HomeMy WebLinkAbout3079; POINSETTIA LN BRIDGE CONSTRUCTION; LAB RESULTS;Testing Engineers -San Diego
w 2948 Industry Street, Suite B, Oceanside, Ca. 92054 (619) 757-0248
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
PHYSICAL PROPERTIES OF SOILS & AGGREGATES
LABORATORY REPORT
Client Southcoast Asphalt Products
P.O. Box 1008
,Carlsbad, CA 92008
Job No. 2687
Lab No. SD85-599
Date of Report 3/12/85
Project Southcoast Asphalt — Certificaiton
Location Carlsbad ' Sampled by F.A. TESD Date 3/1/85
Type of Material
-
CL. II Aggregate Submitted by F.A. TESD 'Date .3/l/85
Source of Material Southcoast A.C. Location Sampled Southcoast Plant*
4z;-- A-I~Cic AqTM rl IA-
Sieve
Size
% Passin
T Accumulative -SpeciFication
4 -
V
2-
3/4"
3/8"
No. 4
16
30
50
100
200
Aa Durability Index. Fine=49
Coarse=78
Cal Test=229
* Specification Data/Comments
Tacf- qf-n-4nvAc m~a AqTM tinlpqq nthprwicp nntpd
Test Result 'Specification TEST STU
Fineness Modulus C125-
Organic Impurities C40
Resistance
To
Abrasion
% Weer. rev. C131-
Grading % Wear. 500 rev. 18%
% Wear. rev. C535-
Grading % Wear. J000 rev.
Fractured Faces % by wt/cnt
Liquid Limit/Plasticity Index 0424-
Cleanness Value CaliF 227-
Send Equivalent Value CaliF 217-
Resistance "R" Value 83 CaliF 301-
Moisture
Density
Relations
Max Dry Oensity.PcF. 0 05ge- 0 01557-
0 AASHTO T99-
0 AASHTO T180-
Optimum Moisture. %
Method
.SpeciFic
Gravity
L.
Absorption. %
0 C127-
0 C128-
Bulk (Dry)
Bulk (SSO)
Apparent
Conforms to APWA Green Book Specifications (1982) for aggregate base material, % wear,
"R" Value, and Durability Index
Tesling Engineers--San Diego Reviewed by:-
WJD:je Will idm"' J. DeBerry, R. C'. E. "Yt34545
Sipvp Annlvcic ARTM rllA-
Siev
siz:
% Passing
Accumulative Specification
4 -
3"
2-
100 100
3/4" 94 90-100
83
3/8" 69
No. 4 48 35-55
8 35
~16 25
30 19 lo-In
50 14
1.00 11
200 1 8 1 2-9
Testing Engineers—San Diego
3467 Kurtz St., PO. Box 80985, San Diego, Ca. 92138 (619) 225-9641
2948 Industry Street, Suite B, Oceanside, Ca. 92054 (619) 758-3730
PHYSICAL PROPERTIES OF SOILS & AGGREGATES
LABORATORY REPORT
Client Job No.
South Coast Asphalt'.. Lab No.
P.O. Box 1008 Date of
Carlsbad, CA 92083
'2687
. 085-160
Report 3/4/85
Project South Coast Asiphalt,. SerrLi Annual Testing
Location' Plant Sampled by K. Rowe 2/27/85 r. Date
Type of Material
'
Class II Base Rock Material Submitted by K. Pnwe Date 2/28/85
Source of Material Location Sampled Stockpile
* Specification Data/Comments
Tpq'r Stnridn,rdc Arp AqTM vinlpcc e%thd-r-wica nnrael
Test Result 'SpeciFicati6ti TEST STU
Fineness Modulus C125-
Organic Impurities C40-
Resistance
To
Abrasion
% Wear. rev. C131-
Grading % Wear. 500 rev.
% Wear. rev. C535-
Grading % Water. 1000 rev.
