Loading...
HomeMy WebLinkAbout3188; College Boulevard Extension; College Boulevard Extension Geotechnical Investigation; 1983-11-11SAN DIEGO SOILS ENGINEERING, INC. SOIL ENGINEERING & ENGINEERING GEOLOGY November 11, 19 83 The Roll Company 7330 Engineer Road San Diego, California Job No. SD1217-00 Log No. SD3-2779 Attention SUBJECT: 92111 Mr. Steve Mahoney PRELIMINARY GEOTECHNICAL INVESTIGATION Proposed College Boulevard Extension Carlsbad Research Center to Palomar Airport Road Carlsbad, California Gentlemen: In accordance with your request, we have completed a Prelimin- ary Geotechnical Investigation of the proposed alignment of College Boulevard between the,Carlsbad Research Center and Palo- mar Airport Road. The proposed alignment will cross property owned by the Signal Landmark Company and the Huntington Beach Company. Our investigation has utilized 40-scale, grading and improvement plans for "College Boulevard - Carlsbad Research Center" and 100-scale topographic maps prepared by Rick Engineering. I. IMTROVUCTJOM The scope of services provided during the preparation of this Prelim.inary Geotechnical Investigation included: A. Review of previous geotechnical reports and maps pertinent to the project area (See Appendix A); B. Analysis of stereographic aerial photographs to evaluate the topography and geologic structure of the area (See Appendix A); SUBSIDIARY OF IRVINE CONSULTING GROUP, INC. 6455 NANCY RIDGE DRIVE* SUITE 200» SAN DIEGO, CA 92121 •(619)587-0250 The Roll Company . Job No. SD1217-00 November 11, 1983 Log No. SD3-2779 Page Two C. Geologic mapping of existing exposures and outcrops; D. Subsurface exploration, including six bucket auger bor- ings to a maximum depth of 64 feet and 17 backhoe test pits excavated to a maximum depth of 13 feet; E. Logging and sampling-of exploratory excavations to eval- uate the geologic structure and to obtain ring and bulk samples for laboratory testing; F. Laboratory testing of samples representative of those obtained during the field investigation; G. Geologic and soils engineering analyses of field and laboratory data which provide the basis for our conclu- sions and recommendations; H. Preparation of this report and accompanying maps, cross sections and other graphics presenting our findings, con- clusions and recommendations. II. SITE VESCRIVTION The proposed 0.8 mile College Boulevard extension is planned to connect the proposed Carlsbad Research Center to the north- east and Palomar Airport Road to the southwest. The approxi- mate location and topography are shown on the Location Map, Figure 1. As depicted on the Geotechnical Map (Plates 1 and 2), the area investigated consisted of a strip up to 700 feet wide bracketing the centerline of the proposed roadway. The Roll Company . Job No. SD1217-00 November 11, 1983 Log No. SD3-2779 Page Three Topographically, the area consists of a dissected mesa with gently rolling topography at the higher elevations, bounded by steep slopes and deeply incised drainages. Natural slopes in the vicinity range from nearly flat to 1.5:1 (horizontal: vertical). Specifically, the proposed road alignment will parallel a prominent west to southwest trending ridge. The northeast and central portions of the road will be located on a gentle (5:1 to 8:1) north facing slope whereas the remainder of the road is aligned with the top of the ridge. Maximum relief on the site is 232 feet with elevations ranging from 89 feet to 321 feet above mean sea level. Access to the site is along unimproved roads from the exist- ing Carlsbad Research Center Phase 1 and from Palomar Airport Road to the southwest. The site is presently undeveloped. San Diego Gas and Electric power lines cross the central portion of the site. A City of Carlsbad Water District water main parallels the northeastern half of the roadway and crosses the site near the center por- tion of the alignment (Plates 1 and 2). The southwestern portion of the area is presently being used by off-road recre- ational vehicles. At the time of our investigation a heavy growth of tall grasses and weeds covered most of the site. The Roll Company _ Job No. SD1217-0 0 November 11, 1983 Log No. SD3-2779 Page Four III. PROPOSEV GRAVING Conventional cut and fill grading techniques will be used to provide the proposed one percent to 4.7 percent gradient for the 40 foot wide roadway. Cut slopes up to 50 feet high and fill slopes up to 45 feet high are planned with inclinations of 2:1 (horizontal:vertical). It is our understanding that all proposed slopes are to be considered temporary. II/, FIELV INVESTJGATJOh! The field investigation performed during the course of this investigation consisted of geologic reconnaissance mapping and subsurface investigation consisting of six drilled bucket auger borings and seventeen backhoe test pits. The field in- vestigation was conducted under the direct supervision of our Engineering Geologist. A truck-mounted bucket auger drill rig was used to drill six 2 4-inch diameter borings to a maximum depth of 6 4 feet. The borings were sampled, downhole logged and back-filled, with samples returned to the laboratory for testing. Logs of the borings are presented in- Appendix B. A rubber tire backhoe was used to excavate seventeen test pits to a maximum depth of 13 feet. The test pits were logged and backfilled. Logs of the trenches are presented in Appen- dix B. The Roll Company . Job No. SD1217-00 November 11, 1983 Log No. SD3-2779 Page Five 1/. LABORATORY TESTJMG Samples representative of the earth materials encountered during our field investigation were returned to the labora- tory for testing. The testing program consisted of moisture- density determinations, direct shear testing of ring and re- molded samples, and maximum density-optimum moisture determ- inations . Results and descriptions of the laboratory, tests performed are included in Appendix C. l/I. GEOLOGY A. Regional Geology The subject site is located in the Peninsular Ranges Geomorphic Province of California near the western margin of the southern California batholith. The batholith, consisting of Mesozoic granitic and metamorphic rocks, is exposed in the higher elevations. Near the Pacific coast, the batholith is overlain by Mesozoic and Cenozoic sedi- mentary rocks. Pleistocene sea level floctuations have left a series of resistant marine terrace deposits on the older sediments which, when eroded in'the Late Pleistocene and recently, have formed the dissected mesa and incised canyon landforms seen today. Specifically, the site investigated is underlain by Jur- rassic metavolcanics and Eocene sedimentary rocks. A marine terrace deposit was encountered at the higher elevations, alluvial sediments are present in the The Roll Company - Job No. SD1217-00 November 11, 19 83 Log No. SD3-2779 Page Six canyon bottoms with colluvial materials present on the slopes. A brief description of the geologic units observed within the site follows below. The distribution of the geologic units is shown on the enclosed Geotechnical Map, Plates 1 and 2. B. Geologic Units 1. Santiago Peak Volcanics (map symbol Jsp) The Jurassic Age Santiago Peak Volcanics underlie the extreme northern portion of the site. The Santiago Peak Volcanics are mildly metamorphosed volcanic rocks ranging from basalt to rhyolite. On-site, the volcanics are predominately andesitic (see B-1, Appendix B). As exposed nearby, the Santiago Peak Volcanics are moderately to highly jointed with spacings ranging from inches to feet. Most joints and fractures are clay lined. It is not anticipated that grading for the pro- posed road will encounter these materials within the area investigated. 