SOIL INVESTIGATION FOR THE PROPOSED
RANCH0 CARLSBAD
MOBILEHOME PARK
SAN DIEGO COUNTY, CALIFORNIA
for
WALTERS & SON, INC.
4242 Campus Drive
Newport Beach, California 92660
WOODWARD-CLYDE & ASSOCIATES
Consulting Soil and Foundation Engineers and Geologists
-~
-
-
-~
-
-
-
-
-
-~
-
-
_-
TABLE OF CONTENTS
PAGE
LETTER OF TRANSMITTAL
SCOPE
FIELD INVESTIGATION
LABORATORY TESTS
SITE AND SOIL CONDITIONS
DISCUSSION
CONCLUSIONS AND RECOMMENDATIONS
LIMITATIONS
FIGURE 1 - SITE PLAN
FIGURE 2 - LOG OF TEST BORING 1
FIGURE 3 - LOG OF TEST BORING 1 CONTINUED
FIGURE 4 - LOG OF TEST BORING 2
FIGURE 5 - LOG OF TEST BORING 3
FIGURE 6 - LOG OF TEST BORING 4
FIGURE 7 - LOG OF TEST BORING 5
FIGURE 8 - LOG OF TEST BORING 6
FIGURE 9 - LOG OF TESR BORING 7
FIGURE 10 - LOG OF TEST BORING 8
FIGURE 11 - LOGS OF TEST BORINGS 9 & 10
FIGURE 12 - LOGS OF TEST BORINGS 11 & 12
FIGURE 13 - LOGS OF TEST BORINGS 13, 14 & 15
FIGURE 14 - GRAIN SIZE DISTRIBUTION CURVES
-.
-
-.
TABLE OF CONTENTS
(continued)
- FIGURE 15 - GRAIN SIZE DISTRIBUTION CURVES
FIGURE 16 - FILL SUITABILITY TESTS -
FIGURE 17 - RESULTS OF CONFINED COMPRESSION TESTS
- ATTACHMENT I - EXPANSION PRESSURE AND RESISTANCE VALUE TEST
ATTACHMENT II - SPECIFICATIONS FOR CONTROLLED FILL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
WDODWARD - CLYDE & ASSDCIATES OO”S”LTI”B SOIL A”0 FO”NOATloN E”aNE*S Arm oEoLowsls
3467 1969 mrll strut January 28,
*an my0 Project No. 68-312 CdHornU 9*110 "14 2?&?911
Walters & Son, Inc. 4242 Campus Drive
Newport Beach, California 92660
Attention: Mr. Henry Hastings
In accordnace with your request, we have made an investigation of the underlying soil conditions at the site of the proposed mobilehome park to be known as Ranch0 Carlsbad in San Diego County, California.
The accompanying report presents the results of the subsurface explora-
tion and the laboratory tests as well as the conclusions and recommenda- tions pertaining to this site.
The Project Engineer assigned to this project was Joseph G. Kocherhans of our firm.
ienski; a. E. 10352
JGK/SFG/mec
Attachments
I
5) Walter & Son
1) Harry Pappas, Jr.
-
-
-
-
-
SCOPE
This is a report of an investigation at the site of the
proposed Ranch0 Carlsbad Mobilehome Park to be located on the east
side of El Camino Real approximately l-1/2 miles north of Palomar
Airport Road in San Diego County, California. The purpose of the
investigation is to determine the subsurface soil conditions, depth
to water including its influence on the design of the proposed flood
control channel and foundation for the proposed clubhouse, the most
suitable type and depth of foundation for the proposed clubhouse,
allowable soil bearing pressures, pavement requirements, and to test
the soils in the proposed borrow area for purposes of making recom-
mendations for fill construction and pavement design.
It is our understanding that the proposed construction wil 1
require general grading to slope the surface to drain with cuts and
fills kept to a minimum. The proposed work includes a flood contra 1
channel through the central portion of the site about 15 ft deep and
90 ft wide, and a clubhouse and recreation center with swimming pool,
all on a fill about 5 ft high. We also understand that the proposed
- clubhouse and recreation buildings will be limited to single story
wood-frame structures supported on continuous footin~gs with a slab-on-
-
-
-
grade floor. We further understand that cut and fill slopes having
maximum heights of less than 20 ft and maximum slope inclinations of
l-1/2 to 1 (l-1/2 units measured horizontally to 1 unit vertically),
are proposed.
FIELD INVESTIGATION
-
Fifteen test borings were made with a 6-inch diameter power
auger at the locations shown on the Site Plan, Fig. 1. The drilling
was done on December 30 and 31, 1968, under the supervision of a project
- WOODWARO - CLYDE & ASSOCIATES cmuu,,i,,p Sa’l old Fmm&,im, .F,wwrr* nnd Cr”l”L!irl*
PAGE 2
--
-
-
engineering'geologist. Field logs were prepared by the geologist
on the basis of an inspection of the samples secured and of the ex-
cavated material. The Logs of Test Borings shown on Figs. 2 through
13 are based on an inspection of the samples, on the laboratory test
results, and on the field logs. The vertical position of each sample
is shown on the Logs of Test Borings.
The test borings were located in the field with the aid of
an undated Site Plan prepared by Idalters and Son, Inc.
