FINAL REPORT OF TESTING
AND OBSERVATION SERVICES
DURING SITE GRADING
VILLAGE B
RANCHO CARRILLO
CARLSBAD, CALIFORNIA
PREPARED FOR
CONTINENTAL RANCH INC.
SAN DIEGO, CALIFORNIA
SEPTEMBER 1998
GEOCON
INCORPORATED
GEOTECHNICAL CONSULTANTS
Project No. 05845-12-16
September 25, 1998
Continental Ranch Inc.
12230 El Camino Real, Suite 300
San Diego, California 92130
Attention: Mr. Dave Lother
Subject: VILLAGE B
RANCHO CARRILLO
CARLSBAD, CALIFORNIA
FINAL REPORT OF TESTING AND OBSERVATION
SERVICES DURING SITE GRADING
Gentlemen:
In accordance with your request and, our proposals dated December 6, 1996 and April 1, 1998 , we
have provided compaction testing and observation services during the mass grading and fine grading
of the subject site. Our services were performed during the period of December 16, 1996 through
August 12, 1998. The scope of our services included the following:
• Observing the grading operation, including the removal and/or processing of loose topsoils,
colluvium, alluvium .
• Performing in-place density tests in fill placed and compacted at the site.
• Performing laboratory tests to aid in evaluating the compaction, expansion, and shear
strength characteristics of various soil conditions encountered and/or used for fill.
• Providing on-site geologic consultation services to verify that grading was performed in
substantial conformance with the recommendations of preliminary project geotechnical
report.
• Preparing an "As-Graded" Geologic Map.
• Preparing this final report of grading.
GENERAL
The grading contractor for the mass grading phase of the project was Sukut Construction,
Incorporated. The fine grading operations were performed by Signs and Pinnick. The project mass
6960 Flanders Drive • San Diego, California 92121-2974 • Telephone (619) 558-6900 • Fax (619) 558-6159
grading plans were prepared by Rick Engineering Company and are entitled Grading Plans for
Rancho Carrillo, Sheets 7, 22 and 23 with the City of Carlsbad approval dated November 14, 1996.
The fine grading plans were also prepared by Rick Engineering Company and are entitled Grading
and Erosion Plans for Rancho Carrillo, Villages A, B, C andD, C.T.. 97-02, Sheets 4 and 5, with the
City of Carlsbad approval dated May 6, 1998. The project soils report is entitled: Preliminary
Geotechnical Investigation, Villages A, B, C and D, Rancho Carrillo, Carlsbad, California,
prepared by Geocon Incorporated, dated March 3, 1993, Updated on July 14, 1997.
References to elevations and locations herein were based on surveyor's or grade checker's stakes in
the field and/or interpolation from the referenced Grading Plans. Geocon Incorporated did not
provide surveying services and, therefore, has no opinion regarding the accuracy of the as-graded
elevations or surface geometry with respect to the approved grading plans or proper surface
drainage.
Major canyons have been labeled with "alpha" designations in order to facilitate addressing their
locations during the documentation of grading operations. Two of the tributaries of Canyon A are
located within the northern portion of the project site.
GRADING
Mass grading of Village B occurred during the period of January 2, 1997 through May 5, 1998. Fine
grading reported herein was performed during the period of June 3, through August 12, 1998.
Grading began with the removal of brush and vegetation from the area to be graded. In addition to
the vegetation, topsoils, colluvium , and alluvium were removed to firm natural ground. In general,
the alluvial deposits were removed in segments. After removal, the excavations were observed by an
engineering geologist to verify that unsuitable materials had been removed and dense formational
soils were exposed at the base of the cleanouts. Canyon subdrains were then installed.
Prior to placing fill, the exposed ground surface was scarified, moisture conditioned, and compacted.
Fill soils derived from on-site excavations and the surrounding areas were then placed and
compacted in layers until the design elevations were attained. In general, the fill materials consist of
grayish brown clayey sand and greenish brown sandy clay to very light brown silty sand.
During the grading operation, compaction procedures were observed and in-place density tests were
performed to evaluate the relative compaction of the fill material. The in-place density tests were
performed in general conformance with ASTM Test Method D-2922-81. The results of the in-place
dry density and moisture content tests are summarized on Table I. In general, the in-place density
test results indicate that the fill soil has a relative compaction of at least 90 percent at the locations
Project No. 05845-12-16 ~- September 25, 1998
tested. The approximate locations of the in-place density tests are shown on Figures 1 and 2. It
should be noted that since the grading of Village B was performed in conjunction with the grading
for Villages A, C, and D, the field density test numbers are not in sequential order.
Laboratory tests were performed on samples of material used for fill to evaluate moisture-density
relationships, optimum moisture content and maximum dry density (ASTM D-1557-91), shear
strength and expansion characteristics. The results of the laboratory tests are summarized in
Tables II through IV.
