HomeMy WebLinkAbout3288; CARLSBAD VILLAGE DR STREETSCAPE; COMPACTION TEST RESULTS; 1989-09-12=a
1550 Hotel Circle North
San Diego, California 92108
(619) 294-9400
Fax: (619) 293-7920
Woodward-Clyde Consultants
September 12, 1989
Project No. 8851079W-UD01 SEP 1 4, j969
Harshbarger Construction Corporation
5928 Pascal Court, Suite 310
Carlsbad, California 92008
Attention: Mr. Clifford Moyer
COMPACTION TEST RESULTS
TRENCH BACKFILL: ELECTRICAL, WALL BACKFILL,
WATER LINE, SEWER, PARKING LOT FILL, STORM DRAIN,
SUBGRADE AND BASE
VILLAGE FAIRE
Gentlemen:
Attached are the results of field density tests performed at the subject site at the request of
Mr. Ken Woods, the project superintendent, and under, his direction. These tests were
performed on the dates. and at the locations. indicated. Also attached are the results of
laboratory compaction tests performed on samples of the materials used for fill and backfill.
Field density tests were in accordance with ASTM Test Method D2922-81 (Density of Soil
and Soil Aggregate in Place by Nuclear Methods). Maximum dry density and optimum
moisture content measurements were made in accordance with ASTM Test Method D1557-
78 (Moisture-Density Relations of Soils and Soil - Aggregate Mixtures).
The reported tests represent the relative compaction and water content at the locations
tested. The observations of construction and fi~Ld density testing procedures used followed
normally accepted procedures which are not exact. The accuracy of the maximum dry
density determination (ASTM Method D1557-78) is discussed in the 1985 Annual Book of
ASTM Standards, Section 4, Volume 04.08 "Soil and Rock; Building Stones." Variations
in relative compaction should be expected in lateral and vertical extent.
We did not observe the preparation and compaction of the all the backfill or subgrade and
base. Our opinions as to the relative compaction, water content, or suitability of the fill in
areas not tested are expressed only where we have observed the preparation of such fill
surfaces. We have no knowledge as to the condition of prepared surfaces, compacted fill,
or backfill which we have not observed during preparation or filling or that we have not
specifically tested.
The surface of trench and retaining wall backfill frequently settles even when backfill is
placed under optimum conditions. It is recommended that the design of any facilities such
Consulting Engineers, Geologists
and Environmental Scientists
Offices in Other Principal Cities P~
Harshbarger Construction Corporation Woodward-Clyde Consultants
Project No. 8851079W-UD01
September 12, 1989
Page 2
as buildings, slabs-on-grade, etc., placed upon such fill be designed to accommodate the
potential settlement.
Results of previous tests taken during the grading of this site were included in our report
dated July 18, 1988. The attached test results are to be considered a part of that report and
are subject to the conclusions, recommendations, and general limitations contained therein.
Very truly yours,
.. W -CL ,;02WARD
Richard P. Y;Mle
G.E. 960
RPW/kah
Attachments
CONSULTANTS
~O ~~Xp-c~ &-~~
a/rpwl5
Compaction Test Results
Job Name: ViUage Faire Dates Covered: through August 15, 1989
Job Number 8951079W-UDOI
Type of Test: Base-Curb and Gutter Page 1 of 6
Field Relative
Moist. Field Lab Lab Adj. Moist. Compa
.
ction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of Date No. Of Location Of Test % Dry Wt. Pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Dec. 09 B-1
1988 B-2
B-3
B-4
B-5
B-6
B-7
B-8
B-9 B-1
Jan. 12 B-10
1989 B-11 B-10
B-12 B-11
Jan. 13 B-13
1989
B-14
B-15 B13
B16 B 12
12' W. of Washington St. SG 6.1 136.0 6 143.5 94
245' E. and 20' S. of N.W. Cor. Park- SG 5.4 138.2 6 143.5 96
ing Lot
140' E. and 15' S. of N.W. Cor. Park- SG 5.3 136.9 6 143.5 95
ing Lot
25' E and 15' S. of N.W. Cor. Park- SG 5.8 138.1 6 143.5 96
ing Lot
12' E. and 12'.N. of S.W. Cor. Park- SG 5.0 137.8 6 143.5 96
ing Lot
75' E. and 40' W. of S.W. Cor. Park- SG 5.4 136.2 6 143.5 95
ing Lot
150' E. and 60' S. of N.W. Cor. Park- SG 5.4 137.2 6 143.5 95
ing Lot
245' E. and 115' S. of N.W. Cor. Park- SG 5.0 137.9 6 143.5 96
ing Lot
12' W. of Washinton St.. on CL SG 5.0 140.0 6 143.5 97
Grand Ave., 10' W. of 1st Driveway Base 5.1 126.1 6 143.5 87
Grand Ave., 8' W. of lst Driveway Base 5.8 131.9 6 143.5 91
Grand Ave., 5' W. of Ist Driveway Base 6.9 134.8 6 143.5 93
Grand Ave. Pky., W. Entry Drive, Base 5.9 130.5 7 140.0 93
5'W. of E. Edge
Grand Ave. Pky., E. Entry Drive, Base 5.9 134.9 7 140.0 96 TW. of E. Edge
Grand Ave. Pky., W. Entry Drive, Base 5.3 133.0 7 140.0 95
YW. of Edge
Grand Ave., W. Entry Drive, Base 6.2 136.1 7 140.0 97
5' S. of W. Edge
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: through August 15, 1989
Job Number 8951079W-UD01
Type of Test: Base-Curb and Gutter Page 2 of 6
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jan. 19 B-17 130'N. and 60'W. of N.W. Con, Base 6.2 134.6 7 140.0 96
1989 Bldg. 2
B-18 155' N. and 65'W. of N.W. Con, B ase 7.9 133.7 7 140.0 95
Bldg. 2
B-19 155' N. and 60' E. of N.W. Con, Base 4.9 133.9 7 140.0 95
Bldg. 2
B-20 135' N. and 60' E. of N.W. Con, Base 4.9 134.2 7 140.0 95
Bldg. 2
B-21 140' N. x 5' E. of N.E. Con, Bldg. 3 Base 6. 1 128.1 7 140.0 91
B-22 145' N. x 5' E. of N.E. Cor., Bldg. 3 B ase 5.6 133.0 7 140.0 95
May I I B-23 West Parking Lot, 120'N. of Elm Ave. Base 5.6 125.8 7 140.0 89
1989 B-24 West Parking Lot, 165' N. of Elm Ave. Base 6.2 126.3 7 140.0 90
B-25 West Parking Lot, 200' N. of Elm Ave. Base 5.8 127.8 7 140.0 91
B-26 West Parking Lot, 222' N. of Elm Ave. Base 5.9 129.3 7 140.0 92
B-27 B-24 West Parking Lot, 165'N. of Elm Ave. Base 6.5 128.3 7 140.0 91
B-28 B-23 West Parking Lot, 120' N. of Elm Ave. Base 6.2 137.8 7 140.0 98
B-29 B-25 West Parking Lot, 200'N. of Elm Ave. Base 6.8 135.0 7 140.0 96
B-30 B-26 West Parking Lot, 222' N. of Elm Ave. Base 6.3 134.7 7 140.0 95
B-31 B-27 West Pa
'
rking Lot, 165' N. of Elm. Ave. Base 6.4 137.7 7 140.0 93
B-32 West Parking Lot, 230' N. of Elm Ave. B ase 5.9 134.6 7 140.0 96
B-33 West Parking Lot, 290' N. of Elm Ave. B ase 6.2 133.6 7 140.0 95
B-34 West Parking Lot, 240' N. of Elm Ave. Base 6.5 136.2 7 140.0 97
B-35 West Parking Lot, 220' N. of Elm Ave. Base 6.8 135.1 7 140.0 96
B-36 West Parking Lot, 180' S. of Grand Base 6.1 133.1 7 140.0 95
B-37 West Parking Lot, 140' S. of Grand Base 6.4 133.1 7 140.0 95
B-38 West Parking Lot, 100' S. of Grand Base 5.5 134.6 7 140.0 96
B-39 North Parking Lot, 50' S. of Grand Base 5.4 133.6 7 140.0 95
B-40 North Parking Lot, 65' S. of Grand Base 6.0 134.0 7 140.0 95
B-41 North Parking Lot, 55' S. of Grand Base 5.3 133.0 7 140.0 95
a/rpwl5 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Viflage Faire Dates Covered: through August 15, 1989
Job Number 8951079W-UD01
Type of Test: Base-Curb and Gutter Page 3 of 6
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jun. 13 B-42 Grand Ave. Meridian, S. Side, Base 6.3 137.4 7 - 140.0 88
1989 50' E. of Int.
