HomeMy WebLinkAbout3551; POINSETTIA LANE OVERHEAD WIDENING; COMPACTION TEST DATA (2001-2002); (2)( k. _~? _55 1
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name rt se,4 ; ca— L .i
Project Number 2-'O I - I ' '/ Test Date Page _L_. of
Client ?'-' is 6J
Test # Material Structure Test Location and Elevation or Depth relative to...
752..-I-
_ - 73+ I 77f Cf t7
/
7-Z'? I' Lj'
3' " I 75 -7 +6 c "
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf) '3$ j , -1-2.13,574 ( I3C.z 1 31,11Y .1, 7 13 Lj
Dry Density (pcf) (TII—S j3 o 2-r4 /7o17 Ijq. J33. I?4. -_- Moisture (%) 167 6. ( ç, S. 11 1571 1 MD Curve Number -- _______ _______ _______ _______ _______
Maximum Density (pcf) /jf
-- Optimum Moisture (%)
Relative Compaction, RC (%) 56. 2. T5, 2- 5',16 I72.. f7 17,3 qt
Relative Moisture, RM
Specified RC(%) 9S --
Specified RM
Conformance (Yes/No)
_
Nuclear Gauge Model and Serial Number: Ttpx1e4- .3 t3c' 3 2. 7 .2..
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: Ke.k 'b&v I L_ Signature: I Client's or Contractor's Acknowledgement: Name: ('14$.- '(rh1tt*nature: I Lt
White- Office Yellow- Contractor Pink- Field Technician
Ej Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
UL
o TestIng Engineers- Inland Empire
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732 Page 1 of
Date:
Job Name: f rr
Address: 3 S5/ /o (kpe..t/JL.. Lj.- C.s-r ij J, C-t4
Job No. a Oo / — /$' /0
Client/Contractor: C.*y oI C---(s 4-oA / /itV Z..C7
Field Report 0 Notice to Comply
Soil o Concrete
ice Performed: 0 Asphalt Concrete o Pre-stress Concrete
0 Engr. Observation 0 Masonry
0 Structural Steel 0 Waterproofing
0 Fireproofing 0 Roofing
[ Other d C
eck List: 0 Soils Report 0 Plans 0 Specs.
it #: Plan File #: 3 L / DSA #:
ment: .44 atf.
Lnn
rformed (see attached) Sample Type:
0 RFI 0 Codes
OSHPD #:________________
r1q Ae - — j-Pt-
, 6j L t h
i i(L) 75 1cp CitC i-C
71 et -L e/ 1 -4 74f57 A4*çP
482 71e.j i c j 6-1-. 7o (2) dS
-1-i;,- 71. % f 7 r Y. 7j3 # 2-5
ce-vp *i ii•-- g -L )
DTIIt'kTlf,.I ...,-. -.......- uu vi ui ooseeu work, unress otneise stated, is in conformance with the approved plans and specifications and
the workmanship provisions of the applicable code. For any "non-conforming' items the contractor shall schedule TESD for reinspection and retesting.
Inspector's Signature/Name
Approval Signature/Name/Cor
TESO Form: 100-01
Cert. No.
Date:
Testing Engineers-San Diego, Inc. - Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 7 ? Po &re.- L
Project Number 01_ ( '/0 Test Date 2( %_t.ic?' 2,sZ2_ Page Of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
__ ,c-a P q-'s-
2 4-8 P S - fr-#->
1.73(t1
Lf S 3
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggr.egate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structurai Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf) /37, 2.. 1I7ft 131,rK 13S,6
Dry Density (pcf) I3O(, I!
Moisture (%) , 6_3 1 3,1
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) 6 ---.7 4,5,
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC
Specified PM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: qts..-B
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: £ '..v- Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
O
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number &o / /? 'Yo Test Date 7 - 01 &'Z— Page 0 of
Client cry
- -
Test# Material Structure Test Location and Elevation or Depth relative .41..E4 g._) Sj C
41 S.
t ,46 O/J 7,F-I44t4cJ& 1Yaa'. icc.
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = 5fdewlk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches) /
Wet Density (pcf)
Dry Density (pcf)
Moisture(%) ç7
MD Curve Number
Maximum Density (pcf)
Optimum Moisture jr
Relative Compaction, RC (%)
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%)
Conformance (Yes/No) Y/)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name: Signature: :fL5_Tl1 -11&?CZ.