Slopes
In general, the cut and fill slopes have planned inclinations of 2:1 (horizontal: vertical) or flatter,
with maximum height of approximately 25 and 27 feet respectively. The fill slopes were either over-
filled and cut back or were track-walked with a bulldozer during grading.
Stability fills were constructed at two locations (see Figures 1 and 2) along the south facing slope
bordering the north edge of the village due to the presence of previously placed fill. No seepage was
observed in the backcut, therefore, heel drains were not placed within these stability fills.
All slopes should be planted, drained, and maintained to reduce erosion. Slope irrigation should be
kept to a minimum to just support the vegetative cover. Surface drainage should not be allowed to
flow over the top of the slope.
Subdrains
Canyon subdrains associated with the Canyon A tributaries connect to the Canyon A subdrain which
drains into the open space off site. The subdrains were "as built" for location and elevation by Rick
Engineering Company are shown on the attached as-graded geologic maps.
Finish Grade Soil Conditions
Based on laboratory test results, the prevailing soil conditions within approximately the upper 3 feet
of rough pad grade on each lot have an Expansion Index of 37 to 103 (Table V), and are classified as
having a "low" to "high" expansion potential as defined by the Uniform Building Code (UBC)
Table 18-I-B.
Project No. 05845-12-16 - 3 - September 25, 1998
It should be noted that although rocks or concretions larger than 12 inches were not intentionally
placed within the upper 3 feet of pad grade, some may exist at random locations. Highly cemented
concretions may also exist within cut portion of the project site.
SOIL AND GEOLOGIC CONDITIONS
The soil and geologic conditions encountered during grading were found to be similar to those
described in the project geotechnical report. In general, the compacted fill soils are underlain by
formational soils of the Delmar Formation.
The enclosed As-Graded Geologic Map (Figures 1 and 2) depicts the general geologic conditions
observed. No soil or geologic conditions were observed during grading which would preclude the
continued development of the property as planned.
CONCLUSIONS AND RECOMMENDATIONS
1.0. General
1.1. Based on observations and test results, it is the opinion of Geocon Incorporated that the
grading, which is the subject of this report, has been performed in substantial conformance
with the recommendations of the previously referenced project soil report. Soil and
geologic conditions encountered during grading which differ from those anticipated by the
project soil report are not uncommon. Where such conditions required a significant
modification to the recommendations of the project soil report, they have been described
herein.
2.0. Future Grading
2.1. Any additional grading performed at the site should be accomplished in conjunction with
our observation and compaction testing services. All trench backfill in excess of one-foot
thick should be compacted to at least 90 percent relative compaction. This office should be
notified at least 48 hours prior to commencing additional grading or backfill operations.
3.0. Liquefaction Potential
3.1. The site is underlain by fine grained compacted fill and dense formational soils. Near
surface permanent groundwater is not present. Therefore, it is our opinion that the soils on
the site are stable and the potential for liquefaction is remote.
Project No. 05845-12-16 - 4 - September 25, 1998
4.0. Foundations
4.1. It is understood that site improvements will consist of multi-story structures, however,
development plans were not available at this time. It is recommended that Geocon
Incorporated be retained to review the proposed building layout and structure dimensions
and prepare an update report with development specific foundation design
recommendations considering the as-graded conditions
5.0. Retaining Walls And Lateral Loads
5.1. Retaining walls not restrained at the top and having a level backfill surface should be
designed for an active soil pressure equivalent to the pressure exerted by a fluid density of
30 pounds per cubic foot (pcf). Where the backfill will be inclined at no steeper than 2.0
to 1.0, an active soil pressure of 40 pcf is recommended. These soil pressures assume that
the backfill materials within an area bounded by the wall and a 1:1 plane extending
upward from the base of the wall possess an Expansion Index of less than 50. For those
lots with finish grade soils having an Expansion Index greater than 50 and/or where
backfill materials do not conform to the above criteria, Geocon Incorporated should be
consulted for additional recommendations.
5.2. Unrestrained walls are those that are allowed to rotate more than 0.001H at the top of the
wall. Where walls are restrained from movement at the top, an additional uniform
pressure of 7H psf (where H equals the height of the retaining wall portion of the wall in
feet) should be added to the above active soil pressure
5.3. All retaining walls should be provided with a drainage system adequate to prevent the
buildup of hydrostatic forces and should be waterproofed as required by the project
architect. The use of drainage openings through the base of the wall (weep holes, etc.) is
not recommended where the seepage could be a nuisance or otherwise adversely impact
the property adjacent to the base of the wall. The above recommendations assume a
properly compacted granular (Expansion Index less than 50) backfill material with no
hydrostatic forces or imposed surcharge load. If conditions different than those described
are anticipated, or if specific drainage details are desired, Geocon Incorporated should be
contacted for additional recommendations.
