HomeMy WebLinkAbout; Worthing - Jones Residences; Solis Report; 1984-10-01GEOTECHNICAL INVESTIGATION
YORTHING-JONES RESIDENCES
1644 TAHARACK AVENUE
CARLSBAD, CALIFORNIA
PREPARED FOR
6. T. W.
690 Elm Avenue, Suite 204
Carlsbad, California 92008
PREPARED BY
Southern California Soil & Testing, Inc.
Post Office Box 20627
6280 Riverdale Street
San Diego, California 92120
October 1, 1984
G. T. W SCS&T 25170
690 Elm Avenue Report No. 1
Suite 204
Carlsbad, California 92008
Attention: Brooks Worthing
SUBJECT: Report of Geotechnical Investigation, Worthing-Jones Residences,
1644 Tamarack Avenue, Carlsbad, California.
Gentlemen:
In accordance with your request, we have completed a geotechnical investi-
gation for the proposed project. We are presenting herewith our findings
and reconunendations.
The findings of this study indicate that the site is suitable for the
proposed development provided the special site preparation and foundation
recommendations presented in the attached report are complied with.
If you have any questions after reviewing the findings and recommendations
contained in the attached report, please do not hesitate to contact this
office. This opportunity to be of professional service is sincerely
appreciated.
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL & TESTING, INC. a?+< ,I-,&+
Curtis R. Burdett, C.E.G. #lo90
RRR:CRB:mw
cc: (6) Submitted
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA SOIL AND TESTINCi, I N 0.
TABLE OF CONTENTS
PAGE
Introduction and Project Description ..................................... 1
Project Scope ............................................................ 1
Findings ................................................................. 2
Site Oescription ..................................................... 2
General Geology and Subsurface Conditions ............................ 3
Geologic Setting and Soil Description ........................... 3
Tectonic Setting ................................................ 3
Geologic Hazards ..................................................... 4
Groundwater ..................................................... 4
Recommendations and Conclusions .......................................... 5
Site Preparation ..................................................... 5
Deleterious Materials ........................................... 5
Corrective Grading .............................................. 5
Surface Drainage ................................................ 5
Earthwork ....................................................... 5
Foundations .......................................................... 6
General ......................................................... 6
Lateral Resistance .............................................. 6
Settlement Characteristics ...................................... 6
Expansive Characteristics ....................................... 6
Limitations .............................................................. 6
Review, Observation and Testing ...................................... 6
Uniformity of Conditions ............................................. 7
Change in Scope ...................................................... 7
Time Limitations ..................................................... 8
Professional Standard ................................................ 8
Client's Responsibility .............................................. 8
Field Explorations ....................................................... 9
Laboratory Testing ....................................................... 9
ATTACHMENTS
Plate 1 Plot Plan
Plate 2 Unified Soil Classification Chart
Plate 3-4 Trench Logs
Plate 5 Direct Shear Test Results
Maximum Dry Density and Optimum Moisture
APPENDIX
Recommended Grading Specification and Special Provisions
GEOTECHNICAL INVESTIGATION
WORTHING-JONES RESIDENCES
1644 TAMARACK AVENUE
CARLSBAD, CALIFORNIA
INTRODUCTION AN0 PROJECT DESCRIPTION
This report presents the results of our geotechnical investigation for two
proposed residences which are to be located at and adjacent to 1644 Tama-
rack Avenue in the City of Carlsbad, State of California. A brief legal
description of the site is Parcel 2 and 3 of P.M. 12830 in the City of
Carlsbad. It is our understanding that two, one or two-story, wood-framed
structures with slab-on-grade construction are planned for this site.
It is our understanding that some grading will be necessary to develop the
site and that the maximum cuts and fills planned are in the order of 5
feet or less. This information was taken from the grading plan prepared
by Brian Smith Engineers. The site configuration and exploration loca-
tions are shown on Plate Number 1.
PROJECT SCOPE
This investigation consisted of: surface reconnaissance; subsurface
explorations; obtaining representative disturbed and undisturbed samples;
laboratory testing; analysis of the field and laboratory data; research of
SOUTHERN CALIFORNIA SO!L AND TESTINE. INC.