White- Office Yellow- Contractor Pink- Field Technician
6
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 5it9 /i
Project Number 2 ° t' I I 41 B Test Date . 25 Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
5 e 01 i 7 54
Izl @ 4ts .i fl
Material S = Soil, AC =Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, LI = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf) I11r. 3o I 3I
Dry Density (pcf)
Moisture (%) 4_i
zct
5_13
MD Curve Number 4
MaximumDensity (pcf) /1Jb )73) I-tf )c)-(O
Optimum Moisture (%) 7 ,0 Lt, 0 . JO _.0
RelativeCompaction, AC (%) i1' L
Relative Moisture, AM (%) - 2. ).')c C\ _
Specified RC S 5 CjI
SpecifiedAM (%) I -) - _3 2±3
Conformance(Yes/No)
_______ ______ 1 _______ _______ _______ _______ _______ ______ _______
Nuclear Gauge Model and Serial Number: ' _C e (V___t\1\_2_1_0 j 00_5
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: /4_tI v T,1 .__tif f Signature:
Client's or Contractor's Acknowledgement: Name: Hk _FLEW _ Signature: —
White- Office Yellow- Contractor Pink- Field Technician
£
e
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name ,'-24!
Project Number Z,J-/,/cj TestDate Pageof_._.
Client
Test # Material Structure Test Location and Elevation or Depth relative ' . ,,— ,cy
z - — /1 /, ." ,. ,' . "5 £. .,,' ''. 'F .4iu
3 — — — // .-, -, c' 7 • ,- ,4-t
7 — - — ,I / I, ,, /,• ,, (' /S . ,fl ç,A) .4-u-A '
— — -
F. f- 4c-
-r-.t (2,-',/tD
& 'V '
/0
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = AggreãtBase, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = S,i4owa1k, Curb/Gutter, 0 = Other
Test#
' y ,- - ___ /0 Probe Depth (inches)
'-/" c,.' ' y "
Wet Density (pot) /24LL _/Z y. /37. /2?. 7 /37 17?. - JJ'G .1. Dry Density (pcf) LZTJ LLZ /3'4 /3'-'' /31.7
-
I /3/. 13/. '77.
Moisture (%)
MD Curve Number
Maximum Density (pcf) - - -
Optimum Moisture (%)
Relative Compaction, RC (%) c z 78 g 7 - 7AL
Relative Moisture, RM (%)
Specified AC
Specified AM (%) ij
Conformance (Yes/No) y Y5 Y'i lei Yi.' P2s ,VJ Yii y•;::i 4-,;
Nuclear Gauge Model and Serial Number: 7-' ,--2 7-' 7ZQ 7d / 7
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: 4r.-4..,*,,--- Signature:
Client's or Contractor's Acknowledgement: Name: H4 qP1'Vnature:
White- Office Yellow- Contractor Pink- Field Technician
NO
122 iesting Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name A". &j
Project Number Test Date . Page of..
Client.
Test # Material Structure Test Location and Elevation or Depth relative to...
7 S -
—
___
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # 2:_
Probe Depth (inches) -,
Wet Density (pcf) $3 /3I. 0 --
Dry Density (pcf)
117,/QLZ Moisture (%) 7.c' 7.
MD Curve Number 3
Maximum Density (pcf)
--
Optimum Moisture (%)
Relative Compaction, RC (%) 7 7
Relative Moisture, RM (%) V. • _______ _______ _______ _______ ______ ______ _______ _______
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: C3 /21C3 9
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: 47
Client's or Contractor's Acknowledgement: Name: "14
White- Office Yellow- Contractor Pink- Field Technician
e))
Testing Engineers-San Diego, Inc. Established 1946
if 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 13.S77i -i--JE CV&-'r/V3 c-.
Project Number L I -I a 'Lo Test Date ô/ic,/a ei- Page _?..
Client
Test # Material Structure Test Location and Elevation or Depth relative ,90 /3 .
C L -3'G. /r
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0= Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number
MaximumDensity(pcf)
OptimumMoisture(%)
Relative Compaction, RC(%) 77
Relative Moisture, RM(%)
Specified RC
Specified RM(%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 4-') /076t
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: £__.-7i_•L4I4'7ignature:
Client's or Contractor's Acknowledgement: Name: M4 signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
ck,
Established 1946
Project Name #.rTuq IA\Z7 fE -i) J\JI r\1AJc
Project Number 2n/-15400 TestOate 5 '76()2- Page -Of
Client 4r Of
Test # Material Structure Test Location and Elevation or Depth relative to...
