HomeMy WebLinkAbout3532; DAVIS AVE WATER LINE REPLACEMENT; FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS 2000; 2000-07-24S *'• ..
Testing Engineers - San Diego,lnc EstabIihcd 1946
FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS
Date: July 24,'2000,.0
Job Number 1999-519G jLSBP') I
Job Name Davis Avenue Water Line
Address: Carlsbad, California •'.
Report Number 1073 -
Plan Number N/A
Permit Number: N/A
Accompanying this cover sheet 'are the field' compaction test results nd related .
construction monitoring reports for the referenced project. These reports are for the
following date(s) --
June 15, 2000 June 22,20Q0
June 16, 2000 June 26, 2000
June 19, 2000
S -
The tests were performed in accordance with generally accepted standards and do not
constitute engineering opinions or project control. It is the responsibility, of the '
contractor,to schedule retests orreinspectioiis of any areas that do not meet project
specifications. This information does not relieve the contractor of his responsibility for
constructing the project in accbdanàe with plaiis, specifications, and 'all applicable codes.
We appreciate the opportunity to provide materials testing service on this project. Should
-you have any questions regarding..the accompanying information, please contact 'our
-
office at (858) 715-5800. ' '
Respectfully submitted,
Testing Engineers - San Diego, Inc -
E :]
.
VicL
arry lark, GE 219
- President, Engineering
Total Pages Attached (9) - . .. - -., -.•
, J %
Testin g
Testig Engineers San Diego, Inc.. 7895 Convoy Court,Suite 18 San Diego, CA.92 III J858] 715-5800 Fax [858] 71 5-5810
O Testing Engineers — San Diego, Inc.
Page lot
Co 7895 Convoy Ct., Suite 18 - c
112
-
San Diego, CA 92111
INSPECTION REPORT
Project Name 6cQ (2"--" 4" TESD Project #
Address 1)4
General General I Subcontractor
Building Permit # DSA#
Plan File # [s11L!ZiI
Government Contract # Other
INSPECTION
-Concrete
Prestress Conc
Masonry
Struct Steel
MAT'SAMPLING QTY I
_______ Soil _______
Base
Subgrade
Asphalt Concrete ________
MATERIAL DESCRIPTION
_______ Conc: Mix U/psi
________ Conc: Mix U/psi
Conc: Mix U/psi _____________
-Rinf: Reber __________________
INSPECTION CHECKLIST
Plans
Specifications
-Size
Slump
Fireproofing Concrete Cylinders _______ Rinf: W.W.F. _______________ -Air Content
—Pile Driving Conc Flex Beams _______ _______ Rinf: Tendons Temperature
Non-Destructive Reinf. Steel _______ -Grout: Mix #/psi -Unit Weight
-Batch Plant -Tendon (PT Strands) ________ -Mortar: Type/psi ________ Consolidation
Soils Technician _______ Mortar Samples -Units: Block -Electrode Storage
Mechanical _______ Grout Samples _______ _______ Units: Block _______ Torque Applied
Electrical Masonry Prisms _______ -Steel _______ Load (Pounds)
_______ Bolt Pull-Out Masonry Block _______ H.S. Bolts Thickness
Roofing Steel ________ ________ Metal Decking
Waterproofing H.S. Bolts _______ -Electrodes
DSA Fireproofing Fireproofing
OSHPD Roofing ______Other____________________ Corective action required
Specialty -
—Other- ________ _____________________________ -corrections completed
Remarks c i-k' i
4 C,ço 17 . /. c.-e /<
&9 ,4' 4or7AtIj'odf fa /e-. ck-47/ 1i-fr
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME
(Print Clearly)
INSPECTOR'S SIGNATURE c'A~.
CERT. NO.
DATE Form 44003
0 REPORT OF
/ NUCLEAR DENSITY TESTS
0 SOIL (ASTM D2922 and D3017) 0 AC (ASTM D2950) /
TEST RESULTS RESULTS RESULTS RES5(TS RESULTS RESULTS RESULTS
Standard Count - Density
Standard Count - Moisture
Probe Depth & ".
Moist. Content, % IC)9.7
Wet Density
WET DENSITY Dry Density (MOIST. + 100) X 100
0
Maximum Density
Optimum Moisture %
% of Maximum Density
% Density Required '7 ç
Complies DOes Ot 1, C—
Test Numbers (
Date Tested Tested .- I Sco
MD Curve No.
TEST LOCATIONS
J Vç ' Iv 6'
- If t (
COMMENTS
GLADE MODEL GUAGESN
-
&v Cpv
PROJECT WORK REQUESTED BY PROJECT NUMBER
1
TECHNICIAN NOTIFIED (SIGNATURE) DATE AT PROJECT SITE BY PHONE
(:j__
THIS REPORT DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO BUILD
PER THE PLANS, SPECIFICATIONS AND ALL APPLICABLE CODES
WHITE - Office CANARY - Field 1Technician PINK - Contractor
Testing Engineers - San Diego, Inc.
