Cabinet Test Start Date
Cab Type £3.1
Serial No
P.O.M.O. No.:
- rhpt-kff
ACCEPTANCE TESTING OF ALL SUPPLIED COMPONENTS
PHYSICAL & FUNCTIONAL TESTING OF ALL MODULES
MINIMUM _100_ HR. _BURN-IN _OF ALL MODULES
PHYSICAL & FUNCTIONAL TESTING OF ALL ITEMS i...—
MINIMUM 24 HR. OPERATION OF ALL CONTROLLER UNITS & CABINETS
Validation of compl n wit MTS Q C Procedure
Technician Date I
Q C Supervis2 DateI l
C \123R4WDATA\CONThQC.WK4
01-27-94 (JoM-CM.S/CONT&)
V
V VV • -.
- - V V V V ,: •,. V
V •. •V VVVV
.
- ;. V
- V .• V -. V'-V - VV• V . - . .VV
-a.'
V V
;'VI - £ V V
V V V V
-
_-
* - I
V• V.V V V4?V •V -. V •.. VVi - .V . 'V.- ,.
4?
* -V..
- - - V - . - . . .5 -• . - - -244
M C I N
1
-TRAFFIC
SUPPLY •- - .*
DATE
CUSTOMER
P.O. NUMBER_4\ rP
CONTRACT#__________________________________
INTERSECTION .
• . . . CERTIFICATE OF COMPLIANCE . ••
I certify that the controller assembly has been tested in compliance with Section
88-3.05 of the State of California Standard Specification, July 92.
Quality control procedure includes the following:
Acceptance testing of all supplied components.
Physical and functional testing of all modules. .
A minimum 100-hour burn-In of all modules.
Physical and functional testing of all controller units and all auxiliary equipment.
A minimum of 24-hour burn-in of all controller unite and all auxiliary equipment.
Physical and functional testing of the complete controller assembly.
A minimum of 24 hours operation of every complete controller assembly. .
a .
Tested
Author]
-Title: - fl
LV
McCA1N TRAFFIC SUPPLY- f
t :
- CABINET SERIAL NUMBER SHEET
ply DESCRIPTION - SERIAL NUMBERS
- ...--_.---..-----.-•--.---
- 1 332 Cabinet
.....•-
1 t: 3PDA#2 --
- / - - - 1 206 Power Supply
- -. - I 1I• 1 Output File
I I - File
1 J.-, File
'-
- .-. .
- l'—
e
~ -- -Test Start Date /1/.2
CahcLTe ' 332-
-'-- - check 0
1:TI(l\1
IVISUAL-INSPECTION
ELECTRICAL SAFETY INSPECTION
UP--
FULL-OPERATION ---. -
FINAL CHECK
6PERATION CHECK
I Ill II the applicable test procedures and have'-observed the testing of the
above signal controller cabinet this unit has t)eefl tested In accordance with (he standaR
Cafliornla Department of Transportation test procehures for contract No
VaIldatlqb MTS Q C Procedure
V)
- batej 4. 1 echnlcian . . - V V
flifie _
-
C;\l 23114W1)Kl'MCAlITUS'I.WI 3 V V -
01-11-94 (JI4.(:MsJconloIku) . - . - - _ - V - - •. -.
.4
-V. ------------------V ----------------- --.-"-"- . - -.-. .-- - - -.-- V • V
- -i V - - - •. L V
J•V
_
V •_•V•V
-
4 ..
V -V
-
I
*
C - - •_ --------------. -' V ___ - -- •V -- -- •V -. -- •_?__ - - ........-' - -. V - I - V - •. -V •
-- V - V V - - - . V V .• C.'.•. -' V •' 1 VVVVV
*
- -- - -- - - - - - - - - - - - - -
1 1
V.
: