UPDATE REPORT OF THE PRELIMINARY SOILS
-
.-
-
-
-
-
-
INVESTIGATION REPORT
Of
La Costa Village Apartments (PCD-88) Lot 398, Map 6905 Luciemaga Street Carlsbad, Califomia
-
- ENGINEERING DEPT. Ll9RAfW
City of Carlsbad 2075 Las Palmas Drive
Carhbad CA92009-4859
b;-rEcElVED
JUL 20 1989
ClTy OF CARLSBAD ~~~~ pan.:. Services
- SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga Street, Carlsbad
TABLE OF CONTENTS
Item Description
Description of Site
Conclusions & Recommendations
Limitation of Report
Enclosures
3
5
10
11
-
-
-
-
-
-
-
-
370 Mulberry Drive Suite E l San Marcos l CA - 92069 l (6I9)744-0111 Page 2
-
SAN MARCOS ENGINEERING, INC.
370 MULBERRY DRIVE. SUITE E
SAN MARCO5 CA 92069
- (619) 744-0111
Civil Engineering . Plannning l Land Developing l Surveying l Soils and Foundation Engineers
.-
July 11, 1989 Job No. 89056
-
Mr. Hang C. Hsuieh
P.O. BOX 8334 .- Ranch0 Santa Fe, CA 92067
-.
-
Re: La Costa Village Apartments (PCD-88) Lot 398, Map 6905 Luciernaga Street Carlsbad, CA
Dear Mr. Hsuieh,
As per your request, - submitted herewith is an update
report of the Preliminary Soils Investigation of the
- above referenced project site.
- Description of Site
.,.~. A field site visit was made on July 7, 1989 and the following
observations are submitted:
-
-
- Page 3
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga Street, Carlsbad, California
-.
-
1. The project site is vacant at this time and it appears
that no construction activity had taken place at the said
-
site since our soils investigation of the site in July,
1985. A copy of said preliminary soils investigation
report is appended as Appendix D.
-
-. 2. No construction activities had taken place in the
adjacent areas that may affect the proposed project at
- said site.
-
-
-
-
3. Additional lab soils testing were performed of the
prevailing site soils composed of Tannish Brown Silty to
Sandy Clay with some broken gravel. Samples were taken
at about 2 feet below existing grade approximately
between B-4 and B-5 shown on Plate 2 of Appendix D. Test
results are shown below:
a. Direct Shear Tests (ASTM)
Apparent Internal Friction Angle@ = 34.2'
Apparent Cohesion C = 207 psf
b. Expansion Index Tests (UBC Std 29-l)
E.I. = 35, low potential expansion
-
-
- 370 Mulbeny Drive Suite E l San Marcos l CA 9 92069 l (619)744-0111 Page 4
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Lucieruaga Street, Carlsbad, California
C. Maximum Dry Density (Data taken from Appendix D)
Maximum Dry Density = 117 pcf
Optimum Moisture Content = 10.5%
Copy of test results are appended as Appendix B. Soil
Classification used in this report is based on the
Unified Soils Classification System as indicated in
Appendix C.
-
Conclusion and Recommendations
- 1. It is our opinion that the site soil conditions have not
changed and the findings and recommendations found in the
- preliminary soils investigation shown in Appendix D are
still valid.
-
.-
-
-
2. We recommend that the existing pad be cleared of all
vegetation, organic matters and other deleterious
materials and all unsuitable materials carted away from
site. The existing site soils shall then be scarified to
at least 12' deep, the soils moisture conditioned and
recompacted to at least 90% of maximum dry density. The
Earthwork Specification shown in Appendix A forms part of
these recommendations.
3. The building structures are recommended to be founded
with standard spread footings at an allowable soil
- 370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111 Page 5
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 .- La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga Street, Carlsbad, California
-
-
-
-
-
-
- Subgrade
-
-
bearing pressure of 1600 psf. Bottom of footings should
be at least 24" below adjacent finish grade. Perimeter
wall footings should be at least 18" wide and reinforced
with 2-#5 bars placed 3" above bottom of footing and 2-#5
bars placed 2" below top of footing. Isolated footings
should be at least 24" square and reinforced with 3-#5
bars placed each way.
4. Concrete slabs should be at least 4" thick and reinforced
with 6x6-10/10 welded wire mesh placed at mid-height of
slab. The slab shall be underlain by 4'thick sand with
vapor barrier placed below the sand. The vapor barrier
shall be placed over at least 1" thick of sand placed
over the subgrade. The typical section is shown below:
6x6-10/10 welded wire mesh
4" concrete slab
4" sand
vapor barrier
1" sand
370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111 Page 6
-
SAN MARCOS ENGINEERING, INC. civil 9 soils 9 foundations Job Number 89056 - Lu Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga Street, Carlsbad, California
-
-
Prior to placing the sand fill and the vapor barrier, the
subgrade soils under the slab should be moistured to at
least 3% above optimum moisture content.
-
-
-
-
-
-
-
-
.-
-
-
5. We recommend that the footing trench soils be inspected
by a soils engineer prior to pouring of concrete for the
footings to ensure that the soils are stable and properly
compacted.
6. Cut and fill slopes should have maximum slope ratio of 2
horizontal and 1 vertical. The outside of footings at
slope areas should be at least 8' measured horizontally
from the daylight line at the slope as shown below:
Finish Grade
Fill Slope
I
I I
nr ,&
r' !-1
1 1
Footing
-
- 370 Mulbeny Drive Suite E 9 San Marcos l CA - 92069 9 (619)744-0111 Page 7
-
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga Street, Carlsbad, California
.~
-
-
-
-
-
-
-
-
-
-
-
-
-
.-
-
I. For the design of the masonry retaining walls, the San
Diego County Standard Drawings and Specifications for
Retaining Walls can be used in the design and
construction of the proposed walls.
The following soil parameters can be used in the design
of non-standard walls:
Active pressure, equivalent fluid pressure,
level backfill, = 30pcf
Active pressure, equivalent fluid pressure,
2:l (horizontal to vertical ratio) backfill = 43pcf
Passive Pressure, Equivalent fluid pressure,
level backfill = 300pcf
Coefficient of friction between soils and
bottom of masonry = 0.4
Allowable Soil Bearing Pressure = 1600 psf
8. The structural section for the road and parking paving
can be determined when the R-Value tests of the prepared
subgrade soils have been taken.
