HomeMy WebLinkAbout3190; RANCHO SANTA FE ROAD; REPORT OF COMPACTION TEST DATA; 2004-10-12Te1 # Material Structur Test Location and Elevation or Depth relative to
#!' P t¼?:Hno OF Q ,s•c
I O0j5jiJoL
___ - - S-r7 IRS f o-
/qj5 p42c1:
SON
kr
sTA- flo
l i
taterial S = Soil AC =sphaIt Concrete ATB = Asphalt Treated Base AB = Agregate Base CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other . : Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
pjj
/y &03'/f/0' /5'a5 1 /*' ZI /9ij
Probe Depth (inches) - -
Wet Density (pcf) jI/I 1't3.2 NO /VI,L/ /9Gj4'3 '4
rDen(L1y (pcf)
MD Curve
Max i rn rDensity (pcf)
Optimum Moisture (0/0),;.
Relative Compaction,-RC (%)
Relative Moisture, RM
Specified RC
Specified RM
Conformance (Yes/No) . .
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor their responsibility for petormance in accordance with the plans, specifications and applicable
codes. The 6ontract6r is respnsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work abservations
TESD s 1dting Techician Name DN46- S L 004 Si nature f \
Clients or Coritractor s Acknowgement Name \ I 1
'" . •'
White Gffice Xello Contractor Pink Field Technician cm .
Project Name
Project Number
Client
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
,MPh'D Qiv"F E 1b4t/dfI#6t6W'
44k, 103 Test Date — /2. Page of
Er' O $tSArD
Test # Material Structure Test Location and Elevation or Depth relative to...
I' It
bet 4- ec> p ,,j
/ 2&'3°'_ - -
9-31-0c_
:30 'Li)
/0 '•j
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB= Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Strutture: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # /S'/l /41/319/V A20
Probe
M5J/ j /Øf//5
Depth (inches) 23$
Wet Density (pcf) i'/c J9SI JY1' /i//4,1% ft11// i,Ij,j ,'l/25 ,V3,I
Dry Density (pcf) /_
Moisture (%) / f / / 7•
_/P 5L _/ _,,_ —
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) .L. __/— -/ / —;/ .-7L.. ,t- J /
Relative Compaction, AC
Relative Moisture, AM (%) -7/— 7' 7L-- / t
SpecifiedRC
Specified AM (%) 7' s..,-4 ' 7
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 7o$Ir2.._ 3VJ74,," h9-L4? 2-0 2_a 'al
This report does not relieve the contractor, of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESDs Testing Technician: Name: ,ifi_$Lfr' sign re: . . r Client's or Contractor's Acknowledgement: Name: /_J__('Vs at: / A -
White- Office Yellow- Contractor Pink- Field Technician
w
; . 0
145
140
135
125
I
S
COMPACTION TEST REPORT
Project No.: 46703 Date: 3/25
Project: Rancho Santa Fe North Realignment and Widening
RECEWB) Location: Belt of on-site crusher
Elev./Depth:
.1 APR 16 2004 Remarks: TESD Lab No. 11577 I
DIUDEK & ASSOC; FIELP, OFF10E MATERIAL DESCRIPTION
Description: 1-1/2 Class 2 aggregate base
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>.3141n.= 10% %<No.200= 7.6%
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density = 143 pcf 140.5 pcf
Optimum moisture = 7 % 7.5 %
ified
point
SATURATION CURVES
SPEC. GRAy. EQUAL TO:
2.8
2.7
2.6
HAD
I I DAVIS I -I No.59908 1 1 \ \ Exp. 12/31/05
NgFCAL' \
Plate TESTING ENGINEER
U
fl'
S
COMPACTION TEST REPORT
Project No.: 46703 Date: 9/30/04
Project: Rancho Santa Fe North Realignment and Widening
Location: AREA 5 STOCKPILE
Elev./Depth:
Remarks: TESD NO. 13423
MATERIAL DESCRIPTION
Description: GRAY-BROWN CLASS 2 BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
% > 314 in. = 4% % < No.200 = 8.6 %
TEST RESULTS
UCL
I100
140
130
120
110
Maximum
Optimum
dry
90 —i
moisture
density = 139.5 pcf
= 6.5 %
Test specification:
TM D 1557-91 Procedure C Modified
100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO.
H
= = = =41 - -
8
70
0 5 10 15 20 25 30 35 40
Water content, %
Plate
TESTINt ENGINFFRS
8587155810 TESTING ENGINEERS SD
Testing Engineers-San Diego, c.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
(858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
-,~jrel& 4VI A C k A_ ,, ~, - " 0 11P9
-
Test Date ..J(,IJt( Page
PAGE 47/47
Established 1946
Test ft
3c
Motcrlal
-Ao
Structure
J•-
Teat Location and Elevation or Depth relative ta,,. -
66 AneA . I
EL. PLm
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS Lime Treated Soil, 0= Other. _.,
-- ________-•._____________________________ Structure- P = Pavement Structural Section, F General Fill, N Native Soil, WL = Waterline, SS m Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, Sc = Sidewalk, Curb/Gutter, 0 = Other .,.
Test 2f
Probe Depth (inches)
Wet Density (pet) f/ /
Dry Density (pci) 41S' 52
Moisture (%)
-
-- ..-.
.••_I_.
--.....
4;f-7
MD Curve Number jY i7'
Maximum Density (pci)
('/C9 /t?