5.4. In general, wall foundations having a minimum depth and width of one foot may be
designed for an allowable soil bearing pressure of 2,000 psf, provided the soil within 3 feet
below the base of the wall has an Expansion Index of less than 90. The proximity of the
Project No. 05845-12-16 - 5 - September 25, 1998
foundation to the top of a slope steeper than 3:1 could impact the allowable soil bearing
pressure. Therefore, Geocon Incorporated should be consulted where such a condition is
anticipated.
5.5. For resistance to lateral loads, an allowable passive earth pressure equivalent to a fluid
density of 300 pcf is recommended for footings or shear keys poured neat against properly
compacted granular fill soils or undisturbed natural soils. The allowable passive pressure
assumes a horizontal surface extending at least 5 feet or three times the surface generating
the passive pressure, whichever is greater. The upper 12 inches of material not protected
by floor slabs or pavement should not be included in the design for lateral resistance. An
allowable friction coefficient of 0.4 may be used for resistance to sliding between soil and
concrete. This friction coefficient may be combined with the allowable passive earth
pressure when determining resistance to lateral loads.
5.6. The recommendations presented above are generally applicable to the design of rigid
concrete or masonry retaining walls having a maximum height of 8 feet. In the event that
walls higher than 8 feet or other types of walls are planned, such as crib-type walls,
Geocon Incorporated should be consulted for additional recommendations.
6.0. Slope Maintenance
6.1. Slopes that are steeper than 3:1 (horizontal:vertical) may, under conditions which are both
difficult to prevent and predict, be susceptible to near surface (surficial) slope instability.
The instability is typically limited to the outer three feet of a portion of the slope and
usually does not directly impact the improvements on the pad areas above or below the
slope. The occurrence of surficial instability is more prevalent on fill slopes and is
generally preceded by a period of heavy rainfall, excessive irrigation, or the migration of
subsurface seepage. The disturbance and/or loosening of the surficial soils, as might result
from root growth, soil expansion, or excavation for irrigation lines and slope planting, may
also be a significant contributing factor to surficial instability. It is, therefore,
recommended that, to the maximum extent practical: (a) disturbed/loosened surficial soils
be either removed or properly recompacted, (b) irrigation systems be periodically
inspected and maintained to eliminate leaks and excessive irrigation, and (c) surface drains
on and adjacent to slopes be periodically maintained to preclude ponding or erosion.
Although the incorporation of the above recommendations should reduce the potential for
surficial slope instability, it will not eliminate the possibility, and, therefore, it may be
necessary to rebuild or repair a portion of the project's slopes in the future.
Project No. 05845-12-16 - 6 - September 25, 1998
7.0. Drainage
7.1. Adequate drainage provisions are imperative. Under no circumstances should water be
allowed to pond adjacent to footings. The building pads should be properly finish graded
after the buildings and other improvements are in place so that drainage water is directed
away from foundations, pavements, concrete slabs, and slope tops to controlled drainage
devices.
8.0. Plan Review
8.1. Geocon Incorporated should be provided the opportunity to review the finish grading plans
and site development plans prior to finalizing. At that time, the foundation design
recommendations can be updated considering the building sizes and locations as related to
the underlying fill conditions.
LIMITATIONS
The conclusions and recommendations contained herein apply only to our work with respect to
grading, and represent conditions at the date of our final observation August 12, 1998. Any
subsequent grading should be done in conjunction with our observation and testing services. As
used herein, the term "observation" implies only that we observed the progress of the work with
which we agreed to be involved. Our services did not include the evaluation or identification of the
potential presence of hazardous or corrosive materials. Our conclusions and opinions as to whether
the work essentially complies with the job specifications are based on our observations, experience,
and test results. Subsurface conditions, and the accuracy of tests used to measure such conditions,
can vary greatly at any time. We make no warranty, expressed or implied, except that our services
were performed in accordance with engineering principles generally accepted at this time and
location.
We will accept no responsibility for any subsequent changes made to the site by others, by the
uncontrolled action of water, or by the failure of others to properly repair damages caused by the
uncontrolled action of water. The findings and recommendations of this report may be invalidated
wholly or partially by changes outside our control. Therefore, this report is subject to review and
should not be relied upon after a period of three years.
Project No. 05845-12-16 - 7 - September 25, 1998
If you have any questions regarding this report, or if we may be of further service, please contact the
undersigned at your convenience.
Very truly yours,
3OCONINCQ
AS:DFL:mj
(4) Addressee
(2/del) Hunsaker & Associates
Attention: Ms. Mary Beth Murray
(2) Rick Engineering Company
Attention: Mr. Craig Kahlen
• If 99
CERTIRED
ENGINEERING
GEOLOGIST
08/31/99
Project No. 05845-12-16 September 25, 1998
fi ii 11 i i fl I!t; i ! fi li li fi ii ii if ii li f i
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
Test
No.
8
11
13
14
16
16A
19
19A
20
20A
20B
21
21A
21B
22
23
24
25
26
27
28
29
30
31
Date
01/06/97
01/07/97
01/08/97
01/08/97
01/09/97
02/06/97
01/31/97
01/31/97
02/03/97
02/03/97
02/04/97
02/03/97
02/03/97
02/04/97
02/05/97
02/05/97
02/05/97
02/05/97
02/06/97
02/06/97
02/06/97
02/06/97
02/06/97
02/06/97
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B '
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
413
417
419
421
423
423
415
415
408
408
408
420
420
420
407
412
418
414
410
416
417
415
428
429
Curve
No.
1
8
8
8
10
10
10
10
10
10
10
10
10
10
1
11
1
10
11
1
2
1
11
11
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
113.4
119.5
119.5
119.5
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
120.7
113.4
119.9
113.4
120.7
119.9
113.4
115.0
113.4
119.9
119.9
Opt.
Moist.
Cont.
(%)
14.6
12.6
12.6
12.6
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
14.6
13.6
14.6
11.0
13.6
14.6
14.8
14.6
13.6
13.6
Field
Dry
Dens .
(pcf)
104.4
108.7
107.8
108.5
104.6
110.2
103.4
109.6
105.2
106.3
110.3
102.1
106.8
109.8
103.7
110.3
104.2
112.3
110.4
104.1
105.7
103.0
108.5
110.2
Field
Moist.
Cont.
(%)
16.5
13.2
15.4
16.7
17.4
13.7
17.0
14.2
16.1
15.2
13.7
18.7
14.1
14.2
16.1
15.0
16.3
14.0
15.3
17.8
16.2
17.2
16.1
15.5
Field
Rel.
Comp.
(%)
92
91
90
91
87'
91
86
91
87
88
91
85
89
91
91
92
92
93
92
92
92
91
91
92
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
I 1 f I II II II 11 I 1 f I ! I 1 f ! I ! f ! f I I I I I I 1 I 1 I I
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
Test
No.
32
33
34
35
36
37
38
39
40
41
42
43
45
46
47
47A
48
48A
79
151
164
191
192
202
Date
02/06/97
02/06/97
02/07/97
02/07/97
02/07/97
02/10/97
02/10/97
02/10/97
02/10/97
02/10/97
02/10/97
02/10/97
02/10/97
02/10/97
02/11/97
03/26/97
02/11/97
03/26/97
03/17/97
03/21/97
03/21/97
03/26/97
03/26/97
03/27/97
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B :
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
417
419
413
421
416
419
418
421
431
421
425
423
424
425
425
425
427
427
393
398
408
420
421
423
Curve
No.
11
4
4
11
2
11
11
11
2
11
2
2
4
2
13
13
13
13
1
14
14
14
14
9
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
119.9
115.8
115.8
119.9
115.0
119.9
119.9
119.9
115.0
119.9
115.0
115.0
115.8
115.0
120.0
120.0
120.0
120.0
113.4
105.0
105.0
105.0
105.0
107.1
Opt.
Moist.
Cont.
(%)
13.6
15.7
15.7
13.6
14.8
13.6
13.6
13.6
14.8
13.6
14.8
14.8
15.7
14.8
13.2
13.2
13.2
13.2
14.6
19.8
19.8
19.8
19.8
17.1
Field
Dry
Dens .
(pcf)
109.6
104.8
106.3
112.8
106.3
110.7
108.2
110.4
104.7
111.2
103.6
106.6
104.5
105.9
104.1
110.4
102.4
109.2
102.9
96.2
95.5
94.8
95.4
100.2
Field
Moist.
Cont.
(%)
16.4
17.3
18.7
15.4
17.9
16.1
15.7
15.5
17.3
16.4
15.0
16.0
18.2
15.3
19.3
16.6
20.8
15.8
17.0
21.4
24.2
21.6
21.3
19.3
Field
Rel.
Comp.
(%)
91
91
92
94
92
92
90
92
91
93
90
93
90
92
87
92
85
91
91
92
91
90
91
94
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
i i i i i i 1 I i i I r i i i i i I i I i f ! i i f i i ) i i I i I i t i
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
Test
No.
204
224
225
228
237
245
254
258
260
263
264
265
266
267
269
270
279
280
281
282
283
284
285
286
Date
03/27/97
03/31/97
03/31/97
03/31/97
03/31/97
04/01/97
04/01/97
04/01/97
04/02/97
04/02/97
04/02/97
04/02/97
04/02/97
04/02/97
04/02/97
04/02/97
04/04/97
04/04/97
04/07/97
04/07/97
04/07/97
04/08/97
04/08/97
04/08/97
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B !
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
410
411
425
408
427
415
420
418
422
420
424
428
424
429
426
426
411
427
413
415
432
423
425
434
Curve
No.
