HomeMy WebLinkAbout3308; Monroe St & Marron Rd; Monroe St & Marron Rd Geotechnical Investigation; 1989-02-23REPCMT OF
QEXJIBCHNICMi INVESTIOTI(»
FUTURE CCMMERCIAL SITES
ICNRDE STREET AND MARRON ROAD
CARLSBAD, CALIFORNIA
PREPARED FOR:
City of Carlsbad
1200 Elm Avenue
Carlsbad, Califomia 92008
PREPARED BY:
Southern Califomia Soil & Testing, Inc.
Post Office Box 20627
6280 Riverdale Street
San Diego, Califomia 92120
SOUTHERN C A L I F O R N SOIL
6280 RIVERDALE ST. SAN DIEGO, CALIF. 92120 • TELE 2BO-4321
67S ENTERPRISE ST. ESCONDIDO, CALIF.
AND TESTING, INC.
P.O. BOX 2D627 SAN DIEGD, CALIF. 921 2D
g 2 • 2 5 TELE 7 4 G - 4 5 4 A
February 23, 1989
City of Carlsbad
1200 Elm Avenue
Carlsbad, Califomia 92008
ATTENnON: Mr. Alphonse Virgilio
SCS&T 8821211
Report No. 2
SUBJECT: Geotechnical Investigation, Future Conmercial Sites, Itonroe
St:reet and Marron Road, Carlsbad, Califomia.
Gentlemen:
In accordance with your request, we have performed an investigation of the
soil conditions in the drainage area east and vest of Monroe Street and
south of Marron Road in the City of Carlsbad, Califomia. Vfe are presenting
herewith our findings and recommendations.
In general we found that the soils below the site are moderately to highly
compressible and are saturated. These conditions will require special
grading and a consolidation period prior to constructing any settlement
sensitive inprovements.
If you have any questions after reviewing the findings and recommendations
contained in the attached report, please do not hesitate to contact this
office. This opportunity to be of professional service is sincerely
appreciated.
Respectfully submitted,
SOUTHERN CALIFORNIA SOIL & TESTIITC, INC.
Charles H. Christian, R.G.E. #00215
CHC:CRB:mw
cc: (6) Subnitted
(1) SCS&T, Escondido
Curtis R. Burdett, C.E.G. #36037
SOUTHERN CALIFDRNIA SOIL AND TESTING I N C
TABLE OF CMfTEMES
PAGE
Introduction and Project Description 1
Project Scope. 2
Findings -3
Site Description 3
Cfeneral Geology and Subsurface Conditions 4
(Geologic Setting and Soil Descriptions 4
Groundwater 5
Tectonic Setting 5
Geologic Hazards 6
Groundshaking. 6
Tsunamis and Seiches 7
Liquefaction 8
Conclusions 9
(feneral • 9
Recoimendations 10
Grading 10
Site Preparation 10
Imported Fill H
Settlement Monitoring H
Surface Drainage 11
Earthwork H
Foundations 12
Cfeneral 12
Reinforcement 12
Concrete Slabs-on-Cirade 12
Settlement Characteristics 13
Expansive Characteristics 13
Lateral Resistance 13
Grading and Foundation Plan Review 13
Limitations 1'^
Review, Observation And Testing 14
Uniformity of Conditions 14
Change In Scope 14
Time Limitations 15
TABLE OF CCMTENTS (continued)
PAGE
Professional Standard 15
Client' s Responsibility 15
Field Explorations 16
Laboratory Testing 16
A3n30JMEWrS
FI(30RE
Figure 1 Site Vicinity Map, Follows Page 1
PLAOIS
Plate 1 Plot Plan
Plate 2 Subsurface Exploration Legend
Plates 3-11 Boring and Trench Logs
Plates 12-14 Grain Size Distribution
Plates 15-18 Consolidation Load Test Results •
APPENDIX
Recomtrended (trading Specification and Special Provisions
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6ZBG RIVERDALE ST. SAN DIEGD, CALIF. 92120 • TELE ZBD-4321 • P.O. BOX 20627 SAN DIEGD, CALIF. 92120
e7S ENTERPRISE ST. ESCONDIDO, CALIF. 920Z5 • TELE 746-4544
\
GBOEBCHNICM. INVESTIG?m:ON
FUTURE CQMMERCIAL SITES
MDNROE STREET A^D MARRON ROAD
CARLSBAD, CALIFORNIA
INTODDUCnCN AND PROJECT' DESCRIPTICN
This report presents the results of our geotechnical investigation for tvo
proposed future comnercial sites in the City of Carlsbad, Califomia. Both
sites are located soutJi of and adjacent to Marron Road, with Monroe Street
separating the two parcels. The following Figiuje Number 1 shows the location
of the site on a site vicinity map.
It is our understanding that the two sites are owned by the City of Carlsbad
and that they intend to eventually sell or lease the parcels. Future use
will probably be for commercial/retail purposes, with one and/or two story-
buildings of wood frame construction and shallow foxmdations being the
probable type of const:ruction. Grading to develop the sites will require
irtporting fill materials to bring the parcels up to street grade. This will
require fills up to about 6 to 8 feet deep on the east parcel and 8 to 10
feet deep on the west parcel.
lb assist in the preparation of this report, we have discussed the proposed
construction with Mr. Virgilio, of City of Carlsbad, and have reviewed the
improvement plans prepared for the construction of Monroe Street. In
SOUTHERN CALIFDRNIA SOIL AND TESTING, INC.
y\ SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
MONROE STREET COMMERCIAL SITE y\ SOUTHERN CALIFORNIA
SOIL & TESTING, INC. BY: CHC/WDW OATE: 2-16-89
y\ SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
JOB NUMBER: 8821211 FIGURE //I
SCS&T 8821211 February 23, 1989 Page 2
addition, we have reviewed a preliminary plan by BSI Consultants,
Incorporated, dated June 13, 1989, that shows proposed street widening
inprovements for Itonroe Street. Southem Califomia Soil and Testing, Inc.
(SCS&T) prepared a geotechnical report for this widening project, dated
January 26, 1989, and portions of said report are incorporated in this
report.
The plate included in the pocket of this report shows the sites, their
approximate topography, and the locations of our subsurface explorations.
PROJECT SCOPE
This investigation consisted of: surface reconnaissance, subsurface
exploration, obtaining representative undisturbed and bulk soil saitples,
laboratory testing, analysis of the field and laboratory data.
a) Ejqjlore the subsurface conditions to the depths influenced by the
proposed construction.
b) Evaluate, by laboratory tests, the pertinent engineering
properties of the various strata which will influence the
development of the site, or be influenced by the site development.
c) Describe the general geology at the site including possible
geologic hazards which could have an effect on the site
development.
d) Develop soil engineering criteria for site grading.
e) Address potential construction , difficulties and provide
recommendations concerning these problems.
f) Recomnnend an appropriate foundation system for the type of
structures anticipated and develop soil engineering design
criteria for the recommended foundation design.
SCS&T 8821211 February 23, 1989 Page 3
FINDINGS
SnE EESCnOPTlCN
, The two project sites are located south of Marron Road, at the south edge of
the Buena Vista Lagoon Basin in Carlsbad, Califomia. The sites are at the
mouth of one of the north draining canyons that feeds into the lagoon basin.
Both sites are nearly triangular in area and are separated by Monroe Street,
vAiich runs south from Marron Road through the natural invert of the canyon.
The west parcel is presently being utilized as a desilting basin and is
about eight to ten feet lower than MDnroe Street and Marron Road. This basin
was created by filling for the adjacent streets above the valley floor. The
basin is fed by the canyon and drains into a storm drain at the northwest
comer of the parcel, that extends under Marron Road and eventually enpties
into Buena Vista Lagoon. The desilting basin has gunite lined embankments
and a relatively flat bottom that supports a thick growth of reeds.