- 370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111 Page 8
- SAN MARCOS ENGINEERING, INC. civil l soils 8 foundations Job Number 89056 La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciemaga Street, Carlsbad, California
-
-
-
-
9. The foundation plans will need to be reviewed by this
firm to make sure that the intent of these
recommendations are followed.
10. All surface water runoff should be directed away from the
foundation system positively.
11. If during grading operations, soils different from the
soils described here in this report are found at the
site, it is recommended that this firm be notified so
that the proper evaluation and recommendations can be
made.
If you have any questions about this report, please call
us.
Continued -
-
.- 370 Mulberry Drive Suite E l San Marcos 9 CA l 92069 l (619)744-0111 Page 9
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciemaga Street, Car&bad, California
-
-
-
-
Limitation of Report
The opinions and recommendations presented in this report are
based upon surficial and limited subsurface observations and
logical projections inferred from observed conditions and the
assumption that the soil conditions do not deviate appreciably
from those encountered.
Should conditions varying from those presented here in this
report be encountered during the developmental construction,
this firm should be notified right away so that a qualified
soils engineer can inspect the site conditions and evaluate
the potential effects and present recommendations.
The report has been prepared in accordance with generally
accepted standards of geotechnical engineering practice at the
time of its preparation. No other warranties expressed or
implied are made as to the professional consultation and
- recommendations contained herein. This report is provided for
the exclusive use of the client or his authorized agents. -
Very truly yours,
SAN MARCOS ENGINEERING, INC.
-
-
-
- 370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111 Page 10
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 Lu Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciemaga Street, Carlsbad, California
EncLosures:
Appendix A. Recommended Earthwork Specifications
Appendix B. Laboratory Soils Testing Results
Appendix C. Unified Soils Classification System
Appendix D. Preliminary Soils Investigation dated
July 25, 1985
370 Mulberry Drive Suite E l San Marcos 8 CA l 92069 l (619)744-0111 Page 11
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Vilhge Apartments (PCD-88) Lot 398, Map 6905, Luciemaga, Carlsbad,
.-
-
-
-
-
-
-
-
-
-
APPENDIX A. RECOMMENDED EARTHWORK SPECIFICATIONS
- 370 Mulberry Drive Suite E l San Marcos l CA l 92069 9 (619)744-0111
SAN MARCOS ENGINEERING, INC. civi: l soils 9 foundations APPENDIX A -RECOMMENDED EARTHWORK SPECIFICATIONS ,_ Job Number 89056
,-
_~.
-
-
-
-
-
1. GENERAL DESCRIPTION. The objective is to obtain uniformity and adequate internal strength in filled ground by proven engineering procedures and tests so that the proposed structures may be safely supported. The procedures include clearing and grubbing, removal of existing structures, preparation of land to be tilled, processing the fill soils, filling of the land, and the spreading and compaction of the tilled areas to conform with the lines, grades, and slopes as shown on the approved plans.
The owner shall retain a Civil Engineer qualified in Soil Mechanics (herein referred to as Engineer) to inspect and test the filled ground as placed to verity the uniformity of compaction of filled ground to the specified 90 percent of maximum dry density. The Engineer shall advise the owner and grading contractor immediately if any unsatisfactory conditions are observed to exist and shall have the authority to reject the compacted filed ground until necessary corrective measures are taken to comply with the specifications. It shall be the soil responsibility of the grading contraCtor to achieve the specified degree of compaction.
2. CLEARING, GRUBBING AND PREPARING AREAS TO BE FILLED.
a. All bmsh, vegetation, and any biodegradable refuse shall be removed, piled and burned or otherwise disposed of as to leave the areas to be filled free of vegetation and debris. Any uncompacted filed ground or loose compressible natural ground shall be removed unless the report recommends otherwise. Any unstable, swampy, or otherwise unsuitable areas shall be corrected by draining or removal or both.
b. The natural ground which is determined to be satisfactory for the support of the tilled ground shall then be plowed or scarified to a depth of at least six inches (6”). and until the surface is free from ruts, hummocks, or other uneven features which would tend to prevent uniform compaction by the equipment to be used.
c. After the natural ground has been prepared, it shall then be brought to the proper moisture content and compacted to not less than 90 percent of maximum density in accordance with the A.S.T.M. D1557-78 method which uses 25 blows of a 10 pound rammer falling 18 inches on each of 5 layers in a 4- inch diameter l/30 cubic foot cylindrical mold.
d. Where fills are made on hillsides or exposed slope areas, with gradients greater than 10 percent, horizontal benches shall be cut into firm undisturbed natural ground in order to provide both lateral and vertical stability. This is to provide a horizontal base so that each layer is placed and compacted on a horizontal plane. The initial bench at the toe of the fill shall be at least 10 feet in width on fii undisturbed natural ground at the elevation of the toe stake placed at the natural angle of repose or design slope. The Engineer shall determine the width and frequency of all succeeding benches which will vary with the soil conditions and the steepness of slope.
- Lu Costa Village Apartments (PCD-88) Lot 398, Map 6905, Duciemaga St., Carlsbad 370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111
-
SAN MARCOS ENGINEERING, INC. civil 9 soils l foundations APPENDIX A -RECOMMENDED EARTHWORK SPECIFICATIONS ~,. Job Number 89056
3. MATERIALS AND SPECIAL REOUIREMENTS, The fill soils shall consist of select materials free from vegetable matter, and other deleterious substances, and shall not contain rocks or lumps greater than 6 inches in diameter. This may be obtained from the excavation of banks, borrow pits or any other approved sources and by mixing soils from one or more sources. If excessive vegetation, rocks, or soils with inadequate strength or other unacceptable physical characteristics are encountered, these shall be disposed of in waste areas as shown on the plans or as directed by the Engineer. If, during grading operations, soils are found which were not encountered and tested in the preliminary investigation, tests on these soils shall be performed to determine their physical characteristics. Any special treatment recommended in the preliminary or subsequent soil reports not covered herein shall become an addendum to these specifications.
