HomeMy WebLinkAbout; Vispera Place Lot 136; Soils Report; 1983-11-02SAN MARCOS ENGINEERING
Civil Engineers 380 Mlilberry Dr. Sure B SAN MARCOS. CALIFORNIA 92069 (619) 744-0111
November 2. 1983
Mr. Erza Jakubec 8606 Flanders Drive San. Diego, Ca. 92 126
Subject: Preliminary Soils Investigation Lot 136 Map 6800 Vispera Place, La Costa
Dear Mr. Jakubec,
As per your request we have performed a preliminary soils investigation of the site soils at the above subject address and the enclosed are our report and reco- mmendations.
The existing soils at the said site is typically expansive silty clay with broken shale stone in the higher elevations. The shale is found to be trending to a more solid state as it gets deeper. No signs of unstable ground is found at site.
We recommend the use of soil bearing footings for the foundation system, however, the recommendations shown in the attached report need to be observed in the design and construction of the proposed structure.
If you have any question about this report and recommendations, please call.
Very truly yours,
SAN MARCOS ENGINEERING
CWlL LNalHclll. SOI” * COUcID.~IOI)
REPORT OF PRELIMINARY SOILS INVESTIGATION AND FOUNDATION RECOMMENDATIONS
Project: Proposed Residence Structure Lot 136 Map 6800 Vispera Place, La Costa Carlsbad, California
1. General Information
The site is located off .Vispera Place which is a cul-de-sac from Unicornio Way
in La Costa Estates, Carlsbad. California. The lot is somewhat like a pie-shaped
piece which has a trending slope of about 24 percent in a northeasterly direction
downwards towards Vispera Place. According to the Plot Plan, the proposed
structure will be located on a promontory along the slope where a cut and fill
situation will be graded. Below is shown the general location of the site.
; h GMA~Rc;~s 28
] %+--J-J---j
SAN MARCOS ENGINEERING
ClYlL LNa,NrT”s. SO,” a rOVND.IlON
The lot is sorrounded by existing residential houses except on the northeasterly
side which is vacant at this time.
2. Purpose of Soils Investigation
The purpose of this preliminary soils investigation is to determine the physical
characteristics of the existing site soils and to make foundations recommendations
in connection with building a residential house at the site in accordance with the
plot plan submitted.
3. The Soils Investigation
The soils investigation consist of a field visual examination of on-site soils,
rock outcrops if any, and a subsurface soils exploration. The subsurface explo-
ration consisted of excavating four(4) test trenches dug by a backhoe at the loca-
tions indicated in Plate 1 of this report. The depths of the trench excavations
were in then order of 5 feet plus or minus.
The soils encountered in the trenches were visually classified and logged accor-
ding to the Unified Classification System as shown in Appendix E of this report.
Soil samples were procured and brought to the laboratory for further classifica-
tion analysis and maximum density tests and determination of moisture. content.
The log of the soils encountered are shown in Plates 2 to 5, inclusive.
4. Findings and Comments
Log of T-l which was taken at the lower elevation of the property show generally
compact to very compact Silty Clay which is dry to moist. At about 4 feet below
the existing ground surface, some black streaks of clay were observed. No water
. -2-
-^- ._... __--. -- ..- _ ~. _
SAN MARCOS ENGINEERING
CWlL LNOINTSIIS. soou e COUltDAT1OI(
was observed in the trench. Trench T-2 which was taken also at the lower eleva-
tion but closer to the foot of the low promontory indicate about 3 feet of very com-
pact, dry to moist light brown Silty Clay overlying very compact, light brown,
dry to moist Silty Clay and degenerated Shalestone. No competent or solid bed-
rock was observed in the trench excavated to about 5.5 feet below existing ground
surface. No water was observed in the excavation.
Trenches T-3 and T-4.were taken at the upper elevations. T-3 indicate very
rocky which is cbmposed of broken, degenerate shalestone to about 3.5 feet.
