Mr. Grant Eklund
C/o City of Carlsbad Public Works - Engineering
I 1645 South Rancho Santa Fe Road #202
San Marcos, CA 92069-5188
I Subject: Supplemental Geotechnical Testing
Project: Rancho Santa Fe Road North, Phase 1
Carlsbad, California
Gentlemen:
June 02, 2004
Contract No.: 46703
In accordance with a request from Mr. Plotnikiewicz, Testing Engineers-U.S. Laboratories, Inc. (TE-
USL) has performed supplemental geotechnical testing at the referenced project. The supplemental
testing consisted of non-destructive pavement deflection testing and the augering of 10 exploratory
borings, including the placement of 7 piezometers, at selected locations on the recently constructed
Rancho Santa Fe Road in Carlsbad, California.
The Supplemental geotechnical testing was prompted by the discovery of 2. new pavement areas
distressed to failure located on the southbound lane near stations 189 +50 and 190+00. This report
presents the results of our non-destructive pavement deflection testing, exploratory borings, and
laboratory testing, and provides our conclusions and recommendations.
Non-Destructive Deflection Testing
The non-destructive deflection testing of the new pavement was completed from
stations 176+50 through 217+50. There were four test lines established along the
length of the test area. Line 1 was in the northbound lane, close to the outer edge of the
pavement; Line 2 was also in the northbound lane, but close to the median; Line 3 was
in the southbound lane, close to the median; and Line 4 was in the southbound lane,
close to the outer edge of the pavement. Most of the pavement had four inches of
asphalt concrete pavement over either 16 or 18 inches of process miscellaneous base.
This structural section was supported on at least eight feet of compacted fill. The fill
appeared similar to the base material and consisted of gravel with a clayey sand or
sandy clay matrix.
Non-destructive deflection tests were performed in 50-foot increments in the test lines
closest to the outer pavement edge. The lines closest to the median area were tested at
100-foot increments. Tests were performed with a falling-weight deflectometer
provided by the County of San Diego. Our geotechnical engineer monitored the testing
and analyzed the test data. A preliminary report has been issued. This report
supersedes the preliminary report.
A total of 225 locations were tested. The test at each location consisted of applying
three different loads and measuring the resulting pavement deflection with seven
sensors spaced outwardly from the load center. Twenty-one test points were obtained
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810
Offices Nationwide
I
I for each test location. The data converted to a Dynamic Stiffness Modulus (kips per
inch) that relates varying loads with corresponding deflections.
I This data was statically analyzed with the results illustrated on the attached Plate 1.
The right side of the distribution curve shows an approximate normal distribution. The
I left side appears truncated, typically due to minimum construction specification
requirements. For this project, the average minus one standard deviation is used for the
borderline of weaker pavement structural section areas.
I Plate 2 shows the distribution of test data along the pavement length. Two areas stand
out with grouping of the lower strength data. Area 1 is from about 198+00 to 202+00.
Area 2 is from 208+50 to 214+00. Relatively low deflections spanned across the width
I of the road in each of these areas. These areas should be monitored for early signs of
pavement distress.
Subsurface Testing
The subsurface investigation was performed on March 19, 2004 and consisted of 10
exploratory borings, identified as C-i through C-10. The borings were placed at pre-selected
locations on both north and southbound lanes of the newly constructed Rancho Santa Fe
Road from stations 176+00 to 208+20. A Mobile C-61 drill rig was utilized to auger the
borings to depths ranging from 6 to 11 feet below the existing asphalt surface. Our staff
geologist logged the borings and collected samples that were sealed in moisture resistant
containers and transported to the laboratory for subsequent testing. Detailed descriptions of
the encountered subsurface materials are provided in the exploration logs in Appendix A
following the text of this report.
