SUPPLEMENTAL SOILS INVESTIGAT[CN
Shelter Cove
Adjacent to Pork Drive and Cove C I
East of Adams Street
Carlsbod, California
(Lots i to 13, inclusive, and Lots 54 to 66, uwztusive,)
Project No. 63-3-20A
August 20, 1963
BCNTOI‘ LhS:liLcRl’iG, iYC
-
-
-
BENTON ENGINEERING. INC.
LPPLlLD SOIL HECHANlCS~ FOUNDATIONS
-
-
-
-
-
-
-
-
-
-
-
-
-
.a41 c.I”*D”*, A”L*“c
PCI,LIP “ENKIWI BENTON 8.N DIIOO 5. E.Llro.Nl. -“c.,01”7. s,*,c .?*m,.aiv.. *,t”..c. 1-55e,
Objectives
SUPPLEMENTAL SOILS INVESTIGATION
The objectives of this investigation were to determine the relative density of the existing
filled ground ond to examine the ut.derlying noturol soils at Lots 1 to 13, inclusive, and 01X, to
determine what types of foundations would be required for the soil conditions encountered in the
borings drilled in the orea of Lots 54 to 66, inclusive, at Shelter Cove, Carlsbad, California.
In order to accomplish these objectives the data presented 0s o part of a general in-
vestigotion incur report doted June 21, 1963 was reviewed and twenty-one additional borings
were drilled. These were drilled on Lots 1 to 13, inclusive, and Lots 54, 56, 57, 60, 62, 63;
64, and 66. Undisturbed and representative loose samples were taken, ond lcborotory tests
were conducted to determine the physical chorocteristics of the existing filled ground and
underlying soils.
Field Investigation
Boring Nos. 19 to 39, inclusive, were drilled with a truck mounted rotary bucket-
type drill rig ot the approximate locations shown on the attached Drcwing No. 1, entitled
“Location of Test Borings”. The borings were drilled to depths of 4 feet to 10 feet below the
existing ground surface. A continuous log of the soils encountered in the borings was recorded
ot the time of the drilling and is presented on the attached Drawing Nos. 36 to 43, inclusive,
each entitled “Summary Sheet”.
-
--
- -2-
-
-
-
-
-
-
-
-
-
-
-
-
-
The soils were visually classified by field identification procedures in accordonce with
the Unified Soils Classification Chart. A simplified description of the clossificotion system is
presented in the ottoched Appendix A ot the end of this report.
Undisturbed samples were obtained ot frequent intervals in the soils ahead of the drilling.
‘The drop weight used For either pushing or driving the sampling tube into the soils WCS the “Kelly”
bar of the drill rig which weighs 1100 pounds, and the overage drop WCS 12 inchef. The general
procedures used in Field sampling are described under “Sampling” in Appendix A.
Loborotory Tests
Loborotory tests were performed on oil undisturbed samples in order to determine the dry
density, ond moisture content. Th e results of these tests are presented on Drawing Nos. 36 to
43, inclusive.
In addition to the above tests, laboratory compaction tests were performd on represent-
ofve samples of the Filled ground soils. The soils were tested in accordance with A.A. S. H.O.
T99-49 method of compaction modified to 26 blows of a 10 pound hammer dropping 18 inches
on each of 3 eJ”cI layers of soil in J 4 inch diameter l/Xl cubic foot diameter mo!d. The
optimum moisture and maximum dry density for each selected representative sample are presented
in tabular form below:
Soil Descripiion
Optimum
Moisture
% dry wt
Maximum
Dry
Density
. Ib/cu Ft
Dork gray silty fine to medium to coarse sand
Dark grey silty Fine to medium sond
Dork groycloyey fine to medium sand
Dark groy brown silty fine to medium to coarse sand
Dark grey brown and light groy silty Fine
to coarse sand and clayey sond
125.2 10.5
124.3 10.6
124.2 10.7
125.9 10.0
123.0 10.0
Dork gray brcjwn silty fine to medium sand and clayey
sand
123.6 10.7
-
-
-
-
-
.-
-
-
-
-
-
-
-
-
-
-
-
-3-
Soil Description
Optimum Dry
Moisture Density
% dry wt lb/w ft
Groy silty fine to coarse sand with clay binder
Dark gray brown silty fine to medium sand with
clay binder
121.9 11.0
119.0 13.7
Gray brown clayey fine ta medium sand
Gray brown silty fine to medium to coarse sand
with clay binder
123.0 11.4
125.2 11.0
Light yellow brown silty fine to coarse sand with clay
binder
122.6 11.5
Dark grey brown clayey fine sand and silty clcy 118.2 12.7
Dork brown clayey fine to medium sand 119.8 12.8
The data obtained from the compaction tests was used to calculate the relative density
of the filled gr?Jnd soils. The relative percent compaction for each sample tested in the filled
ground is included on Drawing Nos. 36 to 43, inclusive.
DISCUSSION AND CONCLUSIONS
Soil Stroto
Fill was encountered at all borings. The depth of fill varied from 1.8 feet at Boring 25,
to 9.0 feet at Boring 36. At Boring 37, ground water caused the caving in of the soil ot 6.0 feet
so the depth of fill is uncertain. The depths of the fill at the other borings and the natural soils
immediately under the fill are presented on Drowing Nos. 36 to 43, inclusive. ~
In general, the soils supporting the filled ground ot Borings 23 to 33, inclusive, ond 38
that were drilled on Lots 1 to 9, inclusive, and on Lots 57, 60, and 62, were medium firm to firm
silty and clayey sands ar medium compact to corrpact fine to medium sands. At Borings 19 to 22,
inclusive, and 34, 35, 36, and 39 that were drilled on Lots 10 to 13, inclusive, Lots 54, 63, 64,
and 66, the fill soils were deeper and were underlain by relatively soft compressible silty clays,
and clayey sands.
-
-4-
Conclusions -
It is concluded from the results of the field investigation and the laboratory test data .
-
that the relative density of the filled ground varies from 78.5 to 94.6 percent compaction.
- The natural soils underlying the fill are also variable. In order to aid in reaching conclusions
as to the type OF ioundations required on each Lot, the findings in the additional twenty-one
-
borings have to be correlated with those of the previous borings drilled and the lots have been
grouped into categories. It should be pointed out thot on other portions of these lots where no
borings were drilled, other soil conditions my exist. -
In that this report supplements our report of June 21, 1963 whenever o Lot No. is listed
- under Category A, B, C or D below, the conclusions presented supplement and supersede those
-7
- previously presented_: Those lots listed under Category A, presented below belong under
“Condition I’! described on page 6 of our previous report and those listed under Categories B,
-
C ond D belong under “Condition II”. For the onticipotz d t:;oes of soil conditions and foundation
design to be used on any lots not itemized below, reference should be made to our previous
report.
-
Category A. Where fill soils vory from 6.0 to 9.0 feet in depth and are generally less
- than 90 percent compaction and these unsatisfactory fill soils are underlain by either soft com-
pressible or unknown noturol deposits. Driven piles would be indicated ot these locations. -
Lot Nos. 10, 11,s 13, 54, 56, 63, 64, and 66. Other adjacent Lots probobly falling into
- this same category. Lot Nos. 53, 55, and 65.
Category 8. Where no fill was encountered in the test borings and where the natural
ground is capable of supporting the structural loads.
-
Lot No. 58
Category C. VJhere fill was determined in test borings to be 90 percent of maximum dry
density or greater, underlain by natural soils capable of supporting fill ond structural loads.
1.
Category C. (Continued) Lot Nos. 7 and 62
Note: In order to build on fill it is standard practice to require all filled ground under *
_1 the entire. building area to be uniformly compacted to at least 90 percent of maximum dry density
I
f
or greater.
c Category D.! Where the fill soils vary from 2.1 to 6.8 feet in depth ond with density tests
generally less than the required 90 percent of maximum dry density. These fills are underlai,n by
natural soils copablz cf supporting the footings of the proposed buildings placed at least one fcat
into the medium firm or medium compact natural soils below the fill.
Lot Nos. 1 to 6, inclusive, 8, 9, 57, 60, and 62.
_I Other probab!e adjacent Lots with~similar conditions.
_I
Let N”;. 50 and 61
Note: The conditions rhcJld be verified either befare or at the time’of excavation for
j
i footing Irenchai.
I I
I
An alternate consideration for Lots 1 to 6, inclusive, Lots 8 and 9, and Lots 57, 60 and 62
!
which ore grcuped under Category D, would be to remove the existing fill to the medium compact __.-
natural soils und then replace the fil! and compact this to at least 5Q percent of maximum dry
-I density under,continuous engineering supervision in accordance with the “Stondord‘Specifications
I
for Placement JF Controlled Compacted Filled Ground” , presented in Appendix AA of this
-i report.
I _r It may be that some of the houses will be located on other oreas on some of those lots
j
,listed under tither “Category A” or “Condition III, where possibly better soil conditions exist.
