Date: D'&cember 28, 1989 To: CITY OF CARLSBAD
2075 Los Palmas Drive
Carlsbad, CA 92009
Project: RANCHO SANTA FE ROAD
Carlsbad, CA
Project #: 1-1-339
Gentlemen:
Enclosed are the compaction reports for the dates of:
12/11/89, 12/12/89
All work monitored by our technicians and inspectors was done
in accordance with the applicable codes and specifications,
unless otherwise noted.
Should you have any further questions, please do'not hesitate
to contact our office-.
AMERICAN ENGINEERING LABORATORIES, INC.
Reviewed by:
ROBERT M. Z~~KELI, Operations Manager
Page 1 of I
AMERICAN ENGINEERING LABORATORIES, INC.
a-1'40 Arlon, Dr.. Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Cir. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307 (619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project # — I [ ___3 3
Project Name (per plans)
Project Address (legal) — CJP4 _514~1,11J~~
Architect
Engineer
Contractor
Report No.
Building Permit No
Plan File No.
Govt. Contract No.
OSA or OSHPD #
Other
INSPECTION CODE -f- MAT'L SAMPLING CITY MATERIAL DESCRIPTION INSPECTION CHECKLIST
— OSHPD I'll — Concrete Cylinders — — Rinf.: Rebar Plan & Specs
— OSA I'll — Cement — — Rinf.: W.W.F. Clearances
— Specialty P49 — Mortar Samples — — Rinf.: Tendons Positions
— Mechanical PIO — Grout Samples — — Conc.: Mix #/psi Sizes
— Electrical P09 — Masonry Prisms — — Conc.: Mix #/psi Laps
— Roofing P17 — Masonry Block — — Conc.: Mix #/psi Future Continuity #/psi
— Concrete P12 — Fireproofing — — Grout: Mix #/psi Consolidation
— Masonry P13 — Units (block or brick) — — Mortar: Type/psi Mortar Balching
— Struct Steel P15 — Asphaltic Concrete — — Units: Block Electrode Storage
— Prestress Conc P14 — Roofing — — Units: Brick Torque Applied
— Pile Driving P16 — Reinf. Steel — — Steel
— Fireproofing P47 — Steel — — H.S. Bolls
— Waterproofing P48 — H.S. Bolts — — Metal Decking
— Non-Destructive P31 — Tendon (PT Strands) — — Electrodes
— Soils Technician P22 — Other — Fireproofing
Corrective action required — Batch Plant P18 — Other — Other
— Boll Pull-Out P33 I — Other Corrections completed
INSPECTION DATE:
I D~_
/ A- Ic = t— S 0 / -D,r- k---) Q I J I _~_ ~'
_Q_
t-- !~: 0 'D ~Q I, C'
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans,. specifications and applicable sections of
the building codes. T report c th locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME P Y~ INSPECTOR COMPANY I.D. NO.
(Print Clearly)
INSPECTOR SIGNATURE CERT. #
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after 3:30 p.m. on weekdays.
DATE
AMERICAN ENGINEERING LABORATORIES, INC.
Ll-?<4'0 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE: 1
I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST # LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
80* DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
TEST # LOCATION OF TEST
`5 7-A-T- C' C(,-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
OWDENSITY
h(A
XIMUM DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
Le tl~ C
/9 (--7
TEST LOCATION OF TEST I"
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
IiIIIII19DENSITY
6-1kY-AVT. F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
12-- w, I/ - A- c-
TEST LOCATION OF TEST
FIEjD
MOISTURE
%
OPTIMUM
MOISTURE
% I
FIELD
IWDENSITY
LA-~r.`C.F.
MAXIMUM
DRY DENSITY
PERCE NT
RE L ATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
F)r R K S:
L4!
1".'_
t I tqflkt 4~0(,
TEST # LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
0 WDENSITY
A, %;I i ~~. F.
MAXIMUM
.. DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
Lp -I
AEL102 (04/89)
v
41 L AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arions Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 -Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE: 2-
C-tN, R Ls 6 04D I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
WW DENSITY
F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
I
TEST N LOCATION OF TEST
`7 -5 rA_ T— t:R 1-6 7 12-
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
jt6~14 SITY
C. F .
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
PERCENT
REL. COMP.
I REMARKS:
E Eel/- % % COMPACTION REOUIRED
TEST 0 1 LOCATION OF TEST
15 T_)~'"l
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
MW DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RE LATIVE
PERCENT REMARKS:
% % COMPACTION
REL
C P. RE~UIDRMED
1q.1-r IQ.5,1
TEST N LOCATION OF TEST
f\-T— <t'
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
,j!rDE
.
NSITY
P.0 F
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCEN. T
REL. COMP.
REOUIRED
REMARKS.
- Fck,\ ~ LA T-e-
TEST N LOCATION OF TEST
15 1 Q7 5
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DON-DENSITY
f,~P:C.F.
MAXIMUM
DRY DENSITY
PE!CENT
RE ATIVE
COMPACTION
PERCENT
REL.
REG=
REMARKS:
Le-Z/ -
I -if t- I tqLl. w') 01 6"~ - '~'-
AEL102 (04/89)
, k A "5
AMERICAN ENGINEERING LABORATORIES, INC.
e'7940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE:
I.D. NO.: C
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST # LOCATION OF TEST S-~ T-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
MY DENSITY
P C. F.
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
CQ~ t,4,- C~l- C-!Fc-,
I-, -~ \J~ \~
TEST If LOCATION OF TEST f~2
I '
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
WPr DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
RIPKL
I 3
TEST N LOCATION OF TEST —IA-*1 *2- -7
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
% . 14-Qj7T.F.