4. PLACING. SPREADING. AND COMPACTING FILL MATERIALS.
a. When the moisture content of the fill materials is below that specified by the engineer, water shall be added in the borrow pit until the moisture content is near optimum to assure uniform mixing and effective compaction.
b. When the moisture content of the fill material is above that specified by the engineer, resulting in inadequate compaction or unstable fill, the fill material shall be aerated by blading and scarifying or other satisfactory methods until the moisture content is near optimum as specified.
c. After processing, the suitable fill material shall be placed in layers which, when compacted, shall not exceed six inches (6”). Each layer shall be spread evenly and shall be thoroughly mixed during the spreading to ensure uniformity of material and moisture in each layer.
d. After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the density set forth in paragraph 2(c) above. Compaction shall be accomplished with sheepsfoot rollers, multiple-wheel pneumatic-tired rollers, or other approved types of compaction equipment, such as vibratory equipment that is specially designed for certain soil types. Rollers shall be of such design and maintained to such a level that they will be able to compact the fill material to the specified density. Tamping feet of sheepsfoot rollers shall be maintained such that the soils will be compacted rather than sheared by the roller. Rolling shall be accomplished while the fill material is at the specified moisture content.
Rolling of each layer shall be continuous over its entire area and the roller shall make sufficient trips to insure that the specified density has been obtained. Rolling shall be accomplished in a planned procedure such that the entire area to be filled shall receive uniform compactive effort.
e. The surfaces of the fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. compacting operations shall be continued until the slopes are stable and until there is no appreciable amount of loose soil on the slopes. Compacting of the slopes shall be accomplished by
- La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Ducienzaga SL, Carlsbad 370 Mulberry Drive Suite E 9 San Marcos 9 CA l 92069 l (619)744-0111
-
SAN MARCOS ENGINEERING, INC. civil 9 soils 8 foundations APPENDIX A - RECOMMENDED EARTHWORK SPECIFICATIONS Job Number 89056 ,~~~
-
-
-
-
backrolling the slopes in increments of 3 to 5 feet in elevation gain or by other methods procuring satisfactory results.
f. Field density tests shall be taken for approximately each foot in elevation gain after compaction, but not to exceed two feet in vertical height between tests. Field density tests may be taken at intervals of 6 inches in elevation gain if required by the Engineer. The location of the tests in plan shall be so spaced t give the best possible coverage and shall be taken no farther apart than 100 feet. Tests shall be taken on comer and terrace lots for each two feet in elevation gain. The Engineer may take additional tests as considered necessary to check on the uniformity of compaction. Where sheepsfoot rollers are used, the tests shall be taken in the compacted material below the disturbed surface. No additional layers of fdl shall be spread until the field density tests indicate that the specified density has been obtained.
g. The till operation shall be continued in six inch (6”) compacted layers as specified above, until the till has been brought to the finished slopes and grades as shown on the accepted plans.
5. INSPECTION. Sufficient inspection by the Engineer shall be maintained during the filling and compacting operations so that he can verify that the till was constructed in accordance with the accepted specifications.
6. SEASONAL LIMITS. No fill materials shall be placed, spread, or rolled if weather conditions increase the moisture content above permissible limits. When the work is interrupted by rain, till operations shall not be resumed until field tests by the soils engineer indicate that the moisture content and density of fill are as previously specified.
7. LIMITING VALUES OF NONEXPANSIVE SOILS. Those soils that expand 3.0 percent or less from air dry to saturation under a unit load of 150 pounds per square foot are considered to be nonexpansive.
8. All recommendations presented in the attached report are a part of these specifications.
-- Ln Costa Village Apartments (PCD-88) Lot 398, Map 6905, Duciernaga Sk, Carlsbad 370 Mulberry Drive Suite E l San Marcos l CA l 92069 9 (619)744-0111
-
Natural Ground Surface
I- Stripping Depth: Remove
-
--
-~
-
Notes:
1.
2.
3. --
All Topsoil
width W should be of least 10:
The outside edge of the bottom key shall be below topsoil or loose surface material.
Keys are required where the natural slope is steeper than 10 percent
gradient or JO horizon tat to I veitical.
TYPICAL KEY BENCHING FOR SLOPES
No Scale
-
-
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 Lu Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga, Carlsbad,
-
-
-
-
-.
-
-
-
-
-
-
-.
-
-
APPENDIX B. LABORATORY SOILS TESTING RESULTS
- 370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111
-
.-
-
-.
1800
: / I , / j j M j / /
0 600 1200 1800 2400 3000 3600
Normal Stress, PM
mi k.RHPLE NO. 1 2 3 ;..j_.:__ ..2..:_.j_.i._
800
WATER CONTENT, i! 21.9 21.6 22.0 + DRY DENSITY, PC+ 104.4 104.4104.4 g ~fv~R~~6m~, % 0.5840.5840.584 99.4 97.8 99.8
I- DIAMETER, in 2.37 2.37 2.37 Q: HEIQHT, in 1.00 1.00 1.00
NORMFIL STRESS, ps.9 509 1017 1524
400
-0 0.1 0.2 0.3 0.4
Horiz. Deform., in ULT. SHEAR, psf
SAMPLE DATA
iAMPLE TYPE: REMOLDED CLIENT: HSUIEH
IESCRIPTION: TAN TO YELLOWISH
LT BRN SAND, <SW> TR CL OR MLPROJECT: PRELIMINARY SOILS INVESTIGATION
.L= PLO PI= LUCIERNAGR STREET, CARLSBAD
;PECIFIC GRAVITY= 2.65 SAMPLE LOCATION: B-S 0 1.5 - 2 FT
1EMARKS: QUICK, UNCONSOLIDATED
PROJ. NO.: 89056 DRTE: 7-X0-89
DIRECT SHERR TEST
'IO. NO. 1
! I I
3 l% 3/I 3/e
100
!?
s 00
Jt &i 70
gl
8 40
2 30
ii! 20
10
0
209 60 20
I I I I / I I I I I /
4 0 16 30 50 100 200 SIEVES DEBalIPrIvE lEIw
\ \- __ btt -- lh 20 little
10
0 trace
2 0:6 0;2 0.06 0.62 0.006 0.002
GRAIN SIZE IN MILLIWll3l!3
BWIDEBS I I GR4VEL SANI C SILT. Non-Phtic. Ghesidess
COBBLES C I M J F C J M 1 F CLAY-SOIL. Plasticity & Clay+abitiea
228 76.2 25.4 9.52 2.0 0.59 0.25 0.074 MM.