Page 1 o
7895 Convoy Ct., Suite 18
4
San Diego, CA 92111
INSPECTION REPORT
Project Name -t' TESD Project # _____________________
Address
General / Subcontractor . 2
Building Permit # DSA #
PlanFile # __________________________________OSHPD #_______________________________________
Government Contract # ___________________________Other
INSPECTION
-Concrete
Prestress Conc
Masonry
Struct Steel
MAT'L SAMPLING QTY
_______ Soil
Base
Subgrade
Asphalt Concrete _______
MATERIAL DESCRIPTION '
Conc: Mix #Ipsi
-Conc: Mix #/psi
Conc: Mix #/psi
_______ Rinf: Reber
INSPECTION CHECKLIST
Plans
Specifications
Sizes
Slump
Fireproofing Concrete Cylinders Rinf: W.W.F. ________________ -Air Content
Pile Driving Conc Flex Beams _______ _______ Rinf: Tendons Temperature
Non-Destructive ________ Reinf. Steel ________ -Grout: Mix #/psi -Unit Weight
Batch Plant -Tendon (PT Strands) _______ -Mortar: Type/psi -Consolidation
't2 Soils Technician -Mortar Samples -Units: Block _______ Electrode Storage
Mechanical _______ Grout Samples _______ Units: Block -Torque Applied
Electrical _______ Masonry Prisms _______ -Steel _______ Load (Pounds)
Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts -Thickness
Roofing Steel _______ -Metal Decking
Waterproofing H.S. Bolts _______ _______ Electrodes
DSA Fireproofing -Fireproofing
OSHPD Roofing Other___________________ ______ Corrective action required
Specialty Other ____________ ________ Corrections completed
Remarks c'1 jo i'ci..7f S
/rt /(,J C&o iCP9e'1 j4 ( crsqQ 114 77tP
7c)vu --- L 'd T47
S CL çA 2 iP / (ZC2 44 AkJ 7Lu
-_ Ii'Representative #\ UOJ1._&___QJLQJJ
- c7r
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME J'S 17ij7V Li.-t)
(Print Clearly)
INSPECTOR'S
CERT. NO.
DATE ? /
Fona5003
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
1,2 REPORT OF COMPACTION TEST DATA
LS hJ& t ,
-_ Test Date _'( '/o &) Page __L
9 &th4'
Test # Material Structure Test Location and Elevation or Depth relative to...
( 5 iv L 54s1 ,. Ihxv -e ) 5(5
0
__ 7 I741d'2
.3 S bti. itC' cVLi '
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,.
U = Other. Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches) 11 61,
Wet Density (pcf) t 3 ,,Q,
Dry Density (pcf) f)"Q.q ,J)'D,
Moisture (%) 1..
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM 0, L./
Specified RC
Specified RM
Conformance (Yes/No) .Yes )€4 )- 0 -
Nuclear Gauge Model and Serial Number: 7774 c_??7( /.L7/( 5 't' 0 /jO/
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specification and appcable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: /'6(\ 11L4gnature:
-
Client's or Contractor's Acknowledgement: Name: _X\,*._L 0 Signi&e:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name ?tV i4c,,A_ iik
Project Number ________________________ Test Date Page of
Client Q7) ca-2 &9
Test # Material Structure Test Location and Elevation or Depth relative to...
14L... /k4) C'31A / I iI? / . 23 /0' 14!
____ ____ ____
k1 c.•ki
ç S t4L 1zA.-4J ccj. i1- ,4yu /Jr t4. &
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test If
Probe Depth (inches) '
Wet Density (pcf) /243 /''c.
Dry Density (pcf) (20-
Moisture (%) ) s-
MD Curve Number
Maximum Density (pcf) / . / ')IJ. .
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:' 7i(t't 1:3;-(/' -
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and ap
p
l
i
c
a
b
l
e
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name:
Si
gnatur Signature:
White- Office Yellow- Contractor Pink- Field Technician
-
Testing Engineers - San Diego, Inc.
C
Page 1 o
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Project Name 1/a(j13 1Cm' U'O4P I/fri Y TESD Project # -
Address ALIZ~5 jo~-_
General / Subcontractor tt
Building Permit # DSA #
Plan File # OSHPD #
Government Contract # Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
Concrete Soil — —Conc: Mix #/psi —Plans
Prestress Conc Base ________ Conc: Mix #/psi -----Specifications
Masonry Subgrade Conc: Mix #/psi Sizes
Struct Steel Asphalt Concrete ________ Rint: Rebar Slump
Fireproofing Concrete Cylinders — —Rinf: W.W.F. ________________ -Air Content
--Pile Driving Conc Flex Beams _______ Rint: Tendons Temperature
Won-Destructive ________ Reint. Steel ________ Grout: Mix #/psi Unit Weight
-Batch Plant -Tendon (PT Strands) _______ -Mortar: Type/psi Consolidation
,-'Soils Technician -Mortar Samples _______ -Units: Block _______ Electrode Storage
Mechanical _______ Grout Samples _______ Units: Block -Torque Applied
Electrical Masonry Prisms Steel Load (Pounds)
-Bolt Pull-Out Masonry Block _______ H.S. Bolts Thickness
Rooting Steel _______ -Metal Decking
Waterproofing H.S. Bolts _______ Electrodes
DSA ________ Fireproofing Fireproofing
OSI-IPD Rooting _______Other____________________ Corrective action required
Specialty Other _____________________________ -Corrections completed
Remarks ZA.,
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable Code.