FIELD
QkW DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
Arc-.
Aa~ vi,
TEST # LOCATION OF TEST
11 Y
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
% L
FIELD
IM DENSITY
U Q-UrC.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
Li `7 t Lfi- S-c"
TEST # LOCATION OF TEST 3
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
% L
FIELD
-%WDENSITY
4-4~M. F.
MAXIMUM
-DRYDENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS: j k"k
'AEL102 (04/89)
1w5
AMERICAN ENGINEERING LABORATORIES, INC.
0-IT4-0 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT:
-::~ N
o DATE: 0
I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
T EST 0 LOCATION OF TEST
FIELD OPTIMUM FIELD MAXIMUM PERCENT REMARKS:
MOISTURE MOISTURE
%
=E
.
NSITY
C F .
DRY DENSITY P
ERCENT
RELATIVE
COMPACTION
REL. COMP.
REQUIRED
[qq. f '~- &' IS--
TEST If LOCATION OF TEST P'Q
1 -7
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE
%
MOISTURE
%
-1111W DENSITY DRY DENSITY RELATIVE
COMPACTION
REL. COMP.
REG U.RE'
6F
C_'e
C)
q E': I
TEST # LOCATION OF TEST, 1 7 *L
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
UWPPDENSITY
&kl-44P.C.F.
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
-COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
I q 67,g pr
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
% -
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
-COMPACTION
PERCE
N.
T
REL. COMP.
REQUIRED
REMARKS:
TEST 9 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
.. DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
AEL102 (04/89)
AMERICAN ENGINEERING LABORATORIES, INC.
W1940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT:
P~
PROJECT:
1-2-pi.t-cq
REPORT OF FIELD COMPACTION TEST
DATE: Z—S-~
I.D. NO.: J~)
PROJECT NO.: t 13,37
1 6 J~,- 3
TEST 4 LOCATION OF TEST k M 5
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
6~~SITY
C.F
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
-REGUIRED
REMARKS:
(1c P-11— 0 (-,:- Fc,'~' ~ u'u'-
5c- Lt C,
TEST III LOCATION OF TEST -5 a 9
-Z-C.5 ~ --- r,-- T- L
FIELD
MOISTURE
%
- OPTIMUM
MOISTURE
%
FIELD.
NSITY
C F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
_REQUIRED_
REMARKS:
tqGl Lt
TEST N LOCATION OF TEST
T
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE OW DENSITY DRY DENSITY RELATIVE REL. COMP.
% % F. C-oMPftC"qN REOUIRED EYE V.
TEST # LOCATION OF TEST S'
0'F
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
FIELD
~LWE
.
NSITY
C F
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
L61 (YJ-,t--7
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
,;E
.
NSITY tr
.0 F
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
6 kt,
L t liz
AEL102 (04/89)
0
AMERICAN ENGINEERING LABORATORIES, INC.
Q119-40 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIE NT: PROJECT: DATE: c- I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST 0 LOCATION OF TEST -4.1 -a (5 6 -t— t 1 -5'/-(,
~?_ ile -(-~e ~ P a I ~ -Q P —( C'
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
I %
FIELD
SM DENSITY
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST 0 LOCATION OF TEST -51171- J_ -3
T- o f=
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
0" DENSITY
MAXIMUM
Y 0 0 Y
PEACE NT
RE ATIVE L
PERCENT REL. COMP. REMARKS-
% % COMPACTION REQUIRED
EDRYENSITY
7~-V i J_ ":)
TEST # LOCATION OF TEST TA~ C' I,---
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
AW DENSITY
C. F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST N LOCATION OF TEST 4-
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
"* DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RE L ATIV E
PERCENT
REL. COMP.
REMARKS:
jP L % % AltF6.C.F. COMPACTION REQUIRED
t~ Ld-- q c -7 t -q 6- _` 5-- I
TEST If LOCATION OF TEST
'?__ V
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
4" DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
A E KWR K S;
tq~, 2--
AEL102 (04/89) /~
.3
AMERICAN ENGINEERING LABORATORIES, INC.
D-TIA-0 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT:
REPORT OF FIELD COMPACTION TEST
-2 DATE:
I.D. NO.: C~~ -~'
PROJECT NO.:
.-B d JZ
TEST N LOCATION OF TEST '5
FIELC~
MOISTURE
%
OPTIMUM
MOISTURE
I %
FIELD
SOW DENSITY
MAXIMUM
DRY DENSITY
PERCE NT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
> Ile
t-A
TEST N LOCATION OF TEST '57-A-T-- ci+-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
VJWDENSITY
MAXIMUM
DRY DENSITY
PERCENT
_L
COMPACTION 0 P CT.ON
PERCENT
REL. COMP.
REOUIRED
REMARKS:
2
L
jRELATIVE [
# LOCATION OF TEST 75 7-A -f— CtTEST
N Pv7 c)
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
UK DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REKLARKS:
TEST # LOCATION OF TEST 51) ~1 '~ 1, -3 C)
FIELD
MOISTURE
OPTIMUM
MOISTURE
% f-A
FIELD
MR DENSITY
C. F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
MEL. COMP.
REGUIRED
RF.WKS: p. A<-
TEST # LOCATION OF TEST 7
~1 1 -7, T-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
SW DENSITY
AW-".C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
RE OLARKS: ~
UR.I,/
-ar-)--~ 14,5~j 17L V,
AEL10 2(04/89) )2'Wj
1~
American Engineering Laboratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126
Telephone (619) 695-3730
San Diego 0 Modesto 0 Corona 0 Yucca Valley
Apple Valley
arm
To: CITY OF CARLSBAD Date: December 7, 1989
2075 Los Palmas Drive
Carlsbad, CA 92009
Project: RANCHO SANTA FE ROAD Project #: 1-1-339.