9 in. 3 in. 1 in. 3/0 in. Nos. 10 30 60 200 SIEVES
7z&e- d?c&zLf,
/ 6’
(RAIN SIZE ANALYSIS. I~IFIUTICN AKJ DESCllIFTICti Cf SOILS.
-
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 _ La Costa Village Apartments (PCD-88) Lot 398, Map 6905, Luciernaga, Carkbad,
-
APPENDIX C. UNIFIED SOILS CLASSIFICATION SYSTEM
-
-
I-
- , 370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111 I
-
-
-
UNIFIED SOIL ClASSiFiCA l7ON SYSTEM
COARSE CIWN~ saL.s
UORE THAN 50% OF MrER,Iu IS L.mE.Q7HAN
E0 =EE
FlNE
m.uNl3 .5m.s
Maw THAN 50x la= MATERIAL IS i%MLER C-IAN gm smf
MAJOR DI MSION
(;wAEL AND whfiur SrxLs
MCRE IHAN .wx et- COARSE Fmc- nm REVINED av#4smE
cuxNm.4MLs (um w “0 FINES)
/ CRAEL mm m&s (APPREQMLE AAmJN~ w mm)
l-
GM al-r *Am.% GQ,4EL-.5AND Ear UIYNRES
GC cum (xIkFL$ GmLEL .%ND .%. T !mluR~
CLEANSAND SW IKU-GRADED WD.l GRAKLLY WDS, (LlmE as ND FINES) LmLE w NO frN5.
SP ma?LY-G?AL7ED SANLX GRAKLLY .%NL%s LnnE OR NO “MS
SAhm lwm SM 9Li-r s.uk%i sA”D-SlLT uIxluREs flNES (APPRECYARLE AmJNT aF nNEs) SC cum WDS, SAND-cu Y MlxNREz
lNoRwNlC SLE mm YERY “NE SANDS ML mxx FLCUR. 9i.l-i a? mm cars WlH SUGW PlAsllaTy.
HIGHLY ORGANIC
SYMBOL DESCRPllON
GW KLL-m.wED GRAy9 CRAEL-SAW AmNREs “l7l.r OR NO “Ms
Gp PDMKY-GWDEO Gwvzs oplrn SAND UlxluREs. urn lx NO “Mrs
iED uAMT
mAN5D lNoRc.wlC aA% OF LOW TO UEm”k4
CL PtAsllan: GwkELLY CLAEj SANDY CUE, SJUY CUB, LEAN MIS.
OL mwlc SILTS ANo m!GANlC .?lLrr MYS OF LOW PLA*nam
MH INmcANIc YLls Mlc.4cwws Lx DIIlwAcEws “NE SAN0 OR SLTY mu
I I
NOE: ~u.L.~B~c& INDICTA E B~QDERLWE .S(XL
KEY ,To SAMPE DATA
\ MOISTURE CONTENT. (2 OF DRY DENSITY)
-I -DEPTH OR ELEVATION (FEET;)
wh4PL.E RECOERY SAUPLER TYPE
UNDISNRBED HD - 3 INCH SPLIT NBE SAMPLER.
l-W - 3 INCH ThiN WALL
SAMPLER
SPT- 2 INCH SPLIT
TUBE SAMPLER
c- ROCK CORE
B- BULK DISTRIBUED
SAMPLE
SAN MARCOS ENGINEERING UNlFlED SaL ctAsswcAll~ SyslEN AND KEY To SAMPLE DATA
-
SAN MARCOS ENGINEERING, INC. civil l soils l foundations Job Number 89056 La Costa Vilhge Apartments (PCD-88) Lot 398, Map 6905, Luciernaga, Carlsbad,
APPENDIX D - PRELIMINARY SOILS INVESTIGATION DATED JULY 25, I985
-
-
370 Mulberry Drive Suite E l San Marcos l CA l 92069 l (619)744-0111
-
- SAN MARCOS ENGINEERING
380 MULBEFrhw DWVI, ,u,rs . *AN UIICOS, CA *2oe*
- ldl0, 74..0,,,
Civil Engineers l Planners l Land Development l Surveys l Sails and Foundation Engineering
July 25, 1985
Mr. Ken Pierre b Mr. Jim Tung 432 Taylor Street
Vista, CA 92083
Re: Lot 398 of La Costa Meadows, Unit #2
Map 6905, Carlabad, California
proposed Apartment Prolect
Dear Mr. Pierre and Mr. Tung,
AS per your request, we have performed a preliminary soils
investigation at the above referenced site for the proposed
apartment prolect thereat and this report is presented ae
regarda our opinion of the site aoils engineering factore
that may affect your prolect.
-
-
-
-
-
-
Description of Site ------ ---- -- ----
The above referenced proJect site ia located in Luciernage
Street, Carlabad, California. The site ia a prepared graded
Pad with the finish grading mildly sloping at about 1%
approximately towards Luciernaga Street. Weeds and grass
have grown at the site since it was graded.
-
-
-
-
-
-
.-
-
-
-
-
-
SAN MARC09 ENGINEERING civil engineering, soils 6, foundation
Pierre 6 Tung, Soils Report, Cont'd...
Along the northerly and easterly property boundary lines are
existing cut alopes with heights ranging from about 15 to 20
feet. At the top of the northerly cut are existing
residential buildings and at the top of the easterly cut are
apartment buildings. At the westerly boundary line is an
existing fill slope. Plate 1 shows the Vicinity Map of the
prolect site.
Proposed ProlRgg --- ---- ---
The proposed proJect is for the construction of 3 apartment
building units. The structures will be 2-story, framed, and
stucco buildinga with tile roof.
No heavy loadings are anticipated.
Purpose of the Preliminary Soils Investigation --_ ___ _- --- ----_----- ----- ----___ ----_
The purpose of this investigation is to determine the
physical propertiee of the existing soila and to make a
foundation recommendations.
ELeli BxElnrafion
The exploration program consist of site observation of
existing soils at ground surface elevation and subsurface
exploration. For subsurface exploration, a truck-mounted
continuous flight auger was utilized to perform subsurface
-
2
SAN MARCO3 ENGINEERING civil engineering, soil6 6 foundation
-
-
-
-
-
-
-
-
Pierre 6 Tung, Soils Report, Cont'd...
drilling. It was also equipped with a hammer to do standard
penetration tests. California split samplers were utilized
in sample procurement.