INSPECTOR'S NAME /Cht*t~ I rint Clearly)
INSPECTOR'S SIG NATU RE4!~,-70,
CERT. NO.
r' DATE c, —gn
Form#00
Testing Engineers-San Diego, Inc.
if 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Al
Established 1946
Project Name ii 1/ i (A1t7I"/ L'M '
Project Number 9 9 - 579 — Test Date - Page 42... of
Client iiX tt d'/oI
Test # Material Structure Test Location and Elevation or Depth relative to...
/ 5 Wz
15 Tove Dc - / '& Da l
3 5 '' e7Q c3c- —i F6
V vi, /6% / 6/i V ,&, e j '5
5~1 £V1-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # I
3
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf) 1/L4 ,/q,7 ,pi,g 12.o
Moisture (%) 49.3 .4 /3./ Y, 5- 1
MD Curve Number
Maximum Density (pcf) — _- -
Optimum Moisture (%)
Relative Compaction, RC (%) £7 ?5 7 17-:5-
Relative Moisture, RM (%) -''7 .34 j- ( -),
Specified RC (%) q 5 .___ .- - -
Specified RM (%) 1-z /'-2 t-z , - t-2
Conformance (Yes/No) It
Nuclear Gauge Model and Serial Number: 121 ,1Te -
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: fi //fJA Signature
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Tecfician
Testing Engineers - San Diego, Inc.
t
Page 1 o
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Project Name live & TESD Project #
Address
General / Subcontractor
Building Permit # DSA #
PlanFile # _________________________________OSHPD #_____________________________________
Government Contract # _____________________________Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
concrete Soil - -conc: Mix #Ipsi Plans
Prestress Conc Base _______ Conc: Mix If/psi Specifications
Masonry )tgrade - -Conc: Mix if/psi-Sizes
Struct Steel Asphalt concrete _______ -Rini: Reber _________________ Slump
Fireproofing 0 _______ Concrete Cylinders -Rini: W.W.F. ________________ -Air Content
-Pile Driving Conc Flex Beams _______ -Rini: Tendons ______________ Temperature
-Non-Destructive _______ Reinf. Steel _______ -Grout: Mix If/psi _____________ -Unit Weight
__,4ch Plant _______ Tendon (PT Strands) _______ -Mortar: Type/psi -Consolidation
Soils Technician _______ Mortar Samples _______ -Units: Block _______ Electrode Storage
Mechanical -Grout Samples _______ Units: Block -Torque Applied
Electrical -Masonry Prisms _______ -Steel ______________________ _______ Load (Pounds)
-Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts _______ Thickness
Roofing SteSt _______ -Metal Decking
Waterproofing -H.S. Bolts _______ -Electrodes
DSA Fireproofing Fireproofing
OSHPD Roofing Other__________________ Corrective action required
Specialty Other ____________ ________ _____________________________ ________ Corrections completed
Remarks
q7 f 1p(&O A9 i
2147
T- (2
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code. -,
INSPECTOR'S NAME (Jeke 5'"'
(Print CIer1y)
INSPECTOR'S SIGNATURE
CERT. NO.
DATE Form#003
0 SOIL (ASTM D2922 and D3017) 0 AC (ASTM D2950)
REPORT OF
NUCLEAR DENSITY TESTS
TEST RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS
Standard Count - Density
Standard Count - Moisture
Probe Depth . .
Moist. Content %
Wet Density . ((( 2 ('3 2 z- /30,
WET DENSITY . Dry Density. (MOIST. -~ 100) X 100 f2.10 -z_ /Z/r 7...//' /2_c 7
Maximum Density
Optimum Moisture %
% of Maximum Density q.7
% Density Required
IEhEIIIIIi Does m
Test Numbers
3
Date Tested
MD Curve No.
TEST LOCATIONS
5 G—
If 'p
1' eA .
fz (t 'C r
i Zf'O
COMMENTS
GUAGE MODEL . I GUAGESIN
S
I .
PROJECT 1... WORI< REQUESTED BY PROJECT NUMBER
, q g- ..79 '-
TECHNICIAN I NOTIFIED (SIGNATURE) DATE AT PROJECT SITE BY PHONE
. El El
THIS REPbRT DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO BUILD
PER THE PLANS, SPECIFICATIONS AND ALL APPLICABLE CODES
WHITE - Office CANARY- Field Technician PINK - Contractor
, CX -,
-
TestingEngineeis - SanDiego,Inc Established 1946
FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS
Date: July 10, 2000
Job Number: 1999-519G
Job Name: Davis Avenue Waterline
Address: Davis Avenue
Carlsbad, CA
Report Number: 1040
Plan Number: N/A
Pen-nit Number: N/A
Accompanying this cover sheet are the field compaction test results and related
construction monitoring reports for the referenced project. These reports are for the
following date(s):
June 27, 2000
June 28, 2000
The tests were performed in accordance with generally accepted standards and do not
constitute engineering opinions or project control. It is the responsibility of the
contractor to schedule retests or reinspections of any areas that do not meet project
specifications. This information does not relieve the contractor of his responsibility for
constructing the project in accordance with plans, specifications, and all applicable codes.
We appreciate the opportunity to provide materials testing service on this project. Should
you have any questions regarding the accompanying information, please contact our
office at (858) 715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc
Larry lark, GE 219
Vic President, Engineering
Total Pages Attached (4)
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego. CA. 921 1I [858) 715-5800 Fax [858] 7 15-58 10
Testing Engineers - San Diego, Inc.
j ... 7895 Convoy Ct., Suite 18
Page lof
San Diego, CA 92111
-, INSPECTION REPORT
. '' ,,- ,
.. /, / ,•_ -., .. -
Project Name / TESD Project # 7 ./
Address /- A'4 7
General / Subcontractor . J
Building Permit # DSA#
Plan File # OSHPD #
Government Contract # Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
concrete _______ Soil _______ Conc: Mix #/psi Plans
Prestress Cone Base ________Cone: Mix ft/psi Specifications
Masonry Subgrade '. _______ _______ Conc: Mix ft/psi _____________ -Sizes
Struct Steel Asphalt concrete _______ _______ Rinf: Rebar ________________ Slump
Fireproofing Concrete Cylinders Rinf: W.W.F. _________________ -Air Content
—Pile Driving Cone Flex Beams _______ _______ Rinf.- Tendons ______________ -Temperature
Non-Destructive _______ Reinf. Steel _______ . -Grout: Mix ft/psi _____________ -Unit Weight
Batch Plant _______ Tendon (PT Strands) _______ Mortar: Type/psi -Consolidation
"Soils Teóhnician _______ Mortar Samples _______ _______ Units: Block ________________ -Electrode Storage
Mechanical _______ Grout Samples . _______ -Units: Block -Torque Applied
Electrical . . -Masonry Prisms _______ _______ Steel ..4. Load (Pounds)
Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts _______ Thickness
Roofing Steel . _______ Metal Decking
Waterproofing H.S. Bolts Electrodes
DSA Fireproofing .. Fireproofing
_______OSHPD . Roofing . ;.,._.. Other___________________ ______ColTedive acton required
Specialty . _______ Other ___________ . .—. '::. ___________________________ -Corrections completed
Remarks
2;-5 /' 5/,.. •:$ c:57; :
- 1_/•,
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
;;;7 .' ._, ,• .-
INSPECTORS NAME
(Pnhi Clearly)' -7
// •7_
INSPECTOR'S SIGNATURE
.
CERT. NO.
DATE
- Form#003
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
(858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name L4Z'2'5 74/6 7Z/
Project Number /999 6/96 Test Date Page _L. of /
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
Z
/i
/? .e
. .c~ 3'•
____ ____ ____
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# /
Probe Depth (inches) ZZ4Qd ._-...
Wet Density (pcf) 24 /i
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf) lo
Optimum Moisture (%)
Relative Compaction, RC (%) 5' 95 95 97 974Y4V1 9:7
Relative Moisture, RM (%)
Specified AC (%) _-
Specified AM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name: , Signature
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers - San Diego, Inc.
' 7895 Convoy Ct., Suite 18 Page lof
San Diego, CA 92111
INSPECTION REPORT
Project Name 4"ë ''' TESD Project #
Address "tf c'2 rd-ci,
General I Subcontractor
Building Permit # DSA #
Plan File # OSHPD #_____________________________________
Government Contract # Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
_______ Concrete Soil -Conc: Mix #/psi Plans
________ Prestress Conc ________ Base ________ -Conc: Mix #/psi Specifications
Masonry Subgrade -Conc: Mix It/psi Sizes
_______ Struct Steel Asphalt Concrete _______ _______ Rinf: Rebar Slump
Fireproofing _______ Concrete Cylinders _______ Rinf: W.W.F. -Air Content
-Pile Driving Conc Flex Beams _______ _______ Rinf: Tendons ______________ -Temperature
Non-Destructive _______ Reinf. Steel _______ -Grout: Mix #/psi _______ Unit Weight
-Batch Plant Tendon (PT Strands) -Mortar: Type/psi -Consolidation
LSoils Technician _______ Mortar Samples -Units: Block -Electrode Storage
Mechanical Grout Samples Units: Block -Torque Applied
Electrical Masonry Prisms -Steel Load (Pounds)
Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts Thickness
Roofing Steel _______ _______ Metal Decking
Waterproofing H.S. Bolts _______ -Electrodes
DSA Fireproofing Fireproofing
OSHPD Roofing -Other _______ Corrective action required
Specialty Other ____________ ________ _____________________________ -corrections completed
Remarks /C'é 2V' cc-
9'25- 72A( -1
z5O' F1 -
969
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME !f.1
Clearly)
INSPECTOR'S SI G NATU R ______________________________
CERT. NO.