B-43 Grand Ave. Meridian, S. Side, B ase 4.8 133.2 7 140.0 95
235' E. of Int.
B-44 Grand Ave. Meridian, N. Side Base 6.6 136.2 7 140.0 97
250' E. of Int.
B-45 Grand Ave. Meridian, N. Side Base 6.1 134.7 7 140.0 96
100' E. of Int.
B-46 Grand Ave. Meridian, N. Side B ase 5.9 137.8 7 140.0 98
50' E. of Int.
Jun, 14 B-47 Grand Ave. Meridian, N. Side, Base 5.3 227.3 7 140.0 90
1989 80' W. of Washington
B-48 Grand Ave. Meridian, S. Side Base 6.1 134.7 7 140.0 96
80' W. of Washinton
B-49 Grand Ave. Meridian, S. Side Base 5.4 137.5 7 140.0 98
25' W. of Washington
B-50 Grand Ave. Meridian, N. Side Base 4.7 138.3 7 140.0 98
45' W. of Washington
B-51 Grand Ave. Meridian, N. Side Base 5.2 139.1 7 140.0 99
130' W. of Washington
B-52 Grand Ave. Meridian, N. Side Base 5.6 136.2 7 140.0 97
210' W. of Washington
B-53 Grand Ave. Meridian, S. Side B ase 4.9 139.3 7 140.0 99
225' W. of Washington
B-54 Grand Ave. Meridian, S. Side Base 5.9 135.2 7 140.0 96
150' W.. of Washington
B-55 B47 Grand Ave. Meridian, N. Side Base 5.3 134.0 7 140.0 95
80'W. of Washinton
Jun. 16 B-56 115' N x 75' E. of S.E. Cor., Bldg. 1 Base 6.4 128.8 7 140.0 92
1989 B-57 55' N. x 75' E. of S.E. Cor., Bldg. 1 Base 5.0 118.5 7 140.0 85
B-58 2' N. x 75' E. of S.E. Cor., Bldg. 1 Base 5.5 126.1 7 140.0 90
a/rpwl5 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: through August 15, 1989
Job Number 8951079W-LJDOI
Type of Test: Base-Curb and Gutter Page 4 of 6
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content 'Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jun. 19 B-59 B-57 40' N. x 75' E. of S.E. Con, Bldg. 1 Base 4.8 127.8 7 140.0 91
1989 B-60 B-56 105' N. x 75' E. of S.E. Con, Bldg. 1 Base 3.5 129.8 7 140.0 92
B-61 B-58 15' S. x 75' E. of S.E. Cor., Bldg. 1 Base 6.4 128.6 7 140.0 91
B-62 70' S. x 80' E. of S.E. Cor., Bldg. I Base 4.3 135.5 7 140.0 96
B-63 30' S. x 60' E. of S.E. Cor., Bldg. 1 Base 4.3 133.2 7 140.0 95
Jun. 20 B-64 B-59 35' N. x 75' E. of S.E. Cor., Bldg. 1 Base 4.8 135.2 7 140.0 95
1989 B-65 B-60 130' N. x 75' E. of S.E. Cor., Bldg. I Base 4.6 133.2 7 140.0 95
B-66 B-61 15' N. x 75' E. of S.E. Cor., Bldg. 1 Base 5.4 134.5 7 140.0 96
Jun 29 B-67 S.W. Cor. of Site, E. Side of Driveway Base 2.3 142.2 10 140.0 100
1989 B-68 S.W. Cor. of Site, W. Side of Driveway Base 2.7 137.4 10 140.0 98
B-69 N. of Island S.W. of Bldg. 1 Base 2.8 133.2 10 140.0 95
B-70 Between S.W. Island and Cent. Island Base 3.5 137.3 10 140.0 98
B-71 Between S. Cent. and N. Cent. Island Base 5.0 135.4 10 140.0 97
B-72 S. of N. Cent. Island E. of Bldg. 1 B ase 3.8 134.2 10 140.0 96
B-73 E. of N.E. Cor. of Bldg. 1 Base 4.0 135.3 10 140.0 97
B-74 E. of N.E. Cor. of Bldg. 3 Base 3.5 137.7 10 140.0 98
Jun 30 B-75 E. Side of E. Prkg. Lot, E. of Bldg. 3 Base 4.4 130.6 10 140.0 93
1989 B-76 E. Side of E. Prkg. Lot, 40' S. of Grand B ase 4.0 128.5 10 '140.0 92
B-77 B-75 E. Side of E. Prkg. Lot, S. of Island 3 B ase 4.0 135.3 10 140.0 97
B-78 B-76 E. Side of E. Prkg. Lot, 40' S. of Grand Base 5.7 133.0 10 140.0 95
B-79 N. of C.I. N.E. of Site, S. of Grand Base 4.5 133.3 10 140.0 95
B-80 W. of C.I. in Prkg. Lot, S. of Grand Base 4.2 136.1 10 140.0 97
B-81 N.E. of Bldg. 3 Base 4.5 137.6 10 140.0 98
Jul 05 - B-82 By C.I. N.E. of Bldg. 3, Curb B ase 3.4 134.1 10 140.0 96
1989 B-83 N.E. of Bldg. 3 at Washington and
Grand by C.I. Base 6.2 128.2 10 140.0 92
a/rpwl5 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: through August 15, 1989
Job Number 8951079W-LJDOI
Type of Test: Base-Curb and Gutter Page 5 of 6
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jul 12 B-84 B-83 N.E. of Bldg. 3 at Washington and
1989 Grand by C.I. Base 4.7 .136.9 10 140.0 98
Jul 13 B-85 20' to S.W. from S.W. Cor. of Neimans Base 4.4 135.3 11 136.0 99
1989 B-86 10' S. of Main Entr. to Neimans Base 2.1 130.8 11 136.0 96
B-87 10' S. of S.W. Cor. of Neimans Base 4.2 140.6 11 136.0 100
B-88 12' S. x 5' W. of Stairs S. of Neimans; Base 4.2 137.3 11 136.0 97
B-89 10' N. of Curb x 20' of Stairs S. of
Neimans Base 4.7 136.5 11 136.0 100
B-90 10' E. x 10' S. of S.E. Cor. of Neimans Base 5.0 139.1 11 136.0 100
B-91 Btwn. 2 Islands S. of S.E. Cor. Bldg. 2 Base 4.0 134.3 11 136.0 99
B-92 S. Bay, S. of Bldg. 2, Cntr. Base 5.1 135.0 11 136.0 99
B-93 N. Bay, S. of Bldg. 2, E. Base 3.2 135.9 11 136.0 98
B-94 S. Cntr. Entr., N. Cntr. Base 5.0 138.2 11 135.0 100
B-95 Cntr. S. of S.W. Cor. Bldg. 1 B ase 4.2 138.6 11 136.0 100
B-96 Cntr. S. Bay, S. of Bldg. 1 B ase 5.1 137.1 11 136.0 100
B-97 Cntr. N. Bay, S. of Bldg. 1 Base 4.8 137.4 11 136.0 100
B-98 Cntr., S. of S.E. Cor. Bldg. I Base 4.7 137.3 11 136.0 100
B-99 W. Side, S.E. Entr. Base 3.0 133.5 11 136.0 98
B-100 E. Side,.S. E. Entr. B ase 4.8 134.9 11 136.0 99
B-101 Cntr. N. of Cntr. Island, S.E. Entir. Base 6.0 134.9 11 136.0 99
B-102 E. Bay, E. of S.E. Cor. Bldg. 1 Base 5.7 130.5 11 136.0 96
B-103 W. Bay, E. of S.E. Cor. Bldg. 1 Base 5.3 131.6 11 136.0 96
B-104 S. Cntr., E. of E. Cntr. Bldg. I Base 5.9 133.8 11 136.0 98
B-105 E. Bay, E. of E. Cntr. of N.E. Bldg. I Base 5.3 133.3 11 136.0 98
B-106 W. Bay, E. of E. Cntr. of N.E. Bldg. 1 Base 2.5 130.3 11 136.0 96
B-107 N. Cntr., E. of Cntr. of Bldg. 1 Base 3.3 131.4 11 136.0 96
Aup 07 B-108 4" Base in N.W. Prkg. Lot Driveway to
1989 Grand, N.W. B ase 3.0 135.6 10 140.0 97
B-109 4" Base in N.W. Prkg. Lot Driveway to
Grand, N. Cntr. Base 5.2 144.0 10 140.0 100
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: ViUage Faire Dates Covered: through August 15, 1989
Job Number 8951079W-LJDOI
Type of Test: Base-Curb and Gutter Page 6 of 6
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Aug 07 B-110 4" Base in N.W. Prkg. Lot Driveway to
1989 Grand, S. Cntr. Base 4.1 137.9 10 140.0 98
B-111 4" Base in N.W. Prkg. Lot Driveway to
Grand, S. B ase 6.7 137.8 10 140.0 98
Aug 08 B-112 4" Base, Concrete Swale, E. of Bldg. 3,
1989 N. End Base 4.0 137.4 10 140.0 98
B-113 4" Base, Concrete Swale, E. of Bldg. 3.