At the boring locations, the pavement ranged from 3.5 to 5.0-inches in thickness, with the
majority averaging 4.5 inches. The asphalt was supported by about 18 inches of on-site
processed miscellaneous base followed by 3 to 9 feet of engineered fill, of which consisted of
clayey gravel (crushed metavolcanic rock) and gravelly clay materials. The fill was generally
damp to moist and dense in consistency, however, moist to very moist soil conditions were
observed at the lower portions of fill above the formational contact at borings C-6, C-8, C-9,
and C- 10.
In addition to the borings, piezometers were constructed in 7 of the 10 borings to monitor
I potential water infiltration. The piezometers were placed at depths ranging from 5 to 10 feet
below the existing asphaltic surface. No measurable water was observed in the borings from
the time of construction through April 25, 2004.
I Laboratory Testing
I A laboratory-testing program was conducted to evaluate pertinent geotechnical engineering
characteristics. Laboratory testing included visual classification, Atteberg Limits, moisture
content determination, and sieve analyses. All phases of the laboratory testing program were
conducted in general accordance with applicable ASTM specifications or other accepted test I method(s). The test results are presented in Appendix B following the text of this report.
I
46703 Rancho Santa Fe Roadway Realignment and Widening - Supplemental Geotechnical Testing
Conclusions
Based on the investigative works discussed herein, it is our opinion that the two major factors
contributing to the addressed problems are as follows:
The utilization of on-site materials with highly plastic fines (processed 3-inch minus and
crushed miscellaneous base derived from metavolcanic rock and soil).
The introduction of irrigation drainage water and lack of subdrain placement within the
roadway alignment at potential seepage zones.
Recommendations
For future consideration of proposed roadways, the following recommendations are provided for
your consideration:
Utilization of CMB (greenbook) in lieu of on-site processed materials would provide a capillary
break and significantly reduce the localized excessive deformation resulting in an extended life of
the pavement.
Installation of seepage pits, consisting of clean 3/4-inch rock extends down to the bedrock
interface, with a volume sufficient to infiltrate irrigation water in conjunction with planters. In
addition, subdrainage elements should be installed where seepage zones occur.
Utilizing rubberized asphalt to minimize manifestation of any excessive deflections and thereby
extend the design life of the pavement.
TESD appreciates the opportunity to be of assistance to you on this project. Should you
questions regarding the content of this letter, please do not hesitate to contact us.
Respectfully submitted,
Testing Engineers - US Labs, Inc.
I ~e~ 61 -;-
Charles B. McDuffie
Staff Engineering Geologist
Distribution: (6) addressees
I3 OLi
No. C..60016
IU.I No. 6E2578
2/
Exp. 6/30104
jtCE RGP
Van Olin, GE 2578 OFCØ
Geotechnical Division anaer
CBMIVO/cl
PLATES
- I-
-•:-.
I
I ' I
•
i .
It
l ;
I
-
I:
H
I
'i'iin Line I Line 2 I Line 3 Line 4 Station Remarks
176+50 565 I 176+50 Line 1: NorthbOund. Outer
177+00 Line 2: Northbound, Inner
177+50 Line 3: Southbound Outer
178+00 Line 4: Southbound Inner
178+50
179+00
179.50
180+00
180+50
101+00
181+50
182+00 -
182+50
183+00
183+50
184.00 Line 4: near construction trailers
184+50
185+00
185+50 Near Paseo Lupino intersection
186+00
186+50
187+00
JZ 188+00
188+50
189+00
189150 Line 3 & 4: near south dig-out -
190+00 Line 3 & 4: near north dig-out
190.50
191+00
191.50
192+00
192+50
193+00
193+50
194+00
194+50
195+00
195+50
196-t00
196+50
197+00
197+50
198 +00
198+50
199+00 Line 1.198+50 to 199+50: newer pavemel
199+50 Line 2, 199+00 to 201+00: newer pavemel
200-100
200+50
201+00
202+00
202+50
203+00
203+50
204+00 Structural section change 6/18 to 6/16
204+50
205+00
205+50
208+00
206+50
207400
207+50 Line 4, 207+50: newer pavement
208+00
208+50:Near Caminilo Juniper intersection
209+00
209+50
-210+00
210+50
211+00
212+00
212+50
213+00 Line 3, 213+00 thinner pavement(2
213+50
214+00
214+50 •
215+00
215+50 e.