Groundwater can be seen at the surface in the lower areas of this parcel.
The area west of the parcel slopes moderately to steeply upward to a
relatively flat lying westerly sloping mesa. A reconnaissance of this
eucalyptus covered hillside above this site did not reveal any areas of
potentially unstable soils or areas of excessive erosion, even though a
trail has been cut into the hillside that in sone areas concentrates
drainage that would normally sheetflow down the hillside. A large manmade
hole about ten feet in diameter and ten feet deep was, hovv^er noted in one
area that could be a safety hazard for children playing in the area.
The east parcel, vhich is also nearly rectangular, is six to eight feet
below the adjacent street grade. The adjacent streets also make this site a
drainage basin that has a relatively flat-lying bottom. The parcel is
drained via a culvert located at the northwest comer, that drains across
the street to the desilting basin. This basin also supports a thick growth
of reeds and has groimdwater standing throughout most of the low lying
areas. Tree stunps were, however, noted throughout this area that indicate
SCS&T 8821211 February 23, 1989 Page 4
that the water table at ground surface must have been created by the damming
effect of the adjacent roads. The area east of this site is also a
eucalyptus covered moderately sloping hillside that did not show any signs
of instability or excessive erosion.
GENERAL WJUJSl AND SUBSURFACE CCNDITICNS
GBQUOGIC SETTING Jttff) SOIL DESCRIPTICiB: The two sites that are the si±>ject
of this study are located in the Coastal Plains Physiographic Province of
San Diego County and, as such are underlain by Tertiary-age sediments,
terrace deposits. Quaternary-age alluvial deposits and artificial fill. The
artificial fill consists of the embankments for the adjacent road beds and
desilting basin. These materials basically consist of clayey sands, slightly
silty sands, and fine to medium sands vhich are generally in a medium dense
condition. The fill was relatively free of organic materials and debris;
however, the contact between the fill material and alluvial soils had a
slight organic content. This may be due to the mixing of some organic
materials with the native soils prior to placement of the fill, or, having
organic materials within the upper foot of alluvium vhich were not properly
removed prior to placing the fills.
The alluviimi that underlies the roads, and hence, the two parcels, consists
of altemating strata of clayey sands, clayey silty sands, sandy silts and
sandy silty clays. For the most part, the alluvium appears to be clayey,
silty sands or clayey sands that are medium dense. These soils have low to
moderate settlement characteristics. Some of the alluvium, however,
consisted of soft to medium stiff clays that had low densities and that were
highly conpressible. The alluviimi extended to a depth of 54 feet and 53 feet
in Test Borings Number 1 and 4, respectively. These borings were located on
the edge of Marron Road, vMch represents the north side of the parcels.
Boring B-2 and B-3 were located on the west and east shoulders of Monroe
Street near the south end of the two parcels. These borings encountered
alluvium to a depth of 19 feet and 14 feet, respectively.
SCS&T 8821211 February 23, 1989 Page 5
Underlying the alluvium and draping the lower portions of the hillsides are
terrace deposits that are basically conprised of medium dense to dense silty
sands and clayey sands. Some slopewash materials also drape the hillsides
as identified in Test Trench Number 3. This material consists predominantly
of medium dense, slightly silty sands.
The Tertiary-age sediments are represented as dense, moderately cemented
sandstones of the Santiago Formation. These materials basically make up the
hills and bluffs south of the lagoon basin.
GROUNDWATER: In the two borings on the south shoulder of Marron Road,
groundwater was found at an elevation of about 12 feet MSL. This is slightly
lower than the bottom of the basin created on the east parcel and very close
to the elevation of the bottom of the desilting basin on the west parcel.
Groundwater exists at the surface in both of these basins. Borings Number
B-2 and B-3, vhich were located at the south end of the parcels, found the
groundwater at elevations of about 16 and 18 feet MSL.
TECTONIC SETTING: Nb faults are known to traverse the subject site but it
should be noted that much of Southern California, including San Diego
County, is characterized by a series of Quaternary-age fault zones which
typically consist of several individual, en echelon faults that generally
strike in a northerly to northwesterly direction. Some of these fault zones
(and the individual faults within the zone) are classified as active while
others are classified as only potentially active according to t±e criteria
of the Califomia Division of Mines and Geology. Active fault zones are
those vhich have shown conclusive evidence of faulting during the Hoiocene
Epoch (the most recent 11,000 years) vMle potentially active fault zones
have demonstrated movement during the Pleistocene Epoch (11,000 to 2 million
years before the present) but no movement during Hoiocene time.
A review of available geologic maps indicates that the,, Rose Canyon Fault
Zone is located approximately five miles to the west. Recent earthquake
activity along faults in the southem extension of the Rose Canyon Fault
SCS&T 8821211 February 23, 1989 Page 6
Zone indicates that this zone could be classified as active. The recent
seismic events along a small portion of the Rose Canyon Fault Zone generated
earthquakes of magnitude 4.0 or less. Other active fault zones in the region
that could possibly affect the site include the Coronado Banks and San
Clenente Fault Zones to the west, the Elsinore and San Jacinto Fault Zones
to the northeast, and the Agua Blanca and San Miguel Fault Zones to the
south.
GBODCDGIC HAZARDS
GROUNDSHAKING: One of the most likely geologic hazards to affect the site
is groundshaking as a result of movement along one of the fault zones
nentioned above. The maximum bedrock accelerations that would be attributed
to a maximum probable earthquake occurring along the nearest portion of
selected fault zones that could affect the site are summarized in the
following table.
TABLE I
Fault Zone
Maximum Probable
Distance
Bedrock Design
Acceleration Acceleration
Rose Canyon 5 miles 6.0 magnitude 0.37 g 0 .25 g
Elsinore 23 miles 7.3 magnitude 0.23 g 0 .15 g
Coronado Banks 20 miles 6.0 magnitude 0.13 g 0 .09 g
San Jacinto 43 miles 7.8 magnitude 0.14 g 0 .09 g
San Clemente 55 miles 7.3 magnitude 0.08 g 0 .05 g
Earthquakes on the Rose Canyon or Coronado Banks Fault Zones are expected to
be relatively minor. Major seismic events are likely to be the result of
mDvenent along the San Clemente or Elsinore Fault Zones, In addition, we
have analyzed the fault zones vhich could affect the San Diego area in order
to detennine the probability of groundshaking of any given level. The
individual faults and different fault zones have slip rates vMch have been
calculated to range from very low to very high rates of activity.
SCS&T 8821211 Febmary 23, 1989 Page 7
The following chart summarizes our opinion of the probability of events
vM-ch would result in associated maximum and "design" bedrock accelerations.
0.30 g 0.20 g 1 x 10 ~3
0.25 g 0.17 g 1 x 10 "2
0.20 g 0.13 g 1 X 10 -1
0.15 g 0.10 g 5 x 10 ~1
0.10 g 0.07 g 1 X 10 -0
Probability of occurrence is defined as the probability of any given event
occurring during the assumed life of the proposed structures (50 years)
vhich would occur in accelerations of that level.
Ejq^erience has shown that structures that are constmcted in accordance with
Uniform Building Code Standards are fairly resistant to seismic related
hazards. It is, therefore, our opinion that structural damage is unlikely
if such buildings are designed and constmcted in accordance with the
minimum standards of the most recent edition of the Uniform Building Code.
TSUNAMIS AND SEICHES: Historically, the San Diego County area has been free
of tsunami related hazards, and tsunamis reaching San Diego County have
generally been wall within the normal tidal range. It is thought that the
wide continental margin off the coast acts to diffuse and reflect the wave
energy of remotely generated tsunamis. The largest tsunami to reach San
Diego Countys coast was 4.6 feet, generated by the 1950 earthquake in south
Chile.