Carlsbad, CA
Gentlemen:
Enclosed are the compaction reports for the dates of:
11/17/89
All work monitored by our technicians and inspectors was done
in accordance with the applicable codes and specifications,
unless otherwise noted.
Should you have any further questions, please do not hesitate
to contact our office.
AMERICAN ENGINEERING LABORATORIES, INC.
Reviewed by:
M. ~j7l~
ROBERT M. ZIKZZI, Operations Manager
1-CfTY OF CARLSBAD~
AMERICAN ENGINEERING'LABORATORIES, INC.-
0 7940 Arions Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business CIr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
CLIENT: PROJECT: DATE: J-1 — 0 G
I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST N LOCATION OF TEST
q ccj~vzcVA C~
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
4'-'e A F 5 F r -ol ell, t-2 I
TEST 9 LOCATION OF TEST
A- A0 f C' g'A P
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED I
REMARKS:
I q -0 1 9.. L-, (2- S,'-) k -Z - 1) If - T - -,~ I
TEST N LOCATION OF TEST
+
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
C;. i,,-g,7 (~,;t
TEST U LOCATION OF TEST
20 + AD f114)s(i
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
FOP-A 9~P 1 9, C (3A. -7 9c(',P 11 ~;-
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
L 1 7-9 1 S, (3 2, 0
A E L 162 (0.4'/,89)
AMERICAN ENGINEERING'LABORATORIES9 INC.
0 7940 Arions Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctf. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley. CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
CLIENT: PROJECT: DATE:
C-' A C L () 0A 9 V A10CA 1) 'GAtITA I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST 0 LOCATION OF TEST
'2 ., ?-A 911! —~-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
&94f? I?
TEST N I LOCATION OF TEST
I 4,'T-A Ze-)A- -4 W flAiSd
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DRY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
fj-
TEST N LOCATION OF TEST
(~cf-h r2— 6 1:7 - + - e- 9 0 154 (~4%-GCZ F-A'P&
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
e-'al Rnvo 1
9
- -
-y
1 '8 , ~- ( .3 & - - I 1~ . 2 , b /'.) d-
-1 ~?
TEST 9 LOCATION OF TEST
1;-VA 24*:~6 A-46 f7114 VPA 0- Ltg6f-A I)E
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
e- -f 5
TEST 4 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
f T .121A 13-2 --o 9
AEL102 (04/89)
AMERICAN ENGINEERING'LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Mr. Dr., Unit A 0 13641 John Glenn Rd.. Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
CLIENT: PROJECT: DATE:
e_vT-(' 'rF C4LSm(? I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST N LOCATION OF TEST
f7b f71415k~ ~Y%,W>Cj_jZAPE
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DAY DENSITY
PERCE ' NT
RELATIVE
-COMPACTION
PERCEN
.
T
REL. COMP.
REOUIRED
REMARKS:
TEST 4 LOCATION OF TEST
~TA 2 (2 + 1 .6
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
.
REL. COMP
REOUIRED
REMARKS:
&' t4 F-el IL I vuo I n-b t ('I --i, 1 241) & q 1)
TEST N LOCATION OF TEST
,~T'A 12 Vi + 1; 1) f—;;LEV Y S-6`1
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F:._
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST N LOCATION OF TEST
,;-fh ?h4
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
C-0ta firf-0-1 12-"6 1 11 't, 1 KI-7 IS-3 "10
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOWRED
REMARKS:
AEL102 (04/89)
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arlons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Dr., Unit A 0 13641 John Glenn Rd.. Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
CLIENT: PROJECT: DATE:
FAje-q6 r,-49'IA fF- R40AV I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST N LOCATION OF TEST
,~—tA Zn- -+L)4
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST 9 LOCATION OF TEST
'Alt 2-V-S + L;b
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
Ca4f7of t- )1 ,6 put, 0_16
TEST # LOCATION OF TEST
e.~ 1-6 t-qj,0 aev
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DRY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
)I , t) I jit, I m- n, . q 6 ,
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST # LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
I
AEL102 (04/89)
American Engineering Laboratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126
Telephone (619) 695-3730
San Diego 0 Modesto 0 Corona 0 Yucca Valley
Apple Valley
To: CITY OF CARLSBAD Date: December 13, 1989
2075 Los Palmas Drive
Carlsbad, CA 92009.
Proj eQt: RANCHO SANTA FE ROAD Project #: 1-1-339
Carlsbad, CA
Gentlemen:
Enclosed are the compaction reports for the dates of:
12/8/89
All work monitored by our technicians and inspectors was done
in accordance with the applicable codes and specifications,
unless otherwise noted.
Should you have any further questions, please do not hesitate
to contact our office.
AMERICAN ENGINEERING LABORATORIES, INC.
Reviewed by:
kOBERT M. ZIKELI, Operations Manager
1-CITY OF CARLSBAD
Project # — t I Z -3
Project Name (per plans) A
Page 1 of t
AMERICAN ENGINEERING LABORATORIES, INC.
G-?94TArions Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way D 58945 Business Cir. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego. CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Report No. —
Building Permit No
Project Address (legal) O-P-~L J_ 'S_ 6 A- c4 Plan File No.
Architect Govt. Contract No.