For example, it is not known whether better conditions exist on the west side of Lots 10, 1 I, 12,
L and ,13, where the fill is at less depth according to the “Grading Plan” and where satisfactory
i \
-
-
-6-
natural sail may possibly exist below the shallower fill. Also, better soil conditions may exist
on those portions of Lots 54, 56, 63 and 64, adjacent to Park Drive. If such more favorable ’
conditions are found at the proposed final locations of houses on these lots, then alternate
types of foundation support may be used.
Respectfully submitted,
BENTON ENGINEERING, INC.
-
APPENDIX AA
-
-3-
i -
-
to compact the fill material to the specified density. Rolling shall be accomplished
while the fill material is at the specified moisture content. Rolling of each layer shall
be continuous over ik entire area and the roller shall make sufficient trips to insure
thot the desired density has been obtained. The entire areas to be filled shall be
compoc ted.
-
-
(e) Fill-slopes shall be compacted by means of sheepsfoat rollers or other suitable equip-
ment. Compacting operations shall be continued until the slopes are stable but not too
dense for planting and until there is no appreciable amount of loose soil on the slopes.
Compacting of the slopes shall be accomplished by backrolling the slopes in increments
of 3 to 5 feet in elevation gain or by other methods producing satisfactory results.
- (f) Field density tests shall be made by the soils engineer for approximately each foot in
elevation goin after compaction, but not to exceed two feet in vertical height between
tests. Field density tests may be taken at intervals of 6 inches in elevation gain if
required by the soils engineer. The location of the tests in plan shall be so spaced to
give the best possible coverage and shall be taken no farther apart than 100 feet. Tests
-. shall be taken on corner and terrace Iok for each two feet in elevation gain. The sails
engineer may take additional tests as considered necessary to check on the uniformity
of compaction. Mere sheepsfoot rollers are used, the tests shall be taken in the com-
- pacted material below the disturbed surface. No additional layers of fill shall be spread
! until the field density tests indicate that the specified density has been obtained.
- (g) The fill operation shall be continued in six inch (6”) compacted layers, as specified
above, until the fill has been brought to the finished slopes and grades as shown on
the accepted plans.
-
5. Supervision. Sufficient inspection by the soils engineer shall be maintained during the
filling and compacting operations so that he can certify that the fill was constructed in
accordance with the accepted specifications.
~,
-
-
-
6. Seasonal Limits. No fill material shall be placed, spread, or rolled if weather conditions
increase the moisture content above permissible limits. !&hen the work is interrupted by
rain, fill operations shall not be resumed until field tests by the soils engineer indicate that
the moisture content and density of the fill are OS previously specified:-,,
7. Limiting Values of Nonexpansive Soils. Those soils that expand 2.5 percent or less from
air dry to saturation under a unit load of 500 pounds per square foot are considered ta be
nonexpansive.
8. All recommendations presented in the “Conclusions” section of the attached report ore a
part of these specifications 1
- I
-
eLMON ENGlNEL”lNG. INC.
-
APPENDIX AA -
-3-
-!
-
’ to compact the fill materiol to the specified density. Rolling shall be accomplished
while the fill material is at the specified moisture content. Rolling of each layer shall
be continuous over ik entire oiea and the roller shall make sufficient trips to insure
that the desired density has been obtained. The entire areas to be filled shall be
compacted.
(e) Fill-slopes shall be compacted by means of sheepsfoot rollers or other suitable equip-
ment. Compacting operations shall be continued until the slopes are stable but not too
- dense for planting and until there is no appreciable amount of loose soil on the slopes.
Compacting of the slopes shall be accomplished by backrolling the slopes in increments
of 3 to 5 feet in elevation gain or by other methods producing satisfactory results.
-
(f) Field density tests shall be mode by the soils engineer for approximately each foot in
elevation gain after compaction, but not to exceed two feet in vertical height between
- tests. Field density tests may be taken at intervals of 6 inches in elevation gain if
required by the soils engineer. The location of the tests in plan shall be so spaced to
give the best possible coverage and shall be taken no farther apart than 100 feet. Tests - shall be taken on corner and terrace lots for each two feet in elevation gain. The soils
engineer may take additional tests as considered necessary to check on the uniformity
of compaction. Mere sheepsfoot rollers ore used, the tests shall be taken in the com- - pacted material below the disturbed surface. No additional layers of fill shall be spread
until the field density tests indicate that the specified density has been obtained.
-
-
-~
(g) The fill qperation shal.1 be continued in six inch (6”) compacted layers, as specified
above, until the fill has been brought to the finished slopes and grades as shown on
the accepted plans.
5. Supervision. Sufficient inspection by the soils engineer shall be maintained during the
filling and compacting operations so that he can certify that the fill was constructed in
accordance with the accepted specifications.
6. Seasonal Limits. - No fill material shall be placed, spread, or rolled if weather conditions
increase the moisture content above permissible limits. When the work is interrupted by
rain, fill operations shall not be resumed until field tesk by the soils engineer indicate that
the moisture content and density of the fill are as previously specified:..,
7. Limiting Values of Nonexpansive Soils. Those soi Is that expand 2.5 percent or less from
air dry to saturation under a unit load of 500 pounds per square foot are considered to be
nonexpansive.
- 8. All recommendations presented in the “Conclusions” section of the attached report are a
part of these specifications;
-
-.
-
-
-
.-.
-
-
-
-
-
-
XJILS INVESTIGAlION
”
c ‘h+-
Ac:Jcci:t r ?-, 2:;. ~:,,. cu ;‘-;. -..:: .,do: it:-.2 RWEIVED ~ ,. .., ,:, cc,;<., .L
-DEc 2 71976
CI7-Y OF CARLSBAD Bulldlng Department
5. .~lFiiEh,~. ._
- BENYON ENGINEERING. INC.
**,L,ID OOll. YEc”*HIC* - rOUND*TION.
ST.1 EL CAJQN IIO”LCY*RD ,- .*I4 OIFCO. C*LlrOlwI* 0.3180
l WlLlP “lNlt,NO .lNION l mIs,D‘*l CIYIL ‘*altos” APPENDIX A
Unified Sail Classification Chart*
.-.
.-
SOIL DESCRIPTION GROUP
SYMBOL
I. COARSE GRAINED, More than half of
material is larger than No. 200 sieve
size.** -
- GRAVELS CLEAN GRAVELS
m half of
coarse fraction is
- larger than No. 4
sieve size but smallerG.RAVELS WITH FINES
than 3 inches (Appreciable amount
- of fines)
-
-.
SANDS CLEAN SAND
man half of
coarse fraction is
smaller than No.
4 sieve size SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAlhED, More r: . .r
- ,materia is sma er than h
sieve size ** SILTS Ah- &LP ,
-
,-
-
-
Liquid Lir
Less than 5~
(ILTS AND
Liquid Limit
Greater then 5,
Ill. HIGHLY ORGANIC SOILS
GW
GP
GM
GC
Well grcded gravels, gravel-sand mixtures,
little 0T no fines.
Poorly grade5 ;;cw’., gravel-sand
mixture;, :3,5 L ‘G c-es.
Silty g:we!;, ;,,. .;- / ;r .ded grawi-
sand-silr n.;xtu
Clayey gra,,eis, L ;~; I ,,:adL: yavel-
sand-clay nixtu: _
SW
SP
SM
SC
\!e;! .raded saw, y ~5. lit?!&
or .x i:nes.
PowI; sraded sands, ccl
iittle c :c. fines.
Silty x. . . aoaly gra&d sL, .I
71iXtb
CIcy,: .,_. . i oaorly grcdec .cna-cicy
mlxrux
ML
CL
OL
MH
CH
OH
Inagc:.. ; ma very fine _ .:. :33x
fl; :“~ . i i-5; -.ai7t
mix:..z: PII : ricit,
lxx,;?‘. .’ me ,_>-
tic!~ .;,ld,
silt) .’ .’
0 . rgac;: .A !‘.e .,t 511:
”
1; si
low p,i;.~L, y
Inorganic sijh, xlcas‘.:. j OT 1 xa-
cecus fine sandy or silt) soils s.zsric
silk.
Inorganic clays of high plasticiry, fat
clays.
Organic clays of medium to high
plasticity.
PT Peat and other highly organic soils.
TYPICAL
NAMES
I.” DllOD, s,,:s01. LA Y‘.li .es.sss.
* Ac+ed by the Ccrps of Engineers and Bureau of Reclamation in January, 1952.
** A* sieve sizes on this chart are U.S. Standard.
.-.
. -
- ‘....
-
-
-
-
.-
-
-
-
-
,-
-
-
-
.-
-.
I -
BENTON ENGINEERING. INC.
