HomeMy WebLinkAbout; Southeast Area Waterline; Soils Report; 1984-02-14PRELIMINARY GEOTECHNICAL INVESTIGATION
SOUTHEAST AREA WATERLINE
RANCH0 SANTA FE ROAD AND MISION ESTANCIA
CARLSBAD. CALIFORNIA
PREPARED FOR:
Oaon Corporation
4350 Von Karmen, Suite 100
Newport Beach, California 92660
PREPARED BY:
Southern California Soil A Testing, Inc.
Post Office Box 20627
6280 Riverdale Street
San Diego, California 92120
February 14, 1984
Daon Corporation
4350 Von Karmen
Suite 100
Newport Beach, California 92660
Attention: Mr. Bill Storm
SCS&T 25028
Report No. 1
SUBJECT: Report of Preliminary Geotechnical Investigation, Southeast
Area Waterline, Ranch0 Santa Fe Road and Mision Estancia,
Carlsbad, California.
Gentlemen:
In accordance with your request, we have completed a preliminary geotech-
nical investigation for the subject project. We are presenting herewith
our findings and recommendations.
The findings of this study indicate that the site is suitable for the
proposed development provided the recommendations presented in the at-
tached report are complied with.
If you have any questions after reviewing the findings and reconendations
contained in the attached report, please do not hesitate to contact this
office. This opportunity to be of professional service is sincerely
appreciated.
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL & TESTING INC.
Curtis R. Burdett, C.E.G. #lo90
RRR:CRB:mw
cc: (5) Submitted
(1) Pat Edgerton
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA 501L AND TESTING. I N 0.
TABLE OF CONTENTS
PAGE
Introduction and Project Description ..................................... 1
Project Scope ............................................................ 1
Findings ................................................................. 2
Site Description ..................................................... 2
General Geology and Subsurface Conditions ............................ 3
Geologic Setting ................................................ 3
Jurassic Santiago Peak Volcanics (Jmv) ..................... ...3
Tertiary Sediments (Ts) ....................................... 3
Quaternary Alluvial Deposits (Qal) ............................ 4
Geologic Hazards ................................................ 4
Groundwater ..................................................... 4
Recommendations and Conclusions .......................................... 5
General Design Considerations ........................................ 5
Site Preparation ..................................................... 5
General ......................................................... 5
Buttress Recommendations ........................................ 6
Subdrains ....................................................... 6
Earthwork ....................................................... 6
Slope Stability ...................................................... 6
Limitations .............................................................. 7
Review, Observation and Testing ...................................... 7
Uniformity of Conditions ............................................. 7
Change in Scope ...................................................... 7
Time Limitations ..................................................... a
Professional Standard ................................................ 8
Client's Responsibility .............................................. 8
Field Explorations ....................................................... 9
Laboratory Testing ....................................................... 9
ATTACHMENTS
Plate 1 Plot Plan
Plate 2 Soil Classification Chart
Plate 3-18 Trench Logs
Plate 19 Direct Shear Summary
Plate 20 Single-Point Consolidation
APPENDIX
Recommended Grading Specification and Special Provisions
PRELIMINARY GEOTECHNICAL INVESTIGATION
SOUTHEAST AREA WATERLINE
RANCH0 SANTA FE ROAD AND MISION ESTANCIA
CARLSBAO, CALIFORNIA
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of our preliminary geotechnical investiga-
tion for a proposed waterline which is to be located along the future
alinement of Mision Estancia and extension of La Costa Avenue in Carls-
bad, California. It is our understanding that approximately l-1/4 miles
of new high-pressure waterline is proposed.
It is our understanding that a substantial amount of grading will be
necessary to develop the site and that the maximum cuts and fills planned
are on the order of 18 feet and 13 feet, respectively. This information
was taken from the improvement plans prepared by Rick Engineering Company.
PROJECT SCOPE
This investigation consisted of: surface reconnaissance; subsurface
explorations; obtaining representative disturbed and undisturbed samples,
laboratory testing; analysis of the field and laboratory data; research of
available geological literature pertaining to the site; and preparation of
this report. Specifically, the intent of this analysis was to:
SDUTHERN CALIFORNIA SOIL AND TESTINO, I N c.
SCS&T 25028 February 14, 1984 Page 2
a)
b)
cl
d)
e)
f)
Explore the subsurface conditions to the depths influenced by the
proposed construction.
Evaluate, by laboratory tests, the pertinent engineering propert-
ies of the various strata which will influence the development.
Define the general geology at the site including possible geolo-
gic hazards which could have an effect on the site development.
Develop preliminary soil engineering criteria for site grading
and provide design information regarding the stability of cut and
fill slopes.
Determine potential construction difficulties and provide recom-
mendations concerning these problems.
Present the findings of our services in a report which will
include plot plan, exploration logs, sunmary of laboratory test
results, and the appropriate conclusions and recommendations.
FINDINGS
SITE DESCRIPTION
The project site is an open, undeveloped area located east of Ranch0 Santa
Fe Road in the City of Carlsbad. The portion of the waterline along
Mision Estancia (proposed) is a curvilinear segment approximately 4500
feet long; the portion along La Costa Avenue Extension (proposed) is a
nearly straight segment approximately 2000 feet long. The morphology of
the site is characterized by gently rolling to steep hills separated by
moderately to well-defined drainage channels. Elevations at the site
range from approximately 160 feet on the southern portion of the site to
SOUTHERN CAL,FORNlA 501L AND TESTING. INC
SCS&T 25028 February 14, 1984 Page 3
approximately 400 feet at the northern end. Vegetation consists of a
light to heavy growth of grasses, shrubs and treees with the heaviest
growth being on the steep hills on the northern portion of the site and in
the larger drainage channels.