Engineer OSA or OSHPD
Contractor Other
INSPECTION CODE MATT SAMPLING OTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
— OSHPD P11 — Concrete Cylinders Rinf.: Rebar Plan & Specs
— OSA P11 — Cement Rint.: W.W.F. Clearances
— Specialty P49 — Mortar Samples Rinf.: Tendons Positions
— Mechanical PIO — Grout Samples Conc.: Mix #/psi Sizes
— Electrical P09 — Masonry Prisms Conc.: Mix #/psi Laps
— Rooting P17 — Masonry Block — — Conc.: Mix #/psi Future Continuity #/psi
— Concrete P12 — Fireproofing — — Grout: Mix #/psi Consolidation
— Masonry P13 — Units (block or brick) — — Mortar: Type/psi Mortar Batching
— Struct Steel P15 — Asphaltic Concrete — — Units: Block Electrode Storage
— Prestress Conc P14 — Roofing — — Units: Brick Torque Applied
— Pile Driving P16 — Reinf. Steel — — Steel
— Fireproofing P47 — Steel — — H.S. Bolts
— Waterproofing P48 — H.S. Bolts — Metal Decking
— Non-Destructive P31 — Tendon (PT Strands) — Electrodes
— Soils Technician P22 — Other — Fireproofing
Corrective action required — Batch Plant P18 — Other — Other
— Bolt Pull-Out P33 — Other Corrections completed
INSPECTION DATE:
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans,. specifications and applicable sections of
the building codes. This report covers the~ locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME JJ INSPECTOR COMPANY I.D. NO.
(Print Clearly)
INSPECTOR SIGNATURE ~) CERT. # DATE
NOTE: Inspections base on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after 3:30 p.m. on weekdays.
AMERICAN ENGINEERING LABORATORIES, INC.
Cg,1-640 Arjons Dr., Suite A
San Diego, CA 92126
(619) 695-3730
CLIENT:
0 350 S. Maple St., Unit K 0 515 Galaxy Way
Corona, CA 91720 Modesto, CA 95356
(714) 272-4230 (209) 576-0813
PROJECT:
JZ JA N- c-H r-, 'D A j~-I-A (r-:
0 58945 Business Center Dr., Unit A
Yucca Valley, CA 92284
(619) 228-1754
DATE: 1,-2—
I. D. NO.: q-,~~ - - L
PROJECT NO.: t '73 -3 1~
REPORT OF FIELD COMPACTION TEST
TEST # LOCATION OF TEST
I
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY P
ERCENT
RELATIVE
comP*e"Qt!
PERCENT
REL. COMP.
REQUIRED
REMARKS:
- tl 13 1)~So
e-1 I U
TEST # LOCATION OF TEST
6
FIELD
MOISTURE
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COME&Q_TION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
C" r C%
TEST # LOCATION OF TEST
QZ:-Q-
FIELD OPTIMUM FIELD MAXIMUM PERCENT REMARKS:
MOISTURE
%
MOISTURE
I %
DRY DENSITY
P. C. F.
DRY DENSITY
PERCE
N
T
RELATIVE
COMPACTION
REL. COMP.
REQUIRED
C,
TEST N LOCATION OF TEST
I
j "j-
F.
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
N
PERCENT
VE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
R E M A R K S;
3 1? 2-f?"
j1DRYDENSITY AELATi,
TEST 0 LOCATION OF TEST c 4::;
W-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
0 . RY DENSITY
PERCENT
RELATIVE
COMPAIqTION
PERCENT REL. COMP.
REQUIRED
REMARKS:
arc
AEL102 (04/891
AMERICAN ENGI-NEERING LABORATORIES, INC.
91'940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: 0 AT E:
I.D. NO.;
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST # LOCATION OF TEST -r -v 1'~~
OPTIMUM FIELD MAXIMUM
P
ERCE NT PERCENT REMARKS: FIELD
MOISTURE
%
MOISTURE
%
DRY DENSITY
P.C.F.
DRY DENSITY RELATIVE
COMPACTION
REL. COMP.
REQUIRED Ql,/
- ~- 6- '% t r- oci~4
C. 4-10
-( - '~ ~ tA
TEST # LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
CO PACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
'77
/L I -- I - '-,. \ ~/ ':;~4 tl-% - . A .
TEST 4 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCE
N.
T
REL. COMP.
REQUIRED
REMARKS:
I I
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATI VE
COMPACTION
PERCE
N.
T
REL. COMP.
REQUIRED
REMARKS:
-7
TEST 9 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
AEL102 (04/89)
TO:
American Engineering La4oratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126 RIECEIV Telephone (619) 695-3730
San Diego Modesto - Corona Yucca Valley JAN 0 4 1990
Apple Valley
MUNICIPAL PROJIMTS,
DIVISION'
CITY OF CARLSBAD Date: December 20, 1989
2075 Los Palmas Drive
Carlsbad, CA 92009
Proj ect: RANCHO S"TA FE ROAD Project #: 1-1-339
Carlsbad, CA t~
Gentlemen:
Enclosed are the compaction reports for the dates of:
12/5/89
All work monitored by our technicians and inspectors was done
in accordance with the applicable codes and specifications,
unless:otherwise noted.
Should you have any further questions, please do not hesitate
to contact our office.
AMERICAN ENGINEERING LABORATORIES, INC.
Reviewed by:'
ROBERT M. ZIX9LI, Operations Manager
1-CITY -OF CARLSBAD-
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arlons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way .0 58945 Business Center Dr., Unit A
San Dlego,'CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: C_ PROJECT: QA DATE:
I.D. NO.:
P ZOJ
13L/5/,Rcl
E C T N 0.: 1- 1- 3-3 ct
-REPORT OF FIELD COMPACTION TEST
TEST N LOCATION OF TEST Li i so :S_ 6" Rt-la"t &.*It,
RA.
