HomeMy WebLinkAbout3188; COLLEGE BLVD EXTENSTION; DAILY RESULTS - IN PLACE DENSITY TESTS;i. fliJ Testing Engineers-San Diego +
A Division of United States Testing Company Inc
S
71i - 3467Kurtz SL, P.O. Box 80985, SAn-Diego; ca. 92138(619) 225-9641 . .:
I - 2956 IndUstry. Street, Oceanside, CaIiforn1a
. . . . . . .
9054 (619) 7570248 .
DAILY RESULTS -IN PLACE DENSITY TESTS
DATE or Tcir _6/17,18,23g25'/87 S ***NUCLEAR DENSITIES*** LOCATION City of Carlsbad
5;
FILE HO 5259 PROJEcT_CollegeBlvd_ImprovementsProiect#3188
LAS. No 087355
.,
. oyp REPORT 7/2/87 _:: CoNTRAcToR . .
.
_EST
No L 0 C A TI ON PLACE
MOIST.
OPTIMUM MOIST.
.
IN PLACE
DRY
DENSITY --
MAX. DRY DENSITY
PERCENT
REL. COUP.
REQUIRED
PERCENT
RELATIVE COUP. R E M A -. S
1.
Station 62+45 at-E.D.L. Line
Center Line Trench El.; 46.91
. . 18.1
..
14.0
.
.104.9 116.0.
. . 90 - .. . Complies
•
2 . Center Line Trench - El,47' -18.2
Station 61+00 at E.D.L. Line
11.4-- 113.2 125.0 -90 91 Complies,.
3
I Station 59+15 - at E.D.L. Drain .
Center Line Trench El. 47.5' . - 18.3
. . .
- 17.5
.
107.4
. .
- 111.8
.90
. .
90
. . .
- 96 .
Complies
4
Station 55+00 at E.D.L.-Drain - . •
Center Line Trench El. 51.0' - -
.. .
22.2
. . . . .
20.5•
. . ••.
94.4
.. . :.
- 104.0
- -: -
-90
- .
91
.. --
Complies -
5 Center Lino Trench _El. _47.5'- 18.5
Station 63+15. at-E.D.L. Drain Line
14.0 .106.4 --116.0 -90 92 Complies
6
Station 58+00 Water.' Mail Line -
Center Line Trench' _El _49.0'
.
15.9 16.9 -
- -
106.2
-.
- --12-3.1 -90
- -.
-92 Complies
-
7 13-'S Center LineEl.45' 12.6
Station 70+00 E.Q.L. Line
14.0 113.4 116.0 90 .98 - Complies
8 - 1' 5 Center Line : El. 39.5' -
Station 71+00 E.D.L. Line
17.6 - 20.5 105.3 107.5 90 98-- Complies - - -
9 - 1'SCenter _Line Trench - El-.47'-47.5 18.5.
Station 66+25 E.D.L. Drain Line
-17.5 100.6 111.5 -90 90 Complies _--.----
10 CenterLineTrench El. 47' 20.0-
Station 67+64-.75 E.D.L. Drain Line
17.5 100.7 1 -111.5 90 90 Complies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
- - - -- . TESTS MADE BY TESTING -ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
- -
THESE RESULTS SHOULD NOT -BE INTERPRETED AS ENGINEERING OPINION OR.JOD CONTROL.
-TESTING ENGINEERS. SAN DIEGO
- - - - - - - - -- REVIEWED BY, - -
0 'S
Colleqe Blvd Improvements Proi #3188 pan 2
TEST No. L 0 C A TI 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
'IN PLACE
DRY
'-DENSITY
MAX. DRY
DENSITY
.
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
.' S
11 Center Line Trader. El. 49' — 49.5 18.7.
Station 67+58 E.D.L. Line
, '17.5' 106.6 111.5 90 96 Complies
12 2'NCenterLine _-El .45' _',
Station 68+50 E.DL. Line
23.2 '.20.5 ,98.7 107.5 ,90 , ' 92 Complies ;
13 E.D.L. Drain Line El. 47' 0 15.1 .14.0
Station '68+40 E.D.L. Line
108.0 116.0.. ,90 93 Complies
14
Station 67+94.75 E.D.L. Line
Center Line Trench E1.47' 15.7 14.0 'o , 105.7' 116.0 '90 " ''91 Complies
_15
Station 73+48 E 0 L Line
Center Line Trench El 31' - 31.51. 14.6 14.0 96.9_ 107.5 90 90 Complies
16
Station 71+70 E 0 L Line
Center Line Trench El. 381
,,
' 18.3 '14.0 ' 98.4 '107.5 '90 '' ,92 Complies
O is
1) NBS/Lowry."
TESTING ENGINEERS -SAN DIEGO
- REVIEWED BY
Albert, F. deBerardinis
North County Branch Manager
( JI1 Testing Engineers-San Diego
A Div sion of United States Testing Company, lnc
III 3467KurtzSt,PO B 80985S0 Ca 92438 (619) 225-9641
C E V ED
FJ 2956 Industry . Street, Oceanside, California 92054 (619) 757 -0248 OCT 7
CITY W
MUNICIPAL PRO
DAILY RESULTS- IN PLACE 'DENSITY TESTS .'
DATE OF TEST ' . ' " ' LOCATION Carlsbad', California
FILE No 5259 PROJECT College Blvd Improvements Project #3188
LAB.' No.' ' " ' DATE OF REPORT 9/24/87 _'. CONTRACTOR
TEST
NO
' . S
L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST..
IN PLACE
DRY
MAX. DRY
"DENSITY,
PERCENT
REL. COMP.
PERCENT
RELATIVE
.'
, R E M A R K S
MOIST. , DENSITY , ' REQUIRED COMP.
6/26 EDL Line Station 75+35
.17 ' ' 1'Scenterlinetrench 16.5 20.5 105.3 107.5, '90 98 ' Complies
,
EDL Line Station 76+00 center line
18 trench @ west end conc. ofstorm_drain 17.7 20 _5 104_4 107.5 90 97 Complies
19 .
EDL Line Station 76+60 . .
Complies. . 2' 5 center line.trench 21.8. 20.5 97.6 107.5 90 91
EDL Drain Line Station 78+44
S center line.d.f trench ' . 2,0 :, 22.0 20.5 98.5
,
107.5 90 ' ' ' 92 Complies
EDL Drain Line Station 79+50 . . .
21 Cener line of trench 19.3 17.5 106.2 111.5 90 .95 Complies
,
EDL Drain. Line Station 81+90' .
22 ' Center line of trench ' . . ' 20.7 20.5 . 98.1 107.5 90 91 ' Complies
7/1
23 .,
14" Waterline (S side)
Station 74+70V_N.of center line . 20.3 20.5 1 102.5 .107.5 90 95 Complies
,
.14" Waterline.' (S side)
'24 Station 75+80 center line 17.2 20.5 105.7_ 107.5 90 ' 98 Complies
14" Waterline' (S side) • ' • ' ' ' ' ' . ' .
25. 'Station 74+00 V N of center 'line 14.0
,
20.5. 104.9 107.5 90 -98 ' Complies. '
7/2 ' On E bound side College Blvd.' at.. , • .. .. '
. 95.4
' ' ' ' ' ' . ,. '
26 * 21 E center line 'of Man Hole #6 ([i'd) 20.8 18.5 11.00 _ 90 87 •1. Does not comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
i s* '
, TESTS MADE BY TESTING ENGINEERS-SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
* Beginning of Punch List Items '
TEST No L 0 C A T I 0 N
IN '.
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY REQUIRED COMP.,
7/2 On. E bound aide' College Blvd. at
27 3' N center line of. Man Hole #7 ' 26.0 18.5 95.0. 'llO.IL 90 86 Does not comply .
On E bound side of College at Man Hole
28 #8 231 N centerline of Man Hole 29.5 18 5 92-.9 110.0. 90 85 Does not comply
7/3 EDL Drain Line Station 39+05
29 Center line of Trench 63W' B T C 11.9 14A 104.3 116.5' 90 90 Complies
[DL Drain Line Station 39+00
30 Center line -of Trench 4' B.T.C. 10.4 14.0 105.5 116.5 90 ' 91
7/8 Man Hole #10 Station 28+3,0
Complies
'.
31 4".Nc'enter_line_of_ Man _Hole_5'.'R.T..C. .11.2 1 11.5. .99.3 121.0 .90 82 __'.. Does_not'complv
Man Hole #10 Station 28+30
32.: .4'N _center line of Man Hole 5'B.T.C. 11.0 11.5 98.5 121.0 90 81 Doesnotcomply'
Man Hole #10 33' B.T.C.
33' 331 S center line.of."ManHole __' 14.9 11.5 91.1 12.1.0 90 '75 Does_not_comply'
Man Hole #10 33' B T C
34 5.3'. _5 center line _of Man Hole .11.8 11.5 95.0 121.0 90. _' ' _79 Does not _comply
7/9 Valve Cluster. East bound lane
35 Station _27+68Finish sub grade . 16.9 13.0 108.2 :120.0 90 :90' . Complies
Valve Cluster East bound lane back-
35-BU Station 27+68 Finish subgradeuptes. 18.0 13.0 '107.7 120.0 90 90 Complies.
Valve Clusters East bound lane
Station40+566" _below finish subgrad .12.0 '
_,
14.0 .106.9 .'116.5 90 ' 92 . Complies
Valve Cluster East bound lane
Station 19+15 611,below _finishsubgrad 18.4 ,13.5 .108.3 118.0 90 '92 Complies
Value Cluster East bound lane
Station 13+001 '''. 16.1 ,13.0 109.5 '120.0 .90 91 Complies
7/13 Water Valves East side of.College . ' 39 Station 53+20 Probe test Probed&Dug down.J St PipeBEddingSand,Nofill. ' . Probe Okay.
Valve Cluster East side of College
40 . Station.48+20__,... 9.5 8.8 123.9 .134.4 90 . 92 . Complies ',
Page 3
TEST
No
' ' S
' L 0 C A T I 0 N
IN
PLACE
.. OPTIMUM
MOIST.
IN PLACE
DRY'
MAx. Dnv
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY ' REQUIRED comp.
7/13 Man Hole #6 E bound side of College
26A 13+1 S of face of curb 3' B.T.C. ''21.8 14.0 105.3 116.5 90 90 ' Complies-RETEST OF #26
Man Hole #7.E bound side of College
27A 3' S center line of Man Hole Lid.3+'.BTL .18.5 18.5 100.6 110.0 90'
,
.92. 'Complies-RETEST OF #27
Man Hole #8 E bound side of College
28A 2+' W of:center'line Of Man Hole Lid: '22.9 ' . 18.5 '. 102.1. 110.0 ' 90 ' 93. Complies-RETEST oF#2
Man Hole #9 S side 3' B T C
41 3+' W of center line of Man Hole Lid ':22 *.,l 19 0 102 ..*8, 111.0. 90 93 Corn lies
7/14 14" Water Line S side
42 Station 87+00 center line trench 17'.7-20.5-'-99.8 107.5...90 93 Complies
14" Water Line Station 85+53
43 .. Center Line of trench El. 168.0 '. ' 20.0 20.5 .. 99..9 ' 107.5 90 . 93" Complies
14" Water line Station 75+00
44'. Center line trench El.221 ' ' ' 189 20.5 .99.3 .107.5 90 1..... ' 92 Complies '
14" Water line Station 77+88
45 Center line trench El. 204 ' 21.7. 20.5 98.8 ' 107.5' . 90 ' ' 92 Complies
. 14" Water line Station '81±50
46 Center line El 189 20.3 20.5 96 8 107 5 90 90 Complies
14" Water line Station 90+00
47.. El. 146" ' . ' ' 20.0 17.5 100.7 111.5 90 ' 90 'Complies
7/15 S side of Man Hole #19 3'.S. centerline
31A Man Hole Lid Also represents Retest 32 12.0 11 5 113 6 121 0 90 94 Complies-RETE ST #311
W side of Man Hole 4flO 3+' centerlii
33A: of Man Hole Lid also represents #34 '" 128 11.5' ' 112.7 121.0 ' 90 . . '93 '&3 Complies-RETEST.
W side at Man Hole--#11 '4' B.T.C.
48 3' Wof center line of Man Hole Lid ' 17.3 ' ' 11.5 109.4 121.0 90 ' 90 Complies '
S side at Man Hole #12 3+' BT.C.
49 4' 5 center line of Man Hole Lid . 15.2 11.5 110.4 121.0 ' 90 , 91 Complies
7/21 14" Water Line Station 90+91
50 1' S center line Trench El. 137' 18.7 1 20.5 1 99.0 107.5 90. 92 Complies S
Is
D1... :paae 4
TEST No
•
.
L 0 CA TI 0 N
__________
IN
PLACE
-
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
_____________
PERCENT
REL. Co.iP.
PERCENT
RELATIVE 'R £ M A R K $
MOIST. DENSITY REQIJIREO COMP.
7/21 ." 14" Water Line Station 90+91 Back up . . . .
*5.BU 1' S. center line trench EL. 137 to 50 18.2 20.5 100.2. 107.5 90 93 Complies
14" Water: Line Station 92+00
52 •' Center line of trench El. 135' 18.7 20.5 99.5 107.5 90 93. Compl.ies
14" Water Line Station 93+97 .
53 1' 5 center line of trench El. 128 .
15.0; . . 13.0' 110.2 119.0 90 '. .93 Complies
14" Water line Station 95+00
54 Center line of Trench'El.' 116' ' 18.2 17.5 101.2. 111.5 . 90 90 ' Complies
'7/24 .East bound lanefi'nish sub grade 2+' BT,' '
55 Station 3+00-7' 5 center ]ihe of.roadwy 10.2 ' 12.0 . 112.1 122.5 9.0 •. 92 . ' Complies
East bound lane finish sub grade
56 Station 79±60 11 1 N center line . 10.1 ' 12.0 109.8 122.5 90 . 90 . ,
: Complies
East bound lane finish sub grade
57 .Station 3+44 7' N center line • 10.7 , 12.0 , .110.8 122.5' ' . .90 • .91 Complies
East bound lane, finish sub'grade - S , '. ,• . . . ' ' . ' . ' , , ' .
58 Station 34-24 11' N center line '' . 8.7 . . 12.0 ' 111.6. . 1.22.5' . ' 90 . 91'. . Complies
East bound lane Station 7+00
59 , 1' N center line finish sub grade 9.5 , , 1.1 .5 ' 117.2 ' 124.0 . 90 . .95 Complies
bound side 'Station 10+16 . ,East .": , ., , , ' , ., ' ' '
60 6' S center line finish sub grade 14 7 11.5 112 .3, 124..0 91 Complies
East bound side Station 10+40
9' N center line finish sub grade , 12.6 11.5 .113.6 ' 124.0 . 90 92 . ' Complies'
East bound side Station 2±75
62 . 10' 5 centerline finish sub grade ' 13.1 11.5 115.4 122.5'. 90 94 Complies
, 'East bound side Station 2+85
63 14' N center line finish sub grade. 13.3 11.5' 111.6 122.5 ' 90' - 9,1 Complies
- West bound lane Station 2±83
64 ' 18' S center line' finish sub grade ' 10.4 ' '11.5 , 117.5 ' 124.0 90 . 95 Complies
West bound lane' Station 8+50.
65 6'N center line. finish sub grade ' 11.1 11.5 113.0 124.0. 90 --91 1 Complies
ls
C11,-.? Q1,-1' Tn .'rs,EmEr+c D4r'1 '1 p;rIp
TEST No . . .
L 0 C A T I 0 N
.
PLACE.
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCEr
REL. CoMp:
PERCENT
RELATIVE R E M A R K S
MOIST. . DENSITY . REOUIRE,O COMP.' .
.7/24 . West bound lane Station 14+50 '. '• '-
..
. . . ': .
.66 10' N center line finish sub grade _15.8 11.5 115.6 124.0 90 . 93 Complies
West bound lane Station 18+95
67 4' S center line finish sub grade . 8.1 11.5 ' 110.9 124.0 90 '' 90 Complies
7/25 East bound lane Station 29+75
68 10 N' center line finish sub grade 10.8 13 0 108.4 120.0 90 - 90..'Complies
East bound lane Station 29+48
69 7' 5 center line .finish sub grade . 10.1 .. 13.0 112.2 '1300 .' 90...._..... 94 Complies
East bound lane' Station 31+45
70 7' S center line finish sub grade 10.9 , 13.0 109.7 1200 90 ' .91 Cnmpi'ies
,
East bound lane Station 32+00
.71 ' .7'. S center line, finish sub grade 11.3 ' 13.0 _108.4 120.0 90 90__" Complies
East bound lane Station 32+50
72 Centerline _finish sub grade 9.4 ..1.0 110.5 120.0 90 - 92. Complies'_''
East bound lane Station 32+40
73 71 Ncenter_line_finish_sub _grade 9.4 ._130 .110.4 120.0. ' _90' 92 Cnmp1ic'
East bound lane Station 33+00
74 . 71 N center line: finish sub grade 7.9 . 13.0 111.1 120.0 90 . 93 . Complies.,..' .1
East bound 'lane 'Station 34+25 . .
75 10' 5 center line 'firish sub grade . 10.5 13.0 106.8---- 120 .0 _ .. 89 !not 'comply
East bound lane Station 34+75
76 8' W center line finish sub, grade 8.5 . '13.0 109.7 " 120.0 90 91 Complies
East bound lane Station 35+60
77 . 1' S center line finish sub grade . 9.4 . . 13.0 '' 107.9 ' 120.0 90 90 ' Complies
East bound lane: Staton 36+00
78 1' 5 line finish sub gr ade ,center , 9.0 13.0 ' 108.0 120.0 90 90 . Complies
East bound lane Station 37+40
79 3' N center Tine finish sub grade' . 9.3' 13.0: 107.1 120.0 , 90 1 89 , Does not comply
East bound lane Station 40+00
80 ' center line of road "finish sub grade 10.0 11.5 110.0 ' 122.5 .90 90. Complies '
ls
Co1'lge' Blvd., Improvements Project #3188.
TEST No ' 0
L 0 C AT 10 N '.
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY.
MAX. DRY
DENSITY
PERCENV
REL. COMP...
PERCENT
RELATIVE RE M A R KS
MOIST.. DENSITY ' . REQUIRED COMP.
West Bound Lane 3' S. Center Line'
81 'Station 39+85 Finish Sub Grade' ' '18.9 ' '11.5 ' 109.7' 122.5 : 90 90 Complies
West Bound Lane Center Line Station
39+70 _FinishSub__Grade 10_7 11 _5 115_1 122.5 90 94 Complies
West Bound Lane Station 35+50 4 5
83 _' .Center Line' Finish Sub Grade , 8.0 11.5 ' 110.9 ' 122.5 __' 90. 91 ,Cornjiies
West Bound Lane Station 35+65 Center
84 Line Finish Sub Grade '.',. 9.1 ',11..5' .111.7 122.5 90 ''91 Comolies
West Bound Lane Station'29±40 9' N ' , , ' ' ' •. ' ' •' ' ' '. ' ... ' ' ' 0
85 ' CenterLine Finish'Sub Grade p' 11.5 111.0 122.5 . . 90 ' 1 91 Compiles
West' Bound Lane Station 29+55 10'
86 S Center Line Finish Sub Grade ' 6.6 . "11.5 115.5 1.22.5
'
90 ' 94 'Complies. '
West Bound Lane Station 28+99 Center
87 Line Finish Sub Grade 10.7 11.5 113.8 122.5 90 93 Complies
Jest Bound Lane Station 28+89 1' 5
88' . Center "Line Finish Sub Grade 10.8 13.0 113.1' 120.0 ' ' 90 94 Complies
West Bound Lane Station 25+42 6' 5
89 CenterLineFinishSubGrade 9_2 13_0 108__8 120_0 90 91 Complies
' East Bound Lane Station 27+50 9' N
_90 CenterLineFinishSubGrade 8_9 11.5 112_5 121_0 90 93 Compliec
East Bound Lane Station 27+60 Center
91 Line Finish Sub Grade . ' 11.8 11.5 '. 109.9 . ' 121.0 90 '91'_. Complies
in Median' Station 28+05 Center..,Break
92 Line Finish Sub'Grade 11.2 .11.5 109.6 ' 121.0 90' 91. Complies
West Bound Lane Station 28+40 Center
93 Line F inish 'Sub Grade , 8.0 11.5 112.0 121.0 90 ' ' 90 Complies
,East Bound Lane Station 28+40,5' N
94 CenterLine _Finish Sub Grade ' 9.3 11.5 .111.1 121.0 ' .90 92.. Complies
East. Bound Lane Station 28+10 3'
95 Center Line Finish Sub Grade . 12..8 11.5 115.3 121.0 90 .. 95 Complies''
nl1pop Blvd. Tmn'rovernents Proiect'#3'188
TEST No. L. 0 C A T I 0 N
- '•
IN
PLACE
MOIST.
OPTIMUM
MOIST.
'IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. CoMP.
REQUIRED
PERCENT
RELATIVE
COMP: R E M AR K S
East Bound Lane Station. 12+2012 S
96 Center Line Finish Sub Grade ' 12.5 13.0 108.9 120.0 '1 90 90 Complies
East Bound Lane Station 12+00 2' N
97 Center Line Finish Sub Grade 10.8 13.0 108 4 120.0- 90 91 Complies
East Bound Lane Station 12+25 Center
98 Line Finish Sub Grade 15.2 13.0' 107.4 12.0 .0 90 90 Complies
East Bound Lane Station 18+00-.9'. N
99 Center line Finish Sub Grade 10.0 ' 13.0 109.0 120.0 ' 90 91 Comliec
' East Bound Lane Station 19+50 4' 5
100 _'Finish_ Sub _Grade _Center_Line 12.0' 13.0 , 109.6 120.0 90 91 complies
East Bound Lane Station 22+00 Center
101 LineFinishSubGrade 12.6. 13 _0 110.6 120.0 90 92 Complies
East Bound Lane Station 4+60 9' E
102 Center_Line_Finish_Sub._Grade 9.1 11.5 110.0 122.5 _'. '90 '._'90' Complies
East Bound Lane Station 4+60 7' E
103 ':' Center Line Finish Sub' _Grade 9.3 11.5 109.7 122.5. ''90 .'.'90-' Complies
'East Bound Lane Station 4+60 Center
104 Line Finish Sub Grade . 12.3 11.5 109.6 122.5- , ' 90 90 Complies . .
East Bound Lane College Station 4+68
105 ill S Ctrline Fini'ch SIJh (rade 1fl.6 11J 110.4' 122Ji Qfl ' gp- ' Cnmpliec
East Bound Lane College Station 4+68
106 Center Line Fini sh Sub Grade ' '8.9 11.5 110.0 122.5 '"90 '90' Complies
East Bound Lane College Station7±00.
107 -1'NCtrline'Depth _ofTrans.8" 11.3 11.0 - 114.9 124.0 90'. 94 ' Complies
SW' TESTING ENGINEERS -SAN DIEGO:':-
'REVIEWED BY
DFit
of
Trlsbad
1)
LAttn
NBS/Lowry Kirk P Ammerman Attn: Kurt Gierlich North County Branch Manager
Jil Testing Engineers—San Diego 1
A Division of United States Testing Company, Inc.
3467
S 1'
KurtzSt., P.O. Box 80985, SanD/ego, Ca. 92138 (619) 225-9641
I —=) 2956 Industry Street, Oceanside, California 92054 (619) 757-0248 .
DAILY RESULTS -IN PLACE DENSITY TESTS
DATE OF TEST flR-2R—R7 S. LOCATION .City of Carlsbad
FILE No. 5259 PROJECT _College Blvd Ixnprovementc
LAB. NO.°87472 DATE OF REPORTL._l0-28-87 CONTRACTOR .
.
TEST
No L 0 C A T I 0 N IN
PLACE
OPTIMUM
. MOIST.
IN PLACE
DRY
MAX. DRY . DENSITY PERCENT
REL. COMP.
PERCENT RELATIVE R E M A R K S
MOIST. DENSITY . REQUIRED COMP.
8-28SAND CONE `]. : . •. . . S.
W/Bnd lane (Act. S/Bnd) St a. 3+70 . . . 25 1 1 /2 ' B.T.C. .5' N Center line 4.8 8.0. 144.4 :140.0. 95 100+ Complies
9-1 NUCLEAR DENSITY-'~ ... .
.5...
N Bnd lane 25' from outside end 4.2 8.0 132.5 140. 95 95 Complies 255
-of Tsln1W/side of Rd 9' W
Center line
N Bnd lane 25' from outside end . . S 256 . . ,
is 4.2 8.0 land sland W/side of Rd 9 W .. 132.3 140.0 95 95 Complies
Center line . . S. .
257 N Bnd lane E/side of Rd 24' from . , . 5.8 . 8.0 . . ;
1 37.6
. .
140.0 . 95 . 98 . Complies. end of Island 12 Center line .
.
-. . . . . . .. . -
N Bnd lane E/side of Rd. 24' from 4.6 8.0 140.1 140.0 95 . . 100 Complies 258 end of Island 17' = Center fln.e_
140.0 259 N Bnd lane Sta 4+53 4.5 .
5 8.0 .
. 131.5 S 95 94 Does not comply
2 1/2 W Center line __._..:_......_.....___ ____
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OH JOB CONTROL.
TESTING ENGINEERS-SAN DIEGO
REVIEWED I-Y
('0T.T.PC1' 1T.11T1 TMPPO\JP.MF.NTc PA(F. 9 1fl-79-R7
TEST IN OPTIMUM IN PLACE MAX. Drn PERCENT PERCENT
No. L 0 CA T I 0 N' PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R K $
MOIST. DENSITY . REQUIRED COMP.
9- .1 Y -R D E'NSTTY':) . . .
N lane Sta. 4+53'
,Bnd 260 2'1/2' W Center line 50 8.0 132.6 140.0 95 95' Complies
N Bnd lane Sta '4+53 2 61 E/side of Rd 10'.:E'Center line .5.9. 8.0 137.3 140.0 95 98 Complies ..'.
262 N Bnd lane Sta'. 4+66 0
' 5:6 8.0 ' 136.3 140.0 . 95 .97 Complies Center line . . . ' .. . . .
263 NBnd lane at Man Hole 2 ,: ' 5.8 8.0 ' 124.4 140.0. .95 . ' 89 Does not comp 1' N of Man Hole
264 ', N Bnd lane .W/edge 12 1/2 W
, ' 6.3 . 8.0 '127.6 140.0' 95 ' . 91 Does' not comply Center line 28 1/2 from nose .
.
. . ., . .
1 1 .0 h face oft curb
265 N Bnd' lane E/d.ge 12 1/2' E " ' 5.7 8.0 ' 127.8 140.0 95 91 ' Does iot comply
C8nterlie 28'L-2.Lfom
1"7" off curb
N Bnd lane 13' W'Center line
266 2' Eof curb Sta. 5+00 7.7 .8.0, 1.26.5 140.0 95 ' '90' ' Does not. comply
N Bnd lane 13' W center line 2'
267 E of curb Stá 5+00 shift gauge 6.9 . 8.0 '. 132.4 140.0 95 . 95 Complies
6' slot
268 N Bnd 'lane St.a +94 o , sand 1/2". 64 ' 8.0 128.2 140.0 95 92 Does not comply
W centerline slight rock point
N Bnd lane Sta 5+04 with sand ., 269 1/2" W. centerline slight ro,ckpoin: .6.1 8.0 127.5 , :140.0 ' 95 . .91 .' Does not. c omply
270 N Bnd lane E/edge 13 1 /2' E
' 6.4 8.0 19.8 140.0 - 95 93 . Does not, comply
_____ Center line Sta.. 5+08
cT.Tva1 TT.UT1 TMPROVF.MENTS PAGE 3 10-28-87
TEST No L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R £ M A R K S
MOIST. DENSITY REQUIRED COMP.
9-1 NUCLEARSIT7
NBnd' lane Sta 6+95 E/edge Rd . 271 14' E Center line . 6.2 8.0 130.4 .140.0 95 93. . Does not complies
272 N Bnd lane E/ed'geRd 13 1/2' E 6.3 8.0 132.7 .140.0 95 95 Complies
Center line 1 1 /2 off street or
curb Sta. 7+05
273 N Bnd lane Man -Hole 3iRd SO. I 3.9' 8.0 123.3 140.0 95 88 Does not comply
274 NBnd lane Sta'. 9+40 .
' 5.7 8.0. ' 131.2 140.0 ' 95 94 Does not compl
2 W Center line
N Bnd lane Man Hole 1/4 3' So.
275 Center line ' ., .3.6 8.0 119.3 140.0 95 ' 85 ' Does not comply
N Bnd lane -13".W Center line
276 Sta 12+40 W/Edge . 7.9 8.0 131.5 140.0 95 94 Does not comply
N bound lane 9' east '.
277 Center line 7.8 8.0 131.4 140.0 95 . 94 . Does not comply.
278 N Bnd lane W/side 17+84
. 5.4 8.0 134.9 140.0 95 96' Complies
10'. W Center line
279 N Bnd lane Sta., 20+50
' 8.4 8.0 ' 17.7 140.0 95 . .91 Does not comply
Center line
N Bnd lane Stá. .20+502 1 /2' 280 Center line ' ' ' 6.3 .8.0 ' 128.0 140.0 95 ' 91 Does not comply
N Bnd lane Sta'. 23+80
281 3' E Center lin,e ' 5.6 8.0 138.3 140.0 95 99 Complies
282' N Bnd Lane Sta. 26+00 ' '6.1 ' 80 125.1 140.0 95 ' 89 Does not comply'
Center line
283 N Bnd lane Sta 07+35 3.8 ' 8.0 126.7 ' 140.0 95 91 Does not, comply
COLLEGE BLVD IMPROVEMENTS PACE 4 10-28-87
TEST IN OPTIMUM IN PLACE MAX. DnY - PERCENT PERCENT
No. L 0 CA T I 0 N PLACE MOIST. DRY ' DENSITY REL. COMP. RELATIVE REMARKS.
- MOIST. DENSITY REQUIRED COMP.
9-1 NUCLEAR
1 Bnd lane valve.ciuster at Sta. 284 27+68 E/side of cluster 6.3 , 8.0'
'
131.3 140.0 95 94 '' Does not comply
285 Bnd lane Valve cluster st sta.
' 5.2 8.0 '123.2 140.0. 95 88 Does not comply
• 27+68 N/side of' cluster
Bnd lane Island So. Nose 5' So. 286 Tose Sta. 28+45 3.7 .8.0 ' , 125.4 140.0 95 87 , Does not comply
287 N Bnd lane Sta 32+00 6.3 8.0 127 4 140.0 05 91 Does not comply • 5 S Center
288 'T Bnd lane Sta 36+15 5 6 8.0- 127 7 140.0 95 91 Does not comply Center line ' •• ' ' .
289 N Bnd lane Approximately '' ' ' ' '
38+10' 5' So. Centerline ' ' , 6.0 8.0., 131.4 140.0 . ' 95 :94 Does not comply
290 N Bnd lane Sta. •39+60
2'' So. Centerline 5.7 8.0 128.2 140.0 95 92 Does not comply
9-9, NU C LEAR DEN SffV':
291 ECenter line trench EDL 10.9 9.'5 102.8. 128.0 90 80 Does not comply tip-in Sta 1+46
292 11/2' ECent:r line trench EDL 10.5 9.5 . 105.7 128.0 90 83 floes not comply tie-in Sta 1+6
293 Sta. 1+47 Center line - '7.6 9.5 105.2' 128.0 ' 90 82 Does not' comply
9-17 CEAR DEN S ITYT) • .. S ' . . .
294' Sidewalk N Side'of College Blvd 8.2 14.0 ' 107.5 116.5 - 90 ' 92 Complies'
3+45
Sidewalk N sid,e of College Blvd • ' 295 4+45 10.3 14.0- 106.3 116.5 90 91 Complies
('ñT T T \Tfl TMPPC17PM1'11T c fl-2R -7
TEST
No. L 0 C A T 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
9-17 NUCL-EAR DENSI ..
.
- Sidewalk N side of College Blvd . .
296 5+45 6.3 14.0 107.8 116.5 90 93 Complies
2 7 Sidewalk N side of College Blvd 6.6 14.0 110.0 116.5 90 94 Complies 6+45
Sidewalk N side of. College Blvd 298 7+45 7.4 14.0 110.2 116.5 .9.0 95 Complies
299 Sidewalk N side of College Blvd 8.5 14.0 110.9 116.5 90 95 Complies . S 8+45 .
Sidewalk N side *.o of CollegeBlvd 300 10+45 . . :8.5 14.0 110.8 .116.5 90 95 Complies.
301 Sidewalk N side 301 of College Blvd - 14.0 107 6 116 5 90 92 Complies 12+45 - .
Sidewalk N Side. of College Blvd . 302. 14+45 .. . 9.6 . 14.0 -113.5 .116.5 90 97 Complies
303
Sidewalk N Sidewalk College Blvd 105 14.0 102.3 116.5 90.
88 . Does not comply
16+50
304 Sidewalk N side of College Blvd 7.1 14.0 104.9. 116.5 -90 90 Co
-
mplies. 18+50 5 .
305 Sidewa lk 'N ice of College Blvd 19.3 . 1.4.0: . 99.7 116.5 90 86 Does not comply 2.0+5.0 . . . . . . . .
306 Sidewalk .'N Side of College Blvd 11.2 . 14.0 105.3 116.5 90 90 Complies' 22+50
. . .
307 -Sidewalk N Side of College Blvd
24+50 . 8.5 14.0 109.7 116.5 90 94 Complies.
308 Sidewalk
26+50
N Side of College
.
Blvd 7.4 14.0 102.8 116.5 90 88 Does not comply
309 5' E of Center line of W lane 4.2 8.0 136.2 137.0 95 . 99 Complies
_____ 53+00 5
COLLEGE BLVD IMPROVEMENTS PAGE 6 10-28-87
TEST IN OPTIMUM IN PLACE MAX. OIlY PERCENT PERCENT
No. L. f 1 A T' 0 N PLACE MOIST. I DRY DENSITY REL. COMP. RELATIVE REMARKS
. . MOIST. DENSITY REQUIRED COMP.
9-17 (NUCLEAR TTY1
_
310' 6' W of Center line., of W lane 4.2 .8.0 '13.2 137.0. . 95 99 Complies 50+00
7' E of Center Iine.of W lane 311 47+00 4 7 8.0 128 8 137 0 94 Complies
312
8' W of Center line of W lane,3.2. 8.0. 137 5 137 0 95 100+ Complies
44+00
313
9' E of CEnter line of W lane 3 4 8 0 136 4 137 0 95 100 Complies
41+00
8' W of Center line of W lane 314 38+00 4 0 8.0 136.6 137 0 95 100 Complies
10' E of 'Center line of 'W lane' 315
, 35+00 .. '. 2.7 8.0 133.8 '137.0 95
,
.' 98F Complies
316 7' W of Center line of W lane
7+flfl '
2.9'
'
8.0 . 141.2 137.0 95 100+ Complies '
5' E of Center line of W lane 317 29+00 3 7 8.0 129 5 137 0 95 95 Complies
318 8' W p Center line of W lane
2-- -6Q0 .
4 8 8 0 129 6 137 0 95 95 Complies
319
6' E of Center line of W lane 4.2 8 10 132.8 137 0
______
95 97 Complies
23+00
320
8' W of Center line of W lane 4 5 8 0 138 8 137 0 95 100+ Complies
20+00
321 11' E of Center line of ,W. lane 5.2 17 -4-flfl
-8.0' 132.2 137.0 95 97 Complies
322 W of Center . line of W lane 5.3 8.0 136.3 ' 137.0 95 ' 100 Complies 14+00'
8'.E of Center' line of W lane 323
' 11+00 . . . . 4.0 8.0 133.1 137.0 96 . 97 Complies
('ñTT( 1T\TTh TMP(WPMPMTQ
TEST L 0 C A T 1 IN PTIMUM OMOIST. DRY STY - - R E M A R K $ MOIST. DENSITY REQUIRED COMP.
9-17UCLEAR ENSI7
324 9' W of Center line of w lane
8+00 6.1 8 0 137 3 137 A 95 100+ Complies
325 4' E of Center line of W lane
5F00 .
4 9 8.0 130.7 137 0 95 95 Complies
326 8' W of Center line of W lane 5.2 . . 8.0 135.1 137.0 95 99 Complies
1+46 13' E of Center line of
32 7 W iane 7 3 8.0 131.5 137. 0 95 . 96 Complies
328 2'w of Centerline of E lane
1+45 6.5
.
8.0 133.7
S
137.0 95 98 Complies
329 4' W of Center line of E lae
1+20 6 4 8;0 128.8 137.0 95 94 Does not comply
5' E of Center line of E lane 330 1+20 7.5 80 129.4 137.0 95 95 Complies
331 215 W of W lane 28' N of Center
line of Palomar Airport Rd.. 8.4 8.0 132.3 137 0 95 97 Complies
160 W of W lane 29' N of Center,
332
line of Palomar Airport Rd
7.7 8.0 128.0 137.0 95 94 Does not comply
333 100' W of W lane 25' S of Center
1 nt rf P 1nni r A-i rpnrt- Pd 7 8 8 0 131 0 137 0 95 96 Complies
334 50'..w of W lane 30' S of Center
line of Palomar Airport Rd.. 6 7 8.0 127 3 137 0 95 93 Does not comply
335 300' E of E lane 25' S of Center
line of Palomar Airpo rt Rd 7.9 8.0 128 5 137 0 95 94 Does not comply
336
200' E of E lane 25' S of Center
linp n P1nnir A1rpnrtRd. 6.9. 8.o 121.5 137 0 95 89 Does not comply
100 E of E lane 25' 5 of Center 337
_____ line of Palomar Airport Rd. 8.2 8.0 123.7 137.0 95 5 90 Does not comply
r.nT.T.F.r_F.'RT.UTh TMPPAUPMMT
TEST • IN OPTIMUM IN PLACE MAX. Dny. PERCENT PERCENT
No. LO C AT I 0 N PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE . REMARKS MOIST. DENSITY REQUIRED COMP.
9-17 j HJCLEARDENSITYf
338 .5' E of E lane 30' S of Center .
line 6.3 8.0 .126.3. . 137.0 95 92 Does not comply of Palomar Airport Rd.
339 RETEST OF #42 8 2 8.0 131.1 137 0 95 96 RETEST OF TEST #42
Complies.
340 IETEST OF #43 7.8 8.0 130.3 137.0. 95 95 RETEST OF TEST //43
roinp4
341 IETEST OF 1/44 7.5 8.0 131.0 13.7.0 95 96; RETEST OF TEST 1/4
Complies
342 ETEST OF #45 7..8. 8.0 130.5 137 0 95 95 RETEST OF TEST #45
Complies
343 IETEST OF #41 7 2 8.0 130.6 137 0 95 95 RETEST OF TEST #41
Complies
344 IETEST OF //39 7.5 8.0 130.2 137.0 95 95 RETEST OF TEST 1/3 9
Complies
345 IETEST OF #37 7 2 8 0 132 0 137 0 95 95 RETEST OF TEST #37
Complies
346 IETEST OF #36 8 1 8 0 132 1 137 0 95 95 RETEST PF TEST #36
Complies
9-18
1 ta 53+00 9 5 F C S/Bound lane 146 2 152 0 95 96 Complies
2 S. t 52+30 8' 5 F C 147 6 152 0 95 97 Complies
3 3 ta. 51+80 3' So. F..C.. . . 147.8 152.0 . 95 97 Complies
4 )ta 48+70 6' So F C 149.6- 152.0 95 98 Complies
(OT.TF.aF. RT.\JT) TMPRflVFM1NT9 DA(' fl I no 0,
TEST
No.
- ' L 0 C A T I 0 N" IN
PLACE
MOIST.
OPTIMUM
MOIST.'
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
"
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K S
9-18 S
Sta 47-80 5' So F C 148.7 152.0 95 98 Complies
6 310.0 uped to 325.0'- 45+50
5' So. F.C. 0646-146 94.2' '
. . 146.7 152.0 95 . .97 Complies
7 Sta 46+85 5' So F C 144.2 . 152.0 95 95 Complies
8 Sta. .46+80 5' So. F.C. 143.9 .-. 152.0 95 95' - Complies-
9 Sta 46+50 4' So F C 145.-1 152.0 95 96 Complies
10 Sta. 44+25 2 1 /2' So. F.,C.' . ' ' ' 147.9 152.0 95 - . 97 Complies
11 , Sta. 44+20 .9 1/2 So. F. C., - 149.4 '152.0 95 - 98 Complies
12 - STa. 40+37 2 1/2' So. F.C. . 147.3 152.0 - 95 97
- Complies
13 Sta. 39+82.1.' N Center Island : ,. Is
. - -• .at futu , re Paloma , '
r bet . .
.
- .
131.8.. . 152.0 95 88 ' Does not comply
14 Sta. 39+90, +7' - , - 142.2 - 152.0 9.5 94. ' Does not 'c omply
15 + 25' 2' N Center line Island 148 4 152.0 95 98 Complies
16 Sta 40+60/2 1/2 N Center line
. tglpnd 147 4 152 0 95 97 Complies
17 Stà. 40+85 Center line Island
, '
137.8 152.0
.
9'5 - 91 Does not comply
18. STa. '40+85 5' N of So. face curb . 140.6 152.0 95, 93 Does not comply
11
COT,LFcF. RT,VT) TMPPOVF.MFNTS
TEST No. L 0 C A T I 0 N IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. Dr1Y
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMAR IKS MOIST. DENSITY REQUIRED COMP.
9-18 RDITYONKP H A LTJ
19 So Face curb 140 3 152 0 95 92 Does not comply
20 2' No Face curb So /Face curb 137 4 152.0 95 90 Does not comply
21 4 1/2' No Face curb 14.9.1.. 152.0 95 98 Complies
22 STa 35+50 6'/2' So Face curb 151 4 152-0. 95 100 Complies
23 Sta 30+55 %' So Face curb 150 4 152.0 95 99 Complies
24 Sta 30+50 153.3 152.0 95 100+ Complies
25 On Palomar Air Port Rd W/Bnd side
7S+lfl 7 F. (enrer line 143.7 152.0 95 95 Complies'
Palomar Airport Rd.
Sta. 75+25 28' E Center line
26 Palomar Airport Rd 144.2 152 .,0 95 95Complies
Sta 75+65 221 /2' E Center line 27 *.2 147 152.0 95 97 omp lies Palomar Airport Rd.-
28 21' E Center line Palomar Airpor 143.5 152.0 95 95 Complies
29 •
5ta 76+85 261 /2' E Centr line 143.1 152.0 95 94 )oes not comply Palomar Airport Rd. : •
30 • Sta. 77+00 22,' E Center lne
• 143.4 152.0 • , 95 94 Does not comply' Palomar Airport Rd. • • ,
N/Bnd lane 3' E' Face curb • S 31 0+38 S 151.5 152.0 95 100 Complies
COLLEGE BLVD IMPROVEMENTS PA( 11 1n_',a_Q7
TEST
No.
-
L 0 CA TI 0 N'
.
PLACE
MOIST.
OPTIMUM
MOIST:
IN PLACE
DRY
DENSITY
MAX, Dnv
DENSITY PERCENT REL.-COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K S
9-18 92 L . -. . -. .
32; 0+15 15 E. Face curb i . 144.7 ; 152.0 . 95 . .95 Complies
33 0+15 5' W Center line Island 1.4.2;8 152.0 95 9.4 Does not comply
34 2+30 So./Brid -lane
Center line Island 144.1 152 0 95 95 Complies
35 So /Bnd Sta 4a+40,5' W Face cur 146 7 152 0 95 97 Complies
36 Sta 4+50 15' E Face curb 147 4 152 0 95 97 Complies
37 Sta. + 450, So./Bnd lane , . . . 3 E Face curb .
.
.
.
. .
.
. .144.1. . 152.0 95 .
. 93 . . Does not, comply.
38 ' So./Bnd ' Sta. '7+00 9' E face curb " 150.9 152.0 95 99 Complies
39 Sta. 7+10 . 6" E .. - ' ' ' 145.6 - 152.0 . 95 96 ' Complies:
40 Sta 7+30 6' W Face curb 143.16. 152 0 95 95 Complies
41 Sta 19+00 3' E Face curb 145.2 152 0 95 97 Complies
42 Sa. 19±05 5' E Face curb ' ' . . . 147.8 - 152.0' '95 - 99. Complies
43 Sta. 19+20 ' ' . .. 146.0 152.0 95 '96 - ' Complies
44 Sta. 24±50 5 1/2" E face curb'
,
150.5 152.0 95 99 Complies
45 Sta '24+49 17' E Face curb . - 146.1 152.0 95 96','. Complies
rflTT.P .RT.UTh TMPP11?M1?11TQ
rsr
O. L 0 C A T I 0 N IN PLACE OPTIMUM
MOIST.