Five (5) holes were drilled at site at the approximate
locations shown in Plate 2. The depth of the holes varied
from 6 to 15 feet. Soils encountered were carefully
observed, classified and logged under the direction and
supervision of a soils engineer. Bulk soils samples were
alSO brought to the laboratory for further analysis and
tests. Soils classification of the soils encountered were
made according to The Unified Soils Classification System.
Appendix E shows the Unified Soils Classification System.
Finding= ------
Surface and near surface soils appear to be stable. There
are no signs of soils movement. No soil tension cracks were
detected. Some minor erosion rills were observed at the
slopes and no signs of landslides were detected in the
slopes.
togs of the aoils encountered are shown in Plates 3 to 7,
inclusive. A generalized soils profile of the subsurface
soils which can be inferred from the soile logs indicate a
generally uniform soils stratification and can be described
a6 about 4 to 6 inches of topsoil with roots, weeds and
mother vegetation matter, overlying about 10 feet of light .
-
-
--
-
-
-.
-
-
-
_.
-
-
-
SAN HARCOS ENGINEERING civil engineering, soils & foundation
Pierre 6 Tung, Soils Report, Cont'd...
Brown to Tan to Yellowish Brown Silty to Sandy Clay with
some broken fine gravel. The standard penetration blow
counts were observed to range from 17 to 37 blows per foot
indicating the soils consistency to be medium compact to
compact soils. Below this stratum is Brown to Dark Brown
Moist Sandy Clay and some fine gravel. This stratum appear
to be the natural ground surface underlying the fill
material of the prepared pad.
Three (3) field compaction tests were performed at the site,
taken at about a depth of 8" below the existing finish
grade. The results are shown in Plates 8 to 10, inclusive,
which indicate the soils to be compact to medium compact in
the upper foot of the soils stratification.
Laboratory Soils Teatinq --------- ----- ------
Four (4) maximum dry density tests were performed in four
soil aamplea and the results are summarized below:
Sample # Taken from Soil Max. Dry Optimum Moisture
VP=+ Density Content (*)
(pcf)
1 B-l at 8' 1 113.8 12.5
2 B-l at 2' 2 114.5 10.5
3 B-4 at 5' 3 117.0 10.5
4 B-l at 5' 2 115.5 12.0
-
SAN MARCO3 ENGINEERING civil engineering, soils 6 foundation
-
-
-
-
-
-
.-
-
-
Pierre E. Tung, Soils Report, Cont'd...
*Soil Type:
1. light Brown to Tan Silty to Sandy Clay, Traces of fine Gravel
2. Tan to Yellowish light Brown Silty to Sandy Clay, Some fine Gravel
3. Dark Brown Sandy Clay, Traces of fine Gravel
Conclusion and Foundation Recommendations ---------- --- ---------- ---------------
1. In our opinion, the proIect site soils is stable for
the construction of the proposed apartment prolect
building. The following recommendations, however, need
to be observed during the design and construction of
the foundation systems of the structures.
2. The top 12" of the existing pad soils need to be
scarified and all organic matters and other deleterious
materials be removed. It shall then be watered and
recompacted to at least 90% relative density prior to
placing any fill material above it or the construction
of footings upon it. The Earthwork Specifications
shown in Appendix E forms part of these
recommendations.
3. We recommend that the building structures be founded
with standard spread footings at an allowable soil
-
- 5
- SAN MARCOS ENGINEERING civil engineering, eoils 6, foundation
-
-
-
-
-
-
Pierre 8 Tung, Soils Report, Cont'd...
bearing pressure of 1600 psf. Bottom of footings
should be founded to at least 24" ad]acent below finish
grade. Perimeter wall footings should be at least 18"
wide and continuously reinforced with 2-#5 bars placed
3" above bottom of footing and 2-#5 bara placed 2"
below top of footing stem or floor level. Isolated
footings should be at least 24" square and reinforced
with 3-#5 bars placed each way.
4. Concrete slabs should be at least 4" thick and
reinforced with 6 x 6-lo/10 welded wire mesh placed at
mid-height of slab. The slab shall be underlain by 4”
thick sand with vapor barrier placed below the sand.
The vapor barrier shall be placed over at least 1"
thick of sand placed over the subgrade. The typical
section is shown below:
6 x 6-14110 welded wire mesh
4" concrete slab 'd
,.
1" sand--/ . .
1
Y 0
. . k
subgrade
6
.a ,
.O l
*. ‘0 ..:
-
SAN MARCO3 ENGINEERING civil engineering, soils 6 foundation
-
-
-
-
-
-
-
-
.-
-
-
-
-
-
Pierre 6 Tung Project, Soils Report, Cont'd...
Prior to placing the sand fill and the vapor barrier,
the subgrade soils under the slab should be moistured
to at least 3X above optimum moisture content.
5. We recommend that the footing trench soils be
inspected by a soils engineer prior to pouring of
concrete for the footings to ensure that the soils are
stable and properly compacted.
6. Cut and fill slopes should have maximum slope ratio of
2 horizontal and 1 vertical. The outside of footings
at slope areas should be at least 8' measured
horizontally from the daylight line at the slope as
shown below:
[Finish Grade
No 3~81s
-
-
SAN MARCOS ENGINEERING civil engineering, soils 6 foundation -
-
-
-
-
-
-
Pierre 6 Tung, Soils Report, Cont'd...
7. For the design of the masonry retaining walls, The San
Diego County Standard Drawings and Specifications for
Retaining Walls can be used in the design and
construction of the proposed walls.
8. The structural section for the road and parking paving
can be determined when the R-value tests of the
prepared subgrade soils have been taken.
9. All surface water runoff should be directed away from
the foundation system positively.
14. If during grading operations, soils different from the
soils described here in this report are found at the
site, it is recommended that this firm be notified so
that the propoer evaluation and recommendations can be
made.
If you have any questions about this report, please call us.