Optimum Moisture
Relative Compaction, RC (%)
Relative Moisture,RM(%) .-- -.- -
Specified RC
Specified AM
_
Conformance (Yes/No)A49.
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor 01 their responsibility for performanr.e in accordance wIth the
p
a
n
a
,
s
p
e
c
i
f
i
c
a
t
i
o
n
s
4
d
a
p
p
l
i
c
a
b
l
e
codes. The contractor is responsible for scheduling retestfnq of reworked areas that have previously f
a
i
l
e
d
t
o
m
e
e
t
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
See accompanying Daily Report for description of work and 0b50rv3tir05.
TESD's Testing Technician: Name: Signature:
Clients or Contractor Acknowledgement;Name Signature
White- Office Yellow- Contractor Pink-Field Technician
- - I
08/81/2003 11:10 8587155818 - TESTING ENGINEERS SD PAGE 45/47
7895 Convoy Court, Suite 18, San Diego, CA. 92111
.
Testing Engineers-San Diego, Established 1946
[858] 715-5800 Fax [858] 715-5810
-
REPORT OF COMPACTION TEST DATA
..
Project Name _ ':rr;:'
___ Project Number 7iO •.. Test Date _O\\~,CO4,._ ageiot_j,..
Chant
Teat e Material Structure ( Teat Location and Etovirilon or Depth relative to...
-
-_T _r.(5_122. 2'ri+z-~)__
-
.',
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated ease, AB = Aggregate Base, CTS = Cement Treated Soil
.,
. . LTS = Lime Treated Soil. 0 = Other
Structure:- P = Pavement Structural Section, F = General Fill. N = Native Soil. WI = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, -; U Other Utilities, W -Wall Backfill, SC 7. Sidewalk, Curb/Gutter, 0 = Other-.--.
Test #
Probe Depth (inches)
Wet Density (pcf)
- t'.k(LC)
Dry Density (pcf)
Moisture (%)
Maximum Density (pct) \1
MO Curve Number
'
Optimum Moisture (%)
Relative Compaction PC ra Relative Moisture, AM (%)
Specified PC
Specified PM (%)
Conformance (Yes/No)
.
-'p.
,-, it
_I.
Nuclear Gauge Model and Serial Number
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable codes. The contractor is responsible for scheduling relesting of reworked areas that have previously failed to meet specifications. . Son accompanying Daily Report for description of work and observations.
TSD's Testing Technician: . Name: ... . •. -. Signature: .. .. -,
Client's or Contractors Acknowledgement: Name
- Signature
White Office Yellow Contractor Pink Field Technician - . - , . . t.&.. t,• . S.
S. - . -
Established 1946
08/01/2003 11:10 8587155810 TESTING ENGINEERS SD PAGE 32/47
Project Name
Project Number
Client
Testing Engineers—San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 7155810
REPORT OF COMPACTION TEST DATA
ci i4Jn /u
Test Oate..4(.4jL1 ._2 /1 tX Page of
Test # Material Structure Test Location and Elevation or Depin relative to...
/1sA-_.gwL s&j ._5"._1 I J A$tcMI . I 7/111-4
f 7 f/ (4 ft$;
..
.L...:T1_ __ ....
_1iI±I:E.II
/[/,Ag~fj
Material; $ m Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AS = Aggregate Base. CTS = Cement Treated Soil LTS Lime Treated Soil, 0 = Other Structure: P Pavement Structural Section, F = General Fill, N = Native Soil. WL = Waterline, SS = Sanitary Sewer, ST Storm $ewer, U = Other Utilities W M Wall Backfill, SC = Sidewalk, Curb/Gutter. 0 = Other
Test #
-..........___........
f/.57 /i'4
Probe Depth (inches)
/t
Wet Density (pcf)i/V_
.!el)_
Moisture (%)
'o-
. -
f/0/3
............---.--.--...--...___
Maximum Density (pcf)
-
Optimum Moisture (%)
/QT
MO Curvo Number
Jo
--
Relative Compaction, nc
Relative Moisture, PM (%)
Specified RC (%)
Specified PM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 7 3.-..Jj m S This report does not relieve the contractor of their responsibility for performance in accordance with the T plans, specifications and applicable
codes. The Contractor Is responsible for scheduling releflting of reworked areas that have previously failed to m specifications.
See accompanying Daily Report for description of work and observations.
TESO's Testing Technician: Name: Signature:
Client's or Contractors Acknowledgement: Name: .. Signature: ... . .......
White- Office Yellow- Contractor Pink- Field Technician
08/81/2003 11:10 8587155818 TESTING ENGINEERS SD PAGE 31/47
UPj;)
Testuig Engineers-San Diego, c.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[8581 715-5800 Fax [855] 715-5810
Established 1946
REPORT OF COMPACTION TEST DATA
Project Name
Project Number 3
-
Test Date _S/ ./L.,.21O? ' Page_. of
Client
Test C MatrI3I Structure [ Test Loc3liOn and Elevation or Depth relative to... -
LJ (L â&OQ'
/_.L4Zt 7I'7!3
So
Material: S = Soil, AC - Asphalt Concrete. ATB = Asphalt Treated Base, AS = Aggregate Base, Cl'S = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section. F =General Fill, N Native Soil, WL =Waterline, SS = Sanitary Sewer, ST =Storm Sewer,
U = Other Utilities, W Wail Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
S-k. 239 -F0O T7 SFAI J\J.