S. End Base 3.1 137.6 10 140.0 98
Aug 10 B-114 20' S. and 30' E. of Old Bldg. Cor. Base 4.8 125.7 10 139.5 89
1989 B-1 15 10' S. and 25' E. of Old Bldg. Cor. Base 4.7 130.5 10 139.5 93
Aug 11 B-116 B-115 10' S. and 25' E. of Old Bldg. Cor. Base 3.6 136.0 10 139.5 97
1989 B-117 B-114 30' S. and 30' E. of Old Bldg. Cor. - Base 3.6 133.0 10 139.5 95
Aug 15 B-118 65' N. and 5' E. of N.W. Cor. Bldg. 3 Base 4.5 136.1 10 139.5 97
1989 B-119 25' N. and 60' E. of N.W. Cor. Bldg. 3 B ase 5.2 137.5 10 139.5 98
B-120 55'. N. and 95' E. of N.W. Cor. Bldg. 3 Base 5.7 136.9 10 139.5 98
B-121 25' N. and 15' E. of N.E. Cor. Bldg. 3 Base 5.2 135.2 10 139.5 96
B-122 10' S. and 40' E. of N.E. Cor. Bldg. 3 Base 6. 1 134.3 10 139.5 96
B-123 10' S. and 60' E. of N.E. Cor. Bldg. 3 Base 5.2 138.0 10 139.5 98
B-124 100'N. and 140' E. of N.E. Cor. Bldg. 3 Base 5.8 137.3 10 139.5 98
B-125 65' S. and 70' E. of N.E. Cor. Bldg. 3 Base 4.6 138.9 10 139.5 99
B-126 20' S. and 20' E. of N.E. Cor. Bldg. I B ase 5.4 132.6 10. 139.5 95
B-127 35' S. and 65' E. of N.E. Cor. Bldg. 1 B ase 4.1 139.2 10 139.5 99
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: through August 23, 1989
Job Number 8951079W-EWOI
Type of Test: Subgrade Median Page I of I
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % bry Wt. Lab Dens.
Aug. 23 SM-1 Grand Ave. E. Narrow Median E. End SG 4.1 122.4 1 132.0 92
1989 SM-2 Grand Ave. W. Narrow Median W. End SG 4.7 122.7 1 132.0 92
Woodward-Clyde Consultants
I
Compaction Test Results
Job Name: Village Faire Dates Covered: December 14, 1988 through May 2, 1989
Job Number 8851079W-EWOI
Type of Test: Water Line Trench Backfill Page I of 2
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Dec 14 W-1 50' N. and 20' W. of N.W. Cor. Bldg. 2 5 1' 17.0 100.3 1 132.0 82
1988 W-2 W-1 60'N. and 20' W. of N.W. Cor. Bldg. 2 50.5' 9.1 111.6 1 132.0 84
W-3 W-2 60' N. and 20' W. of N.W. Cor. Bldg. 2 50.5' 10.6 113.8 1 132.0 86
Soil represented by test W-1, W-2, and W-3 was removed and replaced.
W-4 W-3 60'N. and 20'W. of N.W. Cor. Bldg. 2 5 0.5' 9.3 117.1 4 127.5 91
W-5 35'N. and 20'W. of N.W. Cor. Bldg. 2 52' 8.9 117.8 4 127.5 92
W-6 55'N. and 20' W. of N.W. Cor. Bldg. 2 52' 8.3 118.3 4 127.5 92
Dec 19 W-7 70'N. and 15'W. of N.W. Cor. Bldg. 2 49' 9.4 122.5 1 132.0 92
1988 W-8 90' N. and 20' W. of N.W. Cor. Bldg. 2 49' 10.3 123.2 2 132.0 93
W-9 70'N. and 15'W. of N.W. C6r. Bldg. 2 5 0.5' 6.9 119.5 1 132.0 90
Dec 2 W-10 80' N. and 20' W. of N.W. Cor. Bldg. 2 SG 8.0 125.4 1 132.0 95
1988 W-1 1 100'N. and 20' W. of N.W. Cor. Bldg. 2 SG 8.8 123.2 1 132.0 93
W-12 70' N. and 20' W. of N.W. Cor. Bldg. 2 SG 9.1 126.4 1 132.0 95
W-13 60'N. and 18'W. of N.W. Cor. Bldg. 2 49' 7.6 125.1 1 132.0 94
W-14 65'N. and 20'W. of N. W. Cor. Bldg. 2 SG 8.9 123.1 1 132.0 93
Dec 22 W-15 65'N. and 10'W. of N.W. Cor. Bldg. 2 49' 8.0 122.5 1 132.0 92
1988 W-16 70' N. and 10' W. of N.W. Cor. Bldg.- 2 49' 10.5 121.5 1 132.0 92
W-17 70'N. and 15'W. of N.W. Cor. Bldg. 2 SG 10.2 118.9 1 132.0 90
Jan 03 W-18 70'N. of N.W. Cor. Bldg. 2 5 0.5' 11.4 120.7 1 132.0 91
1989 W-19 44'N. of N.W. Cor. Bldg. 2 50.5' 10.4 121.5 1 132.0 92
W-20 12'N. of N.W. Cor. Bldg. 2 5 0.5' 10.2 118.9 1 132.0 90
Jan 04 W-21 52'N. of N.W. Cor. Bldg. 2 51.5' 6.1 120.3 1 132.0 91
1989 W-22 31'N. of N.W. Cor. Bldg. 2 51.5' 9.8 118.9 1 132.0 90
W-23 167' N. of N.W. Cor. Bldg. 2 FG 7.7 121.9 1 132.0 92
W-24 44' N. of N.W. Cor. Bldg. 2 FG 10.9 120.4 1 132.0 91
W-25 15'N. of N.W. Cor. Bldg. 2 FG 8.8 123.1 1 132.0 93
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: December 14, 1988 through May 2, 1989
Job Number 8851079W-EW01
Type of Test: Water Line Trench Backfill Page 2 of 2
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry WL Dens. pcf % Dry Wt. Lab Dens.