SCS&T 25170 October 1, 1984 Page 2
available geological literature pertaining to the site; and preparation of
this report. Specifically, the intent of this analysis was to:
a)
b)
cl
d)
e)
f)
Explore the subsurface conditions to the depths influenced by the
proposed construction.
Evaluate, by laboratory tests, the pertinent engineering prop-
erties of the various strata which will influence the develop-
ment, including their bearing capacities, expansive characteris-
tics and settlement potential.
Define the general geology at the site including possible geo-
logic hazards which could have an effect on the site development.
Develop soil engineering criteria for site grading.
Determine potential construction difficulties and provide recom-
mendations concerning these problems.
Recommend an appropriate foundation system for the type of struc-
tures anticipated and develop soil engineering design criteria
for the recommended foundation design.
FINDINGS
SITE DESCRIPTION
The project site is a nearly rectangular shaped lot, approximately 100
feet wide by 210 to 220 feet deep, that is located adjacent to and north
of Tamarack Avenue in the City of Carlsbad. The site is bounded on the
east and west by developed residential lots and on the north by vacant
land. The lot slopes gently to the south with elevations ranging from
SOUTHERN CALIFORNIA SOIL AND TEEjTINCi. INC.
SCS&T 25170 October 1, 1984 Page 3
approximately 175 feet to 183 feet. An existing lo-foot wide drainage
easement is present along the eastern property line. Vegetation consists
of a moderate growth of grasses, shrubs, and trees. No structures cur-
rently occupy the site but a substantial amount of end-dumped fill is
present in the central portion of the site.
GENERAL GEOLOGY AND SUBSURFACE CONDITIONS
GEOLOGIC SETTING AND SOIL DESCRIPTION: The subject site is located in the
Coastal Plains Physiographic Province of San Diego County and is underlain
by Quaternary-age alluvial deposits and artificial fill. Specific soils
conditions as encountered in our exploratory trenches consisted of brown
to reddish brown and dark brown, medium dense, porous, silty sands. End-
dumped fill soils also consisting of brown to reddish brown, silty sands
are present in the central portion of the site.
TECTONIC SETTING: A review of available geologic maps indicates the
subject site to be located approximately 5 miles east of the Rose Canyon
Fault Zone. The Rose Canyon Fault Zone is a series of northwest trending
faults of Quaternary age that is currently classified as potentially
active, rather than active according to the criteria of the California
Division of Mines and Geology. This classification is based on the lack
of conclusive evidence to verify Holocene movement along this fault zone.
No fault traces have been mapped through, or ismediately adjacent to, the
subject site and a surface reconnaissance yielded no evidence of faulting
at the site.
It should be recognized that much of Southern California is characterized
by major, active fault zones that could possibly affect the subject site.
The nearest of these are the,Elsinore Fault Zone, located approximately 25
miles to the northeast, and the Coronado Banks Fault zone, located approxi-
mately 20 miles to the southwest.
SOUTHERN CALIFORNIA SOIL AND T E 5 T , N G. I N c.
SCS&T 25170 October 1, 1984 Page 4
GEOLOGIC HAZARDS
The subject site can be considered to be relatively free of geologic
hazards. Potential hazards such as tusnamis, seiches, liquefaction, or
landsliding should be considered to be negligible or nonexistent.
The most likely major geologic hazard to affect the site is groundshaking
as a result of movement along one of the major active fault zones men-
tioned previously. The maximum bedrock accelerations that would be attri-
buted to a maximum probable earthquake occurring along the nearest portion
of selected fault zones that could affect the site are sumnarized in the
following table.
TABLE I
Maximum Probable Maximum Bedrock
Fault Zone Classification Distance Earthquake Acceleration
Rose Canyon Potentially 5.0 miles 6.0 magnitude 0.38 g
Active
Elsinore Active 25 miles 7.3 magnitude 0.20 g
Coronado Banks Active 20 miles 6.0 magnitude 0.12 g
Based on the current fault zone classification and the maximum bedrock
accelerations capable of developing, it is recommended that the Elsinore
Fault Zone be considered the design earthquake source for the subject
development.
