HomeMy WebLinkAbout3466; OLIVENHAIN RD WIDENING & REALIGNMENT; SUPPLEMENTAL GEOTECHNICAL INVESTIGATION; 1996-07-010
G11 ETna. ginsers
Engeejg pgts
I 0•
I
'I
I. SUPPLEMENTAL
I GEOTECHNICAL INVESTIGATION
OLIVENHAIN ROAD IMPROVEMENTS
CARLSBAD, CALIFORNIA
I ,
1
PREPARED FOR
PROJECT DESIGN CONSULTANTS
SAN DIEGO, CALIFORNIA
I
I JULY 1996
I 7
1 RECEIVED
:1 JUL 12 1996
ENGiNEERING
:1 DEPARTMENT
I '-
V
I
GEOCON I1h
INCORPORATED
Geotechnical Engineers and
Engineering Geologists
Project No. 05466-12-01
July 10, 1996
Project Design Consultants
7018 Street, Suite 800
San Diego, California 92101
Attention: Mr. Tom Tomlinson, PE
Subject: OLIVENHA1N ROAD IMPROVEMENTS
CARLSBAD, CALIFORNIA
SUPPLEMENTAL GEOTECHNICAL INVESTIGATION
Gentlemen:
In accordance with your authorization dated June 19, 1996, we have performed a
supplemental geotechnical investigation for the subject project. The purpose of the
investigation was to provide additional information regarding the stability of the proposed
cut slope along the northern portion of the Olivenhain Road, just east of El Camino Real.
Specifically, the investigation was focused on verifying the need to buttress the cut slope
to the west of the SDG&E easement.
SCOPE OF. WORK
As a part of this supplemental investigation, we have reviewed the following documents;
Soil and Geologic Investigation for Olivenhain Road
Improvements and Off-Site Dyke, Carlsbad, California, prepared
by Geocon Incorporated, dated March 21, 1995.
Consultation - Slojie Stability Evaluation, Olivenhain Road
Improvements, Carlsbad, California, prepared by. Geocon
Incorporated, dated July 21, 1995.
Plans for Grading and Improvements of Olivenhain Road
Widening and Realignment, prepared by Project Design
Consultants, dated May 2, 1996.
I . 6960 Flanders Drive
San Diego, CA 92121-2974
619 558-6900
FAX 619 558-6159
I
Project No. 05466-12-01
July 11, 1996
Page 2
The field phase of the investigation consisted of excavating and downhole logging of 2
large-diameter borings along the proposed cut slope' area. Approximate locations of the
exploratory excavations are shown on Figure 1. The excavations were performed
utilizing an Earthdrill E-120, truck-mounted drill rig equipped with a 30-inch-diameter
bucket auger. The borings were excavated to depths of 35 and 41.5 feet below existing
ground surface. Logs of the borings are presented in Appendix A.
I .
BACKGROUND
The referenced project geotechnical investigation (March 21, 1995) report provided
recommendations for grading the proposed Olivenhain Road improvements. These
recommendations included the construction of a buttress fill to stabilize the cut slope
along the northern right-of-way, west of the SDG&E easement crossing. The adverse
geologic conditions requiring the remedial grading were based on soil conditions
encountered in Boring No. LB-1 excavated as part of a previous study (1990) for this
project.
Subsequently, the cut slope area was further investigated by others. After review of the
report from that study, Geocon Incorporated issued a revision (July 21, 1995) to the
original report decreasing the slope buttressing requirement to the western 250 feet of the
roadway cut.
SOIL CONDITIONS
The soils encountered in the new excavations consisted of a relatively thin layer of topsoil
and formational soils of the Delmar Formation, predominately consisting of massive to
thinly bedded claystone interbedded occasionally with layers of sandstone. A few
concretionary, well-cemented, drill resistant beds or lenses were encountered mostly at
the lower depths. The most common feature found in the borings was highly fractured
zones of claystone with abundance of randomly oriented slickensided surfaces. A near-
horizontal bedding plane shear was encountered at 'a depth of 9 feet in Boring No. LB-2.
Slightly remolded, discontinuous clay seams were also encountered over the
concretionary beds or lenses.
Overall, no. significant adversely bedded bedding plane shear zones, correlating with
those found in Boring No.. LB-1, were encountered. However, highly weathered clays
were present near-surface along with highly fractured claystone, particularly interbedded
with lenses or beds of sand.