Fractured Faces % by wt/cnt
Liquid Limit/Plasticity Index 0424-
Cleanness Value Calif 227-
Send Equivalent Value 36 22 Calif 217-
Resistance "R" Value calif 301-
Moisture
0 ensity
Relations
Max Dry Oensity.pcf. 0 05ge- 0 01557-
0 AASHTO T99-
0 AASHTC? T!00-
Optimum Moisture. %
Method
Specific
Gravity
Absorption. %
0 C127-
0 C128-
Bulk (Dry)
Bulk (SSO)
Apparent
Testing Epgineers--San Diego ReV7
CN"
Testing Engineers— .0 Diego
3467 Kurtz Street, P.O. Box EIG-53, San Diego CA 92138 (619) 225-9641
2948 Industry St., Unit B, Oceanside, CA 92054 (619) 758-3730
2 0 1
fOB NO:- 3262 C () 1IR 1 1,3, !1 ") Y.) 11 N D E** I'll' DISTRIBUTED TO:
j66 NAME: POINSETTIA LANE BRIDGE, KTT I" F) (4 'T E, N P E.* Z 04 'T. R CITY~ OF CARLSW EING. DEPT,
JOB ADDiESS: 1 2 0 ()'- E-A-M PiVE"NIJI::* KEkCHEVAL & ASSOCIATES, INC.
CARLSBAD, CA 921,08 C, (1 iR L-5 B A D , Cl' t.) 9 0 0 B TESTING ENGINEERS-SAN DIEGO
NNE-MIXE D CONCRETE CGM?ANY
ENGINEER: William j, Dehrrb R.C.E.- *34545 TM.Chapmanj R.C.E.
IEPORT NO: 2771 CONCRETE COHHESSION TEST DATE: 04/05i65
CYL UN WT AGE@ 51RENGTH PSI DATE OF MIX DESIGN SLUR MADE TIK IN; TIhE OF CYL IHIS' TEMP LOAD PLANT DIAH
&I It YX - FCF TEST TEST DESIGN -POUR DESIGNATION INCH BY MIXER DAY SETINARK F INW. CODE INCH
3066 63/06/03 51 4216 0 4 6 0 G 3/610 0 - 6 64 6
20694 7 3507 LOCATIGN 114 STRUClURE: CARLSBAD, CA.
20695 26 435-1 v" COMPLIANCE: 28 DAY TEST COMPLIES WITH SPECIFICATIO?ls.",-,
20696 66
RECEIVED'
APP, 18 1985
CITY OF CARLSBAD
ENGINEERING DEPARYMMT
'FACE NO; I
Testing Engineers—'-_ Diego
3467 Kurtz Street, P.O. Box ~05, San Diego CA 92138 (619) 225-9641
2948 Industry St., Unit B, Oceanside, CA 92054 (619) 758-3730
IF 3 0 -19
JOB NO: 3262 C'I TY C) F C A R I.. S B A D E N G D 1:—:'P T DISTRIBUTED TO:
JOB NAME: POINSETTIA LANE BRIDGE (i T T E PAT ENPEZAIR CITY Orr CARLSiAD ENG, DEPT,
jOB_ ADDRESS: 1200 El..M AVENLJE KERCHEVAL & ASSOCIATES, INC.
CARLSBAD,- CA 92008 C A R I (,:;BAD, CA 92008 TESTING ENGINEERS—SAN DIEGO
ENGINEER: Roy E. Moore, R,C,E. T.H,Chlapman, R.C.E.
REPORT NO: 2975 CONCRETE COMPRESSION TEST DATE; 04/19/85
CYL Oil WT AGEE STRENGTH PSI DATE OF - MIX DESIGN SLUMP MADE TIKE IN TIME OF CYL THIS TEMP LOAD PLANT DIAM
NMBR PCF TEST TEST DESIGN POUR DESIGNATION INCH BY MIXER DAY -SET/MARK F NMBR CODE INCH
3000 03/26/85 6 SACK 6.5 G 8 -:20 3/03 0 2 0 6
20898 7 2335 LOCATION IN STRUCTURE: POINSETTIA LANE AND SANTA FE RAILROAD- AA041!j&* #
20899 28 390 COMPLIANCE: 28 DAY TEST COMPLIES WITH SPECIFICATIONS,
20900 60 0
REC EIVED
ly, iy 21985
CITY OF CARL - SBAD
ENGINEERING DEPARTMENT
PAGE NO
Testing Engineers- Diego
3467 Kurtz Street, P.O. Box8'*j San Diego CA 92138.(619) 225-9641
2948 Industry, St'.,'Unit B, Oceanside, CA.92054 (619) 758-3730
2 A
-CTTY~~(W~Cj AMILLS--MA~X-)--E-NO—, -6 EPT,
I C--
AR 3AD CA 0 [Nnflm it 0
IXED NCRETE'COMPVNY-7--
WSW-. koy E. Moore,
WE: 04/
L a WT AG @ SIREN TH F— MADE DIAH-------
I - — —
9 1— — - ---- CODE -WCH-
~T-AG
13 R 2370
p
Aly-of=(ARLSBAD—
EE
::T U'RUICI T i CT 04,13 (IfAtl 0."11 ;I(j Y J CW
: TJFA S 3 76 Yil 5il V'~Dclw_;3 TIAC11 T TA IOWA _41U Ai~'_ E 11~ J
i si"., Bjz_.,~ PQ '045EIR."
3 osAjEd).R.T (siccO .3 joP Ah, 3
ZZV.; IM 3JR,`3iqhW
TK,..ji !~..Jj _11HT Z LIT T11T 5-144 Viii ~;?31 Ile la 5 rt, 0 0 FrW.W F13A N V,
J io, I ka 3 Aot~h\j-? fru 'rlk 1 h i - hAl k~vl ~Qs N I i1i I Z 4.
4 I'll \ E I \ E 0 Has
hjXt VEA I folt 1RO0JiTr"' Of 01TAMI T J E I
Z~'OT41303;2 -Mlo 23I.AiLl MT tA; GS i-_-,YAA1Jri153 ~31Z x
u
11
r Testing Engineers —8& Diego
AnF3467 Kurtz Street, P.O. Box 8MWj, San Diego CA 92138 (619) 225-9641
2948 Industry St., Unit B, Oceanside, CA 92054 (_619) 758-3730
r--'fe" .f 10-79
4 0
JOB NO: 3262 C(-)IRI SB(.)I) EN(:*, Dl:-:.1:1-1' DISTRIBUiEO TO-
JOB NAME: POINSETTIA LANE BRIDGE (A 1"T E* 1:1(iT E*~4PEVi**[i? CITY OF CARLSBAD ENG. DEPT,
JOB ADDRESS-: 120() EIJM ()V1:_:'N',jE*. KERCHEVAL & ASSOCIATES, INC.
-CARLSBAD,ICA - 92008 - Gf)~R 1-13 BAD ~ C-0) 92608 TESTING ENGINEERS-SAN DIEGO
PRE-MIXED CONCRETE COMPANY
ENGINEER: William J. Deperry, O'Cl-E. t34545 T.H,Chapman, R C.E.
REPORT NO: '269? CONCRETE COMPRESSION TEST DATE: 63/2VG5
CYL UN WT A&Ei STRENGTH PSI DATE -OF - KX DESIG14 SLUMP ~ADE TI1,E IN' TI~E OF 'CYL TKS~ TEVIP LOAD PLANT DIAM
N n1R FCF TEST _tEST___DESIGN POJR__ 1ESIGNATION 1 NIC H BY MIXER DAY SET/MARK F NMBR CODE INCH
3560 02/15/85 51-2101 4 6 0 :00 3/00 0 0 64 6
20566 7 3378 LOCATION IN STRUCTURE: FOOTING ALUT It SLOPE PAVEMENT
20567 2a 3673 COMPLIANCE: 28 DAY TEST COMPLIES NITH SPECIFICATIONS.