GENERAL GEOLOGY AND SUBSURFACE CONDITIONS
GEOLOGIC SETTING: The project site is located near the boundary between
the Foothills Physiographic Province of San Oiego County and is underlain
by materials of both igneous and sedimentary origin. In general decreas-
ing order of age, the materials encountered in our exploratory trenches
consisted of Jurassic-age metavolcanic rock, Tertiary-age sediments, and
Quaternary-age alluvial deposits. A brief description of each of these
units is presented below.
JURASSIC SANTIAGO PEAK VOLCANICS (Jmv): The oldest materials exposed
at the site are the metavolcanic rocks of the Jurassic Santiago Peak
Volcanics which are part of the basement complex. These rocks are
predominantly dark gray, fine grained dacitic or andesitic rocks with
lesser amounts of other metavolcanic or metasedimentary rocks. The
portion of these rocks below an approximate elevation of 325 feet have
been subjected to intense subaqueous weathering and are almost com-
pletely altered to clay. The weathered portion of the metavolcanic
rock will probably be encountered from Station 35 on Mision Estacia
northward to Station 155 on La Costa Avenue Extension. Relatively
unweathered metavolcanic rock will probably be encountered from Sta-
tion 155 on La Costa Avenue Extension northward to the end of the
project.
TERTIARY SEDIMENTS (Ts): Unconformably overlying the metavolcanic
rocks are Tertiary-age sediments which consist of greenish brown
mudstones (claystones and siltstones) and yellowish brown to light
SOUTHERN CALIFORNIA SOIL AND TESTING. INC.
SCS&T 25028 February 14, 1984 Page 4
greenish brown sandstones. These sediments are interlayered and
interfingered with the majority of the sediments being mudstone. The
Tertiary sediments will be encountered from Station 0 to Station 32 on
Mision Estacia.
QUATERNARY ALLUVIAL DEPOSITS (Qal): Unconformably overlying both the
metavolcanic rock and the Tertiary sediments are Quaternary alluvial
deposits comprised of varying amounts of clay, silt, sand, and gravel.
These Quaternary deposits have been eroded from the nearby bedrock
sources and redeposited in the modern drainage channels.
GEOLOGIC HAZARDS: The most likely geologic hazards to affect the site are
those associated with slope instability problems as a result of low-
strength materials in the Tertiary sediments. Evidence of previous slope
instability problems (including landslides, mudflows, and creep) was
observed on the aerial photograps of the area and in our exploratory
trenches. It appears that most of the upper six to eight feet of the
Tertiary sediments has been subjected to either weathering or mass-wasting
processes and is relatively weak. In some areas, the effects of the
previous weathering and mass-wasting processes extend to a depth of possi-
bly several tens of feet.
&other geologic hazard which may affect the site is groundshaking as a
result of movement along one of the major, active fault zones that charac-
terize the Southern California area. Based on a maximum probable earth-
quake of 7.3 magnitude along the Elsinore Fault Zone (the nearest active
fault zone which is located approximately 25 miles to the northeast),
maximum ground acceleration at the site could be as high as 0.20 g.
GROUNDWATER: Groundwater was encountered in the lower end of the large,
southwesterly trending drainage channel at a depth of approximately nine
feet. It should be recognized that this level will fluctuate greatly with
SOUTHERN CAL!FORNIA SOIL AND TESTINO. INC
SCS&T 25028 February 14, 1984 Page 5
climatic conditions. It should also be noted a substantial amount of
surface water was present in the large channel and in some of the other
drainage courses of the site.
RECOtMENOATIONS AND CONCLUSIONS
GENERAL DESIGN CONSIDERATIONS
Based on the findings of this preliminary study, it is our opinion that
the site is suitable for its proposed development provided the
recommendations contained in this report are followed. Factors which will
affect this development are the presence of loose alluvial soils and
landslide deposits.
SITE PREPARATION
GENERAL: Site preparation should begin with the removal and disposal of
the surface vegetation. The loose and/or soft topsoils and alluvium
should be removed to firm natural ground and stockpiled for future use.
Firm natural ground is defined as native soil which possesses an in-situ
density equal to or greater than 85% of its maximum dry density. The
exposed soils should then be scarified 12 inches, be moistured treated to
at least 1% over optimum moisture content and compacted to a minimum of
90% of maximum dry density. The stockpiled soils and any additional fill
should then be replaced in eight-inch lifts, be moisture treated and
compacted as indicated above. Based on the findings of this study, it
appears that the maximum depth of removal and recompaction will be on the
order of five feet in the vicinity of Trench Number 5. The horizontal
extent of this recommendation should include all areas to receive fill
and/or surface improvements. All undercut areas should be examined by a
representative of this office prior to backfilling to document that firm
natural ground has been exposed.
SOUTHERN CALIFORNIA SDIL AND TESTINCi. INC
SCS&T 25028 February 14, 1984 Page 6
BUTTRESS RECOMMENDATIONS: It appears that a substantial amount of land-
slide debris and/or weak soil zones will require special buttress consid-
erations to alleviate instability problems. These soil conditions are
generally associated with the sedimentary deposits which are located
between Station Numbers UtOO to 6t25 and 12t50 to 32tlOO. These recom-
mendations will be provided in a subsequent report once additional field
and laboratory testing has been completed.
SUBDRAINS: Subdrains may be necessary in a portion of the drainage swales
which are to be filled in. A detail for these drains is provided on Plate
Number 1. The actual locations and necessity of the subdrains will be
determined during site grading on a case by case evaluation.
EARTHWORK: All earthwork and grading contemplated for site preparation
should be accomplished in accordance with the attached Recommended Grading
Specifications and Special Provisions. All special site preparation
recomnendations presented in the sections above will supersede those in
the standard Recommended Grading Specifications. All embankments, struc-
tural fill and fill should be compacted to a minimum of 90% at slightly
over optimum moisture content. Utility trench backfill within 5 feet of
the proposed structures and beneath pavements should be compacted to a
minimum of 90% of its maximum dry density. The maximum dry density of
each soil type should be determined in accordance with A.S.T.M. Test
Method 01557-78, Method A or C.