I
I
I
I
Ll
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Fl
p
j
vflol
Ali Sadr
CEG 177
I
Project No. 05466-12-01
July 11, 1996
Page 3
CONCLUSIONS AND RECOMMENDATIONS
No significant bedding plane shear zone was encountered in Boring Nos. LB-2
and LB-3, that correlate with those found in Boring No. LB-1. Therefore, it is our
opinion that the adverse conditions will be limited to the very westernmost
portion of the proposed cut slope.
'A buttress fill will be reql4ired .for an approximately 150-foot section, from El
Camino Real to Station 3+00. This is a reduced length from that recommended in
the referenced consultation letter (July 21, 1995). The buttress shear key should be.
30 feet wide and have a depth of at least 5 feet below finish subgrade. The
backcut inclination should be no steeper than 1.5:1 (horizontal to vertical). A
'typical buttress configuration is presented in the referenced investigation report.
The remaining cut slope will be stable against deep-seated failure; however, the
presence of the highly fractured and weathered claystones, occasionally interbed
with sandy layers, may cause surficial instability and sloughage' along the slope.
While this sloughage condition is not desirable, we understand that this is may be
considered a maintenance, issue. 'Construction of a stability fill as previously
recommended is an alternative to mitigate this issue.
This supplemental report should be considered as a revision to the referenced
geotechnical correspondence. '.
Should you have any questions regarding this report, or if we may be of further service,
please contact the undersigned at your convenience.
Very truly yours,
LI
I
I
RCE 225 -
AS:DFL:dmc CA
(2) Addressee
(2) City-of Carlsbad Engineering Department
Attention: Mr. Pat Entezari
I
'I
I
or ai
co
3" I
- ---- •.. .. •.• L'----..
=Ar ciTT\1 .?1
-,
LEGEND
...... APPROX. LOCATION OF LARGE
- DIAMETER BORING
' I APPROX LOCATION OF BUTTRESS KEY
Rwy 3, GRQCQN.° 9P
GEOTECHNICAL. ENGINEERS AND ENGINEERING GEOLOGISTS
6960 &.NDERS DRiVE - SANDIEGO, CALIFORNIA 92121-2974
PHONE 619 558-6900 - FAX 619 558-6159
PROJECT NO. 05466-12-01
FIGURE I
DATE 7-13-1996
APPENDIX A
LOGS OF BORINGS
FOR
OLIVENHAIN ROAD IMPROVEMENTS
CARLSBAD, CALIFORNIA
Project No. 05466-12-01
/
PROJECT NO. 05466-12-Ui
BORING -LB 2 0U L_.
Z. -. w
SAMPLE
ELEV. (MSL.) 112 DATE COMPLETED 6/26/96
F
CD EQUIPMENT E-120 BUCKET RIG
MATERIAL DESCRIPTION
0 - TOP SOIL
SC Loose damp, light brown Clayey SAND with some
2 rootlets and desiccation cracks
-
- _______
DELMAR FORMATION
Hard, moist, dark green, Silty waxy CLAYSTONE -
moderately fractured -
CL
— HORIZONTAL DEPOSITIONAL CONTACT
Very dense, damp, light green to tan Silty fine
____
] ::~l I
:•
-
S M SPSf(?rE with occasional well cemented zones -.
- - -
-
:•: - 8 Hard dark grayish green Silty CLAYSTONE
• SM-CL interbedded with light yellowish Silty SANDSTONE
-Bedding plane shear, horizontal 1/16 inch thick at 9 -
10 \ feet - -
Becomes dark green Claystone random orientation —CL-CH
'higilyfractured ----
12 Dense, moist grayish tan, Silty fine SANDSTONE SM heavy staining
-
Hard dark grayish green, Claystone, abundant slicken-
14 sided surfaces, random orientation, -
-Near vertical slicken sided surface at 14 feet
16 CL-CH
18 - - ____
-
-Concretionary lense 8-inches thick at 18.5 feet -
Grades in to light gray Clayey SILTSTONE to Silty - 20 SANDSTONE
MIML
22
24 -
Grades in to hard,dark gray CLAYSTONE, slicken-
26 sided, mostly dipping NE, heavy staining, lenses of -
coal 1/2 inch thick -
CH
28 -becomes sandier with depth
Figure A-i Log of Boring Lii 2, page 1 012 ORW
SAMPLE SYMBOLS D ... SAMPLING UNSUCCESSFUL 11... STANDARD PENETRATION TEST ... DRIVE SAMPLE (UNDISTURBED)
DISTURBED OR BAG SAMPLE .. CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
I
PROJECT NO. 05466-12-01
BORING LB 2
DEPTH SOIL SAMPLE
NO. = z CLASS ELEV. (MSL.) 112 DATE COMPLETED 6/26/96 u w
FEET C
CD EQUIPMENT E-120 BUCKET RIG
MATERIAL DESCRIPTION
30• CH
-Thin layer of slightly remolded Clay over the
32 - - concretionary bed. approximately 20 degrees eastward.