No locally generated tsunamis are known to have occurred in the San Diego
area. However, it is speculated that a major earthquake along one of the
major offshore faults would have the potential of generating a tsunami
capable of inflicting damage to the San Diego coastal region. In addition,
seiches associated with the tsunami forces could cause moderate damage in
lagoonal areas.
SCS&T 8821211 February 23, 1989 Page 8
A lack of knowledge about the offshore fault systems makes it difficult to
assess the risk due to locally generated tsunamis. Considering the fact
that a major tsunami has not occurred in 170 years of recorded history, the
risk of such an event occurring in the near future appears nominal.
LIQUEFACnCW: Liquefaction is the phenomenon in vhich soils lose all shear
strength for short periods of time during an earthquake, and may result in
very large total and/or differential settlements for st:mctures founded in
the liquefying soils. Liquefaction is generally confined to loose,
saturated sands and silts vyhich are subject to sufficient groundshalcing
during an earthquake. Groundshaking of sufficient duration results in the
loss of grain-to-grain contact due to a rapid increase in pore water
pressure, causing the soil to behave as a fluid for short periods of time.
In order to have a potential for liquefaction, a soil must be cohesionless
with a grain size distribution of a specified range; it must be loose to
nedium dense; it must be below the groundwater table; and it must be
subject to a sufficient magnitude and duration of groundshaking.
In evaluating the liquefaction potential for the subject site, we have
relied in-part upon the results of studies presented by Seed and Idriss, "A
Sinplified Procedure for Evaluating Soil Liquefaction Potential", 1971, and
Borchardt and Kennedy, "Liquefaction Potential in Urban San Diego", 1979.
Seed and Idriss present a method in vhich estimates of the stresses likely
to be induced by an earthquake and the stresses likely to initiate
liquefaction are evaluated using Standard Penetration Test (SPT) blowcounts
as an indication of relative density.
Based upon the evaluation methods outlined above, it is our opinion that the
risk associated with liquefaction at the site is marginal to relatively low.
It should be recognized, however, that many of the parameters used in
liquefaction evaluations are subjective and open to interpretation, and that
much is yet unknown about both the seismicity of the San Diego County area
and the phenomenon of liquefaction. Historically, liquefaction in the
Southem Califomia region has been manifested as isolated sand boils and
not as catastrophic ground failure.
SCS&T 8821211 Febmary 23, 1989 Page 9
It should also be understood that much of Califomia, including the San
Diego County area, is an area of moderate to high seismic risk and it is not
generally considered economically feasible to build stmctures totally
resistant to earthquake related damage. However, the current Standards of
Practice for design and constmction should prevent major stmctural damage
vdiich can result in loss of life. The recommendations presented in later
sections of this report should prevent any catast:rophic stmctural failure
that may be associated with liquefaction.
CONCLUSKXe
GENERAL
Based on our findings, it is our opinion that the two subject parcels may be
developed into commercial/retail development as proposed provided the
recommendations presented herein are conplied with. Three conditions will,
however, require special consideration. First, the alluvial deposits vary
from moderately to highly conpressible. Due to their depth and a shallow
groundwater table, removal of this material is not practical. Therefore, the
development of this site will require placing structures on a mat of
uniformly conpacted fill of a thickness that would allow stmctural loads to
dissipate within the fill. For the type of stmctures anticipated, this mat
should be at least eight feet thick. Since the sites will require about this
much fill to bring them up to street grade, it appears this may be able to
be acconplished without extensive dewatering. Stiffened foundations and
slabs should also be used for buildings since the alluviums cannot be
removed.
Secondly, the shallow groundwater table and soft soils will make site
preparation of the areas to receive fill difficult. We anticipate that even
a swanp cat would not be able to clear the sites without some dewatering.
Since the sites aire heavily vegetated, bridging the soft alluvium with dry
soil in order to get equipment onto the site is not recommended without
first removing the vegetation. Vie anticipate that it may irequire a drag line
SCS&T 8821211 Febmary 23, 1989 Page 10
to clear the site to allow bridging with dry soils. Another option, howsver,
would be to excavate a pit near the north boundary and punp out enough water
to lower the groundwater to three or four feet below existing grade. This
may dry out the bottoms enough to allow a swanp cat to operate.
The third condition that should be considered is that the fill loads will
induce tine-dependent settlements in the soft clayey alluvial deposits. Vfe
anticipate that it may take about one year to conplete the settlements.
However, since the sites may not be developed immediately, this may not
present a problem. On the other hand, if iimiediate development is planned,
this condition may require surcharging or the use of deep foundations.
RBOCMMENDATKJNS
SITE PREPARATION: Site preparation should start with removal pf all
vegetation within the areas to receive fill. This may require clearing with
a drag line or a dewatering program to lover the groundwater to a depth that
would allow equipment to work in the basins. It should be noted that some of
the near surface alluviums contains enough organic materials that make them
unsuitable as stmctural materials and that this will require off-site
disposal of such material. Once the vegetation is removed, all existing
soils within eight feet of finish grade should be removed. Any dry materials
aroimd the sides such as slopewash or colluvium should also be removed to
firm groimd or to just above the saturated alluvial deposits. Firm natural
ground is defined herewith as the terrace deposits or Santiago Formation
sandstones, or to any other materials that in the opinion of the soils
engineer are suitable to support the fills and settlement sensitive
stmctures.
On the west parcel, the gunite on the perimeter embankments should be
removed. This material may be broken up into small pieces of hard debris
that may be mixed with the fills as they are placed.
I
I
SCS&T 8821211 Febmary 23, 1989 Page 11
The road embankments should be keyed into as the fills increase in height
such that all loose soils on the face of these slopes are removed.
IMPCREED SOUS: All inported soils should be free of deleterious materials
and other materials determined to be unsuitable fill material by the soils
engineer. Nb rocks or lunps of soil over six inches in diameter should be
inported and at least 60 percent of the material should be smaller than 1/4
•inch. No nore than 30 percent by weight should be finer than the No. 200
sieve. All fill material within four feet of finish grade should be granular
in nature and have an expansion index of less than 50. All inported soil
should be approved by the soils engineer.
SETELEMENT JfUnCRING: Due to the anticipated time dependent settlement
characteristics of some of the alluvial soils, we recommend that the fill
settlement be monitored. Upon conpletion of the grading, at least three
nonunents should be established on each site and these monuments should be
surveyed at least bi-monthly for four months and then at least once a montJi
for six nonths or until it is determined that the settlements are in the
secondary consolidation stage.
SURFMi: imiNZ^: It is recommended that all surface drainage be directed
away from the proposed structures. Ponding of water should not be allowed.
EARTHWORK: All earthwork and grading contenplated for site preparation
should be acconplished in accordance with the attached Recommended Grading
. Specifications and Special Provisions. All special site preparation
recommendations presented in the sections above will supersede those in the
standard Recomtended Grading Specifications. All embankments, stmctural
fill and fill should be conpacted to at least 90% relative conpaction at or
slightly over optimum noisture content. Utility t:rench backfill within five
feet of the proposed stmctures and beneath asphalt pavements should be
conpacted to minimum of 90% of its maximum dry density. The upper twelve
inches of subgrade beneath paved areas should be conpacted to 95% of its
maximum dry density. This compaction should be obtained by the paving
I
SCS&T 8821211 Febmary 23, 1989 Page 12
contractor just prior to placing the aggregate base material and should not
be part of the mass grading requirements. The maximum dry density of each
soil type should be determined in accordance with A.S.T.M. Test Method
D-1557-78, Method A or C.