SLOPE STABILITY
Due to the presence or suspected presence of landslide deposits at this
site, it is probable that slope instability problems may occur. Provided
that the buttress recommendations which will be provided in our future
report we complied with and that all highly expansive clayey soils are
kept at least 10 feet inward from the face of all fill slopes, it is our
opinion that the slopes proposed on the grading plan will be stable.
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 25028 February 14, 1984 Page 7
LIMITATIONS
REVIEW, OBSERVATION AND TESTING
It is recommended that Southern California Soil & Testing, Inc. be re-
tained to provide continuous soil engineering services during the earth-
work operations. This is to observe compliance with the design concepts,
specifications or recommendations and to allow design changes in the event
that subsurface conditions differ from those anticipated prior to start of
construction.
UNIFORMITY OF CONDITIONS
The recommendations and opinions expressed in this report reflect our best
estimate of the project requirements based on an evaluation of the subsur-
face soil conditions encountered at the subsurface exploration locations
'and the assumption that the soil conditions do not deviate appreciably
from those encountered. It should be recognized that the performance of
the foundations and/or cut and fill slopes may be influenced by undis-
closed or unforeseen variations in the soil conditions that may occur in
the intermediate and unexplored areas. Any unusual conditions not covered
in this report that may be encountered during site development should be
brought to the attention of the soils engineer so that he may make modifi-
cations if necessary.
CHANGE IN SCOPE
This office should be advised of any changes in the project scope or pro-
posed site grading so that it may be determined if the recommendations
contained herein are appropriate. This should be verified in writing or
modified by a written addendum.
SDUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 25028 February 14, 1984 Page a
TIME LIMITATIONS
The findings of this report are valid as of this date. Changes in the
condition of a property can, however, occur with the passage of time,
whether they be due to natural processes or the work of man on this or
adjacent properties. In addition, changes in the State-of-the-Art and/or
Government Codes may occur. Due to such changes, the findings of this
report may be invalidated wholly or in part by changes beyond our control.
Therefore, this report should not be relied upon after a period of two
years without a review by us verifying the suitability of the conclusions
and recommendations.
PROFESSIONAL STANDARD
In the performance of our professional services, we comply with that level
of care and skill ordinarily exercised by members of our profession cur-
rently practicing under similar conditions and in the same locality. The
client recognizes that subsurface conditions may vary from those encoun-
tered at the locations where our borings, surveys, and explorations are
made, and that our data, interpretations, and recomnendations are based
solely on the information obtained by us. We will be responsible for
those data, interpretations, and reconnnendations, but shall not be respon-
sible for the interpretations by others of the information developed. Our
services consist of professional consultation and observation only, and no
warranty of any kind whatsoever, express or implied, is made or intended
in connection with the work performed or to be performed by us, or by our
proposal for consulting or other services, or by our furnishing of oral or
written reports or findings.
CLIENT'S RESPONSIBILITY
It is the responsibility of Oaon Corporation, or their representatives to
ensure that the information and recommendations contained herein are
SOUTHERN CALIFORNIA SOIL AND TESTING. INC
SCS&T 25028 February 14, 1984 Page 9
brought to the attention of the engineer and architect for the project and
incorporated into the project's plans and specifications. It is further
their responsibility to take the necessary measures to insure that the
contractor and his subcontractors carry out such recommendations during
construction.
FIELD EXPLORATIONS
Seventeen subsurface explorations were made at the locations indicated on
the attached trench logs on February 7 and 9, 1984. These explorations
consisted of trenches dug by means of a backhoe. The field work was
conducted under the observation of our engineering geology personnel.
The explorations were carefully logged when made. These logs are present-
ed on the following Plate Numbers 3 through 18. The soils are described
in accordance with the Unified Soils Classification System as illustrated
on the attached simplified chart Plate No. 2. In addition, a verbal
textural description, the wet color, the apparent moisture and the density
or consistency are presented. The density of granular material is given
as either very loose, loose, medium dense, dense or very dense. The con-
sistency of silts or clays is given as either very soft, soft, medium
stiff, stiff, very stiff, or hard.
Disturbed and "undisturbed" samples of typical and representative soils
were obtained and returned to the laboratory for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. A brief description of the tests performed is
presented below:
SOUTHERN CALIFORNIA SOIL AND TEST1NG. INC
SCS&T 25028 February 14, 1984 Page 10
a)
b)
cl
d)
MOISTURE-DENSITY: Field moisture content and dry density were
determined for representative undisturbed samples. This informa-
tion was an aid to classification and permitted recognition of
variations in material consistency with depth. The dry unit
weight is determined in pounds per cubic foot, and the field
moisture content is determined as a percentage of the soil's dry
weight. The results are summarized in the trench and boring
logs.
CLASSIFICATION: Field classifications were verified in the
laboratory by visual examination. The final soil classifications
are in accordance with the Unified Soil Classification System.
DIRECT SHEAR TESTS: Direct shear tests were performed to deter-
mine the failure envelope based on yield shear strength. The
shear box was designed to accomodate a sample having a diameter
of 2.375 inches or 2.50 inches and a height of 1.0 inch. Samples
were tested at different vertical loads and at saturated moisture
content. The shear stress was applied at a constant rate of
strain of approximately 0.05 inches per minute. The results of
these tests are presented on attached Plate Number 19.
CONSOLIOATION TESTS: Two single-point consolidation tests were
performed on representative samples of the alluvial deposits
encountered at this site. The results of these tests are pre-
sented on Plate Number 20.
SOUTHERN CALLIFORNIA SOIL AND TESTINO. INC.
OR~IGIt(\AL GROUN9 / . - -t-s _ I
. . : / EiCAVATION
MIr!US in' CRUSt!ED ROCK
COKPLETELY SURROC?IOEO
4” MIN BY FILTER FABRIC, OR
CLASS II PERMEABLE
MATER!AL
4" DIAMETER PERFORATED PIPE - MINIMUM 1% SLOPE
!