218+00
216+50
217+00
217+50
177.00 660
177+50 516 1
178-1-00 582 I 535
178+50 509 486
179-t00 - 505 • 505
179+50 568 r 565
180+00 592 585
180+50 763 1565o
181+00 640 626 3525t1+
181+50 -439:5 798
182.00 540 1 747 941
182+50 698 1 872
183+00 883 1 806 981
183+50 1045 943
184+00 986 1062 794 809
184+50 875 - 758
1199 - 185+00 798 758 1002
185+50 848 729
186+00 939 1 1000 935 863
186+50 1116 7-
187+00 920 828 715 723
17 2. i _L.
o 188+00 746 737 754 801
188+50 794 714
189+00 813 869 689 963
189+50 589 792
190+00 815 861 629 690
190+50 836 691
191+00 675 1221 1 776 963
191+50 805 1 698
192+00 790 1320-' 626 735
192+50 699 744
193+00 717 744 711 714
193+50 822 724
194+00 707 1041 699 785
194+50 973 I 671
195+00 630 1094 584 74
195+50 923 627
196+00 863 972 573 712
196+50 1142 519
197+00 1021 713 544 523
197+50 796 - 465
198+00 — 549 641 —— A 691
198+50
--
611
1 599 702 542
99+50 1 569 45j
200+00 646 Y492-1 490l. 11 4fli
200k ttv460F .-4657ht.,
201 ttl386 ,442ti- 682 681
202400 -1tQ5'1$th 530 1 721 683
202+50 613 761
203+00 519 661 • 873 741
p203+50 539 1 849
204+00 602 607 1 828 852
204+50 551 716
205+00 597 665 669 777
205+50 561 761
206+00 582 589 795 683
206+50 648 832
207+00 722 679 593 811
207+50 654 - 517
208+00 678 712 476.4 572
208+50 714
209+00 --61-91 544 I 501 495
209+50 537
210+00 559 599 62'Ytt a937It
210+50 7437 334th
211+00 660 4445vtii 525 +455-
211 L50_ 670 •-2
212+00 543 th,378t 580 328,b'
212+50 515 Lffi,+42t)&
213~00 ~;;-:,, 509 1 n452 0, 589
213+50 551 54295
214+00 4 724 599 627
214+50 605 638
215+00 516 658 585
215+50 626 •
216+00 554
216+50 591 I
217+00 619
217+50 '76t •
-
C - ••
- 1, • I
•
- -.
4.
• -
-'i 4 4
-- -.)
4 -
• -- 0" '. ', - •
• '.
• 4
• ••- -
r - C
.4 -
I: ,,' . .:J •,•. 1
- BTCIUS Laboratories, Inc
RanchoSanta Fe Road, Carlsbad, California
nvnl.nalr QT19CMCQQ Uflohli IlS Ikinc np, hnhh I
Data Distribution Table MnJmum Maximum Number Mid-Range Percent
0 99 0 50 0% 100 199 0 150 0%
200 299 1 250 0%
300 389 11 350 5%
400 499 28 450
500 599 50 550 22%
600 690 46 650 20% 700 799 42 750 19%
800 899 23 850 10% 900 999 12 950 5%
1000 1099 7 1050 3%
1100 1199 3 1150 1% 1200 1299 1 1250 0% 1300 1399 1 1350 0%
1400 1499 0 1450 0% Number of tests = 225
Deviation
p
184
- Standard Deviation 484
+ Slandard Deviation 852
0% —--r --t---- -------
150 250 350 450 550 650 750 850 950 1050 1150 1250 1350
-
LU Z DATE DRILLED 4/19/04 BORING NO. C-I - 0
GROUND ELEVATION SHEET 1. OF
METHOD DRILLING Mobile C-61 I Q) J (I)
>- &5 LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A Cl) 0)
0 t 0 0 DESCRIPTION
I
ASPHALT:
GC \ 3.5 inches thick
FILL:
Clayey GRAVEL
7 Light brown, damp to moist, dense.
5.6
-,--
EU..