2. Santiago Formation The Santiago Formation is the most widespread geologic unit on the site and has been divided into two units based on the different lithologies encountered in ex- ploratory excavations and in natural exposures. The Roll Company . Job No. SD1217-0 0 November 11, 1983 Log No. SD3-2779 Page Seven a. Santiago Formation Clay (map symbol Ts ,) The Santiago^Formation claystone was encountered in exploratory borings approximately between elevations 230 and 140 and consists of pale green thinly bedded claystone, red-brown, sandy to clayey siltstone and a distinctive dark blue-gray unoxi- dized sandy siltstone to sandy claystone. The Santiago claystone is locally sheared along bedding planes resulting in relatively continuous remolded clay seams or gouge zones (Borings B-1, B-2, B-4 and B-6; Appendix B). b. Santiago Formation Sandstone (map symbol Ts^) The Santiago Formation sandstone was found gen- erally between elevations 230 and 315 feet and again at elevations 142 to 96 feet above mean sea level and is composed of massive to cross- stratified, light gray silty fine to coarse sand- stone. Locally, the sandstone is interbedded with relatively thin siltstone and claystone layers. Terrace Deposit (map symbol Qt) Roughly 5 feet of red-brown silty fine sand and cobbles were encountered at the top of exploratory boring B-2. This deposit probably represents an ero- sional remnant of a marine terrace equivalent to the Lindavista Formation of southern San Diego County. Alluvium/Colluvium (map symbol Qal) Alluvium is present in a drainage at the northeast corner and in the low lying areas at the southwest The Roll Company Job No. SD1217-00 November 11, 1983 " Log No. SD3-2779 Page Eight end of the site. The alluvium consists of brown to light gray loose to soft sandy clay and clayey sand. Dark gray colluvium, formed by down slope creep and sheet wash of topsoil, mantles the slopes on the site. The thickness of the alluvium and colluvium varies across the site from 2 to 14 feet with the thicker de- posits in the vicinity of exploratory trenches T-l through T-6 (Geotechnical Map, Plate 2). 5. Possible Landsliding (map symbol Qls) Two areas of possible shallow landsliding or bedrock creep were noted in the areas of B-1 and B-4 (Geo- technical Map, Plate 1). Aerial photo analysis of these areas did not reveal clear topographic evidence of landsliding; however, anomalous bedding attitudes and remolded clay seams were noted in the upper 16 feet of B-1 and B-4 that could have resulted from down slope movement of bedrock materials. The stability of these areas should be, further evaluated during grading. Surficial landslides were noted in tributary canyons northwest of the proposed alignment and will not affect the proposed grading. Structural Geology The Santiago Formation appears to tilt gently to the west. Local variations in this trend may be attributable to cross-bedding, lense shaped beds, and channels formed dur- ing deposition of the formation. The Roll Company . Job No. SD1217-00 November 11, 1983 Log No. SD3-2779 Page Nine An apparent separation of 4 8 feet between distinctive beds in B-4 and B-6 may be the result of faulting between the two borings. Mapping by others (Appendix A) has shown numerous small and postulated faults crossing the site. Based on our investigation, the only evidence of faulting was in the area between B-4 and B-6. We have depicted a single fault trace between the borings based on aerial photographic analysis, although it is possible, how- ever, that the displacement could be a cumulative effect of several fault traces in the area. Field mapping and aerial photo analysis did not show topographic evidence commonly associated with active faulting nor was there geologic evidence indicating that the faulting was younger than the Pleistocene terrace deposits encountered at the higher elevations of the site. Further evaluation of faulting will be conducted during grading of the road when greater exposures are available. D. Groundwater Groundwater was encountered in exploratory Boring B-6 as seepage from joints and fractures. Groundwater was not encountered in any other excavations or from natural seeps or springs. Groundwater is not anticipated to adversely affect grading. If during construction, however, cut slopes expose seepage, drains may be recommended to en- hance surficial stability. E. Seismicity The site can be considered within a seismically active area, as can all of southern California. The primary effect of earthquakes on the proposed roadway will be The Roll Company . Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Ten groundshaking resulting from seismic activity on re- gional active faults. Table I lists the faults capable of creating groundshaking at the site. Because of the nature of grading (temporary cut slopes in firm bedrock and removal of soft soil beneath proposed fills, ground- shaking will have a negligible affect on the proposed alignment. A. Slope Stability A review of the proposed grading plans with respect to the geologic materials encountered during the investi- gation indicates that the proposed temporary cut slopes will expose Santiago Formation sand and clay. Because of the. difference in relative strength, the stability of the slopes will depend greatly on the type of material exposed. Because the proposed slopes are considered temporary slopes, remedial stability measures may not be necessary if regular maintenance, including clearing the roadway- of possible slope failure debris, is acceptable. Final determination of the requirement of remedial measures will be made in the field during grading by the Geotechnical Consultant. Subsequent development in the area should take into con- sideration that the slopes are temporary and that their long-term stability should be further evaluated with respect to future grading. 1. Santiago Formation Sandstone The majority of the planned slopes will be within the sandstone unit. Because the sand exhibits a relatively high shear strength and a generally un- bedded nature, the potential for deep-seated failures TABLE I SEISMICITY FOR MAJOR FAULTS FAULT Elsinore Newport-Inglewood San Jacinto San Andreas DISTANCE FROM SITE 22 Miles NE 40 Miles NW 4 5 Miles NE 66 Miles NE MAXIMUM PROBABLE, EARTHQUAKE 7.0 6.5 7.5 8.0 ESTIMATED PEAK BEDROCK, ACCELERATION' 0.18 0.06 0.11 0.09 1. Seismic Safety Study, City of San Diego (1974 and Bonilla 1970) 2. Schnabel and Seed (1973) The Roll Company • Job No. SD1217-00 November 11, 1983 Log No. SD3-2779 Page Eleven is considered low. The low cohesive nature of these materials, however, may result in erosion due to surface water runoff. The proposed surface drains and terrace will minimize the erosion. If the temporary slopes are not planted, periodic main- tenance of the road may be needed to remove washed sand and silt. 2. Santiago Formation Claystone Slopes at the southwestern and northeastern ends of the alignment will probably expose Santiago Formation clay- stone. Where remolded bedding dips out of slope, the deep-seated stability of the slopes may be reduced. These slopes should be evaluated during grading to assess the potential for instability and the need for remedial grading in the form of stabilization fills or reduced slope angles. 