HomeMy WebLinkAbout; Laguna Riviera Unit 2 Lots 55-56; Soils Report; 1968-10-28-
-
-
-
-
-
-
-
-
-
-
WOODWARD -CLYDE 8, ASSOCIATES CONSULTlNG SOIL AND FO”NDATlON ENQlNEERS AND GEOL0GlST.s
October 28, 1968
Project No. 66-237-2
Kamar Construction Company
325 Elm Avenue
P.O. Box 71
Carlsbad, California 92008
LAGUNA RIVIERA UNIT NO. 2
REGRADING LOTS 55 & 56
CARLSBAD, CALIFORNIA
In accordance with the request of Mr. Jerry L. Rombotis of your
organization, we have provided soil engineering services in con-
junction with the regrading of the subject lots. These set-vices
included observation of the grading operation and the testing
of fill as placed and compacted.
Fill was placed, compacted and tested on lots 55 and 56.
Site preparation, compaction and testing for the subject grading
were done on October 17, 1968 in accordance with the "Specifica-
tions for Controlled Fill" in our letter dated January 10, 1967.
As the site grading progressed, the compaction procedures were ob-
served and compaction tests were made to determine the relative com-
paction of the fill in place. Field observations and compaction
test results indicate that the fill has been compacted to 90 percent
or more of maximum laboratory density. The results of compaction
tests are given on the attached forms. Results of compaction tests
taken during previous grading on the subject site have been reported
in our report dated September 20, 1968.
Laboratory tests to determine moisture-density relationships, maximum
dry density, optimum moisture content, grain size distribution, plas-
ticity characteristics and strength and swell characteristics were
performed on representative samples of the material used for fill.
The results of laboratory tests have been re,ported in our report dated
September 20, 1968.
Laboratory tests indicate that nonexpansive fill was placed within 2
feet of rough grade on all fill lots noted above.
3
-
-
.Kamar Construction Co.
Project No. 66-237-2
October 28, 1968
Page 2 of 3
-
-
-
-
-
-
-
-
_-
-
A visual inspection of the subject site at the completion of grading
indicates that potentially expansive soil is not evident at finish
grade on either lot.
Footings for structures placed on nonexpansive undisturbed soil or
nonexpansive properly compacted fill nay be designed for a bearing
pressure of 2000 pounds per square foot at a depth of 12 inches be-
low rough lot grade. Footings should have a minimum width of 12
inches.
The elevation of compaction tests shown as finished grade (FG) tests
correspond to the elevations shown on the grading plans for Laguna
Riviera Unit No. 2, latest revised date October 21, 1968 prepared
by Raymond R. Ribal, Civil Engineer.
This report covers the fill placed under our observation during the
dates specified above. Additional fill placed after these dates, as
well as the backfill in utility trenches located within 5 feet of a
building and treater than 12 inches deep, or any trench 5 feet or more
from a building and in excess of 5 feet in depth, should be compacted
under the observation of this office and tested to assure compliance
with the earthwork specifications of the project. This office should
be contacted at least 24 /hours prior to backfilling operations. Utility
service trenches within 5 feet of a building that are perpendicular to
the building footings and are less than 12 inches wide and less than 3
feet deep are not subject to this recommendation.
Structures that will not tolerate differential settlements (such as
foundations, swimming pools, concrete decks, walls, etc.) should not
be located within 5 feet of the top of a slope. Footings located
closer than 5 feet from the top of the slope should be extended in
depth until the outer bottom edge of the footing is 5 feet horizon-
tally from the outside face of the slope.
The inspections and tests of compaction made during the period of our
services on the subject site were in accordance with the local accep-
table standards for this period. The conclusions or opinions drawn
from the tests and site inspections apply only to our work with re-
spect to grading and represent conditions at the date of our final
inspection.
WTODWARD-CLYDE & ASSOCIATES co,m,,i,,r: SOi! "lid Fowh,iw Fl,CiWC,S "d ~cnio::irlr
- Kamar Construction Co.
_ Project No. 66-237-2
October 28, 1968 - Page 3 of 3
-
.-
We will accept no.responsibility for any subsequent changes made to
the site by others or by uncontrolled action of water or by failure
of others to properly repair damages caused by uncontrolled action
of water.
-
-
Louis J. Lee
CFM/LJL/mec
Attachments
- (5) Kamar Construction Co.
(2) City of Carlsbad Building Inspection Dept.
(2) Security Title Insurance Co. -
-
-
-
-
-
-
,.-
--
-
-
_^
0
WOODWARD-CLYDE & ASSOCIATES C"W,,l,i#,C soil "rid li,2l,liiltllitlll r‘,,giwm <ill‘, Cridi.,!i~ I *
-
COMPACTION TEST RESULTS
--JOB NAk I’ LAGUNA RIVIERA UNIT NO. 2
JOB NUMBErI 66-237-2
DATESCoVERED October 17, 1968 P/&E 1 OF 1
UBOI(ATORY - DATE nzl RETEST LOc*TIOII ELLVITION :“,‘:x: .K%, DIN*,n .::z:;:, HUIIBCR OF OFTEST * Dll “IT. PCF psr * OI L&Q_ UENI. __- -- --~ ---
- UPPER LEVEL
hzt. 17 218
219
220
221
-
-
__
-
56
74.5' 13.0 118.0 122.0 96.7
76.0' 8.1 110.2 122.0 90.4
76.6' 11.7 111.7 122.0 91.5
78.5' 110.2 110.2 122.0 90.4