Apr 21 W-26 N. of Bldg. 2 49' 9.0 111.2 1 132.0 84
1989 W-27 N. of N.W. Cor. Bldg. 3 42' 7.6 107.7 1 132.0 82
W-28 N. of N.E. Cor. Bldg. 3 43' 11.0 115.4 1 132.0 87
W-29 N. of N.W. Cor. Bldg. 3 511 10.6 113.1 1 132.0 86
W-30 W. of W. Side Bldg. 2 511 11.6 111.5 1 132.0 84
Apr 28 W-31 17N. and 1'W. of N.W. Cor. Bldg. 3 46' 9.7 128.0 1 132.0 97
1989 W-32 17' N. and 45' W. of N.E. Cor. Bldg. 3 42' 5.0 113.1 1 132.0 85
W-33 18' N. and 91' W. of N.E. Cor. Bldg. 3 43' 10.2 113.3 1 132.0 85
W-34 12' N. and 17' W. of N.E. Cor. Bldg. 2 48' 6.7 115.5 1 132.0 87
W-35 W-29 15' S. and 5'W. of N.W. Cor. Bldg. 2 53' 8.6 123.7 1 132.0 93
W-36 80' S. and 5'W. of N.W. Cor. Bldg. 2 5 3.5' 8. 1 118.5 1 132.0 89
W-37 W-30 115' S. and 5'W. of N.W. Cor. Bldg. 2 54' 8.6 116.7 1 132.0 88
W-38 W-36 86' S. and 5' W. of N.W. Cor. Bldg. 2 53.5' 8.6 120.6 1 132.0 91
W-39 50' S. and 5' W. of N.W. Cor. Bldg. 2 53' 12.2 121.4 1 132.0 92
W-40 W-37 11 O'.S. and 5' W. of N.W. Cor. Bldg. 2 54' 8.4 128.2 1 132.0 97
May 01 W-41 W-34 17N. and 30' E. of N.W. Cor. Bldg. 2 48' 6.3 125.9 1 132.0 95
1989 W-42 W-33 45' E. and 12'N. of N.W. Cor. Bldg. 3 43' 7.6 123.3 1 132.0 93
W-43 W-32 35'W. and 12' N. of N.E. Cor. Bldg. 3 42' 6.7 127.9 1 132.0 97
W-44 22' E. and 12' S. of N.E. Cor. Bldg. 3 4 l' 7.3 125.8 1 132.0 95
W-45 11' E. and 18'N. of N.E. Cor. Bldg. 1 4 1' 6.3 125.4 1 132.0 95
May 02 W-46 Between Bldgs. 2 and 3 4 1' 9.3 123.2 1 132.0 93
1989
a/fpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: September 9, 1988
Job Number 8851079W-EWOI
Type of Test: Sewer Trench Backfill (Interior Plumbing) Page 1 of 1
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
SM 09 S-1 Bldg. 3 Sewer, 60' E. of W. Side 42' 5.7 110.2 1 132.0 63
1988 S-2 S-1 Bldg. 3 Sewer, 60' E. of W. Side 42' 9.2 123.6 1 132.0 93
S-3 Bldg. 3 Sewer, 10' W. of E. Wall 40' 8.5 122.4 1 132.0 92
S-4 Bldg. 3 Sewer, 35'W. of E. Wall 42' 9.6 122.2 1 132.0 92
S-5 Bldg. I Sewer, 55' N. of S. Wall 42' 11.2 120.1 1 132.0 91
S-6 Bldg. 1 Sewer, 12'N. of S. Wall 4 1' 10.6 121.5 1 132.0 92
S-7 Bldg.. 2 Sewer, at S-Footing 41'' 8.2 119.5 1 132.0 90
S-8 Bldg. 2 Sewer, 40' N. of S-Footing 42' 7.2 119.3 1 132.0 90
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: May 23 and 24, 1989
Job Number 8851079W-EWOI
Type of Test: Fill: Parking Lots (East Side) Page I of I
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. Pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
May 23 S-1 Former Washington, W. Side at 3+93 SG 7.7 116.8 8 128.0 91
1989 S-2 Former Washington, Center at 3+53 SG 9.9 124.0 1 132.0 94
S-3 Former Washington, 20' W. at 3+53 SG 8.9 114.1 1 132.0 86
S-4 Former Washington, W. Side at 3+00 SG 8.3 119.2 1 132.0 90.
S-5 Former Washington, 20' W. at 2+49 SG 7.1 111.2 1 132.0 84
~-6 Former Washington, Center at 2+15 SG 9.5 124.3 1 132.0 94
S-7 Former Washington, W. Side at 2+00 SG 7.0 123.2 1 132.0 93
S-8 Former Washington, 20' W. at 1+75 SG 5.3 120.7 1 132.0 91
S-9 Former Washington, Center, N. of N.E.
Cor. Bldg. 3 SG 8.8 121.5 1 132.0 92
May 24 S-10 S-3 Former Washington, 20' W. at 3+53 SG 10.1 118.7 8 128.0 92.
1989 S-11 S-5 Former Washington, 20' W. at 2+49 SG 9.6 107.4 8 128.0 84
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: June 14, 1989
Job Number 8851079W-EW01
Type of Test: Storm Drain Page I of I
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location . Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jun 14 SD-1
1989 SD-2
SD-3
SD-4
SD-5
SD-6
SD-7 SD6
Inlet Box at Washington and Grand-2
Inlet Box at Washington and Grand-2
85'N. and 30' E. of S.E. Cor. Bldg. 2
210' N. and 30' E. of S.E. Cor. Bldg.
10' N. and 30' E. of S.E. Cor. Bldg. 1
60' N. and 65' E. of N.E. Cor. Bldg. 3
Inlet Box at Washington and Grand
60' N. and 65' E. of N.E. Cor. Bldg. 3
Inlet Box at Washington and Grand
3 8' 8.7 115.1 8 128.0 90
38' 9.4 117.4 8 128.0 91
38' 7.5 123.8 8 128.0 96
38' 11.0 117.1 8 128.0 91
38' 12.7 122.0 8 128.0 95
9.2 100.5 8 128.0 79
13.5 115.2 8 128.0 90
a/rpwl5 Wood.ward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: November 21, 1988 through August 11, 1989
Job Number 8851079W-EWOI
Type of Test: Subgrade Page I of 3
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation - Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt.' pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Nov 21 SG-1 Grand Ave. Prkg., E. End SG 6.5 128.8 5 132.0 97
1989 SG-2 Grand Ave. Prkg., Cent. N.S. Dr. SG 6.5 126.9 5 132.0 96
SG-3 Grand Ave. Prkg., Cent. S.S. Dr. SG 8.6 125.9 5 - 132.0 95
SG-4 Grand Ave., Prkg., W. End SG 7.0 128.4 5 132.0 97
May 05 SG-5 W. of Neimans, E. of Carlsbad Blvd. SG 5.3 114.8 8 128.0 90
1989 SG-6 E. of Carlsbad Blvd., N.W. Cor. SG 4.6 119.5 8 128.0 93
SG-7 N. of Neimans SG 4.25 110.7 8 128.0 86
SG-8 W. of Village Faire, Cent. SG 6.04 123.5 8 128.0 -96
May 08 SG-9 50'N. x 50'W. of N.W. Cor. Bldg. 2 SG 4.45 117.2 8 128.0 91
1989 SG-10 50'W. of N.W. Cor. Bldg. 2 SG 4.61 119.4 8 128.0 93
SG-11 50'N. of N.W. Cor. Bld.g 2 SG 5.24 122.2 8 128.0 95
SG-12 15'W. of V.F. x 40'N. of Neimans SG 4.11 117.3 8 128.0 92
May 09 SG-13 15'W. of N.W. Cor. Bldg. 2 SG 9.04 116.9 8 128.0 91
1989 SG-14 SG-7 N. of Neimans SG 5.47 115.8 8 128.0 90
SG-15 SG-5 W. of Neimans, E. of Carlsbad Blvd. SG
May 19 SG-16 50' E. of Carlsbad Blvd. x 25' N. of Elm SG 4.3 109.2 8 128.0 85
1989 SG-17 25' E. of Carlsbad Blvd. x 40' N. of Elm SG 5.7 114.8 8 128.0 89
SG-18 15' E. of Carlsbad Blvd. x 55' N. of Elm SG 6.7 122.2 8 128.0 95
SG-19 35' E. of Carlsbad Blvd. x 35' N. of Elm SG 6.7 119.6 8 128.0 93
May 22 SG-20 SG-16 75' E. of Carlsbad Blvd. x 20' N. of Elm SG 6.6 117.4 8 128.0 92
1989 SG-21 SG-17 50' N. of Elm x 50' E. of Carlsbad Blvd. SG 5.7 119.6 8 128.0 93
SG-22 10' S. of Steps S. of Neimans SG 4.0 112.8 8 128.0 88
SG-23 15' N. of Elm x 125' E of Carlsbad Blvd. SG 4.9 115.0 8 128.0 89
SG-24 60' S. of S.W. Cor. Bldg. 2 SG 7.2 112.6 8 128.0 88
SG-25 10' W. x 30' S. of S.E. Cor. Bldg. 2 SG 5.1 119.8. 8 128.0 93
SG-26 45' S. of S.W. Cor. Bldg. 1 SG 8.0 112.5 8 128.0 88
The relative compaction represented by TESTS SG-5 through SG-15 was accepted by project superintendent
akpwl5 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: November 21, 1988 through August 11, 1989
Job Number 8851079W-EWOI
Type of Test: Subgrade Page 2 of 3
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. Pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
May 22 SG-27 50' W. x 15' S. of S.W. Cor. Bldg. I SG 4.7 126.8 9 140.0 90
1989 SG-28 SG-22 10' S. of Steps S. of Neimans SG 6.5 113.3 8 128.0 88
SG-29 SG-23 15' N. of Elm x 130' E. of Carlsbad Blvd. SG 7.4 120.1 8 128.0 94
SG-30 E. of S.E. Cor. Neimans x S. of S.W. Cor.