IN PLACE
DRY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E .R M A K S MOIST. DENSITY REQUIRED COMP.
9-18 LEARDENSONASPHTT
46 STa 24+45 6' W face curb 150.4 152.0 95 99.Complies
47 S t a 28+45 4 W face curb 147 2 152.0 95 97 Complies
48 Sta 28+30 Center line lane So..144.4 15.2 .0 95 96 Complies
S t a 37+50 So /Bnd lane
2' E face curb
147 7 152 0 95 97 Complies
50 STa 37+55 12' E Face curb s 146 6 152 0 95 97 Complies
9-18 NUC rKRI FrST 7
347 N/Bnd lane Sta. 52+50
6' W Face curb 5 7 4 8 0 131.3 138.0 95 95 Complies
348 N/Bnd lane Sta 48+70
61 E
N/Bnd
4 7 8 0 131 0 138 0 95 95 Complies
349 lane Sta. 44+15
2' E Center line 5-1. 8.0 137 1 .138.0 95 99 Complies
N/Bnd lane S t a 40+70 350 Center line 5.3 .8 .0 137 6 138 0 95 100 Complies
N/Bnd lane Sta 35+50 351 2' E of Face curb S
5.8 8 0:_' 128 8 138.0 95 93 Does not comply
N/Bnd lane Sta 35+50
352 11' E. Face.Curb 5.0 8.0 134.0 138 0 95 97 Complies
Sta 31+70 N/Bnd lane 353 4! W Face curb 6.4
S
..8.0 134 0 138.0 95 97 Complies
354 Sta. 27+60 8' E Center line
1an e S
5.0. 8.0 136 7 138.0 95 99 Complies
c'ri I t'rt' T 17 TMDOTt9XtMmC
TEST
No. . L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST. IN PLACE
'DRY
MAX. Dny
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K $ MOIST. DENSITY REQUIRED COMP.
9-18 (NU C LEA1DE N . . . .
Sta. 27+80 15' W center line
355 lane . 4.8 8.0 .128.3 138.0 95 93 Does not.comply
356 Sta. 28+65 Center line lane'..5.3 . 8.0 135.7 138.0 95 . 98 Complies
357'Sta.- 22+50 2' W Face curb 4.5 8.0 131.8 138.0 95 96 Complies
358 STa 18+30 31/2' E Face curb 4.9 8.0 138'.0 138 0 95 100 Complies
N/Bnd lane STa 14+00 I 359 3 .1/2. E Facecurb 7 1 8 0 131 ..3 138.0
- 95 95 Complies
360 N/Bnd lane Sta 9+20 center line 6.4. 8.0 132 7 138'.0 95 96 Complies
361 N/Bnd lane Sta. 4+70 1' E face
curb
-6.7.- 8 0 130 4 138.0 95 95 Complies
362 Run B/s 3' E of 1' E Face curb 5-.4 8.0 137 3 138.0 95
-
100 Complies For back-upinfo. . . ..
9- 119
N/Bnd lane 3' E face curb 51 144 8 152.8 95 95 Complies
52 N/Bnd lane 2' W face curb 150 ..4 152 8 95 98 Complies
53 N/Bnd lane Sea. 50+70,
4 F fi'p riirh . -
.
-.
.146.5. . 152.8 95 96 .. Complies
N/Bnd lane Sta ..'50+45
_____ 4 face curb . . . . .
148.4
. •.
152.8
.
95
. . -
97
.
Complies
. . . . .
('ñT I '('P 1T Un TMPPfl\T1M1TQ fl A r' t I I.
TEST
No. L 0 C A •I I 0 N
IN
PLACE
OPTIMUM MOIST.
IN PLACE
DRY
MAX: DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
9-19
N/Bnd lane 50+50 Center line 55 lane 144 6 152.8 95 95 Complies
N/Bnd lane Sta 50+47 56 15' W face curb 145 1 152.8 95 95 Complies
N/Bnd St 47+45 57 flane
ace curb. 147 3 152.8 95 96 Complies
N/Bnd lane Sta 47+30 2' W 58 center line lane 14-5.4 152.-8 95 95 Complies
N/Bnd lane Sta. 4+50 4' E
Face curb
145.0 152.8 95 95 Complies
60
N/Bnd lane Sta. 45+00
. 146.3 152.8 95 96 Complies
1/2" E Face curb
61 N/Bnd lane S t a 44+95 12 1/2' 150.0 152.8 95 98 Complies E Face curb
N/Bnd lane STa 44+90 4 1/2'
62 w face curb 147 5 152 8 95 97 Complies
N/Bnd lane Sta 40+70,
W fa,ce curb - 0
148 7
_______
152.8 95 97 Complies
64 N/Bnd lane St 40+70
f .ace curb 143.8 152.8 95 94 Does not comply
65
N/Bnd lane Sta 37+40 146 .7, 152.8 95 96 Complies
5' E face curb
66
N/Bnd lane Sta 37+45 Center line 150.0 J52.8 95 98 Complies
lane 5' No Man Hole
67 N/Bnd lane 37+40
QI 148.5 152 8 95 97 Complies APP w_F uy1-,
- 68 N/Bnd lane STa 31+75 144 9 152 8 95 95 Complies 2 1/2'.W fae curb - 0
C' f\ 'I 7 fl C' 'fl fl 7 TIn
No.
TEST IN
L 0 C A T I 0 N PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.'
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
9- 19
/Bnd lane Sta 31+70 69
' Center line lane 148.1 152 8 95 97 Complies
N/Bnd lane Sta 26+00 7A 0 W face of curb
146.5 152'.8 95 96 Complies
N/Bnd lane Sta. 26+05 71 ' ' 6' W face of curb
:157.9 152.8 ' "9-5 99 ' Complies
72 N/Bnd lane Sta.- 26+00' ' '
'Now
' 14' E face curb ' , 148.1 152.8 95 97 , Complies
N/Bnd lane Sta.' 18+30 73 5 1/2' W face curb 146 6 152 8 95 96 Complies
7-4 N/Bnd lane Sta. 18+3 . ' '' 148.3 152.8 95 ' 97 ' Complies 1,4 1/2' W face curb-
175 N/Bnd lane Sta.'.1.4+00.1 149 6 152 0 95 98 Complies 11' W face of curb
N/Bnd lane Sta 14+11 76 2 1/2' W face of curb 145 4 152 0 95 95 Complies
N/Bnd lane Sta 8+60 77 3' W face of 'curb '
148.3. 152.0 95 97 Complies
N/Bnd lane Sta.- 8+55 -- 78 3'--E face of curb. ' . 143.7 152.0 95. 94 Does not comply
79 N/Bnd lane Sta 4+25 151 0 152.1 0 95 99 Complies 3' W face of curb
80 N/Bnd lane Sta 4+00 144 ..13 152 0 95 95 Complies 2 1/2' E face of curb
S/Bnd lane STa 3+50 81 5 1/2' E face of curb 152.0 152A 95 100 Complies
82
113'
S/Bnd lane Sta. 7 3+50 . 147-. 9 152.8 95 97 Complies
_____ 'E face' of curb
--
1'IT T t'f't' TT7Th TDTtqVKT'T'C'
TEST
No.
- -.
L 0 C A T I 0 N PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAx. Day
. DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE, R E M A R K S MOIST, DENSITY REQUIRED COMP.
9-19
8 3
S/Bnd lane Sta.8 7+00
11' E
143.9 152 95 94 Does not comply face of curb
84 SIB.nd 1-ane Sta. .7+05. . .
6 1/2' E face of curb. .'.
-146.7
.
152.8 95 96 -Complies
85 S/Bnd lane STa. 40±25. .
7' E face of. curb . . 148.9 -152.8 95 . 98 Complies ..
S/Bnd lane Sta. 37+00 86 9' E face of curb
'146.. 152.8 95 96 Complies
87 S/Bnd lane Sta. 30+59 .
' 3 1/2 E face-of curb - . .
145.7 152.8 95 95 Complies
88
S/Bnd lane sta 24+55 147 7 152 8 Complies
95 97
3 1/2 ' E face of curb
89 S/Bnd lane STa. 24±50 .. . . .
13' E face of curb 145 7 152.8 95 95 Complies
S/Bnd lane Sta 19+10
90 2'.E face of curb
146.9 152A 95 96 Complies
91 S/Bnd lane Sta. 18±50
9 1/2''Eface curb.
145 9 152 8 95 96 Complies
92 S/Bnd lane Sta 14+55
. . . -. . .
13 1/2'1?_f rlf_curb
145 5 152.8 95 95 Complies
S/Bnd lane Sta 15+00.
... . . .
. . .147.6 152. 8 . 95 97 .Com.plies 9 1/2'E_face_ofcurb .
S/Bnd lane Std. 15+50 94 2' Eface of curb . . . .
144 6 1,52 .8
.
95
._.
95 Complies
95 S/Bnd lane Sta 14±00
7lF_F,c'eo f eiir h 145.8 152.8 95 95 Complies
S/Bnd lane STa. 10+48
96
2' E Face of curb
146.4 152.8 95 96 Complies
('ET T LIfIV n T TT1\ T 11,nn yi,,r.,,q'e.
TEST No. L 0 C A T I 0 N IN
PLACE OPTIMUM
MOIST. IN PLACE V
DRY
MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE
V
R E M A R K S MOIST. DENSITY V REQUIRED COMP.,
9-19 N URDE
S/Bnd lane S t a 10+00
12 112 E face of curb V V V 147 0 V 152 8 95 V 96 V Complies
98 S/Bnd lane S t a 10+25
8 1/2 E face ,of curb - 147 9 152 8 95 97 Complies
99
N/Bnd lane Sta 15+00 V V V V
5' E face of curb - V 148.0 152.8 - 95 97 V Complies V
N/Bnd lane STa 15+10 100 Center line lane V - V
152 0 - 152 8
-
95 100 Complies
V S/Bnd laneV Sta. 51+85. 101 4' E face of curb 143 7 152 8 95 95 Complies
S/Bnd lane 51+80 102 9 1/2 E face of curb 146.3
-
'152.8 95 96 Complies
S/Bnd lane 51+90 103 5 1 /2' W face of curb 145.5 152 8 95 96 Complies
S/Bnd lane Sta 51+80 104
V 2 W face of curb V
V V V
144 7 152 8 95 95 Complies
N/Bnd lane STa 51+00 105 .136.5. 150.0 ' 95 90 Does not comply,
106 STa 50 50 5' W face of curb 137 0 150.0 95 91 Does not comply
107 Sta 50+50 10' W face of curb 139 7 150 0 95 93 Does not comply
108 At SDG&E sign H P gas line
5 1/2 'W face of curb 144.8 150.0 95 97 Complies
109 At SDEG sign H P gas line 142 ..2 15,0 .0 95 95 Complies g 1/7' 14 fit'c nf etirh
110 Sta. 44+75 .71/2 W face of curb 143 4 150.0 95 95 Complies
COLLEGE BLVD . IMPROVEMENT.S PAGE. 18 10-29-87
TEST No. .
L 0 C A T I 0 N IN
PLACE
MOIST,
OPTIMUM -
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S DENSITY REQUIRED COMP.
9-19 .101=_E A ~R_.!~UN S IT YO
111 N/Bnd E sect of cap approximately
. . . 146.0
.
152.0 . 95 96 Complies Sta. 53+00 6 W Face of curb . . . .
112 N/Bnd Sta. 39+00,13 1 W. face curb . .143.9 -15.2.0 . 95 . 95 C.orn'plies
113 N/Bnd Sta. 32+00 12'-W face curb 142.5 150.0 , 95 95 . Complies
114 N/BNd Sta 29+45 5 1/2' W face curb - 14-3.0' 150.0 95 95 Complies
115. N/Bnd Sta. 25+50 5' W face curb
.
. 145.7 - 152.0 . 95 96 - Complies
116 N/Bnd Sta. 20+50 4' W face curb 148.3 152.0 95 . . 98 Complies
117 S /Bnd lane Sta 47+60
5 E face of curb 145.3 152 0 95 96 Complies
118
S/Bnd lane STa 41±15.
Center line lane -
- . 148.2. 152.0 95 - 98 Complies
119 S/Bnd lane STa. 47+65
, - W face of curb - 5 .
. .
. . 145.2 . 152.0 .
.95 . 96 Complies
120 S/Bnd lane Sta.. 42+53..
2-1/2'- E face of curb . . . 144.7 152.0 95 95 Complies
Sfnd lane Sta 42+50 121
- - 13 E face of curb-
150 1 .152.0 95 99 Complies
S/Bnd lane Sta 42+25 122 144.2 152 0 95 95 Complies
123 S/Bnd lane Sta. 39+00 . . . .
7' W face of curb 143.4 152.0 95 . 94 Does not comply-
- 124
_____
S/.Bnd lane Sta 37+45 - -
11 1/2 W face of curb
. -149.5 152.0 95 98 Complies
(11T.T.(2P RT.Ufl TMPP01T1'MMT'
TEST.
LOCATION* IN
PLACE OPTIMUM
MOIST.
N PLACE
DRY MAX. Dn
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
9-19
125 S/Bnd lane Sta'. 37±30 ..
31 W face of curb 147.3 152.0 95 97 Complies
12.6 S/Bnd lane Sta. 37+5 1-45.4 152.0 95 96 . Complies
127 S/Bnd lane Sta. 28+00 . 155.0 152.0 95 100+ Complies
128 S/Bnd lane Sta 28+00 15' Face
of b .. cur 152.2 152.0 95 100 Complies
1.29 S/Bnd lane Sta. 28+20 1 W
Face of curb Ithland (CNRB) . .
144.2 152.0
.
95 95 Complies
130 S./Bnd lane S ta. 28+83 - . .
,. 13' W face of cutb .
147.3 152.0 97 Complies
131 Sta 22+80 7' W face of curb 148.7 152;0 95 -. 98 Complies
132 Sta 19+05 10 W face of curb 147.0 152.0 95 97 Complies
133 Sta 18+90 3' W face of curb 144.5 - 152.0 95 95 Complies
134 Sta 18+50 7' W face of curb 147.2 152.0 95 97 Complies
135 S /Bnd lane Sta 14+50
4' W face of curb 146 152.0 95 97 Complies
136 S/Bnd lane Sta. 7+00 -.
- . S t W f;;rp of r,irh' .
146.2 152.0 .95 96 Complies
S/Bnd lane Sta 6+80 .
1 7
. 12' W face of curb ..
147 0 152 0 95 97 Complies
1 8 S/Bnd lane Sta. 32+50 .
3' W face of curb . . ..
.
.
144.7 152.0 9.5. 95
.
Complies
COLLEGE BLVD IMPROVEMENTS P A av )fl 1fl...90_7
TEST No. L 0 C A T I 0 N IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DrlY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE
-
R E M A R KS MOIST. DENSITY . REQUIRED COMP.
9-19 1NST1YO FTKS HA1JT
S/Bnd lane Sta. 3+00 . . - ________ ________ _______________________ 139 14' W face of curb
.
.149.6
.•
152.0 95 98 Complies
140 Check out left turnpocket w/Kirt
C. area not compacted-ranged . . 13.9 152.0 95 . 90 Does not comply
from 85-93 . . . .. .
141 Sta. 33+00 4' W face of curb . 140.7 - 152.0 95 92 Does not comply
142 Sta. 30t5 8'-w
. left turnpocket 136.9 152.0 95 90 Doe not comply
143 Sta. 30+45 8' W left turn pocket . 136.4 152.0.- . 95 90 . Does not comply
144 Sta. 30+50 2' W face, of curb
- 129.3 152.0 95 85 Does not comply J ft turn pocket . .. .
- Sta. 30+50 7' W face of curb 145 left turnpocket 1359 152.0 95 89 Does not comply
STa. 32+50 6' W face of curb - 146 1eF t, f iirrpn.kf
139.5- 152.0 95 92 Does not comply
STa. 33+94 5' W face of ctirb 147 left turnDocket - 141.0 152.0 95 93. Does not comply
9-24 CLEAR PNS5TT
363 Sidewalk *W side Center line - 11.9 14.0 1110 116.5 90 95. Complies 41+75 . -
Sidewalk W side Center line 364
. - . Sta.. 45+50 11.7 14.0 110.4 116.5 - .90 95 Complies
3.65 Sidewalk W side Center -line
STa. 49+00. 12.6 14.0 108.0 116.5 90 93 Complies -
C(T.T.7t21 TT.Ufl TMPPI1?MPMTc
TEST - L 0 C A T1 0 N
IN
.PLACE OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY PERCENT
REL. COMP. PERCENT *
RELATIVE R E M A R K S MOIST. DENSITY ' REQUIRED COMP.
9-24
Sidewalk W side Center line 366 Sta. 51+75, 9.5 .14 .0 .112.0 .'11-6.5 90 96 Complies
9/ .. . . ' .
.
All tests are retests of test's
;:taken 9-21-87
College Blvd. left t,urn
Re-A lane CL of Lane 230'N of CL ' 146. ' 152.5 95 96 Complies RETEST A
Re-B College Blvd.' Left turn CL '
120' N of-CL P.A.R. , . 46.8 152.5 95 96 Complies RETEST B
Palomar airport rd. left
turn lane 100'W of CL ' 1375 ..complyRe-C 152
.
90 Doe,s not comply retest C
Palomar airport rd.' left Re-D turn 100' W of CL college blvd..- '144.3 152.5 Complies RETEST D
Palomar airport rd. tight Re-E turn lane 230' E of CL ' 143.1 152.5 95 94 Does not comply
' retest E
Palomar airport rd. rt. lane
' Re-F 120' E of CL collegè blvd.
148.4 152.5 95 97 ' Complies RETEST F
38'S of. CL Palomar airport
. - Re.Rd. CL of college b-lvd. ' '
' 140 6 152.5 95 92 Does not comply
'RETEST G
9/25 (MUCULEAR NS I
RADE
Sidewalk E s'ide' College Blvd. .
367 Centerline Sta. 42+00
, 9.3 14.0 100.1 116:5 90 86 DOes not comply
Sidewalk ,E side College Blvd..10.1
Centerline 39+50
36
8 14.0 100.1' 116.5 90 86 Does not comply
369 Sidewalk E. side College Blvd.
Center line 36+.00 9.2 14.0 1 100.1 116.5 90 86 Does not comply
COLLEGE BLVD. IMPROVEMENTS PAGE 22 .. 11-6-87
EST
10. -r A 0 N '.
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DrY - DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE
- REMARKS
MOIST. DENSITY REQUIRED COMP.
9/2 Sidewalk E side College blvd
370 centerline 31+00
T. 2 14.0 103 4 116.5 90 89 Does not comply
371
Sidewalk E. side College Blvd. 9.8 14.0 103.0 116.5 90 88 Does nOt comply
Cent Center 26+00
-
372
Sidewalk E side College Blvd 10.8 14
.
0 97 3 116.5 90 84 Does not comply
Centerline 22+00
9/3 37+00 Median 9.0 11.0 107 7 116.5 90 92 Complies
373.
374 32+00 Median
. .8.7 . .11.0 107.4 116.5 90 92 '. Complies
375 34+00 Median 9 2 11 0 108.8 116.5 90
-_
93 Complies
-- Median Sta. 23+50 15.9 14.0 105.4 116.5 - 90 90 Complies
376
377 Median Sta 19+10 13.8 14.0 105.5 116.5 90 91 Complies
378 Median Sta 14+10 10.8 14.0 107 6 116 5 90 92 Complies
379 Median Sta 9+50 14 0 14 0 110 1 116.5 90 94 Complies
380 College blvd 8' N of centerline 20 1 14 A 106.8 117.5 90 91 Complies 55+00 N lane 6' .N of center line
C011ege blvd.. 10' Sof centerline 19.2 14.0 - 108.1 117.5 90 92 . Complies-
38 1 58+00 N lane 12' S of centerline
382 College blvd 4' N of centerline 7 6 14.0 117 8 117.5 90 100 Complies 61+00 N lane class II base S . . .
383 College blvd. 19' N of centerline
64+00 N lane area pumping slightl 20.9
S
14.0 104.3
-
. 117.5 90 89 - Does not comply
384 College blvd area around MH need3 19.0 14.0 107 4 117.5 90 91 Complies
compaction66+00 N lane 11'Sof MH
______
1. COLLEGE BLVD. IMPROVEMENTS PAGE 23 1'1-6-87
rEsT
0. L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE -
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE. REMARK S
MOIST. DENSITY - REQUIRED COMP.
0/21 College blvd. area around MH 16.3 14.0 107.2 117.5 90 91 Complies
385 ,needs compaction 69+00 MH 10 W o
MH 8' N of centerline N lane
386 S. lane 1251 -W of faraday Inters 19.1 14.0 106.1 . 117.5 90 90 Complies
College blvd. Slane MH in center 387 of Rd.wy66+OOSlane 14'N of C.L. 15.5 1,4.0 1,10.0 110.6 90 '94 Complies
388
College blvd. MH 63+00 S lane 10' 16.3 14.0 110.6 117.5 90 94 Complies
S of Center line
389 College blvd. MH 60+00 S lane 17.9 14.0 106.4 117.5 90 91 Complies
10'W of centerline -
390 College blvd. MH 56+00 S lane 21.8 14.0 104.7 .117.5 90 89 Does not comply
area around MH need compaction
391° College blvd, 50' E of Intersecti 11 16.7 14.0 106.9 117.5 90 ' 91 Complies
S lane 10' S of centerline ______ ________ ________ . . ________ -
380A.Retest 380 Sta. 55+00 16.6 14.0 107.9 117.5 90 93
Retest //
Complies '380
Retest II Retest 383 Sta. 64+00 20.3 14.0 106.1 117.5 90 90 Complies 383 383A ,
384A Retest 384 Sta. 384
, 18.6 14.0
- 108.2 117.5 90 92
Re
' Complies est II
384
385A 8 Sta 5 6 +00 5 Retest
, 17.7 14.0 109.6 117.5 - 90 93 5 Retest /
- 'Complies 385
386A Retest 386 125' S of Faraday 20.7 14.0 107.0 117.5 90 .91 Compl i.es Retes t //
386
389A Retest 389 60+00 17.8 14.0 107.2 117.5 '90 ' 91 Complies
' 389
Retest 390 Sta. 56+00 , 17.7 14.0 109.6 117.5 90 93 Complies Retest II
390A 390
Retest //
391i' Retest' 3.91 50' N of. intersect. 15.2 14.0 109.1 117.5 ' '90 93 - Complies
Sta. 53+75 - . ______ S S - . -
College Blvd. Improvements Page 24. 11/9/87
TEST I.o. L 0 C A T 10 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. On','
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY REQUIRED COMP..
10/22 College Blvd 69+20 20' N of MH
1.5.5- 14 0 113 0 117 5 90 93 Complies
392 E lane 10'W centerline
CB 72+00 E lane 6' E centerlin 17 9 14 0 109.1 117 5 90 93 Complies 393
CB 75+00 E lane 8' W centerline 19 5 19.5 107 9 117.5. 90 92 Complies
CB 78+00 E lane 7 E centerline 18.8 18 8 104 8 117.5 90 89 Complies 395
396 College Blvd 82+50 E lane 13 8 14.0 109.4 117.5. 90 93 Complies
397 College Blvd 84+50 E lane 21.3 14'.0 101 9 117.5 90 87 Does not comply
398 College Blvd 84+00 W lane 21.2 14.0 10,4 .5 117.5 90 89 Does not comply
399 College Blvd 81+00 W lane 18.7 .14.0. 106.7 117.5 90 91 Complies
400 College Blvd 77+00 W lane 13 4 14 0 110.2 117.5 90 94 Complies
401 College Blvd 73+50 W lane 20.2 14.0 115.1 117.5 90 98 Complies
402 College Blvd 70+50 West lane 15.0 14-.0 '109.9 117.5 90 94 Complies
403 College Blvd SBRM Sewer W of 9 4 11 5 108 .6 , 119-2 90 91 Complies
Palomar airport rd. 50'Wof E rd. S
404 CB S BRM Sewer -W of palomar
airport rd 35' W of E rd 12'W
of MH
TESTING ENGINEERS-SAN DIE)
Reviewed by:
IhR
Kirk P. /jmiennan
North County Branch Manager
3V
flIJ Testing Engineers—San Diego
I A Division of United States Testing Company, Inc.
3467
S(IA11 It\\%V,
Kurtz St., P.O. Box 80985, San Diego, Ca. 92138(619) 225jCE
2956 Industry Street, 'Oceanside, California 92054 (619) 757-OT
DATE OF TEST 10/23/87'
FILE No. 087-527
LAB. No 25.9
DAILY 'RESULTS - IN PLACE 'DENSITY TESSTICIPI PROJECTS
Ca rlsba d, 'CA DIVISION
LOCATION
PROJECT College blvd. Improvements
DATE OF REPORT November 18,1987C0NTRACT0R '
rEsT IN OPTIMUM IN PLACE MAX. Dv PERCENT PERCENT
No L 0 C A TI 0 N PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R K S MOIST. DENSITY ' REQUIRED COMP.
10/23 NUCLEAR'DENSITY:
396A 'Retest of 1/396 Stat. 78+00 E. 18.5 14.0 . 105.7 117.5 90
'
90 Retest //396 Complies Lane 7'E Centerline F.G. Subbase .
98A
Retest of II 398 84+50 E. Lane
' 17.3 ' 14.0 1.05.7 . _17 _5 1. 90 90 Retest /1398 Complies F.G. Subbase
Retest #399 84+00 W. Lane ' ' ' ' Retest, //399
399A Finish Grade Subbase , 17.8 14.0 105.9 117.5 90 90 . Complies
L - 0/24 NU CLEAR DENSITY:'
College Blvd. E Bo'und Stat. 65+5 ' ' 05 e-12 Finish Sub Base 4.8 7.0 131.4 . ' 139.0 95 , 95 Complies
Stat.63+00e 1211 Finish SubBase
O6 5.1 7.0. 131 7 1390 95 95 Complies
07 Stt. e 59+50e 1211 Finish Sub
base , `7.0 ' 132.0 139.0 95 95 Complies
08 Stat 54+50 83e 1211 Finish Sub 5.4 7.0 1316 139 0 95 95 Complies
Base
1+09
Stat 56+00 e-12" Finish Sub Base 5 8 7.0 137-9 1390 95 95 Complies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
COLLEGE BLVD. IMPROVEMENTS 1I/18/8 " . Page 2
EST
0. L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R E M A R K S
10/2/' NUCLEAR DENSITY: S
College Blvd. W. bound Stat. 59+
00. e-12' Finish Sub Base
'70 131.3 139.0 95, 95 Complies
411 Stat. 64+00 e-12" Finish Sub 5.1 7.0
Base
131.4 139.0 95 . 95 Complies
412 Stat 67+98 e-12" Finish Sub 5.3 7 0 .131.6 139.0 95 95 Complies
413 S.G. on College Blvd E Bound 17.6. 14.0 113.7 117.0- 90 97 Complies
414 Stat. 91+00 'e Finish Subbase 15.8' i4.0 . ' 112.7 117.0 90 . 96 ' Cdmplis
415 Stat e 95+50 e Finish Subbase 15.0'-14.0 108.3. 117.0 90 - 93 Complies
416 Stat. 98+50 e Finish Subbase 15 14.0 107.1 ' 1170 90 . 92. ' Complies
417 Stat 98+00 e Finish Sub base 15'.0 14.0 108.3 117.0 90 93 Complies
418 Stat 94+00 e Finish Sub base 16.4 14.0 107.5 117 0 90 92 Complies
419 ' Stat. 88+10 e Finish Sub base 16.8 14.0 .112.4 117.0 90 96 Complies
420 Stat 84+50e Finish Sub base 16.6 14.0 109-'0 117 0 90 93 Complies
0/26 NUCLEAR DENSITY
421 College Blvd East Lane Stat 6 1 7 0 54 +50 129 0 139 0 95 93 Does not comply
422 College Blvd W Lane Stat 57+70 7.0 7.0 .126.3 139.0 95 91 Does not comply
COLLEGE BLVD. 'IMPROVEMENTS 1 1/18 •. Page 3
TEST
No L 0 A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
-DENsITy
MAX. DRY
DENSITY
.
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K S
0/26 NUCLEAR DENSITY
423 College Blvd W lane Stat 57+50 5.4 7 0 128 5 139 0 95 92 does not comply
424 College Blvd. W. lane Stat 7+50 .2 7.0 .126:4 139.0 95 91 'Does' not comply
425 College Blvd W lane Stat 63+50 7.3 7.0 ' 132.7 139.0 95 96 Comolies
426 College Blvd W lane 66+50 5 0 7 0 128 5 139.-0 95 92 T)oe q not comply
427 College Blvd W lane 69+0 5.4 7 0 127 0 139.0 95 91 Does not comply
10/26 NUCLEAR DENSITY
428 College Blvd. E. Lane 70+50 7.2, 7:0 130.1 139.0 95 .94 Does not comply
429 College Blvd'. E.' Lane 73+50 6.3. 7.0 ,' 130.1 139.0 95 94Does not comply
430 College Blvd. E. Lane 76±50 5.9 7.0 , 130. 139.0 95 94 Does not comply
431 College Blvd ...E:. lane 79+50 7 9 .7.0. 130.3 139 0 95 89 Does not comply
432 College Blvd E lane 82+50 5.9 7 0 127 4 139 0 95 92 Does not comply
433 C611ege Blvd E lane 84+00 -'5.9 T.0 131.5 139.-0 95 95 Complies
..434 College Blvd W Lane 84+60 5.6 7 0 129 7 139.0 95 93Does not comply
435 [College Blvd. W'. Lane 82+50
, 5.0 ' 7.0 130.8 139.0 95 94 ' Does not comply
COLLEGE BLVD. IMPROVEMENTS
TEST NO L 0 CA TI 0 N .
IN
PLACE:
OPTIMUM
. 'MOIST.*,...
IN PLACE
DRY MAX DnY
DENSITY.
PERCENT
REL. COMP. PERCENT
RELATIVE R E M A R K S MoisT,DENSITY . REQUIRED. COMP.
10/26 NUCLEAR DENSITY -
College Blvd W Lane 79+501- 436 6.2 7 0 124 2 139 0 95 89 Does not comply
437 College Blvd W Lane 76+50 5 0 7 0 .120.4 139 0 95 87 Does not comply
438 College Blvd W lane 73+50 5.4 .7 .0 124 7 139.0 95 90 Does not comPlY.
College Blvd W lane 70+56 5 0 7 0 126 7 139 0 95 91 Does not comply
Median 57+00 Finish Subgrae 440 17 6 16.5 102 6 11-1.0 90 92 Complies
441 Median 60+00 Finish Subgrade 16.8 16.5 987 111.0 90 . 9 Does not comply -
442 Median 63+00 Finish Subgrade 14 ..6 16 5 103 0 111 0 90 93 C.p1ie
Median 66+75 Finish Subgrade 12.3 16 5 105.9 1.11 .0 90 95 Complies
444 Median 73+00 Finish Subgrade 11.7 14.0 103 1 116.5 90 89 L'os not comply
Median 76+00 Finish Subgrade 10.8 14.'0', 109'.5 116.5 90 94 Complies
446 Median 80+00 Finish Subgrade 19.6 16 5 93 7 111.0 90 84 Does not comply
447 Median 82+00 Finish Subgrade 1'8.6 16.5 101.1% 111.-0 90 91 Complies
448 Median 87+00 Finish Subgrade 11 9 16 5 103 3 111 0 90 93 Complies
449 Median 90+00 Finish Subgrade 15 8 16 5 105 4 111 0 90 95 Complies
I
COLLEGE. BLVD.. IMPROVEMENTS 11/18/87 Page 5
TEST No L 0 C A T I 0 N IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY . REQUIRED COMP.
10/26 NUCLEAR DENSITY:
.450 Medain 92+00 Tinish Subgrade 17 .1-6.5 105.7- '11-1.0'. 90 95 Complies
451 Median 95+00 Finish Subgrade 1.4 .1 16.5 107 1 111 0 90 97 Complies
10/2.7 NUCLEARDENSITY: . .
.
2.1.A College blvd. E. lane 54+50
Retest of 421 7.9 7.0 132:5 139.0 95 95 Complies
College blvd. E. lane 57+OQ 452 w of centerline 6 6 7.0
. .
134.3
.
139.0 95 97 Complies
.
College blvd. E lane Stat. 60+00 6.0 7.0 126.6 139.0
.
95 . 91 Does not comply
. 8' E of centerline
College blvd E lane 63+00 9 6.3 7.0 127 2 135.0 95 92
S S W of centerline , S
D..s not comply.
College blvd E lane 66+00 1O'E 6 1 7 0 130.9 139 0 95 94 Does not comply centerline S.
College blvd. E. lane 66+00 20' 456
W o.f centerline
6.4 7.0 132.3 139.0 95 95 . Complies
422A College blvd. Retest of #.4 22 6.9 7.0 129.6 139.0 95 . 93 Does not comply W lane 54+50
423A College blvd. Retest of 1/ 423 .6.0 7.0 129.8 139.0 95 93 Does not comply W. lane 57+50
College b lvd.Retest of 1/424 424A 7 .7 .0 131.3 139 0 95 94 Does not comply
426A College blvd. Retes of 1/426 5.0 .7.0 132.1 139.0 95 ' '95 Complies
66+50
.
427A College blvd. Retest of #427
. 7.6 7.0 1.31.0 , 139.0 95 . 94 , Does not comply
69+00 ' .
H
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Page 6
TEST No LO C A T 10 N' IN
PLACE
OPTIMUM
MOIST.
IN PLACE DRY MAX. Day
DENSITY
PERCENT
REL. COMP. PERCENT
RELATIVE R EMARKS MOIST. DENSITY REQUIRED COMP.
10/2 NUCLEAR DENSITY: . . .
.
.
453A College blvd. Retest of 53
Stat 60+00 . 55 7.0 134.1 139.0 95 97 Complies'etest of
453
454A College blvd. Retest of //.454
Stat. 63+00 E lane 53 7.0 .134.5 139.0 95 . 97 Complies Retest of
'
. 454
55A . College blvd. Retest of 455 6.9 7.0 132.7. 139.0 95 96 Complies Retest of 66+00 E. lane'
______ .________ //455
422B College blvd. Retest 422A '
. '
. Retest of 54+50 W lane .6.4 , 7.0, "13.4 139.0 95 96 Complies // 422A
423B College blvd. Retest 423A
' Retest o. Stat. 57+50 W lane 6.5. 7.0 ' 133.4 139.0 95 96 Complies // 423A
'24B Collage Blvd. Retestof 424A 5 2 7.0 134.3 139.0 95 97 Complies Retest of
' . Stat. 60+50 W lane' . . .
. // 424A
27B College blvd. Retest of /1 427A
Stat. 69+00 W. lane 5.3 7.0 ' 133.9 139.0 , 95 ' 96 , Complies Retest of
# 427A
'28A College blvd. Retest of #428 5.3 7.0 131.8. 139.0 95 95 Complies Retest of Stat. 70+50 E. lane
' 1/ 428
29A College blvd. Retest of 11429
Stat. 70+50 5.4 7.0 . 128.9 139.0' 95 . 93 Does not comp'l
. . Retest of1/429
30A College blvd.. Retest of #,430
, 5.4 7.0 . 126.5 ' 139.0 95 Does not comply 7)6+50 E. lane .
31A College Blvd. Retest of #432 .5.4 7.0 127.6
'
139.0.
.'
95
.. Retestof_//4
Stat. 79+50 E. lane __, ,
, 92 Dbès not comply
' Retestof//431 32A College blvd. Retest of //432 5.5 7.0 131.3 139.0 95 ' 94 ' Does not comply Stat.'82+50E'.lane '
'433A College blvd. Retest of 433
,
. Retest of//432
Stat.'84+0,0E.Lane '
6.0 ' 7 '0 122.9 ' ' 139.0. 95 , 88 Does not comply
' Retest of//433
.
COLLEGE BLVD IMPROVEMENTS 11/18/87 Page 7
TEST No L 0 C A T I 0 N• IN
PLACE MOIST.
OPTIMUM MOIST. IN PLACE DRY
DENSITY
MAX. DflY
DENSITY PERCENT
REL. COMP .
REQUIRED
PERCENT
RELATIVE
CON,'. REMARKS
10/30 NUCLEAR DENSITY
451 College blvd E lane Stat 60+
00 7 3 138.3 140.6 95 98 Complies
458 College blvd E lane 63+00 5 5 7 3 138 1 140 6 95 98 Complies
Collegeblvd E lane Stat
5 1 7 3 136 6 140.6 95 97 Complies
460 College Blvd. E. lane Stt.
68+70 6.0 7.3 13,6.1 140.6 95 97 Complies
TESTING ENGINEERS-SAN DIEGO
REVIEWED BY
KirkP. Aiiunman
North CountyBranch Manager
Testing Engineers-San Diego
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
1r -) 2956 Industry Street, Oceanside, California 92054 (619) 757-0248.
DATE Or TEST 11./34/87
FILE No_5259
LAB. No 087-560
... S ....
DAILY RESULTS - IN PLACE DENSITY TESTS
.5.
0T1O gar1sbad-0011ege Blvd-
PROJECT Cnllge R yd Impoiemonts
DATE OF REPORT 1 9 .4 v n.4 R 7 ' CONTRACTOR
TEST L 0 C A T I 0 N IN PLACE
OPTIMUM
MOIST.
IN PLACE
. DRY
MAX. DRY DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE . REMARKS
O . . MOIST. DENSITY REQUIRED COMP.
College Blvd E -lane . . . . RETEST II 428A
428B RETEST II 428A 74. 7.3 130.6 141.0 95 93 T)npq nn comply
College blvd E lane . .
. RETEST II 429A
429B RETEST #429A . 73. .73 128.7 141 .0 95 92 Does not comply
College blvd E lane . . .. . . S RETEST ii 430A
430B RETEST #430A . . 7.2 7.3 132.9 140.0 95 95 . . Complies
College blvd E lane - RETEST II 431A
431BRETEST #431A . .8.1 7.3 129.2 . . 141.0 95 92 Does not comply
College blvd E lane RETEST II 432A
432B RETEST.. 11432A 7.1 7.3 128.3 141.0 95 .91 Does not comply
College blvd E lane . . . . . . . . RETEST/I 433A
433B RETEST //433A 7.2 7.3 132.8 141.0 95 94 Does not comply
478 College blvd 85+00: E lane 6.8 7.3 . 12.8.1 141.0 95 91 . Does not comply
479 College blvd'.88+00 E lane 7 0 7 3 131.5 141.0 95 94 Does not comply
480 College blvd 91+00 E lane 7 1 7 3 130.1 .141.0 95 93 Does not comply
481 College blvd 94+00. Elane, 6.1
-
7.3 130.4 141.0 -95 93 Does not comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA.DERIVEO FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
.r !
rr11 c, Blvd Tmnrnvmnrc ' ' 0 , . ' Page 2.
TEST -
L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY "
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE : R E M A R KS
No.MOIST. DENSITY 0 REQUIRED COMP. -
482 'College blvd 96+00: E. lane 6.8 . 7.3 124.5 141.0 95 89 Does not comply
483 College blvd 98+00' E lane 7. .6 13.2.1 141.0 95, 94 Does 'not comply -.
RETEST #428B 'RETEST #428B
428C College blvd 70+50 E lane 7.9 7.3 , 131.6 141.0 95 ' 94 boes not comply
College blvd 76+50 E lane RETEST #429B
429C RETEST //429B 7.9 7.3 '131.5' 141.0' 95 " 94 Does not comply.
'College blvd 76+50 E lane 0 0 ' ' ' .
0 RETEST #430B
430C RETEST #430B 6 5 7 3 134.7 141.0 95 96 Complies
College blvd 79+50 E lane . 0 0 ' . . ' . '' RETEST #431B
431C RETEST #431B . ' '
0 7•3 '7..3 131.2 141.0 ' 95 93 'Does,not comply
College blvd 82+50 Elane RETEST #432B
432C RETEST #432B 0 74, 7.3 131.5 141.0' - 95 ' 94 Does'not comply
College blvd 84+00 E lane ,
' ' RETEST'.#433B
'433C 'RETEST II 433B -
0 7.6 '7.3 134.3 141.0' 95 96 Complies'
College blvd 10'E of 4 85+00' ' . , . 'RETEST #478
478A E lane RETEST #478 ,
0 7•3 7.3 135.8 , 141.0'' 95 97 Complies
College 'blvd 88+00 E lane ' . 0 ' 0
' RETEST #479
479A RETEST #479 ' . 7.01 7.3, 133.6 141.0 95 - 95 ' - Complies
College blvd 91+00 E lane . " 0 ' ' 0 ' - RETEST #480
480A RETEST #480 , 6.1 , 7.3 134.1 .141.0 95 95 Complies
College blvd 94+00 E 'lane 0
RETEST '#481
481A RETEST #481 ' 6.9 7.3 .135.0 141.0 95 96
,
Complies','
College blvd 96+00 E lane RETEST #482
482A RETEST #482 ' ' ' 6.9 . 7.3 135.1 , 141.0 95 , 96 Complies
College blvd 98+00 E lane RETEST #483
483A 0
RETEST #483 74 7.3 1 135.3 1 141.0 95 96 Complies
,
College blvd 70+50 E lane 0 ' RETEST #4.28C -
428D RETEST #428C ' 8.'6 ,, 7.3 136.9 1-41.0 95 , , 97 . Complies
r,s11ô- Riud Tmrrcvpm&iits Page 3
TEST
0.
-
L 0 C A T I 0 N
.•
IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY - DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
429D
ol1ege blvd 73+50 E lane
RETEST #429C 8.0--j .
.
7.3 134.8 141.0 95 95
RETEST//429C
Complies
431D
College blvd 79+50 E lane
RETEST # 431C 6.3 7.3 134.7 141.0 95
.
96
RETEST 1/431C
Complies
432D
College blvd 82+59 E lane
RETEST #432C 7.0 7.3 133.5 141.0 95 95
RETEST 1/432C
Complies
484
College blvd 70+00 W lane
-- 6.4 7.3 130.9 1410 95 93 Does not comply
485 College blvd 73+00 W lane 6.1 7.3 130.6 141.0 95 93 Does not c0mp1•
386 College blvd 76+00 W lane 5.1 7.3 128.3 141.0 95 91 Does not comply
484A
College blvd 70+00::w:lane
RETEST #484 6.3 7.3 135.7
.
141.0 95 96
RETEST #484
Complies
485A
College blvd 73+00 W lane
RETEST #485 6.1 7.3 133.9
.
141.0 95
.
95
RETEST #485
Complies
486A
College blvd 76+00 W lane
RETEST 1/486 6.2 7.3 131.0 141.0
.
95 . 93
RETEST #486
Does not comply
487 College blvd 79+00 W lan.e 7.2 7.3 135.2 141.0 95 96. Complies
488 College blvd 81+00 W lane 5.9 7.3. 134.1 141.0 95 95 Complies
489 College blvd 84+00 W lane 5.8 7.3 137.6 141.0 95 98 Complies
490 College blvd 87+00 W lane 6.3 7.3 126.7 141.0 . 95 90 Doesñot comply
TESTING ENGINEERS-SAN DIEGO
REVIEWED BY
2075 Las Palmas Dr.
Carlsbad, CA 92009-4859
Attn: Pat Entezari
1) NBS/Lowry Attn: Kurt Gierlich
10920 Via Frontera
P.O. Box 28100
-
- Steven P.
North County Branch Manager
-.. .'
( JI Testing Engineers-San Diego
I#A mi
Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138(619)225-9641
- 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS - IN PLACE DENSITY; TESTS
DATE OF TEST 11/11-14/87 LOCATION Carl shad
FILE No. 5259 PROJECT College blvd improvements
LAB. No. 027-572 DATE or REPORT 12/11/87 . CONTRACTOR
TEST
No
. L 0 C A T I 0 N .
