HomeMy WebLinkAbout3416; AVENIDA ENCINAS EXTENSION; PRELIMINARY & ADDENDUM GEOTECHNICAL INVESTIGATION; 1993-12-13CARDIFF GEOTECHNICAL
CONSULTING ENGINEERS AND GEOLOGISTS
December 13, 1993
Fraser Engineering, Inc.
2191 El Camino Real
Oceanside, CA 92054
Subject: PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Extension and Widening of Avenida Encinas
Carlsbad, California
Dear Mr. Wall and Mr. Pasko:
In response to your request, we have performed a preliminary
geotechnical investigation at the subject site for the proposed
street extension and widening of Avenida Encinas.
The findings of the investigation, laboratory test results and
recommendations for grading and pavement sections are presented
in this report.
From a geotechnical point of view, it is our opinion that the
site is suitable for the proposed development, although special
consideration will be required for the underlying alluvial/soil
deposits during the grading and construction phases.
If you have any questions, please do not hesitate to contact us
at 753-3697.
This opportunity to be of service is appreciated.
Respectfully submitted,
CARDIFF GEOTECHNICAL
J s's' Mark Burwell
Geologist
OESSIO4,
SIN
782
rn EXP. 123193 1
4d Vithay Singhanet, P.E.
Geotechnical Engineer
I
OF C P,
135 LIVERPOOL DRIVE • SUITE A • CARDIFF • CA 92007
(619) 753-3697 • FAX (619) 753-4158
PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Extension and Widening of Avenida Encinas
Carlsbad, California
Prepared For:
Fraser Engineering, Inc.
2191 El Camino Real
Oceanside, California
December 13, 1993
W.O. #P-121103
Prepared By:
CARDIFF GEOTECHNICAL
135 Liverpool Drive
Suite A
Cardiff, California 92007
TABLE OF CONTENTS
INTRODUCTION. . . . . . . . . . . . . . . . ............ . . . . . . . . . ........ . . . 1
SITE CONDITIONS . . . . . . . . . . . . . . . . . . . . . .......... . . . . . . . .......1
PROPOSED DEVELOPMENT ............................ ... . . . . . . . . . . 2
SITE INVESTIGATION............................ ......
LABORATORY TESTING.......................... . . . . . . . ...... .. 3
GEOTECHNICAL CONDITIONS . . . . . . . . . . . . . . . . ............ . . . . . . . . . 4
DISCUSSION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
PRELIMINARY PAVEMENT DESIGN....... . . . . . . . . . . . . . . . . ....... . . . 8
CONCLUSIONS AND RECOMMENDATIONS.......... . . . .. . . . . . . . . . . . . .10
GENERAL GRADING CONSIDERATIONS ................ 10
EARTHWORK. . . . . . ........... . . . . . . . . . . . . . . . . . . . . 12
OBSERVATION AND DENSITY TESTING.......... . . . . .14
D • DRAINAGE. . . • . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . .14
E • LIMITATIONS ................... ......... ....... 15
APPENDICES
APPENDIX A ....................... LABORATORY TEST RESULTS
TABLE S-i
PLATE S-i
TRENCH LOGS
TOPOGRAPHIC OVERLAY
PORTION OF GRADING PLAN
TYP. STABILIZATION FILL DESIGN
TYPICAL SECTIONS
APPENDIXB ....................... GRADING GUIDELINES
GEOTECHNICAL MAP
December 13, 1993
W.O. #P-121103
Page 1
INTRODUCTION
This report presents the results of our preliminary geotechnical
investigation on the subject property. The purpose of this study
is to evaluate the nature and characteristics of the earth
materials underlying the site and their influence on the
construction of the proposed street improvements.
SITE CONDITIONS
The subject property includes a coastal segment of land extending
from the terminus of Avenida Encinas, near Poinsettia Lane north
to Palomar Airport Road, in the city of Carlsbad. The southern
portion of the site consists of relatively flat cultivated
terrain. However, the northern portion of the site includes 10
to 12 foot high slopes which descend along the western side of
Avenida Encinas at gradients approaching 1½:1. Except for the
most southern segment, the majority of Avenida Encinas and its
proposed extension generally parallels the Atchison Topeka and
Santa Fe Railroad line. The northern portion of Avenida Encinas
is bounded.along the east by commercial structures.
A review of topographic maps, prior to the development of
structures and the graded portion of Avenida Encinas, indicates a
large canyon (Canyon De Las Encinas) and several westerly and
southeasterly ravines transecting the northern and central
portions of the site (See enclosed topographic overlay).
December 13, 1993
W.O. #P-121103
Page 2
Apparently, one or more culverts were required to transfer water
0i G aot.OGsST VISIT StlE.' I F So
under the elevated railway line. rw T.%ATCuvE.T(S)
WJ REøiulD UJ40W flAt4Y
rI4aR.e
PROPOSED DEVELOPMENT
Plans for the extension and widening of Avenida Encinas were
prepared by Fraser Engineering. The project includes the
connection of the existing half street improvements from the
terminus of Avenida Encinas near Poinsettia Lane north, to the
southern texinus of the street near Palomar Airport Road. The T 50 r .W T,çi..mi,js is Caspgp i' 506m OF PA S
project also includes widening of the existing northern street
segment. The overall length of the project, including the
widening of the northern street segment and the construction of
the new road segment, is approximately 5400 C era feet. . iRi~ Lim WAL.
Additional improvements will consist of curb, gutter, sidewalk,
asphaltic concrete paving and storm drain facilities. Several
utility lines are present along the proposed road alignment. Of
significant concern is the 12 inch diameter high pressure gas
line.
Grading of the southern portion of the road segment will be
limited to minor cuts and fills, up to 4.0 feet. However, cuts
and fill slopes, up to 9.0 feet and 11.5 feet, respectively, are
planned along the northern and central road segments.
SITE INVESTIGATION
Eight exploratory trenches were excavated on the site with a
December 13, 1993
W.O. #P-121103
Page 3
tractor-mounted backhoe to a maximum depth of 14 feet. Earth
materials encountered were visually classified and logged by our
field geologist. Undisturbed, representative samples of the
earth materials were obtained at selected intervals. Samples
were obtained by driving a thin walled steel sampler into the
desired strata. The samples are retained in brass rings of 2.5
inches outside diameter and 1.0 inches in height. The central
portion of the sample is retained in close fitting, waterproof
containers and transported to our laboratory for testing and
analysis.
LABORATORY TESTING
Classification
The field classification was verified through laboratory
examination, in accordance with the Unified Soil Classification
System. The final classification is shown on the enclosed
exploratory Logs.
Moisture/Density
The field moisture content and dry unit weight were determined
for each of the undisturbed soil samples. This information is
useful in providing a gross picture of the soil consistency or
variation among exploratory excavations. The dry unit weight was
determined in pounds per cubic foot. The field moisture content
December 13, 1993
W.O. #P-121103
Page 4
was determined as a percentage of the dry unit weight. Both are
shown on the enclosed Appendix A.
Maximum Dry Density/Optimum Moisture Content
The maximum dry density and optimum moisture content were
determined for selected samples of earth materials taken from the
site. The laboratory standard tests were in accordance with ASTM
D-1557€? The results of the tests are presented in Appendix
"A".• w' 'cii ccvrioo ?
GEOTECHNICAL CONDITIONS
The southern portion of the site is underlain by nearly flat-
lying, friable Pleistocene sands mantled by relatively thin soil
deposits. However, in •the north-central portion of the site
significant alluvial/soil deposits are present. These deposits
are generally soft and compressible and will require special
consideration during the grading phase. A brief description of
the earth materials is discussed below.
Alluvium/Soil (Undifferentiated)
In the vicinity of Trench Nos. 1, 2 and 3, up to 10.5 feet of
dark brown slightly sandy clay was encountered. These deposits
are compressible and ghIy—expansive-.)It. is likely that
significant amounts of these alluvial/soil deposits are present
in the central portion of Canyon De Las Encinas (vicinity of STA.
December 13, 1993
W.O. #P-121103
Page 5
68). Additional alluvial/soil deposits are present in the
transecting ravines in the northern portion of the site (vicinity
of STA. 81). In the southern portion of the site, the
alluvial/soil deposits thin to approximately 6.0 feet, in the
vicinity of Trench No. 4. The southern extent of these deposits
is in the vicinity of STA. 50.
Soil
Based on exploratory Trench Nos. 5 through 7, the southern
portion of the site is generally mantled by 1.5 to 2.5 feet of
clayey sand. The upper 1.0 foot of these deposits have been
cultivated. In the vicinity of Trench No. 8, approximately 2.0
feet of clay was encountered below the soil deposits. The clay
may represent a former drainage course.
Terrace Deposits
Late Pleistocene terrace deposits underlie the surf icial
materials on the site. The sedimentary deposits consist of
poorly consolidated fine and medium-grained sands. The reddish
brown sand is generally clayey and weathered in the upper 2.0
feet, but becomes increasingly dense and competent with depth.
Expansive Soils
The majority of the terrace deposits are composed of granular
deposits which have a potential expansion in the low, range.
December 13, 1993
W.O. #P-121103
Page 6
However, the clayey alluvial/soil deposits encountered have a
potential expansion in the high range. U)ikP1 TtE FoCPAMSIOP
Groundwater
No evidence of perched groundwater was observed in the terrace
deposits, along the southern portion of the site. However,
surface water was observed in areas along the base of the
descending slopes (vicinity of STA. 81). It is likely that
shallow groundwater tables are present in the transecting canyon
and ravine areas (See enclosed topographic overlay).
Seismicity
Based on a review of pertinent geological maps, no active faults
have been recognized on the subject property. The nearest active
fault is the Rose Canyon Fault located about four miles west of
the site. Other active faults which could affect the site are
listed on the enclosed Table S-i.
Although the likelihood of ground rupture on the site is remote,
it is almost a certainty the property will be exposed to ground
motion resulting from the release of energy along the numerous
known and unknown faults in Southern California. Table S-i
indicates seismic parameters for active faults which could affect
the site. The enclosed Seismic Map (Plate S-i) shows the general
proximity of active faults.
December 13, 1993
W.O. #P-121103
Page 7
DISCUSSION
The most southern portion of the site is mantled by
relatively thin soil deposits. However, significant
alluvial/soil deposits and high groundwater conditions
should be anticipated in the central and northern portions
of the project.