I AfL IiLT1 . &)i- PeiA)7T°(/1 (A&X ' CM11M' ~CCJt 4P17 E:Xv-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggr.egate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MID Curve Number
Maximum Density (pet)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%) qsi
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: T½?LLF.- 4V t 3hJ
This report does not relieve the contractor or their responsibility for performance in accordance with the pl and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: A&?L05 E. g,/-f.O Signature:
Client's or Contractor's Acknowledgement: __ Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
1' REPORT OF COMPACTION TEST DATA
Project Name
Project Number - ,'fo TestDate CpC4L--c Page 0 of
Client - 6 /
Test # Material Structure Test Location and Elevation or Depth relative /.,)O /•:C iZ-, ,o__
5- C, t
'/o
44
gb f(lr
il+7o
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture(%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) /4 0 ,, o
Relative Compaction, RC
--
Relative Moisture, RM (%)
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 2"'-' '-'c
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing -Technician: Name: ii441gnature:
Clients or Contractor's Acknowledgement: Name: It4_?L21PJ I I-IW1 Signature:
White- Office Yellow- Contractor Pink- Field Technician
1ting Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
IN'
O Testing Engineers - Inland Empire
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732 Pagel of
Date: 122'7 '20t'Z
J Iob Name: iJ'e/k,
ddress: 7?i'cSe7Y/ ~7
\b'cJ, Job No. ..2ooJ—_/O
høej (v'/S bad
Client/Contractor: __(iq/!h/ /_/I2.4,27 & cr74aC-/I 'iy_'16-rf.
0 Field Repoi1 0 Notice to Comply
Type of Service Performed:
0 pil Concrete 0 Structural Steel
'Asphalt Concrete o Pre-stress Concrete 0 Fireproofing
0 Engr. Observation 0 Masonry 0 Other
0 Waterproofing
0 Roofing
Inspection Check List: 'Soils Report 0 RFI 0 Codes
Building Permit #: Plan File #: DSA #: OSHPD #:________________
)n-Site Equipment: /M4f /A S,&;P1,9,2Qkf1/.2(4c4 /Mk7yf4k, j4Q4'l/f4clvc/PD //0j ./eaQf
Performed (see attached) Sample Type:
Dii- S' 7Mii 04W 1d i'2'f
iW• J-' /S/f,1pj/ éezzd &to I d
cS
4
£d,?
' Z6tEei 0pycY
iayIIy. xoaved 6' - ma4e/ 'a'f Jrc '2"
A . ,
/d Qtc4y-hei9 k e >'iy I761er ,4/i-i-mei ilaia-p.
aYef, 7I/fQ43I (/ #7
- - i .Jr V1rLIRI',,: #II
the workmanship provisions of the 7apc
Inspector's Signature/Name (
Approval Signature/Name/company
TESD Form: 100-01
coserveo work, unless otherwise statedt'is in conformance with the approved plans and specifications and
ide. For any non-conforming items the contractor shall schedule TESD for reinspection and retesting.
CertNo. ,
Date:
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
CL
Established 1946
Project Name /ine-Hi o/fl-r1' 1A//deii,y
Project Number 2oO/- /9O Test Date _/22/47 (?7.2ooZ S Page Z.of
Client (1i' (7i/thd
Test # Material Structure Test Location and Elevation or Depth relative to...
Al- F iQ417A (A11e) ,S4'/7o2), /4ilS'. fr . e/e- c
Ii
/27;c?.fr .
/ s / rs 1Cc
/ 1/ 5T fd 1 7f/' 1c-. 6r4/a' (
0l4y /213.fl.C-h/t'4&'Q )!
)1
/17 ,c P z
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggr.egate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
cc. %7Xo
Test# / 2 3 L/~'( 7 /0
Probe Depth (inches)'s—
Wet Density(pcf)
Dry Density (pcf) — - - — — —
/jQ — — — - c-
Moisture (%) -.- — - - - - -
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, AC (%) 9102 7 ¶3T c- b 7
Moisture, AM (%)
Specifled AC
PX~~'
Relative
Specified AM
Conformance (Yes/No) V' / V"*' J
Nuclear Gauge Model and Serial Number: 7JQr 3q_//-7/ 27c 7'/ins'-__/7gv/sf-2.
This report does not relieve the contractor or their responsibility for performnce in accordance with the pins specifications an/applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: Signature: ______________________________
White- Office Yellow- Contractor Pink- Field Technician
L~_
Project Name
Project Number
Client
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
çg7q,'o oiie- WicieM1aiq I
c200/— /Yo Test Date rn7 8201V Page of
Cy Cnr/thic1
Test # Material Structure Test Location and Elevation or Depth relative to...