Bldg. 2 SG 7.6 111.4 8 128.0 87
SG-31 SG-24 60' S. of S.W. Cor. Bldg. 2 x 10' E. SG 7.0 116.8 8 128.0 91
SG-32 35' S. of S.E. Cor. Bldg. 2 SG 9.2 127.9 8 128.0 99+
SG-33 30' S. of S.W. Cor. Bldg. 1 SG 7.6 127.3 8 128.0 99
SG-34 SG-26 55' S. of S.W. Cor. Bldg. 1 SG 8.3 118.2 8 128.0 92
SG-35 S.E. Cor. Bldg. 1: 50' W. x 15' S. SG 7.0 126.8 9 140.0 91
SG-36 55' S. x 15' W. of S.E. Cor. Bldg. 1 SG 9.3 124.9 8 128.0 97
May 23 SG-37 SG-28 10' S. of Stairs S. of Neimans SG 6.3 111.1 8 128.0 87
1989 SG-38 SG-30 E. of S.E. Cor. Neimans, S. of S.W. Cor.
Bldg. 2 SG 8.1 109.7 8 128.0 86
SG-39 .1/2 Way Between SG-37 & SG-38 SG 8.3 110.1 8 128.0 86
SG-40 SG-38 S. of S.W. Cor. Bldg. x E. of S.E Cor.
Neiman's SG 7.55 120.7 8 128.0 94
SG-41 SG-39 Between SG-37 & SG-38 SG 7.9 123.6 8 128.0 97
SG-42 SG-37 10' S. of Steps S. of Neimans SG 5.7 117.6 8 128.0 92
Jul I I SG-43 30' S. of S.W. Cor. of Neimans SG 8.7 126.2 8 128.0 98
1989 SG-44 15' S. of Stairs S. of Neimans SG 11.5 120.1 8 128.0 94
SG-45 3' N. of Prkg. Lot Curb, 30' E. of Stairs SG 5.9 126.8 8 128.0 98
SG-46 3' S. of Wall x 30' E. of Stairs SG 7.9 127.3 8 128.0 99
SG-47 10' S. of S.E. Cor. of Neimans SG 6.0 122.3 8 128.0 95
SG-48 S. Bay on S. Side of Bldg. 2 SG 5.3 118.5 8 128.0 92
SG-49 N. Bay S. of Bldg. 2 SG 7.3 128.4 8 128.0 99
SG-50 18' S. of S. Entrance to Mall SG 4.0 129.9 1 132.0 98
SG-51 Cent. of S. Cent. Prkg. Lot Entr. SG 5.1 125.6 1 132.0 95
SG-52 W. End of S. Bay S. of Bldg. 1 SG 4.9 126.9 1 132.0 96
SG-53 15' S. x 15' E. of S.W. Cor. Bldg. I SG 4.3 127.5 1 132.0 96
SG-54 Cent. of S. of Bldg. 1 SG 6.2 134.1 9 140.0 96
SG-55 15' W. x 25' S. of'S.E. Cor. Bldg. 1 SG 7.1 129.2 1 132.0 98
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: November 21, 1988 through August 11, 1989
Job Number 8851079W-EW01
Type of Test: Subgrade Page 3 of 3
Field Relative
Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jul 11 SG-56 S.W. Cor. of S. Bay, S. of Bldg. 1 SG 4.9 115.8 1 132.0 88
1989 SG-57 S.E. Entr., N. of Divide SG 6.5 126.9 1 132.0 96
SG-58 S.E. Bay, E. of Bldg. 1 SG 4.8 123.7 8 128.0 97
SG-59 S.W. Bay, E. of Bldg. I SG 6.3 118.3 8 128.0 92
SG-60 SG-44 20' S. of Stairs S. of Neimans SG 6.4 125.6 8 128.0 98
SG-61 SG-48 S. B ay, S.
SG-62 SG-56 S.W. Cor. of Bld.g I SG 7.5 117.6 8 128.0 92
SG-63 SG-59 S.W. Bay, E. of Bldg. 1 SG 7.6 121.7 8 128.0 95
SG-64 S. Center. Parking Lot E. of Bldg. 1 SG 7.5 125.9 8 128.0 98
SG-65 SG-62 S.E. Cor. S. Bay of Bldg. I SG 6.5 122.0 8 128.0 95
SG-66 S. Side E. Central Bay, G. of Bldg. 1 SG 5.5 122.3 8 128.0 95
SG-67 N.E. Cor. E. Central Bay, E. of Bldg. 1 SG 5.8 128.3 8 128.0 100
SG-68 SG-1 1 N. Central, Parking E. of Bldg. 1 SG 4.3 124.8 8 128.0 97
SG-69 E. Central Bay, E. of Bldg. I SG 5.7 125.1 8 128.0 98
Area with failing tests SG-70 through SG-73 was totaly rewored.
Aug 11 SG-74 1 0' E. and 30' N. of N.W. Cor. Bldg. 3 SG 7.8 122.8 8 128.0 96
1989 SG-75 95' E. and 55'N. of N.W. Cor. Bldg. 3 SG 6.5 125.6 8 128.0 98
SG-76 30' E. and 30' N. of N.W. Cor. Bldg. 3 SG 5.0 124.2 8 128.0 97
SG-77 40' E. of N.W. Cor. Bldg. 3 SG 8.8 123.4 8 128.0 96
SG-78 85' E. and 55' S. of N.W. Cor. Bldg. 3 SG 8.1 128.4 8 128.0 100
SG-79 20' E. and 10' S. of N.W. Cor. Bldg. 1 SG 6.7 124.3 8 128.0 97
SG-80 70' E. and 50' S. of N.W. Cor. Bldg. 1 SG 7.5 130.1 8 128.0 100
SG-81 95' E. and 85' N. of N.W. Cor. Bldg. 3 SG 7.3 126.2 8 128.0 98
Aujz 23 SG-82* Grand Ave. E. Narrow Median E. End SG 4.1 122.4 1 132.0 92
1989 SG-83* Grand Ave. W. Narrow Median W. End SG 4.7 132.0 1 132.0 92
*90% R.C. required in City of Carlsbad city street median subgrade.
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: August 22, 1988 through March 1, 1989
Job Number 8851079W-EWOI
Type of Test: Electrical Trench Backfill Page I of 4
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content %Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Aujz 22 E-1 Bldg. 2, 55' N. of S.W. Wall 3 9.5' 7. 1 109.8 1 132.0 83
1988 E-2 W. Side Bldg. 3, 30' N. of S. Side of Bldg. 39.5' 9.1 119.5 1 132.0 90
E-3 W. Side Bldg. 2, 30' N. of S. Wall 42' 12.5 117.9 1 132.0 89
E-4 E-3 W. Side Bldg. 2, 30' N. of S. Wall 42' 9.2 120.5 1 132.0 91
Autz 23 E-5 S. Side Bldg. 2, 35' E. of Wall 40' 8.0 106.1 3 125.5 84
1988 E-6 E-5 S. Side Bldg. 2, 35' E. of Wall 40' 9.3 109.3 3 125.5 87
E-7 E-6 S. Side Bldg. 2, 35' E. of Wall 40' 8.6 113.3 3 125.5 90
E-8 Bldg. 1 at W. Footing 40' 6.6 119.3 1 132.0 90
E-9 Bldg. 2 at E. Footing, Mid-Bldg. 42' 6.2 113.5 1 132.0 86
E-10 Bldg. 1, Main Sweeps at N. Footing 40' 7.8 119.2 1 132.0 90
Aug 24 E-11 Bldg. 2, N.E. of S.W. TrendingWall 4 l' 8.7 110.7 1 132.0 83
1988 E- 12 Bldg. 1, Main Sweeps, Inside N. Wall 42' 14.4 117.0 1 132.0 88
Aug 25 E-13 Bldg. I Main Sweeps, Inside N. Wall 42' 11.6 120.8 1 132.0 91
1988 E- 14 Between Bldgs. 1 and 3, 55' W. of N.E.
Cor. Bldg. 1 40.5' 9.6 123.5 1 132.0 93
E- 15 Between Bldgs. 1 and 3, 45' E. of S.W.