2. The clayey alluvial/soil deposits are compressible. In
order to reduce the adverse affects on pavement, 4eto
Tb 5 T1 - ___ ______ ëbnsolidation,
bremodãid
C—rQadway,Te.. T%SIS UP VJS UNV.FOP. Fi\Rvhv PtoJE.c.1 E%PEREtz
Sou O?Tr Tns TL $o' To ?j $iPCV
vmwwrs
_
In the vicinity of STA. 76+00 and STA 80 +60., the proposed
fill slopes may adversely affect the 12 inch diameter high
pressure gas line. Exploratory. trenches are recommended in
this area to evaluate the geotechrica]. conditions underlying
the gas line.
ta~~I~ropobed—f U17 (See enclosed Typical
YouoL
OT P, rUiY, Ir Is P DE1GI$.
C. Testing of representative- samples of the 'clayey
alluvial/soil deposits indicate an(i le_of5Thlss? It
Peug R-VAw 1ST SaE.TS
may be feasible to utilize on-site granular in the
upper 2.0 feet of the: street ubgrade; h an approach
RTED As 5
December 13, 1993
W.O. #P-121103
Page 8
would significantly improve the resistance value of the
subgrade soils.
The structural sections recommended in. this report generally
represent the "worst" and "best" types of soils encountered
on the site. Final structural sections should be based on
R-value testiyfof the specific - soils used in the street
w 1 E S T Now
subgrade.
WE )Et The ST CflON As P 9r OF ThE.
PE.'GP3.
It is our understanding that the proposed improvements to
Avenida Encinas will be constructed in four separate
segments Th11tia1 OhstIuctip will consist of Segment
followed byZ, C and D. Our conclusions and recommendations
are presented in this sequential manner.
PRELIMINARY PAVEMENT DESIGN
R-value tests were performed on representative samples of clayey
alluvial materials and Pleistocene terrace deposits. The results
of testing indicate an R-value of 5 or less for the clayey
materials and an R-value of 34 for sandy terrace deposits. As
per our conversations with the city of Carlsbad, Avenida Encinas
is classified as a secondary arterial street with an anticipated
taffic Index of Preliminary structural sections presented
below are based on R-value data and the subsurface conditions
encountered during exploration.
December 13, 1993
W.O. #P-121103
Page 9
Preliminary Structural Section .
.AvenidaEncinas (Sta. 5-'00t88+38)
R-value5 (clayey soils), Traffic Index of 8
.4.0 inches of asphaltic paving on
18 inches of Class 2 Aggregate Base on
12 inches of compacted native soil
AvenidaEncinas (Sta. 40+20 to 50+00) -
R-value 34 (sandy terrace deposits), Traffic Index of 8
4.0 inches of asphaltic paving on
10.5 inches of Class 2 Aggregate Base on
I •
12 inches of compacted-terrace deposits
Subgrade soils should be arified, moistened to optimum moisture
content and .compactedto the thickness indicated in the above
structural •section, and left in a condition to receive base
materials. C1i2ase_matilTshould have.aiiiiiiiJ
1t1JfL7ë' and a Subgrade-
(7si
Qpercent- -*of —tlfe-ir7 laboratory muiff-7dFy—_d&-nifities* —f or. the
--
•
.- -
All section changes should beG transitioñed. If adverse
conditions are encountered during the prepaation of subgrade
materials, special construction methods-may need to be employed.
based on ttin.g
Ala -.• No u 15 Th'E 7iiw E.
performed-after.- grading_is-complete..
December 13, 1993
W.O. #P-121103
Page 10
CONCLUSIONS AND RECOMMENDATIONS
General Grading Considerations
Segment A (STA. 40+20 to 58+55) -TRE T,,r 441°rP
In general, the southern portion of the site includes relatively
thin soil deposits overlying Pleistocene terrace sands. Grading
along STA. 40+20 to 50+100 will requi
of the surf icial materials and weathered terrace deposits. Minor
cuts and fill, in this area may be graded at an
inclination of 1½:1 (horizontal to vertical).
From STA. 50+00 to the end of Segment A (STA. 58+55), the site is
underlain by which thicken to more than
çpfet, in a northerly direction. Due to the compressible
4' A'.
nature of these clayey deposits, they shouldThe_removed' to a
minimum depth of properly— 341 -----------------------
compacted fill prior to the placement of additional fill or after
minor cuts up to 3.0 feet, are completed. ijtis
WE U-r \ FL1)LE JMEp.3T Ot,% IKS °"WE Arke W%LUM
Th ic..c.PT 3o J.TICAL 4C.EmE.PJT - 1 W t"4 t W /R.g&
Ot .'The proposed filpP4-srA1_L1[VG slope in the vicinity of STA. 58+55 should be
constructed as a stabilization fill. A 20 foot wide key,
embedded a minimum of 2.0 feet into competent material, should be
constructed along the base of the proposed fill slope. - Fill
should be benched into competent material. Fill slopes should be
constructed a maximum gradient of 2:1 (horizontal to vertical).
I Wot.c.v
FiLL. Is 3't.
December 13, 1993
W.O. #P-121103
Page 11
Segment B and C (STA. 58+55 to STA. 88+38)
Most of the rough grading has been completed along the western
portion of Segment B. However, variable height fill slopes are
planned along the western extent of the project. Fill slopes
should be provided with a key and benched into competent
materials, as previously indicated. The subgrade deposits
should be evaluated upon completion of the fill slopes.
Additional recomdationsiijy_be necessary. ? E.-A pt.AIN
The most extensive grading of the project is planned for Segment
C. Cuts, up to 9.0 vertical feet, are planned along the western
extent of Avenida Encinas. Fill slopes, up to 11.5 feet, are
also planned in this area.
Upon completion of the road cuts, the subgrade deposits should be
evaluated. It is likely that considerable alluvial/soil deposits
will be encountered in this area • A minimuni. of 3.0 foot removal
and recompaction should be anticipated.
The area of the proposed fill slopes in the vicinity of STA.
76+00 and STA. 80+60 is probably underlain by significant
alluvial/soil deposits. isxçpimnended that additional
exploratory trenches be excavated in these areas prior to
grading. The purpose of the additional exploration is to
evaluate the geotechnical conditions underlying the 12 inch
diameter high pressure gas line. If compressible alluvial/soil
deposits are present, the construction of the proposed 7.0 to
61
December 13, 1993
W.O. #P-121103
Page 12
11.5 foot fills could adversely affect the pipe. High
groundwater conditions are anticipated in this area and should
also be evaluated.
It should be noted that removal and relocation of the high
pressure gas line may be necessary in this area. $c' \ %t\
Segment D (STA. 88+38 to STA. 93+85
Only minor improvements consisting of a new sidewalk are planned
along Segment D. However, the subgrade deposits in the area of
the sidewalk should be evaluated during the course of grading.
Additional recommendations for densification of the subsoils may
be necessary. It should be noted that an alternative D.2 on the
grading plans indicate a 7.0 foot widening of the street. If
this alternative is chosen, the fill should be keyed and benched
into competent deposits.
Earthwork
Grading and earthwork should be performed in accordance with the
following recommendations and the Grading Specifications included
in this report.
Site Preparation
Prior to grading, all areas to receive structural fill should be
cleared of surface and subsurface obstructions, including any
existing debris, and stripped of vegetation. Removed vegetation
December 13, 1993
W.O.- #P-121103
Page 13
and debris should be properly disposed of off site. Holes
resulting from removal or buried obstructions which extend below
finished road grades should be replaced with suitable compacted
fill material. All areas to receive fill and/or other surface
improvements should be scarified to a minimum depth of 6 inches,
brought to near-optimum moisture conditions, and recompacted to
at least 90 percent of the laboratory maximum dry density.
Removal of Compressible Soils
As noted previously, significant clayey alluvial/soil deposits
are present. In order to reduce the adverse affects of
consolidation,
- 'E.dC%) 6 MQ1C4Ct%1 naterials should be r9yed_ancLrecompacteth Localized deeper
removals may be necessary along the base of fill slopes and
should be evaluated by additional exploration.
Excavations
The on-site materials are expected 'to be ri22able with modern,
earthmoving equipment in good operating condition. It is
estimated that the alluvial soils to be removed will undergo
approximately 5 to 10 percent shrinkage when compacted as fill
material to 90 percent relative compaction.
Fills
the -on- site - soi-1 s-are -general-ly -suitabl7e--f or-use -as -compacted' Z
December 13, 1993
W.O. #P-121103
Page 14
fill provided they are free of organic material and debris. Fill
should be placed in 6.0 to 8.0 inch lifts, moistened as required
and compacted to a minimum of 90 percent of the laboratory
maximum dry density.
aosits
minimum —depth —of 7__3_._0__'1f eet—be ow-. -the —proposed —road—s 69—r-
Additional recommendations will be presented should any septic
tanks, cistern, seepage pits or other unforeseen geotechnical
conditions be encountered during grading.
Slope Stability
It is our opinion that proposed fill slopes constructed at
inclinations of 2 to 1 (horizontal to vertical) or flatter will
be stable with respect to deep-seated failure, provided the fills
are keyed and benched into competent materials. Our evaluation
is based on a maximum height of 15 feet using a factor of safety
of 1.5 under static conditions.
Observation and Density Testing
Fill should be placed of this firm is
sent to observe and _es j Additional recommendations may be
necessary during the grading
RIM?VITtIiYR IS TiE O,uc.V
Drainage &.M PEA SON
Paved areas should be protected from moisture migrating under the
December 13, 1993
W.O. #P-121103
Page 15
pavement from adjacent water sources, such as planted or grass
areas. Pad water should not be allowed to pond.
LIMITATIONS
This report is presented with the provision that it is the
responsibility of the owner or the owner's representative to
bring the information and recommendations given herein to the
attention of the project's architects and/or engineers so that
they may be incorporated into plans.
If conditions encountered during grading appear to differ from
those described in this report, our office should be notified so
that we may consider whether modifications are needed. No
responsibility for construction compliance with design concepts,
specifications or recommendations given in this report is assumed
unless on-site review is' performed during the course of
construction.
The subsurface conditions, excavation characteristics and
geologic structure described herein are based on individual
exploratory excavations made on the subject property. The
subsurface conditions, excavation characteristics and geologic
structure discussed should in no way be construed to reflect any
variations which may occur among the exploratory excavations.
Please note that fluctuations in the level of groundwater may
occur due to variations in rainfall, temperature and other
December 13, 1993
W.O. #P-121103
Page 16
factors not evident- at the time measurements were made and
reported herein. Cardiff Geotechnical assumes no responsibility
for variations which may occur across the site.
The conclusions and recommendations of this report apply as of
the current date. In time, however, changes can occur on a
property whether caused by acts of man or nature on this or
adjoining properties. Additionally, changes in professional
standards may be brought about by legislation or the expansion of
knowledge. Consequently, the conclusions and recommendations of
this report may be rendered wholly or partially invalid by events
beyond our control. This report is therefore subject to review
and should not be relied upon after the passage of three years.
