CffiOTECHNICAL INVESTIGATION
PROPOSED PARKING LOT
CORNER OF
ROOSEVELT STREET AND ELM AVENUE
CARLSBAD, CALIFORNIA
PREPARED FOR:
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, California 92009-4859
*" . PREPARED BY:
M
« Southern California Soil and Testing, Incorporated
Post Office Box 20627
— 6280 Riverdale Street
San Diego, California 92120
m SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVERDALE ST. SAN DIEGO, CALIF. 9212D ' TELE ZBD-4321 • P.O. BOX ZD6Z7 SAN DICGO, CALIF. 9212D
6 7 B ENTERPRISE ST. E3CONDIDD, CALIF. g Z D 2 5 > TELE 746-4544
m June 25, 1990m
m City of Carlsbad
m 2075 Las Palmas Drive SCS&T 9021086
m Carlsbad, California 92009-4859 Report No. 1
ATTENTION: Mr. Kenneth W. QuonM
m
SUBJECT: Geotechnical Investigation, Proposed Parking Lot, Corner of
m Roosevelt Street and Elm Avenue, Carlsbad, California.
m
•» Gentlemen:
wm In accordance with your request, a geotechnical Invest i nation has been
completed for the above subject project. This letter contains the results of
our field investigation, R-Value laboratory test results, grading
specifications, and structural pavement design recommendations.
""" SITE AND SOIL DESCRIPTION
*w
•i The site is located on the northeastern corner of Roosevelt Street and Elm
m Avenue, and is approximately 140-feet long by 125-feet wide. The site is
relatively flat, and is presently occupied by abandoned houses and concrete
slabs. The site location is shown on the attached Plate Number 1.
Six hand dug test pits w=re excavated by our engineering geology personnel.
«•The pits extended to a maximum depth of two feet. The soils encountered in
*• the test pits consisted of approximately one to 1.5 feet of topsoil
m overlying terrace deposits. The topsoil consisted of dark brown, loose, dry
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
SCS&T 9021086 June 25, 1990 Page 2m
m
to humid, fine-grained silty sand. The terrace deposit soils were found to
m be dark brown to orange-brown to red-brown, medium dense, humid,jog fine-grained silty sand. The locations of the test pits are shown on Plate
HI Number 2. Plates Number 4 through 6 contain the logs which describe the
• soils found in each test pit.
Ml
m LABORATORY TEST RESULTS
R-Value tests were performed on samples obtained from the test pits. The
topsoil and terrace deposits had R-Values of 76 and 75, respectively. The
m results from the R-Value tests are contained in Plates Number 7 and 8.
in
m CONCLUSIONS AND RECOMMENDATIONS
m
GENERAL
«•
In general, no geotechnical conditions were encountered which would preclude
<*•the construction of the proposed parking lot as presently proposed provided
the recommendations presented herein are followed.
•»• The subject site was found to be underlain by a relatively thin layer of
m topsoil deposits extending to a maximum depth of 1.5 feet below existing
^ grade.
M*
GRADING«•
m SITE PREPARATION: Site preparation should begin with the removal of any
u^existing vegetation and deleterious matter from the areas of the site to be
«• graded or that will be built on. Existing topsoils should be removed to
m firm natural ground. Firm natural ground is defined as soil having in-place
density of at least 90 percent. After this has been accomplished, the soils
exposed in fill areas should be scarified to a depth of 12 inches, moisture
conditioned, and recompacted to at least 90 percent relative compaction.
SCS&T 9021086m
m
June 25, 1990 Page 3
m
m
m
m
EARTHWORK: All earthwork and grading contemplated for site preparation
should be accomplished in accordance with the attached Recommended Grading
Specifications and Special Provisions. All special site preparation
recommendations presented in the sections above will supersede those in the
Standard Recommended Grading Specifications. Fill should be compacted to at
least 90% relative compaction at or slightly over optimum moisture content.
Utility trench backfill and beneath asphalt pavements should be compacted to
minimum of 90% of its maximum dry density. The upper twelve inches of
subgrade beneath paved areas should be compacted to 95% of its maximum dry
density. This compaction should be obtained by the paving contractor just
prior to placing the aggregate base material and should not be part of the
mass grading requirements. The maximum dry density of each soil type should
be determined in accordance with ASTM Method D 1557-78, Method A or C.
