HomeMy WebLinkAbout; Rancho Carlsbad Mobilehome Park; Soils Report; 1971-02-17-
Evans. Goffman & McCormick
.SQIL AND ROCK ENGINEERING
. C-“k’DATION ENGINEERING .~- l Engineering GEOLOGY
n ENGINEERING
-
SEISMOLOGY
l GEOPHYSICS
February
our - o'c -
-
-
-
-
__
-
.,-
_-
__
-_
-
C’ ,\ilS A. E”A..S r ..#I E”‘h...
‘AcKsP\ F. COFFKU E”. win* Ce&.‘i.l
,O”X ,:, MC coKI,,cI Ci.il Enlimr.,
Report of Geotechnical Invest'gation Ranch0 Carlsbad Mobile Homes Park Carlsbad, California for Western Land and Development Company
R E C : : 7 -‘~ .f ‘c;,
APR 14
tic; ,' 3 *~..iidlng Dt+, ,,ddnt
1636 E. Edinger Ave., Suite D, Santa ha. California 92705 - (714) 835-1808
.-
-.
.-
.-
-.~
-
_-
-
.~.
--
._
,~_~
INTRODUCTION. . . . . PURPOSE . . . . . SCOPE . REFERENCES: : : : PROPOSED GRADING. GEOTECHNICAL FINDINGS SITE CONDITIONS . EARTH MATERIALS . GROUND WATER. . . SEISMICITY. . . . CONCLUSIONS . . . . . FEASIBILITY . . .
TABLE OF CONTENTS
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
........... FOUNDATION SOILS. . . . . . . . . . . . Volume Change Under Load . . . . . Shrinkage Due to Compaction. . . . GROUND WATER. . . . . . . . . . . . . . SEISMICITY. . . . . . . . . . . . . . . RECOMMENDATIONS . . . . . . . . . . , . . . SITE
FILL
PREPARATION. ........... General. ............. Existing Improvements. ...... Stripping. ............ MATERIAL AND PLACEMENT ...... Suitability. ........... Compaction Standard. ........ FOUNDATION AND STRUCTURE DESIGN .... Footings ............. Support. ........... Allowable Bearing Value. ... Embedment. .......... Slabs-On-Grade ...... Moisture Barrieis. . . .
Found,cion Area Settlement .' : : : LAKE CONS:dUCTION ...........
.
.
.
.
.
.
.
.
.
.
.
.
.
.
SWIMMING POOL CONSTRUCTION. SLOPE STABILITY - FLOOD CONTROL CHANNELS: BRIDGE FOUNDATION DESIGN. . . . . I . a . Abutments. . . . . . . I . . . . . . Interior Bents . . . . . . . . . s . Allowable Bearing Value. . . . . Footing Settlement . . . . . . . Protection . . . . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
: 1 2
: 6
11 :: :: :: 2 15 15 :5
-
Our Job 71-02 Page ii
PLATES Plate 1 - Location Map Plates 2.1 through 2.4 - Geotechnical Maps Plate 3 - Piling Design Criteria
APPENDIX
SUPPORTING DATA EXPLORATION TESTING
-
Moisture Density Compaction Tests Grain Size Distribution Consolidation Tests Strenght Tests PLATES ;:~~~sAA;l.l through A-l.7 - Log of Drill Hole - - Classifications and Descriptions Plate A-3 - Compaction Test Data Plates A-5.1 through A-5.6 - Consolidation Test Data Plate A-6 - Shear Test Data Plate A-7 - Legend to Test Data
,
-
-.
_.
-
-
-
-.~
--
-
.-
-
-
INTRODUCTION
PURPOSE
This report presents the results of our investigation
of soil conditions at the site of the proposed Ranch0 Carlsbad
Mobil Homes Park located on El Camino Real, in the eastern part
of Carlsbad, California (see Plate 1 - Location Map). Our
investigation was performed at the request of Mr. Ronald Schwab
of Western Land & Development Corporation, the project developers.
SCOPE
The scope of the investigative work covered by this
report is as follows:
1. Subsurface exploration, laboratory testing and
engineering analysis to determine the physical
properties of the soil materials which will be
generally encountered in the site grading and
specifically in the structures areas.
2. Formulation of conclusions and recommendations
pertaining to the influence of soil conditions
on the static and dynamic design of the proposed
structures and drainage channel.
-
-.
-
- Our Job 71-02 Page 2
- REFERENCES
\ The following listed reports were,used for reference ..-. during this investigation.
(1) "Soil Investigation For The Proposed Ranch0 Carlsbad Mobilehome Park" by Woodward-Clyde & Associates, dated 1969 -
(2) Letter-report dated January 11, 1971 prepared by Evans, Goffman & McCormick
-
-.