POUNDATICHS
GENEIUVL: Provided the sites are prepared as recommended herein, one and
two-story, wood frame st:mctures may be founded on shallow spread footings.
Such footings should be founded at least 18 inches below lowest adjacent
finish grade and should have a minimum width of 12 inches for continuous
footings and 24 inches for square footing. For preliminary purposes, an
allowable soil bearing pressure of 2500 psf may be assumed. This should be
verified vhen the site grading is conpleted.
RETNFCMIQlQtT: It is recommended that minimum reinforcement for shallow
continuous footings consist of at least four continuous No. 4 reinforcing
bars, two located near the top of the footings and two near the bottom. This
reinforcenent is based on soil characteristics and is not intended to be in
lieu of reinforcement necessary to satisfy stmctural considerations.
CXICREIE SLRBS-CN-ORACE: Interior concrete on-grade slabs should have a
thickness of four inches. Minimum slab reinforcement should consist of No.
3 reinforcing bars placed at 24 inches on center each way. The reinforcement
should be placed near the middle of the slab. A' three-inch-thick layer of
clean, coarse sand or cmshed rock should be placed under the slab. This
layer should consist of material having 100 percent passing the
one-half-inch screen, no more than ten percent passing sieve #100 and no
nore than five percent passing sieve #200. Where moisture-sensitive floor
coverings are planned, the sand or rock should be overlain by a visqueen
noisture barrier. A one-inch-thick layer of silty sand should be provided
above the visqueen to allow proper concrete curing.
SCS&T 8821211 Febmary 23, 1989 Page 13
SETTLEMENT CHAR20£EIISI1CS: The anticipated total and/or differential
settlements for proposed stmctures may be considered to be within tolerable
limits provided the recommendations presented in this report are followed.
This includes allowing the fill induced time dependent settlement to occur
prior to constmction of settlement-sensitive stmctures. It should be
recognized that minor hairline cracks on concrete due to shrinkage of
constmction materials or redistribution of stresses are normal and may be
anticipated.
EXPANSIVE CHARidERISnCS: The inported fill soils within four feet of
finish grade should be nondetrimentally expansive. The recommendations of
this report reflect a this condition resulting from select grading
operations. If this is not the case, revised slab and foundation design will
be necessary.
LAIERAL RESISTANCE: Resistance to lateral loads may be provided by friction
at the t>ase of the footing and by passive pressure against the adjacent
soil. For concrete footings on conpacted fill soil or firm formational
soils, a coefficient of friction of 0.35 may be used. For calculating
passive pressure, an equivalent fluid unit weight of 400 poimds per cubic
foot may be used. Passive pressure should not exceed 2,500 poimds per
square foot. When combining frictional and passive resistance, the former
should be reduced by one-third.
GRADING AND POUNDATICN PLAN REVIEW
The grading and foimdation plans should be submitted to this office for
review to ascertain that the recommendations of this report have been
implemented and the assunptions utilized for its preparation are still
appropriate.
SCS&T 8821211 Febmary 23, 1989 Page 14
LIMITATIONS
REVIEW, OBSERVZOITCN AND TESTING
The recommendations presented in this report are contingent upon our review
of final plans and specifications. Such plans and specifications should be
made available to the soil engineer and engineering geologist so that they
may review and verify the conpliance with this report and with Chapter 70 of
the Uniform Building Code.
It is recomiended that Southem Califomia Soil & Testing, Inc. be retained
to provide continuous soil engineering services during the earthwork
operations. This is to observe compliance with the design concepts,
specifications or recommendations and to allow design changes in the event
that subsurface conditions differ from those anticipated prior to start of
constmction.
UNIPORMITy OF CXUDmCHS
The recommendations and opinions expressed in this report reflect our best
estimate of the project requirements based on an evaluation of the
subsurface soil conditions encountered at the subsurface exploration
locations and the assumption that the soil conditions do not deviate
appreciably from those encountered. It should be recognized that the
performance of the foimdations and/or cut and fill slopes may be influenced
by undisclosed or unforeseen variations in the soil conditions that may
occur in the intermediate and unexplored areas. Any unusual conditions not
covered in this report that may be encountered during site development
should be brought to the attention of the soils engineer so that he may make
modifications if necessary.
CHANCS: IN SCOPE
This office should be advised of any changes in the project scope or
proposed site grading so that it may be determined if the recommendations
contained herein are appropriate. This should be verified in writing or
modified by a written addendum.
SCS&T 8821211 Febmary 23, 1989 Page 15
TIME LIMITATICNS
The findings of this report are valid as of this date. Changes in the
condition of a property can, however, occur with the passage of time,
v^ether they be due to natural processes or the vork of man on this or
adjacent properties. In addition, changes in the State-of-the-Practice
and/or (Government iCodes may occur. Due to such changes, the findings of
this report may be invalidated vholly or in part by changes beyond our
control. Therefore, this report should not be relied upon after a period of
two years without a review by us verifying the suitability of the
conclusions and reconmendations.
PRQFESSICNAL STANDARD
In the perfomance of our professional services, ve conply with that level
of care and skill ordinarily exercised by members of our profession
currently practicing under similar conditions and in the same locality. The
client recognizes that subsurface conditions may vary from those encountered
at the locations where our borings, surveys, and explorations are made, and
that our data, interpretations, and recommendations are based solely on the
information obtained by us. We will be responsible for those data,
interpretations, and recommendations, but shall not be responsible for the
interpretations by others of the information developed. Our services
consist of professional consultation and observation only, and no warranty
of any kind whatsoever, express or implied, is made or intended in
connection with the work perfomied or to be performed by us, or by our
proposal for consulting or other services, or by our fumishing of oral or
written reports or findings.
CLIENT'S RESPCNSIBILITY
It is the responsibility of the City of Carlsbad, or their representatives
to ensure that the information and reconmendations contained herein are
brought to the attention of the engineer and architect for the project and
SCS&T 8821211 February 23, 1989 Page 16
incorporated into the project's plans and specifications. It is furtJier
their responsibility to take the necessary measures to insure that the
contractor and his subcontractors carry out such recommendations during
constmction.
FIELD EXPEORKnCNS
Seven subsurface explorations were made at the locations indicated on the
attached Plate Nuntier 1 on December 30, 1988 through January 10, 1989. These
explorations consisted of four borings drilled utilizing a hollow stem auger
type drill rig and three test trenches using a backhoe. The field vork was
conducted under the observation of our engineering geology personnel.
The explorations were carefully logged vhen made. These logs are presented
on the following Plates Number 3 through 11. The soils are described in
accordance with the Unified Soils Classification System as illustirated on
the attached sinplified chart on Plate 2. In addition, a verbal textural
description, the wet color, the apparent moisture and the density or
consistency are provided. The density of granular soils is given as either
very loose, loose, medium dense, dense or very dense. The consistency of
silts or clays is given as either very soft, soft, medium stiff, stiff, very
stiff, or hard.
Disturbed and "imdisturbed" samples of typical and representative soils were
obtained and retumed to the laboratory for testing.