STRUCTURAL PAVEMENT DESIGN REOCMHENDKnOB
Based on a R-Value of 75 for the on-site soils, it is our opinion that a
minimum structural pavement section may be used at the subject site. The
minimum asphalt concrete (AC) structural section required should consist of
at least 2.5 inches of asphalt concrete pavement over 4.0 inches of Class II
aggregate base. All subgrade soils within 12 inches of subgrade under
asphalt pavements should be compacted to at least 95 percent of maximum dry
density. All base material should also be compacted to at least 95 percent.
Any soft or spongy areas should be removed to firm ground and be replaced
with compacted f ill .
If you should have any questions after reviewing this report, please do not
hesitate to contact this office. This opportunity to be of professional
service is sincerely appreciated.
m
m
m
m
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL & TESTING, INC
Reviewed by:
William R. Stevens, R.C.E. #43010
DBA:WRS:mw
cc: (4) Submitted
(1) SCS&T, Escondido
r\
Daniel BY A#fer, R.C.E
m
m
m
m
m
m
m
m
mt
a
m
m
SOUTHMN CALIFORNIA
SOIL A TBSTINO.INC.
CARLSBAD PARKING LOT
,v.BS/WDW
jot NUMBER 902108»
DATE:^5-90
PLATE
ROOSEVELT STREET
LU
3
ZUJ§
S_j
UJ
J
EXISHNG BUILDING
T5
EX1STMG
BULGING
LEGEND
• TRENCH LOCATION
T2
EXISTING
BULGING
PROPOSED PARKING LOT
'T4
PROPOSED PARKING LOT
T6I
SCALE r=20'
O 10 20 30 4O
SOUTHERN CALIFORNIA
SOIL A TESTING, I NO.
CARLSBAD PARKING LOT
•V:BS/WDW
JOB NUMBER:90210M
DATE:6-22-90
PLATE #2
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION
I.COARSE GRAINED, more than half
of material is larger than
No. 200 sieve size.
GRAVELS CLEAN GRAVELS
More than half of
coarse fraction is
larger than Mo. 4
sieve size but
smaller than 3".
GROUP SYMBOL
GU
GP
GRAVELS WITH FINES
(Appreciable amount
of fines)
SANDS
More than half of
coarse fraction is
smaller than No. 4
sieve size.
CLEAN SANDS
SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAINED, more than
half of material is smaller
than No. 200 sieve size.
SILTS AND CLAYS
Liquid Limit
less than 50
SILTS AND CLAYS
GM
GC
SW
SP
SM
sc
ML
CL
OL
MH
Liquid Limit CH
greater than 50
OH
HIGHLY ORGANIC SOILS PT
TYPICAL NAMES
Well graded gravels, gravel-sand mixtures, little or no
fines.Poorly graded gravels, gravel
sand mixtures, little or no
fines.Silty gravels, poorly graded
gravel-sand-silt mixtures.
Clayey gravels, poorly
graded gravel-sand, clay
mixtures.
Well graded sand, gravelly
sands, little or no fines.
Poorly graced sands, gravelly
sands, little or no fines.
Silty sands, poorly graded
sand and siity mixtures.
Clayey sands, poorly graded
sand and clay mixtures.
Inorganic silts and very
fine sands, rock flour, sandy
silt or cljyey-silt-sand
mixtures with slight plas-
ticity.
Inorganic clays of low to
medium plasticity, gravelly
clays, sandy clays, silty
clays, lean clays.Organic silts and organicsilty clays or low plasticity.
Inorganic silts, micaceous
or diatom^ceous fine sandyor si 1ty soils, elastic
silts.
Inorganic clays of high
plasticity, fat clays.
Organic clays of medium
to high plasticity.
Peat and other highly
organic soils.
US -
Water level at time of excavation
or as indicated
Undisturbed, driven ring sample
or tube sample
CK — Undisturbed chunk sample
BG — Bulk sample
SP — Standard penetration sample
SOUTHERN CALIFORNIA
SOIL ft TBSTINGJNC.