LABORATORY TESTS
The soils encountered were visually classified and evaluated
with respect to strength, swelling and compressibility characteristics,
dry density and moisture content. The classification was substantiated
by grain size analyses and determination of plasticity characteristics
of representative samples of the soils. Fill suitability tests, in-
cluding compaction tests, direct shear tests, expansibility character-
istics, and grain size analyses were performed on samples of the pro-
bable fill soils. The strength of the soils was evaluated by means of
unconfined compression tests and direct shear tests on selected samples
and by consideration of the density and moisture content of the samples .,
and the penetration resistance of the sampler. Swelling characteristics
were determined by loaded swell tests on compacted samples. Compress-
ibility characteristics were established by confined compression tests
on undisturbed samples. Probable subbase materials were evaluated by
Resistance "R" value tests performed by Testing Engineers, Inc. for us.
Thee results of tests on undisturbed samples, except for the
loaded swell tests and the confined compression tests, are shown with
the penetration resistance of the sampler at-the corresponding sample
WOODWARD-CLYDE & ASSOCIATES coruulti,,g Soil od Fmmdalcm. ~,~~i,wm nd Crolo*irt.
PAGE 3
-.
-
_..
-~
-
_-
-
-.
location on the Logs of Test Borings. The grain size distribution
curves and the plasticity characteristics are indicated on Figs. 14
and 15. The fill suitability tests and loaded swell tests are re-
ported on Fig. 16. The results of the confined compression tests
are reported on Fig. 17. Results of the Resistance "R" value tests
are reported on the attached forms.
SITE AND SOIL CONDITIONS
The site is located at the confluence of three natural
drainage systems: (1) the Aqua Hedionda Creek (which divides the site
in a southeast to northwest direction) to the southeast portion
of the site; (2) the drainage channel from the Calavera Lake area
is at the north; and (3) the western drainage of the Santa Sinforosa
Ridge is on the east. The site is generally flat with an overall
slope to the southwest. Elevation range generally from about 37 ft
near the northwestern portion of the site to about 57 ft near the
northeastern area. A small hill exists in the south central area with
a maximum elevation of approximately 113 ft. The majority of the
site has been used for farming and at the present time the property
on the western side of the Aqua Hedionda Creek is being used for a
stable. Vegetation includes dense growths of grasses and weeds, scattered
small brush and dense growths of water plants. Trees line the creek.
The soils encountered in test boring 1, made on the hill,
are believed to be Pleistocene Terrace deposits. These deposits
consist of alternating strata of silty sands and silty to sandy clays
with the clays predominating. The soils found in the other test bor-
ings made in the flat areasof the site are recent alluvial deposits
WOODWARD-CLYDE & ASSOCIATES cauu,,i,lg Soil ad F‘nr"d"li",, Ewiurcn nod Cdwirtr
PAGE 4
consisting generally of silty to clayey sands from 0 to 15 ft in
-
-
-
-
-
-
-
-
-
_-
-
-
-
thickness. These sands are inturn underlain by silty and sandy clays
in thicknesses ranging from 1 ft to in excess of 18 ft. Alternating
sand and clay layers were encountered beneath the clay in some of the
test borings. The sands in the upper 6 to 15 ft of the borings are
generally very loose to loose with average resistance to penetration
of the sampler of 6 blows per ft. The upper clays had average blow
counts of 4 and unconfined compressive strengths of 2700to 7600 psf.
Groundwater was encountered in the borings at depths rang-
ing from 2 to 7-l/2 ft below the ground surface. Water was not en-
countered in Borings 1, 13 and 14. The depths at which water was
encountered at the time of drilling and 2 and 3 days later are noted
on the Logs of Test Borings.
DISCUSSION
Results of our investigation indicate that the alluvial
deposits, which cover nearly all of the existing flat area witin the
site are loose sands and soft clays in the upper 10 to 15 ft. These
soils grade erratically from one soil type to another. Our experience,
as well as results of tests, indicates that these soils can be expected
to consolidate when subjected to loads. There are several methods of
treatment for soils such as to these to minimize harmful effects of
settlements. These include (1) complete removal and replacement of
the soils with proper compaction above the water table; (2) partial
removal of the soils above the water table, and replacement with a
mat of compacted fill and use of light footing loads; and (3) precon-
solidation of areas with surcharge fills where permanent structures
are to be placed.
- WOODWARD-CLYDE & ASSOCIATES cauul*i,,g soi, ami Farndaliun .‘?.~inrcrr "W, C.doeir,r
PAGE 5
We would expect additional settlements in the area due to
lowering of the water table. This will happen to'some degree by
constructing the flood channel to the depths proposed.
Among the items, in addition to settlements, which should
be considered in the proposed development are the stability of cut
and fill slopes, the volume change characteristics of the soils,
including potential swelling, the case of excavation of the materials
in the cut areas, and the relative compaction required in the fills.
The items have been considered in arriving at‘our conclusions and
recommendations presented below. L
--
CONCLUSIONS AND RECOMMENDATIONS
(1) The soils encountered at the site are suitable for
use as fill material. The silty sands may be used as select material.
The silty and sandy clays have been classed as potentially expansive.
(2) Based on our experience in the area with similar types
of soils, it is our opinion that all materials within the site may
be excavated by normal heavy grading equipment. The materials below
the water table may require excavation with a drag line or similar
type equipment.
