HomeMy WebLinkAbout; School Site Kelly & Hillside Addendum; Soils Report; 1968-09-263.67 I(“* str*el September 26, 1968 S." M.80 C.lMmni. 92110 Project No. 67-156
01.) 224.2911 Addendum No. 1
Carlsbad Union School District
801 Pine Avenue
Carlsbad, California 92008
Attention: Mr. Fred H. Lance
SCHOOL SITE AT KELLY & HILLSIDE DRIVES
CARLSBAD, CALIFORNIA
It is our present understanding that the subject site is to be graded
to the elevations shoiqn on the Preliminary Grading Plan dated July 1967,
revised September 11, 1968, and prepared by Albert A. Webb Associates.
We also understand that tentative plans are to place buildings in that
area located.east of the 5-foot fill line, as indicated on the above
plan. On the basis of these plans, it is suggested that preparation
of the subgrade be limited to this eastern portion of the site for tile
inital grading. If building locations are planned for the western por-
tion of the property at some later date, the subsoils can be undercut
and properly prepared in the localized areas, as required.
It is recommended that the grading on the east side of the 5-foot fill
line be done in accordance with the Recommendations and Specifications
for Controlled Fill as presented in our report entitled "Soil Investi-
gation for the Proposed Elementary School at Kelly Drive and Hillside
Drive, Carlsbad, California", dated June 30, 1967.
If you have any questions please call at your convenience.
JGK/LJL/jsk
(2) Carlsbad Union School District
(1) Kamar Construction Company, Attention: Mr. J. Rombotis
(1) Brandow & Johnston Associates, Attention: Mr. M. Kanda
(1) Ruhnau, E vans & Steinman
(1) Albert A. Webb Associates
CITY CJF l:;,fi_;?!,.,:L, 1)
~~i,“i7c+~4r>,i ;‘~ ~:,i ;,, =a. &.. 111,“) -3
,-
I
-
-
-
-
-.,
7
-
-
-.
-
,-
-
-
-.
-
-
SOIL INVESTIGATION FOR THE PROPOSED
ELEMENTARY scHooL AT-KELLY DRIVE At40 HILLSIDE DRIvE
CARLSBAD, CALIFORNIA
for
. .
CARLSBAD UNION SCHOOL DISTRICT
801 Pine Avenue
Carlsbad, California
by
WOODWARD-CLYDE-SHERARD & ASSOCIATES
Consulting Soil and Foundation Engineers and Geologists
TABLE OF CONTENTS
-
_._
-
-
.-
-
-
PAGE
LETTER OF TRANSMITTAL
SCOPE
FIELD INVESTTGATION
LABORATORY TESTS
SITE AND SOIL CONDITIONS
1
1
2
3
DISCUSSION 4
CONCLUSIONS AND RECOMMENDATIONS 5
LIMITATIONS 8
FIGURE 1 - SITE PLAN
FIGURE 2 - LOG OF TEST BORING 1
FIGURE 3 - LOG OF TEST BORING 2
FIGURE 4 - LOG OF TEST BORING 3
FIGURE 5 - LOG OF TEST BORINGS 4 & 5
FIGURE 6 - GRAIN SIZE DISTRIBUTION CURVES
FIGURE 7 - CONSOLIDATION TEST - SAMPLE 3-3
TABLE 1 '- RESULTS. OF CONFINED COMPRESSION TEST
ATTACHMENT 1 -,SPECIFICATIONS FOR, CONTROLLED FILL
-
-
-
-
-
WOODWARD4LYDE*SHERARD&ASSOClATES CONS"LTING ENGINEERS AND GEOLOGlSTS
June 30, 1967
3467 Kwtz street Project No. 67-156
San Lmgco Callfornla 92110 (714) 224.2911
Carlsbad Union School District
801 Pine Avenue
Carlsbad, California
Attention: Mr. Fred H. Lance
In accordance with your request and our proposal for a soil investi-
gation dated May 16, 1967, we have made an investigation of the
underlying soil conditions at the site of the proposed elementary
school at Kelly Drive and Hillside Drive in Carlsbad, California.
The accompanying report presents our conclusions and reconnnendations,
as well as the results of the subsurface exploration and laboratory
tests upon which these recommendations are based.
The Project Engineer assigned to this project was Mr. Joseph G.
Kocherhans of our firm.
r/ Louis J. Lee
JGK/LJL/pf
(2) Carlsbad Union School District
(2) Ruhnau, Evans & Steinmann
-
-
-
-
-
-.