16
9
4
1
9
14
14
9
9
1
14
14
14
14
14
14
17
17
21
21
21
16
14
4
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
114.2
107.1
115.8
113.4
107.1
105.0
105.0
107.1
107.1
113.4
105.0
105.0
105.0
105.0
105.0
105.0
112.2
112.2
118.1
118.1
118.1
114.2
105.0
115.8
Opt.
Moist.
Cont.
(%)
16.3
17.1
15.7
14.6
17.1
19.8
19.8
17.1
17.1
14.6
19.8
19.8
19.8
19.8
19.8
19.8
15.5
15.5
14.0
14.0
14.0
16.3
19.8
15.7
Field
Dry
Dens .
(pcf)
104.1
97.2
104.9
103.0
96.5
94.7
96.6
98.5
98.9
102.5
96.9
95.8
97.6
94.9
94.1
97.2
103.6
102.4
107.2
109.6
107.5
102.9
95.7
105.9
Field
Moist.
Cont.
(%)
17.2
19.5
16.4
16.2
20.4
23.0
22.0
20.6
20.4
16.7
20.3
20.5
20.2
21.0
22.5
20.8
17.3
18.2
16.9
17.0
16.2
19.2
22.0
18.2
Field
Rel.
Comp .
(%)
91
91
91
91
90
90
92
92
92
90
92
91
93
90
90
93
92
91
91
93
91
90
91
91
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
f I I I I I I I I i I 1 I I I I I I I I I 1 I 1 I 1 I' ! I 1 i i I I I I 1 1
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
Test
No.
287
288
296
297
298
299
300
301
359
364
369
386
387
388
389
390
391
392
395
396
400
401
403
404
Date
04/09/97
04/09/97
04/11/97
04/11/97
04/11/97
04/14/97
04/14/97
04/14/97
12/16/97
12/17/97
12/17/97
12/22/97
12/23/97
12/23/97
12/23/97
12/23/97
12/23/97
12/23/97
12/23/97
12/23/97
12/24/97
12/24/97
12/24/97
12/29/97
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
• I
VILLAGE B !
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
416
419
427
436
424
420
427
426
427
430
430
426
429
429
428
431
433
433
435
437
437
439
434
439
Curve
No.
21
21
21
16
17
26
12
26
1
19
4
17
2
17
20
2
24
2
15
15
4
24
24
26
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
118.1
118.1
118.1
114.2
112.2
120.0
114.7
120.0
113.4
112.8
115.8
112.2
115.0
112.2
114.3
115.0
117.4
115.0
116.8
116.8
115.8
117.4
117.4
120.0
Opt.
Moist.
Cont.
(%)
14.0
14.0
14.0
16.3
15.5
12.6
16.0
12.6
14.6
17.2
15.7
15.5
14.8
15.5
14.9
14.8
13.9
14.8
13.3
13.3
15.7
13.9
13.9
12.6
Field
Dry
Dens .
(pcf)
107.3
110.5
107.9
105.7
103.6
110.7
103.9
110.3
102.6
104.5
104.4
101.7
106.7
104.7
105.3
103.8
110.3
108.2
105.6
106.1
107.1
109.6
108.2
111.2
Field
Moist.
Cont.
(%)
16.0
13.9
15.1
16.3
16.7
14.0
19.5
14.4
16.7
19.6
17.1
16.8
15.2
16.3
12.9
14.5
16.5
13.7
15.3
14.9
17.4
13.7
15.5
12.7
Field
Rel.
Comp .
(%)
91
94
91
93
92
92
91
92
90
93
90
91
93
93
92
90
94
94
90
91
92
93
92
93
Req'd
Rel.
Comp.
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
flfiiiilfififilifliiiiiliiliiiitliliii
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
Test
No.
405
406
407
408
409
410
411
412
414
429
430
437
438
439
440
440A
441
442
443
444
446
447
450
457
Date
12/29/97
12/29/97
12/29/97
12/29/97
12/29/97
12/30/97
12/30/97
12/30/97
12/30/97
01/02/98
01/02/98
01/06/98
01/06/98
01/06/98
01/06/98
01/07/98
01/07/98
01/07/98
01/07/98
01/07/98
01/22/98
01/22/98
01/23/98
01/26/98
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
438
441
434
443
439
440
438
436
427
430
433
445
441
440
445
445
455
457
460
463
447
450
451
454
Curve
No.
2
24
2
26
24
26
26
19
10
1
1
26
26
4
26
26
20
26
4
4
4
4
4
24
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
115.0
117.4
115.0
120.0
117.4
120.0
120.0
112.8
120.7
113.4
113.4
120.0
120.0
115.8
120.0
120.0
114.3
120.0
115.8
115.8
115.8
115.8
115.8
117.4
Opt.
Moist.
Cont.
(%)
14.8
13.9
14.8
12.6
13.9
12.6
12.6
17.2
11.0
14.6
14.6
12.6
12.6
15.7
12.6
12.6
14.9
12.6
15.7
15.7
15.7
15.7
15.7
13.9
Field
Dry
Dens .