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R EMARKS
490C
College blvd W lane 87+00
RETEST #490R 9 7 3 133 5 141 0 95 95
RETEST #490B
Complies
492B
College blvd W lane 93+00
RETEST #492A 5 7 -,,.:7.'3 135 5 141.0 95 96
RETEST #492A
Complies
493B
College blvd W lane 96+00
RETEST #.493A . , . 5.6 7.3 133.8 141.0 95' 95
RETEST #493A
Complies
494B
College blvd.W lane 98+00. .
RETEST # 494A .
.
5.3 7.3 135.2
.
141.0
..
95
'
96..
RETEST4494A
Complies
495 College blvd 70+25 1 E lane 91 E of CL 6.0 7.3 - 134.0 141-0 95 95 Cnmpliec
496 College blvd 73+)) E lane 6'E of CL 6.1 7.3' 135.3 . 141.0 95 96 Complies
497 College blvd 79+00 E lane .10'W of CL .6 .5 7.3 .136.7 141.0 95 97 Complies
498 College blvd 79+00 E lane 81 E of CL 5.5 7.3 135.6 141.0 96 _. Complies.
499 College blvd 82+00E lane lOWofCL 7.7. 7.3 138.0 .141.0 95 98 Complies
500 College blvd 84+00_Elane _71 EofCL 7.7 7.3 133.6 141.0. 95 95 Comolies
THE ABOVE TEST, RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY 'TESTING ENGINEERS. SAN DIEGO: FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.,
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
-
-
IN
PLACE
- MOIST. -
OPTIMUM
- MOIST.
IN PLACE
DRY
DENSITY
MAX. -DRY
DENSITY
. -
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
-
. 6.4 7.3 . 137.3 141.0 95 98 - -
± 5.7 73 -. 136.3 141.0 - 95 - 97 -,
-.
6.6
-
.7.3 138.2 141.0 95 98 - -
- 6.9 ..7 .3.134.3 141-0 AS g -
- 5.8
-
73 1 134.9 1 141.0 95 96
6.2 -73- 135.7- 14 - 97 -
REMARKS
College blvd improvements
TIEST LOCATION
.11-14
501 College blvd 85+00 E lane
502 College blvd 88+00.E lane
503 College blvd 91+00 E lane -.
504 College blvd93+00E lane
505 College b1vd98+00E lane
506 College blvd .98+00E lane
I.
tc
Ci tyofisb
1) . NBS/Lowry - -
NEERS.SAN DIEGO
County Branch Manager
1iJi Testing Engineers—San Diego 4''°
-
j,
A Division of United States Testing Company, Inc. II1rLJ.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
I J. 2956 Industry Street, Oceanside, California 92054 (619) 757-0248 .••
DAILY RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST 11/11-14/87 LOCATION Carlsbad
FILE No 5259 PROJECT _College hlvl Tmprovemnt sph1t
LAB No 087-573 DATE OF REPORT 12/11/87 CONTRACTOR
TEST
No
S L 0 C A T I 0 N IN
PLACE MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R EMARKS
221 College 70+00 W lane Left turn lane 1423 39
153 -lb
95 _______ Dos
'22 College blvd RETEST #221 146..6 95 96
nOt comply
RETEST #221
Complies
'23 College blvd 73+00 Left turn lane W la e 145'.(:) 153 p 95 96 Complies
'24 College blvd 85+00 W lane Left turn la e 1438 153.0 95
------------
94 Does not comply
'25
RETEST #224
College blvd 88+00 W lane left tu'n la e _145 153 0
153_.D
95 95
RETEST #224
Complies
'26 College blvd 88+00 W lane left turn la e 1452 95 95 Complies
27 Colleg blvd 70+00 W lane 15'W of CL 152.3 1530 95 100 Complies
'28 College blvd 73+00 W lane 13'W of CL 145.711 151.0 95 96 Complies
'29 College blvd 76+00 10'W of CL W lane - 137.'8 153 Q.
__i53.Q
95 90 Does not comply
30 Colleye'blvd W lane 79+00 12W of CL L43.11 95 94 esno comolv
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS-SAN DIEGO. FOLLOWING ASTM • STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
I •t'
VCr1iArIc hl,d Tmn t,mnfc L1cnh1I- D1 9
TEST No -
-, L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM MOIST.
IN. PLACE
DRY
DENSITY
MAX; DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
231 College blvd W.lane RETEST #229 144.9' 153.0... 95 95
RETEST #229
Complies -
232 College blvd i4 lane RETEST #230 V 145.0 153.0 95 -.95
RETEST #230.
Complies
233 College blvd W lane 82+00 10'W of CL 150 0 153 0
i p
95 98 Complies
234 College blvd W lane 85+00 isaj. 95 100 Complies
235 College blvd 88+00 101W of CL W lane -
- - -
15.1..2, 153.0
-
95
V
.99 Complies
236 Collegeblvd 91+00 8'W'àf CL W lane V
-146- ___
95 97 Complies
237 - College blvd 94+00 -16'W of CL W lane 146.1 153.0 95 96 Complies
238 College blvd 97+00 11'W of CL W lane - 147.6 153.0 95- Complies
239 College blvd 70+00 CL W lane
. . 145.9 - •- 153.0 - 95 96 Complies
240 College blvd 70+00 101 E CL W lane V V V 139.8 153.0 95 V 92 'Does not comply ,
241 College blvd W lane 73+00 CL
V
V
V
142.7- 1V530 95 V .94 Does not comply .
242 •- College blvd W lane 73+00.10'E CL" .. 140.8 153.0
V
-92 --Does not comply
243 College blvd ,W lane .76+00 CL V
V
V
147.6 153.0 95
V
97 Complies
244.- College blvd Wlane 76+00CL 147.2
V 153.0 95 97 V
Complies
245 College blvd W lane 79+00 121 E- CL V ______ 146.8 1 .153.0 95 96 Complies
Colieoe Blvd Imorbvements. Asohalt Pci3
TEST
No
- L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. -
'- REMARKS
246 College W lane 79+00 101E CL 1,45 .0 153 0 95 95 Complies
247 College blvd 83+00 Cl W lane 146.1 153.0 95 96 Complies
248 College blvd 83+00 10'E Cl W lane 146.3 153.01 95 96 Complies
249 College blvd 86+00 CL W lane 146.0 153.0 1 95 96 Complies
250 College blvd 86+00 WE CL W lane 141.3 153.0 95 93 Does not comply •
251 College blvd 89+00 CL W lane 145.5 153.0 95 95 Complies
252 College blvd -89+00 -9'E CL W lane 145.3 153.01 95 95 Complies
253 College blvd 92+00 CL W lane 147.0 153.0 95 96 Complies
254 College blvd 92+00 10'E CL W lane 147.3 153.0 95 97 Complies
255 College blvd 95+00 CL W lane 145.4 153 0 95 95 Complies
256 College blvd 95+00 9'E CL W lane 147 2 153 0 95 97 Complies
257 College blvd 97+00 CL W lane 145.1 153.0 95 95 Complies
258 College blvd 97+00 10'E Cl W lane 146.7 153.0 95 96 Complies
259
73+00
College blvd W lane RETEST- #241 145.5 153.0 -95 95
RETEST #241
Complies
260
RETEST #242
.Colleoe blvd W lane 73+00 ______ 145.2 1 153.0 95 95
RETEST #242
Complies
Cn1lprtp Riud Tmnrnvpmphtc Acnhit Dnnn I!
TEST
No.
.
- LOCATIO N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R E M AR K'S
261 College blvd E lane 71+50 15'W of CL . 145.3 153.0 1 95 95 Complies
262 College blvd E lane 73+00 10'W of CL 145.7 153;0 95 96 Complies
263 College blvd E lane 76+00 8'W of CL 145 9 153 0 95 96 Complies
264 College .blvd -E -lane •9+00 7'W of CL . 145.8:. 153.0 95 96'. Complies -
265 College blvd 12 1 W CL 82+00 E lane . . 146.7 153.0 95 . 96 Complies .
266 College blyd 10'W CL 84+00 E lane . 145.9 153.0 - 95 96 . Complies
267
RETEST #250 '
College blvd 86+00 WE CL W lane
:•
' 145.2
-
.
153:0 95
.
95
RETEST #250-
Complies
11-14
268 Cdlleg blvd E lane 69+00 12'E of CL '-- . '- 145'.0 153.0 95 95' Complies
269 College blvd E lane 72+00 11-'E of CL -' . - 149.5 153.0 95 - 98 Complies
270 College blvd E 1ane75+00 10'E of CL
-
- 147.7 - 153-.0 - 95 - 97 . Complies - -
271 College blvd E lane 78+00 WE of CL - -_- - 146.4 153.0 95 - '- 96 -
-.
Complies
272
-
College blvd E'lane 81+00 9'E of CL . 145.0 -153.0 95 95 Complies
273 -- College blvd E lane 84+00 WE of CL -
.
- - '. 145.0 153.0 - 95 -- •- 95 'Complies
274 College blvd 87+00 E lane 12'E of Cl - - - -. - 138.8 153.0 95 1 91 Does not comply
rnilpn6 Rlvd Tmnrnvmntc. 1cnh1t
TEST
No. L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
275 College _'blvd 90+00E lane 10'EofCl 140.6 153.0 95 92 Doesñotcomply
276 College-blvd93+00E lane 11'EofCL 141.7. .153.0 95 93 Doesnotcomply
277 College blvd _95+00E lane 12IE _ofCl 147.3 153.0 95 97 Complies
278 Collegeblvd98+00Elane10'EofCL .145.5 153.0 95 95 Complies
276A
RETEST #276
College blvd _-3+00E _lane 11 1 E CL_ 145.9 153.0 95 96 Complies
275A
RETEST #275
College b1vd190+00E lane 10'E- _ofCL 148.5 153.0
-
95 97 Complies
274A
RETEST #274:-
Coflege blvd _E lane 87+0012'EofCl 145.3
-
153.0 95 95 Complies
279 :Collegeblvd_69+30E lane CL 145.0 153.0 95 95 Complies
280 -Collegeblvd72+00ClElane 141.9 153.0 95 93'Does not comply
281 Collegeblvd _75+00E lane CL. 145.1 153.0 95 95 Complies
282 College blvd 78+00CLElane 145.8 .153.0 -95 96 Complies
283 College blvd 82+00 E lane CL 145.6 153.0 95 95 Complies -
284 Collegeblvd83+50ElaneCL 149.2 153.0 95 98 Complies
285 CollegeBlvd87+00 _CLElane --145.1 153.0 95 95 - Complies
286 College blvd_12'WofCL87+00Elane -145.0 1 153.0 95 1 95 Complies
Colleae Blvd Imorovements. Asohalt parip 6
TEST No.
.
L 0 C A T 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY -
DENSITY
MAX. DRY
DENSITY PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
287 College Blvd 90+00 CL E lane 146.7 153.0 95 96 Complies
288 College blvd 90+0010'W of CL 145.1 153".0 95 95 Complies
289 College blvd 93+00 E lane CL 145.1 153.0 95 95 Complies
290 College blvd 93+00 E lane 10'W of CL 146.8 153.0 95 96.2. Complies
291 College blvd 96+00 E lane CL 145.0 153.0 95 95 Complies
292 College blvd 96+00 E lane 12'W of CL 145.3 153.0 95 95 Complies
293 College 98+00 E lane CL 145.6 153.0 95 95 Complies
294 College 98+00 E lane 12'W of CL . 146.8 153.0 95 96 Complies
295 College 98+00 Left turn lane E lane 145.1 153.0 95 95 Complies
280A
RETEST #280
College blvd 72+00 Elarie 145.6 153.0 95 . 95
RETEST #280
Complies,
296 College blvd 57+00.W lane 143.0 149.0 95 98 Complies
297 College 54+25 W lane.CL 134.8 153.0 95 '88 Does not comply
298 College blvd 60+00 W lane 101 E CL 133.5 149.0 95 93 Does not comply
299 College blvd 63+00 W lane 10'E CL . . 139.3 149.0 95 93 Does not comply
300 College blvd 66+00 W lane 10'E of Cl ______ 141.5 149.0 95 95 : Complies
Cci1ono h1,d Tmnrn,omoni-c £tcnh11f n__.__ 7 -
TEsT -No. L 0 C A T I 0 N
IN
PLACE
MOIST.
-
OPTIMUM
MOIST,
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
301 College 68+50 W lane 12'E of CL 139.2 1.49 .0 95 93 Does not comply
302 College boyd 68+50 E lane left turn laiie 136.3 .149.0 95 91 Does not comply
303 College 68+50,E lane CL 134 5 149 0 95 90 Does not
304 College boyd 68+50'8'E of CL 134.7 149.0 95 89
comply
Does not comply
305 College blvd53+00 81 E of-CL Wiane 146.2 149.0 95 96 Complie's Ak
297A
RETEST #297
College b1vd54+25 W lane CL - - . . - 142.0 149.0 .95 93 -
RETEST #297
Does not comply
306 College blvd 57+00 9'W of CL E lane 140.1 149.0 95 94 Does not comply
307 College blvd 60+00 8'W of CL E'.-.l ane 141.11 149.0 95 95 Complies
308 College blvd 63+00 8'W of CL E lane 137.4 149/0 95 92 Does not comply
309 College blvd 66+00 left turn lane E la e 141 3 149 0 95 95 Complies
310 College blvd 68+70 left tUrn lahe E laiie 137.6 149.0 95 92 - -Complies
311 College blvd 68+70. E lane 12'W of CL 142.2 149.0 95 95 Complies
12 rt-llpe hivd 8+7fl F 1n Cl 141) 1 149-0 95 94 Doc not comply
301A College b1vd68+50 W lane left turn lan
RETEST #301
142.3 149.0 95 95 Complies
313 College blvd 70+00 E lane 10'W of CL ______ 147.5 149.0 95 99 Complies
TEST
No. L 0 C A T I 0 N ..
IN PLACE MOIST.
OPTIMUM
MOIST. IN PLACE DRY DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. -
I LI
REMARKS
314 College blvd 72+00 E lane 8'W of CL 143.5 149.0 L 95 96 Complies
315 College blvd 75+00 E lane 8'W of CL 143.4 149.0.. 95 96 Complies
316 College blvd 78+00 10'W of CL [ lane 1,43 .8 149 0 95 96 Complies
317 College blvd 81+00 12'W Cl E lane 142.8 149..01 -.95 96 Complies
318 College-blvd 84+)) 101 W CL E lane 143.9 149.0 95 96 Complies S
319 College blvd 87+00 121 W CL E lane 141.9 149.0 95 95 Complies
320 College blvd 90+00 10'W CL [lane 142.4 149.0 95 95 Complies
321 College blvd 93+00 9'W CL E lane 142.0 149.0 95 95 Complies
322 College blvd 95+00 E lane - . 142.1 149.0 95 95 1 Complies
323 College Blvd 97+50 CL E lane, 141.0 149.0 95 94 Does not comply
306A
RETEST #306
College b1vd57+00T9'W of CL- E lane - 140.1 149.0 95 94 Does not comply
324 College blvd 70+00 [ lane 10' [ CL 142.3 149,0 95 95 Complies
325 College blvd 73+00 [ lane 11'E CL 143.2 149.0 95 96 Complies
326 College blvd 75+00 [ lane 10'ECL 143.0 1 149.0 95 96 Complies
327 College blvd 78+00 [ lane WE CL
______
143.4 149.0 95 96 Complies
-
Cri1n i3.nhit- ppq
TEST
NO. L 0 C A T I 0 N IN PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY DENSITY
-
PERCENT
REL. COMP.
REQUIRED
PERCENT RELATIVE
- COMP., R E M A R K S
328 College blvd 81+00 E lane 10'E CL 142.6. 149.0 95 96 Complies
329 College blvd 84+00 E lane 11'E CL 142 7 149 0 95 96 Complies
330 College blvd E lane 10'E CL 142A. 149.0 95 95 Complies
331 College blvd 90+00 E lane 7E CL 142.7 149.0 95 95 Complies
332 College 93+00 E lane 9'E CL 142 4 149.0 95 95 Complies
College blvd 95+00 E lane 7'E CL 141.6 149.0 95 95 Complies
323A
ERETEST #323
College blvd 97+50 CL E lane 142.9 149.0 95 96
RETEST #323
Complies
tc r)trCibd7 TESTING ENGINEERS-SAN DIEGO -
1 REVIEWED BY
- $teven P. Koz.H North County branch Manager
Testing Engineers—San Diego .• ..
' IS A Division of United States Testing Company, Inc.
3467
S
1 KurtzSt, P. Box 80985, SanDiego, Ca 92138 (619) 225-9641
1 -=", 2956 Industry Stre'et,.Oceanside, California 92054 (619) 757-0248
DAILY RESULTS 1,.N,. PLACE DENSITY TESTS
Car1sbad. CA
DATE or TEST 11-17-87 Joe DATA
FILE No.5259 Po.iccr_Coil R1 d
L.AB. ro_087 - 58 9 DATE OF RE'ORT 1 2 - 1 5-8 7 CONTRACTOR .
40. EST LO C A T I 0 N . -
IN
PLACE
OPTIMUM
MOIST. .;
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. 'DENSITY . REQUIRED COMP.
College Blvd S approach to. coil agIi . . S... ; •,• . . .
.5
507 58'W.ofCenterline _El._Camino .4.6 .•7.3 12 7 -.`6 14 1.. C 95 .91 Does_ not .r omp ly
- Real 240'S off ,Centerline Colleg
College Blvd S approach to coil' --g e
50'WofCLEl __Camino Real_120'S 5_7 7_ 13_1 141_I Compli
of Centerline College
College Blvd S approach to Coil ge
509 20'S __of _CL _Co.11ege48'Wof..'CL' .5.2 7'.'3.' 128."3 141 . C 95 91 Does. -not 'comply
t; J. Camino Real .
.
. . - •. ' . . . .. . .
THE ABOVE TEST RESULTS AND CALCULATIO,NS CONSTITUTE THE. REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE 'BY TESTING ENGINEERS- SAN DIEGO. FOLLOWING ASTM STANDARDS OR. SPECIFIED PROCEDURES. - S
THESE RESULTS SHOULD NOT BE INTERPRETED, AS ENGINEERING OPINION OR JOB CONTROL.
TEST
No. L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE DRY
DENSITY
MAX. Dnv
DENSITY
PERCENT
REL. COMP. REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
-
510 ODUecj rre±iari 59+50 cter1mne 22.7 14.0 95 5 117.0 - 90 82 Etes rot cx31r1y
511 Cbllep naiian 66+50 centerline 15.6 14.0 100.3
jV_
117.0
V
907 86 Does rot cJrply
512 CbUi nathan 85+00 amterline 16.8 121.1 105.2 121.0 90 87 Does rot corply
513 CoUegE nathan 93+00 16.4 12.1 105.2 121.0 90. . 87 Does rot amply
514 Cb1le rraiaan 81+75 17 3 12.1 102.1 121.0 90 84 Dces rot curply
515 GaUege rrathan 75+75 13.0 14.0 104.7 117.0 90 90 C):rrplies
507A
Cb11eJE S aprcath 240'S of CL Ca1]
R=#507 . 7.31 1410 51 93 DoEisVIDtCoTP.lY ftiiEsr#507
5078
coUe S 6rpto3th 240'S of CL Cl1kg
iiu±' #507A 5.6 7.3 135.9 141 0 95 97 0rn1aes FEIEST #507A-
508P.
G21ege B1id S apLo3th thU 50'W of CL
El Caniro F1 120'S of CL ±ui #508 6.9 7.3 135.9
V
141.0 95 96 Qplies I= #508
16 C1-11eg N atzpnpxt 27'N nF creterlir Cb11 2 7-3 1-11-6 1.41--n 95 95 clrrplaes
517 Opllege N approach, 125'N of cmterLrie Cbflege 6.31 7.3 135.0 141.0 95 96 G3TpLies
509A
OD11ege approach oenterline of a2lege
ini #509
-
6 5 7 3 135 2
V
141 0 95 96 Cbrp1i
tc
- - (1) City ofc
1) /1øry
i Testing Engineers—San Diego 1 S
AF- A Division of United States Testing Company, Inc.
3467 Kurtz St, p 0 Box 80985, San Diego, Ca 92138(619) 225-9641
2956 Industry Street, Oceanside, California 92054 (6.19) 757-0248 .
.5
DAILY RESULTS IN' PLACE.DENSiTY TESTS
DATE OF TEST 11/1R/R7 A/C NUCLEAR DENSITIES LOCATION
FILE No 5295 .
PROJECT _(hl 1çp P1 d, Prnjcd #3188, ?-]jjo (o
L.aa. No_flR7-Qfl . DATE OF REPORT 12-15-87 CONTRACTOR
DRY
LOCATION COMP.No.
OPTIMUM
MOIST.
IN PLACE
DENSITY
RLAC
MOIST.
EXP5TY REONJP.
REQUIRED
VE. REMARKS
334 .9fffl -F1_rf_tri:ir --1,53-0- 95 92
.]503 153.0 . 95 _. 98 QJTpU.
335
336 Cb]JB: to 11 . . . .. 140.5 153.0 95. 92 Does ntcxrp1y
334i'.
oallege S aptO3th 250'S of CL caLlege . .
imsi_#334
. .
145.0 . 153.0 95 itu±,i #334
33EA
Cblleg aprc3th to mllege cmtrLre
iL #336
145__1 153_0 95 95 OJTp1 _FdET#336
337 Cb11eg 240'N of caiterLre CbU N prcdi 145 4 153 0 95 95 OirpLi jes
338 CbU€gN a_iadi120'NofceiterLrCb11p 149_7 153 0 95 98 CbTpliE
339 OaLleq apO3th cbfl itr1ir . . 145.2 153.0 95 95 cbTp1i es
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS -SAN DIEGO. FOLLOWING .ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING. OPINION OR JOB CONTROL. S
TESTING ENGINEERS -SAN DIEGO
tc . . REVIEWED
.
BY
- S •.
1) S..
99Wn P.
Nrth Qnty Brrxth
C
i J Testing Engineers—San Diego •'WIN
A Division of United States Testing. Company, Inc:
mp'll I
,- -i 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641 f. / =" 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS-IN PLACE DENSITY TESTS
DATE OF TEST 11/19-25/87 A/C Nuclear Densities LOCATION ('r1chr1
FILE NO. 5295 . PROJECT CbUai _B1d.,nrojt#3188.1ticCaTIete
LAB. NO._087-591 DATE OF REPoRT.........124587 . CONTRACTOR
TEST
No
.
L 0 CATION .
IN
PLACE
MOIST.
OPTIMUM
..MOIST. IN PLACE .
. 'DRY DENSITY
MAX.-DRY DENSITY
'
PERCENT. REL. COMP. REQUIRED
PERCENT
RELATIVE
COMP. R E M.A R K S IP
340 69+50 W 1ari 10'W of cniter]ire 144-4 190-0 95 97 Chrph
341 72+00 W 1ae 12'W of cBiter1are 145.4 L50.0 95 97 0brp1a
342 5+00 W lare 8'W of ctnterlire ' .148.6 150.0 . 95 98 Orp1ies
343 8+00 W 8 W of citerLre 148.6 L50.0 95 100 Ctrrplies
344 R1+00 W 1jy 9 'W of cr4-pj-1 >rp _______ - _______ 146 15().0 95 cmcrpl 1
345 4+00 W Jane 8'W of cEnterl]rE '147.3 L50.0 95 99
346 19+90 5'E of 147-5 150 0 95 99 Cliiphps
347 9+50 1.5'E citerLrE 1478.0 150.0 95 99 CiTpLies
348 69+50 Left turn lane 150.0 95 98 Qip1ies
349 /2+00 121E ca-iterLr :141.8 L50.0 95 95 any
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR. JOB CONTROL :
(hi icn Rix1 Prrrirt 1 AR Atha1tir ftncrete
TEST NO. . L 0 C A T I 0 N .
IN.
PLACE
OPTIMUM
MOIST. MO IST.REQUIRED
IN PLACE
DE
DRY
NSITY
MAX. Dnv
DENSITY PERCENT REL.COMP.
PERCENT
RELATIVE
COMP. REMARKS
350 72+00 left tum lare .. . 145.4
142.7
150.0 95 97 Wip]J.
351 75+00 10'E caiter]Jre . - 150.0 95 96 03Tp1i
352 78+00 10'E citer1ir 146.0 150.0 95 98 oxpLies
353 81+00 12'E Cter1IE . .
-
143.7 150.0 55 96 aiVies
354 84+00 10T cter1ir . . 147.4 150.0 95 99. Cmphes
355 87i-00 11'E caiter]ir .. 143.3 . 150.0 95 . 96 Wiplies
356 87+00 10'W centerline .. . 143.5 . 150.0 95 96 OJTLies
357 87-t-00 left tiiTi la -)e' 145.4 150.0 95 97 Cmplies
358. 90+00 11'W cHlteri]IE . . .. 141.9 150.0 95 . 95 aiThes
359 90+0 121E centerline .. . 135.5 150.0 95 91 Does not thTply
359A 90-i-00 12'Ecmterlire itu±sr #359 . . 142.0 150.0 95 . .95 pi-i iu±r #359
360 93+00 10'W riter1ir .
.
., . . 146.0 150.0 95 98 oiThes
361 93-1-00 9'E CtE1i1 . ... ., .
.
. . . 144.8 150.0 95
-
97
TEST
NO. L 0 C A T I 0 N IN
PLACE
01ST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
362 95+00 10'E cterLre 146.5 150 0 95 98 ojiplaes
363 95+00 8'W centerline 143.9 15.0 .0 95 96 GJTLies
364 97+50 9'E centerline 142.4 150.0 95 95 03Tp1aes
365 97+50 10'W centerline 143.2 150.0 95 96 GaIaLies
11-25
366
El cim xeEL 10'N of college bhd (J et
of turrunz isJ.ad) 142.8 150.0 95 96 Cbrp1
367 El camro }è3]. 50'N of Gollege BM 142.4 .150.0 95 95 Ctnplaes
368 El Cmro Fb1 110'N of Coll 131.6 150.0 95 88 Does not coTply
369
College
El camro r1 at the 3nterbrn of the S larE 138.4. 150.0 95 93 i rxt ctnply
370 El Croro F1 30'S of CbU 134.5 150.0 95 90 a rot cnip1y
371 El Cmiro FE31 100'S of Cb11€ge 135.9. 150.0 95 91 Does rot aJTp1y •1
372 Sartbae of Oollege 30'W of El Cmm Il 133.8 150.0 95 90 Etes rot cnrply
373 Nirth1ae of CbU 50'W of El (mro F1
______
B8.2 L50.0 95 93 Does rot OJrply
r Ji/ Testing Engineers—San Diego
.
A, Division of United States Testing Company, Inc.
3467 Kurtz St.; P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
I —J •2956 Industry Street,: Oceanside, California 92054 (619) 757-0248
DAILY' RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST 17-1-R7 ?VC Nicleer Da sities LOCATION
FILE No. 5295 , , ' PROJECT L-jjMjtjr-
LAB, No._087-591 DATE OF REPORT' 17-15-87 " CONTRACTOR
TEST
No., L 0 C A T 10 N
IN '
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP. PERCENT
RELATIVE REMARKS MOIST. , ' DENSITY REQUIRED COMP.
OaUege Blvd.
374 CbUj blid E amroth S siiè 275'E of CL 1477 1fl'0 ' 96 ____________________________ Cbl1ej bbd E approach S site 160'E of
375 ceter1ire co1J.ecj bld 138.1 150.0 95 93 ' D not cxJmly
CbU b1d E apro3th iteri:ir of OaLlege ,
376 501S of cteriire El cai-iro real 133.2 ' 150.0' 95 rr rr* mply ' 0D11egebb.dEapp:oa&iS side, SO'S of ca'iter- 89
'
377 lire ElcaTdmReal 135_5 150_0 95 91 Does rot curply
378 Cb11eB]d W apro3th Nside 40'W ofCL cblle?
-
143.7 150.0 95 96 De rot corply
379 CbUe Bhd W apro3th N side 160'W of CL 0b1l 146.8 150.0 951
, 98 Ojqplies
380 Cb11ecj b1d W aprcth 275'W of (N).of CL cx)11E ge , 137.8 150.0 95 ' 92 Does rot curply
cter Of patcti
381 aElege Bld Patch @ cutb inlet W lare Sta 60 1 141.7 150.0 95 ' 95. QiTplies
Scuth e'd of ptdi
382 Ofle bl-vd patch @ a.xrb inlet W ]a
. . 125.9 150.0 95 82 Wes not a]rply
383 Opllem and Patch @ curb inle1 E lane Ce'iter c E patch 134_8 150_0 95 90 I)crot _ctnply
THE 'ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS -SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL. tc
LiJ city of cr7 . ' '
' TESTING ENGINEERS. SAN DIEGO
REVIEWED BY
P.
Nirth'cbiity Mager
( J Testing Engineers—San Diego:
IS
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego; Ca. 92138(619) 225-9641
I J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY'RESULTS - INPLACEDE.NSITY TESTS
DATE OF TEST 17/1-8/87 • tocATloN crr1.cd
FILE No. 5295 PROJECT Cb11eR1d..PLOj±#3188
LAS. No. .087-592 DATE or REPORT 12-15-87_. CONTRACTOR
TEST
No .
. . . L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY . DENSITY _.
MAX. DRY.
DENSITY
.
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
Co. REMARK S
518 Cb11e ets 75+50 16.3 14.'l- 108.8 117.0 90 93 QnpLi
519 Cb11Ba Etsx?e 70+00 12 3 '14.1 107.9 117.0 90 100 (lrrp1
520 Cbi:Ii±je Estsidc 68+05 16.6 14.1 . 101.5. 117.0 90 87. ECes rot cUTply. -
521 Cb1]epEstsxè 62+75 14_9 14_1 109_7 117_0 90 94 OXPLiffi
522 cb11ej Ests 58+00 12 3
-
14 1 9 —_103 117 0 90 89 ECes not cxnply
523 OoU8ge Estsè 56+00 14.2 14.1 103.8 117.0 90 89 Does rot crnply
524 Cblleje Estse 97+80 16.4 14.1. 98 6 117_0 90 84 Da--. not
525 CbUege Etsie 92+02 . 18.9 14.1 101.0 117.0 90 86 Dces not amply
526 OpUege Fstsi 89+50 19.5 14.1 • . 101.7. 117.0. 87_•. Does rot. coTply
527 . cb11ec Fstside 60+10 14.7 . • 14.1 107.7 .117.0 90 . 92
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING .ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
ChUem B1s..tl. Prrrie± 43188 1ri7
TEST
No. ... L 0 C AT I 0 N IN
PLACE
MOIST.
OPTIMUM
Moisr. IN PLACE
DRY
DENSITY
MAX Day
DENSITY PERCENT
REL. COMP.
REQUIRED
PERCENT
. RELATIVE COMP. R EMARKS
528 b11fl Fstse 84+95 20 3 14.1 97.6 117.0 90 83 DDes rot wTply
529 ODIlege B1d Etside 78+10 19.2 14.1 96.3 117X 90 82 Dces rot Q)Tply
523A OpIlege, Etse 56f00 MJ±b1 #523 16.2 14 1 110.4 117.0 90 94 03TpLies kt.U±1 #523 Amk
522A Oaleqe Fi1±sr#522 12.0 14.1 108.9 117.0 90 93 qw Oirplies F;E=#522
520\ 0b11eg. Etsiiè 68F05 ItII±I #520 18.7 14.1 112 ..6 117.0 90 bTplles i'usi #520
329A College Ftsi 78+50 FJ±I #529 16.6 14.1 107.3 117.0 90 92 ]ipLis iu±i #529
528? oz)]-1j Etskè 85+00 ' k±ithSl #528 14.7 14.1 107.7 117.0 90 92 03TpLies MllES #528
526A bUec Itsx1e 89+00W iJ±i #526 11.6 14.1 100.7 117.0 90 92 03rb MJJb1 #526
12-8
524A OaLlecp Wests.ide 92+05 ktJ±1 #524 11.6 ..14.1 118.7 117.0 90 100 1irp1 i-.usi #524
523A b13 1tske 97+80 FE[ES #523 21.7 14.1 101.6 117.0 90 89 ) rot a)Tply 1tiJSr #
530 amege 1'taide 96+00 10.7 14.1 120.7 117 0 90 100 aTpLies
531 aplleqe 1 tsu 89+25 15.7 14.1 111.1 117.0 90 95 appLies
cbUj R1' Projat #3188 Page 3
TEST
I NO. . L 0 C A T I ON IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S 'MOIST. DENSITY REQUIRED COMP..
532 ODliege B1Mi 83+75 1'tsie 11.7 14.1 '117.7 117.0 90 100 03Tp1as
I
V..
- .•.
tc
/ .-
V
if jtyofQ1stj TESTING ENGINEERS SAN DIEGO
REVIEWED BY 1) /Iøy ,. V •
V
St p YdzeEK '{
I'brth cbiity Brah Mmager
* ( J Testing Engineers—San Diego
I,
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
2956 Industry Street, Oceansid, California 92054 (619) 75770248 S
S. S .
DAILY RESULTS N. PLACE DENSITY TESTS
DATE OF TEST 11/11)187 LOCATION Carlsbad
FILE No._5259 . S PROJECT_College Rlyd Jmprnyementc ,Mnfctllre median check
LAB No 087-571 DATE OF REPORT _12/11/87 CONTRACTOR
TEST ' IN OPTIMUM IN PLACE MAX DRY PERCENT PERCENT NO. ..L 0. C A TI 0. N . PLACE .• MOIST. DRY DENSITY . REL.' COMP. RELATIVE: . R E M A R KS MOIST. . DENSITY . . REQUIRED COMP.
Ml College Blvd median 61+50 ..-15.6 104_
S;efo:tnote on bottom
M2 College blvd median 61+50 15.8 108.1
M3 College blvd median 61+50 17.4 . 105.7
M4 Cnl1egeblvd median 61+50 151 108.2
MS Cnllee hlvd median 61+50 - 17.3 •. 106.6 ..
M6 College blvd median 65+50 17.4 103.8
M7 ('nilege blvd median 69+50.- 16.3
M8 College blvd median 65+50 . 16.5. . . 103.0 .
S
M9 . . College. blvd median 65+50. . 17.2 102.0 . . .
M10 College blvd median 65+50
.
16.7
.
102.8
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY. TESTING ENGINEERS- SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.. . .
THESE RESULTS SHOULD.NOT BE. INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL. 5 5 5
('riliono Ri,d Tmnrrniomnf Mtdin Mni'cfiirp Chøck Paoe2 -
TEST NO. L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY,
PERCENT '
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
Mil College blvd median 86+20 7.7 .10.7.0. ________ ________ ________
See footnote on
bottom of page
M12 College blvd median 86+20 7 0 109.6
M13 College blvd median 86+20 7 .6 106.3
,Ml 4 College blvd median 86+20 9.2 102.8
M15 College blvd median 86+20 8.4 102.4
-M16 College-blvd median 92+00 17.6 '104.4
M17 College blvd median 92+00 17.8 103.5
M1F Cnllepe hlvd median 92+fl6 21) 4 101 7
M19 College blvd median 92+00 18.2 104.5
M20 College blvd median 92+00 .19 .5 101:7
M21 Colleg blvd median 97+00 ' 19.1 98.6
M22 College blvd median 97+00 16.3' 105.9
M23 College blvd median 97+00 16.8 105.3
M24 College blvd median 97+00 ' 16.5'
M25 Co1lege blvd median 97+00 ' 17.1 104.0
NOTE: Required by contractor Median moisture check
tc
(ft
1) NBS/Lowry
TESTING ENGINEERS. SAN DIEGO -
REVIEWED BY -
Steven P. K&b N', North County Branch Manager
Jil Testing Engineers-San Diego Jul A Division of United States Testing Company, Inc.
3467
Kurtz St, P 0 Box 80985, San Diego, Ca 92138 (619) 225 -9641
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS - IN PLACE DENSITY.. TESTS
11/10/87
DATE or TEST
FILE No_5259
LAB. No_ 087-562
LOCATION College Blid Carlsbad
PROJECT College Blvd Improvements
DATE OF REPORT 12/10/87. CONTRACTOR
Tc-.-T . L 0 C A T I 0 N
IN PLACE
OPTIMUM MOIST. IN PLACE
DRY
MAX. DRY'.
DENSITY PERCENT REL. COMP.
PERCENT .
RELATIVE R E M A R 1
MOIST. DENSITY REQUIRED - COMP.
87+00 W lane 8'W of centerline
RETEST#490
490A RFTF ST 7 3 126 8 141 0 95 90 Does not comply
491 College blvd 90+00 W lane 101 E of CL 5.8 7.31 131 5 141.0 95 94 Does not comply
492 Collee blvd 93+000 lane 6'W of CL 5.8 ' 7:3 131.5 141.0 95 ' 94 Does not comoly
493 College blvd 96+00 W lane 7.1E of CL . 6.0 7..3 128.7 141.0 95 . .92 Does not cómly.
494 College blvd 98+00 W lane 11'W of CL 5 3 7 3 131 1 141 0 95 93 Does not comply
87+00 W lane 8'W of centerline RETEST #490A
4908 RETEST.#490A ' : ' 6.0 7.3. 129.7 141.0: 95 . 92 . Does not comply
90+00 W lane 15' E of centerline
RETEST #491
j9j)-. RETEST #491 . ' 5.1 ' 7.3 133.5 141.0 95 . 95 Complies
93+00 W lane RETEST #492
492A RETEST #492 . 6.5 7.3 . 130.2 141.0 95 . 93 . Does' not comply
96+00'W lane RETEST #493
493A RETEST #493 ' ' ' ' 5.8 7.3 ' 129.6 141.0 ' . 95_ °. 92 . Does 'not comply
98+00 W lane RETEST #494
.494A RETEST #494 ' . . 5.4 7.3. '.131.6 '141.0' '95 94 Does not comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF 'FACTUAL-"DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS SAN DIEGO FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL
TESTING ENGINEERS SAN DIEGO
tc
REVIEWED BY
1) City'of Carlsbad
1) NBS/Lowry
Steven P. Kobz
North County Branch Manager
4--~ W,- -
J
sting Engineers-San Diego. Testing
A Division of United States Testing Company, Inc.
-9641 3467 KUrtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225
n
____ 9O In,-1,,cfr,, Qtrgt nQir1, (Iifr,rni 09/lcd f10i 7c7J)9AP
OAT( OV rc3T 10/29/87
FILE No -
087-529
5259 No
DAILY RESULTS IN PLACE DENSITY TEST.S 0 987
NUCLEAR DENSITY: LOCATION Carlsbad,'CA
PROJECT College Blvd. Improvements MUtI(PALPROJECTS
November 19, 1987 DIVIStON
DATE OF REPORT- ___________-CONTRACTOR
CST L 0 C A T I 0 N
IN LACE
OPTIMUM MOI DRY DeNSITY. PERCENT R EL. COMP
PERCENT
RELATIVE R EM A R.
MOIST. DENGITY Rcoumco COMP.
461
Co11ge Blvd. W. lane Stat. 85+ 11.5 7.3 139.1 140.6 95 99 Complies
20 15' E of centerline
462
College Blvd. W. lane Stat. 89+50 7..9 7.3 138.6 -140.6 95 99 Complies
' W of centerline
463 College Blvd. W. lane Stat. 93+50 8.4 7.3 139.5 140.6 95 99 Complies 8' E of centerline
464
College blvd W lane 97+00 9' E 6.3 7.3 135.8 140.6 95 97 Complies
of centerline _________
College blvd. W lane 71+50 E lane 10.1 7.3 135.1 140.6 95 96 Complies 465
466 College Blvd. W. •laie 53+75 10.5 .3 .7 140.0 140.6 95 100. Complies
E of centerline
467 college blvd. Stat. 57+00 13.1 7.3 129.0 140.6 95 92 Does not compl
College Blvd Retest of 11467 11.6 7.3 137.0 140.6 95 97 Complies Rete of
68 Stat. 57+00
469 College Blvd. W. lane 60±00 9'
- 10.0 139.5 - 140.6 95 99 Complies
E of centerline I
470 College blvd. W. lane 63+00 8' 9.8 7.3 136.7 140.6 95 97 Complies
W of centerline
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL. -
COLLEGE BLVD. IMPROVEMENT 11/1/R7 Po 9
TEST
NO.
-
_
.
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
. DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R E M AR K $
10/2 NUCLEAR DENSITY:
471 10' E of n centerlie F.S.G.
College Blvd. W- lane Stat. 66+00
. 10.9. 7..3 .- 137 ..2 140.6 95 98 . Complies
472 . College Gbd W. lane Stat. 69+ 10.8 7.3 1347 140.6 95 96 Complies 50 F. S
473 College Blvd. E. lane Stat. 73+ 9.6 . 7.3 .134.2 140.6 95 95
_
Complis
__ !A. 474 College blvd. E. lane Stat. 78+ 00 9.5' ' 7.3 132.2 140.6 95 . 94. '
Now
Does not comply
475 College blvd. E. lane Stat. 83+
. 9;3 00-
7.3.' 134.7 140.6 ' ' 95 96. Complies
476 College blvd.. E. lane Stat.
55+00
9.5 7.3 137.5 '14.0.6 95 98 Complies
477 s College.Blvd. E. lane Stat.
59+00
9.1 7.3 137.7 140.6 95 98 Complies
-
- TESTING ENGINEERS-SAN DIEGO
REVIEWED BY . tQLC ajj7
:A)NBS/L'owry -
Kirk P. Ammerman
North County Branch Manager
( ii Testing Engineers—San Diego
£Division of United States Testing Company, Inc. /
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
/_- 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS- IN PLACE DENSITY TESTS
DATE OF TEST 11/11-14/87 LOCATION Carlsbad
FILE No. 5259 .. . . PROJECT College blvd Tmprnvmnt sphlt
LAB. No. 087-573 __
.
DATE OF REPORT 12/1 1/87._. CONTRACTOR .
TEST
NO L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
~21 College 70+00W lane Left_turn_ lane- . 1?4 .
.13p
153_0
______. .___93 Does
~22 College_blvd RETEST #221 146.. 6 95 96
_not._tomply
RETEST #221
Complies
23 College __blvd73+00 Left turn _lane_Wla e 145_g 153_0 95 96 Complies
~24 College blvd 85+00W lane Left _turn _la e. 143.8 -153.0 95 . .94 .Does not comply
~25 _.
RETEST #224 . . .. .
College.blvd88+00W.larie _left' _urn_la e
.• . .
.
145.6 153.0 95
95
.95
95 .
RETEST. #224
Complies
Complies 26 College blvd88+00W lane left turn la e . 1452 .153.0
r27
Coileg _blvd 70+00W__lane i5It of CL , . _. . 152.3 153.0 95 .100 Complies _.
28 College _blvd__73+00Wlane13'W__ofCL 145_7 153__0 95 96 Complies
29 College _blvd_'7600_10'W_of_CL_W_lane • .. . 137.
..__153.11
_95 • _90 Does_not comply
3O College blvd _W lane 79+00_12'W_of_CL ._14.3.0. 95 94 Does not comolv
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. •
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
rnilimno hitid Tmnrn,mnfc Acnhiit pnno 9
TEST
No. LO C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R E M A R K S
231 College blvd W lane RETEST #229 144,9_ 153,Q_ 95 95
RETEST #229
Complies
232 College blvd 14 lane RETEST #230 145.0* 153.0' 95 95
RETEST #230
Complies
233 College blvd W lane 82+00 10'W of CL 150 ,0- 153 0
ic p
95 98 Complies
234 College blvd RI ane 85+00 ia.i_ 95 100 Complies
235 College blvd 88+00 10'W of CL W lane 151 2
14R 6 -
153.0 95 99 Complies
236 College blvd 91+00 i8'W of CL W lane 95 97 Complies
237 College blvd 94+00 161 W of CL W lane 146_1 153_0 95 96 Complies
238 College blvd 97+0011 1 WofCLWlane 147.61 153_0 95 97 Complies
239 College _blvd 70+00CLW lane' 145_9 153_0 95 96 Complies
240 Coll ege blvd 70+00_101 ECLWlane. 139.8 153.0 '95 92 Does not comply
241 College blvd Wlane73+00CL
- .
142_7 153_0 95 94 Does not comply
242 College blvd W lane 73+00101 ECL 140_8 153_0 95 92 Doesnotcomply
243 CollegeblvdWlane76+00CL 147_6 153_0 95 97 Complies
244 College blvd W lane 76+00CL 147_2 153_0 95 97 Complies
245 College blvd W lane 79+00 12'E CL ______ 146.8 -153.0 95 1 96 Complies
Colleae Blvd Imorovements: Asohalt pn
TEST
No.