Below 3.5 feet the rock seem to be hard and not rippable. No water was observed
in the trench. T-4 which was taken at a much higher elevation than T-3 indicate
light brown, dry, very compact Silty Clay with traces of broken shale rock in
the upper two feet layer of the stratification. This layer is underlain by Tan,dry
to moist, very compact Clayey Silt, traces of broken rock. At about 3 feet below
existing ground surface was observed a hard solid rock finger which extent could
not be determined. It could be a part of a big boulder or bedrock. No water was
observed in trench T-4.
5. Laboratory Test Results
It is anticipated that the silty clay soils will be used for filling purposes. So a
maximum density test was taken for use in the relative density compaction tests
expected to be done during the grading operations. The result is shown in Plate
6 of this report.
6. Discussion and Recommendations
a. A section drawn along the cent@ portion of the pad and running along the slope
. -3-
SAN MARCOS ENGINEERING
Cl”,L LNOINI~“,. emu * CO”rnDAT1OII
as shown in Plate 7 indicate that the foundation system will be about 4.5 feet
below existing ground surface. It is recommended that the structure be founded
on soil bearing footings. An allowable soil bearing pressure of 1500 psf be used
in the determination of the width of footings. It is anticipated that the footings
will be on shale rock in some areas and on silty clay soils in some areas. It
is recommended that the silty clay material if encountered in the foundation area
be removed to at least 24 inches below finish grade of pad and replaced with good
granular material and.compacted to a minimum of 90 percent relative density.
Footings should’bear on competent rock if rock is encountered in the foundation
area. Al1 perimeter footings are recommended to be at least 18 inches in width,
and the bottom of the footings to be at least 24 inches below finish grade. All
perimeter footings should be continuously reinforced with 2-#4 bars placed 3,”
above the bottom of the footing and 2-#4 bars placed 2 inches below top of footing.
Isolated footings should have a minimum dimension of 24 inches both ways and
reinforced with at least 4-#4 bars placed in both directions.
b. The proposed retaining wall can be designed using the standard plans of the
San Diego County Regional Standard Drawings since the wall is anticipated to be
about 3 feet in height basing it from the section drawn as indicated in Plate 7.
c. Basing it from the log of the soils encountered, it is recommended that the
grading be limited to a maximum excavation of about 4.5 to 5 feet in depth other-
wise blasting of rock may be necessary to attain the desired grade.
d. It appears that the drainage swale along the easterly portion of the property
-4-
, ’
.
SAN MARCOS ENGINEERING
CWlL ENGIN‘SIS. eoks * IO”YDII1OW
needs to be controlled positively considering that a considerable amount of sur-
face runoff from the upper elevation is dumped into that area. This observation
is based on the erosion caused by the runoff as observed. All surface runoff
should be directed away from the foundation system. . .
e. In the preparation of the ground for fill, a11 vegetation should be removed
from the fill site. The specifications shown in Appendix A-Recommended Earth-
work Specifications is part of our recommendations.
f. If during the grading operations, soils other than the soils presented herein
are encountered, this firm should be notified so that an evaluation could be made
of the situation and appropriate recommendations be formulated.
.-
Prepared By:
PLATE 1. plot plan & Grading PIa* , Location of Trench Test pits
~_--,-~~~+-i&i’l I.!, , *T- %- ‘a< ] i 1 II! i / 1 i
,t;----, I --- I I
I ---
- -,
--- /h -- ---
A’l--
~- --- ,. ’ --- ------- J -- ---\ - -1
I I I i
I’ I
/ I I h I/ h h 1.1 I .
‘\ -- -. ,A --
PLATE 2. Log of Soils
SAN MARCOS ENGINEERING ClYlL CNOINCUS. *mu (L ~ouLIo.IIoII
,a0 MUL.~“I* DIII”~. wrrm . SAN UAIICO.. er .a-*
Boring N0.Z.L
Sheet N&I/of/
CONTRACT NO.
twisl 6 Remarks
PLATE 3. Log of soils
SAN MARCOS ENGINEERING CIWL SNQIH~~“S. SO,” L ~OUc(D.TIOf4
3ao MUL.E”mv DIIYC SUIT. . sAr4 Y.“SO.. CA .a-* ce,o, 7.4~0181 Boring NO. Fa
Sheet No.+,+-
CONTRACT NO. PlJRPOSE
Wtcwial .S Remarks
.