I PIPE DEPTH OF FILL
MATERIAL OVER SUBDRAIN ADS (CORRUGATED POLETHYLENE
TRANSITE UNDERDRAIN 2: PVC OR ABS: SOR 35
SOR 21 1:: SCHEMATIC ONLY
NOT TO SCALE
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
mama q llVfDDALC lTDEET s*lu q lrnOO. CALIFOFINIA SPlPD
I BY
TYPICAL CANYON SUBDRAIN RRR DATE 2-13-84
JOB NO. 25028 Plate No. 1
SUBSURFACE EXPLORATION LEGEND
., / UNIFIED SOIL cLbSsIF?xATIoN CHRRT
SOIL DESCRIPTION GROUP SYmOL TfPICx. N.uyES $
1. C0AR.s. GRAINED, More than half ot material is larser than NO. 200 sieve size. m CLEAN GRAVEL.5 nore than hali Of coarse traction i5 larger than NO. 4 sieve size but mnauer than 3”. GRAVELS WITH FINES (Appreciable amount Of fines,
5r\No5 cIzI\Iv SANDS “ore than half Of coarse fraction is smaller than NO. 4 *ieve sire. SANDS WrTH FINES (*ppreciable amount of fines)
11. PINE GRAINED, “Ore than half Of material io smaller than No. 200 sieve size. SILTS AND CLAY.5
liquid Limit less than 50
SILTS AND CLAYS
w
GP
SW
SP
sn
SC
ML
CL
OL
m
we11 graded gravels. gravel- i aand mixtures, little or no fine*. I Poorly graded gravels. gravel sand mixeures, little or no ! fines Silty gravels. poorly graded I gravel-*and-silt mixtures. Clayey grave Is, poorly i
graded gravel-sand, clay mixturqs . /
1 Well graded ra"d;:qb"elly sands, little or no fines. Poorly graded sangs,grave11y sands, little or no fines. silty sands, poorly graded I sand and silt mixtures. j clayey sands. poorly graded i, sand and clay mixtures.
I
Inorganic silts and very ! fine sands, rock flour, sandy silt or clayey-silt-sand mixtures with slight plasit- icity Inorganic e1ays of la*- to medium plasticity,gravelly clays, randy clays,silty clays. lean clays. organic silts and organic silty clays of lcw plasticicy inorganic silts. micaceour or diatomaceous fine randy or silt" roils. elastic *ilts. - liquid limit CH Inorganic clays of high greater than 50 plasticity. fat clays. ..OH _ Organic clays of medim to high plasbzity.
HTGiaY ORGANIC SOILS f-r Peat and other highly organic soils. f - Water level at time of exzaiation or as indicated
us - Undisturbed, driien ring sample or the sample
CX - Undisturbed chunk sample
BG - Bulk sample
SOUTtiERN CALIFORNIA
SOIL & TESTING, INC.
mPm0 q lVEFlDALE q TmEET
IsAN q leoo, CALIEOFINIA SPlPD
BY
JOB NO.
CRB
251328
DATE 2-14-84
PlAta Nn 7
; TRENCH NUMBER 1
z
: cl4 b:> z 2 ; -7 = ,z :a zzk Y- : 3 ii ;p ii; z- 5; !Y ,-II ELEVATION ,“k
; Pu)Y), g; 2:
:5 :,a -P t;;Y
5. r$=cc zg i;
: ; z 4z
Z” c) z 2 0 IL 0
0’ DESCRIPTION 0
0-m
u
CH DARK BROWN, SANDY CLAY
(TOPSOIL)
MOIST STIFF
l-
2
SMI DARK YELLOW BROWN, SILTY MOIST MEDIUM SC CLAYEY SAND 3-- DENSE
SM LIGHT GRAY & YELLOW BROWN MOIST DENSE SILTY SAND (SANDSTONE)
4-
CK
- BG
5-
j-
CONTACT DIPS 5'W
7 CL GREENISH BROWN, SANDY SILTY MOIST HARD CLAY (DEL MAR MUDSTONES)
- e MANY SUBHORIZONTAL SHEARS-
3- NO DEFINITE SLIDE PLANE
CK
- BG
J
1
-I
STA. 3+00
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL A TESTINC,INC. CRB DATE LOGGED: 2-7-84
25028 Plate NO. 3 .
z a9
E ; TRENCH NUMBER 2 hV+ ’ > : ; Y - 2 -7 zz- = ,z v, z $g
-- ;:; z- 5; ;L ELEVATION Itl g; 2; .xL?“w ;; z ~“0 !liy ITi:
ii - :o -P
i <a <== 5;
0 g := go 0 ‘: z 1: v DESCRIPTION E 0
CL/ DARK BROWN, SANDY CLAY MOIST STIFF CH (TOPSOIL)
l-
2-
3- CL GREENISH BROWN, SANDY CLAY- MOIST VERY STIFF MUDSTONE APPEARS TO BE
SLIDE DEBRIS TO 4%'
4-
5- SC LIGHT GREENISH BROWN MOIST DENSE TO to & YELLOW BROWN, CLAYEY SAND
SM VERY DENSE TO SILTY SAND
6- MATERIAL IS SLIGHTLY FRAC-
TURED DOES NOT APPEAR TO BE
SLIDE DEBRIS
7-
a-
9,
STA. 3+80
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: 2-g-B4
JOE NUMBER: 25028 PlateNO. 4
I
I
I
L
1
c
5
7
3
3
1
-
:
F
,;
-iY z- :: 4
c
TRENCH NUMBER 3
ELEVATION
; iG z- w - 0 0 -P z 0
: : i
= I b : 0
I-
I_
>
3-
I-
,
I
-
DESCRIPTION
CH DARK BROWN, SANDY CLAY
(TOPSOIL)
MEDIUM
STIFF
JOIST
JOIST SC! CL
3ROWN TO YELLOW BROWN, VERY
:LAYEY SAND MEDIUM
DENSE
SM
CL
YE
SM
3RAYISH BROWN, SILTY SAND
:SANDSTONE) IOIST DENSE
;REENISH BROWN, SANDY CLAY-
IUDSTONE HIGHLY FRACTURED
lITH CALICHE IN FRACTURES-
\BUNDENT SHEARS; LOOKS LIKE
;LIDE DEBRIS TO 7'
VERY STIF IOIST
IOIST IENSE .IGHT GREENISH BROWN AND
'ELLOW BROWN, CLAYEY & SILTY
;AND MODERATELY FRACTURED-
IOES NOT APPEAR TO BE SLIDE
IEBRIS
TA. 4+25
SOUTHERN CALIFORNIA
SOIL & TESTING,INC.