APPLILD SOIL IAEc”*yy - FO”ND*TIOWs
‘7.1 tn. CAJOW llO”LEYCID SAW D1LGO. C*LIFOIINI* e*,,s
PWlLlP HCNxI*G BENSON
C”L.ID‘W, CIVIL C”CI.dLr.” June 19, 1967
Janss Corrxwtion
lOO.Thou;and Oak. Boulevard ’
-Thousand Oo&, California
Attention: Mr. Ron Harper
Development Manager
Your Project Number JC231-277
Our Project No. 67-l-20DF
Report of Field Density Tesk
Token in Compacted Filled Ground
&tol Cove,
Carlsbad, California
Gentlemen:
This is to report the resulk of tests and observ+ons made in order to inspect the compaction
of filled ground placed on certain areos tr Bristol Cove in Carlsbod, Californic. Tire i;;ir
were pla’ced during the period between MC-rh 30 and June 1, 1967. I’
The grading plan used for the placement of filled ground was prepared by Moffatt 2 Nichol,
Engineers, and dated July 25, 1966. The approximate lbcations at which the tesk were
taken and the final test results are presented on pages 3 to 6, inclusive, under the “Table ,of
Test Resu I k . ” The laboratory determinations of the maximum dry densities and optimum
moisture contenk of the ma@ fill materials are presented on page 6, under the “Laboratory
Test Resulk.” The tests were taken during the weekly periods indicated below:
Test Number Week Ending
- 1 to P~,.lin’clusive
10 to 23, inclusive
24 to 27, inclusive
28to $5, inclusive
47 to 58, inclusive
59 to 73, inclusive
74 to 76, inclusive
77 to 84, inclusive
85 to 94, incl.usire
95 to 107, inclusive ,
April 1, 1967
April 8, 1967
April 15, 1967
April 22, 1967 H
April 29, 1967 flr5’
May 6, 1967
May 13; 1967
Mcy 20, 19;i
May27, 1967
June 3, 1967
-
-
BENTON ENGINEERING, INC
APPLIE.0 SOIL MGHANICS. FOUnDATIONs
-
-
-
-
-
-
-
-
-
.-
-
P”ILIP kiIENIINa q CNTON
PIIT.t,‘*T- EiYlL rz*oI*“”
SOILS INVESTIGATION
ZoPe of, Wark
.,A1 F.I”*&7Y*TI”~..“I
8AN 01‘00 5. C.LI.0”v.I.
ATI.,‘” I.,581
This report presents the findings in eighteen test borings drilled at the Shelter Cove
subdivision adjacent to Park Drive and Cove Drive, east of Adams Street, Corlsbad, Cai ifornia
The objectives of this investigation were to determine the existing soil conditions and to det*rmin,:
the allowable supporting capacities of the soils for use in foundation design.
The soils conditions were logged at the time of drilling and undisr, ‘. ,_ sc-nples were
obtained at frequent intervals in eighteen borings. Laboratory tests we:; CF’ -i;--ed to determ:zc
tho Physical characteristics of the soils. The field observations and lobororory analyses are
presented for the various soil conditions encountered.
The conclusions and recommendations are necessarily based on the findings at the bo:Y~~s
drilled. In compiling the conclusions of this report, Lot Ms. 15 to 71, inclusive, hove ieen
iisted as either being in an arc: 2:. _ c. .#t comp:,;:irrle sol! :!.at Hvould reqclire the use pi
thriven piles for foundatic .i .,T _ D of shallow F’!I I: rd soil where fool:rcs
mcy be readily foun&, .‘e ~. :<..xc: :Jral soils.
It is under:~wo r’-.~:f two story wood frame houses c’ =d on the majority
sf the lots, oiihobgn IC I~~.:Y,;: of either the floor plans or . cre known at rhis -:?L?.
Fleii Iwestigation
eighteen bc i E ,;rs drilled with o truck-mounted rotary bucker-t:..>z drill rig at ?i:e
approximate locations shown on the ottached Drawing No. 1, entitled “Locction of Test %r:.-.:.
BENTON ENGINEERING. INC.
-
-
-
-
-
-
.
-
*CPLICD SOIL “EC”*HIC* - rO”ND*T,OWs
*7., EL CAJON BOULEVARD
SAN OIlGO. CA‘I,OINIA Orals
P*LLI, “‘“XINO .m4TO” C”c.Io‘*l. CI”IL n**1*1s1
APPENDIX B
Sampling
..* m*ao, s*,.s*s. LA Y.... rse.sss.
The undisturbed soil samples are obtained by forcing a special sompling tube into the
undisturbed soils at the bottom of the boring, at frequent intervals below the ground surface.
The sampling tube consists of a steel barrel 3.0 inches cutside diometer, with a special cut-
ting tip on one end and a double boll valve on the other, and with a lining of twelve thin
brass rings, each Ene inch long by 2.42 inches inside diameter. The sampler, connected to a
twelve inch long waste barrel, is either pushed or driven approximately 18 inches into the soil
and a six inch section of the center portion of the sample is taken fcr laboratory tests, the soil
being still confined in the brass rings, after extraction from the sampler tube. The samples are
taken to the laboratory in close fitting waterproof containers in ader to retain the field mois-
ture until completion of the tests. The driving energy is calculated OS the overage energy in
foot-kips required to force the sampling tube through one foot of soil at the depth at which the
sample is obtained.
Shear Tests
The shear tests are run using a direct shear machine of the stroin control type in which
the rote of deformation is oppraximotely 0.05 inch per minute. The machine is so designed that
the tests are made without removing the samples from the brass liner rings in which they ore se-
cured. Each sample is sheared under a normal load equivalent to the weight of the soil above the
point of sampling. In some instances, samples ore sheared under various normal loads in ader to
obtain the internal angle of friction and cohesion. Where considered necessary, samples ore
saturated and drained before shearing in order to simulate extreme field moisture conditions.
Consolidation Tests
The apparatus used for the cJnsolidoticn tests is designee ,;eive one of the one inch
high rings of soil as it comes from the iietd. Loads are opplied in ,b.erol increments to the upper
surface of the test specimen ond the resulting deformations are recorded at selected time intervals
for each increment. Generally, each increment of load is mointoined on the sample until the
rate of deformation is equal to or less than l/lOOCO inch per hour. Porous stones are placed in
contact with the top and bottom of each specimen to permit the ready addition or release of water.
Expansion Tests
One inch high samples confined in the brass rings ore permitted to air dry at 105°F fcr
at least 48 hours prior to placing into the expansion apparatus. A unit load d 500 pounds per
square foot is then applied to the upper porous stone in contact with the tcp of each sample.
Woter is permitted to contact both the top and bottom of each sample through porous stones.
Continuous observations are made until downward movement stops. The dial reading is recorded
and expansion is recorded until the rate of upward movement is less than l/10000 inch per hour.
-
-
-
-
-
-
-
-
-
-
-
-
-
.-
-
-
-
-2-
The borings were drilled to depths of 10 to 49 feet below the existing ground surface. The
drilling WQS accomplished to the ground water level with a 24 inch diameter bucket. At this
point water and drilirr’s mud was addud inside the boring. A greater hydraulic head was
mointained inside each boring as the drilling progressed below the water toble, in order to
prevent the coving of the sides of the hole. Drilling then proceeded with on 18 inch
diameter bucket to the depths of exploration. This method of drilling permits the visual exam-
ination of each bucket of soil as it is removed from the boring. A cwtinuous log of the soils
encountered in the borings wos recorded ot the time of drilling and is shown in detail on
Drawing Nor2 to 21, inclusive, each entitled, “Summary Sheet. ‘I
The soils were visually classified by field identification procedures ‘, ~,:cordor,ze wl:I.
the Unified Soil Classification Chart. A simplified description of this ciossific,; .an SJ~X.T is
presented in the attached Appendix A at the end of this report.
Undisturbed samples were obtained at frequent intervals in the soils ahead of 7, ,; cry, +Q.
The drop weight used for either pushing or driving the sampling tube into the soils was rhe .‘/LI.~
bar of the drill rig which weighs 1650 pounds, ond the ovepage drop was 12 inches. The generci
procedui-es used in field sampling are described under “Sampling” in Appendix B.
Laboratory Tests
Laboratory tests were performed on a/I undisturbed -1~:; 1,~ ‘:: i soils in order to dete:-
mine the dry density, moisture content, and shearing strer,;:~ : 5 of these tests ore
prssc<nted on Drowing Nos. 2 to 21, inclusive. Consolidotior~ ,r.:cz performed on represcnt-
clfwt : :71oles i,~, ‘-I determine the load-settlement choracteris:;ci of the soi!s. The re:-Its
of these rests are presented on Drawing Nos. 22 to 35, inclusive, each ent::aed, “Consolidc:ion
C”;-\,ej. 1’
-
BENTON ENGINEERING. INC.
-3-
The general procedures used for the laboratory tests are described briefly in
Appendix B.