3. Possible Landslides Two areas, as depicted on the Geotechnical Map, Plate 1, may be underlain by landslides. The stabi- lity of cuts in these materials, will best be evaluated during grading when larger exposures will facilitate analysis. At that time, recommendations for long-term stability measures or short-term maintenance can be made. B. Compressible Soil The subject site is mantled with a variable thickness of topsoil and colluvium on slopes and ridges that are con- sidered an unsuitable bearing material for placement of The Roll Company . Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Twelve fill. Removal of these soils to firm material will be necessary to avoid settlement due to the surcharge affect of the fill. Generally, removals will be on the order of five feet, although localized areas of deeper removals should be anticipated. Alluvium/colluvium present in the southern portion of the site may necessitate removals of up to 15 feet. Expansive Soil It has been our experience that topsoil, colluvium and Santiago Formation claystone are moderately to highly expansive. It should be anticipated that relatively thick pavement sections will be recommended if these materials are exposed on the subgrade of the road bed. Suitability as Fill All on-site soils are considered suitable for reuse as fill. Santiago Formation sandstone may be suitable for use as select fill. Topsoil, colluvium and Santiago Formation claystone may be moderately to difficult to compact. The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Thirteen l/III. CONCLUSIONS ANV RECOMUENVATIONS A. General Based on the results of our Preliminary Geotechnical Investigation, we conclude that the project is feasible from a geotechnical standpoint. There are, however, two salient geotechnical conditions which may require special treatment: stability of proposed cut and fill slopes and the presence of deep alluvial deposits at the southwest end of the alignment. Although these conditions will necessitate special remedial measures, they can be successfully treated during the mass grading of the site. We conclude that the proposed development is feasible, from a geotechnical standpoint, provided the following conclusions and recommendations are incor- porated into the project plans and specifications. B. Slope Stability 1. Fill Slopes Temporary fill slopes are proposed on-site to a maximum height of about 40 feet. A 40-foot high fill slope constructed at a slope ratio of 2:1 (horizontal:vertical) should possess gross stability in excess of the generally accepted minimum engineering criteria. Fill slopes more than 30 feet in height shall have drainage terraces provided at vertical intervals not exceeding twenty-five (25) feet. Because temporary fill slopes may be subjected to several winters before grading is completed, they The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Fourteen should be built to the same standards as permanent slopes except that the paved terrace drains may be deleted. Fill slopes should be constructed in accordance with the recommendations herein and the Standard Guidelines for Grading Projects which are attached as Appendix D. It is recommended that fill slopes at 2:1 (horizontal:vertical) less than ten (10) feet in height be constructed by overfilling and cutting back to the compacted core. 2. Cut Slopes a. Santiago Peak Volcanics No cut slopes are proposed in the Santiago Peak Volcanics. b. Santiago Formation Claystone Subsurface exploration indicates that the pro- posed 30-foot high cut slopes near the southwest end of the alignment may expose materials which are considered unsuitable from a long-term slope stability standpoint. It is anticipated that a stabilization fill with a key width equal to one- half the slope height will be recommended at this location. The stabilization fill should be con- structed with backdrains in accordance with the typical details in the attached Appendix D, Standard Guidelines for Geotechnical Projects. Final determination of the requirement for stabi- lization will be made by the Geotechnical Consultant during grading. Continuous geologic observation of the cuts in progress is essential. The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Fifteen c. Santiago Formation Sandstone Santiago Formation sandstone will be exposed in a major 60-foot high cut slope in the central portion of the site. It is not anticipated that stabilization will be required in these areas. Final determination of the need for stabilization will be made in the field by the Geotechnical Consultant at the time of grading. d. Quaternary Terrace Deposits The Quaternary Terrace Deposits will be exposed in the upper portion of slopes proposed along the central portion of the site. It is not anticipated that stabilization measures will be required in these areas. Final determination of the need for stabilization will be made in the field by the Geotechnical Consultant during grading. 3. Construction Slopes Construction slopes in the Santiago Formation are recommended at slope ratios of 1.5:1 to heights up to 30 feet. Above that height, construction slopes are recommended at slope ratios of 2:1 (horizontal: vertical). These recommended ratios can be steepened if the possibility of construction sliding is acceptable. C. Treatment of Alluvium Alluvium is present in the canyon bottom areas on-site and will require remedial treatment prior to fill The Roll Company Job No; SDI217-00 November 11, 1983 Log No:, SD3-2779 Page Sixteen placement. It is recommended that loose, porous or saturated alluvium be removed to firm ground prior to fill placement. For budgeting purposes, it should be considered that all alluvium will be removed to bedrock. Alluvium was observed to depths of about 15 feet near Palomar Airport Road. If a delay between the completion of grading and future construction is acceptable, sur- charging is an acceptable alternative to alluvial removal in this area. Our analysis indicates that a surcharge of about 15 feet would result in about six months of delay after grading before subsequent construction could proceed. The surcharge operation will require fill placement to an elevation of 15 feet above proposed finished grade. The surcharge fill should be compacted to two (2) feet above proposed finish grade and then placed as stock- pile. Settlement markers should be installed for moni- toring after grading. Our preliminary calculations indicate that enough con- solidation should occur within six months of the end of grading to allow construction to proceed in the surcharge area. Final determination of the settlement period will, of course, be determined by analysis of the settlement. D. Grading and Earthwork 1. Inspection Continuous inspection by a geotechnical team (Soils Engineer and Engineering Geologist) during grading The Roll Company job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Seventeen is essential to confirm conditions anticipated by the preliminary investigation and to provide data to adjust designs to actual conditions encountered during grading. 