2 z f F: TRENCH NUMBER 4 +w I- fJ ’ > z 2 ; 7 = ,2 ii= zrt w- WO z Y~ul v, - - =z ,Lz z+ ?p
ELEVATION fZ
: 5 g; c 2 I- 0
L?$ 2 - P 2
mow “S k?c z,*
:za : 2 2 4z := go 0 z s 0
; DESCRIPTION 0
0-r
,”
CL/ DARK BROWN, SANDY CLAY MOIST MEDIUM CH (TOPSOIL) STIFF l-
2
SC/ BROWN VERY CLAYEY SAND MOIST CL MEDIUM
DENSE 3
CL GREENISH BROWN, SANDY CLAY MOIST HARD MUDSTONE
4- HIGHLY FRACTURED - SLIDE
PRONE MATERIAL
- BG
5-
6-
7
- B 8
STA. 4+50
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. CRB DATE LOGGED: 2-7-84
-
25028 Plate NO. 6
5 2 ,” ; TRENCH NUMBER 5 + 0 ’ > : ; 5: 2 7 ;z$ Y - y 0 ,= ,z := Til = I- z z- :& 2 ; -- ELEVATION Y ou- :sm 2: = nmu) z!!! g”o ;; _p Ly
2: k = v) 5; ii
0 + o z z 0 I: 5 u 0 DESCRIPTION :
o-
CL/ BROWN, SANDY CLAY (ALLUVIUM) MOIST STIFF
CH
l-
2-
3- CK
4-
5-
6-
7- CK
a
CL LIGHT GREENISH BROWN, SANDY MOIST STIFF
9- CLAY WEATHERED SEDIMENTS
0
1
STA. 7+00
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED 8Y: CRB DATE LOGGED: z-7-84
JOE NUMBER: 25028 Plate NO. 7
ci z
E p TRENCH NUMBER 6 FTi> L ; 5: ii 7 ;=: w -
z z 4 y 3 v, ;: -1% I- z z- E.b
ELEVATION Y 0,” 2,” SEu z; ;z E “,“” 2:
0. ii : ;:, _D 5 g i;
: ; -p o z a 0 2 K 0
u DESCRIPTION 0 u
0-r CL/ DARK GRAY, SANDY CLAY MOIST MEDIUM
CH (ALLUVIUM) STIFF
l- CK
2-
3- CK
4-
5
CL/ BROWN, VERY SANDY CLAY MOIST TO STIFF
SC 6- SATURATED
CK~
7-
81 B-
CK
9--v - -7
0
1
STA. lot50
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL A TESTING,INC. LOGGED BY: CRB DATE LOGGED: 2-7-84
JOE NUMBER: 25028 Plate No. 8
1.
2.
3.
4.
5.
6.
7-
a-
9:
o-
1-
E z Y tk ;:
-
Cb
3G
,
:K
SC/
CL
7 >C
7 >M
lRENCH NUMBER 7
ZLEVATION
DESCRIPTION
1ARK BROWN, VERY SANDY CLAY
:TOPSOIL)
IROWN, CLAYEY SAND MOIST
.IGHT GRAY SILTY SAND-
;ANDSTONE MODERATELY
RACTURED-DOES NOT APPEAR
'0 BE SLIDE DEBRIS
TA. 19tOO
MOIST
MEDIUM
DENSE
YOIST DENSE
MEDIUM
STIFF
-
-
-!
i 4
I
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTINCi,INC. LOGGED BY: CRB DATE LOGGED: 2-7-84
JOB NUMBER: _-
E 2
it Fr TRENCH NUMBER 8 +w t- 0 ‘> r ii 2 7 = ,z E= zzc w - Fe 5 “if!; G = z- 5k -+
cp 5 ELEVATION ;g z 2%; g; Lfi 2:
P : ln -P
im z 2: ii” 5 ;
: ; up o 5 c a 0 z
0
=0
DESCRIPTION 0
0 ”
0
CL/ DARK BROWN, SANDY CLAY MOIST TO MEDIUM
CH (TOPSOIL) WET
l-
STIFF TO
STIFF
2-
3-
4
SC/ YELLOW & GREENISH BROWN, MOIST MEDIUM
5 CL MIXTURE OF SANDSTONES &
MUDSTDNES DENSE &
STIFF
ABUNDENT FRACTURES &
SLICKENSIDES IN MUDSTONES 6- POSSIBLE SLIDE DEBRIS
7-
B-
9-
3-
I
STA. 20+00
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: 2-9-84
JOB NUMBER: 25028 Plate No. 10
-
l-
2,
3-
4--
5-
6-
7-
B-
-
:
F Q
! c
; Y
:: 4
c
z
ct
-
:H
I
-
rRENCH NUMBER 9
FLEVATION
DESCRIPTION
)ARK BROWN, SANDY CLAY
:TOPSOIL)
iREENISH BROWN, WEATHERED
IUDSTONES, APPEARS TO BE
'LIDE DEBRIS
TA. 21tOO
MOIST
IOIST
MEDIUM
STIFF
STIFF
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: 2-7-84
JOB NUMBER: 25028 PI ate‘?@. 11
0’ a9 E ; TRENCH NUMBER 10 L” I- 0 ’ > E ap ; -. : 4 zzt w- = “,z You, ;i F; -‘u z- ;+
Y 0% ELEVATION 25 = Pv)(o
sKJ1= g: :z Em” 2:
:2
-P
: = 5 ; rig
0 : up D z
: = 0
d
= 0
DESCRIPTION 0 0 0
CL/ DARK BROWN, SANDY CLAY MOSIT STIFF CH (TOPSOIL)
l-
2-
3
CH DARK GREENISH BROWN, SANDY MOIST STIFF CLAY-MUDSTONE 4- HIGHLY FRACTURE WITH ABUNDENT
SHEARS-APPEARS TO BE SLIDE
DEBRIS
5-
5-
7-
VERY STIFF
3- 7
3-j
STA. 21+00
50' right
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: 2-g-84
JOB NUMBER:
7
I
t
:
0
1
2
3
4
5
6
7,
3
2.