(pcf)
105.8
108.9
106.3
110.8
111.2
110.7
111.6
104.4
112.1
105.3
103.8
109.5
109.1
104.7
99.7
108.2
107.2
108.8
106.7
107.8
106.8
107.3
104.9
108.2
Field
Moist.
Cont.
(%)
18.4
16.5
18.1
14.2
13.8
13.0
12.3
17.9
13.6
17.5
18.0
14.2
13.3
17.2
15.2
13.3
15.6
12.8
16.5
17.8
18.0
16.8
18.5
13.7
Field
Rel.
Comp.
(%)
92
93
92
92
95
92
93
93
93
93
92
91
91
90
83
90
94
91
92
93
92
93
91
92
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
If II II it II II II II II II II II [I II II II II II II
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
ST
ST
FG
FG
FG
Test
No.
460
461
462
491
500
501
502
502R
503
503R
506
506A
509
510
515
516
527
528
528A
529A
543
543A
544
547
Date
01/26/98
01/29/98
01/29/98
03/09/98
03/11/98
03/11/98
03/12/98
03/11/98
03/12/98
03/11/98
03/19/98
03/20/98
03/20/98
03/20/98
03/24/98
03/24/98
04/30/98
04/30/98
05/02/98
05/02/98
05/01/98
05/02/98
05/01/98
05/01/98
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B '
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
426
450
457
431
428
430
427
427
428
428
434
434
429
430
431
435
434
436
436
432
430
430
432
427
Curve
No.
4
4
20
4
1
1
2
1
2
1
9
9
2
4
2
4
26
4
4
9
4
4
4
3
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
115.8
115.8
114.3
115.8
113.4
113.4
115.0
113.4
115.0
113.4
107.1
107.1
115.0
115.8
115.0
115.8
120.0
115.8
115.8
107.1
115.8
115.8
115.8
116.4
Opt.
Moist.
Cont.
(%)
15.7
15.7
14.9
15.7
14.6
14.6
14.8
14.6
14.8
14.6
17.1
17.1
14.8
15.7
14.8
15.7
12.6
15.7
15.7
17.1
15.7
15.7
15.7
13.6
Field
Dry
Dens .
(pcf)
104.8
107.1
103.4
107.5
105.8
106.9
105.3
96.9
104.7
98.3
94.8
101.2
104.0
106.4
107.1
103.7
114.5
98.7
106.2
100.5
100.9
107.3
104.4
107.9
Field
Moist.
Cont.
(%)
17.7
16.5
15.5
18.1
17.9
18.5
18.0
25.3
19.2
24.0
20.9
19.8
17.2
16.8
14.7
17.4
12.9
25.2
19.3
21.0
19.8
20.2
21.0
16.4
Field
Rel.
Comp.
(%)
91
92
90
93
93
94
92
85
91
87
89
94
90
92
93
90
95
85
92
94
87
93
90
93
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
f i i i i t f i i i i t i i i i i t f i i r i i r
Project No. 05845-12-01D (G)
Mass Grading
TABLE I
FIELD DENSITY TEST RESULTS
i i i i i i f i t )
FG
FG
FG
FG
FG
FG
FG
FG
FG
FG
Test
No.
548
558
558A
558B
559
559A
559B
560
560A
561
562
563
563A
566
567
568
Date
05/01/98
05/02/98
05/04/98
05/11/98
05/02/98
05/04/98
05/11/98
05/02/98
05/04/98
05/02/98
05/02/98
05/02/98
05/04/98
05/04/98
05/04/98
05/04/98
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
• i
VILLAGE B '
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE -B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
429
429
429
429
431
431
431
431
431
433
429
431
431
444
440
438
Curve
No.
26
1
1
1
1
1
1
1
1
4
1
4
4
4
2
4
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
120.0
113.4
113.4
113.4
113.4
113.4
113.4
113.4
113.4
115.8
113.4
115.8
115.8
115.8
115.0
115.8
Opt.
Moist.
Cont.
(%)
12.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
15.7
14.6
15.7
15.7
15.7
14.8
15.7
Field
Dry
Dens .
(pcf)
112.3
100.2
99.6
107.3
101.3
100.8
105.6
99.8
103.0
104.7
104.4
100.7
104.2
107.1
105.9
106.9
Field
Moist.
Cont.
(%)
16.6
21.1
21.5
18.1
20.6
20.8
17.1
19.7
19.2
15.4
17.3
22.2
20.4
18.4
16.6
17.0
Field
Rel.
Comp.
(%)
94
88
88
95
89
89
93
88
91
90
92
87
90
92
92
92
Req'd
Rel.
Comp.
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
I 1 II II II II II II II
Project No. 05845-12-16 (G)
Fine Grading
II II I I
TABLE I
FIELD DENSITY TEST RESULTS
r i f i r i i i i i f I f
Test
No.