CARLSBAD PARKING LOT
BY:JBR
JOB NUMBER • 9021086
DATE- 6-14-90
Plate No. 3
«
•I I
0.Illa
0.5-
l.Or
•
.5
«
>.0-
•
4
4
^m
0.5-
1.0-
1.5
^
^
^
^
«SAMPLE TYPE 1BG
\
BG SOIL 1CLASSIFICATIONSM
SM
SM
SM
TRENCH NUMBER 1
ELEVATION
DESCRIPTION
TOPSOIL, Dark Brown, Fine-
Grained SILTY SAND
.TERRACE DEPOSITS, Dark Red-
dish-Brown, Fine-Grained
SILTY SAND
Bottom at 1.7'
TRENCH NUMBER 2
TOPSOIL, Dark Brown,
Fine-Grained, SILTY SAND
TERRACE DEPOSITS. .OrapgeT JBrown to Brown, Fine-Grained
SILTY SAND
Bottom @ 2.0'APPARENTMOISTURE3ry to
Humid
Humid
Humid
Humid APPARENTCONSISTENCYOR DENSITYLoose
Medium
Dense
Loose
Medium
Dense
i-
coz c
tro MOISTURECONTENT ('/.}RELATIVECOMPACTIONS)™
-
-
~
-
-
-
-
.
-
>^v SOUTHERN CALIFORNIA
^^/^ SOIL & TESTING. INC.
PROJECT: CARLSBAD PARKING LOT
LOQQKD BY: JBR DATE LOGGED: 6-14-90
JOB NUMBER: 9021086 PLATE NUMBER: 4
Ml
m
m
«**
*-k^
X
a.Ulo
D.5-
i n*.
•
1.5-
•
^
^
44
0.5-
1.0-
1.5r
^
«
«•AMPLE TYPE 1(0
BG
BG SOIL 1ASSIFICATION |-jO
SM
SM
SM
SM
TRENCH NUMBER 3
ELEVATION
DESCRIPTION
TOPSOIL, Dark Brown, Fine-
Grained SILTY SAND
TERRACE DEPOSITS, Dark
Reddish-Brown, Fine Grained
SILTY SAND
Bottom @ 2.0'
TRENCH NUMBER 4
TOPSOIL, Dark Brown, SILTY
SAND
TERRACE DEPOSITS, Orange-
Brown to Brown, Fine-Grained
SILTY SAND
Bottom at 2.0'APPARENTMOISTUREHumid
Humid
Dry to
Humid
Humid APPARENTINSISTENCYOR DENSITYw
Loose
Medium
Dense
Loose
Medium
Dense
>
H
co
UJ *uQ 3-
>a:o MOISTURECONTENT (Z)RELATIVEDMPACTIONi/CIO
-
™
-
-
-
-
-
.
>/^v SOUTHERN CALIFORNIA
vS=v^^^ SOIL & TESTING, INC.
PROJECT: CARLSBAD PARKING LOT
LOQQtD BY: JBR DATE LOQQf D: 6-14-90
JOB NUMBER: 9021086 PLATE NUMBER: 5
m
*•l»M
I
CL111O
•
).5,
•
1.0.
v
1.5-
•
f«
0.&
1 0
I.&.
«•SAMPLE TYPEBG
BG SOILSSIFICATION 1<-Jo
SM
SM
SM
SM
TRENCH NUMBER 5
ELEVATION
DESCRIPTION
TOPSOIL, Dark-Brown, Fine-
Grained SILTY SAND
TERRACE DEPOSITS, Orange-
Brown, Fine-Grained SILTY
SAND
Bottom at 2.0'
TRENCH NUMBER 6
TOPSOIL, Dark-Brown, Fine-
Grained SILTY SAND
TERRACE DEPOSITS, Dark
Reddish-Brown to Brown,
Fine-Grained SILTY SAND
Bottom at 2.0'APPARENTMOISTURE)ry to
iumid
Humid
•lumid
•iumid APPARENTCONSISTENCYOR DENSITYLoose
Medium
Dense
Loose
Medium
Dense
>i-
<o
2 CLU uQ S-
>
IEQ
•MOISTURECONTENT MRELATIVECOMPACTION(X)—
™
-
-
-
-
y/X SOUTHERN CALIFORNIA
^=T=?N^ SOIL i TESTING. INC.
PROJECT: CARLSBAD PARKING LOT
LOQQID BY: JBR OATB LOQQID: 6-14-90
JOB NUMBER: 9021086 PLATE NUMBER: 6
SAMPLE: Tl @ 1.0' - 1.5 Silty Sand Topsoil
TEST SPECIMAN
DATE TESTED
SPECIMENFABRICATIONCompactor Air Pressure psi
Initial Moisture %
Moisture at Compaction %
Briquette Height in.