-.
--
SCOPE
This report describes an investigation of the underlying soil
conditions at the site of the proposed elementary school to be constructed
at the southwest corner of Kelly Drive and Hillside Drive in Carlsbad,
California. The study is intended to determine the subsurface soil
conditions, the condition of areas to receive fill, the presence and
effect of any expansive soils, the most suitable type and depth of
foundation and the allowable soil bearing pressures to be used in design, I,,~,
as well as to estimate the magnitude of possible settlements.
Details of the proposed construction are not known as this time;
however, it is anticipated that the proposed buildings will be of one-story
wood frame construction with concrete slab-on-grade floors. It is also
anticipated that the maximum column and wall loads will be on the order
of 25 kips and 2,000 pounds per ft, respectively.
It is also understood that grading of the site will include a cut
slope on the order of 50 ft maximum height, along the west edge and
fills of unknown height along the east edge. It is anticipated that
fills will be less than 15 ft, maximum height.
FIELD INVESTIGATION
Five test borings were made with a 6-in. diameter truck mounted
power auger at the locations shown on the Site Plan, Fig. 1. The drilling
was done on May 26, 1967, under the supervision of a staff engineering
geologist. Field boring logs were prepared by the geologist on the
basis of an examination of the samples secured and the excavated material.
The Logs of Test Borings presented on Figs. 2 through 5, are based on
an inspection of the samples, on the laboratory test results, and on the
WDDDWARD - CLYDE - SHEAAAD & ASSDCIATES CarvltlnpSoaadP isndnnnand-
Page 2
-
-
-
-
-
-
-
-
field boring logs. The vertical position of each sample is shown on the
Logs of Test Borings.
The test borings were located in the field with the aid of a
Tentative Map Laguna Riviera dated January 20, 1965, and prepared by
Roy L. Klema. Engineers, Inc. The,approximate extent of the site and
the general area of the buildings was marked on this map by your office.
LABORATORY TESTS
The soils encountered were visually classified and evaluated with
respect to strength, swelling and compressibility characteristics, dry
density and moisture content. The classification was substantiated by
grain size analyses and the determination 'of plasticity characteristics,
on representative samples of the soils. The strength of the soils was
evaluated by means of unconfined compression tests and a direct shear
test on selected samples, and by consideration of the density and moisture
content of the samples and the penetration resistance of the sampler.
Swelling characteristics were determined on the basis of grain size distribu-
tion and plasticity characteristics. Compressibility characteristics
were established by a confined compression test and a consolidation test on
undisturbed samples.
The results of tests on undisturbed samples, except for the
consolidation test and the confined compression test, are shown with the
penetration resistance of the sampler at the corresponding sample location
on the Logs of Test Borings. The grain size distribution curves and
the plasticity characteristics are indicated on Fig. 6. The results of
the consolidation test are reported on Fig. 7 and the confined compression
test on Table I.
WDDDWARD -. CLYDE - SHERARD & ASSOCIATES C~SdlandPalmad&Q B-d-H
Page 3
-
-
-
-
-
-.
-.
-
SITE AND SOIL CONDITIONS
The western one-half of the site is situated along the eastern
side slopes of a north-south trending ridge that extends down into a
small valley within which the eastern one-half of the site is located.
The ground surface elevations of the site ranges from approximately
15 ft in the southeast corner to approximately 70 ft on the west side.
At the present time the site is vacant of structures and has a fairly.
dense growth of weeds and small brush.
The basic geologic unit that underlies the site is the San Mateo
formation of Pliocene age. This formation consists of dense sandstones
and siltstones interbedded with some hard claystone strata. The
formational material are overlain, in the valley bottom, (below the
approximate elevation of 30 ft) by alluvial deposits having thicknesses
in excess of 15 ft. The soil mantle, overlying the entire site, generally
ranges in thickness from l-1/2 ft to 5 ft.
The soils, as encountered in the test borings, generally consist of
l/2 ft of loose silty sand underlain by 0 to 2-l/2 ft of soft to stiff
Silty and sandy clay in the higher elevations (Borings 1 and 2) and loose
silty and clayey sand in the lower elevations (Borings 3, 4 and 5).