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PEACE
N'
T
REL. COMP.
REQUIRED
REMARKS: C'On xjj_&O_~ "jd\ %4144"
cks~~
-7.4 %-S 131.0 130.0 113-'a
. (35.,0
TEST N LOCATION OF TEST'
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST # LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PEACE T
RELATINVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
/)-p) / L~2i/J (
AEL102 (04/89)
v
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE:
I.D. NO.:46~
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST 0 LOCATION OF TEST S pck
:StcJ~~ 9-13
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATI V E
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
k4" C"
-~)I' q-5,0
TEST N LOCATION OF TEST
5
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
DRY DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
PERCENT
REL. COMP.
REMARKS:
'"4-
% % P.C.F. COMPACTION AEOUIRED ama
7.13 1-5 19 3 - 1 ~).9,5 9 4 9 5,'0 e&t,,T\ A:,I,, a 4~~
TEST 4 LOCATION OF TEST 50
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
Ito AQJ N 13.5 S'_5 k3 1, Lt 13'a,o
N
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
I -a9-5 91,(-
TEST 9 LOCATION OF TEST 13 q S - 6LA4
G 1114k I
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS:
f), q 's-5 130o( )3d,() qo,,6 c(S_
0.
AEL102 (04/89)
AMERICAN- ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto: CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: ~rxj,,Ja Sav~ :1-c- RA. DATE: 11- acl- :9 Lf
I.D. NO.:
Jim"Ai4j"14A PROJECT NO.:. I- 1- 3-31
REPORT OF FIELD COMPACTION TEST
TEST N L . OCATION OF TEST _-5-0 Al -
vjz.,- G -,Lc~
FIELD
MOISTURE
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED---
REMARKS:
7.5 1 -a-5.~ '~7, ol 95.0
TEST 0 LOCATION OF TEST S o
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DRY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
13d.0 qq-3 9 -5- 0
TEST N LOCATION OF TEST
-3
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
3-cr 0
TEST N LOCATION OF TEST 4- 4-
-kIYI,A llil~
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DRY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
I 6. L( `6 - 5 1~s,q 9,5.-o
TEST 9 LOCATION OF TEST A- . s RA
G
FIELD
MOISTURE
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
CN. '1 -5
AEL102 (04/69)
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way D 58945 Business Ctr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
CLIENT: cu~ rf- (;-,eA-mA PROJECT: 120" DATE: 1 67
-2,V,
4
I.D. NO.:
PROJECT NO.: 1-1-3317
REPORT OF FIELD COMPACTIO14 TEST
TEST N LOCATION OF TEST
e, RA
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY P
EACENT
RELATIVE
COMPACTION
PERCE
NT REL COMP.
REQUIRED
REMARKS:
-7.7 0. ~'— J-~q.00 `7~, ( 7-5. 0
TEST # LOCATION OF TEST
-7
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
9M ld~lo -- <8 7 j . 0
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS3
TEST 4 LOCATION OF TEST
FIELD
MOISTURE
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS-
AEL102 (04/89)
AMERICAN ENGINEERING LABORATORIES9 INC.
0 7940 Arions Dr., Ste. A 0. 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Dr., Unit-A 0 13641 John Glenn Rd., Ste. C
San Didgo. CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) ?47-8445
CLIENT: I PROJECT: 9,_,
j _I DATE:
I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST LOCATION OF TEST pz-A~ oj~
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
. %
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
--
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
51-CA.1-A
A1,K j .
.
t,.V,
G-a 1 75 1(3 3 5 1 -0fl?. 5 ~ ~ 5 - q 95.0
TEST N LOCATION OF TEST
&- a-x ul-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
-A,~ C,~
9.3 -7.
-7
TEST # LOCATION OF TEST a 13 t 6 q
FIELD
MOISTURE
%-
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
A-Lx~ j- r" 0 1 -d-3,9 ]@'t 5 953
TEST N LOCATION OF TEST
4 C-X - SU&T
FIELD OPTIMUM FIELD MAXIMUM
MOISTURE MOISTURE DRY DENSITY DRY DENSITY
% % P.C.F.
9.5 -?. 5 1 -al
PERCENT PERCENT REMARKS:
RELATIVE REL. COMP.
;OMPACTION REQUIRED
c[cr . (" cfs~ 0
TEST 0 LOCATION OF TEST a10
'5
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
-
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
So.—A
vu~j j().5 -.5 ~ 3 1. -a 13 0,o CT9, q "?s -'0
AEL162 (04/89)
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arlons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Clr. Dr., 1.14A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) .228-1754 (619) 247-8445
CLIENT: PROJECT: DATE:
I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST LOCATION OF TEST t So C910-4tizA -0'4n Ak,:;,eJ 4AAA
0A S-11~
FIELD OPTIMUM FIELD MAX MUM PERCENT PERCE~T REMARKS:
M IF OISTURE MOISTURE Dny DENSITY DRY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
<Z-o .-7-5 i~aq.o I-aq-s 139.6 95
TEST N LOCATION OF TEST 0 (0
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
RkOUIRED
REMARKS:
-7-( &r; m5-s 130,.0 q5-1 95
TEST 9 LOCATION OF TEST ck
CIA
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
6. s 1 19-5.3 133.0 9`5-0 95
TEST a LOCATION OF TEST
4 N I
il
L. OPT.
MUM FIELD OMAXIMUMY I PERCENT PERCENT I REMARKS:
MOI:TURE I MOISTURE DRY DENSITY I RY DENSIT RELATIVE REL COMP.