(3) It is recommended that the entire site, except the
hill, be scarified and compacted to a minimum depth of 2 ft below the
.-
-.
proposed finish grades. This should be done in accordance with the
attached specifications for controlled fill. This recommendation may
require the removal of the top foot or so in order to achieve uniform
- compaction throughout the 2 ft layer. If any very loose or spongy
areas are encountered, they should be removed at least to the water
table and be replaced with properly compacted granular material. The
WOODWARD-CLYDE & ASSOCIATES Cdli"l( Soil n,ui Fovndolion Ewiare,. ",d GCOl0Yl.l.
PAGE 6
-
-
.-
-
-
-
..~
grading operations should be inspected in the field by one of our
field technicians and upon his visual examination of the exposed soils,
unsuitable soils should be removed as recommended.
(4) It is recommended that potentially expansive soils be
undercut when encountered within 2 ft of finish grade and that no
potentially expansive soils be used within the upper 2 ft of fill in
building and roadway areas. The potentially expansive soils may
be spread throughout the lower portions of the fills. The soils in
the undercut areas should be replaced with nonexpansive soils compacted
as fill. It should be noted that this requirement may require careful
planning of grading operations.
(5) It is recommended that the proposed finish grades be
planned such that at least 2 ft of properly compacted material is
above the ground water level.
(6) It is recommended that any permanent structures, such
as the clubhouse and recreation building, be placed on a mat of pro-
perly compacted soil having a minimum finished thickness of 5 ft. In
addition, after properly compacting the mat, a surcharge having a
minimum thickness of 5 ft should be placed upon the mat. This sur-
charge should have the minimum plan dimensions of the.structure plus
10 ft. The time required for surcharging should be controlled by
settlement movements placed on the fill mat prior to constructing the
surcharge. It is anticipated that the surcharge will have to be left in
place 2 to 3 months to achieve the necessary settlements. Settlement
readings should be submitted to this office for analysis. It should
be noted that the settlement time can be shortened by increasing the
- height of surcharge.
- WOODWARD-CLYDE & ASSOCIATES &,n&ti,lg s,,i, ami Fo"nd"lim, E,aLirrccrr "d Ceol"Yilt*
- PAGE 7
_.
-
-
-
-
-
-.
-
-
-
-.
-
-.
-
-
(7,) Footings for the proposed clubhouse and recreation
buildings placed on a compacted mat treated as described in Para-
graph 6 above may be designed for a soil bearing pressure of 2000 psf
(dead plus live load). Footings should have a minimum width of 12 in.
and be founded a minimum depth of 12 in. and no more than 24 in. below
finish grade.
(8) Our tests indicate that clay soils encountered at this
site are expansive. We recommend that fill in the area of the swimming
pool be constructed of nonexpansive soil to minimize the possibility
of differential heaving of the pool. We would further recommend that
a blanket of gravel be placed beneath the pool and connected to a re-
lief value if the pool is constructed at a depth below the ground water
table. Further recommendations concerning this matter should await
final siting of the pool.
(9) Our analysis indicate that channel slopes up to 20 ft
high should not exceed an inclination of 2 to 1 (2 horizontal to 1
vertical). The high ground water in the area will result in seepage
flows towards the excavated channel when the flow in the channel is
low. This reduces the overall stability and flatter slopes are
required. There is a possibility that there will be some minor slough-
ing at the toe of the excavated slope where loose pockets of sand are
subjected to seepage flows.
(10) It is our opinion that cut and fill slopes outside of
the flood channel having inclinations of l-1/2 to 1 (l-1/2 units hori-
zontally to 1 unit vertically) and maximum unsupported heights of less
than 20 ft will have an adequate safety factor against slope failure
if constructed in accordance with the plans and specifications.
- WOODWARD-CLYDE & ASSOCIATES CauultbLg soa mad Poundatirm Enyiarcrs "!,<I Gdn*irt.
--
-.
PAGE 8
-
.-
-
-.
-
-
-
-
-
-
-
-.
_.~
-
-
-
(11) A set of specifications for control,led fill is attached.
The recommendations made as a part of this preliminary soils report
shall become a part of the specifications for controlled fill.
(12) The asphaltic pavement design presented below is based
on a traffic index of 5, on a subgrade Resistance "R" value of 15, a
minimum thickness of 2 ft of properly compacted subgrade below the
pavement section, and a nominal.anticipated maintenance over the years
due to the weak soils encountered with depth. The minimum recornnended
pavement section is 2 in. of asphaltic concrete placed on 10 in. of
base material. The paving materials should conform to the following
specifications:
(A) Asphaltic Concrete shall be type A asphaltic
concrete conforming to Section 39 of the State of California Standard
Specifications, 1964.
(B) Aggregate Base shall be Class 2 aggregate base
conforming to Section 26 of the State of California Standard Speci-
fications, 1964.
LIMITATIONS
The conclusions and recommendations made in this report
are based on the assumption that the soil conditions do not deviate
appreciably from those disclosed by the test borings. If variations
are encountered during construction, we should be notified so that
we may make supplemental recommendations if this should be required.
WOODWARD -CLYDE & ASSOCIATES Conru,,ins Soil oud Pauc&lil”l Ellyhrrrr “d Croloyi.,s
-
-
-
-
-
-
-
-
-
-
-
-
-~
-
-
h +i
IO .
Approximately I& miles /-+
to Pahar Airport Rd.