Construction in accordance with the minimum standards of the Uniform
Building Code and the governing agency should minimize potential damage
due to seismic activity.
GROUNDRATER: No groundwater was encountered during our subsurface explora-
tion and we do not anticipate any major groundwater related problems,
either during or after construction.
SOUTHERN CALIFORNIA SOlI. AND TE57,NG. INC.
SCS&T 25170 October 1, 1984 Page 5
RECOMMENDATIONS AND CONCLUSIONS
SITE PREPARATION
DELETERIOUS MATERIALS: All deleterious materials generated from the
clearing and grubbing operations should be legally disposed of off-site.
CORRECTIVE GRADING: We recommend that the existing fill soils and loose
native soils be removed to firm natural ground and be stockpiled for
future use. Firm natural ground is defined as native soil which possesses
an in-situ density equal to or greater than 85% of its maximum dry den-
sity. The soils exposed at the base of these excavations should then be
scarified 12 inches, be moisture treated to at least 2% over optimum and
densified to a minimum of 90% relative compaction. The stockpiled soils
may then be replaced in eight inch lifts, moisture treated and compacted
as indicated above. Based on the findings of this study, it appears that
the maximum depth of removal and recompaction will be on the order of 2 to
3 feet.
SURFACE DRAINAGE: We recommend that all surface drainage should be direc-
ted away from the proposed structures and that ponding of water not be
allowed adjacent to their foundations.
EARTHWORK: All earthwork and grading contemplated for site preparation
should be accomplished in accordance with the attached Recomnended Grading
Specifications and Special Provisions. All special site preparation
recomnendations presented in the sections above will supersede those in
the standard Recommended Grading Specifications. All embankments, struct-
ural fill, and fill should be compacted to a minimum of 90%. Utility
trench backfill within 5 feet of the proposed structures and beneath
asphalt pavements should be compacted to a minimum of 90% of its maximum
dry density. The maximum dry density of each soil type should be deter-
mined in accordance with A.S.T.M. Test Method 1557-78, Method A or C.
SOUTHERN CALIFORNIA SCIIL AND TESTING. INC.
SCS&T 25170 October 1, 1984 Page 6
FOUNDATIONS
GEWERAL: It is our opinion that the proposed structure may be supported
by spread footings. All footings should be founded at least 12 inches '
below lowest adjacent finished grade with a minimum width of 12 inches.
An allowable soil bearing pressure of 1800 pounds per square foot may be
used for foundation design. We further reconmend that all continuous
footings be reinforced with at least one No. 4 bar top and bottom.
LATERAL RESISTANCE: Resistance to lateral loads may be provided by fric-
tion at the base of the footing and by passive pressure against the adja-
cent soil. For concrete footings on compacted soil, a coefficient of
friction of 0.38 may be used. For calculating passive pressure, an equiva-
lent fluid unit weight of 250 pounds per cubic foot may be used. Passive
pressure should not exceed 1,500 pounds per square foot. When combining
frictional and passive resistance, the latter should be reduced by one-
third.
SETTLEMENT CWARACTERISTICS: The anticipated total and/or differential
settlements for the proposed structure may be considered to be within
tolerable limits provided the recommendations presented in this report are
followed.
EXPANSIVE CHARACTERISTICS: The prevailing foundation soils were found to
be nondetrimentally expansive and will not require special consideration
and/or design.
LIMITATIONS
REVIEW, OBSERVATION AND TESTING
The recomnendations presented in this report are contingent upon our
review of final plans and specifications. The soil engineer and engineer-
SOUTHERN CALIFORNIA 501L AND TESTING. INC
SCS&T 25170 October I, 1984 Page 7
ing geologist should review and verify the compliance of the final grading
plan with this report and with Chapter 70 of the Uniform Building Code.
It is recornnended that Southern California Soil and Testing, Inc. be
retained to provide continuous soil egineering services during the earth-
work operations. This is to observe compliance with the design concepts,
specifications or recommendations and to allow design changes in the event
that subsurface conditions differ from that anticipated prior to start of
construction.