2. Clearing and Grubbing Prior to grading, the site should be cleared of surface obstructions and stripped of brush and vegetation. Vegetation from the clearing opera- tions should be removed from the site. Obstructions extending below finish grade should be removed and replaced with compacted fill. 3. Site Preparation a. Treatment of Surface Soils Test excavations indicate that three to four feet of surficial soils are present on-site. The upper portions of the surface soils are generally dry and porous. It is recommended that in fill areas flatter than 5:1 (horizontal:vertical) the upper two feet of surface soils be overexcavated in areas to receive fill. In areas steeper than 5:1 (horizontal:vertical), all topsoil will be re- moved during the benching operation. Final determination of removal depths will be made by the Geotechnical Consultant during grading. b. Existing Fill Soils It is recommended that all areas of existing un- controlled fill be overexcavated in areas to receive fill. The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Eighteen Treatment of Alluvium It is recommended that alluvium be removed or surcharged in accordance with the afore- mentioned recommendations. d. Scarification and Processing of Surface Soils Following overexcavation of unsuitable' materials, areas to receive fill and/or other improvements should be scarified to a depth of 6 to 8-inches, brought to near optimum moisture conditions and compacted to at least ninety percent relative com- paction . Compaction and Method of Filling Fill placed at the site should be compacted to a minimum relative compaction of 90 percent, based on ASTM Laboratory Test Designation D 1557-70, Fill should be compacted by mechanical means in uniform lifts of 6 to 8-inches in thickness. Fills constructed on natural slopes steeper than 5:1 (horizontal:vertical) should be keyed and benched into bedrock or competent natural ground. Compaction of slopes should be achieved by overbuilding the slopes laterally and then cutting back to the compacted core at design line and grade. Although overbuilding and cutting back is the preferred method, fill slopes may be back rolled at intervals not greater than The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Nineteen four feet as the fill is placed, followed by final compaction of the entire slopes.' Feathering of fill over the tops of slopes should not be permitted. Fills should also be placed and all grading per- formed in accordance with the City of Carlsbad's Grading Ordinance and the requirements of the Uniform Building Code. 5. Import Fill Material Presently, it is not anticipated that import fill materials will be required. If necessary, however, the type of material considered most desirable for import is a non-expansive well-graded granular material with minor silt and clay fractions. The Geotechnical Consultant should be contacted for evaluation of individual import sources well in advance of planned import operations. 6. Shrinkage, Bulking and Subsidence Volumetric shrinkage for the topsoil is estimated to be from 15 to 20 percent. Shrinkage in the alluvium is estimated to be from 10 to 15 percent. Santiago Formation bedrock is expected to bulk from 0 to 5 percent. Because alluvium and porous topsoil are being re- moved in most of the canyon areas, subsidence there due to equipment will be negligible. Subsidence will occur in the surcharge area, and adjustments will be made during future grading. The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Twenty Due to the fact that shrinkage and subsidence can vary with many factors, it is recommended that the above values only be used for preliminary planning purposes. To provide for unforeseen variations in actual quantities, a "balance area" should be designated by the Project Civil Engineer. E. Surface and Subsurface Drainage Surface run-off into downslope natural areas and graded areas should be minimized. Where possible, drainage should be directed to suitable disposal areas. Subdrains should be placed under all fills placed in drainage courses and at identified or potential seepage areas. Their specific locations will be determined in the field during grading. General subdrain locations will be indicated on the approved grading plan. The subdrain installation should be reviewed by the Engineering Geologist prior to fill placement. Typical subdrain details are presented in Appendix D. Standard Guidelines for Grading Projects. Subdrain pipes may be coated metal, P.V.C., or approved equiva- lent (crush strength of 1000 pounds/foot or greater). Drainage devices will be recommended behind buttresses and/or stabilization fills to minimize the build-up of hydrostatic and/or seepage forces. The details and recommended locations of these backdrains are presented in Appendix D. Standard Guidelines for Grading Projects. Depending on slope height, more than one tier of drains The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Twenty-One Pavements Due to generally poor subgrade characteristics of the predominant soil types, generally heavy pavement sec- tions can be anticipated. For traffic index values of 7.0, 8.0 and 8.5 which are expected for the street areas, the following preliminary pavement sections can be utilized for planning purposes. Traffic Index 7.0 8.0 8.5 R-Value 7.0 7.0 7.0 Pavement Thickness 4" 4" 5" Aggregate Base 15" 18" 19" Total Thickness 19" 22" 24" From review of the above sections, it is apparent that street areas during rough grading should be kept about two feet low to accommodate the pavement sections. Pavement recommendations should be reviewed as final grades are achieved. Utility Trench Backfill Utility trench backfill should, unless otherwise re- commended, be compacted by mechanical means. Unless otherwise recommended, the degree of compaction should be a minimum of 90% of the laboratory maximum density. As an alternative, granular material (Sand Equivalent greater than 30) may be thoroughly jetted in-place. Jetting should only be considered to apply to trenches no greater than two feet in width and four feet in depth. Following jetting operations, trench backfill should be thoroughly mechanically compacted and/or wheelrolled from the surface. I The Roll Company Job No: SD1217-00 November 11, 1983 Log No: SD3-2779 Page Twenty-Two H. Grading Plan Review When final grading plans for the proposed development are completed, the plans should be reviewed by the Geotechnical Consultant to determine compliance with the recommendations presented herein. Substantial changes from the present plan may necessitate addi- tional investigation and analyses. I. Limitations of Investigation Our investigation was performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable Soils Engineers and Geologists practicing'in this or similar localities. No other warranty, express or implied, is made as to the conclusions and professional advice included in this report. The samples taken and used for testing and observations made are believed representative of the entire area. How- ever, soil and geologic conditions can vary significantly between borings, test pits and surface outcrops. As in most major grading projects, conditions revealed by excavation may be at variance with preliminary findings. If this occurs, the changed conditions must be evaluated The Roll Company November 11, 19 8 3 Job No: SD1217-00 Log No: SD3-2779 Page Twenty-Three by the Geotechnical Consultant and designs adjusted or alternate designs recommended. Very truly yours, SAN DIEGa SOILS ENGINEERING, INC, W. Lee Vanderhurst, C.E.G. 1125 Senior Geologist Tara S. Sikh, R.C.E. 35454 Senior Engineer WLV:TSS:SWJ:llr Reviewed by Stefohen W Manager, p Jensen, C.E.G. 1074 ologic Services Enclosures Appendix A, References Appendix B, Subsurface Exploration Logs of Borings, Figures B-2 through B-27 Appendix C, Laboratory Testing Appendix D, Standard Guidelines for Grading Distribution: (6) Addressee APPENDIX A REFERENCES 1. "Eocene and Related Geology of a Portion of the San Luis Rey and Encinitas Quadrangles, San Diego County," December 1972: University of California, Riverside, Masters Thesis prepared by R. L. Wilson; 2. Mines and Mineral Resources of San Diego County, 1963: California Division of Mines and Geology, County Report 3; 3. "Accelerations in Rocks for Earthquakes in the Western United States," Bulletin of the Seismological Society of America, Vol. 63, No. 2, Schnabel and Seed, April 1973; 4. Fault Hazard Zones in California, Revised January 1977: California Division of Mines and Geology, Special Publica- tion 42; 5. "Fault Map of California," 1975: California Division of Mines and Geology, Geologic Data Map No. 1; 6. "Repeatable High Ground Accelerations from Earthquakes," California Geology, California Division of Mines and Geology, Ploessel and Slosson, September 1974; 7. Clay Mineralogy and Slope Stability, Special Report 133, California Division of Mines and Geology, 1977; 8. Seismicity of the Southern California Region 1932-1972, 1973: California Institute of Technology, Seismological Laboratory; 9. "100-Acre Site, Palomar Airport Road, Carlsbad, California, Soil and Geologic Feasibility Study," January 1980, Geocon Inc. ; 10. "Supplemental Preliminary Geotechnical Investigation, Carlsbad Research Center Phases II and Iii," July 1982, San Diego Soils Engineering, Inc.; 11. "Aerial Photographs," USDA Flight AXN-8M, 1953, Photo Nos. 71-73, 99-101. APPENDIX B SUBSURFACE EXPLORATION The subsurface exploration consisted of six borings to a maxi- mum depth of 64 feet and 17 test pits excavated to a maximum depth of 135 feet. The borings were drilled with a truck-mounted bucket auger drill rig and the pits were excavated with a rubber tire- mounted backhoe. The subsurface exploration was conducted under the direction of the Engineering Geologist. The borings and pits were logged, sampled and backfilled. Samples of the materials encountered were returned to the laboratory for testing. Logs of our borings are presented as Figures B-2 through B-10. The logs of test pits are presented as Figures B-11 through B-27. The locations of the borings and pits included in this appendix are shown on the attached Geotechnical Map, Plate No. 1 and 2. California Sampler blow counts were obtained by driving a 2.625- inch, inside diameter sampler with a hammer dropping through a 12-inch free fall. A 3770-pound hammer was used at depths less than 30 feet, a 2570-pound hammer was used to depths of 60 feet. Unless otherwise shown, the blows per foot recorded on the Boring Logs represent the number of blows used to drive the sampler 12-inches. Samples shown on the Boring Logs as "UNDISTURBED SAMPLES" were obtained with the California Sampler. PR IMARY DIVISIONS GROUP SYMBCX. SECOi-VUARY DIVISIONS COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE GRAVELS MORE THAN HALF OF COARSE FRACTION IS LARGER THAN NO. 4 SIEVE CLEAN GRAVELS GW Well graded gr.ivels gcuv/cl-s.ind ninturei. liUie 0' no fines COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE GRAVELS MORE THAN HALF OF COARSE FRACTION IS LARGER THAN NO. 4 SIEVE CLESS THAN 5% FINF.S) GP Poorly giaded gravels oi grjvel-sjnd nmiures liiile or no fines. COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE GRAVELS MORE THAN HALF OF COARSE FRACTION IS LARGER THAN NO. 4 SIEVE GRAVEL WITH FINES GM Silty gravels, griivel-sand-sill mixiurcs. non-plastic fines COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE GRAVELS MORE THAN HALF OF COARSE FRACTION IS LARGER THAN NO. 4 SIEVE GRAVEL WITH FINES GO Clayey gravels, gravel-sand-clay mniures. plastic fmes COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE SANOS MORE THAN HALF OF COARSE FRACTION IS SMALLER THAN NO. 4 SIEVE CLEAN SANDS (LESS THAN 5% FINES) SW Well graded sands, gravelly sands, little or no tines. COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE SANOS MORE THAN HALF OF COARSE FRACTION IS SMALLER THAN NO. 4 SIEVE CLEAN SANDS (LESS THAN 5% FINES) SP Poorly graded sands or gravelly sands, little or no fires COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE SANOS MORE THAN HALF OF COARSE FRACTION IS SMALLER THAN NO. 4 SIEVE SANOS WITH FINES SM Silty sands, sand-silt mixtures, non-plastic fines. COARSE GRAINED SOILS MORE THAN HALF OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE SANOS MORE THAN HALF OF COARSE FRACTION IS SMALLER THAN NO. 4 SIEVE SANOS WITH FINES SC Clayey sands, sand-clay miittures. plastic fines. FINE GRAINED SOILS MORE THAN HALF OF MATERIAL IS SMALLER THAN NO, 200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS LESS THAN 50% ML Inorganic silis and very fme sands, rock Hour si'ty or clayey fine sands or clayey silts with slight plasticity. FINE GRAINED SOILS MORE THAN HALF OF MATERIAL IS SMALLER THAN NO, 200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS LESS THAN 50% CL Inorganic cla\-s of low to medium plasticity, gravelly clays, sandy clays, silly clays, lean clays FINE GRAINED SOILS MORE THAN HALF OF MATERIAL IS SMALLER THAN NO, 200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS LESS THAN 50% OL Organic silts and organic silty clays of low plasticity FINE GRAINED SOILS MORE THAN HALF OF MATERIAL IS SMALLER THAN NO, 200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS GREATER THAN 50% MH Inorganic sills, micaceous or diatomaceous fine sandy or silly soils, elastic silts. FINE GRAINED SOILS MORE THAN HALF OF MATERIAL IS SMALLER THAN NO, 200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS GREATER THAN 50% CH Inorganic clays of high plasticity, fat clays. FINE GRAINED SOILS MORE THAN HALF OF MATERIAL IS SMALLER THAN NO, 200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS GREATER THAN 50% OH Organic Clays of medium to high plasticity, organic silts. HIGHLY ORGANIC SOILS Pt Peat and other highly organic soils. 