% % I P.C.F. I OMPACTION I REQU
TEST N LOCATION OF TEST AA -
L Cft 1%vis
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DAY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
5-9 '7.5* 1~rj.5'- ~5-5 95
AEL102 (04/89)
q!
AMERICAN ENGINEERING LABORATORIES, INC. j ALM
7940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE:
I.D. NO.:
k4XAA,-M PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST 0 LOCATION OF TEST
A- 4- - )v'aX6y\ @. \ 5 ~ () 0
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
it
MAX MUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
I
-?,,o Ra - I Qq -5 15.9
TEST N LOCATION OF TEST
w3
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DAY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
5 q,a I -~,5 ~-X?, 4 ~?9,5 9<~ -~ 9 S.
TEST 4 LOCATION OF TEST
3 Q0 -t- O'Z
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
n,\Z, "j, VI-I& - 13919 11313 .0 91~'q q5
TEST P LOCATION 0 F TEST
L ~ WS +50 2C, -
j Ue,-w '51 () - S
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
DRY DENSITY
MAXIMUM
DRY DENSIT
PEFICE NT
RELATIVE
PERCENT
REL. COMP.
REMARKS:
% % P.C.F. COMPACTION REQUIRED
as I all- - S
TEST 0 LOCATION OF TEST
5' SAx4tz-~A -c~ 13
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
I %
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT RELATIVE
C.OMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
6e~ i'~' q~ I
A-r— U -
- a"r'~ 7 3 1 '9 -6 . C) -'i~ 13 ~30'0 139.1 1 '_5
AEL102 (04/89)
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr.,- Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Cir. Dr., Unit"ff 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
CLIENT: PROJECT: DATE:
I.D. NO.: fvl~
PROJECT No.: 3 -315
REPORT OF FIELD COMPACTION TEST
TEST 0 LOCATION OF TEST i:f~- 50-71
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
0 0
TEST III LOCATION OF TEST alq +-75 Uw._0'50'8'
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DAY DENSITY RELATIVE REL. COMP.
% % P.C.F. COMPACTION REQUIRED
11-0 11.6 11 Tc7 1(9 11,0 _<75' / (70
TEST 0 LOCATION OF TEST 15 +5 o 5oS.15
3
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE DRY DENSITY DRY DENSITY RELATIVE REL COMP.
% % P.C.F. COMPACTION REQUIRED
19.0 IQS-5 its-( .1 ct 0
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
I
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED
REMARKS:
AEI-102 (04/89)
AMERICAN ENGINEERIN . G LABORATORIES, INC.
.C~40 Arjons Dr., Sulte A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: r-7'Zn- DATE- ) -Z
V— ri
I.D. NO.:
PROJECT NO.:
C L S 6 ko Zo f~,-J-)
LvV coc,-
REPORT OF FIELD COMPACTION TEST
TEST 4 LOCATION OF TEST
77)02~-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
0"* DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
FIEL COMP.
REQUIRED
REMARKS-
I-- -T
TEST 9 LOCATION OF TEST
C)
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DOW DENSITY
C 4-je JrC. F.
h(AXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP
REOUIRED'
REMARKS:
Let,/-
/ 10 L 19 (--7 q67-10
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
RON DENSITY
6AJ—PVT. F.
MAXIMUM
DRY DENSITY P
EACENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:.
r — P-'- (:~- -
TEST P LOCATION OF TEST Z-6
FIE40 OPTIMUM FIELD MAXIMUM PERCENT PERCENT UMARKS:
moisTunE MOISTURE ItOWDENSITY DRY DENSITY RELATIVE nEL. COMP. .
% 1Z COMPACTION REOUIRED A-c
I q"J, to 1 '(5- 1 Ir. 9
TEST 0 LOCATION OF TEST
YL
FIELD
Mot STunE
%
OPTIMUM
MOISTURE
%
FIELD
WDENSITY
F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
AEOUIRED
REMARKS:
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE: 0 &
0P., -P, Ls f5 na) P- LD. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST N LOCATION OF TEST
-2--f -6 c) o -
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
MON DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
4- f -'-I-
t
TEST II LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
ZPNSITY
C.,
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
FIEL. U'11P.
RECI RED
REMARKS!
TEST 0 LOCATION OF TEST
8~~ ~5 17--A- I - 0 /~~- 6 0 IL
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE MOISTURE IAW DENSITY DRY DENSITY RELATIVE REL. COMP.
% % 0,3 On. F. COMPACTION REOUIRED
TEST 0 LOCATION OF TEST
1~
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
% 4
FIELD
OPM DENSITY
LA:4-P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
RE L * COMP.
RFOUIRED
REMARKS:
Lev— f2~-~Z- Fo~, ~ U r-el
)'.~ (7 -T—
TEST N LOCATION OF TEST
c) TV- 7-
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
D#W-DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
FIEL-comp. RE.R.
REMARKS: A
Oz
AEL102 (04/891
P P-~
AMERICAN ENGINEERING LAsoAATORIES, INC.
Er'-7940 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: %Zp I . DATE-
A `4
C. I.D. NO.:
Po ptp
PROJECT NO.:
REPORT OF FIELD CompAcTION TEST
TEST j LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
-%
FIELD
D" DENSITY
CUZXP. C. F.
MAX
I
MUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REOUIRED
REMARKS:
1 3(~ - 2 q(~;— [s C > ~' ~
J, 55
TEST N LOCATION OF TEST 4-
I *
fv~ L,
FIELD OPTIMUM FIELD MAXI Mum PERCENT PERCENT AEt6AnKj:
MO I STunE MOISTURE 1)3Vr DENSITY DRY DENSITY RELATIVE REL COMP.
