HomeMy WebLinkAbout; Single Family Residence Lot 119, Map No. 3312; Rough Grading Report; 2004-12-23COAST GEOTECHNICAL
CONSULTING ENGINEERS AND GEOLOGISTS
December 23,2004
Laveme and Elaine Brown
5411 Los Robles Drive
Carlsbad, CA 92008
Subject: ROUGH GRADING REPORT
Proposed Single Family Residence
Lot 119, Map No. 3312
Vacant Lot, Carlsbad Boulevard
APN 210-115-24
Carlsbad, Califomia
Reference: PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Single Family Residence
Lot 119, Map No. 3312
Vacant Lot, Carlsbad Boulevard
APN 210-115-24
Carlsbad, Califomia
Prepared by Coast Geotechnical
Dated April 15,2002
Dear Mr. and Mrs. Brown:
In response to your request, we have performed field observations and testing during the rough
grading phase on the above referenced property. The results of our density tests and laboratory
testing are presented in this report.
Based on the results of our testing, it is our opinion that the fill was placed in an adequate manner
and compacted to a minimum of 90 percent of the laboratory maximum dry density. The control of
drainage from lot development is essential to the future performance ofthe stmcture.
Ifyou have any questions, please do not hesitate to contact us at (858) 755-8622. This opportunity
to be of service is greatly.
Respectfully submit^^y^^
COAST GEOTECWOT?^ C\?
2109 ^\(r'
Exp. 5-31-06
CERTIFIED
ENGINEERING
/.r: • '' •
Mark Burwell, C.]
Engineering Geologi
Vithaya Singh
Geotechnical En
779 ACADEMY DRIVE • SOLANA BEACH. CALIFORNIA 92075
(858) 755-8622 • FAX (858) 755-9126
ROUGH GRADING REPORT
Proposed Single Family Residence
Lot 119, Map No. 3312
Vacant Lot, Carlsbad Boulevard
APN 210-115-24
Carlsbad, California
Prepared for:
Laverne and Elaine Brown
5411 Los Robles Drive
Carlsbad, CA 92008
December 23, 2004
W.O. G-357032
Prepared by:
COAST GEOTECHNICAL
779 Academy Drive
Solana Beach, California 92075
Coast Geotechnical December 23, 2004
W.O. G-357032
Page 3
INTRODUCTION
This report presents the results of our observations and field density testing on the subject property
during rough grading. The project included the removal and recompaction of soil and weathered
terrace deposits in the rear ofthe building envelope and the excavation of a partial basement in the
westem portion of the site. The approximate locafions of field density tests are shown on the
enclosed Grading Plan, prepared by KRH Engineering.
LABORATORY TEST DATA
The laboratory standard for determining the maximum dry density was performed in accordance with
ASTM D 1557-91. Field density tests were performed in accordance with ASTM D 1556. The
results ofthe laboratory maximum dry density, for the soil type used as compacted fill on the site,
is summarized below:
Maximum
Dry Density Optimum
Description (p.c.f) Moisture (%) Soil Type
Tan to brown fine and 128.6 10.1 A
medium-grained sand
Brown silty, fine and 123.0 11.0 B
medium-grained sand
GEOTECHNICAL CONDITIONS
The property is underlain at shallow depths by Pleistocene terrace deposits. The terrace deposits are
Coast Geotechnical December 23, 2004
W.O. G-357032
Page 4
underlain at depth by Eocene-age sedimentary rocks which have commonly been designated as
Santiago Formafion on published geologic maps. The terrace deposits are covered by residual soil
and minor fill deposits.
DISCUSSION
The grading contractor on this project was Sorrento Valley Construcfion. The following is a
discussion of the general grading operations as they were performed on the project.
1) All surface deleterious material was removed in the building envelope, prior to removals.
2) The soil and weathered terrace deposits in the eastem portion of the residenfial building pad
were removed to a depth of approximately 4.0 to 4.5 feet below grade and stockpiled.