601
602
603
604
605
606
613
614
615
616
617
618
619
620
621
621A
622
623
624
625
656
657
658
659
Date
06/05/98
06/05/98
06/05/98
06/05/98
06/05/98
06/05/98
06/05/98
06/05/98
06/05/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/08/98
06/11/98
06/11/98
06/12/98
06/12/98
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
433
433
435
432
438
436
439
442
444
434
435
435
436
437
432
432
446
441
444
433
436
435
441
448
Curve
No.
1
1
14
9
1
9
1
4
'24
1
1
16
16
16
4
4
24
4
4
2
101
101
16
101
Plus
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
113.4
113.4
105.0
107.1
113.4
107.1
113.4
115.8
117.4
113.4
113.4
114.2
114.2
114.2
115.8
115.8
117.4
115.8
115.8
115,0
115.6
115.6
114.2
115.6
Opt.
Moist.
Cont.
(%)
14.6
14.6
19.8
17.1
14.6
17.1
14.6
15.7
13.9
14.6
14.6
16.3
16.3
16.3
15.7
15.7
13.9
15.7
15.7
14.8
14.4
14.4
16.3
14.4
Field
Dry
Dens .
(pcf)
104.7
106.1
99.2
99.4
103.2
100.7
102.6
106.7
108.9
105.3
104.6
106.8
107.5
107.7
101.4
104.7
110.5
105.6
109.6
106.4
105.9
108.2
103.7
105.2
Field
Moist.
Cont.
(%)
17.8
16.6
23.2
20.5
19.6
22.2
18.1
17.2
17.3
17.9
16.2
18.4
17.2
17.5
18.5
18.0
13.4
17.4
19.1
18.3
19.5
17.6
20.4
16.5
Field
Rel.
Corap.
(%)
92
94
94
93
91
94
90
92
93
93
92
93
94
94
88
90
94
91
95
93
92
94
91
91
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
II II II II II II II !! I 1 • I 1 fl ft 11 I! II II II
TABLE I
FIELD DENSITY TEST RESULTS
II f
Project No. 05845-12-16 (G)
Fine Grading
ST
ST
FG
FG
FG
FG
FG
FG
FG
FG
FG
Test
No.
660
661
662
690
691
692
693
730
731
759
760
761
762
763
764
765
111
773
Date
06/12/98
06/12/98
06/12/98
06/16/98
06/16/98
06/16/98
06/16/98
07/28/98
07/28/98
08/04/98
08/04/98
08/04/98
08/04/98
08/04/98
08/04/98
08/04/98
08/12/98
08/12/98
Test Location
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
VILLAGE B
Elev.
or
Depth
(ft)
436
446
436
450
445
440
444
448
444
452
439
441
442
444
447
449
444
437
Curve
No.
17
4
4
19
4
17
2
17
17
3
3
3
3
3
3
3
17
4
Pius
3/4"
Rock
(%)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Max.
Dry
Dens .
(pcf)
112.2
115.8
115.8
112.8
115.8
112.2
115.0
112.2
112.2
116.4
116.4
116.4
116.4
116.4
116.4
116.4
112.2
115.8
Opt.
Moist.
Cont.
(%)
15.5
15.7
15.7
17.2
15.7
15.5
14.8
15.5
15.5
13.6
13.6
13.6
13.6
13.6
13.6
13.6
15.5
15.7
Field
Dry
Dens .
(pcf)
103.1
107.3
105.0
103.3
105.5
103.0
106.6
101.8
102.4
106.7
109.0
104.8
106.9
108.7
107.9
109.6
105.1
104.6
Field
Moist.
Cont.
(%)
17.0
18.0
15.8
19.0
17.2
16.3
18.0
16.0
15.1
12.3
13.1
13.1
13.4
12.9
12.8
13.5
15.0
16.9
Field
Rel.
Comp .
(%)
92
93
91
92
91
92
93
91
91
92
94
90
92
93
93
94
94
90
Req'd
Rel.
Comp .
(%)
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
90
Note: See last page of table for explanation of coded terms
I ! II f 1 11 11 II
Project No. 05845-12-16 (G)
- TEST SUFFIX
I 1 I I I I f If f I f 1 f I f 1 I 1 I 1 I I I ! f !
EXPLANATION OF CODED TERMS
A, B, C,...: Retest of previous density test failure, following moisture conditioning
and/or recompaction.
R: Fill in area of density test failure was removed and replaced with
properly compacted fill soil.
- PREFIX CODE DESIGNATION FOR TEST NUMBERS
AD -
B -
CG -
CW -
DW -
FG -
IT -
- CURVE NO.
Area Drain
Base Test
Curb & Gutter !
