 to 126,
inclusive, and 129, Condominium Areos’A, 8,
E, F, H, I, and J.
Unit No, 2 -
Lot 5 Unit No& 2 -
Lots 1, 2, 3, and 6