I.
I-
-
: c ,: . - ; ! :! 4 c
:L/
CH
7 NC
-
IL
-
TRENCH NUMBER 11
ELEVATION
DESCRIPTION
DARK BROWN, SANDY CLAY
(TOPSOIL)
YELLOW BROWN, CLAYEY SAND
SANDSTONE
GREENISH BROWN, SANDY CLAY-
MUDSTONE
FRACTURED WITH CALICHE-LOOKS
LIKE SLIDE DEBRIS TO AT LEAS
9 ft.
STA. 25+75
IOIST STIFF
IOIST "IEDIUM
DENSE
IOIST ilERY STIF
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
LOGGED BY: CRB DATE LOGGED: SOIL & TESTING,INC. - -
JOB NUMBER: 25028 Plate No. 13
z 2
,” r TRENCH NUMBER 12 :” ,:> c z ii : zzt w - z ,u” :; w!JJu) iij = := gp ,kZ 5; y OE ELEVATION
z -2u) 2 - IJ? w . ms 0; zw 5:
ki :o ii : 4z :zE 05 z ,“= O ‘, “,” a z+ 0
; DESCRIPTION 0
0 ti
CH DARK BROWN, SANDY CLAY MOIST (TOPSOIL) STIFF
l-
2-
CK
3
CH GREENISH BROWN, SANDY CLAY MOIST VERY STIFr
4- WEATHERED MUDSTONE POSSIBLE LANDSLIDE DEBRIS
5-
6-
7-
i
8
STA. 30+00
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED RI: DATE LOGGED: CRB - _
JOB NUMBER: 25028 Plate No. 14 1
5 z 2 ; TRENCH NUMBER 13 E” I- 0 ’ > z z ; 7 -; 4 zzt Y - y 0
:; iii = -lo :r; z- ?; - - EC
!Y g; ELEVATION fn Y g; z :z 2” 2;;o G;
,” k c.9 IL0 -P tsb 41 $0’: L.ig
0 : 2 a: : ” 0 0 K 0
DESCRIPTION 0 0
D -
CH DARK GRAY, SANDY CLAY SATURATED SOFT
(ALLUVIUM)
l-.
CH BROWN TO YELLOW BROWN, SANDY WET MEDIUM
CLAY (ALLUVIUM) WATER SEEPAGE STIFF
2-
CK
3
CL/ DARK YELLOW BROWN, SANDY MOIST STIFF
CH CLAY ALLUVIUM AND WEATHERED 4, METAVOLCANIC ROCK
CK
5,-
,'
6- CL GREENISH BROWN & PINK, MOIST VERY STIFF
PURPLE AND YELLOW SANDY CLAY
WEATHERED METAVOLCANIC ROCK
7-
8
STA. 34+50
j
-1
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: 2-7-84
JOE NUMBER: 25028 Plate NO. 15 i
E z ,” ; TRENCH NUMBER 14 + w g $ ; ; 2 ; : = ,z z= w- 3 = ww;; z- ;; -- (L ; z 5+ Y Ok ELEVATION 2; :‘; z
z 2: *co, 2;;: LY
; Fi$ -D ii” k “,=a 5;
0 z $0 0 z
‘:
a
z =0
6 0-r DESCRIPTION 0
CL/ DARK BROWN, SANDY CLAY MOIST STIFF CH (TOPSOIL) l-
2-
BG
3-
4
CL GREENISH BROWN WITH PINK, MOIST VERY STIFF
5- WHITE & YELLOW, SANDY CLAY
CK HIGHLY WEATHERED METAVOLCANIC
ROCK
6s
J-
8,
STA. 40+25
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL A TESTINC,INC. DATE LOGGED: 2-7-B
JOB NUMBER:
Plate NO. 16
5 z E G TRENCH NUMBER 15 E” +Oc ‘> E 2 ; : = ,;: 2 2 w-
: “,5 uwii :- =e
-- ELEVATION I- cc+2 se
Y ok 41?; t;: ;L
: at.3 ;g ;;
P ti cJ7 “p” -0 3,’ cg
2 ;
<z $5 o 2
z = 0 : a
0 DESCRIPTION
0 z
0 CL/ BROWN, SANDY CLAY (TOPSOIL) MOIST STIFF
CH
l-
2 CL DARK YELLOW BROWN, SANDY MOIST STIFF TO
CLAY WEATHERED METAVOLCANIC VERY STIFF
3- ROCK CK
$-
5
CL/ PINKISH BROWN, WHITE & MOIST VERY STIFF
CH YELLOW, SNADY CLAY
j- CK HIGHLY WEATHERED METAVOLCANIC
ROCK
J-
8-
9 - PB
0
STA. 147+00
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: - -
JOB NUMBER: 25028 Plate No. 17
z a9
: ; TRENCH NUMBER 16 5” +:> z 2 ; -7 -= a zzt w-
:: ii = +u- =“- ::; z- I Eg ELEVATION ;G 11 OY -l.u) <KJ; ;z Fly
c g win, :i; k” 22 _p
Y z 42 6; := 0 up o z : x 0
: DESCRIPTION ”
0
:
CL/ BROWN, SANDY CLAY (TOPSOIL) MOIST CH STIFF
l-
2 CL REDDISH BROWN, SANDY CLAY MOIST STIFF TO WEATHERED METAVOLCANIC ROCK VERY STIFF 3-
4-
5-
5-
7-
3
STA. 151+25
TRENCH NUMBER 17
) L SC REDDISH BROWN, CLAYEY SAND MOIST
(TOPSOIL) MEDIUM
DENSE
GM/ BROWN, METAVOLCANIC ROCK MOIST GP VERY DENSE
STA. 164+50
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: CRB DATE LOGGED: - -
JOB NUMBER: 25028 Plate NO. 1~
DIRECT SHEAR TEST RESULTS
DESCRIPTION
I I I I
* Test performed at $ of normal speed
SOUTHERN CALIFORNIA
SOIL 81 TESTINQ, INC.