These materials generally comprise the soil mantle and in the valley
bottom grade into the alluvial deposits which consist of up to 15 ft or
more of stiff to hard silty and sandy clays with some interbedding of
sands. The formational materials which underlie the area consist of
interbedded medium dense to dense silty and clayey sand and stiff to
hard silty and sandy clays to the depths explored, a maximum of 49-l/2 ft.
WINDWARD -‘CLYDE - SHERARD & ASSOCIATES C~So(l.uldP .E-~~~
Page 4
-
Water was encountered at a depth of 30-l/2 ft in Boring 2, 11 ft
in Boring 3, 14 ft in Boring 4 and 11 ft in Boring 5 at the time of
drilling. No water was encountered in Boring 1.
DISCUSSION
Two requirements must be fulfilled by any foundation material.
First, it must be safe against shear failure, which would result in
lateral movement of soil from under the load. Second, the vertical
movement must not exceed the amount permissible for the particular
type of structure.
Granular soils, such as the silty sands encountered at the site,
have good shear strengths when properly compacted and confined.
Settlement on such soils is not excessive if the bearing capacity is
governed by the compactness of the material. Compactness of natural
granular soil is best measured by the resistance to penetration of the
sampler. Uniform compactness of granular fill material can best be
secured by engineering supervision of the placement of the fill.
Results of the consolidation test on a representative sample of
the clayey strata within the alluvial deposits indicates that these
clays have been preconsolidated, either by desiccation or by previous
overburden loads, to loads on the order of twice the existing overburden
pressures. When these alluvial soils are subjected to loads less than
the preconsolidation value, the resulting settlements will be due primarily
to recompression and will have a maximum magnitude on the orde~r of
l/2 in. or less. It is also probable that such settlement will be short
term and should occur as the load is applied. If loads greater than
preconsolidation pressure are added, settlements due to normal
WDDDWARD -, CLYDE - SHERARD & ASSOCIATES. CarultbyJcudF lhubwmondm
Page 5
-
-
-
-
-
-.
consolidation will occur and a somewhat greater magnitude may be
expected. The time for these settlements to take place may take several
months, depending on the load and the overall thickness of the clay
strata. When it is required to use loads in excess of the perconsoli-
dation pressure, two possible methods of foundation supportor treatment
may be considered: (1) the use of deep foundations (piles, pier, etc.)
and (2) surcharging the area with fill of a thickness sufficient to
develop the anticipated stress conditions. Adequate field control and
the use of settlement monuments should be employed in conjunction with
any surcharging.scheme in order to determine the actual rate and
magnitude of settlement.
The silty and sandy clays encountered on the site as soil mantle,
alluvial deposits and as clay strata in the formational, have
potentially expansive characteristics; that is, they are susceptible to
fairly large volume changes upon changes in water content. Structures
and pavements supported on potentially expansive soil will be subject to
harmful differential movements if not properly treated. Where, .
feasible, the most practical method of handling expansive clays is to
undercut these materials where exposed at finish grade and replaced with
a properly compacted nonexpansive soil.
CONCLUSIONS AND RECOMMENDATIONS
1. It is our opinion that the proposed structures may be founded
on shallow spread footings on either the undisturbed formational
sands or on properly compacted fill soils prepared in accordance with the
attached specifications for controlled fill.
WWDWARD -. CLYDE - SHERARD & ASSDCIAYES conaumngsdlamiFnndollon Bng&ummld-~
Page 6
-
-
-
2. If structures are to be placed in areas underlain by alluvial
deposits, generally the eastern one-half of the site, it is recommended
that footings be placed on a mat of compacted fill having a minimum
thickness of 5 ft below the bottom of the footing and extending a minimum
of 5 ft beyond the building limits. This recommendation will require
undercutting in cut areas underlain by alluvial deposits. Footings
supported on properly compacted fill may be designed for a maximum dead
plus live load of 2.000 psf.
3. Footings supported on the dense formational sands may be
designed for a maximum soil bearing pressure of 5,000 psf for a dead
plus live loads.
4. In areas where cuts are made potentially expansive soils may
be encountered within 2 ft of finish grade. It is reconended that
where these potentially expansive soils are encountered within the
building area they be undercut to a minimum depth of 2 ft below finish
grade and be replaced with properly compacted nonexpansive soils.
The building area is defined as 5 ft beyond the building limits.
5. It is recornnended that all footings for a structure be founded
entirely on cut soils or on properly compacted fill soils. This
recommendation may generally be most easily fullfilled by undercutting
the formational soils to a depth of 2 ft where required. These areas
may be best determined in the field at the time of grading.