LEGEND
Note: Data taken l Indicates wproximate location of test boring
from plan pre- Q Indicates approximate limits ofuncanpacted fill
pared by Walters ..-fndicates
6 Son, Inc. f' approximate
existing SITE PLAN
ground con- Mmfo CAFMAD
tours WOOCWARD. CLYDE 6 ASSOCIATES
CONSULTING SOIL ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORNIA
DR. BY: p,p (SCALE: l"=WO'
CK'D BY: qj6.x. ]DATE: l-&69
IPUUJ. no:&312
(FIGURE NO: I
-
-
-
-
-
-
-
-
-
-
-
-
-
-.
-
-
-
-
.-
25 (continued on next page)
LEGEND
WC = Water Content in percent of dry weight.
DD = Dry Density in pcf.
BC = Number of blows by IW-Lb. hammer falling
30 inches to drive sampler 12 inches.
Sanpler Data: ID = 2-O", 00 = 2.5".
UC.!? = Unconfined Compressive Strength in psf.
g = Water Level at time of drilling unless otherwise
indicated.
(W)= Group classification symbol in acwrdance with
the Unified Soil Classification System.
LOG OF IEST BORING I
RANCH0 CARLSBAD
WllSULTlWG SOIL MGIIIEERS AllO GEOLOGISTS
~
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
25
30
35
40
4E
xl
55
60
Very stiff, moist, gray silty
Dense, damp, bow s i 1 ty sad (m) i-
Note: For Legend, see Fig. 2.
LOG OF TEST BORING I CONTINUED
RANCH0 CARLSBAD
WOOCWARD~ CLYDE 6 ASSOCIATES
CONSULTlllG SOIL ENGINEERS AND GEOLOGlS1.S SAN DIEGO, CALIFORNIA
OR. BY: PLP 1 SCALE: 1”=5’ Ipnar. m 6B-312
CK'O BY: -J&k lOATE: I-27-69 IFIGURE ~0: 3
fBarino I mntinufd?dl
-
-
-
-
o-
18 -
Boring 2
se, danp, brow silty sand (34)
Very stiff, mist, dark brown silty
[i&7, saturated, brown sandy cI~Y~~~
Ver dense mist, 1 ight gray
si,{y s&'(a)
Note: For Legend, see Fig. 2.
LOG OF TEST BORING 2
RJNMO CARLSBAD
MXWARD *CLYDE a, ASSOCIATES
COllSULTlllG SOIL ENGINEERS AWJ GEOLOGISTS SAN DIE&J. CALIFORNIA
OR. m: pp 1 SCALE: 1” 5' 1PW.J. ND: 68-312
CK'O BY: Jgk 1 DATE: l-g-69 ~ IFIGURE NO: 4 -
-
-
-
-
-
-
-
-
-
-
-~
-.
,-~
Fhhrinn 7
0- Soft, mist to saturated, dark
brow sandy clay (CL)
E t$
5- Bc=I
lJcs=270
IO-
iE$
8C= I6
l5- ucs=3037
Y
I8 J
1 l-2-69
Y-m Y-m ---. _I... ---. _I...
Note: For Legend, see Fig. 2.
LOG OF TEST BORING 3 LOG OF TEST BORING 3
RANCH0 CARLSBAD RANCH0 CARLSBAD
WDOCWARD *CLYDE 6 ASSOCIATES WDOCWARD *CLYDE 6 ASSOCIATES
CJ~WLTIKG solL MGINEERS AND GEOLOGISTS WilSULTIKG SOIL ENGINEERS Ano GEOLOGISTS
SAJI DIEW, CALIFORNIA SAJI DIEW, CALIFORNIA
DR. BY: kp DR. BY: kp ISCALE: !"=5' ISCALE: !"=5' IPRoJ.llo:68312 JPRoJ.llo:68312
l-27-69 l-27-69 ---" ---" CK'D BY: 3 cfl IDATE: CK'D BY: 3 cfl IDATE: IFIGURE NO: 5 IFIGURE NO: 5 .I .I
-
-
-
-
-
-
-
-
-
-
-
15.
18.
&t-inn II
Loose, moist, brown silty sand (34)
Fin, saturated, brown sandy clay
*l-2-69
Note: For Legend, see Fig. 2.
LOG OF EST EORING '+
@.NGW CARLSBAD
WOOCWARD -CLYDE a ASSOCIATES
COnSlJLTlWG SOIL ENGINEERS AH0 GEOLOGISTS SAJI DIEM. CALIFORNIA
DR. BY: PLP 1 SCALE: , “=5!
-CKlD BY: JK IDATE: l-27-69
IPWJ. la: lj8;312-
IFIGURE NO: 6
-
-
-
-
Boring 5
Loose, moist, brom sandy clay (CL)
Stiff, saturated, brown sandy clay
(al
*l-2-69
Note: For Legend, see Fig. 2.
I LOG OF TEST BORING 5 11
CONSULTlllG SOIL ENGINEERS AND GEOLOGISTS
DR. BY: PLP t SCALE: 1"=5' IpRoJ. m: 68-312
CK’D BY: J CR’ IDATE: l-27-69 - [FIGURE ND: 7
_.
.~
-
._
L
-
5
IO
I5
al
WG 9
DD=l211
Bc= 7
WC= 22
DD=lCO BC= 5
ucs=m
Boring 6
I :~I:::: Loose, danp to saturated, dark
.~~?:_i:__f:~ brow clayey sand (SC)
*l-2-69
Note: For Legend, sea Fig. 2.