Test st
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
moisture
CD
MD Curve Number
Optimum Moisture
- -s--
Marnum Den sfiy(pcf)
Relative Compaction, PC (%) 9'
Relative Moisture. PM
Specified RC(%)
Specified RM
Contormance(Yes/No)
-
f2S (4.5 t.fr5 t/t J\LL JL
Nuclear Gauge Model and Serial Number . %/' 57
rmance ri accordance witt/the plans, specificetioni and applicable This report does not relieve the contractor of their rosponsibll
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet
See accompanying Daily Report for description of work and observations.
TESO's Testing Technician: Name: 7 $it_ Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
8587155810 TESTING ENGINEERS SD
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax (858] 715-5810
REPORT OF COMPACTION TEST DATA
P , JJA i/w
Lkfr723 Test Date ,3_ Pageo2
PAGE 29/47
Established 1946
Test # Mater?? - Structure 'TOst Location and Elevtiop or Depth relative SO.,,
M
s F oLs.
...........
..,c1 JIA.........?JpA.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB" Aggregate Base. CTS = Cement Treated Soil
LIS Lime Treated Soil, 0 = Other .__..., Structure; P a Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline. SS = Sanitary Sewer, ST Storm Sewer, U Other Utilities. W = Wall Backfill, SC Sidewalk, Curb/Gutter, 0 Other —
Test ft -
Probe Depth (riches) -- -- -
J
Wet Density (pci)
Dry Density (pcf)
MOisture
--
MD Curve Number
Optimum Moisture (%)
Maximum Density (pcI)
Relative Compaction, RC (%)
Relative Moisture, FIM
Specified FIC (%)
........_. 170 .. . Specified PM
___
Conformance (Yes/No) J\I C A. Ifo.
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office how- Contractor Ink- Field Technician
Nuclear Gauge Model and Serial Number; .... Dilfl" '
This report does not relieve the contractor of their responsibility for performance in accordance with the plans. Jpeciflcatlons and app1cabIe
codes. The contractor Is responsiblp for scheduling retesting of reworked areas that have previously failed to
Sec accompanying Daily Report for description of work and observations
TESDS Testing Technian: Name Signare:
08/01/2003 11:10 8587155810 TESTING ENGINEERS SD PAGE 27/47
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite IS, San Diego, CA. 92111
[858] 715-5800 Fax (858) 715-5810
REPORT OF COMPACTION TEST DATA
Project __ ject Name _V/\4)S&[a, 4/ Al. A/S'/
Project Number c1/.70 Test Date _.J IA 5' 22o3 Page. ..-o
Client c:' P[ V .. ...
Test l Material Structure Test Location ana Elevation or Depth relative to...
ca, xx
floi £S:1tcj/. cSIT b JJ-_i.
21d4L 5LiL-' Z7°° c-/LhI?
L274dSe/
(I 1ii_11Q
E.......LL
L
' S_
Material: S = Soil. AC = Asphalt Concrete. ATS = Asphalt Treated Base. AS = Aggregate Base, cr8 = Cement Treated Soil ITS = Lime Treated Soil 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N - Native Soil. Wi. = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill. SC = Sidewalk, Curb/Gutter. 0 = Other
Probe Depth (inches)s..
Test N.
2J
.
Dryoenstty(pct)
. Moisture (%) 4) //
Wet Density pct)
, 79 //
MD Curve Number
Optimum Moisture (%) / i /
M2XiMUM Density (pd)
ft
Relative Compaction, RC (%) 5 y•7• 97 7 9 Relative Moisture, PM
SpecificdRC(%)
Specified PM
Conformance (Yes/No) ' A1
Nuclear Gauge Model and Serial Number:. /_ 1-'3WJ(.3_71
This report does not relieve the contractor of their responsibility for perfoi4riance in accordance with thIplans, specifications (and applicable
codes. The contractor is respenSible for scheduling retasling of reworked areas that have previously tailed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESO's Testing Technician: Name: li v41tLQ.L... Signature: ... _///_•(
Client's or Contractor's Acknowledgement: Name - - - Signature
White- Office Yellow- Contractor Pink- Field Technician
08/01/2003 11:10 8587155810 TESTING ENGINEERS SD PAGE 25/47
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[8581 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name t2zd'2pjZ1
Project Number _.'73 Test Date Page of
Client
Structure Test Location and Elevation or Depth relative to... OeW#Material
fJ14 S/#S__i7H-adJ5
.............. ..
I.
..-.-.-
_
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB n Asphalt Treated Base, AS r Aggregate Base. CTS = Cement Treated Soil
ITS" Lime Treated Sall, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Well Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test *1
Probe Depth (inches)
zc
Wet Density (pci)
_______. ........-
Dry Density (pd)
Moisture
t
Maximum Density (pet)
Optimum Moisture
/5>
MDCurveNumber .
/50 19
Moisture
Relative Compaction, FIC (%) 9j
Relative Moisture, PM
Specified FIC
.......... . .3 __ ... - Specified PM
Conformance (Yes/No) I('C2 Lf.P.S
Nuclear Gauge Model and Serial - This rcprt does not relieve the. contractor of their responsibility for perl6rnance in accordance with two plans. specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet-Wecificapons.