UNIFWIITY OF CONDITIONS
The recommendations and opinions expressed in this report reflect our best
estimate of the project requirements based on an evaluation of the subsur-
face soil conditions encountered at the subsurface exploration locations
and the assumption that the soil conditions do not deviate appreciably
from those encountered. It should be recognized that the performance of
the foundations and/or cut and fill slopes may be influenced by undis-
closed or unforeseen variations in the soil conditions that may occur in
the intermediate and unexplored areas. Any unusual conditions not covered
in this report that may be encountered during site development should be
brought to the attention of the soils engineer so that he may make modifi-
cations if necessary.
CHANGE IN SCOPE
This office should be advised of any changes in the project scope or
proposed site grading so that it may be determined if the recommendations
contained herein are appropriate. This should be verified in writing or
modified by a written addendum.
SOUTHERN CALIFORNIA 50,L AND T E 5 T, N 0. I N c.
SCS&T 25170 October 1, 1984 Page 8
TIME LIMITATIONS
The findings of this report are valid as of this date. Changes in the
condition of a property can, however, occur with the passage of time,
whether they be due to natural processes or the work of man on this or
adjacent properties. In addition, changes in the State-of-the-Art and/or
Government Codes may occur. Due to such changes, the findings of this
report may be invalidated wholly or in part by changes beyond our control.
Therefore, this report should not be relied upon after a period of two
years without a review by us verifying the suitability of the conclusions
and recommendations.
PROFESSIONAL STANDARD
In the performance of our professional services, we comply with that level
of care and skill ordinarily exercised by members of our profession cur-
rently practicing under similar conditions and in the same locality. The
client recognizes that subsurface conditions may vary from those encoun-
tered at the locations where our borings, surveys, and explorations are
made, and that our data, interpretations, and recommendations are based
solely on the information obtained by US. We will be responsible for
those data, interpretations, and recommendations, but shall not be respon-
sible for the interpretations by others of the information developed. Our
services consist of professional consultation and observation only, and no
warranty of any kind whatsoever, express or implied, is made or intended
in connection with the work performed or to be performed by us, or by our
proposal for consulting or other services, or by our furnishing of oral or
written reports or findings.
CLIENT'S RESPONSIBILITY
It is the responsibility of 6. T. W., or their representative to ensure
that the information and recommendations contained herein are brought to
SOUTHERN CALIFORNIA SOIL AND TESTINCi. INC
SCS&T 25170 October 1, 1984 Page 9
the attention of the engineer and architect for the project and incorpo-
rated into the project's plans and specifications. It is further their
responsibility to take the necessary measures to ensure that the contrac-
tor and his subcontractors carry out such recommendations during construc-
tion.
FIELD EXPLORATIONS
Two subsurface explorations were made at the locations indicated on the
attached Plate Number 1 on September 14, 1984. These explorations con-
sisted of trenches dug by means of a backhoe. The field work was con-
ducted under the observation of our engineering geology personnel.
The explorations were carefully logged when made. These logs are presen-
ted on the following Plate Numbers 3 and 4. The soils are described in
accordance with the Unified Soils Classification System as illustrated on
the attached simplified chart on Plate Number 2. In addition, a verbal
textural description, the wet color, the apparent moisture and the density
or consistency are presented. The density of granular material is given
as either very loose, loose, medium dense, dense or very dense.
Disturbed and "undisturbed" samples of typical and representative soils
were obtained and returned to the laboratory for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. A brief description of the tests performed is
presented below:
SOUTHERN CALIFORNIA 501L AND TESTING. INC
SCS&T 25170 October 1, 1984 Page 10
a)
b)
cl
d)
MOISTlJRE-DENSITY: Field moisture content and dry density were
determined for representative undisturbed samples 'obtained. This
information was an aid to classification and permitted recogni-
tion of variations in material consistency with depth. The dry
unit weight is determined in pounds per cubic foot, and the field
moisture content is determined as a percentage of the soil's dry
weight. The results are sununarized in the trench logs.
CLASSIFICATION: Field classifications were verified in the
laboratory by visual examination. The final soil classifications
are in accordance with the Unified Soil Classification System.