PLATE 4. Log of Soils
SAN MARCOS ENGINEERING
ClYlL EHO,IIr.~“S. se&s * CO”NDATIOr4
380 MUL.C”I* D”‘“l. SUIT.. **N YA”60.. c. *ao.* ldlSl74..01~,
Boring No. FT
Sheet No./Of-
Material 6 Remarks
I I I I I I
n xzoffwn dL’7re*Lti Cd - . 2
I-- -
PLATE 5. Log of soils
SAN MARCOS ENGlNEERlNG CWlL LNOINIL”S. sea. L COUNDITIO”
a*0 MUL.I”II*l D”WI. SUIT. . Boring No. F4
SAN Y**CO*, CA 920.. 16,9,74..01t, Sheet No./Otl/-
/4y 4 / // c - .
?- 0-N n I/--
SAN MARCOS ENGINEERING CWlL LHOINln‘. ,e,Ls a ~OUNDATIO”
PLATE 6. fAt;ieyrn Density vs. Moisture
.
.
120
‘;; a
,.- 2 .t;
$115
8
c !a
Moisture Content, %
Soil Type : Tan Silty Clay
- .
SANG MARCOS ENGINEERING CWlL LNOINSS”S. sol” L COVNoIrlOH
PLATE 7. Section Taken Thru House
Along Slope
Horizontal Distance, Feet
SAN MARCOS ENGINEERING CWlC CNOINIL".. S01" e COUNDITmCI
APPENDIX A. REiCOMMENDED EARTHWRK SPECIFICATIONS
: 1. General Description. The objective'is to obtain uniformity and adequate
internal strength in'filled ground by proven engineering procedures and
tests so that the proposed structures may be safely supported. The pro-
cedures,include the clearing and grubbing, removal of existing structures,
preparation of land to be filled, processing the fill soils, filling of
-the land, and the spreading and compaction of the filled areas to con-
form with the lines, grades, and slopes as shown on the~approved plans.
The owner shall retain a Civil Engineer qualified in Soil Mechanics
(herein referred to as Engineer) to inspect and test the filled ground
as placed to verify the uniformity of, compaction of filled ground to
the specified 90 percent of maximum dry density. The Engineer shall 'advise the owner and grading contractor immediately if any unsatis-
factory conditions are observed to exist and shall have the authority
to reject the compacted filled ground until such that as corrective
measures are taken, necessary to comply with the specifications., It shall be the sole responsibility of the grading contractor to achieve
the specified degree of compaction.
2. Clearing, Grubbing, and'preparing Areas to be Filled
(4
(b)
(cl
(d)
All brush, vegetation and any biodegradable refuse shall be remov-
ed, piled, and burned or otherwise disposed of.so as to leave the
areas to be filled free of vegetation and debris. Any uncompact-
ed filled ground or loose compressible natural ground, shall be
removed unless the report recommends otherwise. Any unstable,
soft, swampy, or otherwise unsuitable areas shall be corrected
by draining or removal, or both.
. The natural ground which is determined to be satisfactory for the
support of the filled ground shall then be plowed or scarified to
a depth of at least six inches (6"). and until the surface is free
~from ruts, hunmocks, or other uneven features which would tend to
prevent uniform compaction by the equipment to'be used.
After the natural ground has been prepared, it shall then be brought
'to the proper moisture content and compacted to not less than 90
percent of maximum density in accordance with.the A.S.T.M. 01557-70 method which uses 25 blows of a 10 pound ranuner falling 18 inches.
oneach of 5 layers in a 4 inch diameter l/30 cubic foot cylin-
drical meld.
Where fills are made on hillsides or exposed slope areas, with gradients
greater than 10 percent, horizontal benches shall be cut into firm undisturbed natural ground in order to provide both lateral and vertical
.