¼! See accompanying Daily Report for description of work and observations
ThSD's Testing Technician; Name: /(S4W i712:i Signature:
Client's or Contractor's Acknowledgement: Name:
White- Office Yellow- Contractor k- Field Technician
Testing Engineers-SahDiego, Inc. Established .1946
7895 Convoy Court, Suite 18, San Diego, CA 92111
[858] 715-5800..Fax [858] 715-5810
1-2 REPORT OF COMPACTION TESTDATA
Project Name E1 4trIic ,/w
Project Number 967273 Test Date___J11iy a.7.~' .7t7 Page of
Client t/
Test # Material Structure Test Location and Elevation or Depth relative to...
zpa 5 [
or
QtcY?
717 ., ' F pi iS.fH. /7â.-ii Cpc/
Material: . S = Soil, AC = Asphalt Concrete, ATB Asphalt Treated Base, AB = Aggregate Base, CTS= Cement Treated Soil
LTS= Lime Treated Soil, O=Other S . .
Structure: P = Pavement Structural Section, F General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other .
Te4#
. ZR f? 211
Probe Depth (inches) . .
Wet Density. (pcf) 2
Dry Density (pcf)'
Moisture (%) /D if h
MD Curve Number
Maximum Density (pcf) /, /0 /30 /. 0
Optimum Moisture (%) . /2 / O / 2
Relative Compaction, AC
Relative Moisture, RM (%)
Specified RC (%)
Specified PM (%)
lze--L Conformance (Yes/No)4-9c-
Nuclear Gauge Model and Serial Number:'/fZ)(1e-f
This report does not relieve the contractor of their responsibility, for perf6rnance in accordance with tl'e plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have-previously failed to met- ecifica ons.
See accompanying Daily Report for description of work and observations..
Ak A TESDsTestingTechnician Name
.
h73
/
- S Signature
Client's or Contractor's Acknowledgement: Name: / )-') (c'Signature:
White- Office Yellow- Contractor ink- Field Technician
Project Name
Project Number
Client
Testing Engineérs-SanDiego, Inc.
7895: Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
A/.
Established 1946
44x703 Test Date __ Pageof
C i f C1hQ
Test # Material Structure Test Location and Elevation or Depth relative to...
2 3 F Md b5 AI ,9 . 0 (r-
A l
F Aug Q11 (41
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other .
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall•Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other .......-..
Te'#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture
MD Curve Number / L/
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%) '9 p
Specified RM (%)
Conformance (Yes/No) (fe c J qe J
Nuclear Gauge Model and Serial Number: 1T L)I.Q_r 3-fl f-t7f 1755 L/121S- .2fl
This report does not relieve the contractor of their responsibility for performce in accordance with thetplans, specifications
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed toeerecfica
See accompanying Daily Report for description of work and observations. -
CAL4 A-, TESD's Testing Technician. Name: IV71D1 T) e Signature: I
Client's or Contractor's Acknowledgement: Name: Signature:
applicable
White- Office Yellow- Contractor.. Pink- Field Technician
Page _2.. of
Testing En..g'mneers-San Diego, Inc. Established 1946
7895 ConvCoUtSuitê 18, San Diego, CA. 92111
[8s8Dç558PO Fax [858] 115-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project 4umber
Clietit.
Test # Material Structure Test Location andElevation or Depth relative to... , -
/(k:, 11 11 SrM 5 L_[ 'so
617
/q? / 4I , L. 416
/L It /fA11
Material: S, Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Strture: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
f
U = Other Utilties, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # . /9 /QL /q I q6A "-f F /q7 O / '
Probe Depth (inches) _ ?
Wet Density (pci) g/2 4'I 1qh: /yç 44 Z-
Dry Density (pcf) . /;/9 /)?/ /fl / 131-14
Moisture (%) fl12 MD Curve Number
.
Maximum Density (pci)
Optimum Moisture ()
Relative Compaction, RC (%) 90 go 9'-
Relative Moisture, RM
Specified RC(%)
Spedified RM (%) ....
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: i I O'4JT 45U (.j;7j '/2.5 i)I/i)S
JThi$rèport does not relieve the contractor of their responsibility for performalice in accordance with theplans, speifications and applicable
codes. The contractor is responsible for scheduling retestig of reworked areas that have previously failed to meet-specifications.,
See accompanying Daily Report for description of work and observations
TESDs Testing Technician Name f\e.S Signature
Clients or Contractors Acknowledgement' t Name . Signature
White- Office T. . - Yellow- Contractor. .- . ' Pink- Field Technician
Testing EngineersSan Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diégó, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA -
Project Name /k1 C 1 cSC-i10 / Re! f/
Project Number Test Date _J(i/çl 3/7.2c213 Page 0t3.
Client C'i' 2f Ccc/.sk'frd
Test # Material Structure Test Location and Elevation or Depth relative to...
2W S F m /ci /a,, e, - /73/a2 ,9TS
s. q7
s. /7Hi) ,
KfLiLbQceç1 . /' /Af
S. /Y lo i. S. / ? a / k'
1.4
Material: S = Soil, AC = Asphalt Concrete, ATB Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other.____________________________________________________________________ . - StructUrgi P = Pavement-Structural Section, F = General Fill, N'= Native Soil,WL = Waterline, SS = Sanitary Sewer, ST= Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk'Curb/Gutter, 0 = Other
tc -k, - S
- •0
Tst #
Probe Depth (inches) 8
Wet Density (pcf)
Dry Density (pcf)
Moiture (%) ,7L/ ç (7 <
MD Curve Number .