DIRECT SHEAR TESTS: Direct shear tests were performed to deter-
mine the failure envelope based on yield shear strength. The
shear box was designed to accomodate a sample having a diameter
of 2.375 inches or 2.50 inches and a height of 1.0 inch. Samples
were tested at different vertical loads and at saturated moisture
content. The shear stress was applied at a constant rate of
strain of approximately 0.05 inches per minute. The results of
these tests are presented on attached Plate Number 5.
CDHPACTION TEST: The maximum dry density and optimum moisture
content of typical soils were determined in the laboratory in
accordance with A.S.T.M. Standard Test O-1557-70, Method A. The
results of these tests are presented on the attached Plate Number
5.
SDUTHERN CALIFORNIA SOIL AND T E 5 T I N G. I N c.
,:. h .i? 6 5
.T’.L” ‘p
co1.z cues,~, ---- - 4 c-&L:
SCALE i%40’
LEGEND:
m TRENCH LOCATION
SOUTHERN CALIFORNIA
SOIL & TESTING,INC. sv: SHS DATE: g-26-84
JOB NUMBER: 25170 Plate No. 1
SUBSURFACE EXPLORATION LEGEND
.*.
UNIFIED SOIL cLASS*FIcATION Cx4RT
.son. DESCRIPT*ON GROUP SynaO‘ TYPIC~ NAXES
1. COARSE GRAIYED, “ore elIan half Of material is &gqg than No. 200 sieve *it*. m CLEAN GIUVELS GH we11 graded gravels, gravel- More than half OL sand mixtures, little or no coarse fnction is fines.
larger than Ha. 4 GP Poorly graded gravels, gravel
*ieve size but sand mixtures, little or no
*ma11rr than 3". - fines. GP.AvET.S WITH FINES GN ;si1ey qrave1r. pOor1y gr&a ,*ppreci?L& amoY@.t gravel-sand-silt mixtures. of fines) .GC Clayey gravr1a. paxly graded gravel-**rd. clay mixture,, .
CLEAN SA.NDS SW we11 graded ran&ave11y nor* than half or *and*, little oFno fill**. co*rs* fraction is SP Poorly graded .an~.,gra"elly smaller than NO. 4 **"ds, little or "0 co**. sieve *ink. SANDS WITH FINES SM si1ey rands, paor1y gr*ded mDereci*blc amount *ana *Iv3 silt mixture*. . . of fines) SC Clayey sands, poorly graded sand and clay mixtures.
11. -PME G?.AINm, “ore than half of material 11 *mailer than NO. 200 ricvc .ile. SILTS ANO CLAYS
.:
Liquid Limit less than 50
STLT.5 Am MYS
ML. Inormmic silts *nd V*N tina~sands, rock rl."r,-.andv *ilC or clayey-silt-sand nixeurer with slight plaat- i&b Inor&tnic clays of lud to medium plasticity,gravelly clays, sandy cla**,silty clay.. lean e1ayr. Organic stlta and organic silty clays of 1s~ plasticity IInorgnnic silts. micacaous or diaenoaceous tine *andy or silty roils, elastic
Liquid'Limit .*ilts. pi Inorganic clays of high greater than* 50 , pkat1city. tat e1aya. -.a-! Organic clay* of medium to high plas+city.
HJGi(LY ORGANIC SOILS IT Peat *n* other highly organic roils.
f ‘:. __.