The professional judgments presented herein are founded partly
on our assessment of the technical data gathered, partly on our
understanding of the proposed construction and partly on our
general experience in the geotechnical field. Our engineering
work and the judgments given meet present professional standards.
However, in no respect do we guarantee the outcome of the
project.
If you have any questions, please do not hesitate to contact our
office at 753-3697.
The opportunity to be of service is greatly appreciated.
APPENDIX "A"
LABORATORY TEST RESULTS
TABLE I
Maximum D,y Density and Optimum Moisture Content
(Laboratory Standard ASTM D-1557-78)
Sample Max. Dry Optimum
Location Density Moisture Content
(pcf)
T-1 @ 2'-4' 119.0 14.0
(Mixture of clay and sand)
TABLE!!
Field Dry Density and Moisture Content
Sample Field Dry Field Moisture
Location Density Content
(pct) %
2 G
T-1@3.0' 104.0 f2.'& 16.2
19.7 T-1 @ 5.0' 98.7 rgp f
T-1 @ 7.0' 97.7 13.5
T-1 @ 10.0' 102.1 3.6
T-2@3.0' 105.5 17.9
(P-121103-1)
TABLE!! (Cont'd)
Field Dry Density and Moisture Content
Sample Field Dry Field Moisture
Location Density Content
(pc f)
T-2 @ 7.0' 112.7 17.3
T-2@9.0' 111.0 17.9
T-3 @ 3.0' 105.0 18.9
T-3 @ 5.5' 104.1 20.6
T-3@8.0' 99.8 21.2
T-4 @ 3.0' 96.8 24.2
T-4@5.0' 114.9 16.9
T-4 @ 7.0' 115.7 7.5
T-5 @ 1.5' 115.6 9.7
T-5@3.5' 112.0 9.1
T-5@7.0' 111.1 8.9
T-5 @ 10.0' 115.6 4.9
T-6 @ 1.0' 112.0 16.4
T-6@3.0' 118.6 15.2
T-6@5.0' 107.8 10.7
T-6@8.0' 108.7 5.7
T-7@3.0' 104.3 22.1
T-7@4.5' 116.7 13.3
T-7 @ 6.5' 113.2 12.9
T-8 @ 3.0' 106.3 21.2
(P-121103-2)
TABLE S-i
SEISMIC PARAMETERS FOR ACTIVE AND POTENTIALLY ACTIVE FAULTS
Max. Max.
Credible Probable Bedrock Design
Earth-, Earth- Accel- Accel-
Fault Distance guake Quake eration eration
--Magnitude--
Rose Canyon 4 mi. S.W. 7.1 6.2 0.31g 0.20g
Coronado Banks 19 mi. S.W. 6.5 6.0 0.15g 0.10g
Elisnore 25 mi. N.E. 7.5 7.3 0.19g 0.12g
San Jacinto 50 mi. N.E. 7.5 7.3 0.19g 0.06g
San Andreas 71 mi. N.E. 8.2 8.0 0.08g 0.05g
The Rose Canyon fault has recently been designated as active (C.D.M.G.)
Design acceleration is commonly considered to be about 65 percent of
the maximum (peak) acceleration for the site within approximately 20
miles of the epicenter.
' ••8R5TOw' SEISMIC MAP
!I 'k •••• \ S A Total length of fu1t ZOne that breaks lo1occr.
'\ -"• deposits or that has had seismic activity
- Poo Fault segment with surface rupture during an \ historic earthquake, or with aseisic fault cr
4 0 \ .1" .
\ '\ Approximate epicentrol area of earthquakes
that occurred 1769 - 1933
<1899
1
CLEGflO
\R/ftcS Earthquake epicenters since 1933
rCA F.. • 1907 Ref: AEG Special Publication, Oct.1973 (by Richard J. Proctor.
1948
RVERSIoE ' B ..
BANNING UJE cur F6&IIT (. ,. A. 1918 i M6.8 ?
PALJ,.4 1923 SPRIF1GS M63,
ietz) 1599OIO IeGa % D
.1937
'S' .
1910 -
1954
' ' • I %,-rk r, ' 1968 19C 4A i. / %' M 6.5
• \ \ ..• ,'(Z
S \ M P E -.R I A / L A N 0 I E
1915 0
G 0
i1356 1915
1942 M63
1 M6.3 1940
b%.. SAN I ----.-.-' __--- - \DIEGO
\.•
&9RiPriTh\
CERRO \. PRI&70 M, 1923
19 4
1935
L
PLATE S-I
EXPLORATORY TRENCHES LOGS
DEPTH DESCRIPTION
Trench No. 1 0-2' FILL: Sand, clayey, tan to brown,
pebbles, poorly mixed, moderately
dense, moist, plastic and wire debris
2'-8' ALLUVIUM: Clay, slightly sandy, dark
brown, damp, stiff, veins of tan sand
8'-10' ALLUVIUM(?): Sand, fine and medium-
grained, slightly moist, loose, no
cementation
Trench No. 2 0-1' FILL: Sand, silty and fine-grained, tan to
brown, di',', moderately dense
1'-5.5' ALLUVIUM: Sand, clayey, mottled tan to
brown, moist, dense
5.5'40' ALLUWUM: Clay, slightly sandy, dark
brown, damp to very damp, stiff
W-14' TERRACE DEPOSITS(?): Sand, slightly
clayey, tan to brown, moist,
moderately dense
Trench No. 3 0-2.5' FILL: Sand, clayey, tan to brown, moist,
loose, plastic debris
2.5'40.5' ALLUVIUM: Clay, slightly sandy, brown,
caliche stringers, damp, soft in upper 4
feet
(P-121103-1)
10.5'-11.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, tan to reddish brown,
moist, dense
Trench No. 4
Trench No. 5
Trench No. 6
0-2' FILL: Sand, clayey, tan to brown, slightly
moist, loose
2'-6' ALLUVIUM: Clay, slightly sandy, brown,
caliche stringer, damp, soft in upper 3
feet
6'-8' TERRACE DEPOSITS: Sand, fine and
medium-grained, slightly clayey, slightly
moist, dense
TERRACE DEPOSITS: Sand, fine and
medium-grained, reddish brown to gray,
slightly moist, dense
0-1.5' SOIL: Sand, slightly clayey, tan to brown,
slightly moist, loose, cultivated area
1.5'-2' SOIL: Sand, clayey, brown, caliche
packets, moist, moderately dense
0-9' TERRACE DEPOSITS: Sand, fine and
medium-grained, reddish brown to gray,
moist, moderately dense @ 8'-9 very
moist, weakly cemented
0-1.5' SOIL: Sand, clayey, tan to brown, blocky,
slightly moist, loose, cultivated area
1.5'-8' TERRACE DEPOSITS: Sand, fine and
medium-grained, slightly clayey in upper
1.5'-2.5 moist, dense below 2.5 grades
to weakly cemented reddish brown to
gray sand
(P-1211103-2)
Trench No. 7
Trench No. 8
0-1' SOIL: Sand, clayey, tan to brown, blocky,
slightly moist, loose, cultivated area
1 '-2.5' SOIL: Clay, slightly sandy, grey, very
damp, soft
2.5'-5' TERRACE DEPOSITS: Weathered sand,
slightly clayey, blocky, brown to slightly
reddish brown, dense, slightly moist
5'-7' TERRACE DEPOSITS: Sand, slightly
clayey, reddish brown, moist, dense
7'-8.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, very slightly clayey,
moist, dense
0-2' SOIL: Sand, clayey, tan to brown, slightly
moist, loose, cultivated area
2'4' SOIL: Clay, slightly sandy, grey, very
damp, soft
4'-6.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, moist
dense
(P-121103-3)
ME
69.0
p
IE
19.0
1960 TOPOGRAPIC OVERLAY
(showing drainage courses prior to development)
\
.-
A
20' WIDE
STABILIZATION FILL
14. VARIABLE 25' 2:1
40 NONPERFORATED PIPE LATERAL TO SLOPE FACE AT 100' INTERVALS
12' MINIMUM KEY DEPTH (into competent material)
EQUIPMENT WIDTH KEY
20' MINIMUM
TYPICAL STABILIZATION FILL DESIGN
I
I
04
IE: Cl qp DE Cl
Ilk 131 IP IEZ**l 3D M ~C 13
GRADING GUIDELINES
Grading should be performed to at least the minimum requirements
of the governing agencies, Chapter 70 of the Uniform Building
Code and the guidelines presented below:
Site Clearing
Trees, dense vegetation, and other deleterious materials should
be removed from the site. Non-organic debris or concrete may be
placed in deeper fill areas under direction of the Soils
engineer.
Light, dry grasses may be thinly scattered and incorporated into
the fill under direction of the Soils Engineer, provided
concentrations of organics are not developed.
Subdrainage
Subdrainage systems should be provided in all canyon
bottoms and within buttress and stabilization fills
prior to placing fill. Subdrains should conform to
schematic diagrams CG-1, CG-3, and CG-4, approved by
the Soils Engineer.
For canyon subdrains, runs less than 500 feet may use six
inch pipe. Runs in excess of 500 feet should have the lower
end as eight inch minimum.
Filter material should be Class 2 permeable filter
material per California Department of Transportation
Standards tested by the Soils engineer to verify its
suitability. A sample of the material should be
provided to the Soils engineer by the contractor at
least two working days before it is delivered to the
site. The filter should be clean with a wide range of
sizes. As an alternative to the Class 2 filter, the
material may be a 50/50 mix of pea gravel and clean
concrete sand which is well mixed, or clean gravel
wrapped in a suitable filter fabric.
An exact delineation of anticipated subdrain locations
may be determined at 40 scale plan review stage.
During grading, the Engineering Geologist should
evaluate the necessity of placing additional drains.
All subdrainage systems should be observed by the
Engineering Geologist and Soils Engineer during
construction and prior to covering with compacted fill.
Consideration should be given to having .subdrains
located by the project surveyors. Outlets should be
located and protected.
Treatment of Existing Ground
All heavy vegetation, rubbish and other deleterious
materials should be disposed of off site.
All surficial deposits of alluvium and colluvium should
be removed (see Plate CG-1) unless otherwise indicated
in the text of this report. Groundwater existing in the
alluvial areas may make excavation difficult. Deeper
removals than indicated in the text of the report may
be necessary due to saturation during winter months.
Subsequent to removals, the natural ground should be
processed to a depth of six inches, moistened to near
optimum moisture conditions and compacted to fill
standards.