Cor. Bldg. 1 3 9.5' 8.7 119.7 1 132.0 90
Aug 26 E-16 E-i Bldg. 2. 55' N. of S.W. Wall 3 9.5' 11.1 120.5 1 132.0 91
1988 E- 17 E-9 Bldg. 2, a E. Footing, Mid-Bldg. 42' 9.8 119.9 1 132.0 90
E-18 E-1 I Bldg. 2, N.E. of S.W. Trending Wall 4 l' 12.2 121.9 1 132.0 92
E- 19 Bldg. 3, 10' S. of S. Wall 4 1' 11.8 119.3 1 132.0 90
Oct 28 E-20 Elec. to Bldg. 2, Upper Parking Lot,
.1988 S. End -2- 9.4 113.5 2 128.0 88
E-2-1 Elec. to Bldg. 2, Upper Parking Lot,
N. End -2- 9.1 115.3 2 128.0 90
E-22 E-20 Elec. to Bldg. 2, Upper Parking Lot,
S. End -2- 9.2 115.4 2 128.0 90
a/rpw 15 Woodward-Clyde Consultants
Nov 04 E-29
1988
Nov 07 E-30 E-27
1988
E-31 E-28
E-32
E-33
Nov 08 E-34 E-35
1988
E-35
E-36
1988
Nov 01
1988
Nov 02
1988
Nov 03
1988
Oct 28 E-23 Elec. to Bldg. 2, Upper Parking Lot,
Middle Surf
E-24 Elec. Off N. End Bldg. 1, 30'N. of Bldg. -2.5'
E-26
E-27
E-28
E-25
Cor. -2
Elec. Off N.W. Cor. Bldg. 3, 40' N. of
Cor. Surf
Elec. Off N.W. Cor. Bldg. 3, 10'W. of
Cor. Surf
Elec. Off N.W. Cor. Bldg. 3, 35' N. of
Cor. Surf
Elec. Off N.W. Cor. Bldg. 3, 40' W. of
Cor. Surf
Elec. Off N.W. Cor. Bldg. 3, 10'W. of
Cor. Surf
5'Off E.W. Bearing, Retaining Wall
S. End -2-
8' Off N.W.-S.E. Bearing, Retaining Wall
S. End -2-
8' Off N.W.-S.E. Bearing, Retaining Wall
S.E. End -2'
12' Off N.W.-S.E. Bearing, Retaining Wall
S.E. End -11
5'Off E.-W. Bearing Wall, S. End -1.
Elec. Off N.W. Cor. Bldg. 3, 10'W. of
Elec. Off N. End Bldg. 1, 8' N. of Bldg. Surf
Compaction Test Results
Job Name: Village Faire Dates Covered: August 22, 1988 through March 1, 1989
Job Number 8851079W-EWOI
Type of Test: Electrical Trench Backfill Page 2 of 4
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
10.0 115.5 2 128.0 90
10.5 119.5 1 132.0 90
11.3 121.4 1 132.0 92
11.1 118.6 1 132.0 90
9.2 110.5 1 132.0 86
11.8 111.5 1 132.0 84
10.6 116.9 1 132.0 88
8.3 123.8 1 132.0 93
8.2 123.1 1 132.0 93
7.5 118.6 1 132.0 90
7.5 123.8 1 132.0 87
10.1 130.8 1 132.0 99
9.2 126.5 1 132.0 93
6.5 127.3 1 132.0 93
afipw 15 Woodward-Clyde Consultants
4
Compaction Test Results
Job Name: Village Faire Dates Covered: August 22, 1988 through March 1, 1989
Job Number 8851079W-EWOI
Type of Test: Electrical Trench Backfill Page 3 of 4
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Comp action
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Nov 08 E-37 8'Off N.-S. Bearing Wall, S. End -2' 7.5 123.5 1 132.0 93
1988
Nov 09 E-38 2' S. and 2' W. of W. Wall, S. End Surf 12.4 120.2 1 132.0 91
1988 E-39 8'S. and 2'W. of W. Wall, S. End Surf 13.1 119.8 1 132.0 90
Dec 22 E-40 135' N. and 65' W. of N.W. Cor. Bldg. 2 52' 11.0 121.6 1 132.0 92
1988 E-41 160'N. and 70' W. of N.W. Cor. Bldg. 2 52' 12.6 120.4 1 132.0 91
E-42 138'N. and 65' W. of N.W. Cor. Bldg. 2 SG 9.3 122.6 1 132.0 92
E-43 158'N. and 70' W. of N.W. Cor. Bldg. 2 SG 9.7 120.8 1 132.0 91
Dec 23 E-44 140'N. and 62' E. of N.W. Cor. Bldg. 2 46.5' 9.6 124.2 1 132.0 94
1988 E-45 160' N. and 60' E. of N.W. Cor. Bldg. 2 46.5' 10.0 120.4 1 132.0 91
E-46 145' N. and 62' E. of N.W. Cor. Bldg. 2 SG 7.3 119.6 1 132.0 90
E-47 162'N. and 60' E. of N.W. Cor. Bldg. 2 SG 9.1 125.2 1 132.0 94
Dec 28 E-48 160' N. and 6'W. of N.E. Cor. Bldg. 3 41.5' 9.3 118.8 1 132.0 90
1988 E-49 135' N. and 6'W. of N.E. Cor. Bldg. 3 41.5' 9.0 121.7 1 132.0 92
E-50 162'N. and 6' W. of N.E. Cor. Bldg. 3 SG 11.6 120.6 1 132.0 91
E-51 134'N. and 6' W. of N.E. Cor. Bldg. 3 SG 9.4 124.4 1 132.0 94
Dec 29 E-52 100' N. and 59'W. of N.W. Cor. Bldg. 2 52' 11.1 115.4 2 128.0 90
1988 E-53 130' N. and 64'W. of N.W. Cor. Bldg. 2 52' 10.5 116.9 2 128.0 91
E-54 102'N. and 59' W. of N.W. Cor. Bldg. 2 SG 9.1 112.1 2 128.0 91
E-55 129' N. and 64' W. of N.W. Cor. Bldg. 2 SG 8.4 118.3 2 128.0 92
Dec 30 E-56 100' N. and 63' E. of N.W. Cor. Bldg. 2 46.5' 9.0 118.5 2 128.0 92
1988 E-57 130'N. and 62' E. of N.W. Cor. Bldg. 2 4 6.2' 9.4 118.6 2 128.0 92
E-58 132'N. and 62' E. of N.W. Cor. Bldg. 2 SG 8.2 125.4 1 132.0 95
E-59 101'N. and 63' E. of N.W. Cor. Bldg. 2 SG 9.1 119.6 1 132.0 90
Jan 04 E-60 88' N. and 63' E. of N.W. Cor. Bldg. 2 46' 9.9 118.8 1 132.0 90
1989 E-61 80' N. and 63' E. of N.W. Cor. Bldg. 2 46' 7.3 121.4 1 132.0 91
a/rpw 15 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: August 22, 1988 through March 1, 1989
Job Number 8851079W-EWOI
Type of Test: Electrical Trench Backfill Page 4 of 4
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Jan 04 E-62 85' N. and 63' E. of N.W. Cor. Bldg. 2 TG 7.1 119.0 1 132.0 90
1989
Jan 05 E-63 78'N. and 8' E. of N.W. Cor. Bldg. 3 46' 8.0 123.8 1 132.0 93
1989 E-64 78' N. and 11'W. of N.W. Cor. Bldg. 3 46' 7.0 126.4 1 132.0 95
E-65 77' N. and 17' E. of N.E. Cor. Bldg. 2 47' 6.9 127.1 1 132.0 96
E-66 77' N. and TW. of N.E. Cor. Bldg. 2 48' 8.5 127.6 1 132.0 96
Jan 09 E-67 77' N. and 12'W. of N.E. Cor. Bldg. 2 49' 8.5 119.4 1 132.0 90
1989 E-68 77' N. and 25'W. of N.E. Cor. Bldg. 2 49' 7.9 126.3 1 132.0 95
Jan 17 E-69 S. Side of Grand at N.W. Cor. Project FG 10.2 121.5 1 132.0 92
1989
Jan 18 E-70 S. Side of Grand at N.W. Cor. Project -1.51 8.2 120.5 1 132.0 91
1989 E-71 S. Side of Grand at N.W. Cor. Project -1.5' 9.0 119.6 1 132.0 90
E-72 S. Side of Grand at N.W. Cor. Project -1.5' 9.3 119.2 1 132.0 90
Jan 20 E-73 20' E. of Existing Bldg. S. of Grand Surf 8.6 125.7 1 132.0 95
1989 E-74 60' N. and 20' W. of N.W. Cor. Bldg. 2 -1.5' 8.5 129.1 1 132.0 97
E-75 70' N. and 15'W. of N.W. Cor. Bldg. 2 -1.51 10.3 119.8 1 132.0 90
Jan 24 E-76 60' N. and 25' W. of N.W. Cor. Bldg. 2 Surf 5.3 127.9 1 132.0 96
1989 E-77 80' N. and 25'W. of N.W. Cor. Bldg. 2 -1. 6.7 127.7 1 132.0 93
E-78 80' N. and N.W. Cor. Bldg. 2 Surf 6.6 124.0 1 132.0 93
Mar 01 E-79 S. Side of Grand at Bus Stop -1.5' 10.5 123.4 1 132.0 93
1989 E-80 S. Side of Grand at Bus Stop Near Center -1.5' 11.1 120.8 1 132.0 91
a/rpw 15 Woodward-Clyde Consultants
4
Compaction Test Results
Job Name: Village Faire Dates Covered: August 12, 1988 through October 3, 1988
Job Number - 8851079W-EWOI
Type of Test: Wall Backfill Page YY'BF-1 of WBF-3
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content %Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry WL Dens. pcf % Dry Wt. Lab Dens.