ammo q “mmmALC STFICCT
*AN D1%!00. CALIFOFINIA om,*a
BY RRR OATE 2-15-84
JOB NO. 25028 Plate NO. 19
SINGLE POINT CONSOLIDATION TEST RESULTS
SOUTHERN CALIFORNIA
SOIL 81 TESTINQ, INC.
.*ma q “IsmDALC STDELT
.AN Ll,.oa, OALIFPrnNIA rnP?PO
BY
JOB NO.
DATE RRR 2-15-84
25028 Plate NO. 20
SCS&T 25028 February 14, 1984 Appendix, Page 1
SOUTHEAST AREA WATERLINE, RANCH0 SANTA FE ROAD AND MISION ESTANCIA
RECOMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS
GENERAL INTENT
The intent of these specifications is to establish procedures for clear-
ing, compacting natural ground, preparing areas to be filled, and placing
and compacting fill soils to the lines and grades shown on the accepted
plans. The recommendations contained in the preliminary soil investiga-
tion report and/or the attached Special Provisions are a part of the
Recommended Grading Specifications and shall supersede the provisions
contained hereinafter in the case of conflict. These specifications shall
only be used in conjunction with the soil report for which they are a
part. No deviation from these specifications will be allowed, except
where specified in the soil report or in other written communication
signed by the Soil Engineer.
OBSERVATION AND TESTING
Southern California Soil & Testing, Inc. shall be retained as the Soil
Engineer to observe and test the earthwork in accordance with these speci-
fications. It will be necessary that the Soil Engineer or his representa-
tive provide adequate observation so that he may provide an opinion that
the work was or was not accomplished as specified. It shall be the re-
sponsibility of the contractor to assist the soil engineer and to keep him
apprised of work schedules, changes and new information and data so that
he may provide these opinions. In the event that any unusual conditions
not covered by the special provisions or preliminary soil report are
encountered during the grading operations, the Soil Engineer shall be
contacted for further recommendations.
SCS&T 25028 February 14, 1984 Appendix, Page 2
If, in the opinion of the Soil Engineer, substandard conditions are en-
countered, such as; questionable or unsuitable soil, unacceptable moisture
content, inadequate compaction, adverse weather, etc., he will be empower-
ed to either stop construction until the conditions are remedied or cor-
rected or recommend rejection of this work.
Test methods used to determine the degree of compaction should be per-
formed in accordance with the following American Society for Testing and
Materials test methods:
Maximum Density & Optimum Moisture Content - A.S.T.M. D-1557-78.
Density of Soil In-Place - A.S.T.M. D-1556-64 'or A.S.T.M. D-2922.
All densities shall be expressed in terms of Relative Compaction as deter-
mined by the foregoing A.S.T.M. testing procedures.
PREPARATION OF AREAS TO RECEIVE FILL
All vegetation, brush and debris derived from clearing operations shall be
removed, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished apperance, free from unsightly
debris.
Any abandoned buried structures encountered during grading operations must
be totally removed. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of.the structure
and properly capped off. The resulting depressions from the above des-
cribed procedures should be backfilled with acceptable soil that is com-
pacted to the requirements of the Soil Engineer. This includes, but is
not limited to, septic tanks, fuel tanks, sewer lines or leach lines,
- - ..-.. r - .I - ~ I I cn mu,,a en,, AND TEBTlNc-~ INCA
SCS&T 25028 February 14, 1984 Appendix, Page 3
storm drains and water lines. Any buried structures or utilities not to
be abandoned should be investigated by the Soil Engineer to determine if
any special recommendation will be necessary.
All water wells which will be abandoned should be backfilled and capped in
accordance to the requirements set forth in the Geotechnical Report. The
top of the cap should be at least 4 feet below finish grade or 3 feet
below the bottom of footing whichever is greater. The type of cap will
depend on the diameter of the well and should be determined by the Soil
Engineer and/or a qualified Structural Engineer.
When the slope of the natural ground receiving fill exceeds 20% (5 hori-
zontal units to 1 vertical unit), the original ground shall be stepped or
benched. Benches shall be cut to a firm competent soil condition. The
lower bench shall be at least 10 feet wide or 1 l/2 times the equipment
width which ever is greater and shall be sloped back into the hillside at
a gradient of not less than two (2) percent. All other benches should be
at least 6 feet wide. The horizontal portion of each bench shall be
compacted prior to receiving fill as specified hereinbefore for compacted
natural ground. Ground slopes flatter than 20% shall be benched when
considered necessary by the Soil Engineer.