DATEC7 -
Form F0_03
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
4e2<'cc
Test Date_ Page of
Arm
Established 1946
Test # Material Structure Test Location and Elevation or Depth relative to...
/ 4 /7 2521 sA4' 4'c
'f
3 .4z- /2 253C)
4 Ile, 1 /7 Z557 ,'Ile
Material: S = Soil, AC = Asphalt Concrete,'ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf) .4'Z
Optimum Moisture (%) . .
Relative Compaction, RC
Relative Moisture, RM
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician:
Client's or Contractor's Acknowledgement Name:
White- Office Yellow- Contractor . Pink- Field Technician
Testing Engineers - San Diego, Inc. Established 1946
FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS
Date: June 23, 2000
Job Number: 1999-519G
Job Name: Davis Avenue Water Line
Address: Carlsbad, California
Report Number: 1353
Plan Number: N/A
Permit Number: N/A
Accompanying this cover sheet are the field compaction test results and related
construction monitoring reports for the referenced project. These reports are for the
following date(s):
June 12, 2000
The tests were performed in accordance with generally accepted standards and do not
constitute engineering opinions or project control. It is the responsibility of the
contractor to schedule retests or reinspections of any areas that do not meet project
specifications. This information does not relieve the contractor of his responsibility for
constructing the project in accordance with plans, specifications, and all applicable codes.
We appreciate the opportunity to providematerials testing service on this project. Should
you have any questions regarding the accompanying information, please contact our
office at (858) 715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc
7ce
la rk,GE 219
esident, Engineering
Total Pages Attached (1)
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego, CA. 921 1I [858] 7 15-5800 Fax [858] 7 15-58 10
Testing Engineers - San Diego, Inc. (3 '
Page j_of_
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Project Name 1?" TESD Project # cLSfc1 6
Address 4\'1e / -/ /h -
General / Subcontractor t1 1-'1S
Building Permit # DSA#
Plan File # OSHPD #
Government Contract # Other f-
1—
INSPECTION MATL SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
concrete _______ Soil conc: Mix ft/psi Plans
Prestress Conc Base ________ ________ Conc: Mix ft/psi Specifications
Masonry Subgrade Conc: Mix ft/psi Sizes
Struct Steel Asphalt concrete _______ _______ Rint: Rebar Slump
Fireproofing Concrete Cylinders _______ Rint: W.W.F. ________________ -Air Content
Pile Driving Conc Flex Beams _______ _______ Rint: Tendons ______________ Temperature
Non-Destructive _______ Reint. Steel _______ -Grout: Mix ft/psi _____________ -Unit Weight
-Batch Plant -Tendon (PT Strands) -Mortar: Type/psi _____________ -Consolidation
Soils Technician Mortar Samples _______ Units: Block -Electrode Storage
Mechanical -Grout Samples -Units: Block -Torque Applied
Electrical _______ Masonry Prisms _______ _______ Steel _______ Load (Pounds)
Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts _______Thickness
Rooting Steel _______ _______ Metal Decking
Waterproofing H.S. Bolts ________ -Electrodes
DSA Fireproofing Fireproofing
OSHPD Roofing ______Other___________________ Corrective action required
Specialty Other ____________ ________ _____________________________ -Corrections completed
Remarks C-i -Wr')t VCA,
?"e 7-F "p iç7" I'D tiLF
'On y viA 1
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME /'f. /?'7-/4) CERT. NO. (Print Clearly)
Form#003 INSPECTOR'S SIGNATURE tJ - DATE
Testing Engineers- San Diego, Inc. Established 1946
FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS
Date: June 15, 2000
Job Number: 1999-519G
Job Name: Davis Avenue Water Line
Address: Carlsbad, California
Report Number: 1287
Plan Number: N/A
Permit Number: N/A
Accompanying this cover sheet are the field compaction test results and related
construction monitoring reports for the referenced project. These reports are for the
following date(s):
June 5, 2000 June 6, 2000 June 7, 2000
The tests were performed in accordance with generally accepted standards and do not
constitute engineering opinions or project control. It is the responsibility of the
contractor to schedule retests or reinspections of any areas that do not meet project
specifications; This information does not relieve the contractor of his responsibility for
constructing the project in accordance with plans, specifications, and all applicable codes.
We appreciate the opportunity to provide materials testing service on this project. Should
you have any questions regarding the accompanying information, please contact our
office at (858) 715-5800.