- Water level at rime of.ex:avation or as indicated
us - lJndisturbecl,,dri;en ring samole 6r tube sample
CK =_
.,.,
Undisturb<d cl&~< sample
'
BS - Bulk sample
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
mm-0 q ,“LmDAL= STRIZET
IAN D1.00, CIILlEOEINlA rnP,DO
BY OATE g-26-84
JOB NO. 25170 Plate No. 2
: ii 2 c TRENCH NUMBER 1 I- w c;* z &Iii 2 7
= Jo’ EC tzc YI~V) iii = ,ws =z cct;z z- :* s: ‘I: c iI ELEVATION
i “,” kfi “5. 2;;: “0; -P z;
; :: “,=a 6; LGa iz :, z “,” 2 =z 0 0 DESCRIPTION :
SM Reddish Brown, Silty Dry Loose
Sand (Fill) 1 CK SM
- BG Brown To Reddish Brown, Humid Medium 114.5 4.5
z- Silty Sand Dense
(Native)
3- CK 101.1 3.1
4-
5-
5-
7-
_ CK
3-
3-
1r
lr-
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTlNG,lNC. LOGGED BY: CRB DATE LOGGED:9-14-B4
JOB NUMBER:
z E E ; TRENCH NUMBER 2 k” kc> E ii ;
: zzb w-
= ,z :z Luyu) Ej : ;; cc+2 z- Y 5;
0 G. ELEVATION “,” 5; <I?u
E i
;t zw
mii 2”O -0
:,” 6: ig
i 2 z +? o 2
O *
EO =0
ci
0
DESCRIPTION
0
SM Reddish Brown, Silty Dry Loose To
Medium
1- Sand Dense
_ CK
z- BG
3- CK
4
- CK SM Dark Brown, Silty Sand Humid Medium 96.4 5.5
5- BG
-Dense
6- CK 96.2 5.7
7- CK
B-
9-
UJ-
li-
SOUTHERN CALIFORNIA SUBSURFACE EXPLORATION LOG
SOIL & TESTING,INC. LOGGED BY: DATE LOGGED: g-14-84 RR
JOB NUMBER: pj170 Plate No. 4
DIRECT SHEAR TEST RESULTS
DESCRIPTION
MAXIMUM DENSITY and OPTIMUM MOISTURE CONTENT
ASTM 1557 - 78 A METHODS
DESCRIPTION
SOUTHERN CALIFORNIA
BOIL 6 TESTINGI, INC. . ..O II”.“PAL. .T”..T ..N m.00. CALICOmNIA ..,.)O
BY RRR DATE 10-2-84
JOB NO. 25170 Plate No. 5
.
m stonaora s/eves Uydromet er
2. I. Y$ % YO e?a wl llBLl fMlnu/L?Sl
Groin Sfze fmnd
PARTICLE SIZE LIMITS I
I eCuLDER~COEeLES GRAVEL I SAND SILT OR CLAY
, GJar*a Fine cmrra Medium Fill*
(12 in.) I
3 in. 3/4 la No.4 NalO NO43 No. 200
u. s. ST4NDARD .SICVE SIZE
SAMPLE T-l (h l-2
SCS&T 25170 October 1, 1984 Appendix, Page 1
WORTHING-JONES RESIDENCES, 1644 TAMRACK AVENUE, CARLSBAD
RECOMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS
GENERAL INTENT
The intent of these specifications is to establish procedures for clear-
ing, compacting natural ground, preparing areas to be filled, and placing
and compacting fill soils to the lines and grades shown on the accepted
plans. The recommendations contained in the preliminary soil investiga-
tion report and/or the attached Special Provisions are a part of the
Recommended Grading Specifications and shall supersede the provisions
contained hereinafter in the case of conflict. These specifications shall
only be used in conjunction with the soil report for which they are a
part. No deviation from these specifications will be allowed, except
where specified in the soil report or in other written communication
signed by the Soil Engineer.
OBSERVATION AND TESTING
Southern California Soil & Testing, Inc. shall be retained as the Soil
Engineer to observe and test the earthwork in accordance with these speci-
fications. It will be necessary that the Soil Engineer or his representa-
tive provide adequate observation so that he may provide an opinion that
the work was or was not accomplished as specified. It shall be the re-
sponsibility of the contractor to assist the soil engineer and to keep him
apprised of work schedules, changes and new information and data so that
he may provide these opinions. In the event that any unusual conditions
not covered by the special provisions or preliminary soil report are
encountered during the grading operations, the Soil Engineer shall be
contacted for further recommendations.
SCS&T 25170 October 1, 1984 Appendix, Page 2
8 If, in the opinion of the Soil Engineer, substandard conditions are en-
countered, such as; questionable or unsuitable soil, unacceptable moisture
content, inadequate compaction, adverse weather, etc., he will be empower-
ed to either stop construction until the conditions are remedied or cor-
rected or recommend rejection of this work.