LOG OF TEST BORING 6
RANCH0 CARLSBAD
WOOCUARD - CLYDE b ASSOCIATES
WKSULTlliG SOIL ENGINEERS AND GEOLOGISTS
SAN DIEGD. CALIFORNIA
DR. BY: PL P ISCALE: I"=5 IpR(u. 10: 68-312
CK'D BY: J&c IDAlE: 1-z-69 _--._- ]FIGURE ND: 8
_~
__
-
_.
-.
-
-.
-
-
-
0
5
3
i
2 IO
?
z "
4 &i 5 15,
19,
Borina 7
Loose, dmp to &watd , dark
brown c,ayey smd ( sc)
Medium-dense
'l-2-69
Note: For Legend, see Fig. 2.
LOG OF TEST BORING 7
RAHCHO CARLSBAD
WOOUJARD~ CLYDE b ASSOCIATES
COWJLTIKG SOIL EJIGINEERS AND GEOLOGISTS SAK DIEGO, CALIFORNIA
DR.'BY: 6-- 1 SCALE: ( 11;51 IPROJ. I*): 68-312
CK'D BY: 3,$/f IDATE: I-V-69 IFIGURE NO: 9
-
-
-
_-
-
-~
-
-
-
-
-
l8-
Boring 8
Dmp, brom silty sand (34) with
gravel
FILL
*l-2-69
Note: For Legend, see Fig. 2.
r
LOG OF TEST BORING 8 RANCH0 CARLSBAD
MIOUJARD. CLYDE b ASSOCIATES
COWJLTIKG SOIL MGIWEERS AND GEOLOGISTS SAll DIEGO, CALIFORNIA
DR. BY: PLP [SCALE: I"=5
'CKlD BY: J 6< IDATE: I-7.749
1FFa.J. ND: 68-312
IFIGURE ND: Q -.
-
-
-
-~
-
( I-
,_ E
IO
18
0
1 5,
8.
*l-2-69
Boring 9
sy- i ::,:ii ;:;;~I ~";e~~~, dark brown clayey
I- ,,, ,,, A~, .~.:,:::::: sand (vi;)
X::;::::::C
t7 I . . rr xtff, saturated, dark gray sandy
clay (CL)
Mediumdense, saturated, brown clayey sand (SC)
Boring IO
S
nse, damp, brown clayey
turated, dark brown silty
:ii., Medium-dense, saturated, brow
iii@ clayey sand (SC)
Note: For Legend, see Fig. 2.
I LOGS OF TEST BORINGS 9 h lo
RAM-IO CARLSBAD , MMUJARD -CLYDE & ASSOCIATES
tOnSJILTING SOIL ENGINEERS AND GEOLOGISTS SAN DIE&J, CALIFDRKIA
DR. BY: PLP JSCALE: l"=!J'
CK'D BY: 36.y 1 DATE: l-27-69
IKfCJ. NO: 68-311
(FIGURE No: J J
_-
-
-
-
-
-.
-
0
IO
Poring I?
5
Stiff, 8 saturated, gray smdy clay
*l-2-69
Boring II
f, damp, dark brown clayey *y~:iG;j fine sand (SC)
[ r:y, damp, dark brow sandy~~clar
;:;;;:;<i l&dim-dense, saturated, brown F:‘:::‘: ,j@zi[ clayey sand (SC)
Stiff, saturated, gray sandy clay
(CL)
Note: For Legend, see Fig. 2.
LOGS OF TEST WRINGS II h I2 I RANCH0 CARLPAD
WOOUJARD~ CLYDE 6 ASSOCIATES
WWLTING SOIL ENGINEERS AND GEOLOGISTS SAN DIEGO. CALIFORWIA
OR. BY: pip (SCALE: l'lz5' IPRGJ. 10: 68-312
CK'D BY: -) E;# IDATE: l-n-69 IFIGURE NO: 12
-.
-
-.
_-
-
-
:
0
5
a
0.
5
8.
0’
5.
a.
f!uing 13
dmp, dark gray silty sand ~-I.~~~cI I WMI with aravel Ia ‘F Stt, danp, dark gray sandy clay
Boring 111
Loose, dmp, brm clayey sand (SC)
Stiff, dmp, gray sandy clay (CL)
bring I!i IiLl I$$$~ L&, dmp, gray clayey sand (SC)
~~~ ..~. ,.~....,
Stiff, saturated, gray sandy clay
*l-2-69
Note: For Legend, see Fig. 2.
I LOGS OF TEST BORINGS 13, 14 b 15
RbNCliO CARLSBAD
WDUJARD *CLYDE 6 ASSOCIATES
CONSULTING SOIL ENGINEERS AND GEOLOGISTS SAJI DIEGO. CALIFORNIA _- DR. BY: PLP JSCALE: 1"=5' IPROJ. 110: 68-312
- CK'D BY: J c/f 1 DATE: l-27-69 ~FII~IJRE NO: 13
.~.
_~
.-~
.-
-
-.