Fill Placement
1. All site soil and bedrock may be reused for compacted
fill; however, some special processing or handling may
be required (see report).
2. Material used in the compacting process should be
evenly spread, moisture conditioned, processed, and
compacted in thin lifts not to exceed six inches in
thickness to obtain a uniformly dense layer. The fill
should be placed and compacted on a horizontal plane,
unless otherwise found acceptable by the Soils
Engineer.
3. If the moisture content or relative density varies from
that acceptable to the Soils engineer, the Contractor
should rework the fill until it is in accordance with
the following:
Moisture content of the fill should be at or above
optimum moisture. Moisture should be evenly distributed
without wet and dry pockets. Pre-watering of cut or
removal areas should be considered in addition to
watering during fill placement, particularly in clay or
dry surficial soils.
Each six inch layer should be compacted to at least 90
percent of the maximum density in compliance with the
testing method specified by the controlling governmental
agency. In this case, the testing method is ASTM Test
Designation D-1557-78.
4. Side-hill fills should have an equipment-width key at their
toe excavated through all surficial soil and into competent
material and tilted back into the hill (CG-2, CG-6). As
the fill is elevated, it should be benched through surficial
soil and slopewash, and into competent bedrock or other
material deemed suitable by the Soils Engineer.
5. Rock fragments less than eight inches in diameter may
be utilized in the fill, provided:
They are not placed in concentrated pockets;
There is a sufficient percentage of fine-grained
material to surround the rocks;
The distribution of the rocks is supervised by the
Soils Engineer.
6. Rocks greater than eight inches in diameter should be
taken off site, or placed in accordance with the
recommendations of the Soils Engineer in areas
designated as suitable for rock disposal (See CG-5).
7. In clay soil large chunks or blocks are common; if in excess
of eight (8) inches minimum dimension then they are
considered as oversized. Sheepsfoot compactors or other
suitable methods should be used to break the up blocks.
8. The Contractor should be required to obtain a minimum
relative compaction of 90 percent out to the finished
slope face of fill slopes. This may be achieved by
either overbuilding the slope and cutting back to the
compacted core, or by direct compaction of the slope
face with suitable equipment.
If fill slopes are built "at grade" using direct compaction
methods then the slope construction should be performed so
that a constant gradient is maintained throughout
construction. Soil should not be "spilled" over the slope
face nor should slopes be "pushed out" to obtain grades.
Compaction equipment should compact each lift along the
immediate top of slope. Slopes should be back rolled
approximately every 4 feet vertically as the slope is built.
Density tests should be taken periodically during grading on
the flat surface of the fill three to five feet horizontally
from the face of the slope.
In addition, if a method other than over building and
cutting back to the compacted core is to be employed, slope
compaction testing during construction should include
testing the outer six inches to three feet in the slope face
to determine if the required compaction is being achieved.
Finish grade testing of the slope should be performed after
construction is complete. Each day the Contractor should
receive, a copy of the Soils Engineer's "Daily Field
Engineering Report" which would indicate the results of
field density tests that day.
9. Fill over cut slopes should be constructed in the following
manner:
All surf icial soils and weathered rock materials should
be removed at the cut-fill interface.
A key at least 1 equipment width wide and tipped at
least 1 foot into slope should be excavated into
competent materials and observed by the Soils Engineer
or his representative.
The cut portion of the slope should be constructed prior
to fill placement to evaluate if stabilization is
necessary, the contractor should be responsible for any
additional earthwork created by placing fill prior to
cut excavation.
10. Transition lots (cut and fill) and lots above stabilization
fills should be capped with a three foot thick compacted
fill blanket.
11. Cut pads should be observed by the Engineering
Geologist to evaluate the need for overexcavation and
replacement with fill. This may be necessary to reduce
water infiltration into highly fractured bedrock or
other permeable zones,and/or due to differing expansive
potential of materials beneath a structure. The
overexcavation should be at least three feet. Deeper
overexcavation may be recommended in some cases.
12. Exploratory backhoe or dozer trenches still remaining
after site removal should be excavated and filled with
compacted fill if they can be located.
Grading Observation and Testing
Observation of the fill placement should be provided by
the Soils Engineer during the progress of grading.
In general, density tests would be made at intervals
not exceeding two feet of fill height or every 1,000
cubic yards of fill placed. This criteria will vary
depending on soil conditions and the size of the fill.
In any event, an adequate number of field density tests
should be made to evaluate if the required compaction
and moisture content is generally being obtained.
Density tests may be made on the surface material to
receive fill, as required by the Soils Engineer.
Cleanouts, processed ground to receive fill, key
excavations,subdrains and rock disposal should be
observed by the Soils Engineer prior to placing any
fill. It will be the Contractor's responsibility to
notify the Soils Engineer when such areas are ready for
observation.
An Engineering Geologist should observe subdrain
construction.
An Engineering Geologist should observe benching prior
to and during placement of fill.
Utility Trench Backfill
Utility trench backfill should be placed to the following
standards:
Ninety percent of the laboratory standard if native
material is used as backfill.
As an alternative, clean sand may be utilized and
flooded into place. No specific relative compaction
would be required; however, observation, probing, and
if deemed necessary, testing may be required.
Exterior trenches, paralleling a footing and extending
below a 1:1 plane projected from the outside bottom
edge of the footing, should be compacted to 90 percent
of the laboratory standard. Sand backfill, until it is
similar to the inplace fill, should not be allowed in
these trench backfill areas.
Density testing along with probing should be accomplished to
verify the desired results.
JOB SAFETY
General:
At Cardiff Geotechnical, getting the job done safely is of
primary concern. The following is the company's safety
considerations for use by all employees on multi-employer
construction sites. On ground per are at highest risk of
injury and possible fatality on grading construction projects.
The company recognizes that construction activities will vary on
each site and that job site safety is the contractor's
responsibility. However, it is, imperative that all personnel be
safety conscious to avoid accidents and potential injury.
In an effort to minimize risks associated with geotechnical
testing and, observation, the following precautions are to be
implemented for the safety of our field personnel on grading and
construction projects.
1. Safety Meetings: Our field personnel are directed to attend
the contractor's regularly scheduled safety meetings.
Safety Vests: Safety vests are provided for and are to be
worn by our personnel where warranted.
Safety Flags: Two safety flags are provided to our field
technician; one is to be affixed to the vehicle when on
site, the other is to be placed atop the spoil pile on all
test pits.
In the event that the contractor's representative observes any of
our personnel not following the above, we request that it be
brought to the attention of our office.
Test Pits Location, Orientation and Clearance:
The technician is responsible for selecting test pit locations.
The primary concern is the technician's safety. However, it is
necessary to take sufficient tests at various location to obtain
a representative sampling of the fill. As such, efforts will be
made to coordinate locations with the grading contractors
authorized representatives (e.g. dump man, operator, supervisor,
grade checker, etc.), and to select locations following or behind
the established traffic pattern, preferable outside of current
traffic. The contractors authorized representative should direct
excavation of the pit and safety during the test period. Again,
safety is the paramount concern.
Test pits should be excavated so that the spoil pile is placed
away from oncoming traffic. The technician's vehicle is to be
placed next to the test pit, opposite the spoil pile. This
necessitates that the fill be maintained in a driveable
condition. Alternatively, the contractor may opt to park a piece
of equipment in front of the test pits, particularly in small
fill areas or those with limited access.
A zone of non-encroachment should be established for all test
pits (see Plate CG-7). No grading equipment should enter this
zone during the test procedure. The zone should extend
approximately 50 feet outward from the center of the test pit.
This zone is established both for safety and to avoid excessive
ground vibration which typically decreases test results.
When taking slope tests, the technician should park their vehicle
directly above or below the test location on the slope. The
contractor's representative should effectively keep all equipment
at a safe operation distance (e.g. 50 feet) away from the slope
during testing.
The technician is directed to withdraw from the active portion of
the fill as soon as possible following testing. The technician's
vehicle should be parked at the perimeter of the fill in a highly
visible location.
In the event that the technician's safety is jeopardized or
compromised as a result of the contractor's failure to comply
with any of the above, the technician is directed to inform both
the developer's and contractor's representatives. If the
condition is not rectified, the technician is required, by
company policy, to immediately withdraw and notify their
supervisor. The grading contractors representative will then be
contacted in an effort to effect a solution. No further testing
will be performed until the situation is rectified. Any fill
placed in the interim can be considered unacceptable and subject
to reprocessing, recompaction or removal.
In the event that the soil technician does not comply with the
above or other established safety guidelines, we request that the
contractor brings this to technicians attention and notify our
the project manager or office. Effective communication and
coordination between the contractors' representative and the
field technician(s) is strongly encouraged in order to implement
the above safety program and safety in general.
The safety procedures outlined above should be discussed at the
contractor's safety meetings. This will serve to inform and
remind the equipment operators of these safety procedures
particularly the zone of non-encroachment.
Trench Safety:
It is the contractor's responsibility to provide safe access into
trenches where compaction testing is needed.
Our personnel are directed not to enter any excavation which 1)
is 5 feet or deeper unless shored or laid back, 2) displays any
evidence of instability, has any loose rock or other debris which
could fall into the trench, or 3) displays any other evidence of
any unsafe conditions regardless of depth.
All utility trench excavations in excess of 5 feet deep, which a
person enters, are to be shored or laid back.
Trench access should be provided in accordance with OSHA
standards. Our personnel are directed not to enter any trench by
being lowered or "riding down" on the equipment.
If the contractor fails to provide safe access to trenches for
compaction testing, our company policy requires that the soil
technician withdraw and notify their supervisor. The contractors
representative will then be contacted in an effort to effect a
solution. All backf ill not tested due to safety concerns or
other reasons could be subject to reprocessing and/or removal.
cL.
CARDIFF GEOTECHNICAL
CONSULTING ENGINEERS AND GEOLOGISTS
January 7, 1994
Fraser Engineering, Inc.
2191 El Camino Real
Oceanside, CA 92054
Subject: ADDENDUM REPORT
Proposed Extension and Widening of Avenida Encinas
Carlsbad, California
References: 1. RECORD OF MEETING MINUTES
Avenida Encinas Extension and Widening
Prepared by Fraser Engineering
Dated December 22, 1993
2. PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Extension and Widening of Avenida Encinas
Carlsbad, California
Prepared by Cardiff Geotechnical
Dated December 13, 1993
Dear Mr. Wall and Mr. Pasko:
This report presents additional /revised recommendations based on
our December 22, 1993 meeting with Carlsbad city representatives,
the Carlsbad Municipal Water district and Fraser Engineering. In
general, the revised recommendations are presented in response to
budgetary constraints expressed by the city and the proximity of
existing utility lines.