Test methods used to determine the degree of compaction should be per-
formed in accordance with the following American Society for Testing and
Materials test methods:
Maximum Density & Optimum Moisture Content - A.S.T.M. D-1557-78.
Density of Soil In-Place - A.S.T.M. D-1556-64 or A.S.T.M. D-2922.
All densities shall be expressed in terms of Relative Compaction as deter-
mined by the foregoing A.S.T.M. testing procedures.
PREPARATION OF AREAS TO RECEIVE FILL
All vegetation, brush and debris derived from clearing operations shall be
removed, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished apperance, free from unsightly
debris.
Any abandoned buried structures encountered during grading operations must
be totally removed. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of the structure
and properly capped off. The resulting depressions from the above des-
cribed procedures should be backfilled with acceptable soil that is com-
pacted to the requirements of the Soil Engineer. This includes, but is
not limited to, septic tanks, fuel tanks, sewer lines or leach lines,
SDUTNERN CALIFORNI* 501L AND TESTING. I N c.
SCS&T 25170 October 1, 1984 Appendix, Page 3
storm drains and water lines. Any buried structures or utilities not to
be abandoned should be investigated by the Soil Engineer to determine if
any special recommendation will be necessary.
All water wells which will be abandoned should be backfilled and capped in
accordance to the requirements set forth in the Geotechnical Report. The
top of the cap should be at least 4 ~feet below finish grade or 3 feet
below the bottom of footing whichever is'greater. The type of cap will
depend on the.diameter of the well and should be determined by the Soil
Engineer and/or a qualified Structural Engineer,
When the slope of the natural ground receiving fill exceeds 20% (5 hori-
zontal units to 1 vertical unit), the original ground shall be stepped or
benched. Benches shall be cut to a firm competent soil condition. The
lower bench shall be at least 10 feet wide or 1 l/2 times the equipment
width which ever is greater and shall be sloped back into the hillside at
a gradient of not less than two (2) percent. All other benches should be
at least 6 feet wide. The horizontal portion of each bench shall be
compacted prior to receiving fill as specified hereinbefore for compacted
natural ground. Ground slopes flatter than 20% shall be benched when
considered necessary by the Soil Engineer.
After clearing or benching, the natural ground in areas to be filled shall
be scarified to a depth of 6 inches, brought to the proper moisture con-
tent, compacted and tested for the minimum degree of compaction in the
Special Provisions or the recommendation contained in the preliminary soil
investigation report. All loose soils in excess of 6 inches thick should
be removed to firm natural ground which is defined as natural soil which
possesses an in--situ density of at least 85% of its maximum dry density.
SOUTHERN CALIFORNIA SOIL AND TESTINO. I N c.
SCS&T 25170 October 1, 1984 Appendix, Page'4
FILL MATERIAL
Materials placed in the fill shall be approved by the soil engineer and
shall be free of vegetable matter and other deleterious substances. Gran-
ular soil shall contain sufficient fine material to fill the voids. The
definition and disposition of oversized rocks, expansive and/or detrimen-
tal soils are covered in the soils report or Special Provisions. Expan-
sive soils, soils of poor gradation, or soils with low strength character-
istics may be thoroughly mixed with other soils to provide satisfactory
fill material, but only 'with the explicit consent of the soil engineer.
Any import material shall be approved by the Soil Engineer before being
brought to the site.
PLACING AND COMPACTION OF FILL
Approved fill material shall be placed in areas prepared to receive fill
in layers not to exceed 6 inches in compacted thickness. Each layer shall
have a uniform moisture content in the range that will allow the compac-
tion effort to be efficiently applied to achieve the specified degree of
compaction. Each layer shall be uniformly compacted to the minimum speci-
fied degree of compaction with equipment of adequate size to economically
compact the layer. Compaction equipment should either be specifically
designed for soil compaction or of proven reliability. The minimum degree
of compaction to be achieved is specified in either the Special Provisions
or the recommendations contained in the preliminary soil investigation
report.
When the structural fill material includes rocks, no rocks will be allowed
to nest and all voids must be carefully filled with soil such that the
minimum degree of compaction recommended in the Special Provisions is
SOUTHERN C*LIFORNI* 501l. AND TESTINO. 1 N 0.