14c
k P
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0= Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
-- ;i,;/;ecy' 2#ii ? (?j€/
Test #
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) - -
Relative Compaction, RC (%)
--
Relative Moisture, RM (%)
Specified RC (%) $_•
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for perforvance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: AYDI1 4.41f-S Signature:
Client's or Contractor's Acknowledgement: Name: -
White- Office Yellow- Contractor Pink- Field Technician
-- Testing Engineers-San Diego, Inc. Established 1946.
j 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name -1o.- Lv'e. tJJ
Project Number 2o I gL10 Test Date.] (k 2oo 2_ Page of
Client d
Test #_JMateriaI Structure Test Location and Elevation or Depth relative to...
L, ,-rk jLgth.1ev.
2 s1-c 2
3 $ Jc s- ,sqfoo (¼
'4 S s:c, - 7s-t+'?o I'
5 S I Sc St-.- 75! -75
ic.. ci- iT
7 5t- riq7-j--tc (¼
L/( -t-a-c 6,Pii 5,U cte lJ$eq L5"/Ye/owSfrt
_L43 P s-t-- 1- 7S
to A- P m. ti (5 . Is' it
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native So.il, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ( 3 1 S g q /0
Probe Depth (inches) 9 S
Wet Density (pcf) 37 IL L211i I 3L t I 12. B. i L3..4 13 8. (° L35L'1
Dry Density (pcf) 2-ii7 I!±I Moisture (%) 6,5 6 ,1-1 /0.3 .7 9, 1 9, 3 6 .7 1 6. '7.
MD Curve Number 3 S -
Maximum Density (pcf) _120,0 __,__
Optimum Moisture (%) I, D
Relative Compaction, RC (%) q4,11 Is.( 91,14 9 C16 ,0 &,, 9'S. 0 qt-li 51c)
Relative Moisture, RM
Specified RC (%)
Specified RM (%)
__
Conformance (Yes/No) j,.g4j Lf y e s
Nuclear Gauge Model and Serial Number: Troyde, 35 30 3 2 7 2. 2
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician:
Client's or Contractor's Acknowledgement:
Name: Kei't i...ViIa__ Signature:
Name: I1AI.I. FI_1Yrw!frWLvt12 Signature:
White- Office Yellow- Contractor Pink- Field Technician
(-k
- Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number cn (. /5 '/' Test Date 4=9 ( ) 5' _ Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to... 3
1 S P 2'c ..35 cr
- d—
c,. , -f--
___ z -'i
S2 7 fd e/ 'if-
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
- 3
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture(%)
MD Curve Number 34ZP
Maximum Density (pcf)
Optimum Moisture (%) //,.i 7
Relative Compaction, RC
Relative Moisture, RM (%)
Specified AC
Specified RM (%) ------- - _____
Conformance (Yes/No) Yf> Y-, I
Nuclear Gauge Model and Serial Number: 2?'-' C-2 -" 7'7&- (
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: (-r Signature:
Client's or Contractor's Acknowledgement: Name: v-. P Signature:
White- Office Yellow- Contractor Pink- Field Technician
Material
Structure:
-
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name 3'..55 L Li
Project Number Ot - Y( Test Date ZZ_AytA..(2..4r2.___. Page _..of._L
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
-S L -1- fl -ç--,. - - tv--L / q 4 C-i
Z. - P
,
i9+- '
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ', —.—
Probe Depth (inches)
Wet Density (pcf)ii'1 S3
Dry Density (pcf) is. iig,
Moisture (%) o iL? Il.4
MD Curve Number
Maximum Density (pcf)
- iS,
Optimum Moisture (%) /2 5 - -
Relative Compaction, RC (%)
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 1- a pie-v 39 I I . 5.2.'? .$
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Tech nician:
Client's or Contractor's Acknowledgement:
Name: - u I L_._ Signature:
Name: AR.oi7ij &iJsignature:a6b
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
CL-
Established 1946
Project Name (P1 c -+- La.e
Project Number 2'' I - I 54 0 Test Date V' 4.p.-i. ( '2.s t_ Page _L. of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
___-pr L. i
- - S1aL- LI i---5 o ,
3
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches) '- 's-'
Wet Density (pcf)
Dry Density (pcf)
Moisture(%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture
Relative Compaction, RC (%) j7/
Relative Moisture, RM(%) +0. ..