-
-~
-
-
-
-
.-
loo
Go
0
W66LES GRAVEL I SAND SILT and CLAY coarse Fine Coarse Med i urn Fine
Hesh Openina - ins. SiewSizes I Nydrometer Analysis I I
76 32 13 f fv IO I6 203DW 6060 lW2QO P
I I I I I 1 i I II I II I III II, I I II , I I I loo II
1000 500 10.0 5.0 I.0 0.1 .05 .Ol .OO5 .oOl
GRAIN SIZE IN HILLIMETERS
'LL = Liquid Limit
'PI = Plasticity Index GRAIN SIZE DISTRIEUTION CURVES
RANCH0 CARLSBAD
t WOODWARD. CLYDE h ASSOCIATES
‘XMSULTING SOIL ENGINEERS AND GEOLOGISTS
SAN DIEW. CALIFORNIA
DR. BY: PLP ISCALE: bRUJ. NO: 63-312
.~.
_~
-~
.-
-~~
-
-
-
-~
-
-
-
-~
-~
.-~
100
90
60
20
IO
0
GRAVEL M66LES coarse 1 I SAND SILT and CLAY Fine Coarse Med i urn Fine
Mesh Opening - ins. SiewSires Nydrometer Analysis I I I ! I
l?i III, II II II I I I I, b I , I I I I I\ I I I Il.I\I I I I II0 II
10.0 5.0
GRAIN SIZE IN MILLIMETERS II
‘LL = Liquid Limit
*PI = Plasticity Index
I GRAIN SIZE DISTRILUTICY CURVES
RANCH0 CARLSBAD II
-
-
-~
-
-
-
-.
-
-.
-.
-.
MECHANICAL ANALYSIS
loo
80 2
g 60 2
540
2s 2 20
I40
130
120
II0
IM)
90
80
100 IO I.0 0.1 0.01 0.001
GRAIN SIZE IN HILLIMETERS
COBBLESp;E: lc, m SAN 1 f /SILT & CLAY
I PLASTICITY CHARACTERISTICS II 12131
Liquid Limit, $
Plasticity Index. $
Classification by Unified Soil
Classification System
SWELL TEST DATA I2 3
Initial Dry Density. pcf
Initial Water Content. %
Load. psf
Percent Swell
II0 II2
I2 I2
160 160
10.3 II.1
SPECIFIC GRAVITY
ilAXlMuM DRY
IENSITY, pcf
I I I I I MOISTURE CON=UT I
ZERO AIR VOIDS CURVES
te: Smple ; g 1-i
IO
LABORATORY CGACTITION TEST
30 40
FILL SUITABILITY TESTS
LABORATORY COMPACTION
TEST METHOD: Dl667-6QT RANCH0 CARLSBAD
WOOCWARD - CLYDE h ASSOCIATES
CONSULTING SOIL ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA
DR. BY: PLP SCALE: (PR~J. NO: 66-312
CK'D BY: d 6-& JDATE: I-27-69 ;FIGuRE ~0: I6
-~
~..
-~
.-
-
-~
--
-~
-.
-.
-
RESULTS OF CONFINED CM'RESSION TESTS
PRESSURE (PSF)
I RESULTS OF CONFINED CM'RESSION TESTS I RbJKHO CARLSBAD
WOOWARD- CLYDE h ASSOCIATES
CONSULTING SOIL ENGINEERS AND GEOLOGISTS
SAN OIEGO. CALIFORNIA
OR. BY: PLP ISCALE: IPROJ. NO: &312
CK'O BY: 4 6.d IDATE: '-L'-6Y IFIGURE NO: 17
ATTACHMENT I
Page l-of 2
TESTING ENGINEERS,~ INCORPORATED SAN ‘DIEGO
OAKLAND
SAN JOSE
‘zz.=-- -_~--___._.-__--- --~- -- ~-..-~~----..~-.-- -~~ __~~___~ ----..~
LlBORATORI NUMBER SD24-51 File No. 507 DATE January 13, 1969
-
JOB DATA Rancho Carlsbad .- Job No. 68-312
-
Woodward-Clyde & Associates 3467 Kurtz Street San Diego, California 92110 -
-
-.
EXPANSION PRESSURE AND RESISTANCE VALUE TEST
EXUDATION PRESSURE. PSI
800 600 400 200
40 80
30 60
, 0 c
0 /’ 10 20 30 40 so
COVER THICKNESS (INCHES) EXPANSION PRESSURE REP”,REMENT
EXUDATION PRESSURE, PSI 340 270 180
UPANSIOH PRESSURE. PSF 22 10 5
RESISTANCE YALUE. "I?" NIL NIL NIL
MOISTURE. %, *T TEST 12.6 13.5 14.3
DRY DENSITY. PCF. *T TEST 122.5 120.5 118.7
- -
REPORTED T-0:
CLlrNT
SAMPLE D*T* Sack 9-1, O'-3".
Sample submitted to the laborato
January 6,1969.
GRADING ANALYSZS
SlEVE PERSENT PASSING SllE AS RC”D. AS TESTED
3”
2 %
2
1 ‘/a 1
v. 100 100
%
3/s
it4 ~-
8
16 -_
30
SO
100 -.
200 (WASH,
SAN6 EQ”I”ALENTTEST (A”ER. OF2,
CLlY
SAND
SE.
DURABILITY FACTOR
PU.TICITY lNDEX TEST
lAwID LIMIT. ?i__
PL*STrC LIM,T. :;-
P.I.
R - ViLlx:
AT 300 PSI EXUOATION PRESSURE:__]~-~
AT EC,~ILIBR~“M (TI= ,:
-
TESTING ENGINEERS. INC.