In addition to the above laboratory tests, compaction tests were performed on some of
the representative samples of the upper soils to establish compaction criteria. The soils were
tested according to a modified A.A. S.H.O. T99-49 method of compaction which uses 26 blows
of a 10 pound hammer dropping 18 inches on each of 3 layers in a 4 inch diameter 1/30th cubic
foot mold. The results of the tests are presented as follows:
Maximum Optimum Mois-
Boring Depth Soil Dry Density ture Content
Number in feet Description Ib/cu ft % dry wt
1 1.5 to 2.5 Silty clay 92.6 25.8
4 2.5 to 3.5 Fine to medium sand 113.1 12.0
12 1 .o to 2.0 Silty fine to coarse sand 121.9 10.8
15 0.5 to 1.5 Clayey fine to coarse sand 118.4 12.6
17 1 .o to 2.0 Slightly silty fine to medium sand 120.5 ‘11.8
California Bearing Ratio tests were also performed on representative samples of the upper
solls from Borings 10 and 11 as requested. The tests were performed in accordance with Section 6
of the Standard Specifications of the Division of tiighways, State of California, dated January,
1949. The test results were presented in a letter dated April 23, 1963 and are repeated in
tabular form below:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Maximum Initial Load in Percent Percent
Dry Moisture Pene- Pounds on C. B. R. Expansion Moisture
Boring Depth Density Content tration 3 Sq. In. o/c of During After
NO. in Feet Ib/cu ft % dry wt Inch Plunger Std. Sooking Penetration
10 O-O.5 121.8 9.7 0.1 1000 33.3 0.4 12.2
0.2 18X 40.6
0.3 1860 32.7
0.4 2020 29.3
0.5 2040 26.4
-
-
,~
-
-
-
-
-
-
-
-
-
-
-
-
-
-4-
r
Maximum Initial Load in
Dry Moisture Pene- Pounds on
Boring Depth Density Content tration 3 Sq. In.
No. in Feet Ib/‘cu it %. dry wt Inch Plunger
10 0.5-1.5 122.6 12.1 0.1 200
0.2 350
0.3 460
0.4 540
0.5 600
C.B.R.
% of
Std.
Percent Percent
Ex,pansion Moisture
During After
Soaking Penetration
6.6 3.6 15.7
7.8
7.9
7.8
7.7
11 O-I .5 119.0 13.0 0.1 250 8.3 2.3 15.6
0.2 460 10.2
0.3 570 10.0
0.4 640 9.3
0.5 700 9.0
DlSCUSSlON AND RECOMMENDATIONS
Soil St:oto
Recent fill soilswerefoundtodepthsof 11.0, 11.0, 8.5, 7.5, 5.5, 12.0, 8.0, 1.8,
2.2, 2.0, 7.5, 6.0, 8.0, and l.Sfeet in Borings 1, 2, 3, 4, 5, 6, 7, 8, 10, 11, 12, 13, 14,
and 15, respectively. The fill soils are generally underlain soft silts, clays, clayey silts and
silty clays in Borings 1, 2, 3, 4, 6, 7, 8, 12, ond 13. At Boring 5, the fill wos underlain by
loose silty sand to 12.0 feet and soft sandy clay to 13.0 feet, then by soft clayey silt, clayey
sand and silty clay to 28.5 feet. Immediately beneath the fill soils at Borings 10, 11, and 14
were alluvial deposits of loose to firm silty sands and clayey sands to the depths of exploration.
At Boring 15, the 1.: f,.. $7 of fill was underlain by a medium :.ri’~: ayer of silty sand to 4.2 feet
znd this was underlot:! L ~>it silty cloy to 6.5 feet. Firmer clayey sand was follnd between 6.5
cna i3.0 feet ant :i I silty sand between 13.0 and 15.0 feet. In 82. ..:~:: 2 and 3 the fill soils
a :, ~,Leriain by relatively soft soils to the depths of exploration. ?:~,~ ;?e?;rs at which the natura;
soi!s i .ome firm ro firm, are below 43.6, 28.5, 29.2, 26.5, 27.0, 20.5, 20.3, and very
10.0 beet, respectively, in Borings 4, 5, 6, 7, 8, 12, 13 and 14.
-
-
sENTON ENGINEERING. INC.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-5-
Natural alluvial slightly silty sandy sails were encountered below the surface at
Borings 9, 16, 17 ond 18. These ore underloin by medium soft to very firm layers of clayey
sand, loose sand, soft sandy silt, clayey silt, ond silty clay to the depths of exploration.
Ground water was either encountered or estimated on the basis of field moisture con-
ditianstobeatdepthsof6.0,‘5.5, 9.0, 8.5, 6.5, 7.0, 8.0, 9.5, 4.0, 9.5, 9.0,8.0, 6.0,
8.0, 6.0, 9.5, 9.0, and 7.0 feet in Borings I, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15,
16, 17, and 18, respectively.
General Conclusions
It is concluded from the findings in the test borings that two major types of soil conditions
exist on the site. One is the condition where the existing fill was found to vary to from 62 to 95
percent of maximum dry density and was underlain by relatively compressible silty clays, clay,
etc. If two story structures were supported on these upper soils where this condition exists, it is
estimated from the lood consolidation test data that total settlements up to several inches could
occur. It is therefore recommended that foundations placed in the orea where this condition
exists be designed to distribute the structural loads into the deeper soils by shear along the length
of driven piles. The other condition is where either natural alluvial soils are exposed on the
surface or were encountered within 2.1 feet below the existing ground surface. In these areas,
conventional type footings may be used for the support of the proposed houses provided the
applied unit load does not exceed 1000 pounds per square foot.
It is understood that all houses are to be placed 30 feet or more inside the rear property
lines that border the channel.
The areaswhere the two types of conditions were encountered in this investigation are
presented in tabular form on the following page together with the types of foundations and
minimum depth footings.
BENTON ENGINEERING. INC.
-6-
Condition I
-
-
Requiring
Driven
Piles
- Depth
Boring of Fill
No. in Feet
1
2 ,-
3
4
5 -
.6
7
8 -
ii
13
- 14
-
11.0
11.0
8.5
7.5
5.5
12.0
8.0
_I~ 1.8~.
Use Pile
Design
Curve
Drawing No. A
Drawing No. A
Drawing No. A
Drawing No. A
Drawing No. B
Drawing No. B
Drawing No. B
Drawing No. B ~_~. .
Condition II
Where Shallow Depth Footings May Be De-
signed Using a Maximum Bearing Pressure
of 1000 Pounds per Square Foot
Boring
No.
Depth
of Fill
in Feet
Recommended
Minimum Depth
Footing Below
Existing Grade
in Feet
9 None 1.0
10 2.1 3.1
11 2.0 3.0
_13- .!..~5_.m.e~- 2.5
16 None 1.0
17 None 1.0
18 ‘None 1.0
7.5 Drawing No. B
6.0 Drawing No. B
8.0 Drawing No. B
Due to the fact that only 18 Borings have been drilled in 57 lots,* it is difficult to de-
termine the exact location where Condition I changes to Condition II. However, after review-
ing all available data, including the original contours shown on the “Groding Plan of Shelter
Cove in the City of Carl&ad” prepared by Roy L. Klemo, Engineers, Inc., it is concluded that
-
the lots could be grouped as follows:
- Condition I Condiriar .!
lots 15 to 34, inclusive - Redr l/2 of Lots 47 to 59, inclusive
Lots ,35 to 46, inclusive
Front l/2 of Lots 47 to 59, inclusive
Lots 60 to 71 r inclusive
- It may be possible that once the plot plan for each house is available on Lots 60 to 66,
inclusive, and the type of structure and loads are known that additional test borings on the front -
‘i/2 of these lots may disclose conditions favorable for the use of shallow footings in place of
- Yriven piles.
* Lots 1 to 14, inclusive, Lot 72 and Lot 73 are not grouped in either category.
BENTON LNGINEERING. INC.
-
-
-7-
Recommendations for Driven Piles
The allowable supporting capacities for several types of driven piles have been deter-
mined. These supporting capacities are based on the shear strength of the soils in contact -
with the piles and include a factor of safety of 2.0.
,- Drawing No. A, entitled “Pile Capacities Law Driving Resistance Area”, is for use in
estimating pile lengths in those areas where soft soils exist to the full depth of exploration as -
at Borings 1, 2, and 3 or to nearly the depth of exploration as at Boring 4.
-
Drawing No. B, entitled “Pile Capacities, Higher Driving Resistance Areas”, are for
- use in estimating pile lengths in all other areas requiring driven piles such as at Barings 5, 6,
7, 8, 12, 13 and 14.