LABORATORy TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. A brief description of the tests performed is
presented below:
SCS&T 8821211 Febmary 23, 1989 Page 17
a) CLASSIFICATICN: Field classifications were verified in the
laboratory by visual examination. The final soil classifications
are in accordance with the Unified Soil Classification System.
b) JDISTURE-^KNSITX": Field noisture content and dry density vere
determined for representative sanples obtained. This information
was an aid to classification and permitted recognition of
variations in material consistency with depth. The dry unit
veight is determined in poimds per cubic foot, and the field
moisture content is determined as a percentage of the soil's dry
veight. The results are simmarized in the boring and trench
logs.
c) GRAIN SIZE DISTRIBLTI'ICN: The grain size distribution was
determined for representative sanples of the native soils in
accordance with A.S.T.M. Standard Test D-422. The results of
these tests are presented on Plates Number 12 through 14.
d) OCNSOLIDATION TEST: Consolidation tests were perfomied on
selected "imdisturbed" sanples. The consolidation apparatus was
designed to accommodate a 1-inch-high by 2.375-inch or 2.500-inch
diameter soil sanple laterally confined by a brass ring. Porous
stones were placed in contact with the top and bottom of the
sanple to pemiit the addition or release of pore fluid during
testing. Loads were applied to the sample in a geometric
progression after vertical movement ceased, and resulting
deformations vere recorded. The percent consolidation for each
load cycle is reported as the ratio of the amoimt of vertical
conpression to the original one-inch sanple height. The test
sanple was inundated at some point in the test cycle to determine
its behavior under the anticipated footing load as soil noisture
increases. The results of this test are presented in the form of
curves on Plates Number 15 through 18.
LEGEND
• BORING LOCATION
H TRENCH LOCATION
15 EXISTING TOPOGRAPHY
APPROXIMATE LOCATION OF
t^fil ORIGINAL TOPOGRAPHY
SCALE
O AO
r'=60'
80 120
SOUTHERN CAUFORNIA
SOIL & TESTING, INC.
CHC/WDW
JOBNa 8821211
OATE 2-16-89
PLATE ^1
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION GROUP SYMBOL
sieve size.
CLEAN GRAVELS
I. COARSE GRAINED, more than half
of matenal is laraer than
No. 200
GRAVELS
More than half of
coarse fraction is
larger than No. 4
sieve size but
smaller than 3".
•GRAVELS WITH FINES
(Appreciable amount
of fines)
SANDS
More than half of
coarse fraction is
smaller than No. 4
sieve size.
CLEAN SANDS
SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAINED, more than
half of material is smaller
than No. 200 sieve sTzeT
SILTS AND CLAYS
Liquid Limit
less than 50
SILTS AND CLAYS
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
Liquid Limit CH
greater than 50
OH
HIGHLY ORGANIC SOILS PT
US -
Water level at time of excavation
or as indicated
Undisturbed, driven ring sample
or tube sample
TYPICAL NAMES
^\ SOUTHERN CALIFORNIA
SOIL A TESTING, INC.
Well graded gr
sand mixtures,
fines.
Poorly graded
sand mixtures,
fines.
Silty gravels,
gravel-sand-si
Clayey gravels
graded gravel-
mixtures.
•avels, gravel-
1 ittle or no
gravels, gravel
1 ittle or no
poorly graded
1t mixtures.
, poorly
sand, clay
Well graded sand, gravelly
sands, little or no fines.
Poorly graded sands, gravelly
sanas, little or no fines.
Silty sands, poorly graded
sand and silty mixtures.
Clayey sands, poorly graded
sand and clay mixtures.
Inorganic silts and very
fine sands, rock flour, sandy
silt or clayey-silt-sand
mixtures witH slight plas-
ticity.
Inorganic clays of low to
medium plasticity, gravelly
clays, sandy clays, silty
clays, lean clays.
Organic silts and organic
silty clays or low plasticity.
Inorganic silts, micaceous
or diatomaceous fine sandy
or silty soils, elastic
silts.
Inorganic clays of high
plasticity, fat clays.
Organic clays of medium
to high plasticity.
Peat and otiier highly
organic soils.
CK — Undisturbed chunk sample
BG — Bulk sample
SP — Standard penetration sample
MONROE STRFFT rOMM
BY: CRB
ERCIAL SITE
JOB NUMBER: 21211
DATE: 01-19-89
Plate No. 2
2 ^
4 -
6 -
BAG
18 i
20
22
24 -I
US
US
26
28
30
ML/
CL&
SM
CL
SC
Fill to 15.5 Feet, Grey
Brown, CLAYEY SAND
ALLUVIUM, Dark Grey.
CLAYEY SILT, Interbedded
With MEDIUM to COARSE
SILTY SAND
Dark Grey, SILTY CLAY
Grey, CLAYEY SAND
Continued
Moist
Satur-
ated
Moist/
Wet
Satur-
ated
Satur-
ted
Satur-
ted
Med i um
Dense
Stiff/
^ledium
Dense
Stiff
oose/
*^edium
Dense
11
10
106.0
85.3
105.4
22.2
36.6
23.5
SOUTHERN CALIFORNIA
SOIL &TESTING, INC.
SUBSURFACE EXPLORATION LOG
LOGGED BY: CRB
JOB NUMBER: 8821211
DATE LOGGED: 01-10-89
Plate No. 3
a.
Ill o
30
32 -
34 -
36
38 H
40
42
44 -
46 -
48 -
IU
0.
>
Ul
_l a. S <
z
o
<
-J CJ
o ^
<
BORING NUMBER 1
ELEVATION 1 Con ' t
DESCRIPTION NT RE NT fENC All IU 3 IU fENC CO
oc t-oc CO z < (0 < CO Ui
a. — a. CO Q
a. o a. z < s < COI OR z
o
< < o
« >- ^
H to —
IU
U z
CO
IU
oc
>
H
CO z
IU ^ a u a >- — oc
Q
IU ^
a —
I- z
(O Ul
3 o
O
IU z
> O
H H
< O -" < IU a.
O
O
US
us
US
50 jus
52 -
54 -
56 -
CL Dark Grey, SILTY CLAY Satur-
ated
Medium
Stiff
10
ML/
CL
Grey, SANDY SILT to SILTY
CLAY Satur-
ated
Medium
Dense/
Stiff
11
SC/
CL
Grey, CLAYEY SAND to
SILTY CLAY
Satur-
ated
Loose/
Medium
Dense
10
SC/
CL
Grey, CLAYEY SAND to
SILTY CLAY
Satur-
ated
Med i um
Dense/
Stiff
10
108.9 21.3
89.3 33.8
111.0 19.1
112.5 19.6
SC TERRACE DEPOSITS, Red
Brown, CLAYEY SAND Satur-
ated
Medium
Dense 17 102.8 23.8
Bottom at 56 Feet
SOUTHERN CALIFORNIA
SOIL &TESTING,INC.
SUBSURFACE EXPLORATION LOG SOUTHERN CALIFORNIA
SOIL &TESTING,INC. LOGGED BY: CRB DATE LOGGED: 01-10-89
SOUTHERN CALIFORNIA
SOIL &TESTING,INC.
JOB NUMBER: 8821211 Plate No. 4
a.
IU a
IU
a
0.
S <
CO
o
(0
CO
<
BORING NUMBER 2
ELEVATION
DESCR IPTION
I- Ui
z oc
Ui 3 oc t-
< CO a. — a O
< 2
>•
(A Ui
5 2 w
a. CO Q
^ ^
•< o 5
Ui
o
z
o
<
K _
H <0 —
Ui —
Ui
a.
Ui
>
CO
UJ w
a u a > ~ oc
Q
Ui a<
OC ~
I- Z
CO UJ
2 o
u
Ul
>
< o
Ui CL
fl= z o o
2 -
4 -
us
8
10
12 -
14 -
US
16 US
18 -
20 I US
22 -
24 -
26
28 -
US
30 -
SM/
SC
FILL TO 8 FEET, Red Brown
to Grey Brown, SILTY SAND
to CLAYEY SAND
Moist Medium
Dense
SM/
SC
SM/
SC
Grey Brown to Red Brown,
SILTY SAND to CLAYEY SAND
ALLUVIUM, Dark Grey,
SILTY SAND to SANDY CLAY
Moist
Satur-
ated
SM/
SC
Dark Grey, SILTY SAND to
CLAYEY SAND Satur-
ated
SC TERRACE DEPOSITS, Red
Brown, CLAYEY SAND
Satur-
ated
Moist/
Wet
SC Red Brown, CLAYEY SAND
Bottom at 26 Feet
Moist
Medium
Dense
Loose
17
106.9 20.1
Loose
105.5 19.9
Medium
Dense
Medium
Dense
Medium
Dense
20 18.4
17 15.0
15.4
17.0
SOUTHERN CALIFORNIA
SOIL &TESTING,INC.