Very truly yours,
SAN MARCOS ENGINEERING
BY
Distribution: (4) Addressee
8
-
-
..-
-
.~
-
-
.-
SAN MARCOS ENGINEERING PLATE 1,
ClVlC EwaNEC... SOIL. * P.au*o.l.o~ PROJECT:
NORTH
1 NO SCALE
I
VICINITY~MAP
LOT 398 APARTMENTS
LA COSTA MDWS, #2
LUCIERNAGA STREET
CARLSBAD, CA,
REFERENCE: THOMAS BROS, MAP
PAGE 20 c-4
q-n U.,, -_-- -- .._
-
-
-
SAN MARCOS ENGINEERING
CWlL ENGINEERS. *OILS * FO”NDA.TION
- FILL
SLOPE
-
-
-.
-
PLATE 2. BORING LOCATION PLAN
PROJECT: LOT 398 LA COSTA MDWS,
UNIT NO, 2 APARTMENTS
v \i+j/ '1 .--A-J+-
9 B-3
D-3
0 B-2
D-2
CUT SLOP
r
LUCIERNAGA 3TY I I
-
aeo h4”LmEII.Y DWVC. ,)U<rr I
- SAN MARCOS ENGINEERING PLATE 3, BORING LOG
CWlL ENOINL..,. 901LS a FO"f.D.naN
Boring No. B-/ 380 M”L..“m* omwc ,“A--. llcl “ArnCO.. c. ,10.* 4dlOl ‘7.4.0111 Sheet N&/of/
- L uck07a9a
CONTRACT NO. J PURPOSE
Material & Remarks
-
-
-
.-
-
-
SAN MARCOS ENGINEERING PLATE 4, BORING LOG C+,C E*OINEE.s. SOILS a FO"*D.TION
380 U"L.EIIS" 09i"C. ,cc-c . &ring No. B-2
SAM “.mC3*. c. *10*. ,dlOl 74d.0111 Sheet No.jof/
L uckr..a*
CONTRACT ~0. J PURPOSE
IBlowsl stows cm I Samole I I --
Depth Log Material 6 Remarks , n
I .A-u-s;hde--w~
I
-
.-
-
-
SAN MARCOS ENGINEERING
ClYlL ENOINEE... s.OlLl a Fc.UNo.TlOn PLATE 5, BORING LOG
3eo MULBEW?" DIIWC. 5Ul7I m Boring No. 63
5AH LIII1C.2,. CA etos, 16191 744.0111 Sheet No.-&fL
,-NITmACT .*r. U -. .:,,.,r bcn” I nnCI I NV. r”t-iYU*C
Blows Blows on
Elev. on Spoon for 6” Sample
0 Casing Penetration N0. &I Material (L. Remarks Depth \
I w ’ / “. (r . .
SAN MARCOS ENGINEERING PLATE 6, BORING LOG
-
-
,-
-
-
-
-
3-o ULLrnLRrl” 091”s. ,u,-*. Boring No. B-4
5.n Y.I)CJS. c. *ace. ,6,01 744-o,,, Sheet No./of /
L uc&-fla+7 ORIN 2 S FOR - f&y Bh&h&uRLZ
CONTRACT NO. J P&POSE
Material 6 Remarks
-
-
, ,
/o /o
I I
--
I
I
I I TV I I
/‘6’ I I I I I
--
-
-
-
-
-
,-
-
-
-
-
-
-
-
-
-
-
SAN MARCOS ENGINEERING
Cl”lL ENGINELm*. 501LI * FOw.D.IIOI(
380 UYLaEIIII” 0.8”s~ ,Li-l . s.* “.rnC?S. c. 910e. ldlO1
PLATE 7, BORING LOG
Boring No. “-7
Sheet No./of-
L uckrda+f ORIN 2 S FOR - /3p ~&&~&~#Z
CONTRACT NO. J PUkPOSE
Warerial 6 Remarks
-
-
-
-
-
.-
-
,-
-
-
PLATE 8, FIELD COMPACTION TEST .~~. SAN MARCGS ENGINEERING
Civil Engineers, Soils & Foundation Date 5/#/gr
* REPORT OF SOUS COMPACTION TEST
Project & .4ddress P /Ii?/-Ez -Ji.579
Location of Test L /w&mqct, J ’
Height of Fill
Test No. D-/
&/& Depth of Test Below F.G. gff
1. Bulk Density of Test Sand, WI = m27 PCf
2. Weight of Soil Taken From Test Hole, W2 = q%?/ Ibs. / gms.
3. Moisture Content of Soil, Calculated = 6.3 %
4. Dry Weight of Soil From Test Hole. W3 = 0.2205 W2/ (100 + WI= 6*oflc Ibs.
5. Weight of Sand Used in Test, Wq = \bs.’ 39’ gm.
6. Weight of Sand in Funnel, W5 = lbs.= /@z gm.
7. Volume of Test Hole, V = (W, - W,)/ 453. 6xW1 = &y3?3 ft3
0. Dry Density of Soil Tested, Wd = W3/ V = pp. Q/ pcf
9. Maximum Dry Density of Soil From Lab Tests, Wd max = //@S pcf
.4t 0. M. C. F7-r %
10. Relative Compaction % = Wd / Wd may x 100 = $? “1.
Remarks:
Soil Type : h&!ka 52~~ J+ a%, &L-q& I
Sketch of Test Location:
(No Scale)
Other Comments:
380 Mulberry Drive San Marcos, Ca. 92069 744-0111
Prepared By:
* Per ASTM Dl556. Sand Cone v&h-I
.-
SAN MARCOS ENGINEERING
Civil Engineers, Soils & Foundation
PLATE 9, FIELD COMPACTION TEST
Date s//y/f<
- * REPORT OF SOILS COMPACTION TEST
Project & -4ddress P’ 7zw& ‘W/e - 1. Arc 35lp
- Location of Test ~~C/Lrr#~KZ- Test No. o-2
Height of Fill n/, 2&m/& Depth of Test Below F.G.
1. -
2.
3. -
4.
- 5.
6.
7.
a.
9.
-
-
Bulk Density of Test Sand, WI = d7 70 PCf
Weight of Soil Taken From Test Hole, W2 = &=a3 lbs./ gms.
Moisture Content of Soil, Calculated = % 7s
Dry Weight of Soil From Test Hole, W3 = 0.2205 W2/ (100 + w)= 57479 lbs.
Weight of Sand Used in Test, W4 = I&,= 3357 gm.
Weight of Sand in Funnel, W5 = lbs.= /3$7 fzm.