6. The soil bearing pressures given above may be increased by
one-third for loads that include wind or seismic forces. It is recom-
mended that all footings'have a minimum width of 1 ft and be founded a
minimum depth of 1 ft below the lowest adjacent finish grade.
WDDDWARD -.CLYDE - SHERARD & ASSOCIATES canllfnl soft and Pm a--Id-m
- Page 7
-
-
-
7. If column and wall loads in excess of 25 kips and 2,000 pounds
per lineal ft, respectively, are required, this office should be
notified so that supplemental recommendations may be made, if required.
8. In proposed paved areas, it is recommended that, potentially
expansive soils encountered within 2 ft of finish grade be removed to
a minimum depth of 2 ft and be replaced with properly compacted non-
expansive fill soils; or that tests be made so that adequate pavement
design criteria can be established.
9. In our opinion, fill slopes having an inclination of l-1/2 to 1
(l-1/2 units measured horizontally to 1 unit vertically) and a maximum
unsupported height of less than 20 ft and the cut slopes having an
inclination of l-1/2 to 1 and an unsupported height up to about 50 it
will have an adequate safety factor against slope failure if constructed
in accordance with the plans and specifications. It is recommended
that cut slopes in excess of 25 ft be constructed with a bench at
mid-height. The bench should have a minimum width of 6 ft and be
provided with a concrete, gunite or asphalt concrete lined drainage
ditch on the inside of the bench and be sloped to drain away from the
slope.
10. It is recommended that loose surface soils not removed by
grading operations be excavated or scarified as required and compacted
before fill. footings or slabs are placed. The maximum depth of these
loose soils encountered in the borings is about 5 ft; however, the
depth of compaction should be controlled in the field by a qualified
Soil Engineer upon visual examination of the exposed soil.
11. It is recommended that the upper 2 ft of fill in building
areas and areas to be paved, be constructed of nonexpansive soil.
WWDWARD CLYDE - SHERARD & ASSDCIATES cdsdl*F- Enehmrd-
Page 8 -
-.
-
-
-
The potentially expansive soils may be spread throughout the lower
portions of the fills.
12. It is recommended that all grading operations be done in
accordance with the attached specifications for controlled fill and .
under the observation of this office.
13. If fills in excess of 15 ft are placed in building areas
it is recommended that the plans be reviewed by this office in order
to evaluate the probable settlements and to determine if the use of
settlement movements may be required.
LIMITATIONS
The conclusions and recommendations made in this report are based
on the assumption that the soil conditions do not deviate appreciably
from those disclosed by the test borings. If variations are
enc0untere.d during construction, we should be notified so that we may
make supplemental recommendations if this should be required.
-.
-~
--
-
-
WDDDWARD - .CLYDE - SHERARD & ASSOCIATES Catul&lpScildP E-ad-
FIG. 1
-
-
-
-
-
-
-.
~-
GENERAL AREA
*i-- OF BUILDINGS
->
/
i \ I
? .A I
‘\. I -- --
20
-- /--A,,’ SCALE I 1 “-100’
l 4
KELLY
e INDICATES AP+IXIU~TE LOCATION Of TEST
BORING.
,20-/1NDICATES APPROXIMATE EXlSTlNP CROUND SURFACE
/ CONTOUR.
< WDDDWARD, CLYDE. SHERARD & ASSOClATES
SITE PLAN
SCHOOL SITE - LAGUNA RIVIERA
PROJECT NO. 67-156
6-29-67 LC
-
-
-
-
-
-
-
-
-
-
-.
-
-
-
-~
-
-
-.
a
10
L :: I
8 20
;:
2
ZJ
g ” 30 g
ii m
F 2i D 40
50
FIG. 2
6ORlNG 1
BROWN SILTY SAND
BLACK SANDY CLAY
GRAY SANDY CLAY
GRAY BROWN SILTY
LIGHT BROWN,CLAYEY
DAMP, LIGHT BROWN
;g”,: r,,:::: 1~ -GRAVELLY &::. _
\‘{I& ,() - ,:,;:;:::
OD=1 07 7 ;;!~!;j:$
SC- 21 ;i_::::::i:
j’ fi 32* -~~.r c-200 _ DENSE, DAMP, LIGHT BROWN SILTY
MEDIIJU SAND (SM)
SC- 38
LEGEND
WC - V!ATER CONTENT IN PERCENT OF DRY WEIGHT.