-
Total Depth = 8.0 feet
Groundwater not encountered
— - - Backfilled on 4/19/04
Refusal at -8 feet.
15.4.6
__ —-
BORING Testing Engineers - U.S. Labs Rancho Santa Fe North Realignment & Widening 7895 Convoy Court, Suite 18
San Diego, CA 92111 CONTRACT NO. REPORT DATE FIGURE
5 •UWi.L'U 46703 May 2004 A-I
DATE DRILLED 4/19/04 BORING NO. C-2
--I b -.
!.
0.
GROUND ELEVATION SHEET 1 OF
U)g ° E METHOD DRILLING Mobile C-61 I D U)
5 LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A
—-1—U)
>-
(I) U)
0 DESCRIPTION
ASPHALT: - -
\ 4.5 inches thick
76 FILL:
Clayey GRAVEL
Light brown, moist, dense.
5L..
6.3 -
SANTIAGO FORMATION:
Metavolcanic ROCK with clay
10 - 4.3 . Light brown, damp, dense to very dense.
Total Depth = 11.0 feet
Groundwater not encountered
. Backfihled on 4/19/04 -
BORING LOG Testing Engineers - U.S. Labs Rancho Santa Fe North Realignment & Widening
Rancho Santa Fe, California 7895 Convoy Court, Suite 18
San Diego, CA 92111 CONTRACT NO. REPORT DATE FIGURE ________ Uw'.'. 46703 May 2004 A-2
Cl) w Z DATE DRILLED 4/19/04 BORING NO. C-3
0
-
.
0
GROUND ELEVATION SHEET OF
ECo _
LL c (j° METHOD DRILLING Mobile C-61 I C/) D
Co
(I) z w LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A
a
0 L DD > c o a DESCRIPTION
ASPHALT:
GC \ 4.5 inches thick
FILL:
Clayey GRAVEL
Light brown, damp to moist, dense.
3.9
SANTIAGO FORMATION:
CLAYSTONE, contains some gravel size metavolcanic rock.
Light orange brown, damp to moist, stiff.
10 Total Depth = 10.0 feet
Groundwater not encountered
Backfilled on 4/19/04
20
Testing Engineers - U.S. Labs BORING LOG
Rancho Santa Fe North Realignment & Widening I
I
7895 Convoy Court, Suite 18 Ii Rancho Santa Fe, California . I
________ San Diego, CA 92111 CONTRACT NO. REPORT DATE FIGURE
46703 I May 2004 1 A-3 I
U) w - Li- Z DATE DRILLED 4/19/04 BORING NO. C-4
a,2 0
0
GROUND ELEVATION SHEET I OF
>- E U) jO METHOD DRILLING Mobile C-61
C/)
U) z w LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A
a
— co1 DESCRIPTION
ASPHALT: \ 4.5inchesthick I
FILL: 156
Clayey GRAVEL
Light brown, damp to moist, dense.
7.3 GCI Gravelly CLAY
I Tan, very moist, firm to stiff.
Contains some 1-2 inch diameter unbrocken clay clods.
t GCt Clayey GRAVEL
I I I Light brown, damp to moist, dense.