Volume of Test Hole, V = (W, - W,)/ 453.6xWL = d&G?9 ft3
Dry Density of Soil Tested, Wd = W3/ V = AT* w PCf
Maximum Dry Density of Soil From Lab Tests, Wd max = //cf. r pcf
At O.M.C. /da r yT*
10. Relative Compaction % = Wd / Wd max x 100 = FT %
Remarks:
Soil Type :
Sketch of Test Location: (No Scale)
Other Comments:
300 Mulberry Drive San Marcos. Ca. 92069 744-0111
Prepared By:
* Per ASTM Dl556. Sand Cone Method
-
SAN MARCOS ENGINEERING PLATE 10, FIELD COMPACTION TEST
- Civil Engineers, Soils & Foundation Date s/#$?c
- * REPORT OF SOILS COMPACTION TEST
Project & -4ddress -7zYl.q &wf. 0 3?8
L J ’ Location of Test M c/b07agd, Test No. a-3 J
Height of Fill Depth of Test Below F.G. f&/
1. -
2.
3.
4.
- 5.
6.
.-
7.
0.
9.
-
Bulk Density of Test Sand, W1 = & 27 PCf
Weight of Soil Taken From Test Hole, W2 = 33-3 lbs./ gms.
Moisture Content of Soil, Calculated = 7.6 %
Dry Weight of Soil From Test Hole, W3 = 0.2205 W,/ (100 + wl=G25/47 lbs.
Weight of Sand Used in Test, W4 = Ibs.=%/S gmr
Weight of Sand in Funnel, W5 = lbs.= ./&L gm.
Volume of Test Hole, V = (W, - W,)/ 453.6xWI = f9Gy97 ft3
Dry Density of Soil Tested, Wd = W31 V = 8-3 94 pcf
Maximum Dry Density of Soil From Lab Tests, Wd max = /Y&r- pcf
At0.M.C. /‘@-s %
10. Relative Compaction % = Wd 1 Wd max x IO0 = 77 %
Remarks:
Soil Type :
Sketch of Test Location:
(No Scale)
Other Comments:
300 Mulberry Drive San Marcos. Ca. 92069 744-0111
Prepared By:
* Per ASTM Dl556, Sand Cone Method
-
SAN MARCOS ENGINEERING
PLATE 11. I AR lJF\SITY TFST
Cnll. e.arri*... ,QIU . ~O”IO.I~O”
Moisture vs. Dry Density Curve
sO&‘gy -*/
.5;/A A- 9& &%+7, z&e* @wd
140
130
120
110
100
90
MOISTURE CONTENT, ‘$6
Remarks:
Test as per A.S.T.M. Designation D 1557-78 Method OA OB OC !JD
aa0 UUL.*‘.” O.l”Z. ..,..s .
a.* “..CC,. c. ,10.. #0,8,71..0111
-
-
-
SAN MARCOS ENGlNEERlNG
Clrll. L”O,,.#I... ,OlU . COV”D.IIO.4
PmE 12, LAB DENSITY TEST
hloisture vs. Dry Density Curve
&A s”2e,T,: -g/
‘z $k-4i%M/k4 & &
Lace tion: 5/A &.- s-Q% a&f
uc/m*,wB# SdL f=e 5?-de-L
-
140
130
5 a 120
.
i
E a 110
*
a”
100
90
MOISTURE CONTENT, %
Remarks:
Test as per A.S.T.M. Deslqnation D 1557-78 Method OA q B OC fJD
,a0 U”L.I.CI D.l”*. .-.1x .
a.* “..CCI. c. .,o.. calm, Irr.Olls
PLATE 13, LAB DENSITY TEST
-
SAN MARCO5 ENGINEERING C,",l. LmOIms*.*. ,aLa . ro"..O.IlOn
hloisture vs. Dry Density Curve
Prqjectr
/iire - 7zkq GR7db/kw
/& 3'B:'~ LA& '
Location:
hC/hzq~&
-5'
&w/I c5sz&&
zzcec f-7-e'
r&-;t /
140
130
8 !l( 120
.
c
z
: 110
>
2
100
12 0 4 8 16 20 24
MOISTURE CONTENT, %
Remarks:
Test as per A.S.T.M. Desiqnation D 1557-78 Method OA q B q C OD
sea UYL.E.- q .W‘. ‘....S .
UI “..CCl. 5. *x0.. saao, ,...a,,, &m-w7
-
.-
-
SAN MARCOS ENGINEERING
PLATE 14, LAB DENSITY TEST
Moisture vs. Dry Density Curve
zz* /goA
.@3sB ' I
Location:
AfC/+7~~Q, L2ckAG/
130
6 a120
.
:: ii
2 9110
>
2
-
-
100
MOISTURE CONTENT, %
Ren-arks:
Test as per A.S.T.M. Designation D 1557-70 Method q A q B OC OD
se0 ..lYL.I.mT E.P.‘. .r..v . UI “r*Ccs. c. .10.. <e*o, 7.r.011,
-3 - SAN HARCOS ENGINEERING Civil Engineera, Soils b Foundation
APPENDIX A
RECOKUENDED EARTHWORK SPECIFICATIONS
1. QgHEfiAg, Qg~~g~pTgQ& The oblective is to obtain uniformity 6 adequate internal strength in filled
ground by proven engineering procedures and teats a0
that the proposed structures may be safely supported.
The procedures include the clearing and grubbing, removal of existing structures, preparation of land to
be filled, processing the fill soile, filling of the
land, and the spreading and compaction of the filled areao to conform with the lines, grades, and slopes as shown on the approved plans.
The owner shall retain a Civil Engineer qualified in Soil Kechanics (herein referred to as Engineer) to
inspect and test the filled ground as placed to verify
the uniformity of compaction of filled ground to the
specified 90 percent of maximum dry density. The
Engineer shall advise the owner and grading contractor
immediately if any unsatisfactory conditions are
observed to exist and shall have the authority to reject the compacted filled ground until such that as corrective measures are taken, neceaaary to comply with
the specifications. It shall be the sole
responsibility of the grading contractor to achieve the specified degree of compaction.
2. CHHARINCL cizQe!mQ, ANQ ~REEARINC AREfd TQ Be
eE!&PPz
(a) All brush, vegetation, and any biodegradable
refuse shall be removed, piled, and burned or
otherwise disposed of as to leave the areas to be filled free of vegetation and debris. Any unconpacted filled ground or loose compressible natursl
ground, shall be removed unless the report recommends
otherwise. Any unstable, -=mv. or otherwise
unsuitable areae shall be corrected by draining or removal, or both.