200 DEFINITION OF TERMS U S. STANDARD SERIES SIEVE 40 10 CLEAR SQUARE SIEVE OPENINGS 3/4" 3". 12" SILTS AND CLAYS SAND FINE MEDIUM COARSE GRAVEL FINE COARSE COBBLES BOULDERS GRAIN SIZES SANDS.GRAVELS AND NON-PLASTIC SILTS BLOWS/FOOT * VERY LOOSE 0-4 LOOSE 4-10 MFOIUM DENSE 10-30 DENSE 30-50 VERY DENSE OVER 50 CLAYS AND PLASTIC SILTS STRENGTH* BLOWS/FOOT* VERY SOFT 0 - 1/4 0-2 SOFT 1/4 - 1/2 2-4 FIRM 1/2 - 1 4-8 STIFF 1 - 2 8-16 VERY STIFF 2-4 16-32 HARD OVER 4 OVER 32 RELATIVE DENSITY CONSISTENCY Number of blows of 140 pound hammer falling 30 inches to drive a 2 inch 0 0 (1-3/8 inch I 0) split spoon (ASTM D-I586). ^Unconfmed compressive strength m tons/sq. ft as determined by laboratory testing or approximated by the standard penetration lest CASTM D-1586). pocket penetrometer, torvane. or visual observation KEY TO EXPLORATORY BORING LOGS Unified Soil Classification System (ASTM D-2487) JOB NO.: , _ 1217-00 DATE; NOVEMBER, 1983 FIGURE: B-1 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED: ' 10/17/83 METHOD OF DRii I iNd- Bucket Auger LOGGED BY: LV .GROUND ELEVATION:. 258 LOCATION: Geotechnical Map P UJ 11. a UJ o < u CO o o UJ CQ UJ OCJ Q05 Z 3 uj*£ (OUJ Oz 20 u tto Oo. BORING NO L DESCRIPTION SOIL TEST CL TOPSOIL; Gray brown silty sandy CLAY; 10- 15- 20- 25- 30- 35- 40- CL Push SM- CL CL SM CL-j ML moist, medium stiff, rootlets, desic- cated 16.3 L09.C COLLUVIUM: Dark olive brown, slightly Consolidation sandy silty CLAY; moist, medium stiff, remolded, massive SANTIAGO FM; Paid greenish-yellow, 9.1 115, 14.8 112, mottled orange and olive-brown, sandy . CLAY and silty SAND mix, moist, very stiff, dense, less clayey with depth, 0 8' manganese oxide stained bedding over calcite cemented zone; horizontal @ 10' gradational to light red-brown, silty, medium to fine SAND, moist, very dense Pale green to olive, silty CLAY; moist, very stiff, remolded at contact with sand, N-S, 5°-10° W thinly bedded iron oxide and sulfide stain on bedding, E-W 4°-6° N, locally remolded, gypsum seams 14.9 Gray mottled orange, silty fine SAND; moist, very dense, thin interbeds of silty clay; E-W, 8° S L7.9 L08.? Olive silty CLAY - clayey SILT; moist, very stiff, thinly bedded and locally sheared along bedding; N-S, 5° W, be- comes massive and very hard @ 21' with randomly oriented discontinuous gypsum seams @ 26' becomes dark reddish-gray Maximum density, Shear test SANTIAGO PEAK VOLCANICS; Dark green hard aphanitic metavolcanic rock, clay- filled fractures § 6" spacing Total Depth 32' REFUSAL No Seepage No Caving Geologically logged to 30' Backfilled 10/17/83 JOB NO.: 1217-00 LOG OF BORING FIGURE: B-2 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED: 10/17/83 METHOD OF DRILLING- Bucket Auger LOGGED BY: LV .GROUND ELEVATION: 321 LOCATION: See Geotechnical Map P UI UJ IL X »- CL UJ o -0' o Ui OQ m cr_j 30. UJ -I o. < 0> Ml a:' OJUJ Oz O BORING NO i DESCRIPTION SOIL TEST SM TERRACE: Light brown silty fine SAND; X damp, dense, abundant cobbles to 6" diameter, poorly cemented from 2'-4' 5-Contact; Horizontal SM 9.3L22.e SANTIAGO FM: Pale yellow-gray, slightly 10- silty fine SAND; moist, very dense, local indistinct, lamination; horizon- tal @ 8' becomes coarse sand with scat- tered gravel, moderately cemented locally Is CL 16 X SP SM 20- 26- 11.5 more gravel with depth meter Contact; N-S, 12° E up to 3" dia- Dark olive-gray silty CLAY; moist, very stiff, hard, sheared at random orien- tation; @ 14' grades to olive-gray, silty fine SAND, moist-very moist, very dense Red-brown, slightly silty, medium to coarse SAND; moist, dense. Bedding; N-S, 20° W, highly irregular contact; 40 - 60° S dip Pale olive-gray silty fine SAND; moist, dense. Bedding; N 70 W, 4° S rnnt^pt; N 45 -^Q g SP 9.2 119. Yellow-gray slightly silty fine SAND; moist, dense, massive, poorly graded 30- 36- 40- JOB NO.: (3 32' bedding; N 60 E, 6° S 0 40' bedding; horizontal 1217-00 LOG OF BORING FIGURE: B-3 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED:__10Z11Z83_ METHOD OF DRILLING: Bucket Auger LOGGED RY- ^'^ GROUND ELEVATION: • I nPATioN- See Geotechnical Map a Ui o 40- CO UJ a:_j 30. ^1 z 3 UJS Oz 20 o > u. Co Oa < t -J w °-z BORING NO 2_ (CONTINUED) DESCRIPTION SOIL TEST SM SANTIAGO FM; Dark gray-brown fine SAND; damp, very dense (3 42' grades to yellow-gray silty fine SAND;, moist, very dense, massive 45-X 50- 55- 60- 65 Total Depth 64' No Seepage No Caving Geologically Logged to 62' Backfilled 10/17/83 70 75 80- JOB NO.: 1217-00 LOG OF BORING FIGURE: B-4 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/18/83 METHOD OF DRILLING: Bucket Auger LOGGED BY:. LV .GROUND ELEVATION:. 288 LOCATION: See Geotechnical Map P Ul UI -0' CO CO o O u. O CO Q UI CO HI a:_i 30. z 3 UI _l 0. 2 < 0) 3 CO UJ ^ h- Z coju Oz So o >-lJ. OQ. it BORING NO. DESCRIPTION SOIL TEST CL SC ML 10- TOPSOIL; Gray-brown slightly sandy silty CLAY; moist, stiff, porous, roots, less granular with depth gradational contact SANTIAGO FM; Light gray clayey SAND; moist, dense, poorly cemented, gra- velly from 5-6' Contact; Horizontal Olive-gray fine sandy SILT, very stiff, locally clayey moist, SM 15- 20- 25- 30- 35- SM 40- @ 11' becomes silty fine SAND; massive @ 19' becomes silty coarse SAND; dis- continuous, gravel stringers, poorly cemented locally @ 27' faint discontinuous lamanae bedding; N 30 W, 15°-20° S; horizontal @ 34' 1' thick horizontal well-graded sand Irregular high relief contact Olive-gray silty very fine SAND; moist, very dense, massive I JOB NO.: 1217-00 LOG OF BORING [FIGURE: B-5 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED:_10/18/81. METHOD OF DRILLING: Bucket Auger LOGGED BY:. LV .GROUND ELEVATION:. 288 I nnATiriN- See Geotechnical Map UJ 0. UJ o 40- z O < O OT OT < O UJ CD UJ cr_i 3D. 51 QOT z 3 UJ^ h OTjJf Oz o. o Do. < t BORING NO. (CONTINUED) DESCRIPTION SOIL TEST SP 45- 50- 55- 60- SANTIAGO FM: Light gray slightly silty SAND; moist, very dense, medium to fine grained. Cross-stratified; E - W/20 - 35 N (a 48' 25 W cross-stratification, N 45 E/ 15 X 6.3 L18.; @ 59' lamination; horizontal 65- 70- 75- 80 Total Depth 62' No Seepage No Caving Geologically Logged to 59' Backfilled 10/18/83_ JOB NO.: 1217-00 LOG OF BORING FIGURE: g-g SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/18/83 METHOD OF DRILLING: Bucket Auger LOGGED BY: LV QRQUND ELEVATION: 235 LOCATION: ^ee Geotechnical Map -0' z o o CO CO •e a UI CO Ul cr_i 30. QOT Z 3 is OJUJ So o >-a. Oa SS BORING NO 1 DESCRIPTION SOIL TEST CL SM 6- 10- ML- CL 15- ML 20- CL 25- 30- ML CL 35- 40- TQPSOIL; Dark brown slightly sandy silty CLAY; moist-very moist; roots X 10.6L09.C SANTIAGO FM: Light yellow-olive gray silty fine SAND; very moist, medium dense; friable, massive 12 Contact; N lO W, 37°-50° W 11.2L04.7 Dark red-stained silty sand over dark gray slightly sandy SILT - CLAY; moist, very stiff; highly fractured, iron stained on fractures Bedding; N 10 E 55° W; @ 15' sheared zone; subparallel, remolded clay seams @ 1" spacing, clay seams discontinuous over 1'. Shear; horizontal Pale olive mottled orange fine sandy SILT; moist, very stiff; locally clayey, highly fractured, iron and manganese stain on fractures, minor caliche Dark blue-gray silty CLAY; moist, hard discontinuous lenses and stringers