_-
._
.
_-
-
PROPOSED GRADING
The proposed grading is to consist principally of
placing fill in the near-level areas obtained from the hill at
the east end of the property. A small lake and two flood control
channels are also to be excavated. The proposed grading concept
is shown on Plates 2.1 through 2.4 - Geotechnical Map.
GEOTECHNICAL FINDINGS
SITE CONDITIONS
Reference is made to report refer>:ice (1) for a general
description of site conditions in December, 1968. Very little
change was evident at the time of our investigation.
EARTH MATERIALS
The descriptions of the earth materials included in
-
-
-
- Our Job 71-02 Page 3
00 .($$I ,I&, ~.r~. -I- @J@
reference (1) were basically verified by our investigation.
GROUND WATER -
At the time of the investigation, free water was
- encountered in the recent
six feet below ground surface.
SEISMICITY
-
-
Seismicity is concerned with earthquakes; the abrupt
release of accumulated strain energy and stress in the rock
materials of the earth's crust. Recurring accumulations and
releases of strain energy have resulted in systems oft faults
or zones of weakness in the earth's crust which are likely to
be associated with future earthquakes.
There are no faults within-f the site
which are known to have been associated with earthquakes during
the period of instrumented seismic study; approximately 60 years.
The mission church at San Juan Capistrano, approximately 30
miles from the site, was destroyed by an earthquake on December 8,
1812. The fault system with which this earthquake was associated
is not known. On the basis of proximity it may have been either
the Newport-Inglewood or Elsinore fault zones.
-
-
-
Our Job 71-02 Page 4
@@
i-
@@
The site is located approximately 45 miles from the
epicenter of the "Long Beach" earthquake of March 11, 1933,
Richter magnitude 6.3. The off-shore extension of the Newport-
Inglewood fault with which this earthquake was associated is
-
probably within 45 miles of the site.
The site is approximately 25 miles southeasterly from
the Elsinore Fault Zone which has not been associated with
-
-
earthquakes of magnitude as great as 6.0 during the period of
instrumented seismic study.
-
-
-
.-
-
-
-
There are insufficient instrumental data from strong
earthquakes to establish the precise influence of local geology
on earthquake ground motion. However, sufficient observations
have been made to classify sediments in marine environments as
particularly responsive to earthquake excitation; three to four
times more responsive than well-consolidated materials or rock.
Earthquake effects of primary engineering significance
are (1) surface rupture or permanent ground displacement along'
the fault trace, and (2) ground vibration (elastic displacement,
frequency and duration) which can cause physical damage to
structures, landslides and consolidation (settlement) of loose
earth materials.
-
1
-
-
-
-
-
-
-
-
-
-
-
-
Our Job 71-02
@@
Page 5 -I- @@
The recurrence of seismic activity along the Newport-
Inglewood fault system system may be indicative that relief
occurs at a fairly consistent point of maximum strain. It is
therefore, anticipated that although earthquakes may be expected
in the future from this system, they should not be significantly
stronger than those experienced in the past, i.e., magnitude 6.3.
The relation between earthquake magnitude, M, and
ground acceleration, a, in centimeters per second per second,
at the epicenter may be roughly estimated by the expression:
M= 2.2 + 1.8 log a. Based on this relationship, which assumes
a point source of energy release, a magnitude 6.3 corresponds
to a ground acceleration of 0.19g at the epicenter.
CONCLUSIONS
1.10 FEASIBILITY
It is our opinion that it is geotechnically feasible
to develop the property for the proposed use assuming the
conclusions and recommendations presented in this report
are followed.
1.20 FOUNDATION SOILS
1.21 Volume Change Under Load. The soil materials which
comprise the recent alluvium and topsoil (i.e., the soils
1
-
-
_-
-
-
--
.-
.-
-
Our Job 71-02
in the level portions of the property) are moderately
compressible under the loads of the proposed fills and/or
structures. This load-induced settlement will cause
structural damage if not neutralised prior to building
construction. Additionally, the soils from the hill which
will be used as fill material are, according to reference
(l), expansive. This expansion could affect both structures
and- pavements and should be re-evaluated at the completion
of rough grading.
1.22 Shrinkage Due to Compaction. It is our opinion that
the loss in soil volume due to excavation and replacement
as compacted fill at an average relative compaction of
93 percent will be (1) on the order of 10 percent for the
materials taken from the hill area, and (2) on the order
of 15 percent for the recent alluvium present inthe near-
level portions of the site,
1.30 GROUND WATER
Present and anticipated ground water levels will in-
fluence the construction and maintenance of the proposed
facilities. The proposed flood control channels will
improve ground water conditions by establishing a per- ~
round water
levels. - -_
-
1
Our Job 71-02
1.40 SEISMICITY
Statistical analysis of California earthquake data
indicates the following probabilities of ground acceleration
at the site with respect to a 50-year life of the improve-
ments.