(b> The natural ground which is determined to be satisfactory for the support of the filled ground shall then be ploved or scarified to a depth of at least eix
inches (6"). and until the surface if free from ruts, hummocks, or other uneven features which would tend to prevent uniform compaction by the equipment to be used.
1
APPENDIX A, RBCOMNENDOD KARTNWORK SPICIFICATIOWI, CONT’D,.. -
-,~ 3
-
(C!) After the natural ground has been prepared, it
ahall then be brought to the proper aofature content
and compacted to not lees than 90 percent of IGACiSlUR
deneity in accordance with the A.S.T.M. D1557-70 method
which uaea 25 blowe of a 10 pound rammer falling 18
inchee on each of 5 layers in a 4-inch diameter l/30
cubic foot cylindrical meld.
(d) Where fills are made on hillaider or exposed alope
areas, with gradients greater than 10 percent,
horizontal benchea shall be cut into firm undisturbed
natural ground in order to provide both lateral and vertical stability. This is to provide a horizontal base so that each layer is placed and compacted~ on a
horizontal plane. The initial bench at the toe of the fill ahall be at leaat 10 feet in width on firm
undisturbed natural angle of repose or design alope. The Engineer ahall deteruine the width and frequency of
all succeeding bencher which will vary with the aoil conditiona and the eteepnesa of alope.
3. n!Emu4P A&P' SPkmd4 llmeerelrer The fill aoil shall consist of eelect materials free from vegetable matter, and other deleterious subatancea, and
ahall not contain rocka or lunpe greater than 6 inches
in diameter. This nay be obtained from the excavation of banka, borrow pita or any other approved sourcea and by mixing eoila fro8 one or more eources. If excessive
vegetation, rocks. or aoila with inadequate strength or
other unacceptable phyeical characteristica ate encountered, theae ahall be diapoaed of in waste area.%
aa ahown on the plane or as directed by the Engineer.
If. during grading operatione. .aoile are found which
were not encountered and teated in the preliminary investigation, teats on these soil8 ehall be performed
to determine their physical characteristica. Any special treatment recommended in the preliminary or
eubeequent soil reports not covered herein shall become an addendum to these specifications.
4. ELdEZNEr SP!?Ef!DZ!!GL Am Eo!?!mTm EI44 !?ATKRId4S,
(a) When the moisture content of the fill material ia
below that specified by the Engineer, water shall be added in the borrow pit until the moisture content is
near optimur to assure uniform mixing and effective compaction.
(b) When the moisture content of the fill naterlal ie above that specified by the Engineer, resulting in
2
APPENDIX A, RECOUKENDED EARTHWORK SPECIFICATIONS. CONT'D...
-1.3
,~..”
-~ 1 ,.J
inadequate compaction or unatable fill, the fill material ahall be aerated by blading and scarifying or other satisfactory nethoda until the moisture content is near optimur aa specified.
(c) After processing. the suitable fill material shall be placed in layer6 which, when compacted, shall not exceed SiX inches (6".) Each layer shall be spread evenly and shall be throughly mixed during the spreading to ensure uniformity of material and moisture in each layer.
(d) After each layer hae been placed, mixed and spread evenly, it ahall be throughly compacted to not leas
that the denaity set forth in paragraph 2(c) above. Compaction ahall be acconpliehed with aheepsfoot
rollere, multiple-wheel pneumatic-tired rollers. or other approved types of compaction equipment, such as
vibratory equipment that ie specially designed for certain soil typea. Rollera shall be of such design and maintained to such a level that they will be able to compact the fill material to the specified density. Tamping feet of sheepefoot fellers shall be maintained such that the SOil will be compacted rather than aheared by the roller. Rolling shall be accompliehed while the fill material ia at the specified moisture
content.
Rolling of each layer shall be continuous over its entire area and the roller shall make sufficient trips to insure that the specified density has been obtained. Rolling shall be accompliehed in a planned procedure such that the entire areae to be filled shall receive
uniform compactive effort.
(e> The surfaces of the fill a1ope.a shall be compacted
by means of sheepafoot rollers or other suitable equipment. Compacting operations shall be continured until the slopes are stable and until there is no
appreciable amount of loose soil on the slopes..
Compacting of the slopee ahall be accomplished by
backrolling the alopea in incrementa of 3 to 5 feet in elevation gain or by other method6 producing
satisfactory reeulte.
(f) Field density teats shall be taken for
approximately each foot in elevation gain after compaction, but not to exceed two feet in vertical height between teats. Field density teats may be taken
at intervala of 6 inches in elevation gain if required
by the Engineer. The location of the teate in plan shall be so spaced to give the beat poesible coverage
and ahall be taken no farther apart than 100 feet.
Tests shall be taken on corner and terrace lot.5 for each two feet in elevation gain. The Engineer may take
3
-
APPENDIX A, RKCOUKENDED EARTHWORK SPECIFICATIONS, CONT'li...
additional testa ae considered neceeaary to check on
the uniformity of compaction. Where sheepsfoot rollera
are used, the teeta ahall be taken in the compacted
material below the dieturbed surface. No additional
layer6 of fill shall be spread until the field density
tests indicate that the specified density has been obtained.
(CT) The fill operation shall be continured in six inch
(6") compacted layer6 aa specified above, until the fill hae been brought to the finfahed alopea and grades as shown on the accepted plans.
5. &spectlonL Sufficient inspection by the Engineer
shall be maintained during the filling and compacting
operations so that be can verify that the fill war
constructed in accordance with the accepted apecificationr.
6. Seaaona& Lfm#~, No fill material ahall be placed, ------- --a spread, or rolled if weather conditiona increaee the moisture content above permiesible limits. When the
work la interrupted by rain, fill operation6 shall not
be reeumed until field teats by the eoilr engineer
indicate that the moieture content and density of fill
are ae previouely specified.
7. Lini$ina VsU*s of NmraPNnslYs aal., Those eoila that expand 3.0 percent or leaa fro8 air dry to saturation under a unit load of 150 pounds per square foot are conaideted to be nonexpansive.
8. All recommendationa presented in the attached report are a part of these epecificatione.
-
4