HomeMy WebLinkAbout3079; POINSETTIA LN BRIDGE CONSTRUCTION; CONCRETE PIPE CERTIFICATION; 1984-08-29CALCO CONSTRUCTION-
General Engineering Contractor
r.. ^ 71- DESIGN
C. J. LUMSDAINE CO. CONSTRU&ION
WM. A. CORN - RCE#15483 MANAGEMENT -KJp-M1WD
AUG 2.9 1984
LETTER OF TRANSMITTAL CITY OF CARLSBAD
ENGINEERING DEPARTMENT
SENT BY: Pam Romanello DATE: 8/29/84 OUR JOB NO. 404'
TO: Pat Entezari
City of'Carlsbad
PROJECT DESCRIPTION: Poinsettia Lane Bridge Project
ENCLOSURES: Letter of Certification for,RCP Ameron
COMMENTS:
Pamela Romanello
Project Coordinator
438-8441
5245 AVENIDA ENCINAS, STE. G P. 0. BOX 1171 e CARLSBAD, CA 92008. (619) 4444W—
"v
4700 Ramona Boulevard
Post Office Box 2024
Monterey Park, California 91754-0924
(213) 268-4111
A .%%JJ fa P 11 kI
Pipe Division
Southern California
August 27, 1984
CALCO
P.O. Box 1171
Carlsbad, California 92008
Reference: Poinsetta Lane - Avenida
Encinitas to Carlsbad Blvd.
Contract 3079 - City of Carlsbad
Ameron #5823
Gentlemen:
This letter is to certify that the 54" - 1350D; 3011 - 1350D;
24" - 1350D; 18 11 - 1350D; Reinforced Concrete Pipe furnished to
CALCO on the above referenced job has been manufactured in
accordance with the applicable provisions for the project
specification.
Sincerely,
Roy Oda
r
Engine rinag Supervisor
RO: bs
17A