After clearing or benching, the natural ground in areas to be filled shall
be scarified to'a depth of 6 inches, brought to the proper moisture con-
tent, compacted and tested for the minimum degree of compaction in the
Special Provisions or the recommendation contained in the preliminary soil
investigation report. All loose soils in excess of 6 inches thick should
be removed to firm natural ground which is defined as natural soil which
possesses an in-situ density of at least 85% of its maximum dry density.
E.-T,lTYCON CAIIFCIFINIA 501L AND TESTING. INC
SCS&T 25028 February 14, 1984 Appendix, Page 4
FILL MATERIAL
Materials placed in the fill shall be approved by the soil engineer and
shall be free of vegetable matter and other deleterious substances. Gran-
ular soil shall contain sufficient fine material to fill the voids. The
definition and disposition of oversized rocks, expansive and/or detrimen-
tal soils are covered in the soils report or Special Provisions. Expan-
sive soils, soils of poor gradation, or soils with low strength character-
istics may be thoroughly mixed with other soils to provide satisfactory
fill material, but only with the explicit consent of the soil engineer.
Any import material shall be approved by the Soil Engineer before being
brought to.the site.
PLACING AND COMPACTION OF FILL
Approved fill material shall be placed in areas prepared to receive fill
in layers not to exceed 6 inches in compacted thickness. Each layer shall
have a uniform moisture content in the range that will allow the compac-
tion effort to be efficiently applied to achieve the specified degree of
compaction. Each layer shall be uniformly compacted to the minimum speci-
fied degree of compaction with equipment of adequate size to economically
compact the layer. Compaction equipment should either be specifically
designed for soil compaction or of proven reliability. The minimum degree
of compaction to be achieved is specified in either the Special Provisions
or the recommendations contained in the preliminary soil investigation
report.
When the structural fill material includes rocks, no rocks will be allowed
to nest and all voids must be carefully filled with soil such that the
minimum degree of compaction recommended in the Special Provisions is
c n II I Y 5 D N cPLIrOF1NIA 501L AND TESTING. INC
SCS&T 25028 February 14, 1984 Appendix, Page 5
achieved. The maximum size and spacing of rock permitted in structural
fills and in non-structural fills is discussed in the soil report, when
applicable.
Field observation and compaction tests to estimate the degree of compac-
tion of the fill will be taken by the Soil Engineer or his representative.
The location and frequency of the tests shall be at the Soil Engineer's
discretion. When the compaction test indicates that a particular layer is
less than the required degree of compaction, the layer shall be reworked
to the satisfaction of the Soil Engineer and until the desired relative
compaction-has been obtained.
Fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable equipment. Compaction by sheepsfoot rollers shall be at vertical
intervals of not greater than four feet. In addition, fill slopes at
ratios of two horizontal to one vertical or flatter, should be track-
rolled. Steeper fill slopes shall be over-built and cut-back to finish
contours. Slope compaction operations shall result in all fill material
six or more inches inward from the finished face of the slope having a
relative compaction of at least 90% of maximum dry density or that speci-
fied in the Special Provisions section of this specification. The compac-
tion operation on the slopes shall be continued until the Soil Engineer is
satisfied that the slopes will be stable in regards to surficial stabil-
ity.
Slope tests will be made by the Soils Engineer during construction of the
slopes to determine if the required compaction is being achieved. Where
failing tests occur or other field problems arise, the Contractor will be
notified that day of such conditions by written communication from the
Soil Engineer in the form of a daily field report.
SCS&T 25028 February 14, 1984 Appendix, Page 6
If the method of achieving the required slope compaction selected by the
Contractor fails to produce the necessary results, the Contractor shall
rework or rebuild such slopes until the required degree of compaction is
obtained, at no additional cost to the Owner or Soils Engineer.
CUT SLOPES
The Engineering Geologist shall inspect all cut slopes excavated in rock
or lithified formational material during the grading operations at inter-
vals determined at his discretion. If any conditions not anticipated in
the preliminary report such as perched water, seepage, lenticular or
confined strata of a potentially adverse nature, unfavorably inclined
bedding, joints or fault planes are encountered during grading, these
conditions shall be analyzed by the Engineering Geologist and Soil Engi-
neer to determine if mitigating measures are necessary.
Unless otherwise specified in the soil and geological report, no cut
slopes shall be excavated higher or steeper than that allowed by the
ordinances of the controlling governmental agency.
ENGINEERING OBSERVATION
Field observation by the Soil Engineer or his representative shall be made
during the filling and compacting operations so that he can express his
opinion regarding the conformance of the grading with acceptable standards
of practice. The presence of the Soil Engineer or his representative or
the observation and testing shall not release the Grading Contractor from
his duty to compact all fill material to the specified degree of compac-
tion.
C-~ITYCO~ ralIFnwN,n eo,l. AND TESTING. INC.
SCS&T 25028 February 14, 1984 Appendix, Page 7
SEASON LIMITS
Fill shall not be placed during unfavorable weather conditions. When work
is interrupted by heavy rain, filling operations shall not be resumed
until the proper moisture content and density of the fill materials can be
achieved. Damaged site conditions resulting from weather or acts of God
shall be repaired before acceptance of work.
RECOMMENDED GRADING SPECIFICATIONS-SPECIAL PROVISIONS
The minimum degree of compaction to be obtained in compacting natural
ground, in the compacted fill, and in the compacted backfill shall be at
least 90 percent.
Detrimentally expansive soil is defined as soil which will swell more than
3 percent against a pressure of 150 pounds per square foot from a condi-
tion of 90 percent of maximum dry density and air dried moisture content
to saturation.
Oversized fill material is defined as rocks or lumps over 6 inches in
diameter. At least 40 percent of the fill soils shall pass through a No.
4 U.S. Standard Sieve.
Transition Lots: Where transitions between cut and fill occur within the
proposed building pad, the cut portion should be undercut a minimum of one
foot below the base of the proposed footings and recompacted as structural
backfill.