Ground Acceleration g-acceleration of gravity
O.lOg 0.15g 0.2og 0.25g 0.3og
Once Per 50 Years Probability
88% 64% 40%
:;; 0
The predominant period of ground motion at the site
due to local earthquake (recurrence of the "Long.Beach"
. earthquake, for example) is expected to be 1.0 second to
2.0 seconds. The expected duration of strong shaking is
- estimated to be on the order of 10 seconds.
-- The predominant period of ground motion due to distant
(50 miles or more) earthquakes is expected to be longer
than 1.0 second.
Economically, there is an optimum earthquake-resistant
-.
.-
design depending on (1) the probability of earthquakes of
various intensities, (2) the cost of designing and con-
strutting appropriate earthquake resistance, (3) the loss
-
1
-
-
-
,-
._
,-
.-
-.
--
Our Job 71-02 Page 8
@@
of use of incapacitated facilities and (4) the cost of
repairing earthquake damage.
For design calculation it is suggested that simulated
earthquake motions as defined by "Simulated Earthquake
Motions", Jennings, housner and Tsai, California Institute
of Technology, April, 1968, be considered. Of the data
presented in this reference, the Type C-l earthquake is
regarded as most representative of the earthquake ground
motion likely to be experienced at the site.
RECOMMENDATIONS
2.10 SITE PREPARATION
2.11 General. Except as modified by the recommendations
presented in this report, all site preparation and grading
should be performed in accordance with our Minimum Standard
Grading Specification of February, 1968.
2.12 Existing Improvements. All existing building foundations,
cess pools, septic tanks, irrigation lines and other similar
improvements should be removed and replaced with compacted
fill.
2.13 Stripping. Stripping (i.e., removal of in-place soils)
is recommended under the following conditions:
1
-
-
-
- Our Job 71-02 Page 9
-
-
-
,-
A. To a depth of 12 inches below ground surface in
those non-structural areas involving fill of more
than two feet.
.- B. To a depth of two feet below finish grade (with
a minimum depth of 12 inches), in those~non-
-
-
.-
structural areas involving fill of two feet or
less.
C. To a depth of two feet below natural grade (with
a minimum depth of 12 inches) in those non-
structural areas involving cut. Provision should
be made to extend stripping in this case to remove
soft spots which extend below two feet.
D. To a depth of five feet below footing elevations
within a limit of five feet horizontally beyond
building or structural footing lines. This
stripping will provide for a compacted fill load-
transfer blanket for structural footing.
2.20 FILL MATERIAL AND PLACEMENT
2.21 Suitability. All on-site soils, including those re-
moved by stripping, are suitable for use as compacted fill
when placed at or near optimum moisture contents.
-
-
-
- Our Job 71-02
-
-
-
-
-
-
-
-
-
-
-
@@
Page 10 -I- ~@@
2.22 Compaction Standard. All soil materials used as
compacted fill, or processed in-place soils, should be
brought to near-optimum moisture content and compacted.
to at least 90 percent of the maximum density per ASTM
Test Method~D1557-66T (modified to use three layers).
2.30 FOUNDATION AND STRUCTURE DESIGN
Based on plans presently available, it is understood
that there are six buildings to be constructed on the
property, i.e., an administration building, recreation
building, clubhouse and three laundry buildings. All are
to be of wood-frame, one-story construction. A limited
portion of the clubhouse is two-story construction. The
location and general nature of the structures are shown on
Plates 2.1 through 2.4.
2.31 Footings. Assuming site preparation is performed
according to our recommendations, it is our opinion that
the structures listed can be supported by shallow continuous
wall and isolated column footings.
- Support - All footings and slabs-on-grade should be
-
supported by at least five feet of compacted soil
material.
-
?
-
-
- C&m Job 71-02
-
-
-
-
-
-
-
-
-
-
Allowable Bearing Value - Maximum of 2000 pounds per
square foot for live plus dead load. Isolated column
footings which have a contact bearing area of 16 square
feet or more should be limited to an allowable bearing
value of 1500 pounds per square foot.
Embedment - Minimum of 12 inches below lowest adjacent
grade.
2.32 Slabs-On-Grade. A conventional slab-on-grade system
should provide adequate light- to medium-duty floor support,
assuming the slab is a "nominal four inches" thick and
wire-mesh reinforced. Detailed slab design recommendations
should be finalized following rough grading, so that the
soils actually supporting the slab can be evaluated.
2.33 Moisture Barriers. Moisture and vapor barriers, such
as plastic sheeting should be provided under all interior
slabs-on-grade.
2.34 Foundation Area Settlement. Some settlement will occur
as a result of the loads imposed by the proposed fills. A
minimum of 30 days should elapse between fill completion
and foundation construction to permit the majority of this
settlement to occur. Direct-reading settlement platforms
should be installed so that settlement can be monitored.
-
-
1
-
-~
,_.
-
-
-
-
-
-
-
-
Our Job 71-02
@O f+J ,x:
Page 12
@@
1,
2.40 LAKE CONSTRUCTION
Construction of the lake as proposed would create a
potential ground water gradient towards both the clubhouse
and recreation building. If that gradient were allowed to
develop, a shallow foundation system would, not be feasible
for either structure. One oft the following listed alter-
native corrective measures are available and should be
utilized to minim&e this possibility.
(A) The lake should be lined with either plastic
sheeting, gunite or an equipment-width,~ compacted,
impervious, clay blanket.
(B) The'lake slopes should be treated with bentonite
or a chemical sealant so long as it was under-
stood that at least a portion of the lake,slopes
would have to be resealed if the lake was ever
drained at a time when the ground water level
was higher than the lake bottom.
cc> A sub-drain-system shoulhb..
sides of the lake&intercept lake leakage and .c"--,- -
maintain a low ground waadienf. Such a /-____--. l_-..L .,_. ,.,-._,. ___, .,,,., -
system is illustrated on Plate 2.3 - Geotechnical
&P. These sub-drains would consist of four-inch
1
-
- Our Job 71-02
-
-~
-
-
-
-
-
-
-
@@
Page 13 -I- @J@
diameter , perforated pipe drains embedded in a
compacted rock and sand bacmwith a gradient - r)
approximately as shown on Plate 2.3.
It should be noted that it may prove necessary to con-
struct the subdrains described in item (C) above, solely to
permit formation of the lake slopes and installatiw
permament linipe, If the subdrains are not installed and
a plastic lining is used for the lake, we recommend that
the portion of the lining below elevations +45 be provided
with a minimum to counterbalance ?\ b/a,
bouyant forces on the lining when the lake is drained. % 2.50 SWIMMING POOL CONSTRUCTION
We recommend that the swimming pool be designed to
(1) impose a live plus dead load on the foundation soils
,/ l
4
of not more than 130 times the pool depth, in pounds per
a<
@ Q
square foot, and (2) resist a bouyant force equivalent & to a water head equal to elevation +45 less the elevation \ A
of the pool bottom (i.e., on the order of five feet).
2.60 SLOPE STABILITY - FLOOD CONTROL CHANNELS
The proposed flood control channel will, in our opinion,
be grossly stable under static and anticipated dynamic
,
-
-
-
-
-
.-
-
--
-
-
-
-
Our Job 71-02 Page 14
2.70
2.71
loading conditions at inclinations as steep as 1% hori-
zontal to 1 vertical. However, at an inclination of 12,
horizontal to 1 vertical, we anticipate substantial erosion
and shallow slumping under conditions of fluctuating ground
and channel water levels. Additionally, slope planting
will be difficult to maintain, An inclination of 2 hori-
zontal to 1 vertical, or flatter, would, in our opinion,
be more desireable.
BRIDGE FOUNDATION DESIGN
As shown on Plate 2.1 - Geotechnical Map, the main
entrance road will cross the flood control channel via a
bridge. Bridge support will apparently be provided by two
abutments and two interior bents located at the toe of
the channel slopes.
Abutments. The abutments may be supported by either
a shallow, pad footing or be driven or cast-in-place piling.
If a shallow, pad footing is used, we recommend the same
sizing criteria as described in of this report,
and its use would be dependent upon providing permanent
upstream and downstream erosion protection for the channel
in the area of the bridge. If driven or cast-in-place
--
-
-
-. Our Job 71-02
piling are used, we recommend sizing according to Plate 3 -
Piling Design Criteria. In the case of cast-in-place
piling, anticipate tremie concrete placement with casing
for hole protection. It should be noted that Plate 3
provides ultimate resistance values. We recommend that
._~
-
-
-~
.
.
a factor of safety of at least 2 be applied to these data
to compensate for variations in soil conditions.
2.72 Interior Bents. The interior bents can also be
supported by either shallow pad footings or driven or cast-
in-place piling. If shallow pad footings are used, the
following criteria should apply:
A. Allowable Bearing Value - 1000 pounds per square
foot plus 200 pounds per square foot for each foot
of embedment to a maximum of 1600 pounds per
square foot, for live and dead loads.