-
Where piles ore to be driven closer than 8 diameters, center to center, it is recom-
- mended that their supporting capacities be reduced to allow for the overlapping of lbading zones
between adiacent piles. A suitable eff iciency formula for this condition is presented as follows:
-
E= 1-D
c
m(n-1) + n(m-1) +fi(m-I) (n-l)
W Smn 1 -
Where E = Efficiency = Bearing capacity of pile in group
Bearing capacity of isolated pile
- D = Diameter of pile in feet
-
S = Space in between piles center to centcr in feet
m= number of rows
n = number of piles per row
.-
-
Where the piles are driven into the relatively dense sand stratum as encountered
below a depth of 27 feet at Boring 7, each pile may be stopped before its total design
length shown an Drawing No. B is reached, provided the driving resistance builds up to
a point where the supporting capacity of the pile exceeds that given by the modified
BENTON ENQINEERINO. ,NC.
-8-
Hiley formula presented below by a factor of safety of at least 4.
-
-
-
-
Where R =
W=
H=
P=
L=
A=
E=
S=
c=
l2WH(W + CP,
R= mm-
s + 24,000
Total supporting capacity of single pile in tons
Weight of hammer in tons
Height of drop of hammer in feet
Weight of pile in tons (or mandrel)
Length of Pile in Feet
Cross-sectional area of pile (or mandrel) in sq. in.
Modulus elasticity of pile (or mandrel) in Ib/sq. in.
Permanent displacement of last blow in inches
(usually taken as overage of last 10 blows)
Factor based on coefficient of restitution = 0.25 for steel
= 0. IO for concrete or wood
To apply a factor of safety of 4.0 to the above formula, the allowable load per pile
should equal R .
7 -
-
The estimated total settlement for a single pile lwded ta the design capacities indi-
cated on Drawing Nos. A and B is estimated to be less than l/4 inch.
Several types of driven piles ore presented on Drawing Nos. A and B. These include
70# per yard steel rail piles, 8.62 inch 0. D. and 10.75 inch 0. D. pipe piles and 8 inch
-
--
diameter tip timber piles that are tapered 1 inch in 10 feet. Other types of piles may also
be used and their supporting capacities may be computed to be directly proportioned to the
surface area in contact with the supporting soils.
If timber piles are used, it is recommended that these be press.;re treated with creosote
- in order to increase their life expectancy.
- The “Structural Engineers of San Diego” group have recommended that the total allow-
able axial loads applied at the top of steel roil piles should not exceed 17 kips on a iU# per
yard rail. If a 90# per yard rail was used, the total axial load should not exceed 25 kips.
BENTON SNGINEERINQ. INC.
_ ., ._ >
-9- -
These values are based on the assumption that the pile is laterally fixed IO feet below the adia-
.- cent ground surface. The axes of adjacent piles are to be driven normal to each other. If
splices in the steel roil piles ore found to be necessary, these should be in occcrdance with the
A. S.C.E. Splices presented on page 131 of the “American Institute of Steel Construction Manual”
except that high strength bolts, properly torqued should be used and the ends of the roil pile
section should be butted. -
Recommendations for Shallow Footings
In those areas where Conditions II exists, it is recommended that all footings be placed
at least one foot into undisturbed natural silty sand or clayey sand soils.
Conventional continuous wall and spread type footings may be used in all areas of the
-
-
,-.
lots excavated below the original ground surface. However, in order to reduce the possibility
of differential settlements in the areas where some fill exists, such as toward the middle of Lots
47, 48 and 49, it is recommended that all structural laads be distributed on continuous wall
footings deepened one foot below the fill and designed to include.at least one No. 4 contin-
- uous steel reinforcing bar placed at 3 inches above the bottom of the footing and another No. 4
continuous steel reinforcing bar at I l/2 inches below the top of the stem wall of the footing.
It is recommended that careful inspection of each footing excavation be made under
- each house in order to verify that the footings are founded in uniform notural sail conditions
throughout. -
It is concluded from the load-consolidation test data that continuous wall footings
- founded one foot into the undisturbed silty sand and clayey sand soils as recommended ond
-. loaded to a maximum of 2030 pounds per lineal foot on a 2 feet wide footing will be subject to
estimated total settlements varying between l/4 and l/2 inch.
-
sENTON ENOINEERING. INC.
-10”
First Floor Support
- ln areas where driven piles ore required, it is recommended that the first floor be
structurally supported on driven piles. Therefore, it is likely that wood framed floor systems
would be more economical to use in these areas than the heavier reinforced concrete floor
- slobs.
In areas where conventional footing s moy be founded at shallow depths, then either -
concrete floor slabs placed on grade or wood fromed floor systems may be used.
.-
Respectfully submitted,
BENTON ENGINEERING, INC.
-
PHB/gw
-
BENrON ENGINEERING, INC.
_.
-
-
-
-
-
,-
-
-
-
5 v
-&
3 In -
-
-
-
-
-
-
-
PILE CAPACITIES
(Borings 1, 2, 3, and 4)
Safe Allowable Load in Kips* per Single Pile
* I Kip = 1000 Pounds
.-.
“PILE CAPACITIES, LOW DRIVING RESISTANCE AREA”
4 PPOJECT NO,
BENTON DRAWING NO.
63-3-20A ENGINEERING, INC. A I
,~
-
-
-
-
-
-
-
-
-
-
,_~-_--,_ .,_,._ --..- -.---.-.I ----.- -,_~-.- -_.
PILE CAPACITIES
(Borings 5, 6, 7, 8, 12, 13 and 14)
Safe Allowable Load in Kips’ per Single Pile
!O
I-
T t
1
25 30
..a, A.11 it,: .,... i .:.< .r, ..+.*‘m~+~.- < .~. L J i i ,,i . . i .~- r . i :..1 . ..*. _. /
,,,. . . ../..._I ,._ ,-.., -I. ;,.i . . . . 1 ‘..-:‘.‘-’ xrndf e:! :,. .-.+*,
1 : i ; . ) 1 *~~I~ : ~. r . 1
0,). .,1* ;J 1 ;~ ~J; ;:-~ Flj
I ‘:1‘ ‘.--
l 1 Kip = 1000 Pounds
“PiLE CAPACITIES, HIGHER DRIVING RESISTANCE AREAS”
PROJECT NO DRAWING NO
63-3-20A I BENTON ENGINEERING, INC. I B
-
-
-
-
-
,-
-
-
-
QI - -I -a -D - m ,-
I -
x
z - 2 0 L
-
2 - 2
$ Y
-
SUMMARY SHEET
BORING NO.J..& r : ;; j ,~ .,.-“!
:,,, I
G ’
dLTY F/M SAND
I,-&/ ‘%yandBlue,Groy
i,Oa F:; Gray, Moist to SaturTd,
Gray, Saturated, Soft,
Occasional Fine Sand Seams
Gray, Saturated, Soft, Shells
. . .
26-L . . . . . . . . . .
7 Occasional Clayey Silt Ldyen
28,:::::
SILTY CLAY
(BAY MUD)
evel)x -
SILT
SILTY CLAY
(BAY MUD)
SILTY CLAY
CLAYEY FINE
SAND
0.4 45.2
0.4 57.3
0.4 76.8.
57.6 0.24
64.6 0.?4
81.3 oz
75.0 0.26
56.0 0.38
55.5 0.40
?6.6 0.50
-
c .I :: i i+ VC ?c - -
12.
t9.1
z -
1.f
-
-
* All elevations presented in this report are based on the interpolation between
the finished grades shown on the “Grading Plan” by Ray L. Klema, Engineers, In
v/F;NGINEER,NG, ,NC. / 2 DRAWING NO.
-
-
-
-
-
-
-
-
-
: : .-
i 1 .- ;i U 1
a
- 2 c
2
-c -
5
-
-
z Y::: SUMMARY SH&ET
5,; ;r” BORING NO.1 &;’ 0 $2 Opposite Station 55+26
Continued From Drawing No. 5
Gray, Saturated, Soft Shells
3 :‘,: ‘: 6-g& : ,’
Silty Fine to Medium Sand ond
-
Groy, Soturotod, Soft
Occasionoi Fine to Medium
Sond Layers
4q-- -_ _ - - _
44 -- -_
9
- 11
4 --,--
A
1 KQ2Y
ii&$d Shells
-
CLAYEY FINE
SAND
VERY FINE
SANDY SILT
CLAYEY SILT
0.8
0.8
2.5
2.5
30.5
$9.4
17.8
!3.9
-
35.:
72.2
‘2.5
xl.1
-
I. 73
I.35
..58
.85 -
Q cz
G 0
q. ,”
5, :
Q ., ..
PROJECT NO,
63-3-20A BENTON ENGINEERING, INC. I
DRAWING NO.