5
8.2
SANTIAGO FORMATION:
Metavolcanic ROCK with clay, trace fine sands
-)
Light orange-brown, damp, dense to very dense.
a)
3.0
Total Depth = 10.0 feet
Groundwater not encountered
- - . Backfilled on 4/19/04
15.4.6 - -
a) 5
a)
1-
U) — - -
'a C) (0
(9 (0 (9 0 -J
(9 2
BORING LOG Testing Engineers - U.S. Labs Rancho Santa Fe North Realignment & Widening 7895 Convoy Court, Suite 18 Rancho Santa Fe, California
________ San Diego, CA 92111 CONTRACT NO. j REPORT DATE FIGURE
It •"' 46703 I May 2004 I A-4 a-
Z DATE DRILLED 4/19/04 BORING NO. C-5
- 0
GROUND ELEVATION SHEET I OF
METHOD DRILLING Mobile C-61
>- LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A Cl) Cl)
0' a DESCRIPTION
I ASPHALT: - -
GC \ 4.5 inches thick
- 66 - Clayey GRAVEL
- -
Light brown, moist, dense.
- - - - —
-- 10.8 GC Gravelly CLAY
Light brown, moist to very moist, firm to stiff.
5.1.5
15.7 CL Silty CLAY with rock
Tan, moist, stiff.
- High plasticity. -
SANTIAGO FORMATION:
CLAYSTONE
10 6.7 Tan, damp to moist, stiff.
Some trace fine sand and gravel.
Total Depth = 11.0 feet
Groundwater not encountered
Backfilled on 4/19/04 - - -
206.1
BORING LOG Testing Engineers - U.S. Labs Rancho Santa Fe North Realignment & Widening
Rancho Santa Fe, California 7895 Convoy Court, Suite 18
San Diego, CA 92111 CONTRACT NO. REPORT DATE FIGURE
IWi•iU 46703 May 2004 A-5
a
a C
a
a 0
U) w u- DATE DRILLED 4/19/04 BORING NO. C-6
"(L 0 GROUND ELEVATION SHEET I OF I I
Q)<O UJ > E (I) C) METHOD DRILLING Mobile C-61
U)
U) Z w
2 C6 LL
LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A
0 ILl wa.Iö 0
DESCRIPTION WELL CONSTRUCTION
J FILL: GC ASPHALT: \ 5 inches thick - -
7.1 - - Clayey GRAVEL
Light brown, damp to moist, dense.
9.0
ii
2 inch diameter
ii
Piezometer pipe
- - 10.0 At -8 ft, becomes moist to very moist.
- - 9.7
10-1-0
10.5 -
--
Total Depth = 11.0 feet
Groundwater not encountered
- - - Backfilled on 4/19/04
15.4.6
-- -
BORING LOG Ø3 Testing Engineers - U.S. Labs Rancho Santa Fe North Realignment & Widening 7895 Convoy Court, Suite 18 Rancho Santa Fe, California
CONTRACT NO. REPORT DATE FIGURE San Diego, CA 92111
46703 I May 2004 I A-6
C,) w L1 z DATE DRILLED 4/19/04 BORING NO. C-8
0 GROUND ELEVATION SHEET I OF
? 'D<OW METHOD DRILLING Mobile C-61 I COD
C/)
Ci) Z w CO LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A
o iuoI9 w =1> ö a
ca 2
0 0 DESCRIPTION
-
I' ASPHALT:
GC \ inches thick
3.8 FILL:
Clayey GRAVEL
Light brown, damp to moist, dense.
-
GC Gravelly CLAY
I -- Light brown, moist to very moist, stiff.'
18.3 - SANTIAGO FORMATION: 5 - CLAYSTONE / SANDSTONE
Tan, moist, stiff.
Total Depth = 6.0 feet
Groundwater not encountered
- - Backfilled on 4/19/04
a) >
Flo' 1 20 16.11 I I I I I I I
C) BORING LOG
' Testing Engineers - U.S. Labs Rancho Santa Fe North Realignment & Widening 7895 Convoy Court, Suite 18 Rancho Santa Fe, California
San Diego, CA 92111 CONTRACT NO.
'
REPORT DATE
I
FIGURE
46703 May 2004 A-7
C/)
.