Maximum Density (pcf) J5/ç ,'s i;y-
Optimum Moisture(%)
Relative Compaction, AC Relative Moisture, AM (%)
Specified RC(%)
Specified AM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Senal Number:12s/ii
This report does not relieve the contractor of their responsibility for perforn{ance in accordance with the plans, specificati6ns and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: AID JA i AQ Signature ) Q9
Client's or Contractors Acknowledgement: Name: 7 h" .. Signature:
White- Office Yellow- Contractor Pink- Field Technician
Esab1ished 1946 'ESO
Project Name
Project Number
Client
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
C1I? J1II9 /7t,ci ,44i7'X fii€
/b7O3 Test Date_jUf ..20t23' Pageof.' S Chi OF c:4r/sbacl
Test # Material Structure Test Location and Elevation or Depth relative to...
/52 S ST ,i?S 5/crrn i)i •io 5- )53m
/53 S 5T
/ sq Sr D /
Sr /crA/- S L - /& o €-E 1
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other . Structure P = Pavement Structural Section F = General Fill N = Native Soil WL = Waterline SS = Sanitary Sewer ST = Storm U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
t P-i; = P c. (,a c/ -/?T - o1TC1 L
Test#
__'•___
::;
___ ___ Probe Depth (inches)
S
Wet Density (pd) /53• /5f) 15c /ç'9
Dry Density (pcf) /3:/ _____
çi/,
____ ____ ____ _____ ____
Moisture (%)
MD Curve Number -
Maximum Density.(pcf
Optimum Moisture
Relative Compaction, AC (%) J7 ci 7 97 Relative Moisture, AM
Specified AC 175 615 gç
%ç-
Specified AM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor of their responsibility for performare in accordance with the pins, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed toamedations.
See accompanying Daily Report for description of work and observations. 7
TESD's Testing Technician: Name: A.S./c JcS..S Signature,—
Client's or Contractors Acknowledgement Name /t-" Signature -
White- Office - Yellow-Contractor (!Pink- Fielb Technician
08/01/2003 14:42
cESb
8587155810 TESTING ENGINEERS SD PAGE 02/02
Test(q Engineers-San Diego, I1n. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax 8581 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 1C&fi(1 '"- I
Project Number '(7O ' .. - Test Date Page of
Client
I ibsi C I Material StTucture Test Location and wevation or Depth relative to...
FJ
Material: S = Soil, AC = Asphalt Concrete, AiB = Asphalt Treated Base, AS = Aggregatd Base, CI'S Cement Treated Soil
ITS = Lime Treated SoIl, 0 a Other
Structure; P Pavement Structural Section, F General Fill, N Native Soil, WL = Waterline, 5$ = Sanitary Sewer, ST = Storm Sewer,
U Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 a Other
Nuclear Gauge Model and Serial Number: I I_4L1fi,)4k/(t)I 1 .D2 ti-/)/I'M I2/1J(-'-' -
This report does not relieve the contractor of their responsibility for perrmance in accordance with the plans, speciflcOns and applicable
codes. The contractor Is responsible for 5chadUllflg retesting of reworked ereas that have previously failed to mee (ionS.
See accompanying Daily Report for description of work and observations.
TESO's Testing Technician: Name: ?451f') 4mI' Signature:
Client's or Contractor's Acknowledgement: Name: _.,_ Signature:
White- Office Yellow- Contractor Pink- Field Technician
Project Name
Project Number
Client
Tes g Engineers-San Diego, 0., Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax: (858] 715-5810
REPORT OF COMPACTION TEST DATA
4/
3, Test Date Page of
Test # Material Structure Test Location and Elevation or Depth relative to...
C 3' F wi r. ir 7ccj c&
A S 92J ci/J
24 ~ F ,e1/ f oJi
" 3 F A1,-,1111----,J
. ftrc -c. Is 1
F 'R / ç
F F" A/4d /OWL,,mi c
S F 1cf
\ / Material: S.= Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = A gre ate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 'O = Other .
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil'WL.= Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
-12
I
çj ... / .
Test #. . 30
Probe Depth (inches)
7ç 11A
. . $'••' . .
Wet Density(pcf) . — /&- f/7 /qç' /J7 ,/y
Dry Density';(pcf). / /t? /ç
Moisture (%) .
,/1 /3' 2z
MD Curve Number
Maximum Density (pcf) /
Optimum Moisture (%) / . _/c,_ c c ,i
Relative Compaction, RC(%)
Relative Moisture, RM (%)
Specified RC(%) gc Qc 9c 9ç 9)ç ?s 9c ?C:. 9.c
Specified AM (%)
Conformance (Yes/No) 9c (' Ly4 1'2-( 4"e-( ç . 'f
Nuclear Gauge Model and Serial Number: //Qec 3 4//F/1/ 7I33 z7
This report does not relieve the contractor of their responsibility for perf6mance in accordance witI the plans, specificaons and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet s ecificati'ons..
See accompanying Daily Report for description of work and'observatio'ns.
TESD's Testing Technician: Name: 'J 'e! Signature:
Client's or Contractor's Acknowledgement:. . Name: ' ' . Signature
White- Office '.---.--7 Ye ow- Contractor
( ' ,
Pink- Field'Technician
Testing Engiheers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA 92111
- -
[858] 715-5800 Fax [858] 715-5810 1061;94
..,.. REPORT OF COMPACTION TEST DATA
Project Name 2c1l2 Q/ é//
Project Number 3 - Test Date//%Z'(4,;&W14 Page of
Client 4ATq
Test # Material Structure Test Lócatipri and Elevation or Depth relative to...