Reference 1 (Items 1,2,3 and 8)
Subgrade Preparation/Pavement Design
The purpose of our initial recommendations for the removal and
recompaction of compressible clayey deposits was for the purpose
135 LIVERPOOL DRIVE • SUITE A • CARDIFF • CA 92007
(619)753-3697 • FAX (619) 753-4158
January 6, 1994
W.O. P-121103-2
Page 2
of reducing potential settlement of the pavement. However, as per
our meeting with city representatives, grading will be limited to
scarification and compaction of the upper 12 inches of the
subgrade soils. As indicated in our pavement section of the
preliminary geotechnical investigation, the subgrade soils should
be moistened to optimum moisture content, compacted and left in a
condition to receive base materials. These preliminary pavement
design recommendations remain applicable and should, be
implemented.
A temporary pavement section of 4.0 inches asphaltic concrete over
6.0 inches of base was suggested during the meeting. As an
alternative, the subgrade and base material may be constructed as
a designed section and covered by 2.0 inches of asphaltic
concrete. In this case, the ultimate pavement design could be
achieved by placing additional asphaltic concrete, in lieu of
removal of a temporary pavement section.
Reference 1 (Item 5)
Gas Line Crossing
As an alternative to a structural arch, it may be feasible to
bridge over the gas line utilizing geogrid and special grading
techniques. A typical section is illustrated on the enclosed
Plate A.
January 6, 1994
W.O. P-121103-2
Page 3
Reference 1 (Items 6 and 7)
The proposed fill slope (Station 58+55) will require special
compaction techniques in and around the gas line. If the grading
contractor feels that adequate compaction cannot be obtained in
these areas, lateral movement of fill could adversely affect the
gas line. In this regard, an alternative approach that of
utilizing a geogrid system is presented on the enclosed Plate B.
As indicated in the enclosed Typical Section, Plate B, •using
geogrid at 2.0 foot intervals will significantly reduce potential
lateral movement. This approach will also reduce the amount of
compaction effort in and around the gas line.
All fill should be placed under the observation and testing of a
qualified geotechnical engineer. It should be noted that
additional recommendations may be necessary during the
construction phase.
If you have any questions, please do not hesitate to contact us at
753-3697.
This opportunity to be of service is appreciated.
Respectfully submitted,
CARDIFF GEOTECHNICAL
Burwell
CO Geologist aUi 782
3:t Exp. 12-31-97
V'dW Qx &j
Vithaya Singhanet, P.E.
Geotechnical Engineer
SUBGRADE
GEOGRID
D 8' BEYOND 4-XIST 12" HP EXTEND GEOGRI
1:1 PROJECTED PLANE EACH
SIDE OF PIPE 1:1 PROJI
1' MIN. COVER
A f
MIN-
GAS
\
z
MIN
TM WHERE LATERAL EXTENTION IS
CTED PLANE NOT FEASIBLE, EXTEND GEOGRID
- 3' MIN BEYOND 1:1 PROJECTED
PLANE AND INTO 1' DEEP TRENCH
DETAIL 7
GEOGRID PROTECTION FOR GAS LINE
N.T.S.
TENSAR-BXI200 OR EQUILVALENT
PROPOSED
2:1 FILL SLOPE \ VARIABLE HEIGHT \ MAX 16' \\ 3'
EXIST GRADE __
39
__
PROPOSED
.75:1 SLOPE
_\
-\- T-----7- EXIST 12
HP GAS TM
- -
1r- ---
I
L MIRAGRID 5T OR EQUILVALMT ------------
- 2' MIN r
-.4 2' MIN CLEARANCE OR
MIN CLEARANCE REQUIRED
BY GAS COMPANY
KEY DEPTH=2' MIN. INTO COMPETENT TERRACE
DETAIL 8
CEOGRID REINFORCED SLOPE
N.T.S.
IrE 13
PRELIMINARY GEOTECHNICAL INVESTIGATION
CARDIFF GEOTECHNICAL
CONSULTING ENGINEERS AND GEOLOGISTS
December 13, 1993
Fraser Engineering, Inc.
2191 El Camino Real
Oceanside, CA 92054
Subject: PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Extension and Widening of Avenida Encinas
Carlsbad, California
Dear Mr. Wall and Mr. Pasko:
In response to your request, we have performed a preliminary
geotechnical investigation at the subject site for the proposed
street extension and widening of Avenida Encinas.
The findings of the investigation, laboratory test results and
recommendations for grading and pavement sections are presented
in this report.
From a geotechnical point of view, it is our opinion that the
site is suitable for the proposed development, although special
consideration will be required for the underlying alluvial/soil
deposits during the grading and construction phases.
If you have any questions, please do not hesitate to contact us
at 753-3697.
This opportunity to be of service is appreciated.
Respectfully submitted,
CARDIFF GEOTECHNICAL
,I4 ESS,O
Mark Burwell
Geologist
CO 82 LU cc Exp.12.3197)
~44144- "imv-f- Vithay9a Singhanet, P.E.
Geotechnical Engineer
135 LIVERPOOL DRIVE • SUITE A • CARDIFF • CA 92007
(619) 753-3697 • FAX (619) 753-4158
PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Extension and Widening of Avenida Encinas
Carlsbad, California
Prepared For:
Fraser Engineering, Inc.
2191 El Camino Real
Oceanside, California
December 13, 1993
W.O. #P-121103
Prepared By:
CARDIFF GEOTECHNICAL
135 Liverpool Drive
Suite A
Cardiff, California 92007
TABLE OF CONTENTS
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
SITE CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 1
PROPOSED DEVELOPMENT...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
SITE INVESTIGATION............ ............. . . ..............2
LABORATORY TESTING. ......... . . . . . . . . . ...... . . . . . . . . . . . . . . . . .3
GEOTECHNICAI. CONDITIONS . . . . . . . . . . . . . . . . . . . . . . ...............4
DISCUSSION...... . . .......... . . .............. . . . . . . . . . . . . . . . .7
PRELIMINARY PAVEMENT DESIGN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
CONCLUSIONS AND RECOMMENDATIONS ................. . . . . .. . . . . .10
GENERAL GRADING CONSIDERATIONS ................ 10
EARTHWORK ..................... ............. ... 12
OBSERVATION AND DENSITY TESTING ................ 14
DRAINAGE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
LIMITATIONS...... . . . ............ . . . . . . . . . . . . . .15
APPENDICES
APPENDIX A ....................... LABORATORY TEST RESULTS
TABLE S-i
PLATE 5-1
TRENCH LOGS
TOPOGRAPHIC OVERLAY
PORTION OF GRADING PLAN
TYP. STABILIZATION FILL DESIGN
TYPICAL SECTIONS
APPENDIXB ....................... GRADING GUIDELINES
GEOTECHNICAL MAP
December 13, 1993
W.O. #P-121103
Page 1
INTRODUCTION
This report presents the results of our preliminary geotechnical
investigation on the subject property. The purpose of this study
is to evaluate the nature and characteristics of the earth
materials underlying the site and their influence on the
construction of the proposed street improvements.
SITE CONDITIONS
The subject property includes a coastal segment of land extending
from the terminus of Avenida Encinas, near Poinsettia Lane north
to Palomar Airport Road, in the city of Carlsbad. The southern
portion of the site consists of relatively flat cultivated
terrain. However, the northern portion of the site includes 10
to 12 foot high slopes which descend along the western side of
Avenida Encinas at gradients approaching 1½:1. Except f or the
most southern segment, the majority of Avenida Encinas and its
proposed extension generally parallels the Atchison Topeka and
Santa Fe Railroad line. The northern portion of Avenida Encinas
is bounded along the east by commercial structures.
A review of topographic maps, prior to the development of
structures and the graded portion of Avenida Encinas, indicates a
large canyon (Canyon De Las Encinas) and several westerly and
southeasterly ravines transecting the northern and central
portions of the site (See enclosed topographic overlay).
Apparently, one or more culverts were required to transfer water
under the elevated railway line.
December 13, 1993
W.O. #P-121103
Page 2
PROPOSED DEVELOPMENT
Plans for the extension and widening of Avenida Encinas were
prepared by Fraser Engineering. The project includes the
connection of the existing half street improvements from the
terminus of Avenida Encinas near Poinsettia Lane north, to the
southern terminus of the street near Palomar Airport Road. The
project also includes widening of the existing northern street
segment. The overall length of the project, including the
widening of the northern street segment and the construction of
the new road segment, is approximately 5400 lateral feet.
Additional improvements will consist of curb, gutter, sidewalk,
asphaltic concrete paving and storm drain facilities. Several
utility lines are present along the proposed road alignment. Of
significant concern is the 12 inch diameter high pressure gas
line.
Grading of the southern portion of the road segment will be
limited to minor cuts and fills, up to 4.0 feet. However, cuts
and fill slopes, up to 9.0 feet and 11.5 feet, respectively, are
planned along the northern and central road segments.
SITE INVESTIGATION
Eight exploratory trenches were excavated on the site with a
tractor-mounted backhoe to a maximum depth of 14 feet. Earth
materials encountered were visually classified and logged by our
field geologist. Undisturbed, representative samples of the
earth materials were obtained at selected intervals. Samples
December 13, 1993
W.O. #P-121103
Page 3
were obtained by driving a thin walled steel sampler into the
desired strata. The samples are retained in brass rings of 2.5
inches outside diameter and 1.0 inches in height. The central
portion of the sample is retained in close fitting, waterproof
containers and transported to our laboratory for testing and
analysis.
LABORATORY TESTING
Classification
The field classification was verified through laboratory
examination, in accordance with the Unified Soil Classification
System. The final classification is shown on the enclosed
exploratory Logs.
Moisture/Density
The field moisture content and dry unit weight were determined
for each of the undisturbed soil samples. This information is
useful in providing a gross picture of the soil consistency or
variation among exploratory excavations. The dry unit weight was
determined in pounds per cubic foot. The field moisture content
was determined as a percentage of the dry unit weight. Both are
shown on the enclosed Appendix A.
Maximum Dry Density/Optimum Moisture Content
The maximum dry density and optimum moisture content were
determined for selected samples of earth materials taken from the
site. The laboratory standard tests were in accordance with ASTM
December 13, 1993
W.O. #P-121103
Page 4
D-1557-78. The results of the tests are presented in Appendix
III •
GEOTECHNICAL CONDITIONS
The southern portion of the site is underlain by nearly flat-
lying, friable Pleistocene sands mantled by relatively thin soil
deposits. However, in the north-central portion of the site
significant alluvial/soil deposits are present. These deposits
are generally soft and compressible and will require special
consideration during the grading phase. A brief description of
the earth materials is discussed below.