0
(/)
UJ
0
>- (1)
Z
5
Cl)
DATE DRILLED 4/19/04 BORING NO. C-9
GROUND ELEVATION SHEET I OF
METHOD DRILLING Mobile C-61
LOGGED BY CBM DRIVE WEIGHT N/A DROP N/A
DESCRIPTION
- -
- - I ASPHALT: \ 4.5 inches thick
11.4
GC
GC
FILL:
Clayey GRAVEL
Light brown, moist, dense.
Gravelly CLAY
Light brown to brown, very moist, firm to stiff. - -
5 - 19.1
SANTIAGO FORMATION:
CLAYSTONE
Tan to light brown, damp to moist.
High plasticity.
10
- -
Total Depth = 6.0 feet
Groundwater not encountered
Backfilled on 4/19/04
- -
is4..
20J----
Testing Engineers - U.S. Labs
7895 Convoy Court, Suite 18
________ San Diego, CA 92111
BORING LOG
Rancho Santa Fe North Realignment & Widening
Rancho Santa Fe, California
CONTRACT NO.
46703
REPORT DATE
May 2004
FIGURE
1 A-8
I
I
I
Li
I
I
I
I
I
I
1
I
I ç-CI)
!.
D
0
Cl)
Z
E5
DATE DRILLED 4/19/04 BORING NO. C-10
GROUND ELEVATION SHEET I OF
METHOD DRILLING Mobile C-61
LOGGED BY CBM DRIVE WEIGHT• N/A DROP N/A
DESCRIPTION
5
GC
GC
CL
ASPHALT:
\ 4.5 inches thick
- -
71
13.7
14.4
FILL:
Clayey GRAVEL
Light brown, moist, dense.
Gravelly CLAY
Light brown to brown, very moist, firm to stiff.
SANTIAGO FORMATION:
CLAYSTONE
Tan to light brown, damp to moist, stiff.
High plasticity.
-
-
-
-
-
10
20
- -
Total Depth = 6.0 feet
Groundwater not encountered
Backfilled on 4/19/04 -
- -
6.1
Testing Engineers - U.S. Labs
7895 Convoy Court, Suite 18
________ San Diego, CA 92111
____________________________________________________________
BORING LOG
Rancho Santa Fe North Realignment & Widening
Rancho Santa Fe, California
CONTRACT NO.
46703
REPORT DATE
May 2004
FIGURE
A-9
m
U.S. LABS
Natural Moisture
(Ring Samples)
Date: April 28, 2004
Job No: 46703
Client: CITY OF CARLSBAD
Address: 5950 El Camino Real
Carlsbad Ca 92008
Report No: 6857
ENGINEER: VAN OLIN, CIVIL ENGINEER
REVIEWED: CARLOS ACERO, STAFF ENGINEER
Project: Rancho Santa Fe North Realignment and Widening
Date Sampled: 04/19/04
Lab Number 11865 11867 11868 11869 118701 11871 11872
Sample Identification C-I @2' C-2 @ 1' C-2 @7' C-2 @ 10' C-3 @2' C-3 @8' C-4 @ I'
Moisture Content, % 5.6 7.6 6.3 4.3 3.9 11.0 5.6
Lab Number 11873 11874 11875 11876 11877 11878 11879
Sample Identification C-4 @ 2.5' C-4 @ 7' C-S @ 1' C-5 @ 2' C-5 @ 6' C-S @ 10' C-6 @ 1'
Moisture Content, % 17.3 8.2 6.6 10.8 15.7 6.7 7.1
Lab Number 11880 11881 11882 11883 11884 11885 11886
Sample Identification C-6 @ 2' C-6 @ 8' C-6 @ 9' C-8 @ 1' C-8 @ 3' C-8 @ 4.5,' C-9 @ 1'
Moisture Content, % 9.0 10.0 9.7 3.8 17.7 18.3 4.3
Lab Number 11887 11888 11889 11890 11891
Sample Identification C-9 @ 3' C-9 @ 5' C-10 @ 1' C-10 @ 2.5' C-10 @ 4.5'
Moisture Content, % 11.4 19.1 7.1 13.7 14.4
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 1 San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810