. L 0 C A T I 0 N -
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
.
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
. REMARKS
246 College W lane 79+00 10'E CL 145.0 153.0 95 95 Complies
247 College blvd 83+00 Cl W lane 146.1 153.0 95 96 Complies
248 College blvd 83+00 101 E Cl 'W lane 146.3 153.01 95 96 Complies
249 'College-blvd 86+00 CL W lane . 146.0 153.0 95 96 Complies
250 College blvd 86+00 WE CL .W lane 141.3 153.'0 95 93 Does not comply
251 College blvd 89+00 CL .W lane 145.5 153".0 95 95 Complies
252 College blvd -89+00 91 E CL W lane . 145.3 153.0 95. .95 .Complies
253 College blvd 92+00 CL W lane 147.0 153.0 95 96 Complies
254 College blvd 92+00 10'E CL W lane 147.3 153.0 95 97 Complies
255 College blvd 95+00 -CL W 'lane'' . . 145.4 153.0 95 Complies
256 College blvd 95+00 9 1,E''CLI W lane 147.2 153.0 95 97 Complies
257 College blvd 97+00 CL W lane 145.1 153.0 95 95 Complies
258 College blvd 97+00 10IE Cl W lane . 146.7 153.0 95 - .96 Complies
259
73+00 '- ,
College blvd W lane RETEST #241 .
,
'
-'
-145.5 153.0
-
95 95
RETEST #241W
Complies
260
RETEST #242 ,
Colleoe blvd W lane 73+00 ______ 145.2 153.0 95 . 95
RETEST. #242
' Complies
Colleci Blvd Tmnrnvmnts Acnhlt P;;no d
TEST
No. L 0 C A T I 0 N
IN -
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY -
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. CdMP..
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K $
261 College blvd E lane 71+50 15'W of CL 145.3 153.0 95 - 95 Complies
262 College blvd E lane 73+00 101 W of CL 145.7 153.0 95 96 Complies
263 College blvd E lane 76+00 81 W of CL 145.9 153.0 95 96 Complies
264 College blvd E lane 79+00 7'W of CL 145.8 153.0 95 96 Complies
265 College blvd 12'W CL 82+00 E lane - - 146.7 153.0
-
95 96 Complies
266 College blvd 10'W CL 84+00 E lane 145.9 153.0 95 96 Complies
267
RETEST #250
College blvd 86+00 WE CL W lane 145.2 153.0 95 95
RETEST #250
Complies
11-14
-
-
-
268 Colleg blvd E lane 69+00 12'E of CL 145.0 153.0 95' 95 Complies
269 College blvd E lane 72+00 11-'E of CL 149.5 - 153.0 95 98 Complies
270 College blvd E 1ane75+00 10IE of CL 147.7- 153.0 95 97 Complies
271 College blvd E lane 78+00 WE of CL 146.4 153.0 95 96 Complies
272 College blvd E lane 81+00 91 E of CL 145.0 —153.0 95 95 Complies
273 College blvd E lane 84+00 WE of CL - 145.0 153.0 - 95
t
* 95's Complies
274 - College blvd 87+00 E lane 121 E of Cl ______ 138.8 153.0 95 1 91. Does riot comply
Ciionc Ri,d Tmnrnwomont4z AcnhAlf
TEST
No.
: -
L 0- C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
Moisr.
IN PLACE
IDRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
-
R E M A R K S
-
275 College blvd 90+00 E lane 101 E of Cl 140.6 153.0 95 92 Doe snot comply
276 College blvd 93+00 E lane 11'E of CL 141.7 153.0 95 93 Does not comply
277 College blvd 95+00 E lane 12'E of Cl . 147.3 153.0 95 97 Complies
278 College blvd 98+00 E lane 10tE of CL .145.5 153.0 95 95 . Complies
276A
RETEST #276
College blvd 93+00 E lane 11'E CL 145.9 153.0 - • 95 96 Complies
275A
RETEST #275
College blvd 90+00 E lane .10'E of CL . 148.5 153.0
9
95 97 Complies
274A.
RETEST #274.
College blvd Elane 87+00 12 1 E of Cl 145.3 153.0 95 95 Complies
279 College blvd 69+30 E lane CL 145.0 153.0 95 95 Complies
280 College blvd 72+00 Cl E lane • 141.9 153.0 95 93 Does not comply
281 College blvd 75+00 E lane CL 145 1 153 0 95 95 Complies
282 College blvd 78+00CL E lane 145.8- 153.0 .95 96 - Comlies
283 College blvd 82+00 E lane.CL . - . 145.6 153.0 - 95 95 Complies
284- College blvd 83+50 E lane CL - -149.2 153.0 . 95 98 Complies
285 College Blvd 87+00 CL E lane . . -.145.1 153.0 . . 95 95 Complies
286 lCollege blvd 12'W of CL 87+00 E lane ______ - 145.0 153.0 95 95 . - Complies -
Cn11tn RT,r1 Trnnrn;mpnf, Inh.1t Pan P f
TEST
No L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
287 College Blvd 90+00 CL E lane 146.7 153.0 95 96 Complies
288 College blvd 90+0010'W of CL 145.1 153.0 95 95 Complies
289 College blvd 93+00 E lane CL 145.1 153.0 95 95 Complies
290 College. blvd 93+00 E lane 10'W of CL 146.8 153.0 95 96.2 Complies
291 College blvd .96+00 E lane CL 145.0 153.0 95 95 Complies
292 College blvd 96+00 E lane 12'W of CL 145.3 153.0 95 95 Complies
293 College 98+00 E lane CL 145.6 153.0 95 95 Complies
294 College 98+00 E lane 12'W of CL 146.8 153.0 95 96 Complies
295. College 98+00 Left tirn lane E lane 145.1 153.0 95 95 Complies
280A
RETEST #280
College blvd 72+00 Elane
,
145.6 153.0 95 95
RETEST #280
Complies
296 College blvd 57+00W lane 143.0 149.0 95 98 Complies
297 College 54+25 W lane CL 134.8 153.0 95 88 Does not comply
298 College blvd 60+00 W lane 10'E CL 133.5 149.0 95 93 Does not comply
299 College blvd 63+00 W lane 10'E CL 139.3 149.0 95 93 Does not comply
300 College blvd 66+00 W lane 10'E of Cl ______ 141.5 149.0 95 95 Complies
('nllann' I,1..,4 Tn,nant,nmnn+r lrnInl+
TEST • No.
-
L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST:
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMA RKS
301 College 68+50 W' lane 12'E of CL 139.2 149.0 95 93 Does not comply
302 College boyd 68+50 E lane left turn la e 136.3 149.0 95
--
91 Does not comply
303 College 68+50-E lane CL 134 5 149 0 95 90 Does not comply
304 College boyd 68+50 WE of CL 134.7- 149.0 95 89 Does not comply
305 College blvd 53+00 WE of CL W lane 146.2 149.0 95 96 Complies
297A
RETEST #297 . .
College b1vd54+25 W lane CL - 142.0 149.0
-
95 93
RETEST #297
Does not comply
306 College blvd 574O 9'W of CL E lane 140.1 149 0 95 94 Does not comply
307 College blvd 60+00 8'W of CL E lane 141 1 149.0 95 95 Complies
308 College blvd 63+00 81 W of CL E lane 137.4 149/0 95 92 Does not comply
309 College blvd 66+00 left furn lane E la e 141.3 149.0 - 95 95 Complies
310 College blvd 68+70 left turn lane E 1 aiie 137.6 149.0 95 -92 Complies
311 College blvd 68+70 E lane 12'W of CL 142 2 149.0 95 95 Complies
12 College blvd +7fl F lane Cl . _________ 1401 149.0 95 94 Doc not comply
301A
RETEST #301
College b1vd68+50 W lane left turn lane 142.3 149.0 95 95 Complies
313 -- College blvd 70+00 E lane 10'W of CL ______
147.5 149.0 95 99 Complies
,_.___. n, ... I n,...,.i. -
TEST
No.
- -
.
L 0 C A T I 0 N
-
IN
PLACE
MOIST.-
OPTIMUM
MOIST. IN PLACE DRY .
DENSITY
..
MAX. DRY
DENSITY
.
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE.
COMP.
I J
R E M A R K S
314 College blvd 72+00 E lane 8'W of CL 143.5 149.0 95 96 Complies
315 College blvd 75+00 E lane 8'W of CL 143 4 149.0 95 96 Complies
316 College blvd 78+00 lOW of CL E lane 143.8., .149.0 95 96 Complies
317 College blvd 81+00 12'W Cl E lane 142 ..8 149.0 95 96 Complies
318 College blvd 84+)) 10'W CL E lane 143A '149.0 95 96 Complies
319 College blvd 87+00 121 W CL E lane 141.-9 '149.0 95 95 Complies
320 .College blvd 90+00 10'W CL [lane ., 142.4 .149.0 95 . 95 Complies
321 College blvd 93+00 9'W CL E lane 142.0 149.0 95 95 Complies
322 College blvd.95+00 E lane -; 142.1 149.0 95 95 Complies
323 V College Blvd 97+50 CL E lane . . 141.0 149.0 95 94 Does not comply
306A College b1vd57+00 9'W of CL E lane
RETEST #306
140.1 149.0 95 94 Does not comply
324. College blvd 70+00 Elane 10' E CL . . 142.3 149.0 95 95 . Complies
325 College blvd 73+00 E lane WE CL 143.2 1490 95 96 Complies
326 College blvd 75+00 E lane 10'E CL . . 143.0 149.0 95 .96 . Complies
327 College blvd 78+00 E lane WE CL ______
143.4 149.0 95 96 Complies
/ J Testing Engineers—San Diego
I ' A Division of United States Testing Company Inc
3467 Kurtz St., 'P. 0 Box 80985, San Diego, Ca 92138(619) 225-9641
2956 Industry Street, Oceanside California 92054 (619) 757-0248
DAILY RESULTS-IN' PLACE DENSI.1Y:TESTS
DATE or TEST 1i/1R/F7 A/C NUCLEAR DENSITIES LOCATION ___05r_______________________________________________
FILE No 5295 PROJECT_Ch11c'cj R11, -jct #3188, J0h1tie C1ricrrti
LAB No_fl7-Qfl DATE OF REPORT_12-15-87 CONTRACTOR
TEST NO. L 0 C A T I 0 N
IN
PLACE
01ST.
OPTIMUM
MOIST.
IN PLACE H DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP'. REMARKS
334 Cbliaq2 c 9ffrflrh 7Cfl' ç -f 03aterjIme <jj .1420 ...510 - 95 93 - iL i 31j
1fl'S rif nmter1ir Ch11 V 150.3 :153.0 95 V 98 V OJTp1i
V335
336
(1Jj
Cb11ePiro3thIDODUeca-iterl'ire V
V
140.5 153.0 95 92 r not crp1y
334A
S açproth 250'S of CL College V
FE= #334
V 145 0 153.0 95 95 _____ CbTplies jjj #334
33EA
0bUtj3 approach to college cEnterLre
ni #336
145_1 153_0 95 95 cbrp]ies fflb1_#336
337 0b1] 240'N of citer1ar CollegeN aprcdi 145.4 153 ..0 95 95 0jip1
338 Cb11f3jNapra:xth120'N of ciiterLreCb11ej 149.7 .153.0 95 98 Cbp1i es
339 cJj11e prcth cbi1eg ceitrLne 145_2 153 0 95 95 cbip1a
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
V
V TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR 'SPECIFIED PROCEDURES. V V
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL
V TESTING ENGINEERS.- SAN DIEGO
tc V
V V
V REVIEWED BY
1)City of C~rJ.sta V
V
V
V V• V
V
rth Oty Brth
Jj/ Testing Engineers —San Diego
I,!
A Division of United States Testing Company Inc o LILi °
3467 KurtzSt., P.O. Box 80985,. Sari Diego, Ca. 92138(619)225-9641
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILYRESULTS -IN PLAC.E DENSITY TESTS
DATE OF TEST 11/19-25/87 A/C Nuclear Densities LOCATION r1.chd
FILE No. 5295 PROJECT ODLIege
LAB. No. M7-591 DATE OF REPORT_...J,2.,.j.5+87 CONTRACTOR
TEST
No
-- L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP. REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K S
340 9+50 W lane 10'W of centerline . 144.4 150.0 95 97 (bTpLi
341 /2+00 W 1ae 12'W of canterline . 145.4 150.0 95 . 97 CipU es
342 75+00 W lare 8'W of aentErline
. 148.6 150.0 95 98 Cbip1ies
343 8+00 W ae 8' W of centerline 148.6. 150.0 95 100 Oi,p1ies
344 1+() W 1,-r 91W CTF rrtr1ir _146 ._1500 95 ._95 as
345 34+00W lane 8'W-of omterhm 147_3 150_0 95 99
(pli
ccnplaes
346 59+90_5'E_of_cterLr 147_5 150_0 95 99 _______________________
347 9+5015'E C1ter1fr . 1478.0 .150.0 95 . 99 Oip1i
348 1 69+50 Left turn lane ..
. 146.2 '150.0 95 98 apu es
349 /2+00 12'E cmterifre 141.8 150.0. . 95 . 95 Oar p1ies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM' STANDARDS OR SPECIFIED, PROCEDURES.
THESE RESULTS SHOULD NOT BE 'INTERPRETED ,S ENGINEERING OPINION OR JOB CONTROL.
TEST
L 0 A TI 0 N IN,
PLE
OMOIST. IN PLACE
DRY
MAX. Dny
DENSITY
PERCENT
REL. COMP. PERCENT
RELATIVE R E M AR K S MOIST DENSITY REQUIRED COMP
350 72+00 left turn lane 145.4' 150.0 95 97 Ctnplies
351 75+00 10'E caterLr 142.7 150.0 95 96 Cbrp]i es
352 78+-00 10'E c81terLre 146.0 150.0 95 98 Cb1p1] es
353 81+00 12'E centerline 143.7 150.0 95 96 OiTlies
354 84+00 10'E oenterline 147.4 150.0 95 99 anplies
355 87+00 11'E centerLine 143.3 150.0 95 96 anplies
356 87+00 10'W cEnterllre 143 5 150 0 95 96 Cbrplaes
357 87+00 left turn lane 150.0 95 97 Omphes
358 90+W90~ 11'W centerline 141 9 150 0 95 95 CoTpLies
359 90+00 121E centerline 135.5 150.0 95 91 D rot anply
359A 90+W12'E ceiterLr R=#359 142.0 150.0 95 95 03Tp1i rs' #359
360 93+00 10'W oEntErlirib 146.0 150 0 95 98 Cb1p13es
361 93+00 9'E mterLre 144.8 150 *0 95 97 QJTplles
TEST No. L 0 C A T I 0 N
IN,
PLACE
01ST.
OPTIMUM
MOIST.
IN PLACE
DRY DENSITY
MAX. Driv
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
362 95+00 10'E cEnterline 146.5 150.0 95 98 CmIalies
363 95+00 8'W clterL]ne 143.9 150.0 95 96 OxpLies
364 97+50 9'E aenterline 142.4 150.0 95 95 03i1i
365 97+50 10'W cmterJJre
.
143.2 150.0 95 96 CaTiplies
11-25
366
El crtiro re].. MIN of aollege bhd (Ji.st et
of turrunq js]ai) 142.8 150.0 95 96 Cbiplaes
367
0
EL aiTdm Feal 50 IN Of GD11ege Bhd 142.4 150.0 95 95 Omlalies
368 E1niro F1 110'N of Cbllerp 131.6 150.0 95 "88 Does not amply
369
ODUEge
El curo real at the 3ntertatn of the S lane 138.4 150.0- 95 93 Dan rot apply
370 El C1Bro I1 30'S of OD11ege 134.5 150.0 95 90 Doess rot amply
371 El Cniiro I1 100'S of Cb11j D5.9 150.0 95 91 Does rot amply
372 th1 of OaUege 30'W of El Cmro I1 133.8 150.0 95 90 [ rot anp1y
373 INacdame of Cb11eg 50'W of El Cmro Ra1 138.2 19n.0 95 93 Does not cxrp1y
tc
1) City of cristai 0 . ..
. TESTING. ENGINEERS -SAN DIEGO
REVIEWED BY
0
SbavEn P.K±rzef\
Mirth ctu-±y B r
— ( J Testing Engineers—San Diego
A Division of United States Testing Company, Inc. LL to 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138(619)225-9641
____ 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILYRESULTS -IN PLACE DENSITY TESTS
DATE OF TEST 17-1-87 A/C Njo.1r Daisities LOCATION Cr1ch1
FILE No. 5295 PROJECT 0b11ejBud.,Prcde±_#3188,_A.ti1tir_(1-rrrpt-p
LAB. No._087-591 DATE OF REPORT_17-15-87 CONTRACTOR
TEST
No.
.
. LOCATION IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY MAX. DRY DENSITY PERCENT
REL. COMP. PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
ODIlege V 374 CbUig blid E aprcth S side 275'E of CL . 142.7
.
1ftfl Cb]Jeg bhd E approach side 160'E of V
(bip1i
375 centerline cnl:I13ft hIMI 138.1 150.0 95 93 Does rot. cxrrply
02]Bge bbd E aprcth cEnterlim of Cbllej . 376 50 IS of genterline El idro real 1337 150..O 95 fl- .
Cb11e bl'c,d E açprcath S side 50'S of cmter- 89 ml- mTply
377 Lrie El crum Peal .135.5 L50.0 95 91 DDes not amply
378 CbUø BiMi W aproth N se 40'W of CL CbUe - 143.7 15.0 .0 95 96 D rot curply
379 CbUe B1dW açprcath N site 160'W of CL CaLIEW 146.8 150.0 95 98 CbTp]ith V V
380. ODU blid W approach 275'W of (N) of CL coTh V V 137.8 . 150.0 95 92 not crrrply
cuiter ot Pat=
381 Cb11e Bld Patch @ a.xrb inlet W la-re 5th 60 . 141.7 150.0 95 95 0ip1ies
Sarth ed of patch
382 Cbl1egi b1'd patch @ o.irb inlet W 1we V . 125.9 150.0 .95
V
82 D rot coiply
383 CbUe Bivi Patch @airb inlet E lane Omter C ~ patch 134.8 150.0 95 90 . .. Does not amply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.. V
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINIONOR JOB CONTROL. V to
1)city of cr:ai V TESTING ENGINEERS -SAN DIEGO
V
REVIEWED BY
V
ftirth clinty iiar
/
Testing Engineers—San Diego .oto,4&
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
A Division of United States Testing Company, Inc. t7all
iJ 2956.1ndustry Street, Oceanside; California 92054 (619) 757-0248
DAILY'RESULTS -IN PLACEDENSITY TESTS:
DATE OF TEST 11/18/87 LOCATION Carlsbad
FILE NO. 5259 PROJECT CollegeBlvd.,Improvements
LAB. No. 088-120 DATE OF REPORT 1/20/88 CONTRACTOR
TEST
No. L 0 C A T I 0 N IN PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY PERCENT
REL. COMP. REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K S
f ASPHALT-.J'
.
384 . S approach 250'S of centerline College 142.0 153.0 9.5 93 Doesnotcomply
385 S approach . 150'S.of centerline Colle e 150.3 153.0 95 99 Complies
386 S approach to College centerline 140.5 153.0 95 92 Does not comply
384A
RETEST #384
Sapproach.250'S 'of centerline _Colleg 145.0 153.0 95 95 Complies Retest #384.
386A
RETEST #386
s approach to _Collegecenterline 145.1 153.0 95 95 Complies' Retest #386
387 240'N of centerline College N approac 145.4 153.0 95 95 Complies
388 Napproach120'Nof _centerlineColleg S 149.7 153.0 95 98 Complies
389 CollegeapproachCollege _centerline 145.2 153.0 95 95 Complies
J T
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUtE THE REPORTING OF FACTUAL DATA DERIVED FROM TESTS MADE BY TESTING ENGINEERS-SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
TESTING ENGINEERSSAN DIEGO
tc S REVIEWED BY
1.)- City of Carlsbad
)NLowry
Steven P. Kbze , North County branch Manager
C68-015-019
II ~-AGG~RE~~~TN~67~
COIEGEBOULEVARD-'-IMPROVEMENT S
DATE SAMPLE
TAKEN . , . DESCRIPTION'. COST" ".. .. . '
" •0, ,
'06-15-87 . " Durability - Coarse. . $90.00
Durability -,Fine - . '65.00 . . .
07-08-87 .. . Durability T. Coarse '.. 90.09 . .. . .
Durability - Fine 65 00
07-20-87 Durability - Coarse 90.00'
Durability. - Fine
,
. " 65.00 :
07-28-87 ' . Durability' -. Coarse
. '.' . P90.00 . . . .
.
'Durability. - Fine , " 65'. 00
Sand Equivalent 60 00
•
.. • 08-17-87' . ' Sieve Analysis . '. 35.00
Durability -. Coarse' ' 90.00. .
• • . . Durability - Fine • . • • 65.00 . I
• Sand Equivalent . ', '.60.00' . • . . •
08-28-87 • " •. Durability- Coarse'' ,. 0.00'
Durability' - Fine :, ' 65.00
' R-Valve . . • ' 130.00-
Sieve Analysis 35.00..:
10-15-87 . Durability Coarse' ' .90.00 • . •. • • • ' Durability ,-Fine, . •, '. '65.00
R-Valve '. . .' '' 130.00 • • . 'Sand,Equivalent ••.. , ' 60.00 . .
10-16-87 . . • ..' Sieve' Analysis , . The City will pay. . ,
• ' ': .... Sand Equivalent ' for one cornlete
• ' R-Valve • . • set 'of aggregate
•Durability - 'Coarse base tests. All. . . •
. . • ',, . Durability - Fine others are to be • • •. . • paid by contractor.,,
TOTAL $1,490 00
FORM 7 JP
_ . . Testing Engineers—San Diego
Li 3467 Kurtz St., P.O.Box 80985, San Diego, Ca. 92138(619)225-9641
A-Division of United States Testing Company, Inc.
-. -
2956 Industry Street, Oceanside, California 92054(619) 757-0248:
LABORATORY NUMBER - : - DATE
087-373 July 31, 1987
Job No 5259 RECEIVED
. - . [\1JG 41987 CITY OF CARLSBAD -
2075 Las Palmas Dr. NS/LOWRY
. Carlsbad CA .920094859 -. - . - : - ••
Project: College Blvd. Improvements.-
Carlsbad, CA Project #3188
Subject: MaterIal sampled by Testing Engineers-San Diego personnel and submitted
to the laboratory on July 28,..1987, identified as:
.. Class II -Aggregate Base, Sample 0, secured from jobsite - various, areas.
Procedure:' Durability Index tested in accordance with Cal Trans Method #229 both .
Coarse and Fine.
Results:
.
- COARSE
- FINE -
-
SPECIFIED LIMITS
.
. CF 51 ' DF33
Clay = 10...8 35 Mm
. ..•
.- . - -•• Sand 35 .
-
SAND EQUIVALENT a part of Durabilit Index:
Results: - . 31 . . 28 Min.
TESTING ENGINEERS-SAN DIEGO
Reviewed by:
Albert F.. deBerardinis . - ';•._ . S •••
North County Branch Manager . •- . . . . . .
- . . . . -
is . • . .
.
• .
.
-
-
S..
-
1) City of Carlsbad - - •, •: . : . .. .•. -. .,.
L)J'J.BS/Iy' - . . -. ., .' ': • : . •
1) South Coast Asphalt
P
Testing Engineers —San Diego
l
A Division of United States'Testing Company, Inc.0 3467 Kurtz St., P.O.ox 80985, San-Diego, Ca. 92138(619)225-9641
j 2956 Industry Street, Oceanside, -California 92054 (6 19) 757-0248
LABORATORY NUMBER
. : DATE -
087372 -. : July 29-,' 1987
Job NO. 5259 .
. .•• - . .
CITY OF CARLSBAD . . . .
2075 Las Palmas Dr.
Carlsbad' CA 9200.4859 -. -
Project: CollegeBlvd. Improvements . .
Carlsbad, .CA Project #3188
Subject: Material sampled by Testing Engineers-San Diego personnel 'and submitted
to the laboratory on July 8,. 1987, identified as: . •-
Class II Aggregate Base, -Sample #2, secured from jobsite - various areas.
Procedure: Durability Index tested i.n accordance with Cal Trans Method #229 both'
coarse and fine.
Results: . . . . . . . .
... COARSE - - - .. FINE ' S SPECIFIED LIMITS
CF .54 DF=38
- Clay 10.7 35 Mm.
; - - - - • Sand = 3.0
- -
•
TESTING-ENGINEERS-SAN DIEGO;. •
.S-
- -' .
- . •
• Reviewed by: • • - . -.. - S -- - • v - S
Albert F. deBerardinis - • • - S - - - - . - -
- -
North County Branch Manager - • . •• - -
S
-
ls •, - .S- - - -- ,
-
- •
-
- 1) City of Carlsbad - - S. • - - .5, - S .- - -. - -
- Cl). - NBS/Lowr - -- . ' - ' S • S • • - -.: -•-:
-. '
1) South Coast Asphalt
-
• ,
5
5
•
S - - -
'•
Testing: Engineers—San Diego . .
.A Division of United States Testing Company, Inc.
3467 Kurtz St.,P.O. Box 80985, San Diego, Ca.92138 (619) 225-9641
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
PifYSICAL PROPERTIES. OF SOILS & AGGREGATES
LABORATORY REPORT .
Client CITY OFCARLSBAD .- ...-- ... JobNo. 525-9
2075 Las Palmas Dr.— . Lab: No. .
Carlsbad CA 920094859 Date of Report 9-4-87
Attn: Pat Entezari
.
. -. .. . . . .
?:3ject College Blvd. Improvements Project-3188 . .... .. . .
Lc:a:ion Carlsbad, CA . . Sampled by TESD Date 8/28/87
:ye of Xaterial Class II Base Submitted by-. TESD . Date 8/28/87
Erce of Material- On site Location Sap10 Station 50+55 W/B lane (S/B lane) ------------ 2nd Lift
Sieve Analysis, ASTh C136- Test Standards are ASTM unless otherwise noted
Sieve
Se
Passing
Accuu)at1ve 'Specification
C -
s.
100 -_100
98 - - 90-100
85
72
46 35-55.
37 -
17 10-30
13
Ic: 10
______ 77 2-9
E;ecjfjcatjc Data/Co_-ens
Test - : Res ult Speci rice tion TEST 570
Durability -Index Course ti 35 Mm. C2-
Durability - Index Fine 31 35 Min. c'-
Resistance
Vear. rev. . C131
Grading .Vear. 500rev. .
Abrasion
rev.,C!3!-
Gradi ng S year. 1000 rev. . .
Fractured Feces by vticnt
Llçuid Limit/Plasticity Incas /' . / D424-
Cleanness Value . . . . .. . Calif 227-
Sand Equivalent Value 22 Min Calif 217
Resistance •R" Value . 78 Mm_ taut 3oi-
Moisture.
Density..
Peatjont
Per Dry Dcrtsty7 '1. 0 oce- 0 017-
. 0 t.LSHTO T9c-
0 SHTO TIED
Optimum. Mcis)4c. .
v.etr,cc • /. .
Sr.eciIic
rvity
:
Ltrt/n. -
0 Cl??-
0 C?5-
Eu1, /Dry 1 .
E>% 1550). .
Iarcot
Refers to applicable requie ntsas listed inthe Standard -
Specifications for Public W ks (Green Book)
1) City of Carlsbad
1) NBS/Lowry /flL€t 4.
1) South Coast Asphalt Reviewed
Diego
cLLP
Kirk Ammerman
North County Branch Manager
C,
PHYSICAL PROPERTIES OF SOILS & AGGREGATES
LABORATORY REPORT
Client CITY OF CARLSBAD 0 Job No. 5259
2075 Las Palmas Dr. Lab No.
Carlsbad CA 920094859 Date of Report 102887
Project Improvements to College Blvd. Project #3188 -
Location Carlsbad, CA Sampled by TESD Date 10/16/87
Type of Material Class II Aggregate Base - Submitted by TESD Date 10/19/87
''...Source of Material South Coast Asohait .. Location Sampled Stockpile on site
Sieve Analysis. ASTH C136- Test Standards are ASTM unless otherwise noted
Sieve Passing
Accumulative SpecificationSire
3.
2.
100 - 100
94 90-100
.5
31e - 57 so so
.:. q
it
15 10-30
100
1.2 2-9
Specification Data/Comments
Test Result.'Spec if1cat1on TEST 510
Fineness Modulus C125-
Org anic Impurities C'40-
esistance
To
Abrasion
rev. C1.31
Grad i ng
C3-.
Grading
Veer. 'O0 rev. -
Vear. - rev.:
Wear. 1000 rev. ..
Fractured Faces by ulicnt
Liquid Limit/Plasticity index / /' O424
Cleanness Value - Calif 227-
Sand Equivalent, Value 58 Calif 217 -
Resistance R Value 80 calir 301 -
Durability - Coarse/Fine 74/32
Moisture
Density
qelations
Max Dry Dens ity.pct. - 0 otct- 0 Di,-
0 t.LSHTO Tgc-
'0 £..SHTD 11E0
Optimum Moisture.
Method . .
specific.
Gravity..
£-bsorpt ion. 0
0 C1??—
0C12E
sulk (Dryl .
bulk ISSDI •
Lpparrnt
L
: 0•
0
.
0 ••
. H ••
0
0
is
1) City. of Carlsbad
1) NBS/Lowry
Testing Engineers--San Diego
Reviewed by:
- Kirk P. Ammerman, C.E.
Nsrth (ni,ntv Rrinch Manaar,
Teat Rezult 'Specitication TEST STD
Dürability-IndexCoar 74 e mini -Ca1227
burability-Index-Fin . 32 35 min .. Ca.1-227-
Resistance
To
Abrasion
Wear. rev. . . C131-
Grading wear. 500 rev. . .
Vesr. rev; . •- .- C535-
Gradi ng Veer. 1000 rev. .
Fractured F.ce by vt/cnt
Liquid Limit/Pisaticity Index // / • DM24-
Cleanness Value • • • Ca lif 227-
Sand Equivalent Value • • . . • Calif 717
ResnccR Value • 80 80 mm. Calif 301-
Moisture
Density
Peiatcn,
Max Dry Dcnsty.per. . 0 06St 0 01557
0t.sHTo T99-
Q LSHTO TIED--
Optimum mois ture. .
pctroc
Seciric
Gravity
bzcrpt ion. . *
0C17
0 CITE
Apparent
Bulk (Dryl
Bulk 15W)
Sieve
Size
It Passing
Accumulative 'Specification
3/e
c. -
It
30
lot
I L C
D2ta/Cor.ents . -
'p
rM J4 Testing Engineers—San Diego
J%
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.OBox 80985, San Diego, Ca. 92138(61.9)225-9641 r J. 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
PEYSICAL PROPERTIES OF SOILS & AGGREGATES
. . .
.
. LABORATORY REPORT
Client City of Carlsbad Job No 5259
2075 Las Palmas Drive Lab No 87-1262
Carlsbad, CA 9200974859 Date of Report 11-6-87
Project College Blvd.; * Improvements Project 113188
Location Carlsbad, CA . Sampled by TESD Date I fl-1S7
Type of Material Class II Agg. Base Submitted by TESD Date
Source of Material So. Coast Asphalt . Location Sampled .Stockpile on Site
Ac.TM C1- Tpct Standards are ASTM unlss otherwise noted
Per Standard Specifications fo r Public works construction S ection
200-2.2.3 . . .. .
Testing Engineers- -San Diego
Reviewed by: -
Kirk P. Ammerman
'Torth County Branch Manager
.4 .
J/ Testing Engineers—San Diego .
I%,
A Division of United States Testing Company, Inc. I 1
_____ • 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641 r J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
PHYSICAL PROPERTIES OF SOILS & AGGREGATES
LABORATORY REPORT
Client CITY OF CARLSBAD - Job No 5259
2075 Las Palmas Dr. . . Lab No. SD87-996
Carlsbad CA 920094859 Date of Report 12/7/87
Project College Blvd. Improvements Project No. 3188
Location Carlsbad, Ca. Sampled by. T[SD Date 8/17/87
Type of Material Class II Base . Submitted by TESD Date 8/17/87
Source of Material On site Materials Location Sampled various locations
/
Sieve Analysis. ASTM C136- Test Standards are ASTM unless otherwise noted
Sieve
Size
% Passing.
Accumulative
*specification
II..
3"
1½" 100 100:
3'4" •• 95 : 90-100
76
3/8". -. 66
Na. q . .
. 45 3555
8 69
48
30. 36 * 10-30
so 28
100 19
200 11.8* 2-
Specification Data/Comments
Test . Result Ispecificaticiri TEST STO
Durability Index-Coarse 66 35 Nun..
Durability -Index-Fine 33 35'Min.
ResIstance
To. .
Abrasion
Sand 3.7 . . C131-
Grading Clay - . . 11.2 .
% Veer. rev. . C535-
Grading year. 1000 rev. .
Fractured Faces S by wt/cnt
Liquid Limit/Plasticity-Index . ,/• . . /
Cleanness Value . . . calif 227
Sand Equivalent Value 31 22 Mm. Calif 217-
Resistance "R" Value Calif 301-
Moisture
Density
Relations
Max Dry Density.pcf. 0 0696 0 01557-
0 AASHTO T99-
0 ALSHTOT180-
Optimum Moisture. .
Method . S
-
Specific
Gravity
Absorption. It
0 C127
0c128--
•
Bulk (Dry) .
Bulk LSSOI .
Apparent -
Refers to applicable requirements as listed in the Standard Specifications
forPublic Works (Green Book). ., • . . . . .
*— Falls outside of specified limits. •
ls
1)_CLtyof Carlsbad Testing Engineers--San DieR
EC
El VE...D
l
Lj$ijry Reviewed by:
DEC 161 1987
iEE _S/LoWRy tS.D. • .
• Steven P. Kobzeff •
. • . . . North County Branch Manager
•
( Jill Testing Engineers—San Diego
A,Division of United States Testing Company, Inc.
3467 KurtzSL, P.O. Box 80985, San Diego, Ca. 92138(619)225-9641
1 2956 Industry Street. Oceanside. California 92054 (619) 757-0248
DAILY RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST 11/10/87
FILE NO. 5259
LA B. No._087-571
LOCATION. _Carlsbad
PROJECT _College Blvcl TmprovPmentc Moigtijre median rher.k
DATE OF REPORT _12/11/87 CONTRACTOR
1/OCl/ '
TEST
No. L 0 CAT I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
-
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R EM A R K S
Ml College Blvd median 61+50 15 6 104_5_ * 12" depth
M2 College blvd median 61+50 15.8 108.1 * 8" depth
M3 College blvd median 61±50 - 17.4 105.7 *6" depth
M4 College blvd median 61+50 15,.7 108.2 . * 4" depth
MS Cnllege hlvd median 61+50 17.3 : i.......*106.6 * 2" depth
M6 College blvd median 65+50 17.14 103.8 * 12" depth
M7 Cnllege hlvd median 65+50 ..16.3. 103 0 * 8" depth
M8 College blvd median 65+50 16.5 103.0 * 6" depth
M9 College blvd median 65+50 17 2 102.0 4" depth
M10 1,College blvd median 65+50 16.7 102.8 0 • . * 2" depth
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
Cr11ri Ri;d Tmnrnvomnnf-c McrIin MrIi.CfI,r Chrk PMIP 2.
TEST -
No. L 0 C A T I 0 N
IN
PLACE.
MOIST
OPTIMUM
MOIST.
1. PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT.
REL. Co.ip.
REQUIRED
PERCENT
RELATIVE
COMP
- R E M A R K S
tvlll College blvd median 86+20 .7 .7 107 0 _______- _________ _________ * 17" dept-h
N112 College blvd median 86+20 7.0 109.6 * 8" depth
M13 College blvd median 86+20 . . 7.6 106.3 . - _______
* 6" depth
M14 College blvd median 86+20 9.2 1.02.8 . . * 4" depth
M15 College blvd median 86+20 84 102.4 . _. 2" depth
M16 College blvd median 92+00 17.6 4 -104 * 12" depth -
M17 College blvd median 92+00 17.8 103 5 * 8" depth
M1F Cnllege blvd median 92+flfl 20 A _________ 101 7 * 6" depth
M19 College blvd median 92+00 18.2 104.5 * 4" depth
-
M20 College blvd median 92+00 . . 19.5 . 101.7 . * 2" depth
M21 College blvd median 97+00 19.1 98.6 * 12"idepth
-
M22 College blvd median 97+00 16.3 105 9 * 8" depth
M23 College blvd median 97+00 16 8 105.3 * 6" depth
M24 College blvd median 97+00 16.5 1 _________ 105.5 1 * 4" depth
M25 College blvd median 97+00 -- 17.1 104.0 2" depth
NOTE: Required by contractor Median moisture .check TESTING ENGINEERS-SAN DIEGO
tc REVIEWED BY
1) City of. Carlsbad
1) NBS/Lowry Steven P. Ko&.,North County Branch Manager
Jt 'Testing Engineers-San Diego
V
I'D
A Division of United States Testing Company, Inc.. . V
. Kurtz St., P.O. Box 80985, SanD/ego, Ca. 92138 (619) 225-9641 3467 V V V V
- 2956 Industry 'Street, Oceanside, California 9205.4 (619) 757-0248 V
DAILY RESULTS- IN PLACE DENSITY TES
T
S
DATE OF TEST 1/21/88
FILE No 5259 LOCATION ('.r1 bd
PROJECT _College Blvd, Improvements:.
LA 8. No. 088-129 . ' ' DATE OF REPORT-] CONTRACTOR
TEST
NO. '
V V
, ' ' L 0 CATIO N . .
'- IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS
V ,VV MOIST DENSITY .V REQUIRED' Coup. . Centerline of narrow portion.
555 4Median501 NofSend•Depth12"('' 20.6 140 896 117 0_ 77 . * Centerline of narrow portion
556 V 50'Nof,S end Median 'Depth6" __
V 19.1 14.0 96.3, 117.0 '* . 83' *
Median 50'1N of S end Depth 2"
557 centerline of narrow portion__'• _' 18.8 V 14.0 _. 99•3 ___V 117. 0 * V 85 Median 350'N of S end 2'E
v_558, of Vcen.terline _-Depth _'12" _____." __
V, 19.5 14.0 . 98.5 117.0 V'* ' V 85 *
V V Median "350'N of S end V2IE
559 of_centerline_Dèth_6"_'_. 20.0 J14.0__' 29.3 117.0 85 V Median 350'N of. S end 2'E
V
'
V
,
560 of,_centerline _Depth 2" _''. _.
V • 20.3 14 .0 .87.3 .117.0 '* . 84 *. Median 500'S of N end , centerline
561 -median between _planting _areas'Deph'i2 ''23.9 15.0 95.7
, 113.0 * , , ' 85 ' *
Median 500'S of N end centerline
5,6 2' median-between planting _area _:dept1i_6" :30.0 15.0 V 90.7' 113.0 Mçdian 500'S. of N' end centerline
563 median 'between _planting_ará_depth2" 28.9 - 15.0 90.6 ' '113.0 ,. - ' * ' 80
V - ' Median - 350'S of N end CL of
564 median depth 12" 16.9 15.0 1 101.3 117.0 * _' 86
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTIV 'E•. THE REPORTING OF FACTU
A
L
D
A
T
A
D
E
R
I
V
E
D
F
R
O
M
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED P
R
O
C
E
D
U
R
E
S
.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR .100 CONTROL.
.9 ..
College Blvd, Improvements'. •. S Page 2 TEST
No. - L 0 CAT I 0 N - -
IN
PLACE.
MOIST,
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX DnY DENSITY PERCENT
REL. COMP. REQUIRED
PERCENT RELATIVE COUP. R E M A R K S
565
Median 350'S of N end CL of
median depth 6" 16 1 15 0 104 5 117 0 * 89 *
566
Median 350'S of N end CL of
median depth 2" 17 9 15.0 93 6
.
95
117 0 * 80 *
567
Median 50'S of.'. .
N end depth 12" 21.8
.
15.0 113.0 * 84 *
568 Median 50'S of N end depth 6" 21.1 15.0 95.5 113.0 * 84 *
569 -Median 50'S ofN end depth 2" 20.7 15.0 96.6 - 113.0 * 85 *
* For Information Only
Note:. All Tests Done' Per Contractors
Request
-, t,c . . I).---City of Carlsbad . S . - . TESTING ENGINEERS .SAN DIEGO
S / LowrjJ REVIEWED BY
S
Steven P. Kobe'f
North County Branch Manager
., ~ . ., ". ; . , - '. - , 4. , , , '-
I
CflT.T.F.(F RT.\Jfl TMWRC\IFMF.NT
TEST
No. . L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST,
IN PLACE
DRY
MAX. DaY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M .A R K. S MOIST: DENSITY REQUIRED COMP.-
9-18 N1]EART NW'S IYA1LT7
19 So.-Face'curb ' . . 140.3' .152.0 95 , 92 Does not comply
20 . 2' No. Face curb So./Face curb , 137.4 152.0 95 9.0 Does not comply
21 4 1/2' No. Face curb ' ' ' 149.1 ' 152.0 95 98
,
omplies
22 STa. 35+50 6'/2' 'So. Face 'curb
.
151.4' 152.0. 95 100
,
Comp lies
23 Sta. 30+55 7' So Face curb 150 4 152.0 95 99 omplies
24 Sta. 30+50 ' ' '' ' ' 153.3 152.0 95 100+ Complies
25 On Palomar'. Air Port Rd W/Bnd side '
_____ S1- 7+lfl 7 F Center line
143.7 152.0 95 95 Complies
Palomar Airport Rd.
Sta-. 7+25 28' E Center line • • ' ' ' ' '
26 Palomar Airport Rd 1.44..2 152 0 95 95 Complies
27 Sta 75+65 221/2' E Center line 147 2 152.0 95 97 Complies Palomar Airport Rd.' , ' ' ' ' '
28 21"E Center line Palomar Airpor 143 5 152.0 95 95 Complies
29 St a 76+85 261/2' E Center line 143.1 152.6 95 94Does not comply
_____ Palomar Airport Rd. '
30 Sta. 77+00 22' E Centerline'
' 143.4 152.0 . 95 . 94' Does not comply' Palomar Airport Rd.
lane 3' E' Face curb ' 31
I
N/Bnd
0+38. ' 151.5 152.0". 95 100 Complies
11
COLLEGE BLVD IMPROVEMENTS PAGE H in-7Q-A 7
TEST No. LO CAT 10 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
:DENSITY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K S
9-18 U C LER'DER SI TYoWKWKt?
32 0+15 15' •E Face curb 144.7 152.0 95 95 Complies
33 0+15 5' W Center line Isand. . 1.42.8 152.0 95 9.4 Does not comply
34
______
2+30 So./Bnd lane
, . 3 W Center line Island .
.
. 144.1 .152.0 . 95 95 Complies
35 So./Bnd Sta. 4+40 5 W Face cur 146.7 152.0 95 97 Complies
36 Sta. 4+50 15''E Face curb
. . 147.4 152.0. 95 97 Complies
37 Sta. 4+50 So./Bnd lane
.7 . . 3. E Face curb . .
.
.
. . 144.1
.
152.0
.
95 .93 Does not comply
38 So./Bnd Sta. 7+00 9' E face curb 150.9 . 152.0 95 99 . Complies
39 Sta. 7+10 6' E . . 145.6 152.0 .95 96 Complies
.0 Sta 7+30 6' W Face curb . . . .143.6 . 152.0 .95 95 Complies
41 Sta. 19+00 3' EFace curb
.
145.2 152.0 95 = 97 Complies
42 Sa. 19+05, 5' E Face curb, . 147.8 152.0 . '95 ' 99 Complies
43 Sta. 19+20 ' . . , . 146.0 1520 95 96, Complies
44 Sta. 24+50 5 1/2" E face curb 150.5 152.0 95 99 Complies
45 Sta 24+49 17' E Face curb . .. 146.1 152.0 95 96 Complies . .
TEST L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
N PLACE
DRY
MAX. Dnv
" DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E Ni A R K S MOIST. DENSITY REQUIRED COMP.