SUBSURFACE EXPLORATION LOG
LOGGED BY: CRB
JOB NUMBER: 8821211
DATE LOGGED: 01-10-89
Plate No. 5
1-o.
Ui
a
0
2
4
6
8 -1
10
Ui
a
CO
<
-I u o
CO OT
CO
BORING NUMBER 3
ELEVATION
DESCR IPTION
H Ui
Z IT
Ui 3
K h-
< CO a. —
Q. O
< s
o
< S2
Q. CO 0- z
< o
O
2 S
H Z < <
H- CO
IU —
z
S Ui J
Q. flC O
CO z
Ui Z
C3 o a
V — oc
a
Ui
oc
3
co Ul
s o
o
> o
< o
-i <
Ui a
0= Z
O o
12 -
14 -
16 i US
18 H
20
22 -
24 -
26 -
28 -
30
SM/
SC
FILL TO 10 FEET, Red
Brown to Grey Brown,
SILTY SAND to CLAYEY SAND
Moist
SM/
SC
ALLUVIUM, Dark Grey,
SILTY SAND to CLAYEY SAND
Wet/
Satur-
ated
SC TERRACE DEPOSITS, Grey,
CLAYEY SAND
Moist/
Wet
US SC Grey, CLAYEY SAND
Bottom at 20 Feet
Moist
Medium
Dense
Satur-
ated
Loose/
Medium
Dense
Medium
Dense
Medium
Dense
22
23
121.5 13.0
118.9 13.6
SOUTHERN CALIFORNIA
SOIL &TESTING, INC.
SUBSURFACE EXPLORATION LOG
LOGGED BY: CRB
JOB NUMBER: 8821211
DATE LOGGED: 01-10-89
Plate No. 6
a.
Ui
Q
0 -
o
CO OT
CO
O
BORING NUMBER 4
ELEVATION
DESCRIPTION NT RE NT rENC All Ul 3 Ui rENC K t-K CA z < CO < CA Ui
a. — IL CO Q
a. o a. z < z < COi OR 2 S
1- z
< <
K h-
t- CO
Ui — , cn
Ui oc Ui
0.
CO
z
Ui a u a >- — oc
Q
Ui
CC
3
H
co 5 z
I-z
Ui
o o
Ul
>
<
z
o
O <
a.
Z
O
o
2 -
4 -
6 -
8 -
10
12
US
14 -
16 US
18 -
20 I US
22 -
24 -
26
28 H
US
30
SC
SM
SM/
SC
SC/
CL
SM/
SC
SM/
SC
FILL TO 12 FEET, Light
Grey to Brown, CLAYEY
SAND
Moist Medium
Dense
Grey, SILTY SAND Moist Medium
Dense
ALLUVIUM, Grey, SILTY
SAND to CLAYEY SAND
Wet Med i um
Dense
Dark Grey, CLAYEY SAND to
SANDY CLAY Wet Medium
Dense/
Stiff
Grey, SILTY SAND to CLAY-
EY SAND Satur-
ated
Medium
Dense
Grey, SILTY SAND to CLAY-
EY SAND Saturr
ated
Medium
Dense
11
16
113.7 17.6
82.0 29.3
114.0 19.5
112.8 105.4
SOUTHERN CALIFORNIA
SOIL &TESTING,INC.
SUBSURFACE EXPLORATION LOG
LOGGED BY: CRB
JOB NUMBER: 8821211
DATE LOGGED: 01-10-89
Plate No. 7
SOUTHERN CALIFORNIA
SOIL &TESTING,INC.
SUBSURFACE EXPLORATION LOG
LOGGED BY: CR3
JOB NUMBER: 8821211
DATE LOGGED: 01-10-89
Plate No. 8
I
I
I CL
Ul
Q
CL >
0. z <
CO
0 -I
1
2
3
4 _
5 _
6
z
o
O t CO (0
CO
SM/
SP
TRENCH NUMBER 1
ELEVATION
DESCRIPTION
FILL, Light Brown, FINE to
MEDIUM SAND
I- lu
^ =
< to a. — a. O
< z
Very
Moist
z
Ul oc <
a.
it
Ul OT
I-
co
(0 z o u
UJ
a
oc o
Loose
(0
z _
UJ
>-
oc
Q
IU
CO U
o ^ s o o
UJ
>
z
o
<
a Z o o
7 _
8
SM ALLUVIUM, Dark Brown, SILTY
SAND, Numerous Roots 3'-5'
Seepage and Caving 3'-5'
Wet
Saturated
Loose
Wet Med i um
Dense
SC Dark Brown, CLAYEY SAND Very
Moist to
Wet
Medium
Dense
9 _
10
11
CL/
CH
SUBSOIL/TOPSOIL, Grey Green
and Brown, SANDY CLAY
Wet to
Very
Moist
Stiff
Bottom at 11 Feet
/Q\ SOUTHERN CALIFORNIA
^WW^ SOIL A TESTING,INC.
SUBSURFACE EXPLORATION LOG /Q\ SOUTHERN CALIFORNIA
^WW^ SOIL A TESTING,INC. LOGGED BY: jgR DATE LOGGED: 12-30-88
/Q\ SOUTHERN CALIFORNIA
^WW^ SOIL A TESTING,INC.
JOB ''UMBER:gg2-^211 Plate No. 9
IL
Ul
Q
0 -
1 •
2 -
3 -
4 -
5 -
6 -
7 -
8 -
UJ a >-
Ul
-I
CL Z <
CO
I-<
=i -
o il:
CO OT
CO
<
TRENCH NUMBER 2
ELEVATION
DESCRIPTION
UJ
oc
I-z
UJ
K I-
< CO
t o
< z
Ul oc < a a.
z L:
UJ CO , I- z CO tu
» o
DC
o
>-
H
(0
z _
IU 1^
oc o
oc
CA U
i ^
s o
o
Ul
>
Ul
cc
z
o
o < a. Z o o
SM FILL, Dark Brown, SILTY SAND Very
Moist
Loose
SC ALLUVIUM, Dark Brown, CLAYEY
SAND, Numerous Root I'-S'
Wet
Saturated
Loose
CL/
CH
SUBSOIL/TOPSOIL, Grey Tan,
SANDY CLAY
Very
Moist to
Wet
Stiff
SM/
SP
TERRACE DEPOSITS, Rust
Brown, SLIGHTLY SILTY SAND
Very
Moist
Medium to
Dense
Bottom at 9 Feet
/\ SOUTHERN CALIFORNIA
SOIL A TESTING,INC.
SUBSURFACE EXPLORATION LOG /\ SOUTHERN CALIFORNIA
SOIL A TESTING,INC. LOGGED BY: JBR DATE LOGGED: 12-30-88
/\ SOUTHERN CALIFORNIA
SOIL A TESTING,INC.
JOB NUMBER:gg2j211 Plate No.10
a.
Ul
Q
0 -
1 •
2 •
3 •
4 .
5 .
6 .
7 .
8 .
9 .
Ui
CL >
I-
Ui
-I
CL
Z <
CO
<
O
o t
CO
CO
<
CO
TRENCH NUMBER 3
ELEVATION
DESCRIPTION
I- Ul
z oc
< CA
t o
< z
- ^
z z -
IU Ui OT
4( CO Ul o. m O
0. <
o u
oc
o
>-I-
(A
z _
Ul
>•
OC
a
Ul 5^
OC
CA U>
i ^
s o
u
z
Ui o
> p
I- <J < <
-J Q.
