HomeMy WebLinkAbout3523-5; PEDESTRIAN CURB RAMP IMPROVEMENTS; TEST RESULTS;Testing Engineers-San Diego, Inc.
REPORT OF COMPRESSION TEST Sample Group # 7549
Project Name City of Carlsbad NE, SE, SW Pad Ramp Improvements Project No 2000-999
Project Address various
Gen. Contractor N/A Sub-Contractor N/A
Engineer N/A Architect N/A
Bldg Permit No n/a Plan File No n/a 4J- 6 ..
Gov't Contract # n/a DSAIOSHPD DSA# r/a
Le V 3I
Sample Group Data
Report of Concrete Cylinders Measured Specified
Placement Date 1/4/01 Slump (in.) 4.00 4.00
Supplier/Plant HANSON Air Temp (°F) 75 N/A
Mix Number 3233502 Mix Temp (°F) 70 N/A
Mix Description 560-C-3250 6.12 SK Air Content (%) N/A N/A
-.
Mix Design 3250 psi 22.4 MPa Unit Weight #Error 0
Specified Strength 3250 psi 22.4 MPa
Truck No. 439 Ticket#: 336312 Load# 2 Time Batched 10:30 AM Time Sampled 11:30 AM Age: N/A Mm.
Sample Mark: 14-01/SET 1/00-999 Delivered by N/A Date Rec'd in Lab: Logged in by: N/A
Admixture N/A N/A Gallons of water added at N/A -
Specific Location EAST CORNER OF MAFFON RD AT THE EL CAMINO CINEMA
Special Instructions/Remarks POSSIBLY DAMAGED ON SITE
Compression Laboratory Data
Sample Lab No. Date Discard Dimensions Test Area Max Load Compressive Strength
Age Tested
7 51469 1/11/01 0 6x12in 28.27in2 66,500 lbs 2350 psi 16.2MPa
14 51470 1/18/01 0 6x121n 28.27in2 87,000 lbs 3080 psi 21.2MPa
28 51471 2/1/01 0 6x121n 28.27in2 109,500 lbs 3860 psi 26.6MPa
28 51472 2/1/01 0 6x12in 28.27 in 99,000 lbs 3500 psi 24.1 MPa
Comments: 28 day test meets specifications.
Sampling and testing conducted in accordance with AS TM Standard designations: C31-91, C39-86, 84, C617-87, C42-90
Checked by: Date: Reviewed by: (A-.._- Date C,
Carlos Acero Staff Engineer
cc: City of City of Carlsbad City of Carlsbad
Carlsbad -
Testing Engineers-San Diego, Inc.
REPORT OF COMPRESSION TEST Sample Group # 15551
Project Name City of Carlsbad NE, SE, SW Pad Ramp Improvements Project No 2000-999
Project Address various -
Gen. Contractor N/A Sub-Contractor N/A
Engineer N/A . Architect N/A
Bldg Permit No n/a Plan File No n/a
Gov't Contract # n/a DSA!OSHPD DSA# n/a
Sample Group Data
Report of Concrete Cylinders Measured Specified
Placement Date 12/15/00 Slump (in.) 3.25 4.00
Supplier/Plant HANSON 34 Air Temp (°F) N/A N/A
Mix Number 3233502 Mix Temp (°F) N/A N/A
Mix Description 560-C-32506.12SK PUMP Air Content (%) -N/A N/A
Mix Design 3250 psi22.4 MPa Unit Weight #Error 0
Specified Strength 3250 psi 22.4 MPa
Truck No. 466 Ticket #: 177950 Load # I Time Batched 9:50 AM Time Sampled 11:35 AM..-,-. Age: N/A Mm.
Sample Mark: 12/15/00 #1 2000-999 Delivered by N/A Date Recd in Lab: Logged in by: N/A
Admixture N/A N/A Gallons of water added at N/A by N/A
Specific Location HANDICAP RAMP N/E CORNER OF WESTOOD DR & BLANKARNE DR.