)-18 tNUCLEARDENSITY 67AiALT11
r446, STa 24+45 6' W face curb 150.4' 1.52 .0 95 99 Complies
Sta. 28+45 4' W face curb 1.47..2 152 0 95 97 Complies
28+30 Center line lane So
Rnrl 144 4 '152.0 95 96 Complies
Sa. '37+50 So./Bnd lane 147.7' 152.0 95 97 Complies 2 1 E face curb
'
L5O STa. 37+55 12" E Face curb s
, . ' 146.6 15.0 95 97 'Complies
)-18 NUCLEAR D NSITY
347 N/Bnd lane Sta. 52 50 5.4 ' 6' W Face CSrb
8.0 131.3 ' 138.0 95 ' 95 Complies
348 N/Bnd lane t /+
.
7 0 4 7 8 0 131 0 138.0 95 95 Complies
N/Bnd lane S ., 44+15 ' 349 '2.' E Center ne ' 5.1 8.0 137.1 138.0, '95
'
'99' Complies
350 N/Bnd lane Sta 40+70 5.3 8,0 Center 1 e
______________
137 6 138 0 95 100 Complies
-
351 ' e St 5+50
,
N/BndAace 5.8 '
'
.0 128.8 ' 138.0 95 93 , Does not comply 2' E cub
N/Bnd lane Sta 35+50 5 0 8.0. 134.0 138 0 95 97 Complies 352 11' , Face Curb
353 Sta 31+70 N/Bnd lane 6.4 8.0 134.0* 138.0 95 97 Complies 4''W Face curb
354
'
Sta. 27+60 8" E Center line 5.0 8.0 ' 136.7 138.0 95 99 Complies lane
TEST
No. L 0 C A T I 0 N .
IN PLACE - OPTIMUM
MOIST. IN PLACE DRY MAX. DRY
DENSITY PERCENT REL. COMP. PERCENT
RELATIVE R E M A R K S Moisr. DENSITY - REQUIRED COMP.
9-18 NUCLEAR DENSITY.: '. S
Sta. 27+80 -15'- W Center line . ;.
355 lane A.8 8.0 128 3 138.0 95 93 Does not comply
356 S t a 28+65 nter li ly,lane 5A, 8.0 135.17. 138.0 95 98 Complies
357 S t a 22+50 2' W Fa e curb 4.5 8 0 131 A 138.0 95 96 Complies
358 STa. 18+30, 31/'/E Face curb 4.9 8.0 18.0 138.0 95 100 Complies / l.P\rjj\
359 .N/Bnd lane 14+00
A urb 7 1 8.0 131 3 138.0 95 95 Complies
360 N/Bnd 1a)7"Sta \+20 center line 6 4 8.0 13'2.7 138 0 95 96 Complies
361 N/B lane Sta. +70 1 E face 6 7 8 0 130.4 138 0 95 95 Complies
362 Run B/s 3' E of 1' E Face curb 5.4 8.0 137 3 138 0 95 100 Complies For back-up info. - - .
9-19
n5i N/Bnd lane 3' E face curb
53+00 152 8Sta, 144 8 95 95 Complies
N/Bnd lane 2' W face curb
STa. 52+50 150 4 152 8 95 98 Complies
53 N/Bnd lane Sta 50+70
A F. farp 'nrh 146.5' 152 .8 , S 95 96 Complies
~5-j
N/Bnd lane Sta.'50+45
4 .W face curb - -. S -
148 4
-
152 8
S
95 97 Complies
S
LI
TEST IN OPTIMUM IN PLACE MAX. DY PERCENT PERCENT
No. L 0 C A T I 0 V PLACE
MOIST.---
MOIST. DRY
DENSITY
DENSITY REL. COMP.
REQUIRED
RELATIVE
COMP.
R E M A R
9-19 tE
N/Bnd lane 50+50 Center line 55 lane .144.6 152.8 95 95 Complies
N/Bnd lane Sta 50+47 56 W face curb , V
145 1 152.8 95 95 Complies
N/Bnd St 47+45 57 f
'lane
ace, curb 147 3 152.8 95 96 Complies
58 N/Bnd lane Sta 47+30 2' W
center line lane V
145 4 1528 95 95 Complies
N/Bnd lane Sta. 47+50 4' E V
59
Face curb
V 145.0 1528 V 95 95 Complies
60 N/Bnd lane Sta 45+00 146.3. 152.8 95 96 Complies 3 1/2" E Face curb
N/Bnd lane Sta. 44+95 12 1/2' 61 E Face curb 150.0 V 152.8 95' 98 Complies
N/Bnd lane STa 44+90 4 1/2'
62 W face curb 147 5 152 8 V 95 97 Complies
N/Bnd lane Sta 40+70 63 W fa,ce curb 148 7 1.52 .8 95 97 Complies
64 N/Bnd lane St 40+70
f ace curb 143.8 152 8 95 94 Does not comply
N/Bnd lane Sta. 37+40
65
5' E face curb
146. 152.8 95 ' V 96 Complies
66 N/Bnd lane S ta. '..37+45 Center line
V ' 150.0 152.8 95 ' 98 Complies lane 5' No. Man Hale
67 N/Bnd lane 37+40
V 9' W fice r 11 r 148.5 - 152 8 95 97 Complies
68
N/Bnd lane STa 31+75
V 1449 152.8
V
95 95
V
Complies
2 1/2 ' W face 'curb - - V
/'(\TTt'r'E' DT1T T.,cDDrnT V IA L'M'PC
TEST ' 0 C AT 1 0 N' IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX.'. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
9- 19,
/Bnd,,lane St. 31+70 69 enter Iine lane
S 148.1 152.8 95 97 . Complies
N/Bnd lane Sta., 2+00 , .70 3'-W face of curb
S 146.5 152.8 95 9.6 Complies
N/Bnd lane Sta. 26+05 71 6' W face of curb S
S
S
157.9, 152.8 95 99 Complies
72 N/Bnd lane Sta. 26+00'
S 14' E face curb
,
' 148.1 152.8 95
'
97
N/Bnd lane Sta.' 18+30 5
Complies
73
S
5 -1/2' W face curb S 146.6 152.8 95 96 .. Complies
74 N/Bnd lane Sta 18+38
14 1/2' W face curb •.
148.3 152 8 95 97 Complies
75. N/Bnd lane Sta 14+00
11' W face of curb 149 6 152 0 95 98 Complies
N/Bnd lane Sta 14+11 76 2 1/2' W face of curb 145.4 .152.0 95 95 Complies
N/Bnd lane Sta 8+60 77 3' W face of curb 148.3.
.
152.0' 95 97 Complies
N/Bnd lane Sta. 8+55 . 78
53
E face of curb', . - 143.7 152.0 95. 94 Does not comply
79 N/Bnd lane Sta. 4+25 5
3' W face of curb
5 151.0 152.0 95 99 Complies
S N/Bnd lane St. OO '8 0
2 1/2 ' E face of curb
S
,
S
144.3 152 0 95 95 Complies
S/Bnd lane STa 3+50 81 1/2' E face of curb 152.0 152A 95 100 Complies
82 S/Bnd lane Sta. 3+50 147.9 152.8 95 97 Complies 'E 13' face of curb . '
('(\T T.tt't' DT IT T 14 DDtTV1(VMDC
TEST
No. ,. t .' . LO
'
IN
PLACE
OPTIMUM
Molsr. IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP..
9-19
83
S/Bnd lane Sta. 7+00 143 9 152 8 95 94 Does not comply 11' E face of curb
84 S/Bndane Sta. 7+05' 0
6 1/2'.E face of curb .
146.7 0 152.8 95 . 96 Càmplies
85 S/Bnd lane TaO+25
f ace of curb 148.9 152.8 95 98 Complies
86
S/Bnd lane Sta.. 37+00.
9' E face of curb
146. 152.8 Complies
95 96
87 S/Bnd lane Sta. 30+59
3 1/2 ' E face of curb
145.7 152.8 95 95, Complies
88
S/Bnd lane sta 24+55 1477 1528 95 97 Complies
3 1/2 ' E face of c urb
89 S/Bnd lane STa. 24+50
13' E face of curb 145.7- 152.8 95 95 Complies
S/Bnd. lane Sta. 19+10'146.9 90 2' Eface_ofcurb 152.8 95 96 Complies
91 S/Bnd lane Sta.,18+50
9 1/2'E face
. 145.9 152 8 95 96 Complies
92
curb. •.
S/Bnd lane Sta 14+55
. . 0
13 1/2 Ffp' nf curb 145.5 1.52 .8 95 95 Complies
93
S/Bnd lane Sta 15+00 147 6 152 8 95 97 Complies 9 1/2E_ face _of_ curb.
94. S/Bnd lane Sta.- 15+50 144 6 152.8 95 95 Complies 2' E fac e of curb
95 S/Bnd lane Sta. 14+00 9? F._Fa'eofrtirh
145.8 152.8 . 95 95 Complies
S/Bnd lane STa.. 10+48
96
2' E Face of curb
146.4 152.8 95 96 Complies
('I'r TVC't' DTTTT\
TEST No. L 0 C A T I ON IN . PLACE OPTIMUM
MOIST. IN PLACE
DRY
MAX. Day DENSITY
raun
PERCENT
REL. COMP.
1!
PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
9-19 N U AR NJTY OF ASP H ALJ
S/Bnd lane Sta. 10+00 97 S , . 12 1/2 E face of curb
. . .147.O 152.8 . 95 96 Complies
98 S/Bnd lane Sta. 10+25 . .
. . 8 1/2 E face of curb .
147.9 152.8 95 . .97 Complies
N/Bnd lane Sta 15+00
5' E face of curb . 148.0 152.8 95 97 Complies
S
N/Bn lane STa. 15+10 100 .
'Center . 1.5 152.0 152..8 100 Compl.ies
S/Bnd lane.S.ta. 51+85 . 101 4' E.face of curb.
.
. 143.7 152.8 95 95 Complies
S/Bnd lane 51+80 102 9 1/2 E face of curb . . . S
146 3 152 8 95 96 Complies
S/Bnd lane 51+90 103 5 1/2' W face of curb 145 5 152 8 95 96 Complies
104 S/Bnd lane Sta. 51+80 144 7 152'.8 95 95 Complies 2 W face of curb
N/Bnd lane STa 51+00 105 136 5 150.0 95 90 Does not comply
106 STa 50 '50 5' W face of curb 137.0 150.0 95 91 Does not comply
107 Sta 50+'50 .1V W face of curb .139.7 150.0 95 93 Does not comply
108 At SDG&E sign H.P. gas line
1/2 W face of curb 144 8 150.0 95 97 Complies
109 At SDEG sign H.P. gas line .
S 142.2 150 O 95 . 95 Complies
9 1/7 W Fr r,F curb .
110 Sta. 44+75 71 /2' W face of curb 143.4. .150.0 95 95 Complies
COLLEGE BLVD IMPROVEMENTS PAGE 18' 10-29-87
TEST
No.
-
L 0 C A T I 0 N'
______________________________________________
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
.REL. COMP.
PERCENT
RELATIVE R E M A R K S DENSITY REQUIRED COMP.
9-19 UCL-EAbENSLTY0N, ASPHJJT
N/Bnd E sect of cap approximately 146 0 152 0 95 96 Complies Sta. 53+00 6 W Face of curb' ' , .
112 N/Bnd Sta 39+00 13 W face curb 143 9 152.0 95 95 Complies
113 N/Bnd Sta. 32+0,0 12' W face curb ' 142.5 150.0 95 ' 95 ' Complies'
'
114 N/BNd Sta. 29+45 5 1 /2' .W'face curb
'
143.0' 150.0, 95 - 95 Complies
115 N/Bnd Sta. 25+50 5' W fac,e 'curb . 145.7 152.0 '95 96 Complies
116 N/Bnd Sta 20+50 4' W face curb 148'.3 152.0 95 98 Complies
117 S /Bnd- lane Sta 47+60 152'.0 5 E face of curb
145.3 95 96 Complies
118 S/Bnd lane STa 41+15-
Center line lane 148 2 1527 0, 95 98 Complies
119 S/Bnd, lane STa. 47+65
, 5 W face of curb
- , 145.2 152.0 95 96 Complies
120 S/Bnd lane Sta 42+53
2 1 /2' E face of curb 144.7 152.0 95 95 Complies
S/Bnd lane Sta 42+50 121 13 E face-- of curb .- - - . -_.
150 1 152 0 95
. 99
. . .
Complies
122 S/Bnd la-ne 5taf42+2 144 2 152 0 95 95 Complies
123 S/Bnd lane Sta. 39+00
7' 'W face of curb 143.4 152.0 95 - 94 ' Doesnot comply
124
_____
S/Bnd lane Sta
.' . 11 1/2 W face of curb 149.5
-
152.0 95 98 Complies
ST -- L 0 C A T I 0 N IN
PLACE
MOI ST.
OPTIMUM
MOIST.
IN PLACE
DRY MAX. Dny
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS DENSITY REQUIRED COMP.
9-19
125 S/Bnd lane Sta.. 37+30 : 3'.W face of curb 0 147.3 152.0_. 95 97 Complies
126 S/Bnd lane Sta. 37+5 0 14.4 152.0 95 96 Complies
127 S/Bnd lane Sta., 28+00
0 155.0 152.0 95 100+ Complies
18 S/Bnd lane Sta. 28+09 15" Face
of curb _______
15.2 152.0 95 100 Complies
129 S/Bnd lane Sta. 28+20 1' W
Face of curb Island (CNRB) .
144.2 152.0 95 95 Complies
130 S/Bnd lane S ta. 28+83 0
1'W 'f 0 3 ace of cut b 147.3 152.0 95 97 Complies
131 Sta 22+80 7 W face of curb 148.7 152.0 95 ' 98 Complies
132 Sta.,19+05 10' W face of curb i47.0 152.0 95 97 Complies
133 Sta 18+90 3' W face of curb '144.5 - 1.52 .0 95 95 Complies
134 Sta 18+50 7' W face of curb 147.2 152.0 95 97 Complies
135 S'/Bnd lane St. 1.4+50 .
0
' 4' W face of curb 0
146. 152.0 95 97 Complies
136 S/Bnd lane Sta. '7+00
tj f.qrp nfriirh 0
, 146.2' 152.b 95 96 , Complies
S/end lane Sta. 6+80
O 137 12' W face of curb ' 0 0 147.0 152.0 95 97 Complies
138 S/Bnd lane Sta. 32+50
3' Wface of, curb
. 144.7 152.0 95 95 Complies
_COLLEGE BLVD IMPROVEMENTS PA(1 fl
TEST
No L 0 CA TI ON IN
PLACE,
Moisy.
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. Dny
DENSITY
Pcncc,-r
REL. COMP.
PERCENT
RELATIVE R E M A R K S
9-19
-
INU1RENSITYPFASPHALT
irn
/
DENSITY REQUIRED Coup.
S/Bnd lane Sta. 3+00 '
Complies 14' W fae of curb S 149.6 152.0. 95 98
140 Check out left turnpocke w/Kirt
C. area not compactedrangd ,' 13.9 152.0 95 , 90 Does not comply
I t from 85-93
141 Sta. 33+00 4 W face of curb'. 140.7' 152.0 95 '92 Doe not comply
14.2 Sta 30+45 8' W
left turripocket
136.9 152 0
S
95 90 Does not comply
114 31 Sta 30+45 8' W left turn pocket - 136.-4 152 0 95 90 Does not comply
Sta. 30+50 2' W face- o curb
. ' J..e.ft turn 'Docket '
'1293 152.0 ' 9 85 Does not comply
1 45 Sta. 30+50 7' W. face of curb
', left turnpocket ' ' ' ' . ' - '
.135.9 152.0' 95' ' ' 89 Does' not comply
Ta. 2+50 6' W face of curb
' 139.5' 1 f- t'iirnporker ' ' 152.0 95 ' 92 , Does not comply
STa. 33±94 '5' W face, of cnrb
' left turnpocket '
'
.
' - 141.0 152.0 95 ' 93 - Does 'not comply
9-24 NUCLEAR DENSITY
Sidewalk W side Center line' 363 '41+75 5
11.9
' 14.0 ' ' ' 111.0 ' ' 116.5 - - 90 ' 95 Complies '
364
-
Sidewalk W side Center lin
•, Sta. 45+50 - , ' ' '
11.7 ' 14.0 110.4 - 116.5 '90 ' , 95 " Complies -
365 Sidewalk W side Center line
' ' STa. 49+00
'
' , 12.6 14.0 108.0 ' '116.5 90 - 93'
'
Complies
C0T.T.1a1 RT.VT1 TMPP1VF.MFNTS PA('1? 11 1fl....10_7
ST No. L 0 C A T I ON'
IN
PLACE OPTIMUM MOIST. IN PLACE
DRY MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
9-24 NUCLEAR DENSITY: .
366 idea1k W side Center line
9.5 .14.0 112.0 116.5 .'90 96 Complies Sta. 51+75 .
1r'-NVQ-U-L EA R.
All tes t s are-retests of te
:taken 9-21-87
Re-A College Blvd. left turn 146.3 152..5 95 96 Complies RETEST A lane CL of Lane 230'N of CL .
Re-B College Blvd. Left turn CL
. . 46.8 152.5 95 . 96 Complies RETEST B
Palomar airport rd. left Re-C lane 100'W o.f CL 1375 Does not comply 152.5 95 90
retest C Palomar airport rd: left Re-D turn loot W of CL college b vd. 144.3 . 152.5 Complies 95 . 95 RETEST D
Palomar airport rd. tight
Re-E turn lane 230' E of CL 143 1 . 152 5 95 94 Does. not comply
0 . . rètst E Palomar airport rd. rt. lan Re-F 148.4. 152.5 95 97 Complies RETEST F 120' E of CL college blvd. .
l40.6 38' S of CL Palomar airport Re-C 152.5 95 92 Does not comply Rd. CL of college blvd. . .
*
. RETEST C
- 9/25 NUCULEAR DENSITIES-FINISH SUB
GRADE
367 Sidewalk E side College Blvd.
. Centerline Sta. 42+00 .9.3 14.0 100.1 1165 90 86 ' Does not comply
Sidewalk E side College Blvd.. 36 8 Centerline 39+50 . 10 1 14.0 100.1 116.5 90 86 Does not comply
369 Sidewalk E. side College Blvd.
9.2 14.0 100.1 116.5 90 . 86 Does not comply
( J Testing Engineers—San Diego
p A Divisioh of United States Testing Company, Inc. .
, 3467 Kurtz St., P.O.Box 80985, San Diego, Ca 92138 (619) 225-9641
I J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST 10/30/87 LOCATION Carlsbad, CA
FILE No. . . PROJECT_ College Blvd. Improvements
-
LAB. No._5259 DATE OF REPORT_November 18, 1987 CONTRACTOR .
.
TEST
NO. f A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX: DRY
DENSITY
PERCENT.
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY REQUIRED COMP.
10/3(). NUCLEAR DENSITY ASPHALT:
College Blvd.-Stat. 3+O0
148 W center 146.4 .152.6 , 95 . ' 96 Complies
149 ' College Blvd. Stat...55+00 .
. / . '146.7. ' 152.6 95.' . 96 - Complies
14' W center line W lane
150 College Blvd 57+00 16' W center / 145.2 152 6 95 95 Complies
line W lane
151 College blvd. 60+00 151 W center
. 143.4 152.6 . .95 94 'Does not comply line W lane
.
152 College blvd. 62+00 14' W. center . 142.8 152.6 95 94. Does not comply
line West Lane .
.
.
153 Retes'tl51:-'60+00 15' W centerline . . . , 144.8 152.6 '95 95 '
Complies Retest #151
'W lane' . . .
154' College blvd. 60+00. centerline
.
152.6 95 147.7 . 97 Complies' W lane
155 College blvd 53+00 Centerline 140.5 152 6 95 92
.W Jane
-
Does not comply
156 College blvd Retest#1 146.7 1.5.2.6 95 96 Complies Retest# 155
Stat. 53+00 centerline Wiané ' . .
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL - DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM' STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS' ENGINEERING OPINION OR JOB CONTROL.'
COLLEGE BLVD. IMPROVEMENTS : 11/18/87 Pagp 2
TEST
No. L 0 C A IN
PLACE
OPTIMUM MOIST.
IN PLACE
DRY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP. - -
10/'3L NUCLEAR DENSITY ASPHALT:
157 College blvd. Stat. 55+00- center 148.7 : 152.6 95 97 Complies line W.. lane,. .., '•
158 College blvd Stat 57+00 Center 146 0 152 6 95 96 Complies line W lane
159, Retest #15'3 Stat 60+00 15 W
:. centerline W. lane 7 .152.6 95 96 Retest 53149 • Complies
160 College blvd. 62+00 14' W center ' . 146.5 152.6 95 96 Complies line _W.lane
161 College blvd. Stat. 62+00 center 146.2 ' 152.6 95 96 ' Complies line W. lane
162 College blvd. Stat. 64+00 15' 146.0 152.6 95 96 Complies W centerline W. lane .
163 'College blvd. Stat. '64+00 center
• 145.8 152.6 95 96 Complies line' W. lane ' •
164 College blvd. 66+00 9' W center . '
' 146.1 152.6 95' • 96 Complies
line W lane ' ' ' •
165 College blvd. 66+00 Centerline
• 151.7 152.6 95 99 Complies
' W lane
166 College blvd. Stat. 68+60 10'
' 150.6 152.6 95 99 Complies 'W w of centerline lane
167 College Blvd. 68+00 centerline
S 146.1 152.6 95 ' 96 ' Complies Wlane S • S S
168 College blvd. Stat. 53+00 1O'E •
centerline.W lane S 5 141.4' 152:6. • 95 S 93 • Do not comply
169 College blvd S t a t 53+00 10' E
centerline_W_lane 145.7 1.521.6, 95 96 Complies
College blvd. 55+00 left turn 5
170
. S • • • lane W lane S •
147.3 152
'
.6 95 '97 ' Complies
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Page 3
TEST
No. L 0 C A T I ON
- -
IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP. PERCENT -
RELATIVE -- - - - R- E M _A 'R KS MOIST. DENSITY - REQUIRED COMP.
10/30 NUCLEAR DENSITY ASPHALT
College blvd Stat 55+00 6 E ol 171 centerline W. lane
- - - -- 144 9
- - - 152 6 -- 95 95 Complies -
College blvd 6' E of centerline 172 57+00 w lane 149.7,-- 1.52 .6 95 98 Complies
College blvd. Stat. 57±00 left 173 turn lane W. lane -
- -
-
-
144.9 - 152.6 95 9-5
-
Complies
174 College blvd. Stat.- 59+00. 12' E
- 152.5 - 152.6 95 - 100 Complies of centerline W. lane -- - -
College blvd.-Stat. 62+00 12'E
- 175
cii centerline -W. Lane - -
151.9 152.6 95 100 Complies
176 college blvd. Stat. 64+00 14' E
- - of centerline W. lane 148.5 - 152.6 - 95 97 Complies
177 College blvd. Stat. 66+00 12' E
- 147.8 152.6 95 - - 97 Complies - of centerline W. lane - -
-
178 College blvd Stat 68+60 10' E 147 4 152 6 95 97 Complies Of centerline W. lane - - - - -
ç;ollee blvd. Stat. 8±69 15' E
- 179 àf centerline E-. lane - - -
-
- -
-1
.
47.3- 152.6 -95
-
97 - Complies
College blvd. Stat.-68+60 , -
180 7' E of centerline E. lane - -1462 1 52 6 - 95 -96 Complies
College blvd. Stat. 66+00 15' 181 of centerline E. lane 149.0 - 152,.6 ' - 95 - 98 Complies
- 182 College blvd. Stat. 66±00 center
- line E. lane - -
145
-
.7 1526 95- 96 Complies
- College blvd. Stat. 64±00 12 1 -E
- 1-47 .2 152.6 95 - - 96 C - omplies
- of center me t lane -
184 College blvd.- Stat. 64+00 center -
line E. lane . - - : 145.0 -152. 6
-
- 95 95
- -
Complies
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Page 4
TEST . - - IN OPTIMUM IN PLACE MAX. DRY PERCENT PERCENT
No. L 0 C A PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E A
MOIST. DENSITY REQUIRED COMP.
IO/3C NUCLEAR DENSITY ASPHALT
College blvd Stat 62+00 0 185
E of centerline. E. lane - 150.8- 152.6. 95 99 Complies
186 College blvd. Stat. 62+00 center
. 145.8 152.6 95 96 Complies line E. lane . . . .
187 College blvd, Stat, 60+00 15' E 150.8 152.6 95 99 'Complies of center line E. lane
188 College blvd, 60+00 centerline 145.8 152.6* 95 96 Complies
E_lane
189 College blvd Stat 57+00 12' 150.8 ..152.6. 95 99 Complies
E of centerline E. lane
190 College blvd. Stat. 57+00 center 151.7 152.6 95 99 Complies line E lane
191 'College -blvd, 55+00,13''E - 146.0 152.6 95 96 Complies centerline E. lane
192 College blvd. Stat 55+00 center
line E. lane 147.2 152.6 - -95 97 Complies
193 College blvd. Stat. 53+00 13' E of
centerline E. lane
146.2 152.6 95 - 96 Complies
194
College blvd. Stat. 53+00 center
- 149..6 152.6 95 . 98 Complies
line. E. lane
.195 College blvd. Stat. 53+00 left . 149.5 152.6 95 98 Complies turn lane E lane
196 College blvd. Stat. 55+00 15' W
- 145.6 152.6 95 95 Complies of centerline E lane
197 College blvd. Stat. 57+00 14' 147.8 152.6 95 ' - 96 Complies-
____ W of centerline E lane
COLLEGE BLVD. IMPROVEMENTS
L 0 C A T
IN OPTIMUM Dny
DENSITY R J p. PERCENT RELATIVE R E M A R K $ MOIST. DENSITY REQUIRED COMP.
10/3( NUCLEAR DENSITY ASPHALT:
-
-
198 College Blvd Stat 60+00 14' W
of centerline E. lane. ,, 150 7 152 6 95 99 Complies
199 College blvd Stat 62+00 12' W 147 8 of center E lane 152.'6 95 96 Complies
200 College blvd 64+00 13' W of 147.2 152 6 95 97 Complies centerline E lane
201 College blvd Stat 66+00 left 148 7 152 6 95 97 Complies turn lane E. lane . . .
202 College blvd. 68+70 left turn,
, ' 148.4 152.6 95 9,7. , Complies lane E. lane .
203 College blvd. Stat. 53+00 15.'
W of centerline W lane 145.6 149.3 95
- .
98 Complies
204 'College.bivd. Stat. 55+00 12' ' 142.5 149.3 95 95 Complies W'_ofcenterline W. --lane .
205
College blvd Stat 57+00 14' W 148.'8 m pliesane 149.3. 95 99 Co of center. line W' l .
College blvd Stat 60+00 12' W 206
of centerline W lane . .
.14.4.4 149 3 . 95 .
-
97 Complies
207 College blvd. Stat. 62+00 14' .
, 144.8 149.3 95 97 Complies W of' centerline W lane
208 College blvd. Stat'. 64+00 14' W , 146.6 149.3 ' 95 '98 ' Complies of centerline W lane
209 College blvd. Stat. 66+00 12' W
'
.
of, centerline W lane
142.6 149.3 ' 95 96 , Complies
210 College blvd Stat 68+60 14'
W of Centerline W lane '
1 42 9 149 3 95 95 Complies . . 0
211 College . blvd . Stat. 68+60 4' 0
141.9 . 149.3' 95 95 Complies E of :centerline E lane -'-
COLLEGE BLVD. IMPROVEMENTS.
S
.1 1/18/87 Page 6
IN OPTIMUM IN PLACE MAX. Dv PERCENT PERCENT T
No.
LOCATION PLACE MOIST.
DE
DRY NSITY
ii
DENSITY REL.COMP. RELATIVE REMARKS
S MOIST,REQUIRED COMP.
LO/30. NUCLEAR DENSITY ASPHALT
- 212 College blvd Stat 66+00 18 E
.of -centerline E'lane 142.0 149 3 95 95 Complies
College blvd Stat 64+00 16' E
213 of centerline E lane . . . .
142 3
.
149 3
.
95 99 Complies
214
College blvd. Stat.. 62+00 15' E 143.6 149.3 95 96 . Complies.
of centerline E lane
215 College blvd. Stat. 60+00 14' E
. 145.5 149.3 95 .98 Complies of centerline E lane
216 College blvd Stat 57+00 10' E
S .
of centerline E. lane . 143 5 149.3 95 96 Complies
College blvd. Stat. 55+00 12' E 2 1 7 of.centerline E land .
144.b
S
149.3 95 5 . 97 Complies
218 College.blvd. Stat. 55+00 left 143.4 . 149.3 95 96 Complies left turn lane E lane . .
College blvd. Stat. 53+00 8' E
219 of centerline E lane .
147.0 149.3 95 99 Complies
220 College blvd. Stat. 53+00 left 145.1 149.3 95 98 Complies turn .laneE lane
TESTING ENGINEERS -SAN .DIEGO
. . REVIEWED BY
Kirk -P. Ammerman
North County Branch Manager
,4ç9/Ii T P"Cc/77 ::c
f.rrT 'E' TTTTr r.xDoyL'qD'Mme
DAry 0 1 'O 0i TEST
No. L 0 C A TI 0 N•
IN
PLACE OPTIMUM
MOIsT. IN PLACE
DRY MAX. DRY
, DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY . . REQUIRED COMP.
9-17 NUCLEAR DENSITY:.
7 5' E of E lane 30' S of Center 338 6.3 , 8.0 .1 26.3 . 137.0 95 92. Does not( comply .me of Palomar Lyirport Rd.
339 "'RETEST OF #42 / 8 2 8.0 131 1 137 0 95 RETEST OF TEST //42
Complies
340 " ETES OF //4 7 8 8.0 130 3 137 0 95 95 RETEST OF TEST //t
C.rmp1is
341 ETES OF 44 . . 7.5 8.0 131.0 . 137.0 95 , ' 96 ' RETEST OF TEST 1/44
Compl. 342 V1ETEST 1/45 7.8 8.0 . 130.5 137.0 9.5 .95 . RETEST OF TEST 1145
Complies
343 0 #41 7 2 8 0 130 6 137 0 95 95 RETEST OF TEST //41
Complies
344 VETESj RETE ST OF TEST //39 . . OF' 39 ' . 7.5 8.o 130.2 137.0 95 ' . 95 Complies
345 ' E/ST OF //37 7 2 8.O 132.0 137 0 95 95 RETEST OF TEST //37
Complies 346 W RETEST OF #36 . .. 8.1 .8.0 132.1 137 ..0 . 95 95 RETEST PF TEST 1/3 6
______ _________ _________ _________ • ' Complies
)_18J(ucLE&D ENS kTy:oNAspHAL.T? '• . , . . .. . '.
_______________ ta 53+00 9' S F C S/Bound lane
146 2 152.0. 95 96 Compli1es
2 J ta 52+30 8 S F C 147.-6 152-.0 95 97 Complies
ta. 51+80 3' 'So. FC. '
, . . 147;8 152.0 . 95 . 97 Complies
14J 5 ta. 48+70 6' So.' F.C. .. , 149.6 152.0 95 98 ' Complies
CflT.T.F.(1 RT.\Jfl TMP1flV1?.M1NTS DAI't' fl 1 'O fl7
TEST
No. . L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R E M A R K S
9-18 TTY
Sta 47-80 5' So F C 148 7 152 0 95 98 Complies
6. 310.0 uped to 325.0 - 45+50 .
5' So. F.C. 0646-146 94.2.. .
.
S 146.7. 152.0. . 95 9.7 Complies
7 Sta 46+85 5' So F C 144 2 152.0 95 95 Complies
8 Sta 46+80 5' So F C 143-5 152.0 95 95 Complies
9 Sta46+50 4' S9. F. C. S 145.1 152.0 95 96 Complies S
10 Sta. 44+25 2 1/2' So. F..C., 147.9 152.0 95 .97 Complies
11 Sta. 44+20 9.1/2' So. F.C. S
149.4 152.0 95 98
:
Complies
12 STa 40+37 2 1/2' So F C 147 3 152 0 95 97 Complies
13 Sta 39+82 1' N Center Island :. :. . et Isi at future Palomar 131.8. 152.0 95 88 Does not comply
14 Sta 39+90 +7 142 .2, 1.52 .0 95 94 Does not comply
15 + 25' 2' N Center line Island 148 4 152.0 95 98 Complies
16 Sta. 40+60/2 1/2 N Center line
S slaad,
. 147.4 152S .0 95
_________
97 S Complies
17 Sta4,40+85 Center line Island
S
137 8 152 0 95 91 Does not comply
18 STa. 40+85 5' N of So, face curb 140.6 152.0 95 93 Does-not comply
,s7z'26 77Jf
fliJi Testing Engineers—San Diego
- A Division of United States Testing Company, Inc.
, 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225 -9641
- I J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248 - ..
TEST
No.
-
L 0 C A TI 0 N
-
IN -
PLACE
MOIST.
- OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
.
PERCENT REL. COMP. REQUIRED
PERCENT
. RELATIVE
COMP. REMARKS
1 College Blvd median 61+50 ..15..6 10_
See footnote on bottoi
of page .2'.
2 College blvd median 61+50 15.8 108.1
3 College blvd median 61+50 17.4 105.7
4 College blvcl:median 61+50 ' 15,1.. 108.2
s-c- %-.- 74
('n. 11 PqP hlvrl median 61+50 17.3 - _106.6
~46 College blvd median 65+50 . 17.4 103.8
7 1 Fiqp hlvd' median' 65+50 '16.3 103.0 . . . . .
8 . College blvd median 65+50 . . 16.5 .103.0
9 ' college blvd median 6550 ', •. 1'72.. ' .102.0
10 College blvd median 65+50 . , .' 16.7 . '102.8
- THE,ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
- TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM 'STANDARDS OR SPECIFIED PROCEDURES.'
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
.
I_J Testing Engineers—San Diego
ID
A Division of United States Testing Company Inc 1EiVEI
3467 Kurtz St,PO Box 80985, San Diego, Ca 92138 (619) 225-9641
1iJ 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
JAN 2 5 1988
DAILY RESULTS IN PLACE DENSITY. TESTS . MUNICIPALPQOJECTS
DIVISI
DATE OE.TEST 11/17-18/87 . . LOCATION Carlshrn-i
FILE No.5259 . PROJECT College Blvd., Improvements
LAB. NO. 088-1120 . DATE OF REPORT 1/.20/88.
. CONTRACTOR . . .
TEST
No
. . . . . . . . L 0 C A TI 0 N .'.
IN PLACE
OPTIMUM
MOIST. IN PLACE.
DRY
MAX. DRY
DENSITY PERCENT REL. COMP. PERCENT
RELATIVE . .
R M A R K S MOIST. DENSITY REQUIRED COMP. 11/17 College Blvd South approach 58'W of. . . 544 . centerline El Camino Real 240'S of CL 4.6 177 A. 141 p' 95 91 . 'Does not comply S. approach. 50'W of centerline El
545 Camino Real 120'S of centerline Coile e 5.7 7.3 ' 133.1 141.0 . 95 95 Complies
S. approach 20'S of centerline Colieg
546 ' . 48'W of centerline El Camino Real. . 5.2 , , 7.3. ' .128.3 ' 141.0 '95 . 91 ' Does not comply
547 College median St// 59+50 centerline 22 7 14.'.0 '95.5'' 117 0 90 82 Does not comply
548 College median St/I 66+50 centerline 15 6 - 14.0 100.3 117 *.0 90 86 Does not comply
549 College median St/I 88+00 centerline 16 .*8 ..12.1 105.2 121.0 90 87 Does not comply
-
550 College median St// 93+00 164 12.1. 105.2 121.0 90 87 Does not comply
551 College median St//'81+75 . . 173 12.1 102.1 121.0 90 84 Does not comply
.552 ' College Median . St// 75+75. ' ' ' 13.0 1 14.0 1 104.7 117.0 90 ' . 90 ' Complies .11/18 Retest //544 S approach 240'S of ,
544A. centerline College . . . ' 6.2 7.3 . 131.3 .,141.0 95 , 93 Does not comply Retest544
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM TESTS MADE BY TESTING. ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
-.-
College Blvd, Improvements Page 2
- TEST lu OPTIMUM . IN PLACE MAX. Da PERCENT PcncEur L 0 C A I I 0 N PLACE MOIST. Day DENSITY REL. Coup. RELATIVE R M A R K $
-
MOIST. * DENSITY REQUInCO Coup. 240'S of centerline College
.• . . .
.
--
544B Retest ,#544A -..S approach 5.6 7.3 135.9 141.0_ 95 97 Complies . Retest //544A Retest /1545 . . . *. .
. 545A South approach 6.9 7.3 -
-
.135.'2 141.0 •- .95 - 96 - Complies Retest /1545 N approach 275'N of . . .-
553 centerline College -5.2 7.3 133.6 141.0 95 95 Complies
. 4 N- approach 125'N
-554 at centerline College -, . -- - -- 6.3 7.3 135.0 -141.0. 95 . 96 Complies -
* Retest #546 Approach centerline
546A of Colle'e * . - 6.5 -. '7.3- 135.2 141.0 - 95 - 96 ComDlies Ps-t- /1cLA
r _J Testing Engineers—San Diego .
Jf
A Division of United States Testing Company, Inc.
3467 Kurtz St;, P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641 1
L) 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS -IN PLACE DENSITY TESTS
DATE OF TEST 11/18/87 LOCATION Carlsbad
FILE No. 5259 . PROJECT CollegeBlvd.,Improvements
LA e. No. 088-120 DATE OF REPORT 1/20/88 CONTRACTOR_
TEST
No. L 0 CA T I 0 N IN PLACE MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY DENSITY PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K $
ASPHALT
384 S _approach250'SofcenterlineColle e' ' _"142.0 '.153.0 95 93 Doesnotcomply
385 S_ approach 150'S _ofcenterlineColle e . .150.3 153.0 95 99 'Complies
386 S approach to College centerline 140.5 153.0 95 92 Does not comply
384A S_approach250'Sof centerline _College
RETEST /1384
. . 145.0 153.0 95 . 95 Complies Retest /1384.
386A S.approachto College centerline
RETEST /1386'
145.1 153.0 95 95 Complies' Retest //386
387 . 240'N of centerline College Napproaci
. ', 145.4 153.0 95 . 95 ' Complies
388 Napproach _120.'N.of'centerline College '. . . .149.7 153.0 95 98 Complies
389 CollegeapproachCollegecenterline
.
'145.2 153.0 95 95 Complies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS-SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
TESTING ENGINEERS. SAN DIEGO
REVIEWED BY '
(i
1) NBS71-o—wry
Steven P. 1(obze , North County Branch Manager
RECEIVED
(J Testing Engineers—San Diego . " 198B JAAF ADivision of United States Testing Company, Inc.
3467 Kurtz St.,P.O. Box 80985, San Diego, Ca. 92138(619)225-9641
J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248 iPA PROJECTS
DMSt0M
DAILY RESULTS -IN PLACE DENSITY TESTS
DATE OF TEST 11/10/87 LOCATION Carlsbad
FILE No. 5259 . . . .. . .. PROJECT _College Blvd Tmprovmnt ,Mictiire median rherk
LAB. No. 087-571 DATE OF REPORT .12/11/87 S CONTRACTOR
TEST
No. L 0 C A T 1'0 N
IN
PLACE
OPTIMUM
MOIST. . IN PLACE
, DRY MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE
-
. R E MA R KS MOIST. . . DENSITY REQUIRED COMP. S
Ml College Blvd median 61+50 15.6 1045_ * 12" depth
-
M2 College blvd median 61+50 - 15.8 108 1 * 8" depth
M3 College blvd median 61+50 17.4 105.7 * 6" depth
M4 College blvd median 61+50 157 108 2 * 4" depth
M 5 College blvd median 61+50 17.3 106.6 . .. * 2" de ph
M6 College blvd median 65+50 1714 103.8. * 12" depth
M7 College hl yd median 65+50 16.3 103.0 8" depth
M8 College blvd median 65+50 16 .*5 L 103.0
. 102.0
* 6" depth
M9 College blvd median .65+50 17.2 . . . . . 4 depth
M10 College blvd median 65+50 16.7 102 .,8 * 2" depth
THE ABOVE TEST RESULTS AND CALCULATIONS, CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR. JOB CONTROL.
4
fllu,1 Tm ,mrfc MrHr, mni ef,iro ChcrL'
EST
o. L 0 C A T I 0 N
IN
PLACE
MOIST
OPTIMUM
MOIST.
IN PLACE
DRY
)ENSITY
- MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP
-R E M A R K S
I_. College blvd median 86+20 7.7 107.0 _________ * 12" depth
2 College blvd median 86+20 7 0 109.6 * 8" depth
L_ College blvd median 86+20 7 6 _______ 106.3 _______
* 6" depth
4 College blvd median 86+20 9.2 102.8 * 4" depth
5 College blvd median 86+20 8.4 102 4 * 2" depth
6 College blvd median 92+00 17.6 104.4-+ * 12" depth
7 College blvd median 92+00 17.8 103 5 * 8" depth
L8. College blvd mrhn 97+00 2n -4 101-7 _________
* 6" depth
9 College blvd median 92+00 .18 .2 104.5 * 4" depth
0 College blvd median 92+00 19 5 101.7 1 * 2" depth -
'1 College blvd median 97+00 19.1 98.6 127depth
12 College blvd median 97+00 16.3 105.9 * 8" depth
13 College blvd median 97+00 16.'8 105.3 1
* 6" depth
_.
4._ rnllpqp blvd median 97+00 16 5 ________ 105 5 ________ _______ ________ * 4" depth
25 C011ege blvd median 97+00 - 17.1 104.0 . * 2" depth
STE: Required by contractor, Median moisture check
tc
1) City of Carlsbad -
1) NBS/Lowry
TESTING ENGINEERS - SAN DIEGO
REVIEWED BY
3teve-n-77. Koh,North County Branch Manager
.3 I . J' Testing Engineers-San Diego
. .
A Division of'United States Testing Company, Inc. y RECEIVED
1~ offmi 3467 Kurtz St,PO BOX 80985, San Diego, Ca 92138 (619) 225-9641 2
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
JAN 071988
DAILY RESULTS- IN PLACE DENSITY TESTS MUNIPALPROJECTS
DIVISION
DATE OV TEST 12/9-I5/87. . S LOCATION Carlsbad '.
FILE , _5295
- PROJECT College Blvd Project #3188
LA o. No:_087-654 - DATE OF REPORT 12/23187 CONTRACTOR . .
TEST
NO . LO C A TI ON . IN PLACE OPTIMUM
MOIST. IN PLACE . DRY MAX. DRY . DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE W R EMARK S MOIST. DENSITY REQUIRED COMP. (sidewalk)
. . . 533 El Camino Real 120'NofCollege.blvd 10.1 7.3 123.9 141.0 90 . 88 Does_ndt _comply (sidewalk).
534 El Camino Real 60'Nof College _Blvd 19.7 17.5 106.3 112.0. 90 95 _Complies
12-9 NUCLEAR DENSITY ,. S .
.
. . _. . . ...
. (sidewalk)-
535 EI Camino. Real 0+130Eof College Blvd ' 5.1 .. 7.3. 128.1 _.. .141.0.. 90 . 91 'Complies (sidewalk)
.
. - 536 El. Camino Real 0+080E_of College Blvd 7.7 . 7.3 125.1 141.0 90 . 89 Does not comply (sidewalk) . . . . . 537 El Camino Real Q+030EofCollegeBlvd 10.7 .7.3 111.3- 118.0 90 95 . Canpliés L2-10
538'sidewalk 83+00E' lane , _____. __- 26.3 23.5 87.0 __..- 104.0 ___.. 90..'.... 84 _. Thesno•aiip1y
539 sidewalk 73+50Elane.,___.. _.. :21.0 20.5'.: 96.3.. . 108.0: .90 90 _. Complies
540 . sidewalk_66+5.0_E_ lane , .. _-. 23.6 23.5 _. .9,.l 104.0 90 86 Does _not.canply
541 55+50 sidewalk E lane
- 22.4 23.5 9.2.8 104.0 90 89 Doesnot comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THC.REPORTINO OF
.
F
A
C
T
U
A
L
D
A
T
A
D
E
R
I
V
E
D
F
R
O
M
TESTS MADE BY TESTING ENGINEERS :SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR J
O
B
C
O
N
T
R
O
L
.
-
College Blvd Project fl3188 S Page 2 TEST
NO. :
L 0 C AT I 0 N
IN.
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY DENSITY
MAX. Dnv,
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
.RELATIVE
COMP. R E M A R K S •
542
Telephone line crossing iliitersection
College Falccnar Airport. Rd.
of
4.7 8.5 127.5 138.0 95'. 93 Does not comply
543
Telephone crossing Intersection of
College .& Palcinar Airport Rd. 4.1
S
8.5
S
131.0 138.0 • 95 95
S
Canplies
TESTING ENGINEERS .SAN DIEGO LC S
S •. S REVIEWED BY 1) City of Carlsbad S 1) NBS/Lowry S
S S S
S
5
•
.
Fteven~P.!Kobzeè' . S
•.
5S5 5 5 North County Branch Manager S S
-
(
( J Testing Engineers—San Diego I4c
A Division of United States Testing Company Inc. .
3467 Kurtz St, p 0 Box 80985, San Diego, Ca 92138 (619) 225-9641
I —) •2956 Industry Street, Oceanside, California 92054 (619) 757-0248 S.
DAILY RESULTS - EN. PLACE DENSITY TESTS
DATE OF TEST--10/30/87 . .. . . LOCATION Carlsbad, CA .
FILE No '087-52.7 . - . .PROJECT College Blvd. Improvements
LAB No 5259 DATE OF REPORT_November 18, 1987.* CONTRACTOR
TEST No. I C. A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY .
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS
MOIST. DENSITY REQUIRED COMP. -
10/3 NUCLEAR DENSITY ASPHALT: . . . . . .
College Blvd. Stat. 53+00 -. . . . . . . .
148 12' W center line W lane . . 146.4 .152.6 . 95 .. 96 Complies
149 College Blvd. Stat. .55+00 .
. :1467. 152.6 95 96 Complies 14' W center line W lane
150 College Blvd 57+00 16' W center 145.2 152.6 95 95 Complies line W. lane
151 College blvd. 60+00 15' W center
. . 14.3.4 152.6 .95 94 Does not omply
. line W lane . . . .
152 College blvd. 62+00 14' W . center . 142.8 152.6 95 94 Does not comply
line West Lane,
153 Retstl5'60+00 15' W centerline . 144.8 152.6 95 95 Complies Retest1/
W lane .. i N t'
154 College blvd. 60+00. centerline
.
jrjjj
147.7 152.6
5.
97 Complies W lane
155 College blvd 53+00 Centerline NOV 241987140 5 15-2.6 95 92 Does not comply
156 College blvd Retest#l5 146 7 15.2 .6 - 95 96 Complies Retestl1 155
St-at.53+00 centerline W lane 1UNICIPALPIOJECT
DIVISION
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Page 2
TEST
No. L 0 f KI
IN
PLACE
OPTIMUM MOIST. IN PLACE
DRY
. MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS
MOIST.. DENSITY REQUIRED COMP.
10/3L NUCLEAR DENSITY ASPHALT:
157 College blvd. Stat. 55+00 center S 148.7... 152.6 95 97 Complies line W. lane .
158 College blvd. Sta t.. 57+00* Center
. 146.0 152.6 95 ..96 Complies line W lane
159 Retest .1/1-5.Stat. 60+00:15' .W
centerline W. lane .
. 149.7 152.6 95 96 Complies Retest fl5
160 College blvd. 62+00 14' W center 146.5 152.6 95 . 96 Complies lp
line W. lane
161 College blvd. Stat. 6.2+00 center .
. 146.2 152.6 95 96 Complies
line W. lane
162 College blvd. Stat. 64+00 15'
.
146.0. 152.6 95 96 Complies W centerline W. lane .
163 'College blvd. Stat. 64+00 center . 145.8 152.6 95 .96 Complies line W. lane . .
164 College blvd. 66+00 9' W center, . 146.1 152.6 .95 . 96 Complies line W lane
1 65 College blvd. 66+00 Centerline
w lane . 151.7 152.6 95 99 Complies
166 College blvd. Stat. 68+60 10' 150.6 152.6 95 99 Complies W of centerline W lane . .
167 College Blvd. 68+00 centerline.. 146.1 152.6 95 96 Cdrnplis . Wlane
168 College blvd. Stat. 53+00 10'E
. centerline.W lane 141.4 152.6 95 93 . . oot comply
College blvd Stat 53+00.'10' E 169 centerline_W_lane 145 7 152,6 95 96 Complies
170
College blvd. 55+00 left turn 147.3 152.6 95 97 Complies S W. . lane lane
COLLEGE BLVD. 'IMPROVEMENTS 11/18/87 Page 3
TEST No. L 0 C A T I 0 N IN
PLACE. OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY . REQUIRED COMP.
1.0/30 NUCLEAR DENSITY ASPHALT
Sat 55+00 6' E 171 Co llege
::i "1ne w .144 .,9 .152 ..,6 95 95 Complies
Ce lv6' E of centerline
172 57+00 W. lane 149.7 152 6 95 98 Complies
College blvd.' Stat 57+00 left . 173 turn.lane W. lane .
.
144.9
.
152.6 .95
,
95 Complies
College blvd. Stat. 59+00. 12' E
' 174 of centerline W. lane . .
' 152.5 152.6 95 100 Complies
College blvd. Stat. 62+00 12''E
175
of centerline W. Lane
151.9 152.6 ' 95 100 Complies
176 College blvd. Stat. 64+00 14' .E
' of centerline W. lane 148.5 152.6 95 97 Complies
177 College blvd Stat 66+00 12' E 147 8 152 6 95 97 Complies of centerline W. lane
178 College blvd. Spat. 68+60 10' E . , ' 147.4 152.6 95 97 . Complies of centerline W. lane
College blvd. Stat. 68+60 15' E 179 of centerline E. lane ' '147.3. . .152.6 95 ' 97 Complies
College blvd.. Stat.' 68±60, '
180 7' E of centerline E. lane ' ' 146 • 2 152 6 ' 95 96 Complies
College blvd. Stat. 66+00 T.5 E
. 181 of centerline E. lane 149.0 152.6 '95 98
'
Complies
182 College blvd. Stat. 66+Q,0 'center .
. 145.7' 1526 ' 95 96 Complies line E. lane
183 ' College blvd Stat. 64+00 12' E .
. ' 147.2 , 152.6 95 96 Complies 'centerline of E lane
184 College blvd. Stat. 64+00 center
. 'line E. lane 145.0 152.6 95 95 Complies
COLLEGE BLVD. IMPROVEMENTS 1 1/18/87 Page 4
TEST IN OPTIMUM IN PLACE MAX. DRY PERCENT, PERCENT
No. 'l A ON PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R K S
MOIST.- DENSITY REQUIRED COMP.
L0/3( NUCLEAR DENSITY ASPHALT
College blvd Stat 62±0010' 185
E of centerline E. lane 150 ..8 .152.6, 95 99 Complies
186 College blvd Stat 62±00 center 145 8 152 6 95 961 Complies line E lane
187 College blvd, Stat, 60±00 15' E 150.8 152.6 95 99 Complies
of center line E. lane
188 College blvd, 60+00 centerline 145.8 152.6 95 : 96 . Complies E_lane
189 College blvd Stat 57+00 12 150 8 152 6 95 99 Complies
E of centerline E. lane
190 Collge blvd. Stat. 57±00 center .151.'7 152.6 95 99 Complies line _E_lane
191 College -blvd, 5+00 131 E of . 146.0 152.6 95 96 Complies centerline_E.lane
192 College blvd Stat 55±00 center
line E. lane 147.2 152 6 95 97 Complies
193 College blvd Stat 53+00 13' E
centerline E. lane - 146.21 152.6 95 96 Complies
19 College blvd Stat 53±00 center .149.6 152.6 95 98 Complies line E lane
195 College blvd Stat 53±00 left 149 5 152 6 95 98 Complies tur;n lane E lane
196 College blvd. Stat. 55+00,15' W 1456 152.6 95 95 Complies of centerline E lane
197 College blvd. S.tat. 57+00 14' 147.8 152.6 95 96 Complies
____ W of centerline E lane
COLLEGE BLVD.. IMPROVEMENTS 1II18I87 Pp 'S
TEST L 0 C A T I 0 N
IN OPTIMUM
MOIST. IN PLACE
DRY
MAX. Dnv DENSITY RELATIVEACE. REL. COMP. - R E M A R K S MOIST.— DENSITY REQUIRED COMP.
10/3(NUCLEAR DENSITY ASPHALT:
:198 College Blvd. Stat. 60+00 .14 1 W
-
of centerline E lane
150.7 152.6 95 Complies 99
199 College blvd..Stat 62+00 12' W 147 8 of center E. lane .
. ". . .
152 6 95 96 Complies
200 College blvd. 64+00 13 W of 1472 ' 152.6 95 97 . Complies centerline E lane
201 College blvd. Stat. 66+00left
. . 148.7 152.6 95 . 97 Complies
turn Lane E.lane ,
202 College blvd. 68+70 left turn
148.4 152.6 95 97 Complies lane E. lane .
203 College blvd. Stat. 53+00 15,'
W of centerline W lane
. 145.6
.
149.3
.
95 98 Complies
204 'College blvd Stat. 55 -00 12'
. W_ofcenterline___W ___lane 142.5 149.3 95 95 ' Complies
College blvd.. Stat.' 57+00 14' W 205 of center line W lane
.
. .
148.8
,
149.3 .95 Complies 99
College blvd. Stat. 60+00 12' W
' 206 of centerline W lane .. 144.4 149.3 95 97 Complies
207 'College blvd. Stat. 62+00 14'
' 144.8 149.3 95 ' 97 Complies
W of' centerline W lane
208 College blvd. Stat. 64+00 14' W
' 146.6 149.3 95 ' .98 Complies of centerline W lane
,
209 College blvd. Stat. 66+00 12' W
of centerline W lane ,
142.6 149.3 95 96 Complies
210 College blvd.. Stat. 68+60 14'
W of Centerline W lane
142.9 ', 149.3 ' 95 . 95 0 Complies
211 College blvd. Stat. 68+60 40'' 141.9 '149.3 95 ' 95 Complies E of centerline E lane I ______ '
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Page 6
TEST IN OPTIMUM IN PLACE MAX. Dnv PERCENT PERCENT
No.LOC ATION PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R EMARKS
. MOIST. . DENSITY REQUIRED COMP.
1.0/31 NUCLEAR DENSITY ASPHALT
212 College blvd Stat 66+00 18' E
of centerline E lane . S
142 0 149.3 95 95 Complies
College blvd. Stat. 64+00 16' E
213 of' centerline E lane
142.3 149.3 95 99 Complies
214
College.blvd. Stat. 62+00 15' E
' 143.6 149.3 95 ' :96 Complies
of centerline E lane
215 College blvd. Stat. 60+00 14'E . .
. ' 145.5 149.3 95 " 98 Complies of centerline. E lane .
216 College blvd. Stat. 57+00 10' E ,
of centerline E. lane ' 143:5 149.3 96 Complies
217 College blvd. Stat. 55+00 12' E 144.0 149.3 95 97 Complies of. centerline E lane . .
218
blvd. Stat. 55+00 left
l
College' 143.4 149.3 95 96 'Complies
eft turn lane E lane
-College blvd. Stat. 53+00 8' E
219 of centerline E lane .
147.0 149.3'. 95 99 Complies
220
College blvd. Stat. 53+00-left. 145.1 149.3 95 98 Complies turn laneE' lane S .
TESTING ENGINEERS -SAN DIEGO
REVIEWED BY
Kirk P Ammerman
North County Branch Manager
•
flJi Testing Engineers-San Diego RECEIVED A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138(619)225-9641.
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
S FE8 02 1988
-
MuNIC'ALPROJECT9 DAILY RESULTS - IN PLACE DENSITY TESTS DIVISION
DATE OF TEST 1/21/88
525 . . .,,
LOCATION (v1ch .
FILE No _________________ PROJECT_College Blvd, Improvements
LA e. tb o. 088-129 DATE OF REPORT_1/7S/Rb CONTRACTOR
N L 0 C A T I 0 N IN PLACE
OPTIMUM
MOIST. IN PLACE
DRY MAX. DaY'
DENSITY PERCENT
REL. Coup.
PERCENT
RELATIVE R E M A R K S MOIST.. DENSITY REQUIRED Coup. Centerline of narrow portion
555 Median 50'N of S end Depth 12" 20.6 14-0 89 f 117 0 * 77 * Centerline of narrow portion
556 '0'N of S end Median Depth 6" 19.1 14.0 96.3 117.0 * 83 *
Median 50"1N of S end Depth 2"
557 centerline of narrow portion 18.8 14.0 ;' .993 11.0 * 85 Median 350'N .6f .'S end 2'E
558 of centerliner. Depth 1211 19 5 14 0 98.5.'117 0 * 85 *
Mdian 350'N of S end 21 E
559 spf centerline Depth 6" 20.0 -14.0 99.3 117.0 * 85 .Median-.350'N of S 'end'-:2'E
560 of'.centerline Depth 2" . 20.3 14.0 • 87.3 117.0 * 84 * Median 500'S of N end centerline., j median .between planting areasiDepth12 ' 23 9 15.0 95.7 113 0 * 85 *
Median 500'S of N end centerline
562' median,between planting.-area 'depth 6'! 30.0 • 15.0 90..7 .113.0 *; 80 *
S Mçdian 500'S of N end centerline
563 median between planting area depth 2" 28.9 15.0 90.6 113.0 * 80 *
Median. 350'S of N end, CL of • , .
• S 564 median depth 12" - 16.9 15.0 101.3 117.0 * 86
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACT
U
A
L
D
A
T
A
D
E
R
I
V
E
D
F
R
O
M
TESTS MAO BY TESTING ENGINEERS -SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOD CONTROL.
Collpgp Blvd Imnrvmrit-
TEST
No. L 0 C A TI 0 N IN -
- PLACE
MoisT,
OPTIMUM
MOIST. . IN PLACE
DRY DENSITY
MAX. Dnv
DENSITY
'
PERCENT
REL. COMP.
REQUIREO
PERCENT
RELATIVE
CoMP. R E M A R }< S
565
Median 350'S of N end CL of
median depth 6" 16.1 15.0.- 104.5 117.0 * 89 *
566
Median 350'S of N end CL.'of
median depth 2" 17.9 15.0 93.6 117.0 * 80 *
567
Median 50'S of
N end depth 12" . 21.8 15.0 95. . 113.0 . 84 *
59ji Median 50'S of N end depth 6" 21.1 15.0 95.5 113.0 * 84 *
.
569 Median 50'S of N end depth 2" 20.7 15.0 96.6 113.0 * 85 *
* For Information Only
Note:. All Tests. Done Per Contraçtor
. . . Rcguc3t
.-
tc
TESTING ENGINEERS . SAN DIEGO 1) NBS7Lowry - REVIEWED BY
Steven P. Ko &f
North County Branch Manager
>
scol tfM,
fh1Li Testing Engineers -San Diego
'Z. A Division of United States Testing Company Inc I
3467 Kurtz St P0 Box 80985 San Diego, Ca 92138 (619) 225-9641
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS -IN PLACE DENSITY TESTS
DATE or rc.r 6/17j8,23,25/87 ***NUCLEAR DENSITIES*** LOCATION City of Carlsbad
FILE NO 5259 PRoJECT College Blvd Improvements Proiect #3188
LAS No 087-355 DATE OF REPORT 7/2/87 CONTRACTOR__________________________________________________
N L 0 C A T I 0 N PLACE.
OPTIMUM MOIST. IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. Coup.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY REQUIRED COMP..
Station 62+45 at E.D.L. Line
1 Center. Line Trench El. 46.9 1 . 18.1 14.0 104.9 116.0 90 90 Complies
Station 61+00 at E.D.L. Line " :
2 Center Line Trench El. 471 .18.2 11.4 113.2 125.0 90 .. 91 Complies
I.Station 59+15 at E.D.L. Drain :
3 Center Line Trench El.. 47.5' 18.3 17.5 107.4 111.8 90 96 Complies
Station 55+00 at E D L Drain V
4 Center Line Trench El, 51.0' 22.2 20.5 94.4- 104.0 90 91 Complies
Station 63+15 at E.D.L. Drain Line
5' Center Line Trench El. 47.5' 18.5 14.0 106.4 116.0 90 92 Complies
Station 58+00 Water Mail Line
6 Center Line Trench El. 49.01. .' 15.9 16.9 106.2 123.1 90 92 Complies
Station 70+00 E.D.L. Line
7 1- S Center Line El. 45' 12.6 .14.0 . 113.4 116.0 90. ' 98 Complies
Station 71+00 E.D.L. Line
8 it S Center Line El. 39.5' . 17.6 20.5 105.3 107.5 90 .98 Complies
• Station 66+25 E.D.L. Drain Line -' . .
9 1'.S Center Line Trench' El. 471
- 47.5 18.5 17.5 100.6 111.5 90 90 Complies
Station 67+64.75 E D L Drain Line
10 Center Line Trench, El. 47' . 20.0 1 17.5 '100.7 111.5 90 90 Complies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM .
TESTS MADE SY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. '
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL
TESTING ENGINEERS SAN DIEGO
REVIEWED BY
e .
'Colleqe Blvd. Improvements Proj. #3188 Pa6p 2
EST
-.
LOCATION "
' ' '
IN
PLACE MOIST.
OPTIMUM
MOIST..'
'
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
comp. R E M A R K $
•
11 Center Line Trader El. 491
- 49.5
Station 67+58 E.D.L. Line
18.7 '. 17.5 106.6 111.5' 90- 96 Complies
•
12 2 -N Center Line El. 45'
Station 68+50 E.D.L. Line
23.2 20.5 , 98.7 107.5 90 , 92 , ' Complies
13 'E.D.L. Drain Line El. 47' •' '
Station 68+40 E.D.L. Line
'15.1 14.0 , 108.0 116.0' 90. '93 Complies ,
14 ,
Station 67+94.75 E D L Line 1,,
Center Line Trench El.' 471 15.7 ' 14.0 105.7 116.0 90' 91 Complies
Center Line Trench El. 31 1 - 31.5 1
Station 73+48 E.D.L.' Line "
' 14.6 14.0' ' 96.9 107.5 ' 90 ' 90 Complies
116Center Line Trench El. 38'
Station 71+70 E.D.L. Line
18.3 ' '14.0 ' 98.4 107.5 ' 90 '
-
92' Complies
-I,
i's • - ' ' . ''• - ' ' . ' RECEiVED ' ' ' ' TESTING ENGINEERS.SAN DIEGO ' • ' ' ' • ' '
'
'
•
'• ' • ' ' '
' REVIEWED BY : 1) City of Carlsbad' JUL 07 1987 :
,, ,,
' '
' '
' '''• REY
N BS/LO WRY
Abert F deBerardinis
North County Branch Manager , ' '
DAILY RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST _____________
LOCATION Carlsbad California
FILE NO. 5259 . PROJECT-College _Blvd, _Improvements _Project#31RR
LAB.,NO. .
DATE OF REPORT._ 9124187 CONTRACTOR
TEST
No L 0 C A T 10 N
IN
PLACE
MOIST.
OPTIMUM MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY DENSITY
PERCENT
REL. COMP. . REQUIRED
PERCENT RELATIVE COMP.
R E M A R K S
6/26
17
EDL Line Station 75+35
1'S center line trench 16.5 20.5 105.3 107.5 90 98 Complies
EDL Line Station 76+00 center line
18 trench@westendconc.ofstormdrain 17.7 20.5 104.4 107.5 90 97 Complies
EDL Line Station 76+60 .
19 2'Scenterlinetrench 21.8 20.5 97.6 107.5 90 91 Complies
EDL Drain Line Station 78+44
20 1'S center line oftrench __. 22.0 20.5 98.5 107.5 90 92 Complies
EDL Drain Line Station 79+50.
21 Cénerlineoftrench 19.3 17.5 106.2 111.5 90 95 Complies
EDL Drain Line Station 81+90
22 Centerlineoftrench 20.7 20.5 98.1 107.5 90 91 Complies
7/1
23
14" Waterline (S side)
Station 74+701'Nof center line
.
20.3 20.5 102.5 107.5 90 95
0,
Complies
14" Waterline. (S side)
24 Station75+80centerline 17.2 20.5 105.7 107.5 90 98 Complies
14" Waterline (S side) . . . . .
25 Station74+001'Nofcenterline 14.0 20.5 104.9 107.5 90 98 Complies
7/2 On E bound side College Blvd. at . .
26 * 2' _E center line of Man Hole #6(Lid) 20.8 18.5 95.4 110.0 90 87 Does not comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
ls TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
* Beginning of Punch List Items
Cnllecie R1v1. Tmnrnvementc Prniert 31R
TEST
No LOCATION
IN
PLACE
OPTIMUM
Mo,sr.
IN PLACE
DRY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R £ M A R K S
MOIST. DENSITY REQUIREO COMP.
7/2 On E bound side College Blvd. at. . . .
.27 3' N center line of Man Hole #7 _26.O 18.5 95.0 110.0 90 86 Does not comply
On E bound side of College at Man Hole
28 #8 23' N centerline of Man Hole 29.5 18.5 92.9 110.0 90 85 Does not comply
7/3 [DL Drain Line Station 39+05.
29 Center line of Trench 63' B.T.C. .11.9 . 14.0 104.3 116.5 90 90 Complies
EDL Drain Line Station 39+00 . .
30 Center line of Trench 4' B.T.C. 10.4 .14.0 105.5 116.5 . 90 91 Complies
7/8 Man Hole #10 Station 28+30 . . .
31 4' N renter Lin of Man Hole 5 1 R.T.C. . 11.2 11.5 99.3 121.0 90 82 Does not comply
Man Hole.#10 Station 28+30 . . .
32 4' N center line of Man Hole 5' B.T.C. 11.0 11.5 -98.5 121.0 . 90 81 - Does not comply
Man Hole. #10 33' B.T;C. . .
33 . 31-'_S _center _line _of Man Hole 14.9 11.5 91.1 12.1.0 90 _. 75 Ones _not _comply
Man Hole #10 33' B.T.C. . . . . . . . . .
34 53'S_center line of Man Hole 11.8 11.5 .95.0 121.0 90 79 Doesnotcomply
7/9 Valve. Cluster East bound lane . .
35 Station 27+68 Finish sub grade -.16.9 .13.0 108.2. ..120.0 .90 90 .Complies
Valve Cluster East bound-lane back- . . . . .
35-BU Station27+68Finishsubgrade _uptes 18.0 13.0 107.7 .120.0 90 90 Complies.
Valve Clusters East bound lane .. . . . .
36 Station 40+56.6" below -finish .subgrad 1.2.0 14.0 106.9..116.5 90 92 Complies
Valve Cluster East bound lane . . .
37 . Station 19+156"belowfinishsubgrad 18.4 13.5 108.3 118.0 90 .92 Complies.
Value Cluster East bound lane .
38 Station13+001 ___. .16.1 13.0 109.5 120.0 90 91 Complies
7/13 Water Valves East side of College . . . . . . . .. . . - .
39 Station 53+20 Probe test _Probe d&Dug down. Just PipeB ddingSand,No _fill. . Probe Okay
Valve Cluster East side of College
40 Station 48+20 .9.5 8.8 123.9 .134.4 90 . 92 Complies
Is
College Blvd. Improvements Project #3188 Page 3
TEST
No L 0 C A T I 0 N IN
PLACE
OPTIMUM
Molsr.
IN PLACE
DRY
MAX. OnY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY -----REQUIRED COMP.
7/13 Man Hole #6 E bound side of College
26A 13+' S of face of curb 3' B.T..C. 21.8 14.0 105.3 116.5 90 90 Complies-RETEST OF #26
Man Hole #7 E bound side of College . . .
27A 3'S center line-of-Man Hole Lid 3'BT( 18.5 18.5 100.6 110.0 90 . 92 Complies-RETEST OF #27
Man. Hole #8 E bound side of College
28A 2' W of center line of Man Hole Lid 22.9 18.5 102.1 110.0 90 93 Complies-RETEST OF #2R
Man Hole #9 S side 3', B.T.C.
41 3' W of center line of Man Hole Lid 22.1 19.0 .102.8 .111.0 90 93 Complies '
7/14 14" Water Line S side .
42 Station 87+00 center line trench 17.7 -20.5 99.8 "107.5 90 93 Complies
14" Water Line Station 85+53
43 'Center Line of trench El. 168.0 20.0 20.5 -99.9 107.5 90 93 Complies
14" Water line Station 75+00
44 Center line trench E1.221 ' 18.9 20.5 99.3 107.5 90 92 Complies
14" Water line ,Station 77+88
45 Center line trench El. 204 . 21.7 20.5 98.8 . 107.5 90 ' 92 Complies
14" Water', line , Station 81+50 . . .'
46 Center line El. 189 ' 20.3 20.5 96.8 107.5 90 90 Complies
14" Water line Station'90+00 '
47 El. 146' ' 20.0 17.5 100.7 111.5 90 90 Complies
7/15 S side of Man Hole #10 3' S centerline
31A Man Hole Lid Also represents Retest 32 12.0 11.5 113.6 121.0 ' 90 94 Complies-RETEST #31 &3
W side of Man Hole #10 3' S centerlin . . '
33A of Man Hole Lid also represents #34 12.8 11.5 112.7 121.0 90 93 Complies_RETEST#.,&3L
W side at. Man Hole #11 4' B.T.C.
48 3' W of center line of Man Hole Lid' 17.3 11.5 109.4 121.0 90 90 Complies
S side at Man Hole #12 3 B.T.C.
49 4' S. center line of Man Hole Lid 15.2 '_11.5..110.4 121.0 90 91 Complies
7/21 14" Water Line Station 90+91
50 1' S center line Trench El. 137' 18.7 20.5 99.0 107.5. 1 90. 92 1 Complies
ls
College Blvd. Improvements Project #3188 . Paqe 4
TEST No L 0 C A T I 0 N IN
PLACE
OPTIMUM
Moisr.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
7/21 14"Water Line Station 90+91 Back up
*59.BU 11 S center line trench EL. 137' to 50 18.2 20.5 100.2 107.5 90 93 Complies
14" Water Line Station 92+00
52 Center line of trench El. 135' 18.7 20.5 99.5 107.5 .90 93 Complies
14" Water Line Station 93+97
53 1' S center line of trench El. 128' 15.0 13.0 110.2 119.0 90 93 Complies
14" Waterline Station 95+00: .
54 Center line of Trench El. 116'. 18.2 17.5 .101.2 111.5 90 90 Complies
7,'24 East bound lang finish sub, grade 2 BT
55 Station 3+00 7' S center line*of'roadw3 10.2 ' 92.0 112.1 122.5 90 .92 Complies
East bound lane finish sub grade .
56 Station 79+60 11' N center line 10.1 12.0 109.8 122.5 90 90
- Complies
East bound lane finish sub grade
57 Station 3+44 7' N center line 10.7 12.0 110.8 122.5 90 . _91 Complies
East bound lane finish sub grade . - . . •.
58 Station 3+24 11' .N center line . 8.7 .12.0 111.6 122.5 .90 91 Complies
East bound lane Station 7+00
59 1' N center line finish sub grade 9.5 11.5 117.2 .124.0 90 95 Complies
East bound side Station 10+16 . .
60 6' S center line finish sub grade 14.7 11.5 112.3 .124.0 90 91 Complies.
East bound side Station 10+40 . . . . .
.61 9' N center line finish sub grade 12.6 11.5 113.6 124.0 90 92 Complies
East bound side Station 2+75
62 . 10' S center line finish sub grade 13.1 11.5 115.4 122.5 90 94 Complies
East bound side Station 2+85
63 14' N center line finish sub grade 13.3 11 .5 111.6 .. 122.5 90 91' '. Complies .
West bound lane Station 2+83
64 18' 5 center line finish sub grade 10.4 11.5 117.5 124.0 90 95 Complies
West bound lane Station 8+50
65 1 6' N center line finish sub' grade 11.1 .11.5 113.0 124.0 90. .91 . Complies
ls
('r1iorio Il,d Tmni-'rt,omonf c Prrior+ *1PP p;np c
TEST
No L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE. REMARKS
COMP. MOIST. DENSITY REQUIRED
7/24 :West .bound lane Station 14+50 . .
66 101 N center line finish sub grade _15.8 11.5 115.6 124.0.. 90 93 Complies
West bound lane Station 18+95
67 4' S center line finish sub grade 8.1 11.5 110.9 124.0 90 . 90 Comolies
7/25 East bound lane Station 29+75 .
68 10 N! center line finish sub grade 10.8 13.0 108.4 120.0 .90 90 Complies
East bound lane Station 29+48
69 7' S center line finish sub grade 10.1 13.0 112.2 130.0 90 94 Complies
East bound lane Station 31+45 . 0
70 7' S center line finish cub grade 10.9 13J0 1097 121L0 90 91 Cnmplies
East bound lane Station 32+00
71 . 7' 5 center line finish sub grade 11.3 13.0 _108.4 120.0 90 - 90 Complies
East bound lane Station 32+50 .
72 Centerlinefinishsubgrade 9.4 13.0 110.5 120.0 90 92 Complies
East bound lane Station 32+40
73 7'N_ center _line. finish _grade _sub 9.4 13.0 110.4 120.0 90 92 flnmp1ic
East bound lane Station 33+00 . .. ..
74 71 Ncenterlinefinishsubgrade 7.9 13.0 111.1 120.0 90 93 .Complies,,.
East bound lane Station 34+25
75 101S center line finish sub grade 10.5 13.0 106.8_ 120.0 90 89 Ebes not comply
East bound,lane . Station 34+75 0
76' 8'Wcenterlinefinishsubgrade 8.5 13.0 109.7 120.0 90 91 Complies
East bOund lane Station 35+60
77 1'Scenterlinefinishsubgrade 9.4 .13.0 . 107.9 120.0 90 90 Complies
East bound lane Station 36+00
78 1'Scenterlinefinishsubgrade 9.0 13.0 108.0 120.0 0 90 90 Complies
East bound lane Station 37+40
79 3 _Ncenter.linefinishsubgrade .93 13.0 .107.1 120.0 90 89 0, Does not comply
East bound lane Station 40+00
80 center line of road finish sub _grade 10.0 11.5 110.0 122.5 90 . 90 Complies
College Blvd Improvements Project #3188 Page 6
TEST
No L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY REQUIRED COMP.
West Bound Lane 3' S... Center Line
81 Station 39+85 Finish Sub Grade :8.9 11.5 109.7 122.5 90 90 Complies
West Bound Lane Center.Line Station
39+70 Finish Sub Grade . 10.7 11.5 115.1 .122.5 90 94 Complies
West Bound Lane Station 35+50 4' S
83 Center Line Finish Sub Grade 8.0 11.5 . 110.9 122.5 90 . 91 Complies
West Bound Lane Station 35+65 Center
84 Line Finish Sub Grade 9.1 11.5 .111.7 122.5 90 91 Complies
West Bound Lane Station -'29+40 9'. N . .
85 Center LineFinish Sub Grade 11.5 111.0 122.5 90 .i Complies
West Bound Lane Station 29+55 10' .
86 S Center Line Finish Sub. Grade 6.6
.
11.5 115.5 . 1.22.5 90 94 Complies
West Bound Lane Station 28+99 Center
87 Line Finish Sub Grade 10.7 11.5 113.8 122.5 90 93 Complies
West Bound Lane Station 28+89 1 ' S . . . . . . . 88 Center Line Finish Sub Grade 10.8 13.0 113.1 120.0 90 94
.
Complies
West Bound Lane Station 25+42 61 7S . . .
89 Center Line Finish Sub Grade 9.2 13.0 108.8 120.0 90 91 Complies
East Bound Lane Station 27+50 9' N . . . ., .
90 Center Line Finish Sub Grade . 8.9 11.5 112.5
.
121.0 90
. .
.93 Complies
91 Line Finish Sub Grade 11.8
East Bound. Lane Station 27+60 Center
11.5 109.9 121.0 90 91 . Crmplic
Break in Median Station 28+05 Center . . .
92 Line. Finish Sub Grade 11.2 11.5 .109.6 121.0 .90 91 Complies
West Bound Lane Station 28+40 Center . .
.
93 Line F inish Sub Grade 8.0 11.5 112.0 121.0 90 . 90 Complies.
• East Bound Lane Station 28+40 51 N-
94 Center Line Finish Sub Grade: 9.3 11.5 111.1 121.0 90 92 Complies ,.
East Bound Lane Station 28+10 3' . . . . . . .
. 95 Center Line Finish Sub Grade . 12.8 11.5 115.3 121.0 90 .95 Complies .
Colleqe Blvd. Improvements Project #3188
Page 7
TEST
No. L 0 C A T I 0 N
-
-__-
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
-
R E M A R K S
East Bound Lane Station 12+20 12' 5 ' ' '
96 Center Line Finish Sub Grade 12.5 13.0 108.0 120.0 90 90 Complies
East Bound Lane Station 12+00 2' N
97 Center Line Finish Sub Grade. 10.8 13.0 108.4 120.0 90 91 Complies
East Bound Lane Station 12+25 Center
98 Line Finish Sub Grade . 15.2 1.3.0 107.4 120.0 90 90 Complies
East Bound Lane Station 18+00 9' N
99 ('nter ( me Finish Sub Grade 10.0 _13.0 .109.0 120.0 , 90 91 Complies
East Bound Lane 'Station 19+50 4' S
100 Center Line Finish Sub Grade 12.0 13.0 109.6 120.0 ' 90 ' 91 Complies
East Bound Lane Station 22+00 Center
101 Line Finish Sub Grade ' '12.6 13.0 _J10.6' 12.0 '' 90 ' 92 Complies
,
East Bound Lane Station 4+60 9' E
102 Center Lin Finish Sub Grade ' 9.1 11.5 110.0 122.5 90 90 Cmp.lies
East Bound Lane Station 4+60 7' E
103 Center Line 'Finish Sub Grade '9.3 11.5• 109.7 122.5 90 90 Complies
East Bound Lane Station 4+60 Center
104 Line Finish Sub Grade . , 12.3 11.5 109.6 122.5 '.90 90 Complies
East Bound Lane College Station 4+68
105 i' c Ctr]inp Finich Sub Grac1 10 11.9 110.4 122J gp qn Cnmplic
East Bound Lane College Station 4+68
106 Center Line Finish Sub Grade 8.9 :11.5 110.0 12.2.5 ' 90 90 .Complies
East Bound Lane College Station 7+00
107 l.' .N Ctrline Depth of Trans. 8" 11.3 - 11.0 114.9 124.0 90 9' - Complies.
1) City of-Carlsbad
Attn: Pat Entezari
1) NBS/Lowry
Attn: Kurt Gi-erlich
TESTING ENGINEERS-SAN DIEGO
REVIEWED BY -
Kirk P. Ammerman
North County Branch Manager
—
(J Testing Engineers—San Diego
I A Division of United States Testing Company, Inc.
3467 Kurtz St,PO Box 80985, San Diego, Ca 92138 (619) 225-9641
-" 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST 7/27 - 7/31/87 LOCATION CityofCarlsbad
FILE No. 5259 PROJECT _Improvements_to_College_ Blvd. .
LAB. NO. 087-450 DATE OF REPORT 10-20-87 CONTRACTOR 0
TEST
NO.
-
L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
- MOIST. DENSITY REQUIRED COMP. -.
7/27 Nuclear Densities
East bound lane
108 Station 3+008'S_of Center line 11.2 11.5 110_6 122_5 90 90 Complies
East bound lane
109 Station3+3712'SofCenter _line 9_7 11 .5 1141 122_5 90 93 Complies
West bound lane
110 Station _7+40 _11'N___ofCenter_Lind 10_8 11 _5 118_3 124_0 90 97 Complies
West bound lane
111 Station 8+25__6' _S _of___ Center Line 11 _3 11.5 111.9 124__0 90 90 Complies
West bound lane . . .
112 Station10+206'Sof _Centerline 11__1 11__5 111 _4 124_0 90 91 Complies
East bound lane ..
113 Station14+07Center _line 11.0 11.5 109.7 122.5 90- 90
0
Complies
7/28 NuclearDensities
114 ForceMain _Station __83+90 19_1 10_5 100__0 117__5 90 85 Does not _comply
115 ForceMainStation84+00 18_0 10_5 105_4 117_5 90 90 Complies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS-SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED 'PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
i-0
Collecie Blvd. Imorovements Paae 2
TEST
No L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMAR KS
MOIST. DENSITY REQUIRED COMP.
Force Main Station 84+40
116 271 N of Valve @ S end of S line 17.9 10.5 102.2 117.5 90 87 Does not comply
Force Main Station 86+40
117 27' N of Valve @ S end of S line 16.2 10.5 106.5 117.5 90 91 Complies
Storm Drain : 24','S of SE corner
118 Deck 0-8" below top Of ditch 24.9 10.5 95.3
-
117.5 90 81 Does not comply
• Storm Drain 24' S of SE corner
119 Deck 0-8 below top ofditch 25.2 10.5 97.8 117.5 .90 83 .Does not comply
EDL Line • 1' below finish grade • .
120 Station84+65centerline 20.4 17.5 106.0 11.1.5 .90 95 Complies
EDL Line 1 1' below finish grade
121 Station84+65centerline 19.5 17.5 106.9 - 111.5 90 96 Complies
• EDL Line 1' below existing grade
.
122 Station90+00 23.0 17.5 100.3 111.5 90 90 Complies
EDL Line 1' below existing grade :
123 Station 90+0G. 25.5 17.5 98.7 111.5 90 89 Doesnotcomply
EDL Line 1' above existing grade .
124 Station 90+005 side of stake EL. 48 17.7 17.5 98.3 111.5 90 88 Doesnotcomply
Street Drive Crossing . .
125 1"below _finishgrade • 26.4 17.5 96.1. 111.5 90 86 Doesnotcomply
7/29 NuclearDensities - ClassIIBase
East bound lane of College
126 Station _2+95 1st lift 4.2 5.0 124.9 137.0 95 91. Doesnotcomply
EDL Line S half El Camino Real .
127 Station _98+95 center line trend 17.9 11.5 110.9 122.0 90 91 Complies
EDL Line S half El Camino Real . . •
128 Station98+90centerline _trend 19.3 11.5 110.4 122.0 90 91 . Complies
EDL Line S half El Camino Real .
129 Station 98+23 center line'-5.1 5.0 127.6 137.0 90 1 93 Complies
College Blvd. Improvements Page 3
TEST NO. L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
EDL Line S half El Camino Real
130 Station 99+00 Center line 4.3 5.0 130.8 137.0_ 90 96 .Complies
7/30 Nuclear Densities Class II Base .
52' S of 1st manhole 9" below finish
131 grade 31 N of curb 4.0. '5.0 124.5 137.0 95 91 Does not Comply
East bound lane 9" blow finish grde
132 Station 42+60 11" 5 center line 5.3 5.0 129.9 137.0 95 95 Complies
East bound lane 9" below finish grad
133 Station 42+45 Center line 5.6 5.0 125.7 137.0 95 92 Doec not Comply
Station 42+16 9" below finish grade
134 Center line (@ break) of Median 5.6 5.0 122.6 137.0 95 90 - Does not Comply
Station 42+25 9" below finish grade -
135 Eastboundlane12'Scenterline 7.1 5.0 128.6 137.0 95 94 Does not Compl y
Station 42+27 '9" below finish grade
136 East bound lane 12'5 center line 6.4 5.0 125.9. 137.0 .95 92 DoesnotComply
Station 37+00 9° below finish grade
137 Eastboundlane10'Scenterline 4.3 5.0 136.6 137.0 95 100 Complies
Station 37+25 9" below finish grade
138 East bound lane 3SF' _N centerline MH 4.9 5.0 128.5 137.0 95 94 DoesnotComply
Station 37+27 9" below finish grade
139 East bound lane 3'NcenterlineMH 5.7 5.0 121.9 137.0 95 89, Doesnot.Comply
Station 37+29 9" below finish grade
140 East bound lane 3'N centerline MH 5.2 5.0 123.2 137.0 95 90 DoesnotComply
Station 29+35 East bound lane N of
141 center line 10-53-'_sofIsland 4.1 5.0 126.4 137.0 95 92 . DoesnotComply
Station 29+30 East bound lane .
142 63-'Sof Island front ofcurb 5.0 5.0 127.1 137.0 . .95 93 DoesnotComply
East bound lane
143 Station _29+00 Center line oflane 5.9 5.0 127.2 137.0 95 93. DoesnotComply
Colleqe Blvd. Improvements Paqe 4
TEST
No L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY. .
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
MOIST. DENSITY REQUIRED COMP.
East bound lane 7' N front of curb
144 Station 29+30 111 S center line 5.9 5.0. 130.6 137.0 95 95. Complies
Station 28+00 . . .
145 Center line of Island 1st lift 5.4 5.0 122.6 137.0 95 90 Does not Comply
Station 28+05
146 Center line of Island 1st lift . . 5.7 5.0 122.9 137.0 95 90 . Does not comply
Station 28+00 . . . . . . .. . .
147 . Center Tine of Island New -count 5.9 5.0 119.3 137.0 . 95 87 Does not COmply
Station 28+05 . .
148 Center line of Island New Count 5.6 5.0 120.1 137.0 95 88. Does not Comply .
East bound lane of College
149 Station 28+00 71 N of center line 6.4 5.0 114.7 - 137.0 95 84 Does not Comply
East bound lane . .
150 Station28+007'NofCenterline 6.2 5.0 127.7 137.0 95 93, DoesnotComply.
East bound lane . . .
151 Station 28+00 10 1 5of _Centerline_. 5.9 5.0 130.3 137.0 95 95,. Complies
East bound lane . ,. .
152 Station 27+80 Center line oflane 4.5 5.0 119.3 137.0 95 87 DoesnotComply.
East bound lane
153 Station22+5310'Nofcenterline 3.8 5.0 129.6 137.0 95 95 Complies
East bound lane .
154 Station 22+66 on -center line 3.8 5.0 122,5 137.0 95 89 Does not Comply
East bound lane . . .
155. Station 23+00-Center line 3.5 5.0 122.4 137.0 95 89 DoesnotComply
East bound lane . . .
156 Station 23+25_8'Sof center _line 5.1 5.0 118.0' 137.0 95 87 Does not_comply
East bound lane . . . .
157 Station 16+50_7'Nof center line . 4.8 5.0. 11.6.1 137.0 '95 85 _. Doesnotcomply
East bound lane
158 -Station 14+75 'center line' 4.3 5.0 124.6 137.0 95: 91 _'S Does' _not Comply
College Blvd. Improvements Page 5
TEST No. L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
52' W of East bound lane
159 Station 9+9010'Nof center line 5.4 5.0 134.5 137.0 95 98 Complies
East bound lane
160 Station 14+1310'Sof center line .5.0 5.0 119.6 .137.0 .95 87 Doesnotcomply
East bound lane . .
161 Station 14+1310'5of center line 4.2 :5.0 128.8 137.0 95 94 Does not comply
East bound lane
162 Station6+919'Sofcenterline 4.3 5.0 132.6 137.0 95 97 Complies
East bound lane
163 Station7+00centerline 3.7 5.0 118.0 137.0 95 86 Does not comply
East bound lane
164 Station4+755'Sofcenterline 4.7 5.0 -117.2 137.0 95 86 Does not comply
East bound lane
165 Station 41+50 9' N of center line . 5.1 5.0 128.2 137.0 95 94 Does not comply
7/31 . NuclearDensities .
West bound lane
166 _ Station 52+501' below top ofcurb 8.1 .5.0 122.1 137.0 ,95 . 89. Doesnotcomply
West bound lane .
167 Station 47+001' below top-of curb 7.3 5.0 126.9 137.0 95 93 Doesnotcomply
East bound lane finish sub grade
168* 5'Sof center line El.53.4 17.9 17.5 105.5 111.5 90 95 . Complies
West bound lane finish sub grade
169* 9'Sof center line.El.53.1 18.3 17.5 103.4 111.5 90 93 Complies
Station 52+55
170 3'Sofcenterlinefinishbasegrade 5.2 7.0 135.2 138.5 95 . 98 Complies
Station 50+50
171 2'S of-center line finish base grade 5.6 7.0 138.3 138.5 95 100 Complies
U * = Sand Cone Densities
ls
1L..Cfly of Carlsbad
wry.
TESTING ENGINEERS-SAN DIEGO
REVIEWED BY
-p A.- . Kirk P. Ammerman
North County Branch Manager
(
7t~i
J Testing Engineers—San Diego
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138(619) 225-9641
-= 2956 Industry Street, Oceanside, California 92054 (19) 757-024R S.
DAILY RESULTS - IN PLACE DENSITY TESTS
DATE or rcs'r 08/04/87 ***NUCLEAR DENSITIES*** LOCATION
FILE NO_5259 .