Density pcf
EXUDATION PRESSURE psi
EXPANSION PRESSURE DIAL
STABIL-OMETERPn at 1000 pounds psi
ph at 2000 pounds psi
Displacement turns
"R" Value
CORRECTED "R" VALUE
A
6-15-90
350
2.2
9.5
2.53
122.5
470
14
24
4.00
78
78
B
6-15-90
350
2.2
10.5
2.55
118.8
105
19
34
4.45
68
68
c
6-15-90
350
2.2
10.0
2.54
121.5
240
16
27
4.15
75
75
D E
"R" VALUE AT 300 PSI EXUDATION PRESSURE =' °
GRAIN SIZE DISTRIBUTION
SIEVE
3
2'4
2
ft
1
\
\3/4
#4
#8
#16
#30
#50
#100
#200
.05mm
,005mm
.001mm
AS RECEIVED
LIQUID LIMIT
PLASTIC LIMIT
PLASTICITY INDEX
SAND EQUIVALENT
AS TESTED
800 600 500 400 300 200
EXUDATION PRESSURE psi
100
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
08BO niVEROALK BTRBBT
BAN DIBOO, CALIFORNIA BB1BO
CARLSBAD PARKING LOT
WRS
JOB NO. 9021086
6-18-90
Plate No. 7
3
!
i
]
3
SAMPLE: TP3 @ 1.0' - 2.0 Silty Sand Terrace Deposits
TEST SPECIMAN
DATE TESTED
SPECIMENFABRICATIONCompactor Air Pressure psi
Initial Moisture %
Moisture at Compaction %
Briquette Height in.
Density pcf
EXUDATION PRESSURE psl
EXPANSION PRESSURE DIAL
STABIL-OMETERPh at 1000 pounds psi
?h at 2000 pounds psi
Displacement turns
"R" Value
CORRECTED "R" VALUE
A
6-15-90
350
3.6
9.4
2.52
124.2
200
18
30
4.50
71
71
B
6-15-90
350
3.6
8.4
2.51
124.7
730
12
19
4.60
81
81
c
6-15-90
350
3.6
8.9
2.51
124.7
385
14
24
4.25
77
77
D E
"R" VALUE AT 300 PSI EXUDATION PRESSURE =75
GRAIN SIZE DISTRIBUTION
SIEVE
3
2'£
2
116
1
\
\
3//8
#4
#8
#16
#30
#50
#100
#200
,05mm
.005mm
.001mm
AS RECEIVED
LIQUID LIMIT
PLASTIC LIMIT
PLASTICITY INDEX
SAND EQUIVALENT
AS TESTED
0 .806 700 600 500 400
m
m
m S\^ SOUTHERN CALIFORNIA
/<jLN SOIL & TESTING , INC.
>T™T^r BBBO niVBRDALB STREKT
\^S BAN DIKOO, CALIFORNIA 88180
CARLSBAD PARKING
BY WRS
JOB NO. 9021086
DATE
Plate
LOT
6-18-90
No. 8
PARKINS DOT, ROOSEVELT STREET AND ELM AVENUE, CARLSBAD
RBOCMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS
GENERAL INTENT
The intent of these specifications is to establish procedures for clearing,
contacting natural ground, preparing areas to be filled, and placing and
compacting fill soils to the lines and grades shown on the accepted plans.
The recommendations contained in the preliminary geotechnical investigation
report and/or the attached Special Provisions are a part of the Recoirmended
Grading Specifications and shall supersede the provisions contained
hereinafter in the case of conflict. These specifications shall only be
used in conjunction with the geotechnical report for which they are a part.
No deviation from these specifications will be allowed, except where
specified in the geotechnical report or in other written communication
signed by the Geotechnical Engineer.
OBSERVATION AND TESTING
Southern California Soil and Testing, Inc., shall be retained as the
Geotechnical Engineer to observe and test the earthwork in accordance with
these specifications. It will be necessary that the Geotechnical Engineer
or his representative provide adequate observation so that he may provide
his opinion as to whether or not the work was accomplished as specified. It
shall be the responsibility of the contractor to assist the Geotechnical
Engineer and to keep him appraised of work schedules, changes and new
information and data so that he may provide these opinions. In the event
that any unusual conditions not covered by the special provisions or
preliminary geotechnical report are encountered during the grading
operations, the Geotechnical Engineer shall be contacted for further
recommendations.
(R-9/B9)
Hi
m
SCS&T 9021086 June 27, 1990 Appendix, Page 2
If, in the opinion of the Geotechnical Engineer, substandard conditions are
encountered, such as questionable or unsuitable soil, unacceptable moisture
content, inadequate compaction, adverse weather, etc.; construction should
be stopped until the conditions are remedied or corrected or he shall
recommend rejection of this work.