-Concretionary bed 16 inches thick- near refusal -------------------------------------- -
Very dense, moist tan to yellowish tan fine to
- 34 - medium Silty SANDSTONE
:SM
BORING TERMINATED AT 35 FEET
'I
Figure A-2 Log of Boring LB 2, page 2 of 2 ORW
0 ... SAMPLING UNSUCCESSFUL IL.. STANDARD.-PENETRATION TEST ... DRIVE SAMPLE (UNDISTURBED)
SAMPLE SYMBOLS
DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
I
PROJECT NO. 6-12-01
- )- W V%i'fThTI' T ..
BORING LB z,-
DEPTH
( I-
SOIL
o. i-WX
SAMPLE
ELEV. (MSL.) 120 DATE COMPLETED 6/26/96
FEET
EQUIPMENT E-120 BUCKET RIG
MATERIAL DESCRIPTION
/ Sc TOP SOIL
- / / Loose, to medium dense, dry to damp light brown
2 - - _____ Clayey fine to medium SAND with rootlets and
\ desiccation cracks
DELMAR FORMATION -
4 - Highly weathered- formational creep- Stiff, very
moist, light green highly fractured clay with fractured
- :L-CH filled with Silty SAND
-
- Very hard, moist, dark green CLAYSTONE,
8 - moderately fractured with shiny parting surfaces
10 -
-
- CL-CH
12
- 14 -
- - - -Lens-of very dense, moist, light yellowish brown
Silty fine to medium SAND, 2-6 inches thick, near
- 16 - horizontal at 14.5 feet
- 18 - SM Dense, moist, light grayish brown Silty fine
- - SANDSTONE -
- 20 - Hard, very moist, mediiiiñ brown, thinly bedded,
CLAYSTONE with dark brown and yellow staining
- - along bedding and fractures slightly remolded,
CH discontinuous.
- 22 - -becomes light grayish green with light yellow
- stainng
: SM -Very dense, wet, light green Silty Sandstone 23-24
24 - - fèet / -
26 CH
28 -
• -Concretionary lens orange standing along fractures at - VIIIA! 28.5 feet
Figure A-3 Log of Boring LB 3, page 1 of 2 ORW
[El SAMPLING UNSUCCESSFUL El ... STANDARD PENETRATION TEST U ... DRIVE SAMPLE (UNDISTURBED)
SAMPLE SBOLS
... DISTURBED OR BAG SAMPLE fil ... CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
I
NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
I
PROJECT NO. 05466-12-01
>- w B ORING LB 3 z
DEPTH SOIL
SAMPLE
NO. ELEV. (MSL.) 120 DATE COMPLETED 6/26/96
FEET
CD EQUIPMENT E-120 BUCKET RIG 0 C.)
MATERIAL DESCRIPTION
- - 30 ____ - . ------------------------------------
- - Very hard, 'moist dark gray to greenish gray
- 32 - CLAYSTONE from 30 feet
CH
- 34 -
-Gypsum veinlets from 32 to 36 feet -
-Concretionary bed 12 to 14 inches thick at 35 feet
-
36 ______
.c. -
- Interbedding with light green Silty SANDSTONE at
38 -
•
H-SM 36.5 and 38.5 feet -
p
-40- 'CH
-
- Concretionary bed-near refusal -
boring terminated at 41.5 feet
Figure A-4 Log of Boring LB 3, page 2 of 2 ORW
0 ... SAMPLING UNSUCCESSFUL 111 .. STANDARD PENETRATION TEST ... DRIVE SAMPLE (UNDISTURBED)
SAMPLE SYMBOLS
... DISTURBED OR BAG SAMPLE ... CHUNK SAMPLE ... WATER TABLE OR SEEPAGE
I NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE
DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.