B. ,Footing Settlement - Estimated one inch minimum
upon loading.
C. Protection - Permament upstream and downstream
erosion protection including cut off walls to
eliminate scour.
It should be noted that the soil materials at channel
grade in the bridge area will be predominately clayey, and
.-
1
-
-
-
-
-~
-
-~
/-
Our Job 71-02 Page 16
the process of forming and pouring concrete will be 2 difficult. 0
If driven or cast-in-place piling are to be used, we
recommend sizing according to Plate 3 - Piling Design
Criteria. In the case of either shallow or deep footings,
lateral loads may be resisted based on an allowable passive
soil resistance of 250 pounds per square foot per foot of
depth.
The Plates and Appendix which are attached and complete
this report are listed in the Table of Contents.
Respectfully submitted,
EVANS, GOFFMAN & MCCORMICK
Dennis A. Evans Civil Engineer 14450
JEG:DAE:si
-
1
-
-
,
-
-
-
--
-
.- iE
.-
.-
OBJECT Location Map
SUBJECT Ranch0 Carlsbad Mobile Home Park
DATE 2/15/71 BY DAE CHKD. SHEET 1~ OF 1
JOB NO. 71-02 Evans. Gqffman 8, M*Cormick PLATE 1 r
i
/
!
t a
,- a <
i t
E a
I
j :-
:
‘-- : c
_.
<-
! _.~ &
0
j .
I
a
:: w
: -
,
!: E
0
-
..-
*GRAPH VALUES FOR STRAIGHT- SHAFT ONLY ARE FOR UNIT DIAMETER. FOR TOTAL CAPACITY OF OTHER SIZES, MULTIPLY CHART VALUES TIMES SHAFT DIAMETER.
RESISTANCE VALUES ARE ULTIMATE WITHOUT CONSIDERATIO OF.FACTOR OF SAFETY.
STRAIGHT-SHAFT, CAST-IN-PLACE PILING (UNDRIVEN)*
40 .
TOTAL ULTIMATE RESISTANCE - KIPS
OBJECT PILING DESIGN CRITERIA
SUBJECT RANCH0 CARLSBAD MOBILE HOMES PARK
DATE 2/16/7I BY DAE CHKD. SHEET 1 OF 1
JOB NO. 71-02 Evans. Gqffman & M%ormick PLATE 3
--
- Our Job 71-02
-
-
Page A-l
@j@
@@
+
-
APPENDIX
SUPPORTING DATA
EXPLORATION
Surface observations and review of previous, refer-
.-
-
enced work by Woodward-Clyde & Associates were supplemented with
seven drill holes ranging in depth from 8 to 21 feet. The
locations of the drill holes per this investigation are shown
on Plates 2.1 through 2.4. The geologic and engineering field
classifications and descriptions of the materials encountered
-. are presented on Plates A-l.1 through A-l.7 - Log of Drill Hole.
Plate A-2 is a "fold-out" legend to these logs.
-.
TESTING
-
-
.-
.-
-
Moisture-Density. Field moisture content and in-place
density were determined for all undisturbed samples; these re-
sults are presented on the right-hand column of Plates A-l.1
through A-l.7 - Log of Drill Hole.
Compaction Tests. Selected samples were tested for
their compactive characteristics using the three-layer criteria
of ASTM Test Method D-1157-66T. The test results are summarized
on Plate A-3 - Compaction Test Data.
1
Our Job 71-02
-
-
Grain Size Distribution. Grain size distribution,
including Atterberg Limits and hydrometer analysis, were deter-
mined for representative samples of the proposed fill materials.
These results are summarized on Plate A-3 - Compaction Test
Data, and Plate A-4 - Grain Size Distribution Data.
-
Consolidation Tests. Consolidation tests were per-
formed on selected undisturbed samples of the materials which
will serve as a foundation for the proposed fills and structures.
These test results are presented on Plates A-5.1 through A-5.6 -
Consolidation Test Data.
_.
_..
Strength Tests. Triaxial compressional tests were
performed on a number of undisturbed samples. All samples were
saturated prior to testing using the backpressure technique.
- Confining pressures were adjusted to simulate in-situ conditions
-
.-
and the samples were subject to a constant rate of strain of
.005 inches/minute to failure in an undrained condition. Measure-
ments were made with a load cell and strain pick-up and trans-
ferred electronically to an X-Y recorder. The results are
summarised on Plate A-6 - Shear Test Data.
A legend to the test data is presented as Plate A-7.
The Plates which complete this Appendix are listed in
the Table of Contents.
-
-,
1
I
-
-
? ,. .
((-\
L -
DRILLED l/18/71 WITH Rotary Bucket
DIAMETER OF DRILL HOLE IN INCHES 18
LOGGED BY JEG DH 1
SURFACE ELEVATION IN FEET +52 DATUM Mean Sea Level
GEOLOGICAL ENGINEERING
ALLUVIUM
brown,moderate-ly firm to soft,interbedded with SILTY SAND (SM),brown,mod- erately firm to soft,with varying amounts of clay
r;-v ^ ';: I5 2;:
?$I 22,105-CN
35 5;: (T) .-.-. - ; T-:
24,103-CN T
Bottom at 21 feet,caving below 18 feet. Water level at 5 feet. Hole backfilled.,
SHEET 1 OF 1
LOG OF DRILL HOLE
LEGEND ON PLATE A- 2
JOB 71-02 Evans, Goffman 8, McCormick PLATE A-1.1
iWRl3 12-67
-.
.~.
-~.
/
__
i --
i -.
-
-
-
-
-
.-
c -
.-
DRILLED l/18/71 WITH Rotary Bucket
DIAMETER OF DRILL HOLE IN INCHES 18
LOGGED BY JEG DH 2
SURFACE ELEVATION IN FEET +57 DATUM Mean Sea Level
CLASSIFICATION AND
*et --r-T v-1 J-
ALLUVIUM
SHEET 1 OF 1
LOG OF DRILL HOLE
LEGEND ON PLATE A- 2
JOB 71-02 Evans. Goffman 8, McCormick PLATE A-l.2
iY-6313 12-67
$
-
_-
/^-
.-
~.-
._
i
I
i
DRILLED l/18/71 WITH Rotary Bucket
DIAMETER OF DRILL HOLE IN INCHES 18
LOGGED BY JEG DH 3
SURFACE ELEVATION IN FEET 254 DATUM Mean Sea Level
GEOLOGICAL TEST DATA CLASSIFICATION CLASSIFICATION AND
caving below 5 feet. Hole backfilled,
SHEET 1 OF 1
LOG OF DRILL HOLE
IOB 71-02
FGY-PI> 13-c.7 --.~. ..a., A- “.
LEGEND ON PLATE A- 2
Evans. Goffman 8, McCormick PLATE A-l.3
.-
‘--
.-~
--
1
! -..-
.-.
,rl
I ! !
/ :
!
. .
I
!-
jr !
I-
i
i--
)f?ILLED l/18/71 WITH Rotary Bucket
IIAMETER OF DRILL HOLE IN INCHES 18
.OGGED BY JEG DH 4
SURFACE ELEVATION IN FEET 250 DATUM Mean Sea Level
ALLUVIUM
dark brown, soft
occaslona SILTY SAND (SMy,'tan,fin& to coarse and
to coarse
Bottom at 21 feet. Minor caving between 17 and 18% feet., Watbr below 4 feet. Hole backfilled.
SHEET 1 OF 1
LOG OF DRILL HOLE
LEGEND ON PLATE A- 2
JOB 71-02 Evans. Goffman & McCormick PLATE A- 1-L
EGY-RU 13-67 I
t
-
-
.-
-
-
.-
/
I-
/
i-
/ .-
,- .
I_
!
1
;-
1
!-
DRILLED l/18/71 WITH Rotary Bucket
DIAMETER OF DRILL HOLE IN INCHES 18
LOGGED BY JEG DH 5
SURFACE ELEVATION IN FEET +52 DATUM Mean Sea Level
ALLUVIUM
LTY SAND (SM),brown,medi-
CLAYEY SILT
Bottom at 22 feet. Water at 34 feet, caving at 3 to 9 feet and 19 to 22 feet. Hole backfilled.
SHEET 1 OF 1
LOG OF DRILL HOLE
JOB 71-02
LEGEND ON PLATE A- 2
Evans. Goffman & McCormick PLATE A- 1.5
iWRl3 12-67
DRILLED l/18/71 WITH Rotary Bucket
DIAMETER OF DRILL HOLE IN INCHES 18
LOGGED BY JEG DH 6
SURFACE ELEVATION IN FEET 255 DATUM Mean Sea Level
GEOLOGICAL ENGINEERING TEST DATA CLASSIFICATION CLASSIFICATION AND
ALLUVIUM
CLAYEY SAND
to coarse wit SAND (SP),tan,fine to
Bottom at 17 feet. Seepage at 4% feet and 12 feet. Minor caving below 12 feet. Hole backfilled.