Respectfully submitted,
Testing Engin ers - S Diego, Inc
-/,/,,
LarryC1.ttrk,~t*219
Vice resident, Engineering
Total Pages Attached (6)
Testing Engineers - San Diego, Inc.. 7895 Convoy Court. Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810
•. i7
- O Testing Engineers - San Diego, Inc. Page iof
7895 Convoy Ct., Suite 18
f
San Diego, CA 92111
INSPECTION REPORT
Project Name LZVLi t(?A- ft',e TESD Project #
Address
General / Subcontractor
Building Permit # DSA #
Plan File # _________________________________OSHPD #_____________________________________
Government Contract # _____________________________Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
Concrete _______ Soil Conc: Mix #/psi Plans
Prestress Conc ________ Base ________ ________ Conc: Mix #/psi Specifications
Masonry Subgrade Conc: Mix #/psi Sizes
Struct Steel Asphalt Concrete _______ _______ Rinf: Reber Slump
Fireproofing Concrete Cylinders - -Rinf: W.W.F. _________________ -Air Content
Pile Driving Conc Flex Beams _______ _______ Rinf: Tendons Temperature
Non-Destructive ________ Reint. Steel ________ -Grout: Mix #/psi ______________ -Unit Weight
Batch Plant _______ Tendon (PT Strands) -Mortar: Type/psi _____________ -Consolidation
Soils Technician _______ Mortar Samples -Units: Block _________________ _______ Electrode Storage
Mechanical -Grout Samples -Units: Block _______________ -Torque Applied
Electrical -Masonry Prisms _______ -Steel Load (Pounds)
Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts -Thickness
Roofing Steel _______ -Metal Decking
Waterproofing -H.S. Bolts _______ -Electrodes
DSA Fireproofing Fireproofing
OSHPD Roofing _______Other_____________________ _______Corredive action required
Specialty Other ____________ ________ _____________________________ -Corrections completed
Remarks cbt c C4c&feI q¼op C(Z,,-Ce(,-4I 14)/ ,?
>/c ;;S~xh V. '"r 7 '
/1A c.eIc/i/ f/1eç k' S' Q 7& £7 4P41) L6k A I4 7t
ACOy/
LI & G Ai 7& h ,,f' I-
12i1Jt yQ7' j
a)te) /2-<'Lic • c ,pj , op
CdLpf -kr'-, ir& /1
eld Representative ALL -
w C/( - ______________
CERTIFICATION OF COMPLIANCEL11 ofthe obser work, unless otherwise stated, is in conformance with the approved plans and CERTIFICATION OF COMPLIANCE All of
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME CERT. NO. (Print Clearly)
61, rb INSPECTOR'S SIGNATURE DATE Fo#003 7
7895 Convoy Court, Suite 18, San Diego, CA. 92111
Q
Testing Engineers-San Diego, Inc. Established 1946
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name D'4 AV€. tAJA 1' i7
Project Number 9Q -t/9 G Test Date Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
L Qj '7/ 6A t&I 0w,s Ave VE
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches) er
Wet Density (pcf) i,c'.c
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC (%) _-
Relative Moisture, RM (%) ,
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: 't1FlA'1Signa
Ze Client's or Contractor's Acknowledgement: Name: 'X )'vsigna: SWX,'-L, Sp,..LiZ
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers - San Diego, Inc.
/ Page 1 of
7895 Convoy Ct., Suite 18 - -
San Diego, CA 92111
INSPECTION REPORT
Project Name 4' c€ TESD Project #
Address
r
General / Subcontractor 1*.
Building Permit #
Plan File #
Government Contract #
DSA#
OSHPD #
Other £iJc cvf
L—QcItI- 77(
INSPECTION
Concrete
Prestress Conc
Masonry
Struct Steel
MAT'L SAMPLING QTY
_______ Soil _______
Base
Subgrade
Asphalt Concrete _______
MATERIAL VESCPNION
_______Conc: Mix#Ipsi
—Conc: Mrx #/psi
Conc: Mix U/psi
_______ Rinf: Rebar
INSPECTION CHECKLIST
Plans
Specifications
Sizes
Slump
Fireproofing Concrete Cylinders. _______ Rinf: W.W.F. ________________ -Air Content
—Pile Driving Conc Flex Beams _______ _______ Rint: Tendons _______________ Temperature
Non-Destructive _______ Reinf. Steel _______ -Grout: Mix U/psi _____________ -Unit Weight
Batch Plant -Tendon (PT Strands) -Mortar: Type/psi -Consolidation
)Q Soils Technician _______ Mortar Samples -Units: Block -Electrode Storage
Mechanical -Grout Samples _______ _______ Units: Block _______Torque Applied
Electrical -Masonry Prisms _______ _______ Steel _______ Load (Pounds)
-Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts Thickness
Roofing Steel _______ _______ Metal Decking
Waterproofing H.S. Bolts -Electrodes
_______ OSA Fireproofing Fireproofing
______ OSHPD Roofing ______Other__________________ ______ Correiveaction required
Specialty Other ____________ ________ _____________________________ ________ Corrections completed
o
f4Cfk/ ,,L
Ct r?c0 '2 %sM' S 7
t4 c' c
7;j,- 'e7c (ijr
9c- 4 4 j '
Col. ç dq- i5J Av, ti
ld entef
- i CERTIF ATI"OFCOM IANCE: All of the observed work, unless otherwise stated, IS n conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
-
INSPECTOR'S NAME 1 d27 £- ti-v'
Prin Clearly)
INSPECTOR'S SIGNATURE
7
CERT. NO.