Alluvium/Soil (Undifferentiated)
In the vicinity of Trench Nos. 1, 2 and 3, up to 10.5 feet of
dark brown slightly sandy clay was encountered. These deposits
are compressible and highly expansive. It is likely that
significant amounts of these alluvial/soil deposits are present
in the central portion of Canyon De Las Encinas (vicinity of STA.
68). Additional alluvial/soil deposits are present in the
transecting ravines in the northern portion of the site (vicinity
of STA. 81). In the southern portion of the site, the
alluvial/soil deposits thin to approximately 6.0 feet, in the
vicinity of Trench No. 4. The southern extent of these deposits
is in the vicinity of STA. 50.
Soil
Based on exploratory Trench Nos. 5 through 7, the southern
December 13, 1993
W.O. #P-121103 -
Page 5
portion of the site is generally mantled by 1.5 to 2.5 feet of
clayey sand. The upper 1.0 foot of these deposits have been
cultivated. In the vicinity of Trench No. 8, approximately 2.0
feet of clay was encountered below the soil deposits. The clay
may represent a former drainage course.
Terrace Deposits
Late Pleistocene terrace deposits underlie the surf iciál
materials on the site. The sedimentary deposits consist of
poorly consolidated fine and medium-grained sands. The reddish
brown sand is generally clayey and weathered in the upper 2.0
feet, but becomes increasingly dense and competent with depth.
Expansive Soils
The majority of the terrace deposits are composed of granular
deposits which have a potential expansion in the low range.
However, the clayey alluvial/soil deposits encountered have a
potential expansion in the high range.
Groundwater
No evidence of perched groundwater was observed in the terrace
deposits, along the southern portion of the site. However,
surface water was observed in areas along the base of the
descending slopes (vicinity of STA. 81). It is likely that
shallow groundwater tables are present in the transecting canyon
and ravine areas (See enclosed topographic overlay).
December 13, 1993
W.O. #P-121103
Page 6
Seismicity
Based on a review of pertinent geological maps, no active faults
have been recognized on the subject property. The nearest active
fault is the Rose Canyon Fault located about four miles west of
the site. Other active faults which could affect the site are
listed on the enclosed Table S-i.
Although the likelihood of ground rupture on the site is remote,
it is almost a certainty the property will be exposed to ground
motion resulting from the release of energy along the numerous
known and unknown faults in Southern California. Table S-i
indicates seismic parameters for active faults which could affect
the site. The enclosed Seismic Map (Plate S-i) shows the general
proximity of active faults.
DISCUSSION
i. The most southern portion of the site is mantled by
relatively thin soil deposits. However, significant
alluvial/soil deposits and high groundwater conditions
should be anticipated in the central and northern portions
of the project.
2. The clayey alluvial/soil deposits are compressible. In
order to reduce the adverse affects on pavement, due to
consolidation, the upper 3.0 feet of the clayey soils should
be removed and replaced as compacted fill in the proposed
roadway areas.
December 13, 1993
W.O. #P-121103
Page 7
In the vicinity of STA. 76+00 and STA 80 +60, the proposed
fill slopes may adversely affect the 12 inch diameter high
pressure gas line. Exploratory trenches are recommended in
this area to evaluate the geotechnical conditions underlying
the gas line. It may be necessary to relocate the gas line
in the proposed fill slope areas (See enclosed Typical
Sections).
Testing of representative samples of the clayey
alluvial/soil deposits indicate an R-value of 5 or less.
It may be feasible to utilize on-site granular deposits in
the upper 2.0 feet of the street subgrade. Such an approach
would significantly improve the resistance value of the
subgrade soils.
The structural sections recommended in this report generally
represent the "worst" and "best" types of soils encountered
on the site. Final structural sections should be based on
R-value testing of the specific soils used in the street
subgrade.
It is our understanding that the proposed improvements to
Avenida Encinas will be constructed in four separate
segments. Initial construction will consist of Segment A
followed by B, C and D. Our conclusions and recommendations
are presented in this sequential manner.
December 13, 1993
W.O. #P-121103
Page 8
PRELIMINARY PAVEMENT DESIGN
R-value tests were performed on representative samples of clayey
alluvial materials and Pleistocene terrace deposits. The results
of testing indicate an R-value of 5 or less for the clayey
materials and an R-value of 34 for sandy terrace deposits. As
per our conversations with the city of Carlsbad, Avenida Encinas
is classified as a secondary arterial street with an anticipated
traffic index of 8. Preliminary structural sections presented
below are based on R-value data and the subsurface conditions
encountered during exploration.
Preliminary Structural Section
Avenida Encinas (Sta. 50+00 to 88+38)
R-value 5 (clayey soils), Traffic Index of 8
4.0 inches of asphaltic paving on
18 inches of Class 2 Aggregate Base on
12 inches of compacted native soil
Avenida Encinas (Sta. 40+20 to 50+00)
R-value 34 (sandy terrace deposits), Traffic Index of 8
4.0 inches of asphaltic paving on
10.5 inches of Class 2 Aggregate Base on
12 inches of compacted terrace deposits
Subgrade soils should be scarified, moistened to optimum moisture
content and compacted to the thickness indicated in the above
structural section, and left in a condition to receive base
materials. Class 2 base material should have a minimum
R-value of 78 and a minimum sand equivalent of 30. Subgrade
December 13, 1993
W.O. #P-121103
Page 9
soils and base materials should be compacted to a minimum of 95
percent of their laboratory maximum dry densities for the
sections indicated.
All section changes should be properly transitioned. If adverse
conditions are encountered during the preparation of subgrade
materials, special construction methods may need to be employed.
Final pavement section design should be based on testing
performed after grading is complete.
CONCLUSIONS AND RECOMMENDATIONS
General Grading Considerations
Segment A (STA. 40+20 to 58+55)
In general, the southern portion of the site includes relatively
thin soil deposits overlying Pleistocene terrace sands. Grading
along STA. 40+20 to 50+100 will require removal and recompaction
of the surficial materials and weathered terrace deposits. Minor
cuts and fill, up to 3.0 feet, in this area may be graded at an
inclination of 1½:1 (horizontal to vertical).
From STA. 50+00 to the end of Segment A (STA. 58+55), the site is
underlain by alluvial/soil deposits which thicken to more than 10
feet, in a northerly direction. Due to the compressible nature
of these clayey deposits, they should be removed to a minimum
depth of 3.0 vertical feet and replaced as properly compacted
fill prior to the placement of additional fill or after minor
cuts, up to 3.0 feet, are completed.
December 13, 1993
W.O. #P-121103
Page 10
The proposed fill slope in the vicinity of STA. 58+55 should be
constructed as a stabilization fill. A 20 foot wide key,
embedded a minimum of 2.0 feet into competent material, should be
constructed along the base of the proposed fill slope. Fill
should be benched into competent material. Fill slopes should be
constructed a maximum gradient of 2:1 (horizontal to vertical).
Segment B and C (STA. 58+55 to STA. 88+38)
Most of the rough grading has been completed along the western
portion of Segment B. However, variable height fill slopes are
planned along the western extent of the project. Fill slopes
should be provided with a key and benched into competent
materials, as previously indicated. The subgrade deposits should
be evaluated upon completion of the fill slopes. Additional
recommendations may be necessary.
The most extensive grading of the project is planned for Segment
C. Cuts, up to 9.0 vertical feet, are planned along the western
extent of Avenida Encinas. Fill slopes, up to 11.5 feet, are
also planned in this area.
Upon completion of the road cuts, the subgrade deposits should be
evaluated. It is likely that considerable alluvial/soil deposits
will be encountered in this area. A minimum of 3.0 foot removal
and recompaction should be anticipated.
The area of the proposed fill slopes in the vicinity of STA.
76+00 and STA. 80+60 is probably underlain by significant
December 13, 1993
W.O. #P-121103
Page 11
alluvial/soil deposits. It is recommended that additional
exploratory trenches be excavated in these areas prior to
grading. The purpose of the additional exploration is to
evaluate the geotechnical conditions underlying the 12 inch
diameter high pressure gas line. If compressible alluvial/soil
deposits are present, the construction of the proposed 7.0 to
11.5 foot fills could adversely affect the pipe. High
groundwater conditions are anticipated in this area and should
also be evaluated.
It should be noted that removal and relocation of the high
pressure gas line may be necessary in this area.
Segment D (STA. 88+38 to STA. 93+851
Only minor improvements consisting of a new sidewalk are planned
along Segment D. However, the subgrade deposits in the area of
the sidewalk should be evaluated during the course of grading.
Additional recommendations for densification of the subsoils may
be necessary. It should be noted that an alternative D.2 on the
grading plans indicate a 7.0 foot widening of the street. If
this alternative is chosen, the fill should be keyed and benched
into competent deposits.
Earthwork
Grading and earthwork should be performed in accordance with the
following recommendations and the Grading Specifications included
in this report.
December 13, 1993
W.O. #P-121103
Page 12
Site Preparation
Prior to grading, all areas to receive structural fill should be
cleared of surface and subsurface obstructions, including any
existing debris, and stripped of vegetation. Removed vegetation
and debris should be properly disposed of off site. Holes
resulting from removal or buried obstructions which extend below
finished road grades should be replaced with suitable compacted
fill material. All areas to receive fill and/or other surface
improvements should be scarified to a minimum depth of 6 inches,
brought to near-optimum moisture conditions, and recompacted to
at least 90 percent of the laboratory maximum dry density.
Removal of Compressible Soils
As noted previously, significant clayey alluvial/soil deposits
are present. In order to reduce the adverse affects of
consolidation, the upper approximately 36 inches of these
materials should be removed and recompacted. Localized deeper
removals may be necessary along the base of fill slopes and
should be evaluated by additional exploration.
Excavations
The on-site materials are expected to be rippable with modern,
earthmoving equipment in good operating condition. It is
estimated that the alluvial soils to be removed will undergo
approximately 5 to 10 percent shrinkage when compacted as fill
material to 00 percent relative compaction.
December 13, 1993
W.O. #P-121103
Page 13
Fills
The on-site soils are generally suitable for use as compacted
fill provided they are free of organic material and debris. Fill
should be placed in 6.0 to 8.0 inch lifts, moistened as required
and compacted to a minimum of 90 percent of the laboratory
maximum dry density. As previously indicated, clayey alluvial
deposits should be removed and replaced as compacted fill to a
minimum depth of 3.0 feet below the proposed road subgrade.
Additional recommendations will be presented should any septic
tanks, cistern, seepage pits or other unforeseen geotechnical
conditions be encountered during grading.