3
-
-
-
-
-
-
-
-
-
-
-
-
, ?z - 2 I : 3 :: il w ,
-
.$ - z
? .-
-I YS SUMMARY ,. 8 IL ii,” 2: BOR,,,,G NO.
ii 52 ELEVATION v.?’ 9’ 0
1 2 4
6 ------
a
Fine Sandy Cloy Layer
Gray Brown, Saturated, Soft
16
Occasional Thin Fine to Medium
Sand Layers
ray, Soturoted, Loose,
Dark Groy, Saturated, Soft
Occxionol Thin Fine to Medium
fiY F/M SAND
SILTY CLAY
Water--, ---
SILTY CLAY
FINE SAND
CLAYEY SILT
7
(
C
t
t I t
!( I I.4 146.7
: ! : I ;z i > ? ‘ I 1
- ,k Ei >Y ;ti 3 -
iii2
70.:
65.:
64. t
56. ;
58.;
81.
74.5
,27
‘22
24
-
27
.26
-
,24
-
35
- : .c :t F L “(J
z
‘5 .
;1 .I
19. ~
-
-
-
Continued On Drowins No. 5
PROJECT NO.
63-3-20A BENTON
DRAWING NO.
ENGINEERING, INC. 4
.-
-
-
-
-
-
-
.-
,-
-
-
-
-
-
-
-
-
5:: SUMMARY SHEET
22 BORING NO. 2
32 ELEVATION 3 I Continue$rom Drcwina No. 4
3, ,.z@j
m Occosionol Thin Fine To Mediurr
36 , --El Sand Layers
38
40
42
44
Gray, Saturated, Soft,
Occasional Silt Pockets
46 Gray, Saturated, Soft
CLAYEY SILT
SILTY CLAY
CLAYEY ,FlNE
SAND
F/C SAND
CLAYEY FINE
SAND
0.8 18.8
II 1.7 18.3
-
52.1
100.
108. -
I
1.60’
T 1.36
PROJECT NO. DRAWING NO.
63-3-20A BENTON ENGINEERING, INC. 5
-
-
-
-
-
-
-
-
-
-
-
-
- 0.8
0.4
-
.ij; iz,: iijc
s*
-
__ 25.9
32.7
-
FG
- icy 25 :y iz{ - - 96. I
85.8
-
z.2
-
67.3
SUMMARY SHEET
BORING NO. 3 ! & f 5 “, ,,, ,/I
ELEVATION 9* O’
,i :)’ 1,’ ,’
SILTY F/M SAND
0.95 79.;
0.97 71.t
- --
J-10
0.50
MIXTURE OF
SILTY FINE/
MEDIUM SAND,
SILTY CLAY,
FINE SAND
/-A!lQteL
GTY Cl AY
SILT
0.4
SILTY CLAY 0.4 50.7
CLAYEY FINE TO
MEDIUM SAND 61.1 0.4 65.0
SILTY CLAY
- FINE TO COARSC FINE TO COARSC L L
SAND SAND : 0.4 : 0.4 54.5 71.8
SILTY CLAY
0.4
28 Seam
30 54.6 67.6
I Continued On Drawing No. 7
I
PROJECT NO.
BENTON
DRAWING NO.
63-3-2OA ENGINEERING, INC. 6
-
-
-
-
-
-
-
-
-
-
-
-
-
-
.-
z yI= SUMMARY SHEET 2% XL zz Et! BORING NO.. 3
: 22 ELEVATION
;Fo Continued From Drawing No. 6
Gray, Saturated, Soft Fine to
Medium Sand Loyer I
Groy to Dark G ray, Saturated, -
Soft, Occasional Silt Pockets,
Occasional Fine to Medium Sand CLAYEY SILT
Groy, Saturoted, Soft
Occasional Silty Clay Pockets
CLAYEY FINE
SAND
0.4
0.4
0.4
0.4
-
u* lx*3
g LO:
x;
-
19.4
,8.0
!I.3
!0.3 -
11.8
- 12.3
3i5.5
36.7 -
-
.37
.60
.62
3% I
PROJECT NO.
63-3-2QA BENTON DRAWING NO. ENGINEERING, INC. 7
-
-
-
-
-
: -
-
-
-
-
-
.-
-
-
-
-7
:
;
L
t. L
1 I
7
(
(
(
s-
2 .- :‘u i :: ; g .u
j i
i
1;
’ > ! ;
-5
; t
t
I
t
t
c
SUMMARY SHEET
BORING NO. 4 ’ UT 1” / ,: (?’ ‘I
ELEVAT,O,., 9.9' ,)" "
Brown, Moist, Loose
Grey, Moist, Soft
&own. Moist, Soft
Brown, Moist, Loose
Root Layer
MIXTURE SILTY F/h
$W~. 5 SILTY C_Ll-
SILTY CLAY
SILT
FINE TO MEDIUM
SAND
Root Layer
- Water ---p-w- --
Brown and Gray, Saturated, MIXTU;;;-LOF
Loose =INE/MEDIUM
SAND, SILT,
SILTY CLAY
Brown, Saturated, Soft
CLAY
Gray, Saturated, Soft
Gray, Saturated, Loose
\
SILTY CLAY
/‘.4IXTURE F/C SANI
8 CLAYEY F/t SAN
L
i E
-
-4-x
I.8 20.3
-
i.4
-
59.9
I.4
-
48.2
-
I.8 , 56.3
I-;; . .
i0.8 0.63
-
-
9-3
y.t
--I- E
-
A--
53.5 0.13
i
71.7 0.69
Gray, Saturated, Soft
I
Occasiona: Fine to Medium Sand
Seams
24
26
28
32
I.4 59.6
ILTY CLAY
( 56.0
Continued on Drawing No. 9
PROJECT NO. DRAWING NO.
63-3-20A BENTON ENGINEERING, INC. 8
.-
,-
-
-
-
-
-~
-
-
-
-
-
-
- : (5
- 2 -i 5
-
E E YE YE SUMMARY SHEET SUMMARY SHEET SC. SC. :E! :E! 2z 2z BORING NO.. 4 BORING NO.. 4
s s L5z L5z ELEVATION ELEVATION
-3 ,_ -3 ,_ Continued From Drowing No. 8 Continued From Drowing No. 8
) Groy, Saturated, Soft ) Groy, Saturated, Soft SILTY CLAY
Gray, Sotumted, Soft Gray, Sotumted, Soft
~,~ ,.,. ;.;~:z’.:.‘.
_ .:~:::...::,‘j-: Brown, Saturated, Compact
46, :: ::::i;::-:::.. ..;:: ;.. 1
CLAYEY FINE TO
MEDIUM SAND
FINE TO COARSE
SAND
L
I
L
0.8 :
2.1
3.4
42
27. I 95.8
20.2 107.1
17.8 106.:
3.62
0.74
-
!.88
ul
PROJECT NO.
63-3-20A BENTON DRAWING NO. - ENGINEERING, INC. 9
--
-
-
-
-
-
-
-
-
-
-
-
-
-~
-
2 j : ! - i
I
; I t (
-
F: : tl L( -
‘9-
-
-
-
-
-
-
~
0.4 19.4 1
1’ --I-
) 147.8 f
08.2 1.00
.74.3 0.39
67.7 0.62
70.3 0.24
I
i y
; 1
: : c
1
‘7
f
1
2 tt;‘:: SUMMARY SHEET IL KY” 22 BORING NO. 5 I:r’.?
0 2; ELEVATION 11.1’
-&V
~-‘.’ Blue Groy, Moist, Soft, Roots i
I _ 1
MIXTURE OF
SILTY F/C SAND
w-
MIXTURE OF FINE
iANDY CLAY
4ND CLAY
6-
Saturated
/-Water -_
jlLTY FINE TO
MEDIUM SAND I
1 f WGroy, Saturated, Soft :INE SANDY CLA
1 Groy 8 Brown, Soturoted, Soft,
Occasional Shells
1 Occasional Silt Layers
Occasional Fine to Medium
Sand Layers, Occaslonol
1 Clay Lovers . . (
I
i56.2
I
I
,56.0
:LAYEY SILT
‘$1 ‘LAYEY FINE SAI-
ILTY CLAY
8.4
Gray, Saturated, Soft
LAYEY FINE TO
tEDlUM SAND
Groy, Saturated, Soft Groy, Saturated, Soft
Gray & Brow, Saturated Gray & Brow, Saturated
. . . . -----Occasional Fine to Medium -----Occasional Fine to Medium -..... -.....
-Sand Layers -Sand Layers 37-c 37-c
‘2.2 1.96
. __.... El . . . . .
I~NEERING, INC.
i,
-
-
-
-
-
-
-j
\
-~
-
-
-
-
-
-
,z !?z SUMMARY SHEET XG c”, $2 BORING NO. 6 /.CT $.zfi
0” 32 ELEVATION 12.9’
Light Brown and Brown, Moist,
--
SLIGHTLY SILTY
FINE TO MEDIUM
SILTY CLAY
Brown, Soturated, Soft
CLAY
Gray, Saturated, Soft
Gray, Soturoted, Soft
CLAYEY F/M SAN
CLAYEY SILT
Gray, Saturated, Soft,
Occasional Very Fine Sand
2 Gray, Saturated, Medium Firm CLAYEY FINE SAb
3&-i;;-.- ’ _ ’ 5-‘/: G ray, Saturated, Compact, SLIGHTLY SILTY
-!K2,*y Occasional Shell Layers FINE TO COARSE
/ 7’ 32 !:I::,
SAND
- ray, Saturated, Firm CLAYEY FINE TO
COARSE SAND
3bK??z I tfq)+
PROJECT NO. I
63-3-20A I BENTON ENGINEERING, INC.