8 cc.
EHC:md E. H. crook
ATTACHMENT I
Page 2 of 2
TESTING ENGINEERS, INCORPORATED
SAN DECO TESTlNG LABORATORIES 3467 KUNTL SWEET UN DIEGO. cALlFOPNI* PlllO ,711, 211.11*5
,ORY ,I 30.3 S.83,.
SAN DIEGO
OAKLAND
SAN JOSE
;5_--- ---~--- ___-_.---~-.-~.. -~~ --___L_-_- ~--- - LABORATORY NUMBER SD24-51A File No. 507 DATE January 13, 1969
-
JOB D*T* Ranch0 Carlsbad
- Job No. 68-312
Woodward-Clyde & Associates
3467 Kurt2 street San Diego, California 92110
- -
EXPANSION PRESSURE AND RESISTANCE VALUE TEST
EX”DATlON PRESSVRE. PSI
.- -.~ 800 600 400 200
c
E .--
ii!
5 ffl’ “+3 80
g h
E-
2 3o 60 ; :
ci :
w- 6 :
g 20 ;
4o b :- 0
LII
5
2
F- 10 20
z
?I u-
0 0
0 $0 20 30 40 50
- COVER THICKNESS CINCHES) EXPANSION PRESSURE REQUlREMENT
ExUD*TION PRESSURE. Psi 700 600 *
LXP*NStOH PRESSURE. PSF 26 17
- RESISTANCE VALUE. “Il.’ 4 4 *
MOISTURE. %:.. AT TEST 19.0 19.9 DRY DENSITY. PCF. AT TEST 107.4 108.6 _I. -- -~ NOTE: -7EPonTerr l-0: - *Soil reached fluid range too soft to b#
CUENT - act.
= e <
SAMPLEDAT/\ Sack l-6, la'-36".
sample submitted to the
laboratory January 6,,1969.
__- --_
Gn~~,rro AN,.LYSIS
SIEVE PERCENT P*sslNa 51ZE AS REVD. AS TESTED -
3” __-
2 %
2
I %
1
)i 100 100.-
‘/a
3/a
m
8
16
30 __-
50
100 ___-
200 ,wnsn, ~-
SAND EQlJI”*IENTTEST CA”ER. OF 2,
CLAY
5ANO
S.Es
DURABILITY t=*cKm
PusTlcln INDEX TEST
L19”ID LIMIT. :i- .
PLI\STIC LIMIT. !A-
P.J. -
R-VALUE:
AT 300 PSI EWJDATION PRESSURE:&-.
AT E9”ILIBRI”M (T,Z ):
xxnpacted. - --
.- TEST& ENGlNEERS. INc.
. . ;
,_ ” a* 8 ~.“__
EHC:md E. H. Crook
- I .
-
-
-
- ‘. II
-
-
III
-.
-~
.-.
-
-
ATTACHMENT II
PROJECT NO. 68-312
Page 1 of 5
. 1
SPECIFICATIONS FOR CONTROLLED FILL
GENERAL
This specification covers preparation of existing surfaces to receive
fills; the type of soil suitable for use in fills; the control-of com-
paction and the methods of testing compacted fills. It shall be the
Contractor's responsibility to place, spread, water and compact the
fill in strict accordance with these specifications. A Soil Engineer
shall be the Owner's representative to inspect the construction of
fills. Excavation and the placing of fill shall be under the direct
inspection of the Soil Engineer; and he shall give written notice of
conformance with the specifications upon completion of grading. De-
viations from these specifications will be permitted only upon writ-
ten authorization from the Soil Engineer. A sci? investigation has
been made for this pro!ect; any recommendations made in the report
of the soil investigation or subsequent reports shall become an
addendum to these specifications.
SCOPE
ihe placement of controlled fill by the Contractor shall include all
clearing and grubbing, removal of existing unsatisfactory material,~
preparation of the areas to be filled, spreading and compaction of
fill in the areas to be filled, and all other work necessary to com-
plete the grading of the filled areas.
MATERIALS
1. Materials for compacted fill shall consist of any material imported
or excavated from the cut areas that, in the opinion of the Soil Engineer,
is. suitable for use in constructing fills. The material shall contain
no rocks or hard lumps greater than twenty-four inches in size and shall
contain atleast forty percent of material smaller than one-quarter inch in size. (Materials greater than six inches in size shall be placed by
the Contractor so that they are surrounded by compacted fines; no nes-
ting of rocks,shall be permitted.) No material of a perishable, spongy,
or otherwise of an improper nature shall be used in filling.
2. Material placed within twenty-four inches of rough grade shall be
select material that contains no rocks or hard lumps greater than six
inches in size and that swells less than three percent when compacted,as
hereinafter specified for compacted fill and when subjected to an axial
pressure of 160 pounds per square foot.
WOODWRD-CLYDE & ASSOCIATES CmmRb,~ snit "lid F0.w 14, i",, Ell*bwrr nwl Crr.loCir,s
- ATTACHMENT II
-
-
-
,~-~
-
-
PROJECT NO. 68-312
Page 2 of 5
3. Representative samples of material to be used for fill shall be tested in the laboratory by the Soil Engineer in order to determine
the maximum density, optimum moisture content and classification of
the soil. In addition, the Soil Engineer shall determine the approxi-
mate bearing value of a recompacted, saturated sample by direct shear
tests or other tests applicable to the particular soil.