. io.ccr nivu IIIlprr mr.
.'.e. No O7-4_51 DATE or RE-PORT 1Q-23-87 CONTRACTOR
L 0 C A T I 0 N
IN PLACE
OPTIMUM MOIST.
IN PL..cc
DRY
MAX. DRY DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE
COMP. R E M A R K S
MOIST. DENSITY REQUIRED .
NUCLEAR DENSITIES:
172 Duct Bank N/S Sta 56+55 19.4 14.0 104.2 116 90 90 Complies
Center line trench
173 Duct Bank N/S Sta. 59+50 17.7 14.0 106;9 116 90 92 Complies
Center line trench-
174 Elect. Trench N, Side College Blvd.
62+flfl Center
'159 14 104.5 116.0 90 90 Complies
175 Elect. Trench N Side College Blvd. 20.5 20.5 104.6 107.5 90 97 Complies
Sta 63+00 Center line
176 Elect Trench N side College Blvd
4+40 Center line St. 24.2 20.5 100 6 107 5 90 94 Complies
177 Trench S Side College Blvd. 15.8 14.0 105.1 116.0 90 91 Complies
Sta. 64+50 Center line
1-5 SAND -CONE:
178 Survey Stake 62+50 Elev. 248.MSL 15.3 14.0 113_5 118.2 90 96 Complies
179 Near Stake 61+00Elev. 247 MSL 10.9 18.5 97.2 106.3 90 91 Complies
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL. DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
COLtEGE BLVD IMPROVEMENTS PROJECT 1/3188 PAGE 2
TEST No L 0 C AT 10 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
8-5 SAND CONE:
180 Stake 58+50 Elev Approximately 11 ..2 -13.4 114.5 119.8 90 96 Complies
181 Near Stake 57 El approx. 51-2MS 18.6 17.0 96.6 106.4 9.0 . 91 Complies
182 Between Stake 56+00 & fire hy- 18.6 drent_Elev_Approx.252
17.0. 102.4 . 106.4 90 96 Complies
8-7 RING TEST PUNCH - LIST ITEM:
183 Down Slope Sta.-18-30 12.9 14.0 104.6 116.5 90 90 Complies
8-11 NUCLEAR DENSITY: . S
184 N Side at 30" Storm Drain 13.4 14.0 Sta.54+15
103.2 '116.5 90 89 Does not complies
185 N Side at 30" Storm Drain
Sta. 54+ 5
12.5 14.0 105.8 116.5 90 91 Cp,plies
TESTING ENGINEERS. SAN DIEGO
mw REVIEWED BY
1) City of Carlsbad
JNB S / Low Kirk P. Ammerman, (C.E.)
North County Branch Manager
i J -San Diego Testing Engineers
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
I=) 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY -RESULTS - IN PLACE DENSITY TESTS
DATE OF TEST 08/17/87 _____________ LOCATION City of Carlhd
. 5259
***NUCLEAR DENSITY**
PROJECT 'College Blvd Improvement Project 113188 FILE No.______________________ . _______________________________________________________________
LAB. No. _-08 7-4 51 DATE OF REPORT-1 fl/ 7 3/R 7 .---.CONTRACTOR,
rEsT
No LO C A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
-PERCENT
RELATIVE R E M A R K S
MOIST.-. DENSITY REQUIRED COMP._-
8-17 NUCLEAR DENSITY: .. . -
186 Electr. Trench Sta 71+50 21.4 17.5 103.6 111.5 - 90 93 Complies
Center line _Trench
187 St-a 73+10 Center line Trench 21.9 17.5 100.5 111.5 90 90 Complies
8-18 NUCLEAR DENSITY:
188 5-2+95 Center line WIB lane '.'.7 .3 8.5 134.7 140.0 95 . 96 Complies
52+75 14' N Center line 7.0 8.5 131.3 140.0 95 Corn-plies
189 W/ Rnd
190 52+75 Same hole Different depth 7.0 8.5 134.2 140.0 95 95 Complies
of transmission
W./Bnd Lane •Sta. 50+50
- 5.3 8.0
.
-133.2 140.0 .95 95
-- . - -
191- Complies
192
12 1/2 S Center line
Sta. 48+50 4.8 8.0 133.4 140.0 95 95 Complies
8.0 - 133.6 140.0 95 193
91S Center ,
S-ta. 8+40
. 5.9 95 Complies
S Center line -
- THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
- TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
COLLEGE BLVD IMPROVEMENT PROJECT //3188 PAGE 2
TEST IN OPTIMUM IN PLACE MAX. Dnv PERCENT PERCENT
No. L 0 CAT I 0 N• PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R KS MOIST. DENSITY REQUIRED COMP.
8-18 NUCLEAR DENSITY:
194 Sta 46+50 3' S Centeir line 6.0 8.0 36.4 140.0 95 97 Complies
195 Sta. 46+70 4' S Center line 6.0 8.0 . 139.8 140.0 95 100 Complies
196 Sta. 44+55 12' S Center line 6.2 8.0 122.7. 140.0 95 88 Does not complies
197 W/Bnd lane Sta 44+55
. 5.5 8.0 124.9 140.0 95 89 Does not complies 9' c r.-i- lirip
198 W/Bnd lane Sta 44+50 7.1 '. 8.0 139.2 140.0 95 99 Complies Center line . .
W/Bnd lane Sta 42+50. . - .. . .. 199 Center line Area Pumping 9 7 8.0 133 7 140 ..0 95 96 Complies
200 W/Bnd lane Sta 42+45 '5 0 8.0. 134.0 140.0 95 96 Complies 6' S Center line
201 Sta 42+50 10''S Center 'line 5.1 -8.0 125.1 140.0 95 89 Does not complies
202 Sta 42+60 4' S Center line 4.3 8.0 131.2 140.0 95 93 Does not complies
203 W/Bnd lane sta 40+80 10'-N 5.1 8.5 133.3 140.0 95 95 Complies Center line
8-20 NUCLEAR DENSITY: . . . . . .
204 W/B lane Sta 52+55 4.3 8 0 132 1 140 0 95 94 Does not complies
,' N Center line
205 W/Bnd lane Sta 51+00 on 5.9 8.0 136.0 140.0 95 97 Complies
Center line . .
W/Bnd lane Sta 50+00 . . . . . 206 6' S Center line 6.2 8.0 133.6 140.0 95 95 Complies
T- T xin 0 (. XT t A t M 'P 0 ID (\ 1 V /' P 41 1 1 Q Q
TEST
No.
' ' C A T I 0 N
IN PLACE OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DR Y.
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R KS
MOIST. DENSITY REQUIRED COMP.
8-20 NUCLEAR DENSITY
207 W/Bnd lane Sta 8' N Center line .6 .3 8.0 131.8 140.0 95 94 Does not complies
208 W/Bnd lane Sta 8' N Center line 6.0 8 0 132.9 140 0 95 95 Complies-retest of20
209 W/Bnd lane Sta 47+W4' S 5.5 8.0 Center 1 -me
131 A 140.0 95 94 Does not complies
210 W/Bn,d lane Sta 46+00 6.1 8.0 134.4 140.0 95 96 Complies 5' N Center line
2 W/Bnd lane Sta. 45+00 4.5. 8.0 125.3 140.0 95 89 Does not complies
12 1/2' S Center line
- 0
.
.
212 W/Bnd lane Sta 44+00 Center line 5.7. 8.0 134.4 140.0 95 96 Complies
213 lane Sta 43+00 1W/Bnd 5 5 8.0 131 0 140.0 95 94 Does not complies 13' N Center line
214 W/Bnd lane Sta 42+00 8 3 8.0 133.5. 140 0 95 95 Complies
' N Center line
215 W/Bnd lane Sta 41+5 5.2 8.0 134 7 140.0 95 96 Complies
3' S Center line
2 16 W/Bnd lane Sta 40+95 3.8 8.5 126 9 140 0 95 91 Does not complies 12' S Center line
217 W/Bnd lane Sta 40+75 5.1 8 5 Cent- er line
129 01 95 92 Does not complies
21 8 W/BNd lane Sta 40 + 4.-7 8.5- 131 ,5 140A 95 94 Does not complies
11 1/2' N Center line
219 Same location as above depth of 5.8 8.5 132.8 140.0 95 95 Complies transmission only difference
20 W/Bnd lane Sta 40+55 5:5 8.5 : 131.0 1.40.0 95 94 Does not complies.
_____ Center line
rnTT.F.a1 RT,\Jfl TMP.ROVEMENT PROJECT 113188 Page 4
No TEST • -
LO C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DAY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE -
COMP,
R E M A R K S
8-20 NUCLEAR DENSITY
221 10' S Center line 4.8 8 5
W/Bnd lane Sta 40+54
133.4 140.0 95 96 Complies
8-21 SAND CONE: -
222 Elect Trench Sta. 91+93 &
Trench 15.2 '17.51
-
100-.8. 111.5 90 90 Complies
223 93 70 Station - 22.1 17.5 10-1.1 111..5 90 91 Complies
mw
1) City of Carlsbad
fTi7Lowry -.
• • TESTING ENGINEERS-SAN DIEGO
- REVIEWED BY
.• - Kirk P. Ammerman, (C.E.)-
• • North County Branch Manager
RECEIV
E
D
OCT 2 8 1987
NBS/LOW
R
Y
- S.D.
fl J/ Testing En gin Diego ..
A Division of United States Testing Company, Inc. 0 LI\J/J
3467 Kurtz St., P.O. Box 80985, San-Diego, Ca. 92138 (619) 225-9641
2956 Industry Street, Oceanside, California 92054 (619) 757 -0248
DAILY RESULTS--IN PLACE DENSITY-TESTS
DATE OF TEST 08/24/87 . . . LOCATION. City. of Carlsbad
FILE -NO. . PROJECT College Blvd Improvements
LAB. No. 087-452 DATE OF REPoRT_J0..L..2.6j.8.J..... --------- ._ .......CONTRACTOR_
TEST No.
.
L 0 C A T I 0 N
IN. PLACE OPTIMUM
MOIST..
IN PLACE DRY MAX DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R EM -A R K S
MOIST. . DENSITY REQUIRED COMP.
-24 NUCLEAR DENSITY
224 49+00'12' N-Center line 6.3 8.0 138.9 1-40,0 95 99 COMPLIES 1/Bnd lane 8-20
6+65 13 1/2' . . . . . . . . 225 Center line . 4.2 8.0 124.2- 140.0 95 89 Does not complies
226 44+90 Ref. from stake E/Bnd side
.
. 5.0 8.0 .. 126.5 140.0 95 86. Does not comply 13 S Center l ine *.
Sta 42+89 . . . . . 227 ' 5 Center line 4.7 8.0 129.8
.
140.0 -95
.
93 .- Does not comply
228 Same hole as. above 42+89. . . .
____ W/Silica sand 4.9 8 0 130 5 1400 95 93 Does not comply
40+75 1' S Center. line . 229 2nd shot see below, 4 5 8.0 133 3 1400 95 _-
95* Complies
230 Sta 40+75 W/Bnd lane 5 0 8.0 . 128 0 140 0
- -
95 . . 91* Does not comply 1 Center line . --
* 1st shot shted gauge came up wltnif . . . . .
** 2nd Test for Bob W/So. Coa 231
After 1pass or roller Sta. .44+90 5.3 8.0 122.5 140.0
- 95 . 88 - Does not comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM -
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. -
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL
rnLT.FaF. RT,VT) TMPPflVF.MFNTS
TEST IN OPTIMUM IN PLACE MAX. DRY PERCENT PERCENT
NO L 0 C A T I 0 N PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R K $ MOIST. DENSITY REQUIRED COMP.
8-24 NUCLEAR DENSITY:
ontinues from test #231 pg. #1
Moved gauge 3".frorn original test
spot - used silica sand
232. P
r tSta 44+90 ? N of Test 4.9 8.0 126.3 140.0 95 90 Does not comply
2.33 Elect. Trench Sta 77+80
. ,enter 1in 19.0 20.5 98 4 .107.5 90 92 Complies
234 Sta. 77+82 1 1. N Center line 19.5 20.5 99.5 107.5 90 93 Complies
235 Sta. 86+90 Elect. Trench . .
_____
15.2 14.0 Center line
104.8 116.0 90 90 Complies
236 Elect. Trench 91+40 Center line 18.7 17.5 102.9 111.5 90 92 Complies
237 Sta 90+90 Center line 11.6 17.5 101.7 111.5 90 91 Complies
238 Elect, trench 95+70
.
19.6 17.5 103.6 111.5 90 93 Complies
Telephone Trench Sta. 73+40 23.9 1 SCenter line Trench 15.7 17.5 100.8 111.5 90 90 Complies
240
•
Sta 76+28
. 20.1
1 N Center Trench
17.5 101.8 111.5 90 91 Complies
241 Sta. 81+37 Center line
• 21.1 17.5 102.2 111.5 90 92 Complies P/UP Sample check Pt. of M/D
8-25 Street light crossing Sts. 69+71 • 17.1 13.0. 108.5 119.0 90 91 Complies 71t7 6 TJ/fl2ntr line 1'/Bnd Side
243 Street light crossing Sta. 78+00
•
21.3 14.0 104.5 116.0 90 90 Complies
_____ 1 E trench Center line
r,f')T T.Fr_17. RT.\lfl TMPROVF.MNTS PAGE 3
TEST
No.
' r c T I 0 N
IN
PLACE
OPTIMUM.
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS
MOIST. DENSITY REQUIRED COMP.
8-25 NUCLEAR DENSITY:.
ST. lgt. Crossing E/Bn.d Ctr. line 244 Side Trench Sta 82+00
6 1/2' N of fire hydrant .
at sta 82+20 18.3 13.0 107.4 119.0 90 92 Complies
245 Strt. lgt. Crossing Sta. 83+25 18.7 14.0 106.0 116.0 90 92 Complies
46 Street light Crossing 9 Sta.92+OO17.1 17.5 1 111 90 90 Conplies
21'
E/Bnd side:Probe W/Bnd side tight
EO.
E. Center line Trench _
8-26 SAND CONE:
.
S
__
]..5 .
2 w/;Bnd lane 1 112' B.TC. 5.0 8.0 136.3 140.0 95 97 Complies 37+50 Center line Rdwy S S
W/Bnd 1 1/2' B.T.C. S 248 13' S Center line 4.8 8.0 135.0 140.0 95 96 Complies
W/:Bnd lane 1 1 /2' B.T.C. St.28+55 S . 249 12, 1/2' 5 Center line . 5.4 8.0 133.3 140.0 95 95 Complies
8-28 - SthTD CONE
250 250 land (Act S/Bnd) Sta 3+70 4.8 8.0 144 4 140.0 95 100+
1 1/2' B.T.C. 5' N Center line
8-27
S
SAND CONE:
251 W/Bnd lane 1 1 /2' B.T.C. 7.1 .8 .0 134.9 140.0 595 96. Complies
2 52 W/Bnd lane Sta 15+25 Center line 4.0 8.0 135.8 140.0 95 97 Complies
1 1/2' B.T.C.
253 1 1/2' B.T.C. 2' W Center line 6.8 8.0 133.2 140.0 95 95 Complies
Sta. 4+60 . S
TESTING ENGINEERS. SAN DIEGO
REVIEWED BY mw
1) City __ of Carlsbad
:N_ X,A ~; -F> Att~~~~ Z:I
Kirk P. Ammerman, (C.E.)
North County Branch Manager
an Diego rj Testing Engineers —S
I,. A Division of United States Testing Company, Inc. -
-
, 3467 Kurtz St., P.O.Box 80985, San Diego, Ca. 92138 (619) 225-9641
I J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248 . ..
DAILY RESULTS- IN PLACE DENSITY TESTS
DATE OF TEST fl-7R-R7 . . . . - . LOCATION City of Carlsbad
FILE No.5259 PROJECT College Blvd Improv'ementc -
L_B. No._087 -472 . DATE OF REPORT ____CONTRACTOR . . .
TEST NO
.
L 0 C A T I 0 N
IN
PLACE .
OPTIMUM
. MOIST.
IN PLACE
DRY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K $
MOIST. DENSITY. . REQUIRED COMP._—
8-28SAND C0NE1
q/Bnd lane (Act S/Bnd) Sta 3+70 25 B.T.C. 5'.N Center.'ie . 4.8. . :8.0.. .. 144.4 -. 140.0 95 . 100+. Complies . .
9-1 tNUC1JEARDENSITY
N,Bnd lane 25' from outside end 4.2 8.0 132.5 140.. 95 95 Complies 255
nfTslRndW/side of Rd 9' W1
Center line .
NBnd lane 25' from outside end . . .. 256 .. . , 4.2 of island W/side of Rd 9 W 8.0 .. 132.3 140..0 95 :95 Complies
Center line. . . . . - - .... .. .
N Bnd lane E/side of Rd 24' from 257 5.8 end of Island 121 = Center line
8.0 137 6 140.0 95 98 Complies
N B,nd. lane E/side of Rd." 24 from .4.6 8.0 140.1. -140.0 95 :--100. j-Complies 258 'and of Island 12' = Center, 1ine..1 . .
140.0 259 N Bnd lane Sta 4±53 - 4.5 8.0 .
. . 131.5 . 95 94 I;
. . Does not, comply
_____ 2 1/2 W Center line . .
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS- SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
TESTING ENGINEERS. SAN DIEGO.
1EVIEWED 14Y
('.flT.T.F.(F. BT.Vfl TMPROVEMENTS 1fl_)R_7
TEST ' IN OPTIMUM IN PLACE MAX. DRY PERCENT PERCENT
No. L 0 CA T I 0 N' ' PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE REMARK $ MOIST. , DENSITY REQUIRED COMP.
9-1 LUCLEAR DENg
N Bnd lane Sta. 4+53 260 2 1/2' W Center line ' 5.0 8.0 132.6 140.0 95 95 Complies
N Bnd lane Sta 4+53 261 E/side of Rd-10.''E Center line 5 9 8.0 1 137.3 140.0 95 98 Complies
262 N Bnd lane Sta. '4+66 5.6 8.0 136.3. 140.0 95 97' Complies
. Centerline
263 NBnd lane at •Man Hole 2 5.8 8.0 ' 124.4 140.0. 95 89 Does not comply 1 N of Man Hole
', N Bnd lane W/edge 2 1/2' W% 264 Center line 28 1/2 from nose 6.3 8.0 . . 127.6 140.0 95 ' 91 Does not comply
tace ott curb
265 N Bnd lane E/edge 12 1/2' E 5.1 8.0 127 8 140.0 95 91 Does not comply
1'7" off curb . .5 5 -• . . , - S
N. Bnd lane 13'. W Center line 266 2' E of curb Sta. 5+00 . 5 7.7 8.0 1.26.5 140.0 95 '90. Does not comply
N Bnd lane 13'.W center line 2'
267 E of curb Stá.5+00 shift 'gauge . 6.9 .8.0 '. 132.4 140.0 95
,
95 Complies
61 slot
268 N Bnd lane Sta 5+04 no sand 1/2' 6.4 .8.0. 128 2 140.0 95 92 Does not comply W centerline slight rock. point
.N Bnd lane Sta + 504 with sand... ' ,S 0
269
1/2". W centerline s'li'ghtrockpo.in:
S
.6.1 8.0. 127.5' 140.0 95 S
. 91... ' S Doe's not .cornpl.y
270 N Bnd lane E/edge 13 1 /2' E 6 4 8 0 129 8 140 0 95 93 Does not comply
_____ Center line Sta. 5+08 5 5 .
T7 r tLl TIT IM TMvpnTpM1NTR PAGE 3 10728-87
TEST No L 0 C A T I 0 N'
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMe.
PERCENT
RELATIVE REMARKS
MOIST. DENSITY ' REQUIRED COMP.
9-1
N Bnd lane Sta 6+95 E/edge Rd 271 14' E Center line 6.2 8.0 130.4 140.0 95. 93 Does not 'complies
272 N Bnd lane E/edgeRd 13 1/2' E 6.3 8.0 132.7 140 ..0 95 95 Complies
Center line 1 1/2 off street or .
curb Sta. 7+05 S .
273 N Bnd lane Man 'Hole 1/3 1' So.
Mp Nle Cntr line Pd
3.9 ' 8.0, 123.3 140.0 95
'
88 Does not comply
274
of
NBnd lane 9+40 5.7 8.0. ' '131.2 140.0. 95 94 Does not compl
2 "W Center line .
N Bnd lane Man Hole //4 3' So. ' '
275 Center line ' ' 1 .3.6 8.0 119.3 140.0 95 ' 85 Does not comply
N 'Bnd lane 13" line ,WCenter S .
276 Sta 12+40 W/Edge , 7.9 " 8.0' ' 131.5 140.0 95 94 Does not comply.
N bound lane 9' east
277 Center line 7 8 8 0 13.1 .4 140 0 95 94 Does not comply
278 N Bnd lane W/side 17+84 5.4 8.0 134 9 140.0 95 96 Complies
10 -W Center line
279 NBnd lane Sta.. 20+50 '
' 8.4 8.0 ' 127.7 140.0 95 .91 'Does not comply
Center line
Bnd lane Stä. .20+50 2 1/2' ,N' 280 Center line ' , S , 6.3 8.0 128.0 140.0 95 91 , Does not comply,
281 3' E Ce'nter'line . . 5.6
N Bnd lane Sta'. 23+0
8.0 138.3 140.0 . 95 99 Complies '
282 N Bnd Lane Sta 26+00 6.1 8.0 125.1 140.0 95 89 Does not comply
Center line
283 N Bnd lane Sta 07+35 5' 3..8 8.0 126.7
,
140.0 95 91 Doe's not comply
COLLEGE BLVD IMPROVEMENTS PAGE .4 1.0-28-87
TEST IN OPTIMUM IN PLACE MAX DRY PERCENT PERCENT No. L 0 C A T I 0 N PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R K $ MOIST DENSITY REQUIRED COMP.
9-1 (NUCLEAR
1 Bnd lane valve cluster at Sta 284 27+68 E/side of cluster 6 3 8.0 131 3 1 40 0 95 94 Does not comply
285 .
1 Bnd lane Valve cluster St sta.
. 5.2 8.0 123.2. 140.0 95 88 Does not comply 27+68.N/side of cluster . .. . . . .
T Bnd lane Island So. Nose 5' So. . . . . . 286 1ose Sta. 28+45 . 3.7 .8.0 125.4 140.0 95 87 Does not comp y-
287 N Bnd lane Sta.' 32+00 6.3 8 -.0 .,
. 127.4 10.0 . . 95 91 Does not comply 5 S Center line . . . . .
288 T Bnd lane Sta 36+15 l
5.6 8.0 127 7 140.0 95 91 Does not comply Center line . . . .. . . -. S . . .. .
N Bnd lane Approximately 289 38+10 5' So Center line 6.0 8 0 131 4 140 0 95 94 Does not comply
290 N Bnd lane Sta. 39+60
2' So Center line 5.7 8.0 128.2* .140.0 95 92 Does not comply
9-9 J NUCLEAR DENSITY:
291 1 1/2'.-.E Centerline trench EDL 10 9 9.'5 102.8. .128.0, 90 80 Does not comply tie-in Sta 1+46 . S . . . .
292' 1 '1/2'. E Center.lin trenc h EDL 105 9.5 105.7 128.0 0 83 Does not comply tie-in Sta 1+46 . : . .. S. .
293 Sta 1+47 Center line 7 6 9 5 105.2- 128 0 90 82 Does not comply
9-17 (NULCEARDENT?
294 Sidewalk N Side of College Blvd 8.2 14 0 107 5 116 5 90 92 Complies 3+45
Sidewalk,N sideof College '1vd S S 295
5 . 103 14.0 106.3 116.5. 90 91 Cdmplies
rcTT'1 TUfl TMDDrnTMMPQ • 1 f\ .O O7
TEST
No. - L 0 C.A T I 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS
MOIST. DENSITY . REQUIRED COMP.
9-17 ITY
Sidewalk N side of College Blvd
296'5+45 6.3 14.0 107.8 116.5 90 93 Complies
297 Sidewalk N side of College Blvd 6.6 14.0 110.0 116.5 90 94 Complies 6+45 • ______ _________•
.Sidewalk N side of College Blvd 298
' 7.4 14.0 110.2 • 116.5 90 95 Complies
,'Sidewalk N side of College Blvd 8.5 14.0 110.9- 1165 90 .95 Complies 8+45
300 'Sidewalk N side -of College-Blvd • •
10+45 8.5- 14.0 110.8 116.5 9.0 95 Complies
Sidewalk N side of College B lvd
12+45 -14.0 .. 107.6 116.5 90 92 Complies
tSidewalk N Side of College Blvd 302 14+45 • 9.6 14.0 113.5 116.5 90 97 Complies
303 "Sidewalk N Sidewalk College Blvd 10..5 .14 .0 102.3 116.5 90 • 88 Does not comply 16+50 • . . - _______
•
_______ _______ _____________________
304 'Sidewalk 'N 'side of College Blvd 7.1 14.0 104.9. 116.5 90 - 90 Complies 18+50 - - ______ • ________ ________ ________ _________ _________________________
305 rSidewalk N side of.College. Blvd 19..3 14.0 • 99.7 116.5 • 90 . 86 Does not comply 20+50
306
Sidewalk N Side of College Blvd 11 2 14.0 105 ..3 116.5 90 90 Complies
- 22+50 - •
'Sidewalk N Side of College Blvd 0 307
- 24+50 - • 8.5 14.0 109.7 116.5 90 94 •,. Complies -•
308V Sidewalk
26+50
N Side of College
-
Blvd 4
______
14.0
_________
102.8 116.5 90
________
88 0 Does not comply _________________________
09 309V' .5Y •E of 5.' Center line of W lane 4.2 8.0
•
.136.2 137.0 95 99 Complies 53+00 ) - -
COLLEGE BLVD IMPROVEMENTS PAGE 6 10-28-87
TEST - IN OPTIMUM IN PLACE
-
MAX. DRY PERCENT PERCENT
No. L 0 '-" T ,.s J ' PLACE ' MOIST. DRY DENSITY REL. COMP. RELATIVE R E M A R K S
. MOIST. DENSITY ' REQUIRED COMP.
9-17 NUCLEAR DENSITY--f
310 V 6' W of Center line of W lane 4 2 .8 .0 .136.2 137 0 95 99 Complies 50+00 . '
/7" E of Center. line of W lane ' 311 47+00 4 7 8 0 128 8
.
137 0 95 94 Complies
312 v8' W of Center line of W lane 3.2. 8.0 137.5 137.0 95 100+ Complies 44+00
313 9' E of CEnter line of W lane 3.4 8.0 136 4 137 0 95 100 Complies 41+00
8' W of Centerline of W lane.' 314 38+00 . " . - ' 4.0
, 8.0 ' 136.6 137.0 95 - 100 Complies
I10' E of Center line of .W lane 315 35+00 .' ' ' 2.7 8.0 133.8 '137.0 95 98E Complies
316 7' W of Center line of -W lane
12+00
2 9
.
8.0 - 141.2 137.0 95 ' ' 100+ - Complies
'5' E of Center line of W lane 317 29+00 3.7 8.0 129 5 137 0 95 95 Complies
318 4 W p Center line of W'lane',.
4-00 8 .8 .0 129 6 137 0 95 95 Complies
319 V' E of Center line of W lane 4-.2 8.0 132.8 ' 137.0 95 97 Complies 23+00
3 20
8' W of Center line of W lane 4 5 8.0 138 8 137 0 95 100+ Complies
20+00
321
-
'11' E of Center line of W lane
17+00
5.2 .8 .0 132 2 137 0 95 97 Complies
322 ' W of Center line of W lane 5.3 8.0 136.3 137.0 95 100 Complies 14+00
s8' E of Center line of'W lane 323 11+00 4.0 8.o 133 1 137.0 95 97 Complies
flflLT.F.1 RT.\lfl TMPR011PM1flTTq
1T
LO CAT I ON'
IN
PLACE OPTIMUM
MOIST.
IN
DRY
PLACE MAX. DRY
DENSITY
PERCENT
REL.COMP.
PERCENT
RELATIVE R E M A R K $ DENSITY REQUIRED COMP. MOIST.
9-17NU-CLEAR DENS.
32 9' W of Center line of w lane 6.1 8.0 137.3 ' 137.0' 95 100+ Complies
325 4' E of Center line of W lane
54-00 49 . 8.0 130.7 137.0 95 '95 Complies
326 le8' W of Center line of W lane
. 52. . 8.0 135.1 137.0 95 99 Complies
1+46 13' E of Center line of 32 ,
' i lane 7.3 8.0 13.5 137 .0 95 96 Complies
328 2' W of Centerline of E lane.
' 1+45 6.5
.
8.0 ' 133.7
- '
137.0 95 98 Complies
329 94' wof Center line of E lane
1. + 20 6.4' ' 8.0 128.8 1370 95 ' 94 Does, not comply
330
V5' E of, Center line of E lane
1+20
7
'
5 . 8.0 129.4
.
137.0 95 Compités
331 12151 W 9f W lane 28' N of Center
'line of Palomar Airport Rd.
8.4 8.0 132.3 137.0 ' 95 97' Com plies
332
v160' W of W'lane 29' N of Center
line of Palomar Airport Rd'.
7.7 8.0 '128.0. 137.0 95 94 Does hot comply
333 '100' W of W line 25" S 'of Center
imp of Palomar Airport Rd
7.8. ' 8.0 131.0 1,37.0' 95 ' 96 Complies -
V50' VSO' W of W'lane 30' S of C enter
line of Palomar Airport Rd. ,
'6.7 . 8.0 127..3 137.0 95 93 ' Does not comply
4-300' E o'f E lane 25' S of Center
line of Palomar 'Airport Rd. 7 .9 '
'
8.0 ' 128.5 137.0 95 94 , Does not comply
336 1 200 E of E lane 25' S of Center
' imn ~f P 1nm r Airp rr PcI . 6.9
',
8.0 121.5, ' 137.0' 95 89' Does n'ot comply
_____
vloo E of E lane 25' S of Center,
line of Palomar Airport Rd. I 8.2
.
8.0 123.7
.
137.0 95 . 90 ' Dos not com ply
C()T.T.1'(21 RT.\Tfl TMPPfl\TMPMrQ
TEST No. L 0 C AT 10 N
IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY.
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S MOIST. DENSITY . REQUIRED COMP.
9-17 TUCLEARE D EN ITY: . .
. . '.
. .
338 1"5' E of E larié.'.30", S of Center
line of Palomar Airport Rd. '.
.
. 6.3 . . 8.0 . . .126.3 . .
'. 137.0 .
95 92 Does not comply
339 RETEST 0F#42 8.2 . 8.0 131.1 137.0 95 '.96 RETEST. OF TEST //42
Complies
34,0 "RETEST OF 1/43 . 7.8 . . 8.0 130.3 137.0 95 . 95 RETEST OF TEST
341 VRETEST OF //44 . , 7.5 8.0 131.0 137.0 . .95 96 ' RETEST OF'TEST 1/44
342 /ETES..T OF 1/45 ., ' 7.8 8.0 '. 130.5 1370 95 95 ,
RETEST OF TEST 1/4 5
Complies
343 R ETEST OF #41 7 2 8 0 130 6 137 0 95 95 RETEST OF TEST //41
Complies
344 V ETEST OF //39 7 5 8.0 130.21137 0 95 95 RETEST OF TEST //39
Complies.
345 LETES OF'//37 . . ,
"
•. 7.2 ' ' 8.O. 132.0 137.0 95 .95 RETEST OF'TEST //37
Complies
346 RETEa.T OF #36 .' . 8'.l 8.0 132.1 -. 137.0 ' 95 . 95 RETEST 'PF TEST //36
Complies
9-18 t L
1 ta 53+00 9 5 F C S/Bound lane .146.2 152.0 95 96 Complies
2 5 t 52+30 8" S F.C. . . .. .
.. . ''147.6 ' 152.0 ' 95 . 97 Com'1ies
3. 5 ta,. 51+80 3' So. F.C. ' . . ' 147.8 152.0 95 97' ' Complies
4 ta 48+70 '6' So. F -.C. 149.6 . 152.0 95 98 . Complies'
C0TTPr1 RT.\1fl TMPPC'ITMTT
TEST IN OPTIMUM IN. IN PLACE MAX. DRY PERCENT
J..
PERCENT
i,U OI -
No. ' r ' A TI 0 N' ,
'
PLACE
MOIST.
MOIST.
DENSITY '
DENSITY REL. COMP.
REQUIRED'
RELATIVE
COMP.
' R E M A R K S
9-i8
46 STa 24+45 6' W face curb 150.4 152 0 95 99 Complies
47 Sta. 28+45 4' W face curb 147 2 152 0 95 97 Complies
48 Sta.28+30 Center line lane So /
Rr t1 - ' ' ' '
144 4 152 0 95 96 Complies
49 Sta. 37+50 So /Bnd lane
2' E face curb 147 7 152-1 0 95 97 Complies
50 STa 37+55 12' E Face curb' 146 6 152 0 95 97 Complies
9-18 UCL EAR DENSITJ
347 N/Bnd lane Sta. 52+50
6' W Face curb
5.4 8.0 131.3 138.0 95 95 Complies
348 N/Bnd lane Sta 48+70
6' E 4 7 8 0 131 0 138 0 95 95 Complies
N/Bnd 'lane Sta. 44+15349 ' ' ' 2' E Center line 5 1 8 0 137 1 138.0 95 99 Complies
N/Bnd lane Sta.. 40+70 350 Center line 5.3
'
8.0 137.6 138.0 95 100 Complies
351 ' 2' 'E of Face curb
N/Bnd lane Sta 35+50 5.8
'
8 0 128.8 '138..0 95 93 Does not comply
N/Bnd laneSta. 35+50 -
- 352 Ii' E. Face Curb '
5.0 8.0 " 134.0 138.0 95 - Complies
- Sta. 31+70 N/nd lane' -
-
, . 6.4 - 4" W Face curb
- 8.:0 .134.0 - 138.0 95 - 97 Complies
354 S t a 27+60 8' E Center line
lane - , .. ' '
5.0 8 0 136 7 138
'
0 95 99 Complies
El
f' n T 1 t f' V DI TT 1 r .i D T) f% IT V IN V M 'P C'
TEST No. L 0 C A T I 0 N IN
PLACE OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K $ MOIST. DENSITY REQUIRED COMP.
9-18 rNUCLEAR DENSI .. . .
Sta. 27+80 15' W center line S
355 lane 4.8. 8.0 .128.3 . 138.0 95 93 . Does not comply
356 Sta. 28+65 Center line .lane'. 5.3 8.0 135.7 138.0. 95 98. Complies
357 Sta. 22+50 2'. W Face curb . 4.5 8.0 131.8 . 138.0 95 96 Complies
358 STa. 18+30 31/2',E Face curb 4.9 8.0 138.0 138.0 95 100 Complies
,.I \
___ N/Bnd lane STa. 14+00 359 3 1/2 E Face -curb \ -
7.1
- .
8.0 131.3
- -.
138.0 95 95 Complies
360 N/Bnd lane Sta 9+20 center line 6.4 8.0 132.7 138.0. 95 96 Complies
361 NtBnd- lane Sta.. 4+70 1 E face 6.7
CULIJ.
-8.0 130.4 138.0 95 95 Complies S
362 Run B/S 3' E of 1' E Face curb 5.1.4 8.0 137 3 138.0 95 100 Complies For back-up info. • • - . . - .
9-19 NULER'D E NS1ZT Y-ON-ASPHAL
N/Bnd 3') E face curb - 51 5a
ne
. 144..8 152.8 95 95 Complies Sta.
52 .N/Bnd lane 2' W face curb
52+50 Complies.STa. 150.4 4528 95 98 -
53 N/Bnd lane Sta. 50+70
. 4' F. riirh • - - S
. t46.5 - 152.8 95
. 96 Complies
N/Bnd lane Sta. 5O+4 5
54 4 W face curb 148.4 - 152.8 95 - 97 Complies -
11
C(T.T.1C RT.\TTh TMPP0\1PMNT OAt't''')t\ 1 C',
TEST
No. L 0 C A T I ON: PLACE
OPTIMUM
MOIST. N PLACE
DRY
TMAX. DRYPERCENT
DENSITY REL. COMP. PERCENT
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
9-19
S/Bnd lane Sta. 3+00 139 14' W face of curb . ' .149.6 152.0 95 98 'Complies
140 Check out left turnpocke w/Kirt
G area not compacted ranged 136.9 152.0 95 90 Does not comply
from 85-93
141 Sta. 33+00 4' W face of curb 140.7 - 152 ..0 95 92 Does not comply.
142 S t a 30+45 8'-w
left turnpocket
136 9 152.0 95 90 Does not comply
143 Sta. 30+45 8' W left turn pocket
, . 16.4 152.0 95 ' 90 Does not comply
144 Sta. 30+50 2' W face of curb .
. 129.3' . 152.0 95 85 Does not. comply J.e.ft turh pocket
Sta. .30+50 7' W face of cur.b '
' 145 left. turnpocket . . ' . '
.
1359 152.0 , 95 89 Does' not comply.
STa 32+50 6' W face of curb 146 le t turn 139.5-- 152 0 95 92 Does not comply
STa. 33+94 5' W face f curb' 147 :
' left turnpocket ' 141.0 . 152.0 95 . 93 Does not comply
9-24( DENSITY'.: L.
Sidewalk W side Center line 363 ' 41+75 11.9 14.0 111.0 116.5 90 95 Complies
Sidewalk W side Center line 364
' Sta. 45+50 11 7 14.0 110-4 116.5 90 95 Complies
365 Sidewalk W side Center line
STa 49+00 12.6 14.0 1 108.0 116.5 90 93 Complies
C0T.1?(1? T\11'I TMPPA1IPMP1'JTQ
TEST
No. L 0 C A TI 0 N '
IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT.
REL. COMP. PERCENT
RELATIVE- R E M A R K S MOIST. DENSITY REQUIRED COMP.
9-24 1JJ_CLAR DENSITY:
ealk W side Center line 366 id,.
Sta 51+75 : ":
9.5 .14.0 112.0
.
116.5 90 96 Complies
9/25 T3
All tests are retests of tests
taken 9-21-87
Re-A College Blvd. left turn
lane CL of Lare 230'N of CL ' 146.3 - 152..5 95 96 Complies RETEST A
Re-B College Blvd. Left turn CL
120'.N of CL, P.A.R. 46.8 152.5 ' 95 96 ' Complies RETEST B
Palomar airport rd. left Re-C turn lane 100'W of CL 137.5 152.5 95 90 Does not compl' ,'
. retest C
Palomar airport rd. left Re-D turn 100' W of CL college blvd.. '144.3 152.5 95 . C omplies RETEST D . 95
Palomar airpor,t rd. right, .
Re-E tur'n' n lane 230' E of CL ' 143.1 152 5 95 94 Does not comply
. retest E
Palomar airport rd. rt. lane Re-F 120' E of CL college. blvd. -
'
148.4
. ,
152.5 95 .- 97 Complies RETEST F
38' S of CL Palomar. airportRe-G . . 140.6 152.5 95 92 Does not comply Rd. CL Of college blvd." - , RETEST
9/25çU - D ENSITIES -FINISH SUB.
GRADE
_
0
Sidewa lk E side College Blvd.
367 Centerline Sta. 42+00 9.3 14.0
-
100.1 116:5 90 86 Does not comply
-. Sidewalk E side College Blvd.- 368 Centerline 39+50 10 1 14.0 . 1 . 00.1 116.5 90 86
-
Does not comply
369 Sidewalk E. side College Blvd.
9.2 14.0 100.1 116.5 90 86 ' Does: not comply
-COLLEGE BLVD. IMPROVEMENTS PAGE 22 116-87
EST IN OPTIMUM IN PLACEMAX.. Dnv PERCENT PERCENT
10. N - PLACE MOIST. DRY -DENSITY REL. COMP. RELATIVE R E M A
- MOIST: DENSITY REQUIRED COMP.
9 / 21 Sidewalk E side College blvd.7
370
2 14 0
centerline 31+00
1.03 .4 116 5 90 89 Does not comply
37.1
Sidewalk E side College Blvd 9 8 14.o 1.03 .0 116.5' 90 88 Does not comply
Centerline 26+00
-
372
Sidewalk E side College Blvd 10.8 14 .0, 97.3 116.5 90 84 Does not comply
Centerline 22+00 .
9/3 37+00 .Median 9 0 11.0 107.7' 116.5 90 92 Complies
373
374 32+00 Median 8.7 11.0 107 4 116.5 90 92 Complies
375 34+00 Media 9 2 11.0 108.8 116 5 90 93 Complies
-- Median Sta. 23+50
- - 15.9 14.0 105.4 116.5 0 9.0 Complies - 376
377 Median Sta 19+10 13.8 14.0 105:5 116.5 90 91 Complies
378 Median Sta 14+10 10.8 '14.0 107.6 116.5 90 92 Complies
379 Median Sta 9+50 14.0 14 0 110.1 116.5 90 94 Complies
380, College blvd 8' N of center line 20 1 14.0 106.8 117 5 90 91 Complies 55+00 N lane 6' N of center line
College blvd 10' 5 of centerline 19.2 14.0 108..l 117.5 90 92 Complies
381 58+00 N lane 12' S of centerline
38 College blvd 4' N of centerline 7 6 14 0 117 8 117 5 90 100 Complies
61+00 N lane class II base
383 College blvd. 10 Nof centerline ;9 201. 14.0
64+00 N lane area pumping slighti '104.3 117.5 - 90 - 89 Does not comply
384 College blvd area around MH need 19.-0 14.0 107.4 117 5 90 91 Complies compactio.n66+00 N lane 11 'Sof MH
4. -
COLLEGE BLVD. IMPROVEMENTS PAGE 23 11--97
rEsT
O• . LO CA TI 0 N
IN
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
. . MOIST. DENSITY REQUIRED COMP.
0/21. College blvd. area around 9 16.3 14.0 107.2 117.5 90 91 Complies
385 'needs compaction 69+00 MR b W o
MR 8' N of centerline N lane
386 S lane 125' W of faraday Interse 19.1 14.0 . 106.1 117.5 90 90 . Complies
College blvd. S lane MH in center 387 of Rd.wy66+00Slane 14'N of C.L. 15.5 14.0 110.0 110.6 90 94 Complies
388
College blvd. MH 63+00 S lane 10' 16.3 14.0 110.6 117.5 90 94 . Complies
S of Center line
38 College blvd. MH 60+00 S lane 17.9 14.0 106.4 117.5 90 ' 91 Complies S 10''W_of_centerline
390 College blvd. MR 56+00 S lane 21.8 14.0 104.7 .117.5 90 ' 89 Does not comply
area-around MR need compaction '
391 College blvd, 50' E of'Intersecti '16.7 14.0 106.9. 117.5 90 91 ' Complies
S lane 10' S of centerline
380A.lRetest 380 Sta. 55+00
. 16.6 14.0 107.9 117.5 90 3 Complies
R etest
380
Retest II Retest 383 Sta. 64+00 . 20.3 .. 14.0 106.. 1 117.5 90, 90 Complies 383 383A
384A Retest 384 Sta. 384 18. 14.0 108.2 ' 117.5 90 92 Complies ' Rest II
384
38'S' Retest Sta
,
.. 17.7' 14.0 69+00 ' . 109.6 ' 117.5 90 93
Retest 1/
Complies ' 385
.386A Retest 386 125' S of Faraday 20.7 14.0 107.0 117.5 90 91 Compli,es, Retest--#
386
. 389A Retest 389 60+00 17.8 14.0 107.2 ' 117.5 90 ' 91
' , Retest/ Complies 389
Retest 390 Sta. 56+00 17.7 14.0 109.6 117.5 90 93 Complies Retest 1/
390A , 390
Retest 1/
391A 'Retest 391 50' N of, intersect. 15.2 14.0 ' 109.1 117.5 '90 93 complies 9 Sta. 53+75 • • • _________ _________ , '•
_________
,
College Blvd. Improvements
TEST
0. L 0 C A T I 0 N
.
IN PLACE OPTIMUM
MOIST. IN PLACE
DRY
'MAX. Dnv
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A K S ' MOIST. . DENSITY ' REQUIRED COMP.