Do - DRY DENSITY IN PCF.
SC - NUMBER OF SLOWS BY 140-La. HAMMER FALLING 30 INCHES TO DRIVE SAMPLER 12 INCHES.
SAMPLER DATA: IO - 2.0”, OD - 2.5”.
DS - DIRECT SHEAR TEST DATA:
- ANGLE OF APPARENT FRICTION IN DEGREES.
C - APPARENT COHESION IN PSF.
6.M) - G ROUP CLASSIFICATION SYMBOL IN ACCORDANCE WITH
THE UNIFIED SOIL CLASSIFICATION SYSTEM.
WOODWARD, CLYDE, SHERARD 8, ASSOCIATES
LOG OF TEST BORING 1
SCHOOL SITE - LAGUNA RIVIERA
PROJECT NO. 67-156
LEGEND
IL 7 -WATER LEVEL AT TIME OF DRILLING.
b’) - G ROUP CLASSIFICATION SYMBOL IN ACCORDINCa WITH
THE UNIFIED SOIL CLASSIFICATION SYSTEM.
- -
BORING 2
BLACK SANDY CLAY
DENSE, DAMP, -
HT
FIG. 3 FIG. 3 - -
-. LOG OF TEST BOR I NG 2
-.
FIG. 4
-
-
--
-
-
0
10.
2@
30-
0
43
BORING 3
WiTH’SAND LAYER
BC- 28
STIFF, WET, LIQHT BROWN SILTY
LEGEND
WC - WATER CONTENT IN PERCENT OF DRY WEIGHT,
DD - DRY DENSITY IN PCF.
BC - NUMBER OF SLOWS BY 140-LB. HAMMER FALLING
30 INCHES TO DRlYE SAMPLER 12 INCHES.
SAMPLER DATA: ID = 2.0’1, OD - 2.511.
UCS - UNcoNfiNm COMPRESSIVE STRENGTH IN PS~..
v = -WATER LEVEL AT TIME OF DRILLING.
(Si) = G RDuP CLASSIFICATION SYMBOL IN ACCORDANCE WlTH
THE UNIFIED SOIL CLASSIFICATION SYSTEM.
,,,,.
1 WOODWARD, CLYDE, SHERARD & ASSOCIATES
LOG OF TEST BORING 3
SCHOOL SITE - LAGUNA RIVIERA
PROJECT NO. 67-136
6-29-67 LCM
FIG. 5
-
-
-
-
-
-
-
,-
0
10
hi
f 20 I
%
iz
3
!i? z 30
ei
g
;= 0 m I k
;
10
15
BORING 4
WC- 4 1t-i LOOSE, DRY, DARK BROWN SILTY
DDE108 , SAND (SM)
BcB a -’ ~~
l.
DENSE, DAMP, CRAY SILTY SAND
DARK BROWN SANDY
<_“, \--,
LIGHT BROWN SANDY
.:;i:i;;i_i::_ MEDIUM-DENSE, SATURATED, LIGHT 5:;:::: BROWN CLAYEY SAND (SC)
i::,:.:::,::::;
BORINQ 5
LOOSE, DRY, DARK BROWN SILTY
LOOSE TO MEDIUM-DENSE, DAMP,
BROWN SILTY SAND (SM)
T TO WET, DARK
GRAY SILTY CLAY (CH)
LEGEND
WC - WATER CONTENT IN PERCENT OF DRY WEIGHT.
DD - DRY DENSITY IN PCF.
BC - NUMBER OF SLOWS BY 140-b. HAMMER FALLINQ 30 INCHES TO DRIVE SAMPLER 12 INCHES.
SAMPLER DATA: ID - 2.0”. 00 - 2.5”.
UCS - UNCONFINED COMPRESSIVE STRENGTH IN PSF.
g - WATER LEVEL AT TIYE OF DRILLING.