Special Instructions/Remarks
Compression Laboratory Data
Sample Lab No. Date Discard Dimensions Test Area Max Load Compressive Strength
Age Tested
7 50707 12/22/00 0 6x121n 28.27mn2 78,000 lbs 2760 psi 19.0 MPa
28 50708 1/12/01 0 6x12in 28.27in2 120,000 lbs 4240 psi 29.2 MPa
28 50709 1/12/01 0 6x12mn 28.27in2 118,000 lbs 4170Pfi 28.7 MPa
56 50710 2/9/00 1 6x121n 28.27in2 lbs psi MPa
Comments: -28.qqy !qt specifiCatior. .
Sampling and testing conducted in accordance with ASTM Standard designations: C31-91, 39-86. C78-84, C617-87, C42-90
Checked by: Date: Reviewed by:(_ 1L-_ r-: Date: C? I I /
Larry Clark . Engineer
cc: City of City of Carlsbad City of Carlsbad
Carlsbad -
Testing Engineers -San Diego, Inc.
Mr. Gary Goodman
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008-7314
RECEIVED
FEB 202001 Established 1946
ENGINEFfz1NG==-
DEPARTIAENT fl -
/
FE131 2 1 2C0I
- CL&j
January 17,'2
TESD Job No, 2000-999
Job Name: CITY OF CARLSBAD PAD IMPROVEMENTS
Address: Carlsbad, California
The following pages present TESD's field compaction, inspection, and/or laboratory test
reports for the above referenced project for work performed through 01/04/01.
These reports cover the locations of work inspected and tests performed in accordance
with generally accepted standards and do not constitute engineering opinions or project
control. It is the responsibility of the contractor to schedule retests or reinspections of
any areas that do not meet project specifications. TESD neither controls nor supervises
the work at the site. We are not responsible for errors and omissions of the contractor, nor
for the contractor's failure to keep the work on schedule or carry it out in accordance with
the project plans, specifications and all applicable codes.
We appreciate the opportunity to provide services on this project. Should you have any
questions regarding the accompanying information, please contact our office at (858)
715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc.
Larry Clark
Vice President of Engineering
cc: City of Carlsbad - Building Department
City of Carlsbad - Accounts Payable
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 (858] 715-5800 Fax [858] 715-58 10
O
Testing Engineers - San Diego, Inc. Page 10f4.
7895 ConvoyCt., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Project Name a'P- &'2fr SD Project # 99
Address -. I
General / Subcontractor , //
Building Permit # DSA #
Plan File # OSHPD #
Government Contract # Other
INSPECTION
Concrete
Prestress Conc
Masonry
Struct Steel
MAT'L SAMPLING QTY
_______Soil ______
Base
Subgrade
Asphalt Concrete _______
MATERIAL DESCRIPTION 3Z33 Sw-
______Conc: Mix #/psi .JZ ',fA
Conc: Mix #/psi
Conc: Mix #/psi _____________
_______ Rint: Reber _________________
INSPECTION CHECKLIST
Plans
Specifications
_______Sizes
Y Slump 4d "
Fireproofing _..,,ncrete Cylinders Rinf: W.W.F. _______________ _______Air Content
-Pile Driving Conc Flex Beams _______ _______ Rint: Tendons .-"Temperature "7e:,,e'
Non-Destructive _______ Reinf. Steel _______ -Grout: Mix #/psi _____________ _----;.Unit Weight
-Batch Plant -Tendon (PT Strands) _______ _______Mortar; Type/psi ____________ _______Consolidation
Soils Technician _______ Mortar Samples _______ -Units: Block -Electrode Storage
Mechanical -Grout Samples _______ _______ Units; Block _______Torque Applied
Electrical _______ Masonry Prisms _______ _______Steel _______ Load (Pounds)
-Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts _______Thickness
Rooting Steel _______ _______ Metal Decking -
Waterproofing H.S. Bolts _______ _______ Electrodes
_______ DSA Fireproofing -Fireproofing
______ OSHPD Roofing ______ ______Other__________________ Cormctive action required
Specialty Other ____________ _______ ___________________________ -Corrections completed
Remarks n2 7 7J_-
7?7ff - 7 / - 7- ,
Field Representative #
CERTIFICATION .OF COMPLIANCE: All of the observed work, unless otherwise stated, is in with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME A9,eZCS (Print Clearly) CERT. NO.