Tests used to determine the degree of compaction should be performed in
accordance with the following American Society for Testing and Materials
. ,test methods:
Maxiinum Density & Optimum Moisture Content - ASTM D-l 557-78.
Density of Soil In-Place - ASTM D-1556-64 or ASTM D-2922.
All densities shall be expressed in terms of Relative Compaction as
determined by the foregoing ASTM testing procedures.
PREPARKTION OF AREAS TO RECEIVE FILL
All vegetation, brush and debris derived from clearing operations shall
be removed, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished appearance, free from unsightly
debris .
After clearing or benching the natural ground, the areas to be filled shall
be scarified to a depth of 6 inches, brought to the proper moisture content,
compacted and tested for the specified minimum degree of compaction. All
loose soils in excess of 6 inches thick should be removed to firm natural
ground which is defined as natural soils which possesses an in-situ density
of at least 90% of its maximum dry density.
(R-9/89)
SCS&T 9021086 June 27, 1990 Appendix, Page 3
When the slope of the natural ground receiving fill exceeds 20% (5
horizontal units to 1 vertical unit), the original ground shall be stepped
or benched. Benches shall be cut to a firm competent formational soils. The
lover bench shall be at least 10 feet wide or 1-1/2 times the the equipment
width whichever is greater and shall be sloped back into the hillside at a
gradient of not less than two (2) percent. All other benches should be at
least 6 feet wide. The horizontal portion of each bench shall be compacted
prior to receiving fill as specified herein for compacted natural ground.
Ground slopes flatter than 20% shall be benched when considered necessary by
the Geotechnical Engineer.
Any abandoned buried structures encountered during grading operations must
be totally removed. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of the structure
and properly capped off. The resulting depressions from th<=? above described
procedures should be backfilled with acceptable soil that is compacted to
the requirements of the Geotechnical Engineer. This includes, but is not
limited to, septic tanks, fuel tanks, sewer lines or leach lines, storm
drains and water lines. Any buried structures or utilities not to be
abandoned should be brought to the attention of the Geotechnical Engineer
so that he may determine if any special recommendation will be necessary.
All water vrells which will be abandoned should be backfilled and capped in
accordance to the requirements set forth by the Geotechnical Engineer. The
top of the cap should be at least 4 feet below finish grade or 3 feet below
the bottom of footing whichever is greater. The type of cap will depend on
the diameter of the well and should be determined by the Geotechnical
Engineer and/or a qualified Structural Engineer.
(R-9/89)
SCS&T 9021086 June 27, 1990 Appendix, Page 4m
FILL MKPERIAL
M
fli Materials to be placed in the fill shall be approved by the Geotechnical
UK Engineer and shall be free of vegetable matter and other deleterious
• substances. Granular soil shall contain sufficient fine material to fill
the voids. The definition and disposition of oversized rocks and expansive
^^g- or detrimental soils are covered in the geotechnical report or Special
Provisions. Expansive soils, soils of poor gradation, or soils with low
strength characteristics may be thoroughly mixed with other soils to provide
m satisfactory fill material, but only with the explicit consent of the
* Geotechnical Engineer. Any import material shall be approved by the
** Geotechnical Engineer before being brought to the site.
m
m PLACING AND COMPACTION OF FILL
Ml
Approved fill material shall be placed in areas prepared to receive fill in
layers not to exceed 6 inches in compacted thickness. Each layer shall have
a uni form moisture content in the range that wi 11 a 1 low the compact ion
— effort to be efficiently applied to achieve the specified degree of
•** compaction. Each layer shall be uniformly compacted to the specified
«" minimum degree of compaction with equipment of adequate size to
^, economically compact the layer. Compaction equipment should either be
^ specifically designed for soil compaction or of proven reliability. The
minimum degree of compaction to be achieved is specified in either the
••Special Provisions or the recommendations contained in the preliminarym
geotechnical investigation report.
When the structural fill material includes rocks, no rocks will be allowed
•• to nest and all voids must be carefully filled with soil such that the
«• minimum degree of compaction recommended in the Special Provisions is
achieved. The maximum size and spacing of rock permitted in structural
fills and in non-structural fills is discussed in the geotechnical report,
when applicable.