of iron oxide stained silt; abundant randomly oriented, discontinuous gypsum seams. Bedding; horizontal (a 27' bedding; N 80 E, 15° S (a 29' bedding; N 10 W, 5°-10° E Gradational contact 17.0 Lll.S Dark blue-gray fine sandy CLAY - SILT; moist, hard; unoxidized, massive, slab fracture during drilling Total Depth 40' No Seepage No Caving Geologically Logged to 38' Backfilled 10/18/83 JOB NO.: 1217-00 LOG OF BORING FIGURE: B-7 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED: 10/18/83 METHOD OF DRILLING: Bucket Auger LOGGED BY: LV .GROUND ELEVATION:_174_ LOCATION: See Geotechnical Map -0 z o o CO CO o UI 00 UJ cr_j 3a «l QOT Z 3 UI* is So o >u: Oa i^ SS BORING NO L DESCRIPTION TOPSOIL: Dark gray-brown silty CLAY; very moist, stiff; roots, desiccated SOIL TEST 'CL SM ML X 10- 15 20- 25- 30- 35- 40- SANTIAGO FM; Pale olive-gray mottled orange silty very fine SAND; moist, very dense Gradational 16.8L09.S Olive brown fine sandy SILT; hard, mottled with dark gray silt; massive, slab fracture drilling moist, clayey during @ 20' becomes silty CLAY @ 25' becomes fine sandy SILT Total Depth 24' No Seepage No Caving Geologically Logged to 27' Backfilled 10/18/83 JOB NO.: 1217-00 LOG OF BORING FIGURE: B-8 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED- 10/19/83 METHOD OF DRILLING: Bucket Auger LOGGED BY:. LV .GROUND Fl FVATION- 209 LOCATION: See Geotechnical Map P UJ UJ li. a UI o -0- z o o OT < -I o o o u. OT o _l CO o Ul CD UI o:_i 3a «i oco z 3 UI -I a < OT UlS i£ OTW Oz so o Oa < t SS BORING NO L DESCRIPTION SOIL TEST SM TOPSOIL: Light brown silty very fine SAND; damp, loose SM 5- 10- 15- 20- 25- 30- 35- 40- SANTIAGO FM; Yellow-brown silty medium X 6.7 115. E to fine SAND; damp, very dense; weathered, friable, local siltstone fragments, vertical fractures @ 7' becomes gray-brown @ 10' becomes moist Maximum Density X 10.5 L13.£ @ 14' slight seepage, color change to light brown, discontinuous around southern half of hole X 13.4-L19.C (3 22' dark brown speckling (3 23' becomes finer grained @ 24' 1/4" thick oxidized zone, un- dulating horizontal 15 X 10.4 L20.S @ 32' seepage (§ 33' light brown silty SAND to sandy SILT; moist, very dense to hard @ 36' 3"-4" thick well-cemented zone @ 40' joint with seepage N 75 W, 90' JOB NO.: 1217-00 LOG OF BORING FIGURE: B-9 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED:__12Z1§ZM. METHOD OF npii i iMft- Bucket Auger LOGGED BY: LV .GROUND ELEVATION:. 209 I nr.ATiftM- See Geotechnical Map a UJ o 40- O Ul CQ UJ £r_i 3a «i DOT Z 3 UlS Is Oz so o >-u: CEO Da ^Z < t SS BORING NO. (CONTINUED) DESCRIPTION SOIL TEST SANTIAGO FM: (Continued) Dark gray slightiy sandy SILT; aamp, hard (3 43' joint; N 8 E, 70°-80° NW (3 45' seepage @ 46' dark gray gouge zone, 1:5" thick, very moist, seepage on north half of hole (3 46.5' to 47' fine sand lense; horizontal ML 45- 50 55- 12 15 14.3 118.E 15.1 114, 12 X 18.1 Lll. Maximum density Shear test 60 65- 70 75 80 Total Depth 60' Seepage 0 14', 32', 40', 45'-47' No Caving Geologically Logged to 57' Backfilled 10/19/83 JOB NO.: 1217-00 LOG OF BORING FIGURE: B-10 SAN DIEGO SOILS ENGINEERING. INC. I I DATE OBSERVED: 10/11/8 3 METHOD OF DRit LING: 24" Backhoe LOGGED BY: KS . GROUND ELEVATION: 90'- LOCATION: See Map -0- 10- 15- 20- 25- 30- 35- 40- CL SC o UJ CQ UJ tr_( 3a QOT Z 3 UJ -J a S < OT 3 GO X UJJ5 h Oz SO o >i Ol <! 'OT •z 'UJ TEST PIT NO. 1 DESCRIPTION •ALLUVIUM/COLLUVIUM: Light brown sandy CLAY, moist, soft, minor organics and roots BEDROCK; Santiago Formation; Light yellow slightly clayey SANDSTONE, moist, medium dense, massive Total Depth 8' No Water No Caving SOIL TEST JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-11 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED:. 10/11/83 METHOD OF DRILLING: Backhoe LOGGED BY: KS .GROUND ELEVATION:. 96 '-LOCATION- See Map -0- o o u. « o -I CO o UJ CO UJ o:_j 3a ^1 QOT Z 3 a < OT Ul ^ h OTtjU Oz SO o >-tL Oa <t SS TEST PIT NO. Test Pit located in channel, approx. 5' below adjacent ground DESCRIPTION SOIL TEST SP ALLUVIUM; Light grey-tan fine- medium SAND, moist, loose, few brown CLAY lenses SC 10- BEDROCK; Santiago Formation,- Light yellow-green slightly clayey SANDSTONE, moist, medium dense, massive Total Depth 7-1/2' No Water No Caving 15 20- 25- 30- 35- 40- JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-12 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING- 24" Backhoe -1-LOGGED BY:_KS ^^GROUND ELEVATION: 104'- LOCATION: See Map UJ UJ L. a UJ o -0- z O o OT OT < -I O o UJ 03 UJ a: 3a t-5 S£< QOT Z 3 UJ .J a S < « 3 CO UJS h OT|iJ Oz SO o Oa ""Z < t 5S TEST PIT NO. 3 Test Pit located in channel, approx. 8' below adjacent grade, DESCRIPTION SOIL TEST SP SM 10- 15- 20- 25- 30- 35- 40- ALLUVIUM/COLLUVIUM; Tan, slightly clayey, medium-fine SAND, moist, loose BEDROCK: Santiago Formation; Light yellow-green silty fine SANDSTONE, moist, medium dense Total Depth 7' No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-13 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED:. 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY:. KS .GROUND ELEVATION: 125 ,+ LOCATION: See Map UJ -0- z O < o OT OT < -I o O o u. OT o CO O Ul CD UJ o:_i 3a •-2 S2< QOT Z 3 OT|f| Oz so o >u: Oa < t TEST PIT NO. 4 DESCRIPTION SOIL TEST CL 5- 10- 2M. 15 20- 25- 30- 35- 40- COLLUVIUM: Brown sandy CLAY, moist, soft, moderately organic @ 7' Light brown, clayey SAND BEDROCK; Santiago Formation; Light yellow silty very fine SANDSTONE, moist, medium dense Total Depth 13-1/2' No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B_I4 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 MFTHnn OF ppii 1ING- 24" Rankhop J- LOGGED BY: KS -GROUND ELEVATION: 142 ' - 1 or.ATION- See Map 3 DEPTH (FEET) CLASSIFICATION BLOWS/FOOT UNDISTURBED SAMPLE BULK SAMPLE MOISTURE CONTENT (%) IN PLACE DRY DENSITY (PCF) TEST PIT NO. 5 DESCRIPTION SOIL TEST CL TOPSOIL: Brown fine sandy CLAY, moist - wet, soft 5- SP BEDROCK: Santiago Formation; Light grey-yellow stained, fine - medium SANDSTONE, moist, medium dense, massive 10- Total Depth 6' No Water Minor Caving 15- - 20- • 25- 30- 35- 40- JOB NO.: 1217-00 LOG OF TEST PIT jFIGURE: B_I5 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED:. 