Specified RC
Specified RM (%)
Conformance (Yes/No) y )°~~.
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing- Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: MJ92l1 I TILt4'signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 3 1 Poi'ti <,e
Project Number '42 I \ ?4 7 Test Date " 7. 1, - ) 2_ Page of
Client Ze'7O C,0 yk p'tP.
Test U Material Structure Test Location and Elevation or Depth relative to...
I A C P Uti (t'-fy i-'t1 topi' 9' vJ W1OlA ¼tote
'2- AC. if It / .,-.j c.vd
A c r ii , , o - o(iote.
It
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggr.egate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density. (pcf) \43\ \ 45.5142.1 7
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC (%) qq
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously faile
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: N'\ c._ Signature:
Client's or Contractor's Acknowledgement: Name: /iJ'-l'L. fl1XZ Signature:
White- Office Yellow- Contractor Pink- Field Technician
011—
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number -2 &C (- í-/C.) Test Date Page. __of
Client /../e w_ 77,
Test # Material Structure Test Location and Elevation or Depth relative to...
r( /0 C
Material:
Structure: Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# /1 I
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture
Relative Compaction, RC (%)
- -
Relative Moisture, RM
Specified RC (°') '1 c
Specified RM (%)
Conformance (Yes/No) I I
Nuclear Gauge Model and Serial Number: 71-12) fa_ ' 7
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: Signature/
Client's or Contractor's Acknowledgement: Name:
White- Office Yellow- Contractor Pink- Field Technician
G_
Testing Engineers-San Diego, Inc. Established 1946
. 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name &( v\.S\A f-4
Project Number lot, i -l'1f 0 Test Date iY - ,5- 0 e Page_of_.
Client C11 Uf- t.y'tsL
Test It Material Structure Test Location and Elevation or Depth relative to...
I ____ VL (Aa'J M44rhAC .fL ;ttt. i',1p'j, D
371tt) . 1—U-
S W Ptor ;(,A d 1
'1- - WL 4- L; j_ r5 'f. i- cL_
WL i
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
' .±_...
Probe Depth (inches)
Wet Density (pcf)
___--..--
35.7 j•
oryDensity(pcf) 1L i± _l~i
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) j .O10,0 a 7i 9s
Relative Moisture, RM (%)
Relative Compaction, RC(%)
' j•-o f13 — ")- ______ ______ ______ ______ ______ ______
Specified RC 15
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 1to\- \- r01-go . * Cl4i'c ?I .
This report does not relieve the contractor or their responsibility for performance in accordance with the plálsA secifibations and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed t
o
/neet specifications.
See accompanying Daily Report of description of work and observations II A
TESD's TestingTechnician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: t)- t4Z Tor/v/&Masignature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number / '3 yo Test Date // Page __.of_._.
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
5
3 S t-- St4 I7S242-s
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
. ..j
Probe Depth (inches) /lb D
Wet Density (pcf)
Dry Density (pcf) lI1.3 ii Lts~
Moisture (%) T
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) 1/.0 Ii.
Relative Compaction, RC (%) 49
Relative Moisture, RM (%)
Specified RC
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: J40 5e Reen y.y%97q1iature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Offic Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
j. Liii Ov'e4'4 euA t"J (€ ;
20 Test Date
rul
Established 1946
---) -, Page of —
Test # Material Structure Test Location and Elevation or Depth relative to...
L
2
13
S
5
0
0
Sh I7Or 1 " 3 /b4tjq v
fz iS 3 -'r a, " 2" IJow
5
t __ 0 1?& 4irtco.vf rQAJOd4
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterlin? = S nitary S wer ST to ,Sewer U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other _tV'S?2t1' _k7t_v,e
Test# .5 2.A
Probe Depth (inches)
Wet Density (pcf) 1271 (, C I2 2 /33.0 132.3
Density (pcf) IDry J7 J±P±! ---....-.-..,---.-...
Moisture (%) iz 01 2
MD Curve Number
Maximum Density (pcf) 130,5 H:0,5 J3&5 /30.5 1305
Optimum Moisture (%) _
...;.
Relative Compaction, RC (%) 30 ZF 96 q 2-
Relative Moisture, RM (%) LO +i' q 6.3 -)-O 0.'!