3/b S f '±)SF)9' /7c,,LQI.
e7L))ef; s. Q,
r (4J4 /f7 /rn&/9/7aQ /&
3( S F bjie, 1i (/2c/f'a
Ici* *.. \&Q4-D.
Test# .
. ./O 3/1 /Z 3/4 /S /h
Probe Depth (inches) . . _• ? . . _______
,p if- S .
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number . L( 1
Maximum Density (pcf)
Optimum Moisture (%) /9gr /O
Relative Compaction, RC
Relative Moisture, RM (%) / 1
Specified RC
Specified RM
Conformance(Yes/No) 1/Q.( (ft( 9/ei %' yej
Nuclear Gauge Model and Serial Number:' 3
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specificatioi{s and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet .specifi ations.
See accompanying Daily Report for description of work and observations. /
TESD s Testing Technician Name A Signature
Client's or Contractor's Acknowledgement:. Name: / '-'-' '-' ( '"----- Signature: ..
White- Office . Yellow-- Contractor ink- Field Technician
.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
S Structure P =Pavement Structural Section F =General Fill N =Native Soil WL = Waterline SS = Sanitary Sewer ST = Storm Sewer,
= Other Utilities, W =Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other ..
3-9
Established 1946
Test #
Probe Depth (inches)
Wet-Density (pcf) 0 ,• /f fsc ___ r
Dry Density.(pcf)
Moisture (%) 61F ; /4-' /g /z27
MD Curve Number /,7
£/
Maximum Density (pcf) /'7' /q72- /g?
Optimum Moisture (%) 5 5
Relative; Compaction, RC (%) ç 17
Relative. Moisture, RM
q r Specified RC (%) /57 qç ç 'ç ç 9 C
Specified RM (%)
Conformance (Yes/No)
Project Name
Project Number
Client
.c.. Test g Engineers-San Diego, Inc.
7895'Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Test # Material Structure Test Location and Elevation or Depth rfe to .
30 4L3 F' iS/5f 1 Q-
503 P Pc34op.5f S5 J/a.
( ,t
3'13 5 E
//p762i h
/t%t ?-
I Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0= Other
structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor of their responsibility for prf&mance in aàordance 4th the, plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of leworked areas that have previously failed to mee spe •fications.
See accompanying Daily Report for description of work and obs'ëivátions.
TESD's Testing Technician: Name: . Signature: '
Client's or Contractor's Acknowledgement: Name:' signatue: -.
White- Office . Yellow- 'Contractor 'nk- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-580O Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
/4 S $7 'ip —_S, i)L '-i '5) <-T Sim co I
S ST
p7[) f /ipp
Material: S = Soil, AC = Asphalt Concrete, ATB = Asph'alt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
31A .J D_(.2/(/TS/)2Q 41/ 0]' /3)
Test#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf) //2-
Moisture (%)'
sx
MD Curve Number
Maximum Density (pdf
Optimum 4stre,()
Rativ6bmpactioC
Relative Moijure, v1 (%)/ 1
Specified RC )
/ Specified RM (.%) .
Conformance (\e''sINo)
Nuclear Gauge Model and Serial N/nber:' 7 1D( ,Q-f 3 ./ I I/ 73 1/,w1 2//2/ qk, 1
This report does not relieve theóntractor of their responsibility for perfotnance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously f
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: ,11'yl ?' l /r1)J.- Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor
-
Pink- Field Technician
145
140
135
120
115
110
COMPACTION TEST REPORT
Project No.: 46703
Project: Rancho Santa Fe North Realignment and Widening
Location: Belt of on-site crusher
Elev./Depth:
Remarks: TESD Lab No. 11577
MATERIAL DESCRIPTION
Description: 1-1/2" Class 2 aggregate base
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>314 in. 10% %<No.200= 7.6%
Date: 3/25
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density = 143 pcf
Optimum moisture = 7 %
140.5 pcf
7.5 %
ified
point
SATURATION CURVES
SPEC. GRAy. EQUAL TO:
2.8.