DATE Formli003
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number - -i/ 6 Test Date Page _IL of
Client 7 h<.4
Test # Material Structure Test Location and Elevation or Depth relative to... ig
Al Q /)/4 f /
/LcAJ 1._ 112g' —J
3 S vL— 1O'.S --- 1;c'j -
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 1
Probe Depth (inches)
Wet Density (pcf) j,f' f/.:.
Dry Density (pcf) fZ)
Moisture(%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC (%)
Relative
11:Y4
Moisture, AM (%)
Specified AC
Specified RM
Conformance (Yes/No) AA I /1 I
Nuclear Gauge Model and Serial Number: I 7T'1lC'7<. Z,s_1743 clW -Al P-7116-K5
This report does not relieve the contractor or theit responsibility for performance in accordance with the plans, specif1ations and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: /24( Avb4
I Fztur Client's or Contractor's Acknowledgement: Name: ?1t1e"7' Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
San Diego, CA 92111
INSPECTION REPORT
Page 1 o I
Project Name TESD Project#
Address xiA< /4c2tQ/ (jZ 6eeP
General / Subcontractor
Building Permit # DSA#
Plan File # OSHPD #f
Government Contract # Other . 1 CQ/ SS4f
I - 14JZ A_ 77 A'
INSPECTION MAT'L SAMPLING QTY MATERI,L D [N INSPECTION CHECKLIST
Concrete _______ Soil -Conc: Mix #/psi Plans
________ Prestress Conc ________ Base ________ ________ Conc: Mix #/psi Specifications
Masonry Subgrade Conc: Mix #Ipsi Sizes
_______ Struct Steel Asphalt Concrete _______ _______ Rift: Reber Stump
Fireproofing Concrete Cylinders _______ Rift: W.W.F. -Air Content
Pile Driving Conc Flex Beams _______ _______ Rinf: Tendons Temperature
Non-Destructive _______ Aeinf. Steel _______ -Grout: Mix #/psi -Unit Weight
Batch Plant Tendon (PT Strands) _______ -Mortar: Type/psi -Consolidation -
' Soils Technician _______ Mortar Samples -Units: Block Electrode Storage
Mechanical _______ Grout Samples _______ -Units: Block -Torque Applied
Electrical Masonry Prisms Steel Load (Pounds)
-Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts -Thickness
Roofing Steel _______ _______ Metal Decking
Waterproofing H.S. Bolts _______ _______ Electrodes
_______ DSA Fireproofing Fireproofing
______ OSHPD Roofing ______Other____________________ ______ Conedive action required
Specially Other ____________ ________ _____________________________ -corrections completed
Remarks /rtQ- Q)'I
hj 7 .Sr(p
/1 i —c1 i-P frA< q'ø 4-7 i(
,t &-eje-- 9T
ft 42jpI c9 ?(1L -cq'-- fl-
U &2!&w o(4 . /-.-- ?7 41?
17L,4cP 6
Je A7 ReJative#
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME
/ (Print Clearly) CERT. NO.
INSPECTOR'S SIGNATURE DATE____________________
Form#003
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
-et)1S /+AQ Cc-A //'u' Project Name
Project Number 9 Test Date /) /0D Page of
Client 3 IV
Test # Material Structure Test Location and Elevation or Depth relative to...
L
*- _3 S _r&w1j4e_S3o
f-(& 12.e
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# I
Probe Depth (inches) 8 51/
WetDensity (pcf) [33. /.?3.Cl
DryDensity (pcf) I ;)q ..A Jjj .3
Moisture (%) 1t/L /7'
MD Curve Number / I
MaximumDensity(pcf) . /)*
OptimumMoisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)- 0.9 -I'8
Specified RC
Specified RM
Conformance(Yes/No) )'cz..c I ')f.A
Nuclear Gauge Model and Serial Number: 7&X_C.ZT( _3'Y/(s_(_/Li j .-c1
This report does not relieve the contractor or their responsibility for performance in accordance with the plar'6, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician:
Client's or Contractor's Acknowledgement:
Name:
Name:
-77i)L-J Signa
-W.
________
Si nature: _________________
White- Office Yellow- Contractor Pink- Field Technician
ATLANTIC CITY
RAHWAY
FT. LAUDERDALE
ORLANDO
SAN DIEGO
Testing Engineers - San Diego, Inc.
Established 1946
7895 Convoy Ct., Suite 18 (619) 715-5800
San Diego, CA 92111 (619) 715-5810
ri
NOTIFICATION OF INSPECTION HOURS
Date: Job Number:
Job Name: L-ihS JJ4 41A
Address:
Type of Inspection:
DATE START STOP REG.HOURS OT HOURS
TESTING ENGINEERS - SAN DIEGO, INC.