20568 60 0
3000 02/20/85 5 0 0 0 iOO- 2/00 0 0 66 6
2a614 7 3377 LOCATION IN STRUCTURE: THIS IS A 9UNIIE TEST SAHIPLE CAST IN A CYLINDER NLD
20615 , 28 3502 COMPLIANCE: 28 DAY TEST COMPLIES WITH SPECIFICATIONS,
r Testing Engineers—SIMiego
1 '9
Arr467 Kurtz Street, P.O. Box 80MVSan Diego CA 92138 (619) 225-9641 1p
2948 Industry St., Unit B, Oceanside, CA 92054 (619) 758-3730
2 0 -2
JOB NO: 3262 I'Y 0 1:7 (-i 1R I SB(41) ENG DE-Dj-l -C,". IC DISTRIBUTED TO:
JOB NAME: POINSETTIA LANE BRIDGE (-I 'T E* PA'T 1:-Nr-11:-:'ZA1R - KERCHEVAL & ASSOCIATES, INC,
JOB ADDRESS: 1 2 0 0 E-* I - M A V I'--- L J 1: TESTING ENGINEERS-SAN DIEGO
CARLSBAD, CA 72009 CARI D i -) D , C 92008 CITY OF CARLSBAD ENG, DEPT.
ENGINEER: William J. DeBerry, R.C,E. *34545 T,H,Chapman, R.C,E,
REPORT N 0, 2117 CONCRETE CRIPRESSION TEST DATE:- 02/08/85
CYL UN WT AGE@ STRENGTH PSI DATE OF MIX DESIGN SLUMP MADE TIME IN TIME OF CYL THIS TEMP -LOAD - PLANT DIAN
HHBR PCF IEST IEST DESIGN POUR DESIGNATION INCH BY MIXER DAY ~- IET/KARK F HHBR CODE INCH
5000 12/03/84 0 0 0 0 4/00 0 0 0 6
210514 67 6720 LOCATION IN-STRUCTURE: --
20515 67 6526 COMPLIANCE-: 677DAY -IEST COMPLIES U I TH SPECIFICATIONS.
-20516 67 0
20517 67 - 0
FORM 16 JP
Testing Engineers -San Diego
A Division of United States Testing Company, Inc. 1,7wLl/ 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
2.948 Industry Street, Suite B, Oceanside, Ca. 92054.(619) 757-0248
FILE No. — 1969 - SUMMARY OF COMPRESSION TEST RESULTS PAGE One
SPECIFIED
JOB: Poinsettia-Lane Bridge MATERIAL: C-Unitp- 28-DAY STR.: ----3MJD—PS1
PROPORTIONS/Mix No.:
ADDRESS: Carlsbad, California
TYPE: C EM ENT: SPEC. SLUMP: —IN.
YEAR: 1985 ADMIXTURE: AGG. SIZE: —IN.
*STORED & CURED. NOT TESTED ULTIMATE COMPRESSIVE STRENGTH. PSI DATE --_ — , - , I OTHER LAB. NO. I DATE
.
I CAST LOCATION IN STRUCTURE SLUMP - 7-C I MAILED~ TEST RESULTS
MO.DA IN. AGE
20629 02/25 Poinsettia Lane bridge and 3184 1 3573 1 60 1 Disc.1 04/02/85
20630 Santa Fe tracks - made by
20631 Contractor
RECEIVED.
APRO 41985
CITY OF CARLSBAD
ENGINEERING DEPARTMENT,
(1) Kercheval & Assoc., Inc.
(1) City of Carlsbad Building Inspection Dept.
,ATTN: Pat Enpezair
THC: np
TESTING EN ERS. S EGO
REVIEWED 13
Thomas H. Chaofan, R.C.E.