0.4
1
-
7.6
-
4.2 - I DRAWING NO
11
--
-
-
-
._
,-
-
-
-
-
-
-
-.
-
-
-
-
-
,z YZ SUMMARY SHEET IL ii: 22 BORING NO. 7 !.OT$ ,‘;I
2i 22 ELEVATION 10.6’ n I
Yellow, Moist, Loose
Dark Gray, Moist, Soft
Grav Brown, Moist. Loose
Grav, Moist, Soft
1 6-&Z&Z Dork Gray SILTY CLAY
Dark Gray, Moist, Soft
ray Brown & Gray, Saturated,
Soft, Occasional Thin Fine
I I
/A Gray 8, Blue Groy, Saturated, _. ---
Soft
Soturated, Soft
WA Blue Grav. Saturated, Soft
Gray, Saturated, Medium Firm,
Clay Binder, Occasional Shells -. *.
2 :. . : -
. -* El@ -- . .* . . - .
2 -*.. . * a.
SILTY FINE TO
COARSE SAND
CLAYEY SILT
SIf T’f FI NF c AND
L Estimoted V
SILTY CLAY
CLAY
CLAYEY SILT
V. F/SANDY SILT
CLAYEY SILT
SILTY FINE SAND
F/C SAND
FINE TO COARSE
SANDSTONE
5 1 60.210.24165.0 1 0.4 53.f
ter m
0.4 52.c 1 1
I
68. 0.40 68. 0.40
H----i
0.4 76.0
i
56.7 0.27
3.3 20.7 106.8 1.57
108.7 1.24
PROJECT NO.
63-3-20A BENTON DRAWING NO. ENGINEERING, INC. 12
-
-
-
-
-
-
-
-
-
-
-
-.
-
-
SUMMARY SHEET
CLAYEY FINE TO
MEDIUM SAND
PROJECT NO.
63-3-20A BENTON DRAWING NO. ENGINEERING, INC. 13
-
-
-
-
-
-
-
-
-
-
-
-~
SUMMARY SHEET
BORING N0.d T- 5’
COARSE SAND
Yellow, Saturated, Very Firm
FINE TO MEDIUM
-
-
-
-
-
-
-
-
-
PROJECT NO.
63-3-20A BENTON ENGINEERING, INC. ORAYiNG No.
-
-
-
-
-
-
-
-
-
-
-
-
zi SlJMAtARY SHEET 5; z I~ I’ WRING NO. 10 ’ ‘:‘,‘;:‘;,, !,’ :: : Et XL EK ,T II., 14.3’ ; ‘- , 1~ ,I,
: E
z ELEVATION czc
P
4
6
and 8 Grovel Pockets, SLIGHTLY SILTY
FINE TO MEDIUM 0.8
SAND
ro6.U 0 58
112.8 1:46
Lt. Brown, Moist, Medium Loose
6
8
IO
mA\t. Brywy, Mcyist, Medium Loose
Gray 8, Gray Brown
:INE TO MED. - SA.N()
2.5
SILTY FINE TO
MEDIUM SAND 0.8
Water 1 -- _
12.8
16.7
I
04.0/O. 62 /
i
PROJECT NO.
63-3-2OA BENTON DRAWING NO. ENGINEERING, INC. 15
-.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
-
.-
-1 r 5: SUMMARY SHEET ?- %? 22 BORING NO.-= 12 /,., ;/.‘:::.
z $2 ELEVATION )o
_/_ 214
1 6
a
Groy ad Light Brown, Moist,
Occasicnol Silty Cloy Pockets
-----
y and Dark Gray, Saturated,
Saturated, Compact
i MIXTURE OF
:INE SANDY CLAY
ilLTY F/C SAND
SILTY CLAY
CLAY
SILTY CLAY
SILTY FINE SAND
SLIGHTLY SILTY
FINE TO MEDIUM
SAND
-
I.4
9.2 -
6.6
- --
2.4
-
1.2
-
i i . .
;i
1 >
? ‘ ‘
62.2 0.:
68.5!0.;
05.412.1
-L 06.82.:
c 2
:;
i : t E J$
1.C -
- - .
-
PROJECT NO.
63-3-20A BENTON ENGINEERING, INC. DRAw#G No.
.~~~
-
c,
-
-
-
-
.-
-
-
-
-
-
z ZE SUMMARY SHEET + z; 22 BORING NO. 13 j, 3 T A :: y/
: 2s ELEVAllON 2. 7’
*SY!?Y
57+41--
IMIXTURE 0F CLAY
I--
Estimated Water --..
ray Brown, Moist, Soft CLAYEY SILT
Groy, Very Moist, Soft -I-
Occasional Silt Pockets d 0. 56. 64. :
69.f
61.t
5
2
1
A
i
4
1
SILTY CLAY -.kkZlO ccosional Fine to Medium I 0. 50. 4 Sandy Cloy Seams and Pockets
i--- -
-
Brown Groy, Soturoted, Soft
Groy, Saturated, Soft
Light Groy, Saturated, Firm
SILTY VERY FINE
SAND
CLAYEY SILT
I
0.d 61: qi
24
26
-
E .- -t
-j
2 u - I ti z c
- 2
j CT: .-
6.7 27.’ 96.5 SILTY FINE SAND
I c I
ray, Saturated, Firm IVERy FI_NE/SAF rlD1 I LILT
ed. Very Ftrm ISW :
74jO.59; 8.1 46.41
PROJECT NO.
63-3-2CA BENTON ENGINEERING, INC. DRAWING NO.
. 17
-
-
-
-
-
-
-
-
-
-
-
-
.-
e i c - i 7 5 -
z 2: SUMMARY SHEET
XL EK 2: 9 BORING NO. 14 I,or ?+L
E $2 ELEVATION -...-.wi 14 8’
Brn . , Moist, Medium??rm
;:
Dark Gray, Moist, Soft
I:
CLAYEY FINE TO
MEDIUM SAND
SILTY FINE TO
0.8 -
.- Grey and YeK&~s~ot
8.
i- COARSE SAND
‘MIXTUREOT--
/i/i j / ater I
16.8j115.0;0.77
/
MEDIUM SAND I : I
SLIGHTLY SILTY I I
FINE TO COARSE
1 SAND
-
0.8
-
l--L 15.8 115.6 1.87 15.0 -
BOR,NG NO* 15 rI, : I ;; .‘*
ELEVATION 12.0’
Brown, Moist, Medium SILTY FINE SAND
/ 3.3 13.6 113.0 0.72 95.
, Medium Firm CL&YE?? F/C SAND
Brawn, Moist, Medium Firm SLIGHTLY SILTY
FINE TO MEDIUM
2.5, 9.9,105.2 0.48
YT-fY-vm CcAvmrlcsAm
SILTY F/C SAND
XAYWXT-
6.7 _
-
CLAYEY FINE TO
COARSE SAND
PROJECT NO.
BENTON ENGINEERING, DRAWING NO.
63-3-20A INC. 18
-.
.-
-
-
-
-
-
-
-
.-
-
-
-
-
d
1 - 7 2
-
d-
4-
6-
8-
lo-
12-
14
16-
18-
20-
22-
24-
26-
28-
30-
;i SUMMARY SHEET
XI BORING NO .___ d” r ’ “’
$2 ELEVATION -!.!.3’
Brown, Moist Loose
Abundant Vegetation and Roots SLIGHTLY SILTY
- FINE TO MEDIUM
SAND
---” __ /- water --
Fine Sand Pockets CLAYEY FINE TO
COARSE SAND
Saturated, Loose FINE TO COARSE
SAND -~-~~ ~~.~
VF/SANRYXlT-
CLAYEY SILT
z Gray, Saturated, Soft
z
z 2.Lz-L z z 22 -Lx-L CLAYEY FINE TC
c z MEDIUM SAND x e
-I- t / I
f
I
T
bj I I
I
0.8/,1.2,
0.4 21.4 1
1
-i--l 10.1 16.7 1
-7 82.9 0.47
--I--
J 85. 0.27
106. 0.59
”
I
PROJECT NO. DRAWING NO.
63-3-20A BENTON ENGINEERING, INC. 19
-.
-
-
-
-
,-~
-
-
-
-
-.