Ui 2
O
o SM/
SP
SLOPEWASH, Brown, SLIGHTLY
SILTY SAND
Moist Loose to
Medium
Dense
SM ALLUVIUM, Green Grey, SILTY
SAND, Caving and Seepage
8'-9'
Saturated Loose
Bottom at 9 Feet
y\ SOUTHERN CALIFORNIA
^•Wfe^ SOIL A TESTING,INC.
SUBSURFACE EXPLORATION LOG y\ SOUTHERN CALIFORNIA
^•Wfe^ SOIL A TESTING,INC. LOGGED BY: JBR DATE LOGGED: 12-30-88
y\ SOUTHERN CALIFORNIA
^•Wfe^ SOIL A TESTING,INC.
JOB NUMBER:8821211 Plate No. ll
>
N
m
o
H
QD
c
H
O
O
OD 5
03 00 ro 1—» ro
00
CD
ro
m
ro I
1—' o I 00
ID
n
a* m
mZ
nz
o m
tn —\
TO
o o
m
o
I—I
I—I —I m
Bl & 21
B4 @ 36
(12 in.) 3 in. 3/4 in. No.4 No. 10 No. 40 No. 200
U.S. STANDARD SIEVE SIZE
1440 I'SO Om.) 100
.1^
PARTICLE SIZE LIMITS
1
1 BOULDER 1 COBBLES 1 1
GRAVEL SAND SILT OR CLAY
1
1 BOULDER 1 COBBLES 1 1 Coarse Fine Coarse Medium Fine
SILT OR CLAY
CD
>
N
m
g
O) H
CD
c
«_ o w
z
p
CO
00
ro
5
a
00
cn
CJO
m
ro I
o
I
00
(D
n
s* m
mZ
» n
nz
O
OO
—I ;^ m m -H
o
O
m
o
I—I
r-
I—I -H m
Bl (3 41
9876543 2
I
(Pro/^ Size (mm)
Bl @ 31
(12 in.) 3in. 3/4in. No.4 No.lO No.40 No.200
U.S. STANDARD SIEVE SIZE
440 (SO Gm.) 100
I44Q. (100 am.)
PART ICLE SIZE Ll MITS
1
1 BOULDER I COBBLES
1
GRAVEL SANO SILT OR CLAY
1
1 BOULDER I COBBLES
1 Coarse Fine Coorse Medium Fine
SILT OR CLAY
>
cn
N
m
o
H
GO
c
H o z
o 5
00
00
ro
a
DO 3>
-a
cu
c-l-
ru ro
I
I—' o
I
CO
U3
ID
fi* m
mZ
« n
nz
70
o
—I
TO m m
o o
TO
o
r—
oo
B4 @ 21
36" 18"
24" 12
^.S. standard Sieves
Vi' *I0 *20 M40 t*60
3^" i»4 «8 . *I6 »30 *50 / *I00 *200
/hydrometer
(t^inutes)
5 30 180 1440 (SO om.) •100
987654 3 2
I
Grain Size (mm)
PARTICLE SIZE Ll MITS
1
1
BOULDER 1 COBBLES
1
GRAVEL SAND SILT OR CLAY
1
1
BOULDER 1 COBBLES
1
Coarse Fine Coarse Medium Fine
SILT OR CLAY
(12 in.) 3in. 3/4in. No.4 No.lO No.40 No. 200
U.S. STANDARD SIEVE SIZE
I
I
I
SOUTHERIM CALIFORIMIA
SOIL & TESTING LAB, INC.
BBBO RIVERDALE STREET
SAN OIEQO, CALIPORNIA BBieO
MONROE STREET COMMERCIAL SITE
BY DBA DATE 2-23-89
JOBNO. 8821211 Plate No. 15
I
LOAD kips/sq.ft.
1 SOUTHERN CALIFORNIA
SOIL & TESTING LAB, INC.
SaSO RIVEROAUE STREET
SAIM OIEGO, CALIFORNIA SBieo
MONROE STREET COMMERCIAL SITE
BY DBA DATE 2-23-89
JOB NO. 8821211 Plate No. 16
LOAD kIps/sq.ft.
MONROE STREET COMMERCIAL SITE
DBA DATE 2-23-89
JOBNO. 8821211 Plate No. 17
SOUTHERN CALIFORNIA
SOIL & TESTING LAB, INC.
SaSO RiVEROALE STREET
SAN oiEcao, CALIFORNIA seieo
LOAD kips/sq.ft.
SOUTHERN CALIFORNIA
SOIL & TESTING LAB, INC.
BBSO RIVEROALE STREET
SAN OIEQO, CALIFORNIA BBieo
MONROE STREET COMMERCIAL SITE
DBA DATE 2-23-89
JOB NO. 8821211 Plate No. 18
FUTURE CXWMERCIAL SITES, M3NR0E STTOET AND MZVRRCN ROAD, CARESBAD
RECXWMENraD (3RADING SPBCIFICflTICNS - GENERAL PROVISICNS
(SHERAL UnENT
The intent of these specifications is to establish procedures for clearing,
compacting natioral ground, preparing areas to be filled, and placing and
conpacting fill soils to the lines and grades shown on the accepted plans.
The recomiendations contained in the preliminary geotechnical investigation
report and/or the attached Special Provisions are a part of the Reconmended
Grading Specifications and shall supersede the provisions contained
hereinafter in the case of conflict. These specifications shall only be
used in conjunction with the geotechnical report for vdiich they are a part.
No deviation from these specifications will be allowed, except where
specified in the geotechnical soil report or in other written communication
signed by the Soil Engineer.
CfiSERVAnON ANQ TESTING
Southem Califomia Soil and Testing, Inc., shall be retained as the Soil
Engineer to observe and test the earthwork in accordance with these
specifications. It will be necessary that the Soil Engineer or his
representative provide adequate observation so that he may provide an
opinion that the work was or was not accomplished as specified. It shall be
the responsibility of the contractor to assist the soil engineer and to keep
him appraised of work schedules, changes and new information and data so
that he may provide these opinions. In the event that any unusual
conditions not covered by the special provisions or preliminary soil report
are encountered diiring the grading operations, the Soil Engineer shall be
contacted for further recommendations.
If, in the opinion of the Soil Engineer, substandard conditions are
encountered, such as; questionable or unsuitable soil, unacceptable moisture
(R-8/87)
SCS&T 8821211 February 23, 1989 Appendix, Page 2
content, inadequate conpaction, adverse weather, etc., construction should
be stopped until the conditions are remedied or corrected or he shall
recommend rejection of this vrork.
Test nethods used to determine the degree of conpaction should be performed
in accordance with the following American Society for Testing and Materials
test methocds:
Maximum Density & Cptiraum Moisture Content - A.S.T.M. D-1557-78.
Density of Soil In-Place - A.S.T.M. D-1556-64 or A.S.T.M. D-2922.
All densities shall be expressed in terms of Relative Compaction as
determined by the foregoing A.S.T.M. testing procedures.
PREPARffTION OF AREAS TO RECEIVE FILL
All vegetation, brush and debris derived from clearing operations shall
be reiroved, and legally disposed of. All areas disturbed by site grading
should be left in a neat and finished appearance, free from unsightly
debris.
After clearing or benching, the natural ground in areas to be filled shall
be scarified to a depth of 6 inches, brought to the proper moisture content,
conpacted and tested for the minimum degree of conpaction in the Special
Provisions or the recommendation contained in the preliminary geotechnical
investigation report. All loose soils in excess of 6 inches thick should be
rent3ved to firm natural ground v^ch is defined as natural soils vAiich
possesses an in-situ density of at least 90% of its maximum dry density.