% % 1,4L) 9—jr. C. F. COMPACTION REOUIRED
VIf
TEST h LOCATION OF TEST 2- 7 -2
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
4PT DENSITY
4--, Q[V. L. F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
A- t:
s
TEST 0 LOCATION OF TEST %,., - -z -'~ -2, +-~~ /
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
WW DENSITY
Q 42M.F.
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOVIRED
REMARKS:
(-Ye
13,
t fz~:~b t
TEST 0 LOCATION OF TEST
FIELD OPTIMUM FIELD MAXIMUM PERCEN T PERCENT REMARKS:
MOISTURE MOISTURE -C= DENSITY DRY DENSITY RELATIVE REL COMP.
% % COMPACTION REOUIRED
..Wd 1 (6-1
AEL102 (04/891
/rw5
LOCATION OF TEST
OPTIMUM FIELD PERCENT PERCENT REMAAKS:
MOISTURE
%
k"PDENSITY
A>-er. C. F.
MAXIMUMY
DRY DENSIT RELATIVE
COMPACTION
REL COMP.
REOUIRED f
j, q
TEST 0
FIELD
MOISTURE
AMERICAN ENGINEERING LABORATORIES, INC.*
0-700 Arlons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley. CA 92284
(6`19) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE- 0
0 c'f—, 1~(:) pcq -5; Nrj-~E: LD. NO.:
0-
PROJECT NO.:
REPORT OF FIELD comPACTiON tEsT
TEST H LOCATION OF TEST IT-
FIELD OPTIMUM FIELD MAX MUM PERCENT PERCENT REMARKS:
MOISTURE
%
MOISTURE
% . r~ENS or ITY
C F.
IF 0 ENSITY RY D RELATIVE
COMPACTION
REL COMP.
REOUIRED
~,y-?,q V
TEST 11 LOCATION OF TEST fl-Q T3~- 5 7-
f. -?
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT REMARKS:
MOISTURE
%
MOISTURE
%
-O*W DENSITY
&IQ~rC.F.
DRY DENSITY RELATIVE
COMPACTION REL COMP. .. 1IRE.
L
Q_~ C)
1:..
TEST 4 LOCATION OF TEST
FIELD
I OP -MU-
FIELD DMAXIMUMY I PERACTE'.T I PERCENT I REMARKS:
MOISTUI MO.TSTURE I DRY DENSITY I RY DENSIT REL V, REL.
C
% % P.C.F. OMPACTION AEOUI
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
OPTIMUM
MOISTURE
%
FIELD
DAY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REOUIRED
REMARKS:
AMERICAN ENGINEERING LABORATORIES, INC.
01940 Arjons Dr., Suite A 0 350 S. Maple St_ Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT:
C I Ty C' P~
PROJECT:
REPORT OF FIELD COMPACTION TEST
DATE: 12- -L Z-S-%
, . cm - LA to, C9
I.D. NO..
PROJECT NO.:
1 '0 ~'- 3
TEST H LOCATION OF TEST
q f
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
SITY
A=fc. F
MAXIMUM
DAY DENSITY
—
PERCENT
RELATIVE
COMPACTION
PERCENT
nEL. COMP.
REQUIRED —
REMARKS:
~7 (.e Z-
/5'- )— I ~: 4-2-3, 94i;& 1-7
TEST 0 LOCATION OF TEST
F
IELD
M 01 STURE
%
OPTIMUM
M OISTURE
%
FIELD
,agNSITY 01tre
r~~P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
FIEL. COMP.
REOUIRED
REMARKS!
g;-7 (-e-LI—
-1 Ll>
~ tq<) , 's— t W—'3 (? 5—
TEST 0 LOCATION OF TEST -5, `~) (0 4- 1 ~-
-~?-) ~ - o- ~-' T <
FIELD
,AD, UAr ST
OPTIMUM
MOISTURE
FIELD
WW DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
PERCENT
REL. COMP.
REMARKS:
(Z (-Q- 0— A- Q-- L
% % C-0MPftc'"qN —14EOUIRED
TEST 11 LOCATION OF TEST
0 F
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
~_W E
N
SITY
C F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REOUIRED
REMARKS: P~L 6 (C.
-/41 -c~)b L
TEST N LOCATION OF TEST
-2-3 57A
FIELD
MOISTURE
OPTIMUM
MOISTURE
t
FIELD
QW E NSITY
J;C qj~ F.
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
PERCENT
REL. COMP.
REMARKS: 6
-% % COMPACTION REOUIRED L
1 4 tI-q R~
.
Lqq,)
Arl mi fn4/Ani
AME ICAN ENGINEERING LABORATORIES9 INC.
P-19-40 Arjons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754
CLIENT: PROJECT: DATE:
IPN I.D. NO.: va~-J(Z&q'c' ` C-1 0
PROJECT NO.:
T-A-
REPORT OF FIELD COMPACTIO14 TEST
TEST 0 LOCATION OF TEST
-15 1 -- I a (5 6 1-
:~?- Cf P-e V20- ~ -P a I. ~-Q P-(- a -
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
*AW DE:NSITY
P~FIELD
C . F.
MAX MUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED_
REMARKS:
U7 Ue v
(Ltq- 1
f
1.'? - 11 '> 1&
TEST 0 LOCATION OF TEST -51a:-1 -3
- ~- Q p T- f=
FIELD
Mol STUnE
OPTIMUM
MOISTURE
FIELD
#",rf DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
PERCENT
REL. COMP.
REQUIRE D
nFMAnKS!