,a0 r4VL.I”“” DIWI. ,“lTrn . .AN YIICOS. c. *IO.* t*ne, ,4..01,‘
.:
‘, .
Page 2
'1-~
RECOMMENDED EARTHWORK SPECIFICATIONS~(CONT.)
stabil'ity. This is to Provide a horizontal base so that each layer
is placed and compacted on a horizontal plane. The initial bench
at the toe of the fill. shall be at least 10 feet in width on firm
undisturbed natural ground at the elevation of the toe stake placed at the natural angle of repose or design slope. The Engineer shall
determine the width and frequency of all succeeding benches which will vary with the soil conditions and the steepness of slope.
3. Materials and Special Requirements. The fill soils shall consist of select
matenals free from vegetable matter, and other deleterious substances. and
shall not contain rocks or lumps greater than 6 inches in diameter. This.
may be obtained from the excavation of banks, borrow pits or any other approved sources and by mixing soils from one or more sources. If excessive vegetation, rocks, or soils with inadequate strength or other unacceptable
'physical characteristics are encountered, these shall be disposed of in
waste areas as shown on the plans or as directed by the Engineer. If, during
grading operations, soils are found which were not encountered and tested
in the preliminary investigation, tests on these soils shall be performed
to determine their physical characteristics. Any special treatment recom-
mended in the preliminary or subsequent soil reports not covered herein
shall become an addendum to these specifications.
-_
The testing and specifications for the compaction of subgrade, subbase, and
base materials for roads, streets highways, or other public property or
rights-of-way shall be inaccordance with the standards of the governmental
agency having jurisdiction. j
4. Placing, Spreading, and Compacting Fill Materials.
(a)
b)
(cl
(d)
When the moisture conient of the fill material'is below that specified by the Engineer, water shall be added inthe borrow pit until the moisture content is near optimum to assure uniform mixing and effectjve compaction.
When the moisture content of the fill material is above that specified
by the Engineer, resulting in inadequate compaction or unstable-fill,,
the fill material shall be aerated by blading and scarifying or other
satisfactory methods until the moisture content is near'optimum as
specified.
After processing, the suitable fill material shall be placeb.in layers
which, when compacted, shall not exceed six inches (6"). Each layer shall
be spread evenly and shall be thoroughly mixed durjng the spreading to
insure uniformity of material and moisture in each layer.
After each layer has been placed, mixed and spread evenly, it shall be
thoroughly compacted to not less than the density set forth in
paragraph 2 (c) above. Compaction shall be accomplished with sheeps-
foot rollers, multiple-wheel pneumatir-tired rollers, or other
approved types of compaction equipment, such as vibratory equipment
that is specially designed for certain soil types. Rollers shall be
, .
7’
Page 3
5.’
6.
7.
,) ‘8 . ..-,
(e)
(f)
(9)
RECOlYMENDEO EARTHWORK SPECIFICATIONS (CONT.)
of such design and maintained to such a level' that they will be able
to compact the fill material to the specified density, Tamping feet
of sheepsfoot rollers shall be maintained such that the soil will be
compacted rather than sheared by the roller. Rolling shall be accomp-
lished while the fill material is at the specified moisture content.
Rolling of each layer shall be continuous over its entire area and
the roller shall make sufficient tripsto insure that the specified
'density has been obtained. Rolling shall be accomplished in a
planned procedure such that the entire areas to be filled shall receive'
uniform compactive effort.
The surfaces of the fill slopes shall be compacted by means of sheeps- foot rollers or other suitable equipment. Compacting operations shall
be continued until the slopes are stable and until there is no
appreciable amount of loose soil on the slopes. Compacting of the
slopes shall be accomplished by backrolling the slopes in increments
of 3 to 5 feet in elevation gain or by other methods producing
satisfactory results.
Field density tests shall be taken for approximately each foot in ele-
vation gain after compaction, but not to exceed two feet in vertical
height between tests. Fleld density tests may be taken at intervals of
6 inches in elevation gain if required by the Engineer. The location of the tests in plan shall be so spaced to give the best possible cover- age and shall be taken no farther apart than 100 feet. Tests~ shall be
taken on corner and terrace lots for each two feet in elevation gain. The Engineer may take additional tests as considered necessary to check
on the uniformity of compaction. Where sheepsfoot rollers are used,
the tests shall be taken in the compacted material below the disturbed
surface. No additional layers of fill shall be'spread,until the field
density tests indicate that the specified density has been obtained.