10/22 College Blvd. 69+20 20.' N of Fl
392 E lane 10'W centerline 1.55 14.0 113.0 117.5 90 93 Complies
CB 72-00 E lane 6' E centerlin
393 17.9 14 0 109 ..1 117 5 90 93 Complies
CB 75+00 E lane 8' W centerline l..9.5 19.-5 107 9 117.5 1 90 92 Complies
395 18 CB 78+00 E lane 7.''E centerline- 8 18 8 104.8 117.5 90 89 Complies
396 College Blvd 82+50 E lane 13 8 14.0. 109 4 1 17 5 90 93 Complies
397 College Blvd 84+50 E lane 21 ..3 14-0 101 9 117 5 90 87 Does not comply
398: College Blvd. 84+00 W. lane 14.0 90' 21.2 104.5 117.5 89 Does not comply
399 College Blvd. 81+00 W. lane 18.7 14.0 106.7 117.5 90 ' 91' Complies
400 College Blvd 77+00 W lane 11 3.4 14.0' 110.2 117.5 90 94 Complies
401 College Blvd. 73+50 W. lane 20.2 14.0' 115.1 117.5 90 ' 98 Complies
402 College Blvd:. '.70+50 West lane
' 15.0 14.0 109.9 ' 117.5 90 94 'Complies
403 College Blvd SBRM Sewer W of 9.4 11.5 108.6 119.2 90 91 Complies Palomar airport rd. 50'Wof E rd.
404 CB S BRM Sewer W of palomar
airport rd. 35" W of E rd. 12'W
of MH
TESTING ENGINEERS-SAN DIE(X)
Reviewed by:
Kirk P. /nniennan
North County Branch Manager
(iJ Testing Engineers—San Diego
A Division of United States Testing Company, Inc. I
3467 Kurtz St,PO Box 80985, San Diego, Ca 92138 (619) 225-9641
(iJ 2956 Industry Street, Oceanside, California 92054 (619) 757 -0248
DAILY RESULTS-IN PLACE DENSITY TESTS.
DATE OF TEST 10/23/87 . LOCATION Carlsbad, CA
FILE No. _087-527 , PROJECT_College blvd. Improvements'
LAB. No._52 59 DATE OF REPORT..November 18,!9S7CONTRACTOR
TEST IN OPTIMUM IN PLACE MAX. DRY PERCENT PERCENT
No L 0 C A T I 0 N PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE R K M A R K S
MOIST. DENSITY . REQUIRED COMP.
10/23 NUCLEAR DENSITY
396A Retest of #396' Stat. 78+00 E. 18.5 14.0 19.5.7 117.5
-
90 ' 90. . Retest 11396 Complies Lane 7'E Centerline F'.G. Subbase
398A
Retest of II 398 84+50 E. Lane
'. 17.3 . 14.0 105.7 117.5 90 . 90 . . Retest' #398 Complies F.G. Subbase . .
Retest #399 84+00 W Lane Retest #399
399A Finish Grade Subbase 17 8 14.0 105 9 117.5 90 90 Complies
10/24 NUCLEAR DENSITY
College Blvd. E Bound Stat. 65+51 '. . . 405 II . e'12 Finish Sub Base
4.8 7.0 131.4 , 139.0 95 . 95 Complies
stat. 63+00e 1211 Finish SubBase .
406 . . . 5.1 7.0 . 131.7 139.0 ''95 95 Complies
407 'Stat. e 59+50e 12" Finish Sub 5 7 0 " 132 0 139.0 95 95 Complies base . .
408 Stat. 54+50 83e 1211 Finish Sub 5.4 . '7.0 131.6 139.0 95 . 95 Cothpli'es
Base
409 Stat 56+00 e-12" Finish Sub Base 5-TI 7-0 137 9 139.0 95 95 Complies
THE ABOVE TEST RESULTS AND 'CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
'TESTS MADE BY TESTING 'ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Page 2
TEST
0. L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
lu PLACE
DRY
DENSITY
MAX. Dnv
DENSITY
PERCENT,
REL. Comp:
REQUIRED
PERCENT
RELATIVE ..
COMP.
REMARKS
10/2 NUCLEAR DENSITY:
College Blvd. W. bound Stat. 59+
410 00 e-12 t Finish Sub Base 70 131.3 139.0 95 . 95 Complies
411 Stat. 64+00e-12" Finish Sub 5.1
Base
7.0 131.4 139.0 95 95 Complies .
412 Stat 67+98 e-12" Finish Sub 5-.3 7.0 .131.6 139.0 95 95 Complies
413 S.G. on College Blvd. E. Bound
Stat. 86+00 eF.S.G. 17.6 0 14.0 113.7 117.0 90 97 Complies
414 Stat. 91+00 e Finish Subbase 15.8 14.0 112.7 117.0 90 96 Cönplies
415 Stat. e 95+50 e Finish Subbase 150 14.0 108.3 117.0 90 93 Complies
416 Stat 98+50 e Finish Subbase 1.5 .5 14.0 107.1 117.0 90 92 Complies
417 Stat 98+00 e Finish Sub base 15.0 14.0 108 3 11'7.0 90 93 Complies
418 Stat 94+00 e Finish Sub base..16.4 14.0 107.5 117.0 90 92 Complies
419 Stat. 88+10 e Finish Sub base. 16.8 14.0 112.4 117.0 90 96 Complies 0
420 Stat 84+50e Finish Sub base 16.6 14.0 109.0 117.'0 90 93 Complies
O/26 NUCLEAR DENSITY:
421 College Blvd East Lane Stat
54+50 .
6 1 7 0 0 129 A
_________
139 0
_________
95 93 Does not comply
422 College Blvd W Lane Stat 57+70 7 0 7 0 126.3' .139.0 95 91 Does not comply
COLLEGE BLVD. IMPROVEMENTS, 1 1/18 Page 3
TEST No L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. Day
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE.
COMP. R E M A R K S
O/26 NUCLEAR DENSITY
423 College Blvd W lane Stat 57+50 5.4 ,7.0 128 5 139 0 95 92 floes not comply
424 College Blvd W lane Stat 57+50 .6 .2 7 0 - .126.4 139.0 95 91 toes not comply
425 College Blvd W lane S t a t 63+50 3 7 0 132 7 139.'0 95 96 ComDlies
426 College Blvd W lane 66+50 5'.0 7 0 128 5 139.0 . 95 92 floeq not comply
427 College Blvd W lane 69+00 5.-4 7.0- 127.0 139.0 95 91 Does not comply
10/26 NUCLEAR DENSITY
428 College Blvd. E. Lane 70+50 .7.2 7.0 1301 139.0 95 .94 Does not comply
429 College Blvd. E. Lane 73+50 6.3 7.0. 1 30 139.0 95 94Does not comply
430 College Blvd. E. Lane 7650 5.9 .7 .0 130.3 139.,0 95 94 Does not comply
431 College Blvd .-E.. lane 79+50 7.9 7.0 130.3 139.0 95 89 Does not comply
432 College Blvd ..E. lane 82+50 5 9 7 0 127.4 139.0.'95 92 Does not comply
433 C51lege Blvd E lane 84+00 5.9 7.0 131.5 139 ..0 95 95 Complies
434 College Blvd W Lane 84+60 .5 .6 7 0 129 7 139.0 95 93 Does not comply
435 College Blvd. W. Lane 82+5 . 5.0 7.0 130.8 . 139.0 95 94 Does not comply
COLLEGE BLVD. 'IMPROVEMENTS 1 1/18/87 Page 4
TEST NO • LO CA T1 ON' .
IN.
PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY PERCENT
REL.'COMP,
PERCENT.
RELATIVE R E M A R K S MOIST. DENSITY REQUIRED COMP.
10/26 NUCLEAR DENSITY: . . . . .
College Blvd.. W. Lane 79+50 .436 6.2 .7.0 :124.2 139.0 95 89 Does not com ply
437 College Blvd. .W. Lane 76+50, .5.0 7.0 .120.4 ' 139.0 95 87 Does not comply
438 College Blvd. W. line 73+50 5.4 7.0 124.7. 139.0 95 90 Does not comply
439 College Blvd. W. lane 70+56 5.0 7.0' 12.6 .'7. 139.0 95 91 Does not comply
Median 57+00 Finish Subgrae 440 17.6 16.5 102.6 111.0 90 92 Compli's
441 Median 60+00 Finish Subgrade 16.8 16.5 98 .,7 111.0 90 89 . Does not comply
442 Median 63+00 Finish Subgrade 14.6 16:5 103.0 111.0 90 93 C,p1ies ,•.;
443 Median 66+75 Finish Subgrade 12.3 16.5 105.9 111.0 90 95 Complies
444 Median 73+00 Finish Subgrade 11.7 14.0 .103.1 116.5 90 89 Daas not comply
445 Median 76+00 Finish Subgra.de 10.8 140' . 109:5 116.5 . 9b 94 :Crnplies . .
446 Median 80+00 Finish Subgrade 1.9 .6 16 5 93 7 111 0 90 84 Does not comply
447 Median 82+90 Finish Subgrade 18.6 16.5 101.1 111.0 90 , 91 Complies .
448' Median 87+00 Finish Subgrade
' 11.9 16.5' 103.3 111.9
,
90 93 rn1es
449 Median 90+00 Finish Subgrade 15.8 16.5 105.4, 111.0 90 95 Complies
COLLEGE BLVD.. IMPROVEMENTS 11/18/87 •. Page 5
TEST No . . L 0 C A T 10 N .
IN
PLACE
OPTIMUM
MOIST. IN PLACE
DRY
MAX. Dny. DENSITY PERCENT
REL. COMP. PERCENT
RELATIVE R E M A R K S MOIST. DENSITY . REQUIRED COMP.
10/26 NUCLEAR DENSITY: . . .
.
. . . .
450 Medain 92+00'Finish Subgrade 17 1 .6 .5 105.7 111 0 90 95 Complies
451 Median 95+00 Finish Subgrade 14 7 16.5 107 1 111;0 90 97 Complies
1.0/2.7 NUCLEAR DENSITY: .
.
.
21.A College blvd. E. lank 54+50
Retest 6f'421 7.9 7.0 132:5 139.0 95 95 Complies
College blvd. E. lane 57+09 2 45 :. W o.f centerline 6 6 7.0 134.3 139.0 95 97 Comlies
College blvd. E lane Stat. 60+00
8' E of centerline .
6.0 7.0 126.6 139.0
.
95 91 Does not cQmpl
4 54 College blvd. E. lane 63+00 ' 6.3 7.0 127.2 139.0. 95 92 W of centerline .
4- 55 College blvd E lane 66+00 10'E 6.1 7 0 130.9 139.0 95 94 Does not comply centerline
College blvd: E. lane 66t00 20' 456 . W ofcenterline . . .
6.4 7.0 132
.
3 139.0
.
95 95 Complies
422A College blvd. Retest of U 422 6.9 7.0 129.6 139.0 95 93 Does not comply W lane 54+50
423A College blvd. Retest of 1/ 423 6.0 7.0 129.8 139.0 95 93 Does not comply W. lane 57+50
424A College Retest of #424 .
5
blvd.
5.7 7.0 131.3 139:0 95 94 . Ds:nQt,comply
426A College blvd Retest of /1426 5.0 7 0 132 1 139.0 95 95 Complies
. . 66+50 .
427A College blvd. Retest of /1427 7.6 7.0 . 131.0 139.0 95 94 Does not comply
. 69+00
COLLEGE BLVD. 'IMPROVEMENTS 11/18/87 Page 6
TEST IN OPTIMUM, IN PLACE MAX. DnY PERCENT PERCENT No LO C A T I 0 N ' PLACE MOIST. DRY DENSITY REL. COMP. RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP.
10/2 NUCLEAR DENSITY
453A College blvd Retest of 453 5.5 7-.0 134.1 139.0 95 97 Complies Retest of Stat. 60+00 453 454A College blvd Retest of 11454 5_3 7.0 134 5 139.0 95 97 Complies Retest of Stat. 63+00 E lane
. 454
55A College blvd. Retest of 455 6.9 7.0 132.7. 139.0 95 96 Complies Retest of 66+00 E. lane 11455
422B College blvd. Retest 422A W.. . . Retest of 54+50 W lane
.. . 6.4 7.0. 133.4 139.0 95 96 Complies 1/ 422A
'23B College blvd. Retest 423A ' . S
. Retest o Stat. 57+50 W lane 6.5. 7.0 133.4 139.0 95 96 Com,plies 1/ 423A
424B Cdllge Blvd, Retestof 424A 5
.
2 7 0 134.3 139.0 95 97 Complies Retest of Stat. 60+50 W lane . . . 11 424A
'+27B College blvd. Retest of 11 427A 5.3 7.0 133.9 139.0 95 '. 96 Complies Retest of Stat. 69+00 W. lane
'28A College blvd. Retest of #4128 5.3 . 7.0 131.8 139.0 95 95 Complies 'Retest of Stat. 70+50 E. lane
, 1/ 428
29A College blvd. Retest of 11429 5.4 7.0 128.9 139.0 95 5 93 . Does not comply _' Stat..70+50
. Retest ofi/429
30A College blvd.. Retest of // .430 54 7.0 : 126.5 139.0 95 91 'Does not comply 7>6+50 E. lane . ,, . ' S S R test of 11430 31A College Blvd.' Retest of #432 .5.4 7.0 ,.1;27.6 139.0 92 Does not comply ' Stat. 79+50 E. lane S
. S Retest of//431 32A College blvd. 'Retest of 11432 ' 5.5 7.0 131.3 139.0 95 94 Does not comply Stat. 82+50E'.lane
S Retest of11432 33A' College blvd. Retest of 433
. 6.0 ' ' 7 0 ' 122.9 139.0 95 . ' 88 Does not comply '84+00 E. Lane Stat. .
Retest of11433
COLLEGE BLVD. IMPROVEMENTS 11/18/87 Pa ge 7
TEST
No L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST. IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY PERCENT
RcL. COMP.
REQUIRED
PERCENT -
RELATIVE
COMP. R E M A R K S
[0/30 NUCLEAR DENSITY
45.7 College blvd E lane S t a t'.60+
7 3 138.3 140 6 95 98 Complies
45,8 College blvd E lane 63+00 .5-.5 7.3 138 1 140 6 95 98 Complies
459 Collgeb1vd.- E. lane Stat.
66+00
.
5.1 .73 136.6. 1406 95 97 Complies
460 College Blvd. E. lane Stat.
68+70 6 7.3
-
136;1- 140.6 95 97 Complies
- - TESTING ENGINEERS -SAN DIEGO
REVIEWED BY
-.
- - - - - Kirk.P. Aüimëman-
North County -Branch Manager
( J Testing Engineers—San Diego
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641
I -=" 2956 Industry Street. ()c n.cid. (IifnrniR 9254 (1319) 7F7-n24J
DAILY 'RESULTS IN PLACE DENSITY TESTS
DATE orTEST 10/29/87 NUCLEAR DENSITY: LOCATION Carlsbad, CA
0877529 PROJECT College Blvd. Improvements
FILE NO )•Q November 19, 1987
LA U. No____________________ DATE OP REPORT_____________________-CONTRACTOR
TcsT L 0 C A .
OPTIMUM MOIST. IN PLACE DRY
PER C
PLACE
MAX. DRY DENSITY R :EONJP. RELATIVEENT I R E 1.4 A R K S
.. 461
MOIST.
College Blvd. W. lane Stat. 85+ 11.5 7. 139.1 140.6. 95 :complies
20 15' E of centetline
462
College Blvd W lane Stat 89+50 9
.
7 3 138 6 140.6 95 99 Complies
' W of centerline
- 463 College Blvd. W. lane Stat. 93+50 8.4 .7.3 139.5 140.6 .95 99 Complies
8' E of centerline
• 464 College blvd. W lane 97+00 9' •E 6.3 7.3 135.8. 140.6 . . 95 97 Complies
. of centerline
College blvd W lane 71+50 E lane -10.1 7 3 135 1 140.6 95 96 Complies 465
466 College Blvd W lane 53+75 ' 10.5 7 3 140 0 146.6 95 100 Complies
E of centerline
467 College blvd Stat 57+00 13 1 7 3 129 0 140 6 95 92 Does not comply
College Blvd Retest of 11467 11 6 7 3 137 0 140 6 95 9 7 Retest of Complies 11 468 Stat. 57+00
467
469 College Blvd. W. lane.60+00 9' 10.0 73 139.5 140.6 .95. 99 Complies
E of centerline
'T4776FWC0
11ege blvd W lane 63+00 8' 9.8 7.3 136.7 140.6 95 97 Complies
of centerline
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFI(O PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
()LT,F.(F BLVD. .IMPROVEMF.NT. 11/1O/7
rEST
No;
- .
. ' '
. .
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY.
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
REMARKS
10/2 NUCLEAR DENSITY:'
'471 College Blvd.. W. lane Stat. 66+00
10' E of centerline F.S.G.. 10.9 7.3 . 137.2 140.6 .. 95 .
98 Complies
472 College blvd.
50 C
W. lane Stat. 69+ 10.8 7.3 1347 140.6 95: . 96 Complies
College Blvd. E. lane Stat. 73+ .9 .6 25 F.S.G.
. 7.3 .134.2 140.6 - 95 95 Complies
474 College blvd. E. lane Stat. 78+
00 ..
9.5 7.3
.
132.2 140.6. 95 94 Does not comply
College blvd E lane Stat..83+ 9 3 7 3 00
134 7 140 6 95 96 Complies
476 College blvd.- E. lane Stat. 9.5
55+00
7.3. 137.5 140.6 95 98 Complies
477 I College-Blvd. E. lane. Stat. . 9.1 7.3 59+00
137.7 140.6 95 98 - Complies
- . TESTING ENGINEERS -SAN DIEGO
REVIEWED BY - 1) CIty. of Carlsbad
BZLow
Kirk P. Ammerman .
North County Branch Manager
~127 Testing Engineers-San Diego t o
A
Do
Division of United States Testing Company, Inc.
3467 KurtzSt., P.O. Box 80985, SanDiego, Ca. 92138 (619) 225-9641
J 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
TEST ' ' C A T I 0 N
IN PLACE
OPTIMUM
MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE R E M A R K S
No. MOIST. DENSITY . REQUIRED COMP. -
College Blvd E lane . S RETEST # 428A
428B RETEST 11 428A:. 7.4 7.3. 130.6 141.0 95 93 Does rnr r nmply
College blvd E lane RETEST II 429A
429B RETEST #429A 7.3 7.3 128.7 141.0 95 92 Does not comply
College blvd Elane RETEST // 430A
430B R;ETEST 1/430A 7.2 7.3 132.9 140.0 95 95 Complies
College blvd E lane RETEST II 431A
431B RETEST #431A 8 1 T. 3 129.2 141.0 95 92 Does not comply
College blvd E lane RETEST II 432A
432B RETEST #432A . 7.1 7.3 128.3 141.0 95 91 Does not comply
Côllege blvd E lane . . . RETEST // 433A
4'33B RETEST.#433A 7.2 7.3 13.2.8 141.0 95. 94 Does not comply
478 College blvd 85+001 :E lane - 6.8 7.3 128.1 141.0 95 91 Does not comply
479 College blvd 88+00. E lane 7 0 7.3* 13L.5 141 A 95 94 Does not comply
480 College blvd 91+00 E lane 7.1 ' 7.3 130.1 141.0 95 93 " Does not -comply
481 College blvd 94+0 E lane 6.J. 7 3 130 4 141.0 95 93 Does not comply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
- S TESTS MADE BY TESTING ENGINEERS -SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
r'...l ,...._...'... D1.. 9
TEST L 0 C A T I 0 N
IN
PLACE
OPTIMUM
MOIST:
IN PLACE
DRY
MAX. Onv
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE REMARKS
No MOIST. M DENSITY REQUIRED COMP.
482 College blvd 96+00 E lane 6.8 7.3 124 5 .14-1.0 95 89 Does not comply
483 College blvd 98+00' E lane . 7..6 7.3 132.1 141.0 95, 94 Does not comply
RETEST #428B '. ' ' ' ' DETEST //428B
428C College blvd 70+50 E lane 7.9 7.3 , 131.6 .141.0 95 ' 94 boes not, comply
College 'blvd 76+50 E'láne ' " - '.'•.. 0 ... . RETEST #429B
429C RETEST #429B . . 7.9 7.3 131.5 .14.1.0' 95 94 Does not comply
'College blvd. 76+50 E lane '' . RETEST #430B
430C RETEST //430B '. ' '
....
. 6.5' 7.3 134.7 .141.0 95 ' 96 Complies
College blvd 79+50 E lane RETEST #431B
431C RETEST 1/431B ' ' ' ' 7.3 7.3 131.2 141.0 95' , 93 Does,not comply
College blvd 82+50 Elane ,RETEST //432B
43'2C RETEST./1432B 7.4 ' .7.3 131.5 141.0 • : 95 .94 Does noltcomp'ly
College blvd 84+00 E lane ' ' ' ' RETEST //433B
433C 'RETEST 1/ 433B ' ' ' 7.6 7.3 134.3 141.0 ' . 95 96 Coñiplies
College blvd 10'E of 4 85+00 . ' RETEST #478
478A ,E lane RETEST 1/478 ' 7.3 ' 7.3 .135.8 141.0 95 ' 97 Complies
College 'blvd 88+00 E lane 0 . '
RETEST //479'
479A RETEST //479 ' ' 7:0 7.3 133.6 141.0 95 95 ' ' Complies
College blvd 91+00 E lane 0 ' ' ' ' ' ' ' ' RETEST /1480
480A RETEST #480 ' :. . 6.1 7.3. .134.1 141.0 95 95 ' Complies
College blvd 94+00 .E 'lane ' ' ' ' ' ' RETEST //81
481A RETEST #481 . . ' ' 6.9 ' .3 135.0 141.0 95 96
,
Complies
College 'blvd 96+00 E lane : , RETEST /1482
482A RETEST #482 ' 6.9 7.3 135.1 141.0 95 ' 96 . Complies
College blvd 98+00 E lane " ' . ' . ' . RETEST #483
483A RETEST //483 ' ' 7.4 7.3 135.3 141.0 .95 96 ' 'Complies
College blvd 70+50 E lane '
0
,
RETEST //428C
428D RETEST 1/428C '' ' 8.6 7.3.. 136.9 141.0 95 97 Complies
Blvd Imnrovments Page 3
TESTS No.
MOIST.
-
. .
- LOCAT I O N .
IN PLACE
OPTIMUM
MOIST.
IN PLACE.
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. RE M A R K S
429D
C ollege blvd 73+50 E lane
RETEST 1/429C . . . 8.0:
.
7.3
.
134.8 141.0 95 95
RETEST-' #429C
Complies
431D
College blvd - 79+50 E lane
RETEST # 431C 6.3 7.3 134.7 141.0
. .
.95
.
96
RETEST #431C
Complies
432D
College blvd 82+50 E lane
RETEST #_432C .- . 7.0
.
7.3
.
133.5 141.0 95 95
RETEST #432C
Comp1is
484
College blvd 70+00 W lane
. ' 6.4 7.3 130.9 141 .0 05 93 Dooc comply
485
.
College. blvd 73+00 W lane 6.1 7.3 130.6 141.0 ' 95 .93 Does not comply
386 College blvd 76+00 W lane 5.1 7.3 128.3 141.0 95 91 Does note-comply
484ARETEST
College blvd 70+00W:.1ane
#484 - . 6.3 7.3
.
135.7
. .
141.0
.
95 S
96
RETEST #484
Complies
485ARETEST
College blvd 73+00 W lane
#485 , '- 6.1 ' 7.3 . 133.9
. '
141.0 95 95
RETEST #485
'Complies
486A
College blvd 76+00 W lane
RETEST #486' .
.
, 6.2
'
7.3 . 131.0 141..0 95 93
RETEST 11486
Does not comply
487 College blvd 79+00 W lan.e 7.2 7.3 135.2 . 141.0 , 9'5' 96. Complies
488 College blvd 81+00 W lane
, 5.9 7.3. 134.1 141.0 95 95 Complies
489 College blvd 84+00 W lane
,. 5.8 7.3 137.6 141.0 95 98 Complies
490 College blvd 87+00 W lane 6.3 7.3'
, 126.7 . 141.0 . 95 - .90 Doesñot comply
t
1) City of Carlsbad
2075 Las Palmas Dr.
Carlsbad, CA 92009-4859
- Attn: Pat Entezari r ---_----_.---___ LLL.jS/Lowry Attn: - Kurt Gierlich'
105Y0_V-iaF=o era
P.O. Box 28100
-
TESTING ENGINEERS -SAN DIEGO
REVIEWED BY
Steven P.
North County Branch Manager
S..
1 7 ' Testing Engineers-San Diego
1,7z
,
, A Division of United States Testing Company, Inc. . :
____/ 3467 Kurtz St., P.O. Box 80985, San Diego, Ca. 92.138(69)225-9641.
Industry Street, Oceanside, California 92,054 (619) 757-0248
DAILY RESULTS- IN PLACE DENSITY TESTS
5. 11/10/87 . LOCATION Côllee.BldCàr1sbad
DATE OF TEST_________________ .
FILE No_..)LJY
.
PROJECT Blvd Improvements
LAB. No__087-5 62 DATE OF REPORT 12/10/87 CONTRACTOR . .
Tr L 0 C A T I 0 N
IN PLACE
OPTIMUM MOIST.
IN PLACE
DRY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
PERCENT
RELATIVE . R E M 'A R K S
MOIST. DENSITY REQUIRED COMP.
87+00 W lane '8'Wof centerline .. . S
RETEST'#490
490A RFTFT #LIQO 7.3 126.8 141.0 . 95. 90 Does not comply
491 College blvd 90+00W lane 101 E of CL
______
5.8 7.3 131.5 141.0 :5: 94. Does not comply
492 Collee blvd 93+00 .0 lane 61 W of CL 5.8 7,3 131.5 141.0 95 94 Does ndt comply
493 College blvd 96+00 W lane 71 E of CL . 6.0 7.3 ' 128.7 . 141.0 . 95 . 92 Does not comply
.494 College blvd 98+00 W lane 11'W.of CL 5.3 7.3 131.1 141.0 95 93 Does not comply
.87+00 W lane 8'W of.centerliie . S . 5 5 5 • . 5 5 RETEST #490A
490B RETEST #490A S 6.0 573 129.7 141.0 95 92 Does not comply
90+00 W lane 15' E of centerline S S
. RETEST #491.
_j)....' RETEST #491 5. 5.1 7.3. . 133.5 141.0 95 95 . Complies
• 93+00 W lane S S
S RETEST4492
492A RETEST #492 5 6.5 7.3 . 130.2 141.0 95 93 Does not comply
96+00 W.lane . S •• S S S S S.
S
, RETEST. #493 .
4931k RETEST #493 5.8 7.3 129.6 141.0 1 95 92 . DoesnoticomDly
98+00 W lane . .. S . S S S . RETEST #494
494A RETEST #494 5 5 5 5.4 5 7.3 .131.6 141.0 95 Does not comply.
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING ör:FAcTUAL DATA -DERIVED FROM S
TESTS MADE BYTESTING ENGINEERS -SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.' . S S
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL. 1- . . • 2.. . . -
-TESTING ENGINEERS .SANDIEGO
..•
S S REVIEWED BY. • -
1) City bf Carlsbad
1) NBS/Lowry . S • . S.
S
. S • • •'
North County ranch Manager
-. fliJ Testing Engineers-San Diego •• - iWARE A Division of United States Testing Company, Inc.
3467 KurtzSt., P.O. Box80985, San Diego, Ca. 92138 (619) 225-9641
-' 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS- IN PLACE-.DENSITY TESTS
DATE OF TEST 11/11-14/87 : LOCATION Carlchad
FILE No. 5259 ... PROJECT_College blvd improvements •.
LAB. Ilo _087-572 DATE OF REPORT 12/11/87 CONTRACTOR . . . . ..
TEST
No
- . L 0 CA T I 0 N . IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.'
REQUIRED
PERCENT
RELATIVE
COMP. R E M A R K $
90C
Col loge
RETEST
blvd
#490R
W lane 87+00'
..
.
5-9
..
7.3
.
1-335. '141.0
. . -
95
.
. 95
: RETEST #490B'
Complies
492B
College
RETEST
blvd W lane
#492A" ---
93+00
. 57 7.3 135.5 141.0 95 : 96
RETEST #492A
Compliec
493B
.College
RETEST
-blvd
#493A
W lane 96+00 .
.
.
. .
:
5.6 7.3 .
.
133.8 141.0 95 95 .
. RETEST #493A
Complic.
494B
College
RETEST
blvd W lane
# 494A .
98+00 . . .
5
. . .
. .7.3 135..2
0
141.0
0
95
.
96
RETEST #494A
Cnmpliec
495 College blvd 70+25 E lane 9'F -of Cl-6.0. 7.3 134.0 ..... 141.0 ..9 . 9 Compliec
496 College blvd 73+)) E lane 6'E of CL 6.1 7.3 .135.3 .141.0 .95 96 Complies
497 . College _blvd 79+00_Elane.i.0'Wof _CL .6.5 7.3, 1.36.7 141.0 95 97 Complies
498 College blvd 79+00Elane.8'E_ofcL.: 5•5 731 135.6 141.0 95 96 0
"Complies_'
499 College blvd824-DOE lane 10'WofCL 7.7. 7.3 138.0 141.0 95 .98 .Complies
500 College blvd 84+00E lane 7'EofCL 7.7 1 7.3 133.6 141.0 95 . 95 1 Complies
- THE ABOVE TEST RESULTS AND CALCULATIONS' CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM - 0
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO, FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
n 1 1 nnr k 1 tn-I 4 n,nv.n t,nmnn + r fl.tt•S •)
-r EST L 0 C A T I 0 N
IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP.
R E M A R K S
11-14 .
501 College blvd 85+00 E lane 6.4 . 7.3 . 137.3 141.0 95 98 Complies
502 College blvd 88+00 ,E lane 5.7 7.3 136-.3 141.0 95 97 Complies
503 College blvd 91+00 E lane. 6.6 7.3 138.2 141.0 95 98 Complies
504 College blvd 93+00 Elane 6.9 7.3 134.3 141-0 9-s 96 Complies
505 College blvd 98+00 E lane 5.8 7.3 134.9 141.0 95 96 Complies
506 College blvd 98+00 E lane 6.2 .7 .3 135.7 141 0 95 97 Comp1ic
t TESTING ENGINEERS. SAN DIEGO
1 )+ City of .Carlsbad REVIEWED BY
11)NBS/Lowry7
Steven P. Kob"~#, North County Branch Manager
Testing Engineers—San Diego r A Division of United States Testing Company, Inc. !It14\
3467 Kurtz St., P.O..-Box 80985, San Diego, Ca 92138 (619) 225-9641
I =) 2956 Industry Street, Oceanside, California 92054 (619) 757-0248
/
DAILY RESULTS- IN PLACE DENSITY TESTS
DATE OFTEST 11 - 17-87 JOB DATACarisbad,_CA
FILE No 5259 PROJECT _Coil PRP H1 Uri
LAB. No_08'7 -589 DATE OF REPORT 12-1 5-87 CONTRACTOR_
EST
-
LOG AT 10 N
IN
PLACE
OPTIMUM .- MOIST.
IN PLACE.
DRY
MAX. DRY
DENSITY .
PERCENT
REL. COMP
PERCENT
RELATIVE - R E MA R K $
'40 MOIST DENSITY REQUIRED COMP
- College Blvd S approach to college
07 58'W __ofCenterline _El___Camino 4.6 7__3 127__6 141 95 91 Does __n0t_6mp1y
- Real 240'S ofc Centerline Colleg
College Blvd S approach to coil age
50 1 W_of _CLEl _Camino __Real_120'S 5_7 7_ 13 _1 A141 95 Compiis
of Centerline College
College Blvd S approach to Coil age
09 20'S__of. _CL College, 48'Wof_CL 5.2 7___3 128 _3 141 95 91 Does not _comply
1l Camino Real
I THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY -TESTING ENGINEERS-SAN. DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. S
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB' CONTROL.
TEST No. . ,L 0 C A T I 0 N IN
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY,
DENSITY
MAX. DaY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
510 CbU€ rrsiiai 59+50 c -iter1ine 22.7 14.0 95.5 117.0 90 82 Does rot coiply
511 College nhan 66+50 citer1ar .15 .6 14 0 100.3 117.0 90 86 Does rot crrrply
512 / College rre±iar 85+00 cmterLr 16.8 12.1 '105.2 121 .0, 90 87 Does rot amply
513 College 93+00 16.4 12.1 105.2 121.0 90 87 cr not a5rply
514 College rraan 81+75 17.3 12.1 10.2 .1 121.0 90 84 Does rot cxrp1y
515 College niian75+75 13.0 14.0 104.7 117.0 90 90 CbTpLies
50A It1±St #507
0b11Eg9 S ajprtath 240'S of CL GaUegp .
6.2 7.3. 131.3 141.0 95
*
93 [)srrjt crjrnly 1LST #507
507B
college S approach 240'S of CL College
ju±r #507A 5.6 7.3 135.9 141.0 95 97 CarpLies FE= #507A
508A
Cb11€g B1d S approach to College 50-W of CL
El Canino Fbal 120'S of CL itu±si #508 6.9 7.3 135.9 141.0 95 96 OXPLies iaisr #508
516 chi N prn±1 275'N of cmt-r1ir Cb11e 5.2 7.3 133.6 141.0 95 95 Omplies
517 College N approach 125'N of cterLre Cb11ejj 6.3 7.3 135.0 141.0 95 96 Cbiplaes
509A
cb1kg 6gr03th oenterline of college
ktithsr#509 6.5
-
7.3 135.2 141.0 95 96 - 03TPlies
--
tc - -
City_of Car-1--bad
- TESTING ENGINEERS-SAN DIEGO
1)_ REVIEWED BY
"St P. Kbbzef¼\
Nrth Canty Br
iiJI Testing Engineers—San Diego
A Division of United States Testing Company, Inc. : in
J 3467 Kurtz St., P.O. Box 80985,.SanDiego, Ca. 92.138(619)225-9641.
- 2956 Industry Street Oceanside, California 92054 (619) 757-0248
DAILY RESULTS- IN PLACE DENSITY TESTS
DATE OF TEST 17f_R/97 - LOCATION Cr1Fhd
FLE No.___5295 _________________ PROJECT OaLlegg B1'vd., PEO1t #3188
"a. NO 087-592 DATE OF REPORT '12-15-87 CONTRACTOR
TEST
NO. L 0 C A T I 0 N - IN -
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. DRY DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT.
RELATIVE.
COMP.
. 0
'. R E M -A R K $
-
518 6 QD]J. tsie 75+50 16.3 14 1 :108.8 117.0 90 93 Omphes
519 10aUeq'e' Etse 70+00 12.3 14.1 107 9 117.0' 90 100 OjrpLies
520 Cb11€cje EtsaIe 68+05 16.6 14 1 101.5 117 0 90 87 Does rot cxjrply
521 0b1kg Estse 62+75 14.9
--
14.1 109.7 117.0 90 94 Qj-rp1i
522 Cb11egEstsaei158+00 12.3
-
14_1 —_103 9 117.0 90 89 DDes rot airply
523 Cb1J. Estsiie 56~00 14.2 14.1 103.8 117.0 90 89 Doesnot (X)Tply
524 QU€gEstside97+80 16_4 14_1 98_6 117_0 90 84 Des not arp1y
525 0b11e Etsice 92-i-02 189 14_1 101_0 117_0 90 86 Does
526 apilece Fts89+50 19_5 14_1 101_7 117_0 90 87 Et not a:nply
527 CaLlege_Etside604-10 14_7 14_1 107_7 117_0 90 92 Cbrplaes
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS SAN DIEGO FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL
Cb11a B1sxL. Prrrie± #3188 . . 7
TEST
No.
' -
L 0 C A T I 0 N -
N,
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE
DRY
DENSITY
MAX. Dnv
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE
COMP. REMARKS
528 Bastside 4- 203 14.1 97.6 ' 117.0 90 83 Does rot xnp1y
529 aDllegee B.h.d Fstske 78+10 19.2 14.1 . 96.3 117.0 90 82 Does rot apply
523A 0b11Etsie56+00 ii±sr#523 16.2 14.1 110.4 117.0 90 94 applies FEIESr#523
322A Cb11B Et 58+00 ktfl±1#522 12.0 14.1 108.9 117.0 90 93 1np1 i-€i±si #522
320A GaUege Etskè 68+05 1ai±3r #520 18.7 14.1 112.6 117.0 90 96 03Tp1i taBr #520
529A CbJJ Eastsice 78+.50 Fui±5r #529 16.6 14.1 107.3 117.0 90 92 - applies ttaisi #529
528A \ Cb1J.. Etsice 85+00 ktLEi #528 , 14.7' 14.1 107.7 117.0 90 92 applies r #528
526A sr#526 1 17.6 14.1 100.7 117.0 90 ' 92 anpUes. k11'#526
12-8
524A Opllege Wests.i92+05 Fiusr#524 " . 11.6 14.1 118.7 117.0 90' 100applies' H=#524
523A 3D11j Untsicb 97+80 IIST #523 21 .7, 14.1 101.6 117.0 90 89 DDes not apply' bU]S1 #523
530 3a11eg tAts1de 961-00 10.7 14.1 120.7 117.0 90 100 1tTp1a
531 DaUgge Westside89+25 ' 15.7 , 14.1
, ,
111.1 ' 117.0 90 95 applies
p.
College Blvd., Proje± #3188 . . Page 3
TEST IN OPTIMUM IN PLACE MAX. DRY - PERCENT PERCENT No L 0 C A T I 0 N PLACE
MOIST. '
MOIST.
-
DRY
DENSITY.
DENSITY REL. COMP. REQUIRED
RELATIVE
COMP. R E M A R K $
532 CtUBft Bh.d 83+75 ts3 ç .11 .7 14.1 117.7 117.0 90 1(0 CaThes
%.
4
.1
tc
1) City of C~ir1sh1 . -- . . . .
TESTING ENGINEERS -SAN DIEGO
REVIEWED BY
-
Stoven Vc
brth
.
- -.
ii Testing Engineers—San Diego
A Division of United States Testing Company, Inc.
3467 Kurtz St., P.O.Box 80985, San Diego, Ca. 92138 (619) 225-9641
2956 Industry Street, Oceanside, California 92054 (619) 757-0248
DAILY RESULTS 1,N F.A'CE DENSITY -TESTS
DATE OF TEST 12/9-15/87 ' LOCATION Carlsbad .
FILE No. 5295' S ' PROJECT College Blvd Project #3188
L..o. No. 087-654 DATE OF REPORT 12J2/R7 ' 'CONTRACTOR
TEST
NO. L 0 C A T I 0 N IN
PLACE OPTIMUM
MOIST. IN PLACE
DRY
MAX. DRY
DENSITY PERCENT REL. COMP.
PERCENT
RELATIVE ' R E M A R K S MOIST. DENSITY REQUIRED COMP. (sidewalk)
533 El camino Real120'N of _College.blvd 10.1 .7.3 123.9 141.0 '90 88 Does not comply (sidewalk).
534 El Camino Real 60'NofCollege'Blvd 19.7 17.5 '106.3 112.0 90 95 Complies
12-9 NUCLEAR DNSITY '. . .
. _, . .... (sidewalk)'
535 ElCamino Real 0+130Eof College Blvd 5.1 7.3 128.1 141.0 ' 90 91 Ccfnplies (sidewalk.)
536 El Camino Real 0+080EofCollege _Blvd 7.7 7.3 125.1 141.0 90 ' 89 , Does not _caiiply ('sidewalk)
537 ElCaminoRealQ+030EofCollegeBlvd 10.7 7.3 111.3
,
118.0 90 95 Complies L2-10
538 sidewalk83+00Elane 26 _3 23 _5 87 _0 104__0 90 84 Doesnotcomply
539 sidèwalk'73+50E lane ' _',, 21.0. 20.5" 96.3 108.0 90 ' 90 ' Complies _.
540 sidewalk 66+50E lane ', 23.6 23.5 .. 9.1 104.0 90 _.' 86 Does not cariply
541 55+50 sidewalk E lane 22.4 23.5 92.8 104.0 . 90_- 89 ' Doesnotcomply
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FA
C
T
U
A
L
D
A
T
A
D
E
R
I
V
E
D
F
R
O
M
TESTS MADE BY TESTING ENGINEERS. SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED P
R
O
C
E
D
U
R
E
S
.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
College Blvd Project #3188 _______ _________ •. Page 2 _____ _________ _________ TEST
No. L 0 C A T 1 0 N IN,
PLACE
MOIST.
OPTIMUM
MOIST.
IN PLACE - :DRY
DENSITY
MAX. DRY
DENSITY
PERCENT
REL. COMP.
REQUIRED
PERCENT
RELATIVE COMP. R E M A R K S
542
Telephone line crossing - Thtersection
College Palomar Airport Rd. -
of
: 4.7 8.5 127.5 :138.0 95 93 Does not comply
543
Telephone crossing -Intersection of •
College & Palomar Airport Rd. 4.1 8.5 131'.O 138.0 95. 95 Ccniplies
7
- -, • - • TESTING ENGINEERS. SAN DIEGO
1) City of Carlsbad - -
REVIEWED BY -.
1) NBS/Lowry • - - -
-•
• : - - -- -
Steven P.. Kobze'
- - • ,
-
- f'Iofth County Branch Manager,
- - .-- - -
- I
co LU GO
01
U
LU —)
1
fIJI Testing Engineers-San Diego
A Division of United States Testing m Copany Inc
- 3467 Kurtz St,PO Box 80985, San Diego, Ca 92138(619)225-9641
EIIIIIJ 2956 Industry Street, Oceanside California 92054 (619) 757-0248
DAILY RESULTS IN. PLACE DENSITY TESTS
DATE OF TEST 11/17-18/87 - LOCATION Cr1shd
FILE No 5259 PROJECT_College Blvd.,Improvements
LAB. No. 088120 DATE OF REPORT-1/2 0/88 CONTRACTOR
TEST
NO. L 0 C A T I 0 N IN PLACE
OPTIMUM . MOIST. IN PLACE - DRY MAX. DRY
DENSITY PERCENT
REL. COMP.
PERCENT
RELATIVE . . REMARKS MOIST. . DENSITY REQUIRED COMP; 11/17 College Blvd South approach 58'W of
. . 544 centerline El Camino Real 240'S of CL 4.6 197 A. 1 IL 1 .0 95 91 . Does not complyL" S. approach 50'W of. centerline El
545 Camin6 Real 120'S of- centerline Col1e e 5.7 7.3 133.1 141.0 95 95 Complies
S approach 20'S of centerline College
546 48'W of centerline El Carnino Real 5.2 . / 7.3 . 128.3 141.0 95 91 .. Does not comply/
547 College median St# 59+50 centerline 22 7 14 0 95.5 117.0 90 82 Does not comply.
548 College median St/I 66+50 centerline 15.6 - 14.0 100.3 117.0 90 86 Does not comply
549 College median St/I 88+00 centerline 16.8 12.1 105 2 121.0. 90 87 Does not comply /
Does not comply' 550 '. College median SO 93+00 16.4 12.1. 105.2 121.0 90 .. .87
551 College median St/I81+75 . . 17.3 12.1 102.1 121.0 90 . 84 Does not comply
552 College Median St/I75+75 : . 13.0 14.0 . 104.7 117.0 90 . 90 . Complies 11/18 Retest #544 S approach 240'S of
544A centerlineCollege _.. .6.2 -..7.3 _- 131.3 141.0 95 .93 - Does •not.complyRetest544
THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE.THE REPORTING OF FACTUAL DATA DERIVED FROM
TESTS MADE BY TESTING ENGINEERS-SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES.
THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL.
College Blvd, Improvements ..
Page 2
TEST . . . ,. S LO C A 1- I 0 N . ..
. - IN, ,. PLACE
OPTIMUM
MOIST.. It'd PLACE
Day
MAX. DAY
DENSITY .
PERCENT REL. COMP.
PERCENT
RELATIVE . R E M A R 1< s -
. MOIST. . DENSITY REQUIRED COMP. 240'S of centerline College . .. . . . . '544B Retest 1/544A S approach -. .5.6 7.3. .135.9 141.0 95 97 Complies: Retest //544A Retest //545
545A South approach . - 6.9 7.3 .1352 141.0 95: . 96 Complies Retest //545 N approach 275'N of
553 centerline College . - - 5.2 7.3 133.6 141.0 95
- 95- Cbmplies N approach 125.'N
554 at centerline College . . . 6.3 .: 7.3 135.0 141.0 95 . 96. Complies
Retest #546 Approach centerline. .