SHEET 1 OF 1
LOG OF DRILL HOLE
LEGEND ON PLATE A- 2
IOB 71-03 Evans. Goffman & McCormick PLATE A- 1.6
1 -
.
f--Y
!-
.-
! _-
.-
i
_-
_.
,-
-
-.
.-
..-
-
.-
_..
.-
_.
_-
,-
; -.
,-
-.
_..
-
,-
i -.
n ii -,
DRILLED l/18/71 WITH Rotary Bucket
DIAMETER OF DRILL HOLE IN INCHES 18
LOGGED BY JEG DH 7
SURFACE ELEVATION IN FEET 2 38 DATUM Mean Sea Level
ALLUVIUM
SILTY CLAY (CL),with sand,
Bottom at 12 feet. Seepage at 3 feet, water level at 5 feet. Caving below 10 feet. Hole backfilled.
-
-
-._
-
-
_-
-
c * -I 0
-
--Q’
:
_.
- r:
2
.-
-
5
5 -
-
E
~_~ 2
..-
140’
i IL
v
2130
0
lr
2
z 2120
2
z
>
$110
t
0”
iG 0
MOlSTURE CONTENT IN PERCENT OF DRY WEIGHT
100
LOCATION (1)
BORING OR TEST PIT DH-1
OEPTil, IN FEET l-2
REPRESENTATIVE FOR .TopGoil
F l *s \ 0
T I (2) / Jc (1)
I Zero Air Voids
\
l-2
Alluvium
SOIL CLASSIFICATION
GRAIN SIZES IN PERCENT OF DRY WEIGHT
SAND (RETAINED ON#200 SIEVE)
FINES (PASSING # 200 SIEVE) 24 52
ATTERBERG LIMITS,IN PERCENT OF DRY WEIGHT (1) LIQUID LIMIT
PLASTICITY INDEX NP 5
SOIL TYPE AND DESCRIPTION Silty Sand Sandy Silt , with clay
COMPACTION PROPERTIES
METHOD OF COMPACTION
ASTM STANDARD TEST METiiOD D-1557- G4T EPUIVALENT TO A.A.S.H.O.
SOIL COMPACTION TEST T180-57(1/50 CUBK FOOT MOLD, IO POUND HAMMER
FALLING 18 INCHES, 25 BLOWS PER LAYER),MODlFlED TO THR E LAYE S
OPTIMUM MOISTURE CONTENT,IN PEeCENT OF DRY WEIGHT (5) (5)
MAXIMUM DRY DENSITY, IN POUNDS PER CUBIC FOOT. 11 119
COMPACTION TEST DATA
108 71-02 Evans. Goffman ,& MaConnick PLATEA -3
d x -- I
0
- 0; l c
-
-
-g
-
-_ f5 5
.-
-
: - a
0
ll. 6. STANDARD SIEVE SIZE
0 100: : IO GRAIL-SIiE Iif 0.01 0.00,
UILLIM
ET&:;
. .
ORAVEL i SlNO COBI)LCS IJ i COARSE ! ,Il.T OR Cl..” FINE icoARsE: YEOIUY : FINE :
PARTICLE SIZE. DISTRIBUTION
LOCATION
DRILL HOLE OR TEST PIT DK DH(Z) DA32
DEPTH, IN FEET i 8 ;
REPRESENTATIVE FOR Alluvium Alluvium Alluvium
SOlL CLASSIFICATION
ATTEABERG LIYITS,IN PERCENT Of DRY WEIGHT (1) (3)
LIQUID LIMIT 26
PLASTICITY INDEX 6 2 :“3
SOIL TYPE AND DESCRIPTION (1) Silty Sand (SM), with clay
(2) Silty Sand (SM), with clay
(3) Clayey Saad (SC), with silt
GRAIN-SIZE DISTRIBUTION DATA
Evans. Goffman MCCormhck PLATE A-4
_-
-
- Y E
-
.-
-
W
.- 2 0
-
LOAD IN POUNDS PER SOUARE FOOT
LEGEND ON PLATE A-7
CONSOLI DATI0.N TEST DATA
JOB 71-02 Evans. Goffman &I McCormick PLATE A-5
-
.-
-
-
d Y -s 0
-.~
.- y
$
-
-- ii (3 7: W
-
.-.
W 2 a
LOAD IN POUNDS PER SQUARE FOOT
8 3 g;
8
2” 5 5 g mg[x
0 - - \
2
-. -N \
(3 w \
u 2 \
I \ \@
\ t w \
ii .
2
‘.a ‘1,
v) 4 \ \ \ \
k \
5
s 6. \ \
! J
\
z
z
8.
I=
2
3
::
$1 u
LEGEND ON PLATE A- 7
CONSOLIDATION TEST DATA
IOB 71-02 Evans. Goffman & McCormick PLATE A-51
-
.-
. .