- (SM) - G ROUP CLASSIFICATION SYMBOL IN
ACCORDANCE WITH THE UNIFIED SDIL WOODWARD, CLYDE, SHERARD & ASSOCIATES
CLASSIFICATION SYSTEM. I LOGS OF TEST BORINGS 4 & 5
SCHOOL SlTE - SCHOOL SlTE - LAGUNA RIVIERA LAGUNA RIVIERA
PROJECT NO. 67-156 PROJECT NO. 67-156
b-29-67 b-29-67 LCM LCM
FIG. 6
SILT and CLAY
Sieve Number Hydrometer Analysis
GRAIN SIZE - MILLIMETERS I
SAMPLE CLASSIFKATION AND SYMBOL uLL *PI
1-l CLAYEY SAND (SC) 36 18
i 1-5 1 SILTY SAND (SM)
3-2 CLAYEY SAND (SC) 38 20
3-3 SILTY CLAY (CH) 58 35
4-l SILTY SAND (SM)
5-l 1 SILTY SAN0 (SM)
5-2 1 SILTY CLAY (CH) 46 27
*LL - LIQUID LIMIT
*PI - PLASTICITY INDEX WCIODWARD, CLYDE, SHERARD I ASSOCIATES
I GRAIN SIZE DISTRIBUTION CURVES I I SCHOOL SITE - LAGUNA RIVIERA
PROJECT NO. 67-156
6-29-67 LCM
.640
.600
0
$ .560
.520
,480
.Ol 0.1 1.0 10
PRESSURE IN TONS PER SO. FT.
Initial Dry Density, PCF
Initial Water Content, %
Initial Saturation, %
Final Dry Density, PCF
Final Water Content, %
Final Saturation. %
104
30
88
110
28
100
Initial Void Ratio, E. 0.649
Final Void Ratio, Ef 0.541
Compression Index, Cc 0.175
Swell Index, Cs 0.0~
Existing overburden press.,P,,TSF 0.45
Max. aast aressure. P,.TSF 0.8
WOODWARD, CLYDE, SHERARD EL ASSOCIATES
CDNJ$D~TlON TEST I -
SCHOOL SITE - LAGUNA RIVIERA
PROJECT NO. 67-156
6-29-67 LCh
RESULTS OF CONFINED COMPRESSION TEST
DEFORMAT I ON
LOAD IN PSF
ADDED
-
Attachment 1
Project No. 67-156
June 30, 1967
Page 1 of 4
- SPECIFICATIONS FOR CONTROLLED FILL
I GENERAL
This specification covers preparation of existing surfaces to receive fills;
the type of soil suitable for use in fills; the control of compaction and
the methods of testing compacted fills. It shall be the Contractor's respon- I~
sibility to place, spread, water and compact the fill in strict accordance
with these specifications. A Soil Engineer shall be the Owner's representa-
tive to inspect the construction of fills. Excavation and the placing of
fill shall be under the direct inspection of the Soil Engineer; and he shall
: give written notice of conformance with the specifications upon completion
of grading. Deviations from these specifications will be permitted only
upon written authorization from the Soil Engineer. A soil investigation has
been made for this project; any recommendations made in the report of the
soil investigation or subsequent reports shall become an addendum to these
specifications.
II SCOPE
- The placement of controlled fill by the Contractor shall include all clear-
ing and grubbing, removal of existing unsatisfactory material, preparation
of the areas to be filled, spreading and compaction of fill in the areas to
be filled, and all other work necessary to complete the grading of the
filled areas.
III MATERIALS
1. Materials for compacted fill shall consist of any material imported or
excavated from the cut areas that, in the opinion of the Soil Engineer, are
suitable for use in constructing fills. The material shall contain no rocks
or hard lumps greater than twenty-four inches in size and shall contain at
'least forty percent of material smaller than one-quarter inch in size.
(Materials greater than six inches in size shall be placed by the Contractor
so that they are surrounded by compacted fines; no nesting of rocks shall be
permitted). No material of a perishable, spongy, or otherwise of an impro-
per nature shall be used in filling.
2. Material placed within twenty-four inches of rough grade shall be select
material that contains no rocks or hard lumps greater than six inches in
size and that swells less than three percent when compacted as hereinafter
Attachment 1 Attachment 1
Project No. 67-166 Project No. 67-166
June 30, 1967 June 30. 1967
Page 2 of 4 Page 2 of 4
4. During grading operations, soil'types other than those analyzed in the
report of the soil investigation may be encountered by the Contractor.
The Soil Engineer shall be consulted to determine the suitability of these
soils.
Iv COMPACTED FILLS
.- 1. General
(a) Unless otherwise specified, fill material shall be compacted by
the Contractor while at a moisture content near the optimum
moisture content and to a density that is not less than ninety
percent of the maximum density determined in accordance with
A.S.T.M. Test No. D1557-641, or other density methods that will
obtain equivalent results.