(R-9/89)
SCS&T 9021086 June 27, 1990 Appendix, Page 5
Mt
m
Field observation and compaction tests to estimate the degree of compaction
** of the fill will be taken by the Geotechnical Engineer or his
m representative. The location and frequency of the tests shall be at the
m Geotechnical Engineer's discretion. When the compaction test indicates that
M a particular layer is at less than the required degree of compaction, the
layer shall be reworked to the satisfaction of the Geotechnical Engineer and
M until the desired relative compaction has been obtained.
Fill slopes shall be compacted by means of sheepsfoot rollers or other
Hi suitable equipment. Compaction by sheepsfoot rollers shall be at vertical
IP intervals of not greater than four feet. In addition, fill slopes at a
** ratio of tvro horizontal to one vertical or flatter, should be trackrolled.
p. Steeper fill slopes shall be over-built and cut-back to finish contours
m after the slope has been constructed. Slope compaction operations shall
result in all fill material six or more inches inward from the finished facemof the slope having a relative compaction of at least 90% of maximum dry
density or the degree of compaction specified in the Special Provisions
m section of this specification. The compaction operation on the slopes shall^_
be continued until the Geotechnical Engineer is of the opinion that the
m slopes will be stable surficially stable.
m
Density tests in the slopes will be made by the Geotechnical Engineer during
^ construction of the slopes to determine if the required compaction is being
achieved. Where failing tests occur or other field problems arise, the
Contractor will be notified that day of such conditions by writtenmcommunication from the Geotechnical Engineer or his representative in the
<• form of a daily field report.
w If the method of achieving the required slope compaction selected by the
M Contractor fails to produce the necessary results, the Contractor shall
rework or rebuild such slopes until the required degree of compaction is
obtained, at no cost to the Owner or Geotechnical Engineer.
(R-9/89)
m
m
SCS&T 9021086 June 27, 1990 Appendix, Page 6•r
CUT SLOPES
m
te The Engineering Geologist shall inspect cut slopes excavated in rock or
• lithified formational material during the grading operations at intervals
W determined at his discretion. I f any conditions not anticipated in the
preliminary report such as perched water, seepage, lenticular or confined^P
— strata of a potentially adverse nature, unfavorably inclined bedding, joints
or fault planes are encountered during grading, these conditions shall be
analyzed by the Engineering Geologist and Soil Engineer to determine ifHimitigating measures are necessary.
m
** Unless otherwise specified in the geotechnical report, no cut slopes shall
m be excavated higher or steeper than that allowed by the ordinances of the
M controlling governmental agency.
m
ENGINEERING OBSERVATION
"* Field observation by the Geotechnical Engineer or his representative shall
HI be made during the filling and compacting operations so that he can express
m his opinion regarding the conformance of the grading with acceptable
•I standards of practice. Neither the presence of the Geotechnical Engineer or
his representative or the observation and testing shall not release the
^ Grading Contractor from his duty to compact all fill material to the
specified degree of compaction.m
m
SEASON UMECS
M
** Fill shall not be placed during unfavorable weather conditions. When work
pi is interrupted by heavy rain, filling operations shall not be resumed until
•I the proper moisture content and density of the fill materials can be
achieved. Damaged site conditions resulting from weather or acts of God
shall be repaired before acceptance of work.
(R-9/89)
SCS&T 9021086 June 27, 1990 Appendix, Page 7
p
m
RECOMMENDED QWDING SPECIFICATIONS - SPECIAL PROVISIONS
m RELATIVE COMPACTION: The minimum degree of compaction to be obtained in
m compacted natural ground, compacted fill, and compacted backfill shall be at
IK least 90 percent. For street and parking lot subgrade, the upper six inches
should be compacted to at least 95% relative compaction.
M
EXPANSIVE SOILS: Detrimentally expansive soil is defined as clayey soil
which has an expansion index of 50 or greater when tested in accordance with
the Uniform Building Code Standard 29-C.
P
*• . OVERSIZED MATERIAL: Oversized fill material is generally defined herein as
rocks or lumps of soil over 6 inches in diameter. Oversize materials should
— not be placed in fill unless recommsndations of placement of such material
is provided by the geotechnical engineer. At least 40 percent of the fill
soils shall pass through a No. 4 U.S. Standard Sieve.
m TRANSITION LOTS: Where transitions between cut and fill occur within the
m proposed building pad, the cut portion should be undercut a minimum of one
m foot below the base of the proposed footings and recompacted as structural
M backfill. In certain cases that would be addressed in the geotechnical
report, special footing reinforcement or a combination of special footing
reinforcement and undercutting may be required.
*
Mi
*
m