Inspector Name:
For verification purposes only, does not necessarily imply responsibility for cost of inspection:
Verified By:
(Signature I Print Name)
Company:Q 0~- ,
Form#004
Testing Engineers — San Diego, Inc.
Established 1946
7895 Convoy Ct., Suite 18 (619) 715-5800
San Diego, CA 92111 (619) 715-5810
ATLANTIC CITY
RAHWAY
FT. LAUDERDALE
ORLANDO
SAN DIEGO
NOTIFICATION OF INSPECTION HOURS
Date: ___Job Number:___________________
Job Name: /& 1-
Address: -
Type of Inspection: "-e
DATE START STOP REG. HOURS OT HOURS
TESTING ENGINEERS - SAN DIEGO, INC.
Inspector Name:
For verification purposes only, does not necessarily imply responsibility for t of inspectior)
Verified By:
(Signature / Print Name)
Company:
Fom#004
ATLANTIC CITY
RAH WAY
FT. LAUDERDALE
ORLANDO
SAN DIEGO
qF-
IN it%
Testing Engineers - San Diego, Inc.
Established 1946
7895 Convoy Ct., Suite 18 (619) 715-5800
San Diego, CA 92111 (619) 715-5810
NOTIFICATION OF. INSPECTION HOURS
Date: Job Number:_________________
Job Name: jVC
Address:
Type of Inspection:
1(-L. cbLe32
DATE START STOP R,GmOURS OT HOURS
TESTING ENGINEERS - SAN DIEGO, INC.
Inspector Name: _____________________________
For verification purposes only, does not necessarily imply responsibility for cost of inspection:
Verified By:
(Signature / Print Name)
Company:
Forrn#004
q —>
LI
I
Testing Engineers - San Diego, Inc. Established 1946
FIELD COMPACTION AND CONSTRUCTION MONITORING REPORTS
Date: June 12, 2000
Job Number: 1999-519G
Job Name: Davis Avenue Water Line JUL 9 2000
Address: Carlsbad, California
Report Number: 1254
Plan Number: N/A
Permit Number: N/A
Accompanying this cover sheet are the field compaction test results and related
construction monitoring reports for the referenced project. These reports are for the
following date(s):
June 1, 2000
The tests were performed in accordance with generally accepted standards and do not
constitute engineering opinions or project control. It is the responsibility of the
contractor to schedule retests or reinspections of any areas that do not meet project
specifications. This information does not relieve the contractor of his responsibility for
constructing the project in accordance with plans, specifications, and all applicable codes.
We appreciate the opportunity to provide materials testing service on this project. Should
you have any questions regarding the accompanying information, please contact our
office at (858) 715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc
4LarryGE 219
t, Engineering
Total Pages Attached (1)
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax (858) 715-5810
Testing Engineers - San Diego, Inc.
7895 Convoy Ct., Suite 18
Page 1 o
San Diego, CA 92111
INSPECTION REPORT
Project Name +Y 7 TESD Project #
Address
General / Subcontractor
Building Permit # DSA#
Plan File # OSHPD #
Government Contract # Other
INSPECTION MAT'L SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
Concrete _______ Soil -Conc: Mix #/psi Plans
________ Prestress Conc ________ Base ________ -Conc: Mix #/psi Specifications
Masonry Subgrade / _______ Conc: Mix #/psi Sizes
________ Struct Steel Asphalt Concrete ________ ________ Rinf: Reber Slump
Fireproofing _______ Concrete Cylinders _______ Rinf: W.W.F. _______________ -Air Content
-Pile Driving Conc Flex Beams _______ _______ Rinf: Tendons Temperature
Non-Destructive _______ Reinf. Steel _______ -Grout: Mix #/psi -Unit Weight
Batch Plant -Tendon (PT Strands) _______ -Mortar: Type/psi -Consolidation
Q Soils Technician _______ Mortar Samples -Units: Block -Electrode Storage
Mechanical -Grout Samples -Units: Block -Torque Applied
Electrical Masonry Prisms _______ _______ Steel Load (Pounds)
-Bolt Pull-Out Masonry Block _______ _______ H.S. Bolts -Thickness
Roofing Steel _______ _______ Metal Decking _______
Waterproofing -H .S. Bolts _______ -Electrodes __________________ _______
DSA _______ Fireproofing Fireproofing
OSHPD Roofing ______Other__________________ ______ Corrective action required
Specialty Other ____________ ________ _____________________________ ________ Corrections completed
Remarks 4-,-q>. 4, 2 1,3-e ,'7nl
,,
;/ ,
hf 7 &Cz.it C- b d
74JZf\QJ CAI1
i /7a?.all -17 i /tc by 9
)7 y A4 . 7Z t2n
ç(
) D,/c/Q, CLC (
I . "J.
Field Representative #
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and
specifications and the workmanship provisions of the applicable code.
INSPECTOR'S NAME )'-/'v'
(Print Clearly)
INSPECTOR'S SIGNATURE
CERT. NO.
DATE
Formll003