-
-
<
- . :
:
-
03.1
94.c
-
0o.t
E-.(
-
xl.;
I.35
1.3E
1.8:
! I. 18
T9.j 7( I.37
18.7 ’ 1 1.23
13.91226
z 5: SUMMARY SHEET i $ :;
XL Ekk! 2: ,7 /,<$ry3.5- BORING NO.-A 5 s 22; Y Y --(
: zz’ ELEVATION 11.8’ > c YO(
ZY z;
-
I II
1 b 11
-II
II
,
I
I(
I I’
SLIGHTLY SILTY 2.5
FINE TO MEDIUM
SAND 0.8
I I
7.6 SILTY FINE TO 0.8
MEDIUM SAND
- - _
-
ay Brown, Saturated, Soft,
SILTY VERY FINE SILTY VERY FINE
SAND SAND 0.8 21.1 0.8 21.1
SILTY CLAY SILTY CLAY 0.4 0.4 40.7 40.7
18
20
Gray, Saturated, Soft
Occasional Thin Sand Seams
Groy, Soturated, Soft
9.5
CLAYEY FINE TO
MEDIUM SAND
PROJECT NO. DRAWING NO.
63-3-20A BENTOM ENGINEERING, INC. 20
-.
-
-
-
-
-
-..
-
-
_-
-
-
-
- a 3
; (I J
i i -
5 i
? ”
-
u
_.. gj
i? -l
-~
: s ,“z SUMMARY SHEET 2: I=; 5:: Lb! 2: BORING NO. 18 j)OT ,:cT d
p” 3z Ius
ELEVATION 12.7’ ;k CI -0
0.8
, iLIGHTLY SILTY
FINE TO MEDIUM 0.8
SAND
6
8,
- Water +c- --I- -
0.8
SILTY FINE TO
MEDIUM SAND 2.5
16
Gray, Saturated, Soft , SLIGHTLY CLAYEY
FINE TO COARSE
SAND 0.8
, 20 bLxx -6 ‘,.~
ray, Soturoted, Medium Firm
CLAYEY FINE ’
SAND I
14.2
-
,;;
:z2 CGc Z$
-
6.8
10.8
.-
16.7
20.0
35.6 -
21.4
23.5 -
: z
: ;
I Y
’ > ! = ‘
11
’ 1
11
,
1 11
t L I 11
86. 0.47 -A-
06.40.99
I
-I- 02. 0.50
-
-
-
-
-
-
-
-
PROJECT NO.
63-3-20A BENTON DRAWING NO. ENGINEERING, INC. 21
-
-
- > m
r’
-2 0
-
-
-
-
-
?
-6
;
lu -5
-:
9
-$
-
-
J
-2 0
-.
.
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
0.2 0.4 0.6 a6 I.0 2 4 6 6 IO 16 0
1
2
3
2 w c 4
0
I !- 5
k
7
+ 2 8 w 0
E a 9
I
g 10
I=
;: i 11
0 o¶
g 0
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO.
63-3-ZOA BENTON ENGINEERING INC. ““YbNG NO.
-
-
-
4
2 2
-
-
-
-
-
-
6
7
8
9
I
;5 10
F
2 2 11
0 u)
g 12
13
14
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
I.2 0.4 0.6 06 Ix) 2 4 6 8 IO
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
I I \ \ . . . .
\ \ j j . \ . \
Pz;$mf;A NO. BE NT,ON ENGINEERING INC.
-
-.
- t ! . .
7
-:
1 c
-
4
- ;
a
5
-
-
> m -
s -2
2 5 : 2 5 J I ‘> I .J r, > i
-s 9
-z
-
-
-~
“4 -I5
-
CONSOLIDATION
/
CURVES ,/”
/I
LOAD IN KIPS PER SQUARE FOOT
0.2 0.4 06 a8 I.0 2 4 6 8 IO 16 0
Ue lth
3
WI VI
ki 4
s
f I- 5
“J a. 6
5 ln
k
7
: 8
z rK k! 9
I
g 10
;r
;:
i 0
% 0
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
P-qJECT NO. 63-3-20A BENTON ENGINEERING INC. DRAWING NO. 24
-
-
t - m
z - @z 0
-
-
-
a c _-. f
-
-
i. ”
YG - i5
- iii
2
0” - 3
.-
-
-.
\1 -. - 2
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
I N-III I I I
0 0.2 0.4 0.6 0.8 Ix) 2 4 6 8 IO I6
Y ! Y ! , ,
\ \ I I
\ \ j (1 j (1
\ \ I i I i
t t
- -
, ,
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
I PROJECT NO.
63-3-20A I BENTON ENGINEERING INC. I DRAWING NO. 25
-
-
-
c .f
-2 s Y
t - L
e
; . 72
5 -~
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
0.6 0.8 I.0 2 4 6 8 IO 16
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. DRAWING NO. 26
-~
-
-
-
,-
-
~, * m
z
.~ z (E 0
>” -0 c)
t
-ii --c cr.
-- g
2
z
- .- Q 0
-.
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
0
2
3
:
% 4
,’
r I- 5
13
14
0.2 0.4 0.6 0.8 I.0 2 4 6 8 IO I6
-
2
3
6.
t-t
I I I III
IIIllli I 1 J \I Jlllli I I J I J J “I I
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. ORAWZG NO.
-
s- - al
2 -uz 0
-
-
-
-
-
&!
-
i z
.-
I
5
- r”
9
-g
-
-
-
I
-2
-~
CONSOLIDATION CURVES
62 0
1
LOAD IN KIPS PER SQUARE FOOT
0.4 0.6 cl8 I.0 2 4 6 8 IO 16
l INDICATES WATER PERMITTED To CONTACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. ] DRATPG ,NO.
r , 1
t m
2 - E
- 1 ‘1 - 2
CONSOLIDATION CURVES
LOA’O IN KIPS PER SQUARE FOOT
0.2 0.4 0.6 Q8 I.0 2 4 6 8 IO 16 0
Bar ng
. so PI I :
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO. BENTON ,ENGINEERING DRAWING NO. 63-3-20A INC. 29
I
* - m
2 - n 0
I
-
-
-
-
: -2 i -. -5
>
1
) >
-s 9
-$
I -4 0
~.
-
-
-
3
VI co
ii 4
:: f I- 5
Y k 6
;:
25
7
!i 8
z
% 9
I
g 10
F
;: i 11
0 0-3
$ 12
13
14
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
3.2 0.4 06 0.8 1.0 2 4 6 8 IO I6
/ \
! I YP
I ’ I i i
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO. BENTON ENGINEERING DRAWING NO.
63-3-20A INC. 30
-
-
-
-
-
-
? - 0
i
T, -L <n
-ii
2
-g
-
-
-
- .< D
-
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
06 08 I.0 2 4 6 8 IO I6
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. ORATIING NO.
-
.-
-
* - m
s -2
-
-
-
-
-
-4
2
-:
;I J
Cl
L
f,
-iii
2
- z
- I
-
-
j
4
a 2
CONSOLIDATION CURVES
0.2 0
LOAD IN KIPS PER SQUARE FOOT
0.4 0.6 08 I.0 2 4 6 8 IO I6
!! e 0
z VI
8
I
I- 5 2
2 k! 3
I
z 4
I=
2
0' 5
if? 0 0 6
7
8
0 INDICATES WATER PERMITTED To CONTACT SAMPLE
PROJECT NO. 63-3-20A BENTON ENGINEERING INC. DRAW39 G NO.
I-
-
t .- m
2 -E
-
-
-
-
.i
-~
:
2
-
cl
b . 3 :,
I
-g z.2
0” -3
-
- /
- 2
-
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
0.2
0
0.4 0.6 0.0 I.0 2 4 6 0 IO I
1
2
3
z
2 4
E
r I- 5
!? ?i 6
::
$
7
k z 8
: (L p" 9
I
z 10
F
2 3 0 0
% 0 1
2 I I i
'1 1~
3 / I
. INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. ““““~~” N(
-
-
-
-
0 >
-6
L -, i - z
-
i
-2
2
-;
-
-
I - c
s
-
CONSOLIDATION CURVES
0.2
LOAD IN KIPS PER SQUARE FOOT
0.4 OS 0.0 I.0 2 4 6 0 IO 16
. INDICATES WATER PERMITTED TO CO%TACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. DRAWING ?. 3.
34
- i
-
> - m
2 -~ z ,-
! - g’ ;; -51 cl! - -‘/ C’ u I _ r. i 7 t’ ; - 3 L i/ -
- j I - ii 2 - $
/ - i
Li - 2 0 .-
CONSOLIDATION CURVES
LOAD IN KIPS PER SQUARE FOOT
0.4 0.6 0.0 1.0 2 4 6 8 IO IS
2
3
w z 2 4
r I- 5
Y
O- z 6
Lo
k 7
I- = 8
s LL
2 9
I
z
I=
2 ? 0
% u
Q INDICATES WATER PERMITTED TO CONTACT SAMPLE
PROJECT NO.
63-3-20A BENTON ENGINEERING INC. DRAWNG s.3. ;j