Slope Stability
It is our opinion that proposed fill slopes constructed at
inclinations of 2 to 1 (horizontal to vertical) or flatter will
be stable with respect to deep-seated failure, provided the fills
are keyed and benched into competent. materials. Our evaluation
is based on a maximum height of 15 feet using a factor of safety
of 1.5 under static conditions.
Observation and Density Testing
Fill should be placed while a representative of this firm is
present to observe and test. Additional recommendations may be
necessary during the grading phase.
Drainage
Paved areas should be protected from moisture migrating under the
December 13, 1993
W.O. #P-121103
Page 14
pavement from adjacent water sources, such as planted or grass
areas. Pad water should not be allowed to pond.
LIMITATIONS
This report is presented with the provision that it is the
responsibility of the owner or the owner's representative to
bring the information and recommendations given herein to the
attention of the project's architects and/or engineers so that
they may be incorporated into plans.
If conditions encountered during grading appear to differ from
those described in this report, our office should be notified so
that we may consider whether modifications are needed. No
responsibility for construction compliance with design concepts,
specifications or recommendations given in this report is assumed
unless on-site review is performed during the course of
construction.
The subsurface conditions, excavation characteristics and
geologic structure described herein are based on individual
exploratory excavations made on the subject property. The
subsurface conditions, excavation characteristics and geologic
structure discussed should in no way be construed to reflect any
variations which may occur among the exploratory excavations.
Please note that fluctuations in the level of groundwater may
occur due to variations in rainfall, temperature and other
factors not evident at the time measurements were made and
reported herein. Cardiff Geotechnical assumes no responsibility
December 13, 1993
W.O. #P-121103
Page 15
for variations which may occur across the site.
The conclusions and recommendations of this report apply as of
the current date. In time, however, changes can occur on a
property whether caused by acts of man or nature on this or
adjoining properties. Additionally, changes in professional
standards may be brought about by legislation or the expansion of
knowledge. Consequently, the conclusions and recommendations of
this report may be rendered wholly or partially invalid by events
beyond our control. This report is therefore subject to review
and should not be relied upon after the passage of three years.
The professional judgments presented herein are founded partly
on our assessment of the technical data gathered, partly on our
understanding of the proposed construction and partly on our
general experience in the geotechnical field. Our engineering
work and the judgments given meet present professional standards.
However, in no respect do we guarantee the outcome of the
project.
If you have any questions, please do not hesitate to contact our
office at 753-3697.
The opportunity to be of service is greatly appreciated.
APPENDIX A
APPENDIX "A"
LABORATORY TEST RESULTS
TABLE I
Maximum Dry Density and Optimum Moisture Content
(Laboratory Standard ASTM D-1557-78)
Sample Max. Dry Optimum
Location Density Moisture Content
(pcf)
T-1 @ 2'4' 119.0 14.0
(Mixture of clay and sand)
TABLE!!
Field Dry Density and Moisture Content
Sample Field Dry Field Moisture
Location Density Content
(pcf)
T-1@3.0' 104.0 16.2
T-1@5.0' 98.7 19.7
T-1 @ 7.0' 97.7 13.5
T-1 @ 10.0' 102.1 3.6
T-2@3.0' 105.5 17.9
(P-121103-1)
TABLE II (Cont'd)
Field Dr Density and Moisture Content
Sample Field Dry Field Moisture
Location Density Content
(pcf)
T-2@7.0' 112.7 17.3
T-2@9.0' 1.11.0 17.9
T-3 @ 3.0' 105.0 18.9
T-3 @ 5.5' 104.1 20.6
T-3@8.0' . 99.8 21.2
T-4 @ 3.0' 96.8 24.2
T-4@5.0' 114.9 16.9
T-4 @ 7.0' 115.7 7.5
T-5 @ 1.5' 115.6 9.7
T-5@3.5' 112.0 9.1
T-5@7.0' 111.1 8.9
T-5 @ 10.0' 115.6 4.9
T-6@1.0' 112.0 16.4
T-6@3.0' 118.6 15.2
T-6 @ 5.0' 107.8 10.7
T-6@8.0' 108.7 5.7
T-7@3.0' 104.3 22.1
T-7@4.5' 116.7 13.3
T-7 @ 6.5' 113.2 12.9
T-8@3.0' 106.3 21.2
(P-121103-2)
TABLE S-i
SEISMIC PARAMETERS FOR ACTIVE AND POTENTIALLY ACTIVE FAULTS
Max. Max.
Credible Probable Bedrock Design
Earth- Earth- Accel- Accel- Fault Distance Quake Quake eration eration
--Magnitude--
Rose Canyon 4 mi. S.W. 7.1 6.2 0.31g 0.20g j
Coronado Banks 19 mi. S.W. 6.5 6.0 0.15g 0.10g
Elisnore 25 mi. N.E. 7.5 7.3 019g 0.12g
San Jacinto 50 mi. N.E. 7.5 7.3 0.19g 0.06g
San Andreas 71 mi. N.E. 8.2 8.0 0.08g 0.05g
The Rose Canyon fault has recently been designated as active (C.D.M.G.)
Design acceleration is commonly considered to be about 65 percent of
the maximum (peak) acceleration for the site within approximately 20
miles of the epicenter.
F,~
SEISMIC MAP
Total length of fu1t 2On reVe that baks
c.N
deposits or that has had seismic activity
Fault segment with surface rupture during an ... historic earthquake, or with aseisajc fault
\100,0
10 Approximate epicentrol area of earthquakes that occurred 1769 - 1933
(899
,
S. as p
Earthquake epicenters Since 1933
IGA 0 E. • N 1907 Ref; AEG Special Publication, Oct.1973 (by Richard J. Proctor -
FISA a
!1948
---- -f RIVERSIDE 3'oN Cp
I • 5ANuI BUJ çn.......UL (8 %918
(923 MG3, .v
L_.
R
899 INDIO%P
1866 E.
1910-
.1937
I -.
I Sea'z ..•
1954 • ? •...,
4N 'S
A M 6.3 19C
S.%NL GO
(656 1915 1942
:
SAN M6.3 1940 1M id
IEGO
..
\1 • \PRIE7p
1923
19 4
.111
•.. 1935
PIILC3
20 So
•• __________________________________
0 to
ENSE4OA PTE S—i N •
•
•
EXPLORATORY TRENCHES LOGS
DEPTH DESCRIPTION
Trench No. 1 0-2' FILL: Sand, clayey, tan to brown,
pebbles, poorly mixed, moderately
dense, moist, plastic and wire debris
2'-8' ALLUVIUM: Clay, slightly sandy, dark
brown, damp, stiff, veins of tan sand
8'-10' ALLUVIUM(?): Sand, fine and medium-
grained, slightly moist, loose, no
cementation
Trench No. 2 0-1' FILL: Sand, silty and fine-grained, tan to
brown, dry, moderately dense
1 '-5.5' ALLUVIUM: Sand, clayey, mottled tan to
brown, moist, dense
5.5'-10' ALLUVIUM: Clay, slightly sandy, dark
brown, damp to very damp, stiff•
10!-14' TERRACE DEPOSITS(?): Sand, slightly
clayey, tan to brown, moist,
moderately dense
Trench No. 3 0-2.5' FILL: Sand, clayey, tan to brown, moist,
loose, plastic debris
2.5'-10.5' ALLUVIUM: Clay, slightly sandy, brown,
caliche stringers, damp, soft in upper 4
feet
(P-121103-1)
10.5'41.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, tan to reddish brown,
moist, dense
Trench No. 4 0-2' FILL: Sand, clayey, tan to brown, slightly
moist, loose
2'-6' ALLUVIUM: Clay, slightly sandy, brown,
caliche stringer, damp, soft in upper 3
feet
6'-8' TERRACE DEPOSITS: Sand, fine and
medium-grained, slightly clayey, slightly
moist, dense
8'-9.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, reddish brown to gray,
slightly moist, dense
Trench No. 5
Trench No. 6
0-1.5' SOIL: Sand, slightly clayey, tan to brown,
slightly moist, loose, cultivated area
1.5'-2' SOIL: Sand, clayey, brown, caliche
packets, moist, moderately dense
2'-9' TERRACE DEPOSITS: Sand, fine and
medium-grained, reddish brown to gray,
moist, moderately dense @ 8'-9 very
moist, weakly cemented
0-1.5' SOIL: Sand, clayey, tan to brown, blocky,
slightly moist, loose, cultivated area
TERRACE DEPOSITS: Sand, fine and
medium-grained, slightly clayey in upper
1.Y-2.5',moist, dense below 2.5 grades
to weakly cemented reddish brown to
gray sand
(P-1211103-2)
Trench No. 7
Trench No. 8
0-1' SOIL: Sand, clayey, tan to brown, blocky,
slightly moist, loose, cultivated area
1 '-2.5' SOIL: Clay, slightly sandy, grey, very
damp, soft
2.5'-5' TERRACE DEPOSITS: Weathered sand,
slightly clayey, blocky, brown to slightly
reddish brown, dense, slightly moist
5'-7' TERRACE DEPOSITS: Sand, slightly
clayey, reddish brown, moist, dense
7'-8.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, very slightly clayey,
moist, dense
0-2' SOIL: Sand, clayey, tan to brown, slightly
moist, loose, cultivated area
2'-4' SOIL: Clay, slightly sandy, grey, very
damp, soft
4'-6.5' TERRACE DEPOSITS: Sand, fine and
medium-grained, moist
dense
(P-121103-3)
I '4
20 WIDE
STABILIZATION FILL
H- VARIABLE
26' 2:1
4 NONPERFORATED PIPE LATERAL TO SLOPE FACE AT 100. INTERVALS
2' MINIMUM KEY DEPTH (into competent material)
EQUIPMENT WIDTH KEY
20' MINIMUM
TYPICAL STABILIZATION FILL DESIGN
63.0
\\ I I / 12-2-
55.29-
0-s%
7.0
\\\
5
/
I."
1:\~k kayms
19.0
I .kin \ J!\\\\
i \\ •\\ \ 1960 TOPOGRAPIC OVERLAY
\ (showing drainage courses prior to development)
____1 w rrTTr fV1V1
IIIUURIII III.Ig1
IL CA
APPENDIX B
GRADING GUIDELINES
Grading should be performed to at least the minimum requirements
of the governing agencies, Chapter 70 of the Uniform Building Code
and the guidelines presented below:
Site Clearing
Trees, dense vegetation, and other deleterious materials should be
removed from the site. Non-organic debris or concrete may be
placed in deeper fill areas under direction of the Soils engineer.