INSPECTOR'S SIGNATURE__________________________________ DATE ? I' . 92Z Fom#003
Testing Engineers -San Diego, Inc. Established 1946
Mr. Gary Goodman January 5, 2001
City of Carlsbad TESD Job No. 2000-999
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Job Name: CITY OF CARLSBAD PAD IMPROVEMENTS
Address: Carlsbad, California
The following pages present TESD's field compaction, inspection, and/or laboratory test
reports for the above referenced project for work performed through 12/15/00.
These reports cover the locations of work inspected and tests performed in accordance
with generally accepted standards and do not constitute engineering opinions or project
control. It is the responsibility of the contractor to schedule retests or reinspections of
any areas that do not meet project specifications. TESD neither controls nor supervises
the work at the site. We are not responsible for errors and omissions of the contractor, nor
for the contractor's failure to keep the work on schedule or carry it out in accordance with
the project plans, specifications and all applicable codes.
We appreciate the opportunity to provide services on this project. Should you have any
questions regarding the accompanying information, please contact our office at (858)
715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc.
Larry Clark
Vice President of Engineering
cc: City of Carlsbad - Building Department
City of Carlsbad - Accounts Payable
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810
Remarks
Testing Engineers - San Diego, Inc.
Page 1 of I
( ) 7895 Convoy Ct., Suite 18 - -
San Diego, CA 92111
INSPECTION REPORT
Project Name I, cf TESD Project #L'(JU
Address ZP)c Luc Cc ')C 3Zc.O irca. Y' @r (sbc'( -
General I Subcontractor
Building Permit DSA#
Plan File # OSHPD #
Government Contract # Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
)( Concrete _______ Soil _______conc: Mix #/psi Plans
Prestress conc Base _______Conc: Mix #/psi Specifications
Masonry Subgrade Conc: Mix #/psi Sizes
_______ Struct Steel Asphalt Concrete _______ _______ Rinf: Reber Slump
Fireproofing Concrete Cylinders ( 01 '4 Rift: W.W.F. ________________ -Air Content
-Pile Driving Conc Flex Beams _______ Rinf: Tendons Temperature
_______ Non-Destructive _______ Reinf. Steel _______ _______Grout: Mix #/psi -Unit Weight
-Batch Plant -Tendon (PT Strands) _______ - Mortar: Type/psi _______Consolidation
Soils Technician _______ Mortar Samples -Units: Block _______ Electrode Storage
Mechanical _______ Grout Samples -Units: Block -Torque Applied
Electrical -Masonry Prisms Steel Load (Pounds)
Bolt Pull-Out - Masonry Block _______ _______ H.S. Bolts -Thickness
Roofing Steel _______ _______ Metal Decking _______
Waterproofing H.S. Bolts _______ _______ Electrodes __________________ _______
_______ DSA Fireproofing Fireproofing
______ OSHPD Roofing ______Other__________________ Corrective action required
Specialty -Other- _______ ___________________________ -Corrections completed
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAM
INSPECTOR'S SIGN
CERT. NO.
DATE _(oo _Fon#003
CONTRACTOR SUBMITTAL LOG
PROJECT a,s. ksv3 Pea-R4-w I '4PROJECT MGR.b •ooc
JOB NO. 3 ,sz - s . . CONTRACTOR tA e
Date
Received
Submittal
Number
Description Subcontractor Contractor
Submittal
Number
No. Copies
Received
Date sent to
Project
Engineer.
ACTION Date
Received
Number
of Copies
Received
Remarks Date Sent to
Contractor . Ref Spec. Section No
Exceptions
Taken
.
Make
Corrections
Noted
Revise &
Resubmit
Rejected
o tthl'°
_______ . . _______
oo Mv to-4o'O
Ii C41 SAA ________
Iz./zjoo .1
--
I.jz/oo t .
. 7J22./OO
/WWOO
. _______
04Ml°0 oolA I . . jtJoo ' .
. _______
00 30*
(•;4. . . i,_in1oo . . _______
P:\00CS\MISF0RMS\C0WTSUBN.FRM REV 1/27/93