2.7 -
2.6
01 A00
I DAVIS
* No. 59908
Exp. 12/31/05 *
CIVIL
Plate
TESTING ENGINE
COMPACTION TEST REPORT
Curve No.: 15
Project No.: SD89583 Date: 3/31/06
Project: Carlsbad - Rancho Santa FeAgua Dulce Ct Consulting
Location: Native Material @ Elevation 280
Elev./Depth:
Remarks: TESD NO. 16951
MATERIAL DESCRIPTION
Description:
Classifications- USCS: ML AASHTO:
Nat Moist = Sp.G. = 2.55
Liquid Limit= Plasticity Index =
%> No.4 = 4.6 % % < No.200 = 64.3 %
TEST RESULTS
CL
C
V
140 =
-
120 —
Maximum
Optimum
dry
100--
moisture
density = 119 pcf
13 %
Test specification:
ASTM D 1557-91 Procedure A Modified
t- s •. 100% SATURATION CURVES
II - FOR SPEC. GRAV EQUAL TO: -
28 11111 27 s
- 26
- -
S
---
--
= = = = = S
-
—
130—---
---; liii Iii III
--
110=::::::
-
90 -
--
8
—
- - S ---
-
--
-
C---
-
-
± E 70
0 5 10 15 20 25 30 35 40 Water content, %
Plate ______TSTIM( FM(IPJFRS____________________________________
COMPACTION TEST REPORT
Curve No.: 17 Project No.: SD89583 Date: 6/8/06 Project: Carlsbad - Rancho Santa FeAgua Dulce Ct Consulting
Location: On-site Stockpile of Native Material, Sample 17
Elev./Depth:
Remarks: TESD NO. 17475
MATERIAL DESCRIPTION
Description: Light Brown Sandy silt
Classifications - USCS: ML A.ASHTO: Nat. Moist. = Sp.G. = 2.50 Liquid Limit = Plasticity Index = %>No.4 1.5% %<No.200 59.5%
TEST RESULTS
Maximum dry density = 116.5 pcf
Optimum moisture = 13.5 %
140
130
90
Test specification:
ASTM D 1557-91 Procedure A Modified
ç
100% SATURATION CURVES ' FOR SPEC. GRAy. EQUAL TO:
28 2.7 2.6
_
= = == = = = = = = = =
- - - S
1111111111
--
S
11111
= = = - - -
-
--
- - - - --- - -
- IIIIIIIiii ç \
---
--
120--
'kiio--
--
-
-
-
100 --- = = = = = = = =
11111 11111
- -
-
- --
--
--
80 - - -
70
0 5 10 15 20 25 30 35 40 Water content, %
Plate TESTIN( FN(IWFFRS
COMPACTION TEST REPORT
Curve No.: 19
Project No.: SD89583 Date: 6/22/06 Project: Carlsbad - Rancho Santa FeAgua Dulce Ct Consulting
Location: Blackrail Street & Songbird Ave, Sample #19
Elev./Depth:
Remarks: NO. 0006
MATERIAL DESCRIPTION
Description: Reddish-Brown Silty sand
Classifications - USCS: SM AASHTO:
Nat. Moist. = Sp.G. = 2.59
Liquid Limit Plasticity Index =
%>No.4 0.0% %<No.200 = 21.1%
TEST RESULTS
CL
140
:i
90
100 ---
=
Maximum
Optimum
thy
moisture
density = 126 pcf
= 11 %
s, Test specification:
- ASTM D 1557-91 Procedure A Modified
-
100%SATuRATiONCURVES
2.8 :::1
FOR SPEC. GRAV. EQUAL TO:
2.7
2.6
-
= = = = '
, S
- -130 --
1IIIIiiiIIi.!
---
---------
80 -
-
=L = =1= == = = = = = = L 25
= = = + = = = 70
0 5 10 15 20 30 35 40 Water content, %
Plate TFTIW( FN(IWFFR____________________________________
COMPACTION TEST REPORT
Curve No.: 18
Project No.: SD89583 Date: 6/19/06
Project: Carlsbad - Rancho Santa FeAgua Dulce Ct Consulting
Location: 3' HIGH GRADE @ FCI SITE, SAMPLE #18
Elev./Depth:
Remarks: TESD NO. 17552
MATERIAL DESCRIPTION
Description: Red Silty sand with gravel
Classifications - USCS: SM AASHTO:
Nat. Moist. = - Sp.G. = 2.58
Liquid Limit = Plasticity Index =
%> 3/8 in. = 17.9 % % < No.200 = 25.8 %
TEST RESULTS
Maximum dry density = 129 pcf
Optimum moisture = 8.5 %
140 = = = = = = . Test specification:
- -S - ASTM D 1557-91 Procedure B Modified -
130 -' - -
400,1 -
-
100% SATURATION CURVES
- FOR SPEC. GRAy. EQUAL TO: ---
28
27
a
120-N.
--- Siio 26
100
90
I -
--
---
S -
-
--
80 ---
70 ---1
- -
- - - o 5 10 15 20 25 30 35 40
Water content, %
Plate TESTING ENGINEERS
COMPACTION TEST REPORT
Curve No.: 20
Project No.: SD89583 Date: 8/1/06
Project: Carlsbad - Rancho Santa FeAgua Dulce Ct Consulting
Location: Old Rancho Santa Fe Rd Sub-base, Sample #20
Elev./Depth:
Remarks: 921
MATERIAL DESCRIPTION
Description: Tannish-Brown Silty sand with gravel
Classifications - USCS: SM AASHTO:
Nat. Moist. = Sp.G. = 2.62
Liquid Limit = Plasticity Index =
%> 314 in. = 12.5 % % < No.200 = 19.8 %
TEST RESULTS
CL
140
90 —
=
II
Maximum
Optimum
dry
moisture
density = 135.5 pcf
= 8 %
Test specification:
ASTM D 1557-91 Procedure C Modified
100% SATURATION CURVES liii FOR SPEC. GRAV. EQUAL TO:
-
2.8
= = = = = \L3J\
130———————— -+
120-- III 11111
80 -11-
70
0 5 10 15 20 25 30 35 40
Water content, %
Plate
FTIIJ( FPJ( INFFR___________________________________
150
140
130
110
100
COMPACTION TEST REPORT
Curve No.: 23
Project No.: 089583 Date: 11/22/06
Project: Carlsbad - RSF Road Slide
Location: Stockpile, Cl 2 Base, Hanson San Marcos, #23
Elev./Depth:
Remarks: 2259
MATERIAL DESCRIPTION
Description: Gray Silty sand with gravel
Classifications - USCS: SM AASHTO:
Nat. Moist. = Sp.G. = 2.70
Liquid Limit = Plasticity Index =
%> 314 in. = 4.3 % % < No.200 = 12.5 %
TEST RESULTS
Maximum dry density = 144 pcf
Optimum moisture = 6 %
Water content, %
I Plate
TESTING ENGINEERS
..