Subdrainage
During grading, the Geologist should evaluate the necessity
of placing additional drains.
All subdrainage systems should be observed by the Geologist
and Soils Engineer during construction and prior to covering
with compacted fill.
Consideration should be given to having subdrains located by
the project surveyors. Outlets should be located and
protected.
Treatment of Existing Ground
All heavy vegetation, rubbish and other deleterious materials
should be disposed of off site.
All surf icial deposits of alluvium and colluvium should be
removed unless otherwise indicated in the text of this
report. Groundwater existing in the alluvial areas may make
excavation difficult. Deeper removals than indicated in the
text of the report may be necessary due to saturation during
winter months.
Subsequent to removals, the natural ground should be
processed to a depth of six inches, moistened to near optimum
moisture conditions and compacted to fill standards.
Fill Placement
All site soil and bedrock may be reused for compacted fill;
however, some special processing or handling may be required
(see report).
Material used in the compacting process should be evenly
spread, moisture conditioned, processed, and compacted in
thin lifts not to exceed six inches in thickness to obtain a
uniformly dense layer. The fill should be placed and
compacted on a horizontal plane, unless otherwise found
acceptable by the Soils Engineer.
(1)
3. If the moisture content or relative density varies from that
acceptable to the Soils engineer, the Contractor should
rework the fill until it is in accordance with the following:
Moisture content of the fill should be at or above
optimum moisture. Moisture should be evenly distributed
without wet and dry pockets. Pre-watering of cut or
removal areas should be considered in addition to
watering during fill placement, particularly in clay or
dry surf icial soils.
Each six inch layer should be compacted to at least 90
percent of the maximum density in compliance with the
testing method specified by the controlling governmental
agency. In this case, the testing method is ASTM Test
Designation D-1557-91.
4. Side-hill fills should have an equipment-width key at their
toe excavated through all surf icial soil and into competent
material and tilted back into the hill (CG-1). As the fill
is elevated, it should be benched through surf icial
soil and slopewash, and into competent bedrock or other
material deemed suitable by the Soils Engineer.
5. Rock fragments less than eight inches in diameter may be
utilized in the fill, provided:
They are not placed in concentrated pockets;
There is a sufficient percentage of fine-grained
material to surround the rocks;
The distribution of the rocks is supervised by the Soils
Engineer.
6. Rocks greater than eight inches in diameter should be taken
off site, or placed in accordance with the recommendations of
the Soils Engineer in areas designated as suitable for rock
disposal.
7. In clay soil large chunks or blocks are common; if in excess
of eight (8) inches minimum dimension then they are
considered as oversized. Sheepsfoot compactors or other
suitable methods should be used to break the up blocks.
8. The Contractor should be required to obtain a minimum
relative compaction of 90 percent out to the finished slope
face of fill slopes. This may be achieved by either
overbuilding the slope and cutting back to the compacted
core, or by direct compaction of the slope face with suitable
equipment.
(2)
If fill slopes are built "at grade" using direct compaction
methods then the slope construction should be performed so
that a constant gradient is maintained throughout
construction. Soil should not be "spilled" over the slope
face nor should slopes be "Dushed out" to obtain arades.
Compaction equipment should compact each lift along the
immediate top of slope. Slopes should be back rolled
approximately every 4 feet vertically as the slope is built.
Density tests should be taken periodically during grading on
the flat surface of the fill three to five feet horizontally
from the face of the slope.
In addition, if a method other than over building and cutting
back to the compacted core is to be employed, slope
compaction testing during construction should include testing
the outer six inches to three feet in the slope face to
determine if the required compaction is being achieved.
Finish grade testing of the slope should be performed after
construction is complete. Each day the Contractor should
receive a copy of the Soils Engineer's "Daily Field
Engineering Report" which would indicate the results of field
density tests that day.
9. Fill over cut slopes should be constructed in the following
manner:
All surf icial soils and weathered rock materials should
be removed at the cut-fill interface.
A key at least 1 equipment width wide and tipped at
least 1 foot into slope should be excavated into
competent materials and observed by the Soils Engineer
or his representative.
The cut portion of the slope should be constructed prior
to fill placement to evaluate if stabilization is
necessary, the contractor should be responsible for any
additional earthwork created by placing fill prior to
cut excavation.
10. Transition lots (cut and fill) and lots above stabilization
fills should be capped with a three foot thick compacted fill
blanket.
11. Cut pads should be observed by the Geologist to evaluate the
need for overexcavation and replacement with fill. This may
be necessary to reduce water infiltration into highly
fractured bedrock or other permeable zones,and/or due to
differing expansive potential of materials beneath a
structure. The overexcavation should be at least three feet.
Deeper overexcavation may be recommended in some cases.
(3)
12. Exploratory backhoe or dozer trenches still remaining after
site removal should be excavated and filled with compacted
fill if they can be located.
Grading Observation and Testing
Observation of the fill placement should be provided by the
Soils Engineer during the progress of grading.
In general, density tests would be made at intervals not
exceeding two feet of fill height or every 1,000 cubic yards
of fill placed. This criteria will vary depending on soil
conditions and the size of the fill. In any event, an
adequate number of field density tests should be made to
evaluate if the required compaction and moisture content is
generally being obtained.
Density tests may be made on the surface material to receive
fill, as required by the Soils Engineer.
Cleanouts, processed ground to receive fill, key
excavations,subdrains and rock disposal should be observed by
the Soils Engineer prior to placing any fill. It will be the
Contractor's responsibility to notify the Soils Engineer when
such areas are ready for observation.
A Geologist should observe subdrain construction.
A Geologist should observe benching prior to and during
placement of fill.
Utility Trench Backfill
Utility trench backfill should be placed to the following
standards:
Ninety percent of the laboratory standard if native material
is used as backfill.
As an alternative, clean sand may be utilized and flooded
into place. No specific relative compaction would be
required; however, observation, probing, and if deemed
necessary, testing may be required.
Exterior trenches, paralleling a footing and extending below
a 1:1 plane projected from the outside bottom edge of the
footing, should be compacted to 90 percent of the laboratory
standard. Sand backfill, until it is similar to the inpiace
fill, should not be allowed in these trench backfill areas.
Density testing along with probing should be accomplished to
verify the desired results.
(4)
JOB SAFETY
General:
At Cardiff Geotechnical, getting the job done safely is of primary
concern. The following is the company's safety considerations for
use by all employees on multi-employer construction sites. On
ground personnel are at highest risk of injury and possible
fatality on grading construction projects. The company recognizes
that construction activities will vary on each site and that job
site safety is the contractor's responsibility. However, it is,
imperative that all personnel be safety conscious to avoid
accidents and potential injury.
In an effort to minimize risks associated with geotechnical
testing and observation, the following precautions are to be
implemented for the safety of our field personnel on grading and
construction projects.
Safety Meetings: Our field personnel are directed to attend
the contractor's regularly scheduled safety meetings.
Safety Vests: Safety vests are provided for and are to be
worn by our personnel where warranted.
Test Pits Location. Orientation and Clearance
The technician is responsible for selecting test pit locations.
The primary concern is the technician's safety. However, it is
necessary to take sufficient tests at various location to obtain a
representative sampling of the fill. As such, efforts will be
made to coordinate locations with the grading contractors
authorized representatives (e.g. dump man, operator, supervisor,
grade checker, etc.), and to select locations following or behind
the established traffic pattern, preferable outside of current
traffic. The contractors authorized representative should direct
excavation of the pit and safety during the test period. Again,
safety is the paramount concern.
Test pits should be excavated so that the spoil pile is placed
away from oncoming traffic. The technician's vehicle is to be
placed next to the test pit, opposite the spoil pile. This
necessitates that the fill be maintained in a driveable condition.
Alternatively, the contractor may opt to park a piece of equipment
in front of the test pits, particularly in small fill areas or
those with limited access.
A zone of non-encroachment should be established for all test
pits. No grading equipment should enter this zone during the test
procedure. The zone should extend approximately 50 feet outward
from the center of the test pit. This zone is established both
for safety and to avoid excessive ground vibration which typically
decreases test results.
(5)
When taking slope tests, the technician should park their vehicle
directly above or below the test location on the slope. The
contractor's representative should effectively keep all equipment
at a safe operation distance (e.g. 50 feet) away from the slope
during testing.
The technician is directed to withdraw from the active portion of
the fill as soon as possible following testing. The technician's
vehicle should be parked at the perimeter of the fill in a highly
visible location.
In the event that the technician's safety is jeopardized or
compromised as a result of the contractor's failure to comply with
any of the above, the technician is directed to inform both the
developer's and contractor's representatives. If the condition is
not rectified, the technician is required, by company policy, to
immediately withdraw and notify their supervisor. The grading
contractors representative will then be contacted in an effort to
effect a solution. No further testing will be performed until the
situation is rectified. Any fill placed in the interim can be
considered unacceptable and subject to reprocessing, recompaction
or removal.
In the event that the soil technician does not comply with the
above or other established safety guidelines, we request that the
contractor brings this to technicians attention and notify our the
project manager or office. Effective communication and
coordination between the contractors' representative and the field
technician(s) is strongly encouraged in order to implement the
above safety program and safety in general.
The safety procedures outlined above should be discussed at the
contractor's safety meetings. This will serve to inform and
remind the equipment operators of these safety procedures
particularly the zone of non-encroachment.
Trench Safety
It is the contractor's responsibility to provide safe access into
trenches where compaction testing is needed.
Our personnel are directed not to enter any excavation which 1) is
5 feet or deeper unless shored or laid back, 2) displays any
evidence of instability, has any loose rock or other debris which
could fall into the trench, or 3) displays any other evidence of
any unsafe conditions regardless of depth.
All utility trench excavations in excess of 5 feet deep, which a
person enters, are to be shored or laid back.
Trench access should be provided in accordance with OSHA
standards. Our personnel are directed not to enter any trench by
being lowered or "riding down" on the equipment.
(6)
If the contractor fails to provide safe access to trenches for
compaction testing, our company policy requires that the soil
technician withdraw and notify their supervisor. The contractors
representative will then be contacted in an effort to effect a
solution. All backf ill not tested due to safety concerns or
other reasons could be subject to reprocessing and/or removal. -
(7)
A
I
I
c'ri crnw r C: AL ILS AL 3P
ANOFETJ 1 ]D FaJ ) T'TJ IET X CD?I J!' ID W X ID E7 t ric
/
ft
I
I
1'
/
1" = 200' /
r i T ID
On
LQt _I
r-zcm (approx. location)
TR- 1 mi -r (approx. location) I
I
a
Y?-AD I F F C3 IThI I
/