10/11/83 METHOD OF DRILLING: 24" Backhoe -I-LOGGED BY: KS .. GROUND ELEVATION: 144 ' - LOCATION: See Map -0- O Ul CD m cr 3a QOT z 3 UIJS is COUJ Oz SO o CL 0( TEST PIT NO. 6 DESCRIPTION SOIL TEST SC ALLUVIUM/COLLUVIUM: Light brown clayey SAND, moist - wet, loose, minor organics 5- 10- SP BEDROCK: Santiago Formation; Light yellow-brown silty fine SANDSTONE, moist, medium dense 15- Total Depth 12' No Water Minor Caving 20- 25 30- 35- 40- JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: g.ie SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY:_jSS GROUND ELEVATION: 2 00'- LOCATION- See Map UJ Ul a UJ o -0- Q UJ CQ UJ cr 3a «l QOT Z 3 UJ^ OOjlJ Oz so o Oa < t ss TEST PIT NO. 7 DESCRIPTION SOIL TEST SC- CL TOPSOIL; Brown clayey SAND, sandy CLAY, moist - wet, loose SP BEDROCK: Santiago Formation; 5- Light yellow-tan fine SANDSTONE, moist 10- Total Depth 4' No Water No Caving 15- 20- 25- 30- 35- 40- JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-17 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe ,+ LOGGED BY:_KS GROUND ELEVATION: 185'- LOCATION: See Map Q Ul CD m CC 3a ^1 QOT Z 3 UJ* h OT|U Oz SO O Oa '"Z <t: SS TEST PIT NO. DESCRIPTION SOIL TEST CL ML 5- 10 15- 20- 25- 30- 35- 40- TOPSOIL; Dark brown silty CLAY, moist, firm, organics, blocky BEDROCK: Santiago Formation; Light yellow-green fine sandy SILTSTONE, moist, stiff, minor cemented zones, random frac- tures, blocky Total Depth 6' No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-18 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY: KS GROUND ELEVATION: 225'- LOCATION: See Map UJ Ul L. X I-a UJ Q -0- o UJ CO m a 3a ^1 QOT Z 3 a < OT 3 CD UJ* OTy Oz SO o >-u. Oa ""Z < t ss TEST PIT NO. 9 DESCRIPTION SOIL TEST CL TOPSOIL: Dark brown CLAY, moist- _ SC- CL 10 15- 20- 25- 30- 35- 40- wet, soft, organics BEDROCK; Santiago Formation; Light green-grey clayey fine SANDSTONE/sandy silty CLAYSTONE, moist, medium dense, fractured Total Depth No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: g.ig SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING- 24" Backhoe LOGGED BY: KS GROUND ELEVATION: 204'- LOCATION: See Map UJ UJ a. UJ o -0- o UJ CD m o:_j 3a ^1 QOT Z 3 UJ* is OTUJ Oz SO o Va Qa ""Z < t ss TEST PIT NO. 10 DESCRIPTION SOIL TEST ML 5- 10- 15- 20- 25- 30- 35- 40- BEDROCK; Santiago Formation; olive green fine sandy clayey SILTSTONE, moist, stiff, frac- tured @ 3' less fractured, very stiff Total Depth No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-20 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY: KS GROUND ELEVATION: 228'- LOCATION: See Map -0' z O o a w OT < Q UJ CO UJ (T _j 3a QOT Z 3 Ul -J a < OT UJ* Is OTW Oz so o Ol ii zi TEST PIT NO. 11 DESCRIPTION SOIL TEST SM SP TOPSOIL; Brown silty SAND, moist, loose, organics BEDROCK: Santiago Formation; White medium-coarse SANDSTONE, moist, dense, massive, contact with topsoil has cobbles and cemented layer 10-Total Depth 5' No Water No Caving 15- 20- 25 30- 35- 40- JOBNO.: 1217-00 LOG OF TEST PIT FIGURE: B-21 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe + LOGGED BY: KS GROUND ELEVATION: 164 ' - LOCATION: See Map O UJ tn III cc 3a «l QOT z- 3 h OTUJ Oz so u Oa "^Z < t SS TEST PIT NO. 12 DESCRIPTION SOIL TEST CL CL 5- 10- 15- 20- 25- 30- 35- 40- TOPSOIL: Brown CLAY, wet, soft, organics BEDROCK: Santiago Formation; Light green with yellow staining, fine sandy silty CLAYSTONE, moist, stiff, frac- tured • @ 6' less fractured, very stiff Total Depth 8' No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-22 SAN DIEGO SOILS ENGINEERING, INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING- 24" Backhoe -1-LOGGED BY:—KS GROUND ELEVATION: 192 ' - LOCATION: See Map O UJ CO Ul crj 3a ^1 Q« Z 3 Ul* Is OTJU Oz SO o TEST PIT NO. 13 DESCRIPTION SOIL TEST CL TOPSOIL: Brown sandy CLAY, wet, soft, organics CL BEDROCK; Santiago Formation; Olive green silty CLAYSTONE, moist - wet, stiff, weathered at 3', blocky at 8' 10- Total Depth No Water No Caving 15- 20- 25- 30- 35- 40- JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-23 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY:. KS ,+ .GROUND ELEVATION: 318'- LOCATION: See Map -0' Q UJ 03 m a:_i 3a ^1 QOT Z 3 UJ -J a < OT 3 01 UJ^S is OTJU Oz SO U >u. Qa >^ <t ss TEST PIT NO. 14 DESCRIPTION SOIL TEST SC SP 5- 10- 15- 20- 25 30- 35- 40- TOPSOIL: Dark brown clayey SAND moist, loose, cobbles, organics TERRACE DEPOSITS;. Light red- brown SANDSTONE, moist, dense, cemented, some cobbles, hard digging BEDROCK: Santiago Formation; Light white-green fine-medium SANDSTONE, moist, medium dense, massive Total Depth 4-1/2' No Water No Caving JOB NO.: 1217-00 I LOG OF TEST PIT FIGURE: 5.24 SAN DIEGO SOILS ENGINEERING. INC DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY: KS GROUND ELEVATION: -254'- LOCATION: See Map ^0- z o o a OT m < a UJ CD UJ CE_J 3a QOT z 3 UJ* is OTjff Oz SO o >-l arc Ol < TEST PIT NO. 15 DESCRIPTION SOIL TEST CL ML 10- 15- 20- 25- 30- 35- 40- TOPSOIL: Dark brown CLAY, wet. soft, organics BEDROCK: Santiago Formation; Weathered light green clayey SILTSTONE, with orange staining, moist, firm Total Depth No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-25 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe -t- LOGGED BY: KS GROUND ELEVATION: 235'- LOCATION: See Map -0- O Ul ffiuj 3a 2< QOT Z 3 UJ* Is Oz So o >-u: o a <t: SS TEST PIT NO. 16 DESCRIPTION SOIL TEST CL SC 10- 15- 20- 25- 30- 35- 40- TOPSOIL: Brown CLAY, moist, firm, organics BEDROCK: Santiago Formation; Light green-grey clayey SANDSTONE, moist, medium dense, massive Total Depth 5' No Water No Caving JOB NO.: 1217-00 LOG OF TEST PIT FIGURE: B-26 SAN DIEGO SOILS ENGINEERING. INC. NORMAL LOAD (PSF) JOB NO.: 1217-00 LOAD CONSOLIDATION TEST FIGURE: C-1 SAN DIEGO SOILS ENGINEERING. INC. DATE OBSERVED: 10/11/83 METHOD OF DRILLING: 24" Backhoe LOGGED BY: KS .+ GROUND ELEVATION: .250 ' - LOCATION: See Map -0' O UJ CD UJ cr_i 3a •-2 J2< QOT Z 3 UJ UJ* Is Oz so o TEST PIT NO. 17 DESCRIPTION SOIL TEST ML- CL TOPSOIL/COLLUVIUM: Light brown clayey SILT/silty CLAY, moist, soft to firm 5- 10- @ 12' weathered bedrock 15-Total Depth 12' No Water No Caving 20- 25- 30- 35- 40- JOB NO.: 1217-00 LOG OF TEST PIT [FIGURE: B-27 SAN DIEGO SOILS ENGINEERING. INC. APPENDIX C LABORATORY TESTING A. Index Tests Moisture content and dry density determinations were made for most ring samples. Results of moisture-density deter- minations are shown on the Logs of Borings, included in Appendix B of this report. B. Consolidation Tests Consolidation tests were performed on remolded colluvial material. Water was added to the apparatus at the load indicated on the consolidation curves. The consolidation test results are presented on Figure C-l. C. Direct Shear Tests Direct shear strength tests were performed on remolded samples. Test results for remolded clay is presented on Figure C-2. All samples were inundated and allowed to come to equilibrium prior to shearing with the exception of the topsoil. D. Maximum Density/Optimum Moisture Content The maximum dry density/optimum moisture content relation- ship was determined for typical samples of the on-site soils. The laboratory standard used as ASTM: D 1557-78. The test results are summarized on Table 1, Figure C-3. 4000 3000 u. OT a X I- C3 z UJ oc K OT O Z CC < UJ X OT 2000 1000 BORING NO. DEPTH (FEET) COHESION. (PSF) ANGLE OF FRICTION.° SAMPLE DESCRIPTION BORING NO. DEPTH (FEET) COHESION. (PSF) ANGLE OF FRICTION.° Remolded Claystone 4 20 ' 350 11 Remolded Claystone NORMAL LOAD (PSF) 4000 3000 u. M a CJ z UJ oc 2000 OT o z E < Ui X OT 1000 BORING NO. DEPTH (FEET) COHESION, (PSF) ANGLE OF FRICTION.o SAMPLE DESCRIPTION BORING NO. DEPTH (FEET) COHESION, (PSF) ANGLE OF FRICTION.o Remolded Claystone 6 47' 450 24 Remolded Claystone 1000 2000 3000 4000 NORMAL LOAD (PSF) 5000 6000 JOB NO.: 1217-00 SHEARING STRENGTH TEST FIGURE: C-2 SAN DIEGO SOILS ENGINEERING. INC. TABLE I MAXIMUM DENSITY/OPTIMUM MOISTURE TESTS (ASTM Test Procedure D 1557-78) Test Location Maximum Dry Density (pcf) Optimum Moisture Content (%) B-1 (a 20' "105.3 18.6 B-6 @ 8-10' 116.5 8.6 B-6 @ 47' 103.0 19.2 Job No: 1217-00 Date; NOVEMBER, 19 83 Figure: C-3 SAN DIEGO SOILS ENGINEERING. INC.