. .
.-
f
_-
.-
-.
_-
-
.-
-..
-
.-
LOAD IN POUNDS PER SQUARE FOOT
8
8: 8;s
:: 8 s s: g
2” N si s
8 go
(D (D 0’
c I 0
ii 2 I
w
2
5
4 0-J 4
v
= WATER ADDED
LEGEND ON PLATE A-?
CONSOLIDATION TEST DATA
JOB 71-02 Evans. Goffman & McCormick PLATE A-5.:
-
.-
.~-
.-
.-
-
d Y
-X 0
-
-g
.-
-~ &
0
I5
-
W l-
-2
-
-
LOAD IN POUNDS PER SQUARE FOOT
0 tjy$ i$g- g 8 s Ei
0 E E is s
2
I-
5
9
W J
i
s
IL 0
I-
=8
E .
if
. . .
z \\
z lo
\ \
0
I=
2
i 1
::
z c)
1
‘1
LEGEND ON PLATE A- 7
~CONSOLIDATION TEST DATA
JOB 71-02 Evans, Goffman & McCormick PLATE A-5.1
__
.-
.-
-
-~ g
0
_.
‘-’ is z W
-.
-
W I- ._ 2
LOAD IN POUNDS PER SQUARE FOOT
k5 -\\ \, .
Liz
\\,
\\
i
6 \ *
it!
z
14
LEGEND ON PLATE A- 7
CdNSOLI DATION TEST DATA
JOB 71-02 Evans. Goffman & McCormick PLATEAti.,
.-
-
.-
-
c h
- I
0
.-
.- 2 0
_-
E t W
-
-
W
2 -a
-
.-
LOAD IN POUNDS PER SQUARE FOOT
Lit w 12 \ \
2 \
2
z15 ’ \ \
0
I=
2
?18
:: LINE SYMBOL’ ----
z LOCATION,DEPTH DH-5 @ 9 1 DH-% @15 1
0 CLASSIFICATION SM SM
SAMPLE TYPE N N
M 22 24 D 103 102
OPT. M
MAX.D
RC
a= WATER ADDED
LEGEND ON PLATE A-’
CONSOLIDATION TEST DAtA
JOB 71-02 Evans, Goffman & McCormick PLATE A-j.1
_^. _- 1- _-
-
-.
--
0 Y .- x 0
-.
-. OI > c
-&
0
-
- E 5
PEAK StiEAR ST’RENGTH IN POUNDS PER SOUARE INCH
E
?I
W
a
a
3
0
m
a w n.
VI
n
2
3
0 n.
2
n
a
0 -I
A
a
E
: z All tests performed on undisturbed, saturated
SHEAR TEST DATA
JOB 71-02 Evans. Goffman 81 M°Cormick PLATE A-6
-
-
.-
-~
-
-
-.
-.
_-
-~
-.
-
SYMBOLS
A A - GRANULAR SOIL
@L--
COHESIVE SOIL OR ROCK
TEST AT SATURATED MOISTURE CONTENT
TEST AT MOISTURE CONTENT AS INDICATED’
cl3 WATER ADDED DURING TEST
ABBREVIATIONS
DH-I6 - DRILL HOLE NUMBER
TP-I2 - TEST PIT NUMBER
($7’ - DEPTH BELOW GRADE IN FEET
(SM) - SOIL TYPE EXPRESSED IN LETTER SYMBOL OF
UNIFIED SOIL CLASSIFICATION SYSTEM
AL(45110) - ATTERBERG LIMITS (LIQUID LIMIT/PLASTICITY INDEX)
‘TYPE OF SAMPLE TESTED
N - UNDISTURBED NATURAL SOIL
F - UNDISTURBED COMPACTED FILL SOIL
R - SOIL REMOLDEO IN LABORATORY
Y M - MOISTURE CONTENT IN PERCENT OF DRY WEIGHT AT WHICH
. TEST WAS
D - DRY DENSITY INITIATED IN POUNDS PER CUBIC FOOT ,
OPf. M - OPTIMUM MOISTURE CONTENT IN PERCENT OF DRY WEIGHT
MAX.0 - MAXIMUM DRY DENSITY IN POUNDS PER CUBIC FOOT
RC - RELATIVE COMPACTION IN PERCENT OF MAXIMUM DRY DENSITY
‘x - TIME (IN MINUTES) FOR”w”PERCENT DF CONSOLIDATION TO TAKE PLACE
LEGEND TO TEST DATA
JOB 71-02 Evans. Goffman~ & MOCormick PLATE A-7
“-_* m .--.%-a