% COMPACTION
HT1 10-16--1 `7~--V
I TEST 9 1 LOCATION OF TEST LZP-T- C)["- ~'- I
FIELD
MOISTURE
OPTIMUM
MOISTURE
FIELD
.0,61* DENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
PERCENT
AEL. COMP.
REMARKS:
d
% % 14 _) 417P. C. F. COMPACTION REQUIRED
-VT -7
TEST N LOCATION OF TEST
C-i
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
90* DENSITY
MAXIMUM
DAY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
FIEL. COMP.
REQUIRED
AEMARKS: 0 Ll-
11fk-i f3--(f <~ it-
TEST N LOCATION OF TEST
-?- V
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
% t
FIELD
414W DENSITY
DeIACA
MAXIMUM
DRY DENSITY
PERCE NT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REhyRKS: 6
AEL102 (04/09)
p1l
ERICAN ENGINEERING LABoRATORIES, INC.
P-TV4-0 Arlons Dr., Suite A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 BusIness Center Dr., Unit A
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284
(619) 695-3730 (714) 272-4230 (209) 576-06i3 (619) 228-1754
CLIENT: PROJECT: DATE:[
C' I.D. NO.:
PROJECT No.:
REPORT OF FIELD COMPACTIO N TEST
-B
TEST H LOCATION OF TEST -4- ~;-(D
-2- fA-,r- 4~-'
FIELD"
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
-09W DENSITY
jQ,-".C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL. COMP.
REQUIRED
REMARKS:
-C)
TEST 0 LOCATION OF TEST '5TA-7-- 0a;'
-7, t1l,
FIELD
MOISTU n E
OPTIMUM
MOISTURE
FIELD
BJWDENSITY
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
PERCENT
FIEL. COMP.
REMARKS: (-ev— (:~~
% % COMPACTION REQUIRED
a I-D- L up-~ 1 1 16~rL q 3-
C~ 4- TEST N LOCATION OF TEST 7-y-) 0 v
c)
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERC
ENT
REMARKS:
Mol STunE MOISTURE IN" DENSITY DRY DENSITY RELATIVE IEL. CIMP.
% V. C.A)-A?-:rP.C.F. COMPACTION REQUIRED L--e— LZ
VD
TIES, T H LOCATION OF TEST
A 5
7
FIELD OPTIMUM FIELD MAXIMUM PERCENT PERCENT RF"KS!
MOISTURE MOISTURE SWW DENSITY DRY DENSITY RELATIVE REL. COMP.
% % C. F. COMPACTION REQUIRED
TEST If LOCATION OF TEST 7 1-9-0 0
FIELD
MOISTURE
OPTIMUM
MOISTURE
%
FIELD
J= DENSITY
AV,". C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
AEL COMP.
REQUIRED
REWKS:
6et-/ -
L-'o:27- IL[yy lvy-1 '~-7' (Z' 9,
P'l
San Diego — 7940 Arjons Dr., Suite A, San Diego, CA 92126 (619) 695-3730
Modesto — 350 S. Maple St., Unit K, Corona, CA 91720 (714) 272-4230
Corona — 515 Galaxy Way, Modesto, CA 95356 (209) 576-0813
Yucca Valley — 58945 Business Ctr. Dr., Unit A, Yucca Valley, CA 92284 (619) 228-1754
Apple Valley — 13641 John Glenn Rd., Ste. C, Apple Valley, CA 92307 (619) 247-8445
REPORT OF GRADING OBSERVATION
CLIENT: JOB No.: 1-1-337 DAY(S):
JOB NAME JOB LOCATION:
R e GENERAL
RADING OR
CONTRACTOR: 7EARTHWORK CONTRACTOR:
LC-~
D ATE (S)/9
SPECIFIC LOCATION OF wor(~ TO BE P(RFORMED:
GENERAL DESCRIPTION OF GRADING ACTIVITY
'A Cfol [h () X"A ( _Qrr10_) a—.;t _X_Q~ -0 0-1-p- t4`4 ;C4
101-3ILLA ~ So ,,j CJL4-'~
I a2
A0JO
COMMENTS/AREAS OF ADDITIONAL CONCERN
C\_X 9-1. A-t
-<n~t
ba sl~W
E 0 u I Pjwm.
~2B _Z,,,~
DATE TECHNICIAN CODE TIME CHARGED OVER-
FROM TO REG, TIME
APPROVED BY
Id-5-67
VISITORS
BY:
--LEI I
WHITE-Engincering File YELLOW-Field rile PINK-Job Superintendent
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Cir. Dr., Unit'A 0 13641 John Glenn Ad., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yudca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 . (619) 228-1754 (619) 247-8445
CLIENT: PROJECT: DATE: /0 5~~ I.D. NO.:
PROJECT NO.:
REPORT OF FIELD COMPACTION TEST
TEST LOCATION OF TEST -/-f Ae—
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQuinED
RFMAnKS:
60; -e . 49/ T6 13.;?-G '7'7 -Z~ '75
TEST 11 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY N
PEnCE T
RELATIVE
COMPACTION
PERCENT
nEL. COMP.
REQUIRED
REMAAKS:
TEST N LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
- DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
AEL. COMP.
REQUIRED
REMARKS:
I
TEST 0 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
nEL. COMP.
REQUIRED
REMARKS!
TEST 9 LOCATION OF TEST
FIELD
MOISTURE
%
OPTIMUM
MOISTURE
%
FIELD
DRY DENSITY
P.C.F.
MAXIMUM
DRY DENSITY
PERCENT
RELATIVE
COMPACTION
PERCENT
REL COMP.
REQUIRED_
REMARKS,
AEl- 102 (04109)