Crib Wall '
Driveway
Finish Grade
Irrigation Trench
JT - Joint Trench
MT - Moisture Test
RW - Retaining Wall
SD - Storm Drain
SG - Subgrade
SL - Sewer Lateral
SM - Sewer Main
ST - Slope Test
SW - Sidewalk
SZ - Slope Zone
UT - Utility Trench
WB - Wall Backfill
WL - Water Lateral
WM - Water Main
Corresponds to curve numbers listed in Table II, representing the laboratory
maximum dry density/optimum moisture content data for selected fill soil samples
encountered during testing and observation.
- ROCK CORRECTION
For density tests with rock percentage greater than zero, laboratory maximum dry density and optimum
moisture content were adjusted for rock content. For tests with rock content equal to zero, laboratory
maximum dry density and optimum moisture content values listed are then unadjusted values.
- TYPE OF TEST
SC: Sand Cone Test
NU: Nuclear Density Test
DC: Drive Cylinder Test
- ELEVATION/DEPTH
Test elevations/depths have been rounded to the nearest whole foot.
TABLE II
SUMMARY OF LABORATORY MAXIMUM DRY DENSITY
AND OPTIMUM MOISTURE CONTENT TEST RESULTS
ASTM D 1557-91
Sample
No.
1
2
3
4
8
9
10
11
13
14
15
16
17
19
20
21
24
26
101
Description
Light brown, Silty CLAY
Yellow-tan, fine to medium, Silty SAND,
with trace clay
Light brown to brown, Sandy CLAY, trace
silt
Green, Silty CLAY, with little fine to
medium sand
Brown, fine, Clayey SAND, with trace silt
and gravel
Yellow-brown, Silty CLAY, with fine to
medium sand
Dark brown, Sandy CLAY, with trace silt
Olive-brown, Sandy CLAY, with trace silt
Yellow-brown, Silty CLAY, with trace sand
Yellow-tan, Silty CLAY
Dark olive-yellow-brown, fine Clayey
SAND
Olive, fine to coarse, Silty SAND
Light olive-brown, fine to coarse, Silty
SAND
Olive, fine to medium Sandy CLAY, with
little silt
Light olive-brown-tan, fine to medium, Silty
SAND, with little clay
Yellow-brown, fine, Silty SAND, with little
clay
Light olive, fine to medium Silty SAND
Yellow-tan, fine to medium, Silty SAND
(poorly graded)
Yellow-gray Silty SAND with little clay
Maximum Dry
Density (pcf)
113.4
115.0
116.4
115.8
119.5
107.1
120.7
119.9
120.0
105.0
116.8
114.2
112.2
112.8
114.3
118.1
117.4
120.0
112.2
Optimum Moisture
Content (% dry wt.)
14.6
14.8
13.6
15.7
12.6
17.1
11.0
13.6
13.2
19.8
13.3
16.3
15.5
17.2
14.9
14.0
13.9
12.6
17.0
Project No. 05845-12-16 September 25, 1998
TABLE III
SUMMARY OF DIRECT SHEAR TEST RESULTS
Sample No.
2
3
8
9
10
16
17
19
Dry Density
(pcf)
103.4
104.4
108.2
97.2
108.2
103.5
101.2
101.2
Moisture Content
(%)
14.8
13.6
12.6
17.1
11.0
16.3
15.5
17.2
Unit Cohesion
(psf)
400
450
425
345
400
740
290
255
Angle of Shear
Resistance (degrees)
30
16
24
28
25
23
36
30
Note: Samples were remolded to 90 percent relative compaction at near optimum moisture content.
TABLE IV
SUMMARY OF LABORATORY EXPANSION INDEX TEST RESULTS
Sample
No.
2
4
9
14
16
17
19
20
B-l
B-2
B-3
B-4
B-5
B-6
B-7
Moisture Content
Before Test (%)
11.0
11.7
12.1
15.5
12.4
12.1
14.2
11.7
11.9
11.2
9.9
11.0
11.9
10.9
12.2
After Test (%)
23.0
29.1
32.1
41.7
34.7
26.1
35.8
26.3
33.7
27.7
24.1
32.9
36.6
32.8
34.1
Dry
Density (pcf)
106.1
104.1
103.0
92.0
101.1
102.4
96.3
103.9
103.8
107.0
110.1
106.0
102.9
105.7
102.3
Expansion
Index
12
87
107
134
87
23
62
25
60
67
37
99
102
53
103
Project No. 05845-12-16 September 25, 1998
TABLE V
SUMMARY OF FINISH GRADE EXPANSION INDEX
TEST RESULTS FOR EACH AREA
Location
Northwest (fill)
West central (fill)
Southwest (fill)
South central (fill)
Southeast (fill)
North (cut)
North Central (cut)
Sample No.
B-l
B-2
B-3
B-4
B-5
B-6
B-7
Expansion Index
60
67
37
99
102
53
103
UBC Classification
Medium
Medium
Low
High
High
Medium
High
Project No. 05845-12-16 September 25, 1998