(b) Potentially expansive soils may be used in fills below a depth of
twenty-four inches and shall be compacted at a moisture content
greater than the optimum moisture content for the material.
- 2. Clearing and Preparing Areas to be Filled
(a)
-.. lb)
(cl
(d)
All trees, brush, grass, and other objectionable material shall
be collected, piled and burned or otherwise disposed of by the
Contractor so as to leave the areas that have been cleared with
a neat and finished appearance free from unsightly debris.
All vegetable matter and objectionable material shall be removed
by the Contractor from the surface upon which the fill is to be
placed and any loose and porous soils shall be removed or com-
pacted to the depth shown on the plans unless otherwise specified
in writing by the Soil Engineer. The surface shall then be plowed
or scarified to a minimum depth of six inches until the surface
is free from uneven features that would tend to prevent uniform
compaction by the equipment to be used.
Where fills are constructed on hillsides or slopes, the slope of.
the original ground on which the fill is to be placed shall be
stepped or keyed by the Contractor as shown on the attached
Figure. The steps shall extend completely through the soil man-
tle and into the underlying formation materials.
After the foundation for the fill has been cleared, plowed or
scarified, it shall be disced or bladed by the Contractor until
it is uniform and free from large clods, brought to the proper
moisture content and compacted as specified for fill.
3. Placing, Spreading, and Compacting Fill Material
(a) The fill material shall be placed by the Contractor in layers that
when compacted shall not exceed six inches. Each layer shall be
spread evenly and shall be thoroughly mixed during the spreading
to obtain uniformity of material in each layer.
WOODWARD - CLYDE - SHERARD & ASSOCIATES C~SoilMdFoundaua BQglnnnuul~~
!
t
/
/
1
I
I /
!
I I 1 /
I /
1
1
j
I
I
I
j
L
Attachment 1
Project No. 67-156
June 30, 1967
Page 3 of 4
(b) When the moisture content of the fill material is below that speci-
fied by the Soil Engineer, water shall be added by the Contractor
until the moisture content is as specified.
(c) When the moisture content of the fill material is above that speci-
fied by the Soil Engineer, the fill material shall be aerated by the
Contractor by blading, mixing, or other satisfactory methods until
the moisture content is as specified.
(d) After each layer has been placed, mixed and spread evenly, it shall
be thoroughly compacted by the Contractor to the specified density.
Compaction shall be accomplished by sheepsfoot rollers, vibratory
rollers, multiple-wheel pneumatic-tired rollers or other types of
acceptable compacting equipment. Equipment shall be of such design
that it will be able to compact the fill to the specified density.
Compaction shall be continuous over the entire area and the equip-
ment shall make sufficient trips to insure that the desired density
has been obtained.
(e) Surface of fill slopes shall be compacted so that the slopes are
stable and there shall be no excessive loose soil on the slopes.
V INSPECTION
1. Observations and compaction tests shall be made by the Soil Engineer
during the filling and compacting operations so that he can state his
opinion that the fill was constructed in accordance with the specifications.
2. The Soil Engineer shall make field density tests in accordance with
A.S.T.M. Test No. D1556-64T. Density tests shall be made in the compacted
materials below the surface where the surface is disturbed. When these
tests indicate that the density of any layer of fill or portion thereof is
below the specified density, the particular layer or portions shall be
reworked until the specified density has been obtained.
VI PROTECTION OF WORK
(a) During Construction - The Contractor shall properly grade all
excavated surfaces to provide positive drainage and prevent
ponding of water. He shall control surface water to avoid
damage to adjoining properties or to finished work on the site.
The Contractor shall take remedial measures to prevent erosion
of freshly graded areas and until such time as permanent drainage
and erosion control measures have been installed.
(b) After Completion - After grading is completed and the Soil
Engineer has finished his observations of the work, no further
excavation or filling shall be done except under the observation
of the Soil Engineer.
8
WOODWARD - CLYDE - SHERARD &ASSOCIATES cavvwnp son and Fe E-d-N
original Ground
Slope Ratio - 5
Ii
NOTES
l’be minimum vidth ‘FL%” of key shall be 2 feet wid,er then
the compaction equipment, and not less than 10 f&t.
he outside edge of bottom key shall be below topsoil
or loose surface material.
Reys are required vhere the natural slope is steeper
than 6 horizontal to 1 vertical, or where specified by
Soil Engineer.
. .