-
COMPACTION TEST REPORT
Curve No.: 23
Project No.: SD89583
Project: Carlsbad - Rancho Santa FeAgua Dulce Ct Consulting
Location: Pedestrial/Bike Path & Utility Access Rd, #23
Elev./Depth:
Remarks: 2296
Date: 12/6/06
Description: Brownish-Gray Base
Classifications - USCS:
Nat. Moist. =
Liquid Limit =
%>314in. %
MATERIAL DESCRIPTION
AASHTO:
Sp.G.= 2.60
Plasticity Index =
% < No.200 =
TEST RESULTS
Maximum dry density = 142.5 pcf
Optimum moisture = 5 %
150 Test specification:
ASTM D 1557-91 Procedure C Modified
130
1
Ism
a • ____ _________
100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
2.7
- 2.6
TIM, ig Engi neers-San Diego; c. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name LLic U NA LJ- 1J, WLAVOI
Project Number 9' 70 Test Date i... Page j. of
Client
Test # Material 'I
Structure Test Location and Elevation or Depth relative to...
r kALUol Lt",J 4 '- 1k P
11
6 5
6%
k
M
p i-.-- PkJ L [L
$L4 1 $ O f$, 4
4t 1' P41 ( 1'4G(1U t 5jia ?-31+7', cx)' t5 4 (rf Ax,P rh1- çoc ,. i$ I 0f.4_, P
L1, '4 D2f t7 r G Qf f A-c P h4L,-tt 1t,. t., L5iT. '$c lift I Ac ' ns4jzsf, LrM', 4'ç -9- +7$, 4eIit)Eor 6S- tc& P tt f 0 t$\Wi j- -1 '5 0.
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
-. 6f 3 1-t 6't6 'ri k±i 1 69l i6. :( Probe Depth (inches)
Wet Density (pcf)
(till 1 11ml i ll,12.7 Dry Density (pci) -
Moisture
MD Curve Number
Maximum Density (pc
Optimum Moisture (%)
-.'--
Relative Compaction, RC (%) iI1 5I 7i Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%)
Conformance (Yes/No) Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor of their responsibility for p
e
r
f
o
r
m
a
n
c
e
,
i
n
a
c
c
o
r
d
a
n
c
e
w
i
t
h
the lans, specifications and applicable. codes. The contractor is responsible for scheduling retesting of reworked are
a
s
t
h
a
t
h
a
v
e
p
r
e
v
i
o
u
s
l
y
f
a
i
l
4
J
t
o
m
e
e
t
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
See accompanying Daily Report for description of work and observation
s
.
'
TFSD s Testing Technician Name -- Signature
Client's or Contractor's Acknowledgement: Name: Ar,4alk Signature:
White- 'Office Yellow- Contractor Pink- Field Technician
specifications and applicable
.meet specifications. -
Te ng Engineers-San Diego, e. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPQRT OF COMPACTION TEST DATA
.i—. I
Test Date J2. Page of_...
Test # Material Structure Test Location and Elevation or Depth relative to...
-
65* oil—
G" ç;cP
F
RAL L4 Cf
Gs& ftC r 5 \A.l $1 irj lAA4r1 4W
/
6 1 '°
'
Ut ,- 4, e -i-°
' A & r LII Tat' L. a-o -i4o gc- 4. tS c ciut vt i4- ,k-iiTt r .
6L hifiT
- f-c ? Cr_
Material: S = Soil, AC = Asphalt Concrete, ATB= Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC= Sidewalk, Curb/Gutter, 0 = Other
-. -
Test #
- Tr Probe Depth (inches)
NEWPOPR
_Optimum Moisture ________________
Compaction, RC (%)
Relative
Relative
__________________
.
Specif
Specified
ied RC
__________
Nuclear Gauge .Model and Serial Number:
This report does not relieve the contractor of their responsibility for performance in accord
a
n
c
e
w
i
t
h
t
h
e
codes. The contractor is responsible for scheduling retesting of reworked areas that hav
e
p
r
e
v
i
o
u
s
l
y
f
a
i
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: Signature:. -
Client's or Contractor's Acknowledgement: -Name:
White- Office Yellow- Contractor Pink- Field Technician
i
COMPACTION TEST REPORT
Project No.: 46703
Project: Rancho Santa Fe North Realignment and Widening
Location: On site crusher
Elev./Depth:
Remarks: TESD Lab No. 11591
Date: 3/29/04
MATERIAL DESCRIPTION
Description: 1-1/2 Class 2 Aggregate Base
Classifications - USCS: AASHTO:
Nat; Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>3/41n.= 21.8% %<No.200=
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density = 148.5 pcf
Optimum moisture = 5 %
143 pcf
6.5%
125
120
115
5 10
150
[I 145
140
130
Lion:
.91 Procedure C Modified
ction applied to each point
100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
2.7
2.6
15
Waterd ent, %
Plate
-TESTING E INEERS