Aug 12 WBF-1 200' S. of N.W. Cor. of Wall -3' 8.9 119.3 1 132.0 90
1988 WBF-2 100' S. of N.W. Cor. of Wall -3' 8.1 119.2 1 132.0 90
WBF-3 50'E. of N.W. Cor. of Wall -3- 8.7 103.0 1 132.0 78
Aug 18 WBF-4 180' S. of N.W. Cor. of Wall -2- 6.4 114.1 1 132.0 88
1988 WBF-5 120' S. of N.W. Cor. of Wall -2- 5.6 114.3 1 132.0 88
WBF-6 WBF-3 60' E. of N.W. Cor. of Wall -2- 7.5 118.7 1 132.0 90
WBF-7 WBF-4 220' S. of N.W. Cor. of Wall -11 7.5 119.0 1 132.0 90
WBF-8 WBF-5 140' S. of N.W. Cor. of Wall -1. 8.6 119.4 1 132.0 90
YvrBF-9 55'E. of N.W. Cor. of Wall -11 7.4 118.8 1 132.0 90
Aug 19 WBF-10 250' S. of N.W. Cor. of Wall 44' 6.5 120.0 1 132.0 90
1988 YvFB F- 11 275' S. of N.W. Cor. of Wall 44' 8.7 121.3 1 132.0 91
WBF-12 50'N. of N.W. Cor. of Wall 44' 8.9 125.2 1 132.0 94
Aug 22 WBF-13 10'N.W. of W. Entry Stairs 44' 8.1 123.7 1 132.0 93
1988 WBF-14 25' N. of S.W. Cor. Bldg. 2 44' 10.8 119.2 1 132.0 90
S ep 09 WBF-15 45' S. of N.W. Cor. Bldg. 2 47' 8.0 122.0 1 132.0 92
1988 WBF-16 135' S. of N.W. Cor. Bldg. 2 46' 8.0 123.9 1 132.0 93
WBF-17 75' S. of N.W. Cor. Bldg. 2 48' 10.5 121.5 1 132.0 92
Sep 12 WBF-18 20' S. of N.W. Cor. Bldg. 2 49.5' 8.4 109.4 4 127.5 85
1988 W13F-19 100' S. of N.W. Cor. Bldg. 2 49.5' 8.4 115.4 4 127.5 90
WBF-20 140' S. of N.W. Cor. Bldg. 2 49.5' 6.2 111.2 4 127.5 87
Sep 13 WBF-21 WBF-18 25' S'. of N.W. Cor. Bldg. 2 49.5' 8.8 117.6 4 127.5 92
1988 WBF-22 WBF-20 140' S. of N.W. Cor. Bldg. 2 49.5' 9.7 121.4 4 127.5 95
WBF-23 20'W. of N.E. Cor. Bldg. 2 45' 10.5 121.7 1 132.0 92
WBF-24 20' E. and 10' N. of'N.E. Cor. Bldg. 2 47' 13.4 117.1 1 132.0 88
S ep 14 WBF-25 20' N. of S. Cor. Bldg. 2 45' 8.0 118.8 1 132.0 90
1988 WBF-26 WBF-24 15' E. and 13' N. of N.W. Cor. Bldg. 2 47' 12.2 120.4 1 132.0 91
a/rpwl5 Woodward-Clyde Consultants
Compaction Test Results
Job Name: Village Faire Dates Covered: August 12, 1988 through October 3, 1988
Job Number 8851079W-EWOI
Type of Test: Wall Backfill Page WBF-2 of WBF-3
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of
Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
Sep 15 WBF-27 N. of S. Cor. Bldg. 2 48' 6.6 112.9 1 132.0 85
1988
Sep 16 WBF-28 15' N. and 5' E. of N.W. Cor. Bldg. 2 48' 6.7 123.2 1 132.0 93
1988 WBF-29 3' N. and 18' E. of N.W. Cor. Bldg. 2 48' 10.5 120.4 1 132.0 91
WBF-30 130' S. and 4'W. of N.W. Cor. Bldg. 2 48' 14.2 117.9 1 132.0 88
S eR 19 WBF-31 WBF-27 N. of S.W. Cor. Bldg. 2 48' 7.9 119.6 1 132.0 90
1988 WBF-32 WBF-30 130' S. and 4'W. of N.W. Cor. Bldg. 2 48' 13.0 113.5 1 132.0 85
WBF-33 110'S. and 5'W. of N.W. Cor. Bldg. 2 48' 12.0 107.1 1 132.0 81
WBF-34 15' S. and 5' W. N.W. Cor. Bldg. 2 5 1' 7.2 115.8 1 132.0 87
WBF-35 WBF-32 130' S. and 4'W. of N.W. Cor. Bldg. 2 48' 9.7 118.8 1 132.0 90
WBF-36 WBF-33 110' S. and 5'W. of N.W. Cor. Bldg. 2 48' 11.0 121.1 1 132.0 91
WBF-37 WBF-34 15' S. and 5'W. of N.W. Cor. Bldg. 2 5 1' 9.0 119.5 1 132.0 90
WBF-38 105' S. of N.W. Cor. Bldg. 2 51, 7.9 110.4 1 132.0 83
Sep 2 WBF-39 WBF-38 105' S. of N.W. Cor. Bldg. 2 51' 8.6 120.0 1 132.0 90
1988 WBF-40 12'N. x 10' E. of N.W. Cor. of Bldg. 2 50' 7.8 119.7 1 132.0 90
Sep 21 YIBF-41 5' N. x 20' E. of N.W. Cor. of Bldg. 2 51, 7.8 120.1 1 132.0 91
1988 WBF-42 55' S. of N.W. Cor. of Bldg. 2 52' 8.0 110.6 1 132.0 83
WBF-43 110' S. of N.W. Comer Bldg. 2 52' 9.5 120.4 1 132.0 91
WBF-44 10' S. of N.W. Comer Bldg. 2 52' 7.6 116.8 1 132.0 88
WBF-45 WBF-42 55' S. of N.W. Comer Bldg. 2 52' 11.0 113.2 1 132.0 85
WBF-46 WBF-44 10' S. of N.W. Comer Bldg. 2 52' 12.9 115.9 1 132.0 87
SeR 22 WBF-47 25'W. and 55'N. of S.W. Cor. Bldg. 2 45' 10.9 125.4 1 132.0 95
1988 WBF-48 10' S. of N.W. Comer Bldg. 2 511 8.0 120.0 1 132.0 90
WBF-49 55' S. of N.W. Comer Bldg. 2 5 1' 11.0 120.5 1 132.0 91
a/rpw 15 Woodward-Clyde Consultants
a
Compaction Test Results
Job Name: Village Faire Dates Covered: August 12, 1988 through October 3, 1988
Job Number 8851079W-EWOI
Type of Test: Wall Backfill Page WBF-3 of WBF-3
Field Relative
Depth or Moist. Field Lab Lab Adj. Moist. Compaction
Test Retest Elevation Content Density Sample Density Field Rock Adj. Lab Content % Of Date No. Of Location Of Test % Dry Wt. pcf No. pcf % Dry Wt. Dens. pcf % Dry Wt. Lab Dens.