When the slope of the natural ground receiving fill exceeds 20% (5
horizontal imits to 1 vertical unit), the original ground shall be stepped
(R-8/87)
SCS&T 8821211 February 23, 1989 i^pendix. Page 3
or benched. Benches shall be cut to a firm conpetent soil condition. The
lower bench shall be at least 10 feet wide or 1 1/2 times the the equipment
width which ever is greater and shall be sloped back into the hillside at a
gradient of not less than two (2) percent. All other benches should be at
least 6 feet wide. The horizontal portion of each bench shall be conpacted
prior to receiving fill as specified herein for conpacted natural ground.
Ground slopes flatter than 20% shall be benched vhen considered necessary by
the Soil Engineer.
Any abandoned buried structures encountered during grading operations must
be totally renoved. All underground utilities to be abandoned beneath any
proposed structure should be removed from within 10 feet of the structure
and properly capped off. The resulting depressions from the above described
procedures should be backfilled with acceptable soil that is conpacted to
the requirements of the Soil Engineer. This includes, but is not limited
to, septic tanks, fuel tanks, sewer lines or leach lines, storm drains and
water lines. Any buried structures or utilities not to be abandoned should
be brought to the attention of the Soil Engineer so that he may detennine
if any special recommendation will be necessary.
All water wells vMch will be abandoned should be backfilled and capped in
accordance to the requirements set forth by the Soil Engineer. The top of
the cap should be at least 4 feet below finish grade or 3 feet below the
bottom of footing vAiichever is greater. The type of cap will depend on the
diaiteter of the well and should be determined by the Soil Engineer and/or a
qualified Structural Engineer.
FILL MATERIAL
Materials to be placed in the fill shall be approved by the Soil Engineer
and shall be free of vegetable matter and other deleterious svibstances.
(R-8/87)
SCS&T 8821211 February 23, 1989 i^pendix. Page 4
Granular soil shall contain sufficient fine material to fill the voids. The
definition and disposition of oversized rocks, expansive and/or detrimental
soils are covered in the geotechnical report or Special Provisions.
Expansive soils, soils of poor gradation, or soils with low strength
characteristics may be thoroughly mixed with other soils to provide
satisfactory fill material, but only with the explicit consent of the soil
engineer. Any inport material shall be approved by the Soil Engineer before
being brought to the site.
PLACING AND OOMPiO^ICN OF FILL
improved fill material shall be placed in areas prepared to receive fill in
layers not to exceed 6 inches in conpacted thickness. Each layer shall have
a uniform moisture content in the range that will allow the conpaction
effort to be efficiently applied to. achieve the specified degree of
conpaction. Each layer shall be uniformly conpacted to a minimum specified
degree of conpaction with equipment of adequate size to economically conpact
the layer. Conpaction equipment should either be specifically designed for
soil conpaction or of proven reliability. The minimum degree of conpaction
to be achieved is specified in either the Special Provisions or the
reconmendations contained in the preliminary geotechnical investigation
report.
When the structural fill material includes rocks, no rocks will be allowed
to nest and all voids must be carefully filled with soil such that the
minimum degree of compaction recommended in the Special Provisions is
achieved. The maximum size and spacing of rock permitted in structural
fills and in non-structural fills is discussed in the geotechnical report,
v^en applicable.
Field observation and conpaction tests to estimate the degree of conpaction
of the fill will be taken by the Soil Engineer or his representative. The
(R-8/87)
SCS&T 8821211 February 23, 1989 i^spendix. Page 5
location and frequency of the tests shall be at the Soil Engineer's
discretion. When the conpaction test indicates that a particular layer is
less than the required degree of conpaction, the layer shall be reworked to
the satisfaction of the Soil Engineer and until the desired relative
conpaction has been obtained.
Fill slopes shall be conpacted by means of sheepsfoot rollers or other
suitable equipment. Conpaction by sheepsfoot rollers shall be at vertical
intervals of not greater than four feet. In addition, fill slopes at ratios
of two horizontal to one vertical or flatter, should be trackrolled.
Steeper fill slopes shall be over-built and cut-back to finish contours
after the slope has been constructed. Slope conpaction operations shall
result in all fill material six or more inches inward from the finished face
of the slope having a relative conpaction of at least 90% of maximum dry
density or that specified in the Special Provisions section of this
specification. The conpaction operation on the slopes shall be continued
until the Soil Engineer is of the opinion that the slopes will be stable in
regards to surficial stability.
Slope tests will be made by the Soils Engineer during construction of the
slopes to determine if the required conpaction is being achieved. Where
failing tests occ\ar or other field problems arise, the Contractor will be
notified that day of such conditions by written communication from the Soil
Engineer or his representative in the form of a daily field report.
If the method of achieving the requixed slope conpaction selected by the
Contractor fails to produce the necessary results, the Contractor shall
rework or rebuild such slopes until the recjuired degree of conpaction is
obtained, at no cost to the Owner or Soils Engineer.
(R-8/87)
SCS&T 8821211 February 23, 1989 i^pendix. Page 6
CUT SLOPES
The Engineering Geologist shall inspect cut slopes excavated in rock or
lithified formational material during the grading operations at intervals
determined at his discretion. If any conditions not anticipated in the
preliminary report such as perched water, seepage, lenticular or confined
strata of a potentially adverse natiire, imfavorably inclined bedding, joints
or fault planes are encounte2:ed during grading, these conditions shall be
analyzed by the Engineering Geologist and Soil Engineer to determine if
mitigating measures are necessary.
Unless otherwise specified in the geotechnical report, no cut slopes shall
be excavated higher or steeper than that allowed by the ordinances of the
controlling govemmental agency.
ENGINEERING OBSERVTmiGN
Field observation by the Soil Engineer or his representative shall be made
during the filling and conpacting operations so that he can ejq^ress his
opinion regarding the conformance of the grading with acceptable standards
of practice. The presence of the Soil Engineer or his representative or the
observation and testing shall not release the Grading Contractor from, his
duty to conpact all fill material to the specified degree of conpaction.
SEASCN LIMITS
Fill shall not be placed during unfavorable weather conditions. When work
is interrupted by heavy rain, filling operations shall not be resumed until
the proper moisture content and density of the fill materials can be
achieved. Damged site conditions resulting from weather or acts of God
shall be repaired before acceptance of wDrk.
(R-8/87)
SCS&T 8821211 February 23, 1989 Appendix, Page 7
RECXWMENDED OWDING SPECIFICATICNS - SPECIAL PROVISIONS
RELATIVE OOMPACnCN: The minimum degree of conpaction to be obtained in
conpacting natural ground, in the conpacted fill, and in the conpacted
backfill shall be at least 90 percent. For street and parking lot subgrade,
the upper six inches should be compacted to at least 95% relative
conpaction.
EXPANSIVE SOILS: Detrimentally expansive soil is defined as clayey soil
which has an expansion index of 50 or greater when tested in accordance with
the Uniform Building Code Standard 29-C.
OVERSIZE) MATERIAL: Oversized fill material is generally defined herein as
rocks or luitps of soil over 6 inches in diameter. Oversize materials should
not be placed in fill unless recommendations of placement of such material
is provided by the soils engineer. At least 40 percent of the fill soils
shall pass through a No. 4 U.S. Standard Sieve.
•reANSinCN LOIS: Where transitions between cut and fill occur within the
proposed building pad, the cut portion should be undercut a minimum of one
foot below the base of the proposed footings and reconpacted as structural
backfill. In certain cases that would be addressed in the geotechnical
report, special fcxDting reinforcement or a combination of special footing
reinforcement and undercutting may be required.
(R-8/87)