3) Stockpiled soils were generally mixed and placed in loose hfts of approximately 8.0 inches,
moistened to about optimum moisture content and compacted. Compaction was
accomplished by wheel rolling with a Caterpillar mbber fire loader.
4) The eastem portion of the residenfial pad was overexcavated to a maximum depth of
approximately 4.5 feet and extended approximately 5.0 lateral feet beyond the building
envelope. The overexcavation was limited to approximately 3.0 lateral feet along the
northem building line, due to a property line wall.
Coast Geotechnical December 23, 2004
W.O. G-357032
Page 5
5) Based on our experience and laboratory testing, the fill deposits have a potenfial expansion
in the low range.
CONCLUSIONS AND RECOMMENDATIONS
1) Based on selecfive testing, the fill was placed to a minimum of 90 percent ofthe laboratory
maximum dry density as suggested by our test results.
2) The soil parameters recommended in the referenced Preliminary Geotechnical Investigation
for foundations and slab design remain valid.
3) The following pavement section is recommended for the proposed driveway:
4.0 inches of asphaltic paving or 5.0 inches concrete on
4.0 inches of select base (Class 2) on
12 inches of compacted subgrade soils
Subgrade soils should be compacted to the thickness indicated in the stmctural section and
left in a condition to receive base materials. Class 2 base materials should have a minimum
R-value of 78 and a minimum sand equivalent of 30. Subgrade soils and base materials
should be compacted to a minimum of 95 percent of their laboratory maximum dry density.
The pavement section should be protected from water sources. Migration of water into
subgrade deposits and base materials could result in pavement failure.
Coast Geotechnical December 23, 2004
W.O. G-357032
Page 6
4) We recommend that all ufilities be bedded in clean sand to at least one foot above the top of
the conduit. The bedding should be flooded in place to fill all the voids around the conduit.
Imported or on-site granular material compacted to at least 90 percent relative compacfion
may be ufilized for backfill above the bedding. The invert of subsurface ufihty excavafions
paralleling footings should be located above the zone of influence of these adj acent footings.
This zone of influence is defined as the area below a 45 degree plane projected down from
the nearest bottom edge of an adjacent footing. This can be accomplished by either
deepening the footing, raising the invert elevafion ofthe ufility, or moving the utility or the
foofing away from one another.
5) Positive site drainage should be maintained at all fimes. Water should be directed away from
foundations and not allowed to pond or seep into the ground or migrate under concrete
flatwork or pavement sections.
6) All the recommendations in the referenced Preliminary Geotechnical Investigation which are
not superseded by this report remain valid and should be implemented during the
constmction phase. Placement of addifional fill and wall backfill should be observed and
tested by a representative ofthis firm.
LIMITATIONS
This office assumes no responsibility for any alterafions made without our knowledge and written
Coast Geotechnical December 23, 2004
W.O. G-357032
Page 7
approval, subsequent to the issuance of this report. All areas of disturbance which require the
placement of compacted fill to restore them to the original condition, will not be reviewed unless
such backfilling operations are performed under our observation and tested for required compaction.
It should be noted that density (compaction) testing is conducted on a very small volume ofthe fill.
The intent is to provide an opinion, based on selective testing and observation during fill placement.
This study has been provided solely for the benefit of the client and is in no way intended to benefit
or extend any right or interest to any third party. This study is not to be used on other projects or
extensions to this project except by agreement in writing with Coast Geotechnical.
Enclosures: Table I
Grading Plan
FIELD AND LABORATORY TEST RESULTS
Date
Test
No.
TABLE I
Field Dry Density and Moisture Content
Moisture Dry Relative
Test Approx. Content Density % Soil
Location Elev. % (pcf) Compaction Type
12/07/04 1
12/09/04 2
12/09/04 3
12/10/04 4
12/10/04 5
See Map
See Map
See Map
52 . 0 '
53 . 0 '
54 . 0 '
See Map S.G.
See Map S.G.
11. 7
10 . 9
9.9
10 . 3
10 .1
123 . 6
115 . 6
120.5
118 . 9
116.0
96
90
94
96
94
A
A
A
B
B
G-357032