S eR 23 WBF-50 50'N. and 20' W. of S.W. Cor. Bldg. 2 46' 15.5 116.4 1 132.0 88
1988 WBF-51 120' S. of N.W. Comer Bldg. 2 51, 7.8 118.5 2 128.0 92
WBF-52 80'S. of N.W. Comer Bldg. 2 52' 7.4 118.2 2 128.0 92
WBF-53 95'N. and 40'W. of S.W. Cor. Bldg. 2 45' 7.9 117.4 2 128.0 91
WBF-54 70'N. and 20' W. of S.W. Cor. Bldg. 2 45' 9.1 116.9 2 128.0 91
Sep 26 WBF-55 75'N. and 25'W. of S.W. Cor. Bldg. 2 47' 5.9 118.1 2 128.0 92
1988 WBF-56 125'S. of N.W. Comer Bldg. 2 52' 8.5 118.1 2 128.0 92
WBF-57 80' S. of N.W. Comer Bldg. 2 52' 8.9 113.9 2 128.0 89
WBF-58 WBF-45 55' S. of N.W. Comer Bldg. 2 52' 7.0 118.9 2 128.0 92
WBF-59 WBF-46 10'S. of N.W. Comer Bldg. 2 52' 7.9 121.7 1 132.0 92
WBF-60 WBF-57 80' S. of N.W. Comer Bldg. 2 52' 9.8 119.0 2 128.0 92
Sep 27 WBF-61 Bldg. 2 - 30'E. x 4'N. of N.W. Cor. 48' 8.6 121.4 1 . 132.0 92
1988 WBF-62 Bldg. 2 - At N.W. of N.W. Cor. 54' 9.1 120.4 1 132.0 91
WBF-63 Bldg. 2 - 70' S. of N.W. Cor. 54' 8.8 123.6 1 132.0 93
WBF-64 Bldg. 2 - 135' S. of N.W. Cor. 54' 10.0 119.6 1 132.0 90
WBF-65 Bldg. 2 - 90'N. of S.W. Cor. 48' 8.3 120.5 1 132.0 91
WBF-66 WBF-50 Bldg. 2 - 50'N. x 20'W. S.W. Cor. 46' 9.2 119.2 1 132.0 90
WBF-67 Bldg. 2 - 30'N. of S.W. Cor. 48' 8.4 123.0 1 132.0 93
Sep 28 WBF-68 Bldg. 2 20' E. of N.W. Cor. 50' 9.0 121.8 1 132.0 92
1988
Sep 30 WBF-69 Bldg. 2 - 6' E. x 5' N. of N.W. Cor. 52' 9.6 121.2 1 132.0 91
1988 WBF-70 Bldg. 2 - 85'N. of S.W. Cor. 49' 9.4 115.6 1 132.0 87
Oct 03 WBF-71 WBF-70 Bldg. 2 - 85'N. x 30' W. of S.W. Cor. 49' 9.3 123.0 1 132.0 93
1988 WBF-72 Bldg. 2 - 60'N. x 18'W. of S.W. Cor. 49' 9.7 123.7 1 132.0 93
a/rpw 15 Woodward-Clyde Consultants
11
PLASTICITY CHARACTERISTICS 1 2 3
Liquid Limit, %
Plasticity Index, % NP Np NP Classification by UnTed —Soil
Classification System Sm Sm Sm
150
ZERO AIR VOIDS CURVES
—2.80 SG
— 2.70 SG
— 2.60 SG
140 L 12.50 SG
[COBBLESI GRAVEL] SAND
H SILT & C7LAY I c I f I cl m I
100
C) Z 80
60 L
z Lu 40 U
cL 20
0
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
130
120
CL
X
110
z
100
DIRECT SHEAR TEST DATA
Dry Density, pcf
Initial Water Content, %
Final Water Content, %
Apparent Cohesion, psf
Apparent Friction Angle, degrees
SWELL TEST DATA
Initial Dry Density, pcf
Initial Water Content, %
Final Dry Density, pcf
Final Water Content, %
Load, psf
Swell, percent
0 . 1 0 2 3 Maximum Dry
Density, pcf 132.0 128-C 125.5—
Optim
'
um Moisture 8.5. 8.! 9.5 — Content, %
80 1 1 1 1 1 1 MOISTURE CONTENT,%
0 10 70 30
LABORATORY COMPACTION TEST
SAMPLE LOCATION
1 SW COR. SEWER B.F.
2 CARLSBAD BLVD. & EIJA
3 NW*COR. 4' BELOW AC PAVJ
40 LABORATORY COMPACTION
TEST METHODA
.4G
FILL SUITABILITY TESTS
VILLAGE FAIRE
DATE: 7-18-88 —F FIGURE NO: DRAWN BY: qb I CHECKED BY: ; [VOI PROJECT NO:8851079W—EW01
WOODWARO-CLYOE CONSULTANTS
PLASTICITY CHARACTERISTICS 4 5 6
Liquid Limit, %
Plasticity Index, % NP
Classification by Unified Soil
Classification System SM
150
ZERO AIR VOIDS CURVES
—2.80 SG
— 2.70 SG
2.60 SG
140 2.50 SG
COBBLESI GRAVELI
I c [ f
SAND
I c I m I fTS ILT & CLAY]
100
Z 80
60 CL
z w 40 U Cr w cL 20
0
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
130 DIRECT SHEAR TEST DATA
Dry Density, pcf
Initial Water Content, %
Final Water Content, %
*Apparent Cohesion, psf
120 Apparent Friction Angle, degrees
SWELL TEST DATA
Initial Dry Density, pcf
Initial Water Content, %
Final Dry Density, pcf
Final Water Content, %
Load, psf
Swell, percent
110
z
cc a
100
90 ' ' ' ' ' . . I . . I
Maximum Dry 0 4 0 5 L6
Density, pcf 127. 5 128 .8 143 . 5
Optim
'
um Moisture 9.5 9.5 6.0 Content, %
80 [ I I I I I MOISTURE CONTENT,%
0 10 20 30
1 ACf%OA'rr%DV f1f%UDArT1f%kJ TCOT
SAMPLE LOCATION
4 W CNTRL AREA OF 8th BELO
PAVEMENT
5 GRAND AVE. PKG.—EAST SIDI
j 6 GRAND AVE. PKG.
40 LABORATORY COMPACTION
TEST METHOD: A;TM-Q I 597-78A
#6—ASTM—D 1557-78C
FILL SUITABILITY TESTS
VILLAGE FAIRE
---T- 7-18-88 FIGURE NO: 2 DRAWN BY: rh I CHECKED BY: PROJECT NO: 8851079W—ElqOl DATE:.
WOOOWARO-CLYOE CONSULTANTS
PLASTICITY CHARACTERISTICS 7 8 9
Liquid Limit, %
Plasticity Index, % NP
Classification by UniTie-d Soil—
Classification System Sm
150
ZERO AIR VOIDS CURVES
—2.80 SG
— 2.70 SG
2.60 SG
140 2.50 SG
I BBLES CO
GRAVELI SAND I SILT I c I f I cl m L f
100
Z 80
60
z Lu 40 U CC Lu 20
0
1000 100 10 1.0 0.1 0.01 0.001
GRAIN'SIZE, mm
MECHANICAL ANALYSIS
130
120
110
z
100
DIRECT SHEAR TEST DATA
Dry Density, pcf -
Initial Water Content, %
Final Water Content, %
Apparent Cohesion, psf
Apparent Friction Angle, degrees
SWELL TEST DATA
Initial Dry Density, pcf
Initial Water Content, %
Final Dry Density, pcf
Final Water Content, %
Load, psf
Swell, percent
90--
M
'
aximum Dry 0 7 0 8 9 N
'
Density, pcf 140:..-0 128. 0 139. 5
Optimum Moisture 7.0 8.5 5.5 Content, %
80 rT7 I MOISTURE CONTENT,%
0 10 20 30
LABORATORY COMPACTION TEST
SAMPLE LOCATION
7 SOUTIl COAST
8 PKG. LOT N.OF NEIMANS
9 SOUTH COAST-
40 LABORATORY COW'ARON57-78 TEST METHOD:
FILL SUITABILITY TESTS
VILLAGE FAIRE _T_ FFIGURE NO: .3 DRAWN BY: qb I CHECKED BY: PROJECT NO:885107W- Q01 DATE: 8-25-89
WOODWARD-CLYDE CONSULTANTS
'i~
100
Z 80
~ 60 CL
[COBBLES GRAVELI SAND
I c I m I f7SILT 7CLAY c I f PLASTICITY CHARACTERISTICS
Liquid Limit, %
Plasticity Index, %
Classification by Uni7ii-ed —Soil
Classification System
150
140
ZERO AIR VOIDS CURVES
—2.80 SG
— 2.70 SG
2.60 SG
2.50 SG
z w 40 U cc w 20
0
1000 100 10 1.0 0.1 0.01 0.001
GRAIN SIZE, mm
MECHANICAL ANALYSIS
130
120
110
100 Ir—
DIRECT SHEAR TEST DATA
Dry Density, pcf
Initial Water Content, %
Final Water Content, %
Apparent Cohesion, psf
Apparent Friction Angle, degrees
SWELL TEST DATA
Initial Dry Density, pcf
Initial Water Content, %
Final Dry Density, pcf
Final Water Content, %
Load, psf
Swell, percent
90
Maximum Dry 010
Density, pcf 136.0
Optimum Moisture 6.0 Content, %
80
r MOISTURE CONTENT,%
0 10 20 30
LABORATORY COMPACTION TEST
SAMPLE LOCATION
10 S. PKG. LOWS. i OF E. —PI
To LABORATORY COMPACTI?N
TEST METHOD: ASTM—D 557-78
G.
FILL SUITABILITY TESTS
VILLAGE FAIRE
DRAWN BY: cb CHECKED BY: PROJECT NO:8851079W-UD01TOATE: B-25-89 FIGURE NO: 4
WOODWARD-CLYOE CONSULT-ANTS