The fill operation shall be continued in six inch (6") compacted layers as specified above, until the fill has been brought to the finished
slopes and grades as shown on the accepted plans.
+=%P Sufficient inspection by the Engineer shall be maintained during
t e 1 lng and compacting operations so that he can verify that the fill
was constructed in accordance with the accepted specifications.
Seasonal Limits. No fill material shall be placed, spread, or rolled if
weather conditions increase the moisture content above permissible limits.
When the work is interrupted 'by rain, fill ope.rations shall not be resumed
until field tests by the soils engineer i,ndicate that the moisture content
and density of fill are as previously specified.
Limiting Values of Nonexpansive Soils. Those soils that expand 3.0 percent
or less from air dry to saturation under a unit load of 150 pounds per square
foot are considered to be nonexpansive.
All recommendations presented in the attached report are a part of these .-. . specitlcations.
SAN MARCOS ENGINEERING
CiYlL ENGINEEIS. SOIL* a FO”ND.TION
580 MULBIRI” q IIVE. SYITK m s*N M*FICOs. c* *,ose cs,as 744.Ott1
i
MAJOR DI”lE.lGNS
I21
I
APPENOIX . E
NIFIED SOIL CLASSIFICATION’
I FIELD IDENTIPICATION PROCEDURES TYPICAL NAMES iExcluding parlicIt iarger than 3 inches and baring tractions 00 errimated v.eigtml
I
GW Wellgaded gw.nh, gravelund mixtur2s. Wida range in grain si*n and Iubltantial
lit,,* or “0 tines. amo”ncI 0‘ .I, intcrmediars mnicle 1121.
GP I
Poorl”.Jradsd gravclr. gravrlund nlixtum, Predominantly on* size or 8 ranga of I~ZDI with ,im* or no fines. Mm* intermediate IiZcI mising.
SW I
Wellgrad*d rama. !pavelly ra”dS. little 0, Wide range in grain size and rubrtanrial amoums
“0 fine,. of .I, inrermediare mrtic,e rim.
SP I
POOIlygraded un.3. grau*w Id”&, Imlc or Prcdaminanrb on* size or 3 range of sizes
no tine% wirh fOr7m inrermediate .iz*, mirang.
SM I- Silty randr. randsilt mixtures. NOnLdal*ic fine or finer With IOW piarwiry IfW idenriticarion proced”r?r see ML beburl.
SC
$ ML
CL
.
Claw” randr. land-da” rniXl”,“. Plastic fines vor idenrificatio” procedura
IH CL below,.
IDENTIFICATION PROCEDURES
on Ptaction Sm*ll” than NO. 40 Si.“, Sizr
Dry Strength Oilatrncv Toughnea
ICO”SiSta”CV !Reacrio” ,CrudGng
near PL, to making, ChW~Cf~~iftiCS
,norganic silt, an* Yery tin* ra”dS. rock
flour, Slltv or clayey on* unds 0, None (0 slight Quick IO IlOW None
Cl8”W lilts Wkh IlighT planici~.
Inorganic clay, a‘ IOW IO medium plaliicic”.
gravelly CIWI, sand” Davy. Iilty claw. Medium to high None to “WY I,ow Medium
lean Cl.“..
OL 1
organic fill, an* organic *i,ty clays 0‘ IOU Slight to
plarricit”. medium SlDW Slight
I I 1 I
M” Inorganic lilts, rnicaCBO”I or distomyaceous Slight to SWl to
fine sand” or liltv soils. e!arfiC 111m. medwm Slow IO none medium
Pt Peat and char highly or!qanic rail% Readily ,denlified b” COIOI. c&Jr. ipangy fee,
and freqYs”U” b” ‘ibro”s rexI”,*.