4. During grading operations , soil types other than those analyzed in
the report of the soil investigation may be encountered by the Contrac-
tor. The Soil Engineer shall be consulted to determine the suitabi-
Tity of these soils.
IV COMPACTED FILLS
1. General
(a) Unless otherwise specified, fill material shall be compacted
by the Contractor while at a moisture content~near the opti-
mum moisture content and to a density that is not less than
ninety percent of the maximum density determined in accor-
dance with A.S.T.M. Test No. D1557-64T, or other density
methods that will obtain equivalent results.
(b) Potentially expansive soils may be used in fills below a
depth of twenty-four inches and shall be compacted at a
moisture content greater than the optimum moisture content
for the material.
2. Clearing and Preparing Areas to be Filled
(a) All treas, brush, grass, and other objectionable material
shall be collected, piled and burned or otherwise disposed
of by the Contractor so as to leave the areas that have
been cleared with a.neat and finished appearance free from
unsightly debris.
(b) All vegetable matter and objectionable material shall be re-
moved by the Contractor from the surface upon which the fill
is to be placed and any loose and porous soils shall be re-
moved or compacted to the depth shown on the plans unless
otherwise specified in writing by the Soil Engineer. The
surface shall than be plowed or scarified to a minimum depth
of six inches until the surface is free from uneven features
that would tend to prevent uniform compaction by the equip-
ment to be used.
KOODKARD.CLYDE & ASSCCIATES Canrullitl~ Soil "Md Fotrnd"lio,~ ~,,ciIIccrs El,,! Ccnhbwr
-
-
ATTACHMENT II
PROJECT NO. 68-31
Page 3 of 5
.(c) Where fills are constructed on hillsides or slopes, the slope
of the original ground on which the fill is to be placed
shall be stepped or keyed by the Contractor as shown on the
attached Figure. The steps shall extend completely through
the soil mantle and into the underlying formation materials.
(d) After the foundation for the fill has been cleared, plowed
or scarified, it shall be disced or bladed by the Contractor
until it is uniform and free from large clods, brought to the
proper moisture content and compacted as specified for fill.
3. Placing, Spreading, and Compacting Fill Material
.(a) The fill material shall be placed by the Contractor in layers
that when compacted shall not exceed six inches. Each layer
shall be spread evenly and shall be throughly mixed during
the spreading to obtain uniformity of material in each layer.
- b) When the moisture content of the fill material is below that
specified by the Soil Engineer, water shall be added by the
Contractor until the.moisture content is as specified.
- When the moisture content of the fill material is above that
specified by the Soil Engineer, the fill material shall be
aerated by the Contractor by blading, mixing, or other sat-
isfactory methods until the moisture content is as specified.
2
- (4
-
- (e)
After each layer has been placed, mixed and spread evenly,
it shall be throughly compacted by tne Contractor to the
specified density. Compaction shall be accomplished by
sheepsfoot rollers, vibratory rollers, multiple-wheel pneumatic-
tired rollers or other types of acceptable compacting
equipment. Equipment shall be of such design that it will
be able to compact the fill to the specified density. Com-
paction shall be continuous over the entire area and the
equipment shall make sufficient trips to insure that the
desired density has been obtained.
Surface of fill slopes shall be compacted so that the slopes
are stable and there shall be no excessive loose soil on the
slopes.
-.
V INSPECTION
1. Observation and compaction tests shall be made by the Soil Engineer - during the filling and compacting operations so that he,can state his
opinion that the fill was constructed in accordance with the specifica-
tions.
- ViOODV!ARD.CLYDE & ASSOCIATES Conrdli:,~ Soil "Kd Fos,ld"lio,, Er,yi,lmn mt, Croln~irr,
ATTACHMENT II
PROJECT NO. 68-312
Page 4 of 5
-
2, The Soil Engineer shall make field density tests in accordance
with A.S.T.M. TestNo. D1556-G4T. Density-tests shall be made in the
compacted materials below the surface where the surface is disturbed.
When these tests indicate that the density of any layer of fill or
portion thereof is below the specified density, the particular layer
or portions shall be reworked until the specified density has been
obtained.
VI PROTECTION OF WORK
(a)
-
-
_.
-
-
-
-
-
b)
During Construction - The Contractor shall properly grade
all excavated surfaces to provide positive drainage and
prevent ponding of water. He shall control surface water
to avoid damage to adjoining properties or to finished
work on the site. The Contractor shall take remedial
measures to prevent erosion of freshly graded areas and
until such time as permanent drainage and erosion controls
features have been installed.
After Completion - After grading is completed and the Soil
Engineer has finished his observation of the work, no further
excavation or filling shall be done except under the observa-
tion of the Soil Engineer.
-
WOODVZRD-CLYDE & ASSOCIATES CmuultIq Snil nd Fntrn,+.,io. E#,::i,wrr nw, Cco,o~irrr
Strip 8s Specified
Original Ground
Sloughing or SlAding
does not occur
Note
NOTES
The minimum width 9" of key shall be 2 feet wider than
the compaction equipment, and not less than 10 feet.
The outside edge of bottom key shall be below topsoil
or loose surface material. 225
Keys are required where the natural slope is steeper ,% ET2
than 6 horizontal to 1 vertical, or where specified by &g
Soil Engineer. LZ In.