SCS&T 25170 October 1, 1984 Appendix, Page 5
achieved. The maximum size and spacing of rock permitted in structural
fills and in non-structural fills is discussed in the soil report, when
applicable.
Field observation and compaction tests to estimate the degree of compac-
tion of the fill will be taken by the Soil Engineer or his representative.
The location and frequency of the tests shall be at the Soil Engineer's
discretion. When the compaction test indicates that a particular layer is
less than the required degree of compaction, the layer shall be reworked
to the satisfaction of the Soil Engineer and until the desired relative
compaction has been obtained.
Fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable equipment. Compaction by sheepsfoot rollers shall be at vertical
intervals of not greater than four feet. In addition, fill slopes at
ratios of two horizontal to one vertical or flatter, should be track-
rolled. Steeper fill slopes shall be over-built and cut-back to finish
contours. Slope compaction operations shall result in all fill material
six or more inches inward from the finished face of the slope having a
relative compaction of at least 90% of maximum dry density or that speci-
fied in the Special Provisions section of this specification. The compac-
tion operation on the slopes shall be continued until the Soil Engineer is
satisfied that the slopes will be stable in regards to surficial stabil-
ity.
Slope tests will be made by the Soils Engineer during construction of the
slopes to determine if the required compaction is being achieved. Where
failing tests occur or other field problems arise, the Contractor will be
notified that day of such conditions by written communication from the
Soil Engineer in the form of a daily field report.
SOUTHERN CAL,FORNIA SO!L AND TESTING. I N c.
SCS&T 25170 October 1, 1984 Appendix, Page 6
If the method of achieving the required slope compaction selected by the
Contractor fails to produce the necessary results, the Contractor shall
rework or rebuild such slopes until the required degree of compaction is
obtained, at no additional cost to the Owner or Soils Engineer.
CUT SLOPES
The Engineering Geologist shall inspect all cut slopes excavated in rock
or lithified formational material during the grading operations at inter-
vals determined at his discretion. If any conditions not anticipated in
the preliminary report such as perched water, seepage, lenticular or
confined strata of a potentially adverse nature, unfavorably inclined
bedding, joints or fault planes are encountered during grading, these
conditions shall be analyzed by the Engineering Geologist and Soil Engi-
neer to determine if mitigating measures are necessary.
Unless otherwise specified in the soil and geological report, no cut
slopes shall be excavated higher or steeper than that allowed by the
ordinances of the controlling governmental agency.
ENGINEERING OBSERVATION
Field observation by the Soil Engineer or his representative shall be made
during the filling and compacting operations so that he can express his
opinion regarding the conformance of the grading with acceptable standards
of practice. The presence of the Soil Engineer or his representative or
the observation-and testing shall not release the Grading Contractor from
his duty to compact all fill material to the specified degree of compac-
tion.
S”I,TUEC)N C.LIFDRNIA 50,L AND TESTING. INC
SCS&T 25170 October 1, 1984 Appendix, Page 7
SEASON LIMITS
Fill shall not be placed during unfavorable weather conditions. When work
is interrupted by heavy rain, filling operations shall not be resumed
until the proper moisture content and density of the fill materials can be
achieved. Damaged site conditions resulting from weather or acts of God
shall be repaired before acceptance of work.
RECOMMENDED GRADING SPECIFICATIONS-SPECIAL PROVISIONS
The minimum degree of compaction to be obtained in compacting natural
ground, in the compacted fill, and in the compacted backfill shall be at
least 90 percent.
Detrimentally expansive soil is defined as soil which will swell more than
3 percent against a pressure of 150 pounds per square foot from a condi-
tion of 90 percent of maximum dry density and air dried moisture content
to saturation.
Oversized fill material is defined as rocks or lumps over 6 inches in
diameter. At least 40 percent of the fill soils shall pass through a No.
4 U.S. Standard Sieve.
Transition Lots: Where transitions between cut and fill occur within the
proposed building pad, the cut portion should be undercut a minimum of one
foot below the base of the proposed footings and recompacted as structural
backfill.
SOUTHERN CALIFORNIA SOIL AND T E 5 T 0 N 0. I N c.