Specified RC (%) q 5 q5 5 95
Specified RM (%) -
Conformance(Yes/No) j\J3 (\f' M, _p10
______
Nuclear Gauge Model and Serial Number: C1'N ft C>)5kJ_/''I_302.()_71C7t' _LT-.)_LIQ 101.I'i _-
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician:
Client's or Contractor's Acknowledgement:
Name: A'r..;y 3hh'&Signature:
Name: (4iw.4 rL0TIV_f49.'4. Signature:
White- Office Yellow-Contractor Pink- Field Technician
140
130
120
100
all
7C
COMPACTION TEST REPORT
Curve No.: 6
Project No.: 01-1840 Date: 3/8/02
Project: Poinsettia Lane Overhead Widening - Geo T&I
Location: NEW 12' DOMESTIC WATER LINE, STA 1754-50
0-3'
/
"J'lcvVED BY:
Remarks: TESD NO. 3945
22
MATERIAL DESCRIPTION
Description: OLIVE-BROWN SILTY SAND WITH GRAVEL
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%>314in.= % %<No.200
TEST RESULTS
Maximum dry density = 133 pcf
Optimum moisture = 7 %
Water content, %
Plate
TF:QTIMr. PMr.1K1;:r-PCZ
O Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name df7t .-a.i1 i1/kL?4'iar
Project Number )o () Test D 14ar 6 2002-
Clieit' CA
Test # Material Structure Test Location and Elevation or Depth relative to...
i s o -h0 51i-30 3
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Watejline, SS Srtitay Sewer, ST - Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other i)Ii - U'Jc*/rL,'1 ck
Test#
Probe Depth (inches)
Cl
Wet Density (pcf)
Dry Density (pet) (,9
Moisture(%)
MD Curve Number I/
Maximum Density (pcf)
Optimum Moisture (%) dr i 3
Relative Compaction, RC (%)
. -
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%) -
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number (ii: FN (C ) S/N 71( D3'5(O, (15
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
-
TESD's Testing Technician: Name: 1111 "Signature:
Client's or Contractor's Acknowledgement: Name: 114/iC— Signature:
White- Office Yellow- Contractor Pink- Field Technician
Established 1946
Page
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
C11
Established 1946
Project Name IMEi7iA L,q,'jc Ot w,eic
Project Number 2iOj- )5 "to Test Date FE Page _of.
Client £ 414 Of-
Test # Material Structure Test Location and Elevation or Depth relative to...
I 46 F IO)ti HUII 1O/t!&731A i%3104 gW7jjj ' 49-
2- 4j' f S' II6LE LOCRIED21,l i7s3#OI.et w
A r 15' Hurt La- ,1OQS1n SIOJ-' ' " 2'jTj'
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# j 2. -z.
Probe Depth (inches) Aft ?
Wet Density (pcf)
Dry Density (pcf)
Moisture (%) 61,6 71
MD Curve Number 5 ç ç
Maximum Density (pcf)
Optimum Moisture (%) (o G
Relative Compaction, RC(%)
Relative Moisture, RM (%) -' -
Specified RC (%) CcyJ9 cio/ ic '/
Specified AM (%) ....-'
Conformance (Yes/No) \
______
Nuclear Gauge Model and Serial Number: C121\j MC 5/t'..i C' fl 2-
This report does not relieve the contractor or their responsibility for performance in accordance with the plans specifications Und applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: Oh 6-6 t, /ekSignature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
'na.
COMPACTION TEST REPORT
Curve No.: 5
Project No.: 01-1840
Project: Poinsettia Lane Overhead Widening - Geo T&1
Location: STOCKPILE
Elev./Depth:
Remarks: TESD NO. 3718
Date: 2/28/02
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index
%> 3/4 in. = 2.9 % % < No.200 =
TEST RESULTS
Maximum dry density = 134.5 pcf
Optimum moisture = 6.5 %
140 Test specification:
ASTM D 1557-91 Procedure C Modified
130
120 100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
2.7
2.6 REVEWED "LOS CE
U, C
0 100
90 .ETJEEE III II I
80 III I II Ii - 1 - -
70 rmii T7
15
TTF
15 20 25 30 35 40
Water content, %
Plate
—TESTING ENGINEERS
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number i Test Date 2 /6 /cZ. Page Q. of .j.
Client i4'cjc5
Test# Material Structure Test Location and Elevation or Depth relativeto...",__/c',e-.,/ kI.jO I UP of—
fl . sf
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0= Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # ................_._._._t__ ----------
Probe Depth (inches)
Wet Density (pcf)
............ . . ............... .. ___ --
Dry Density (pcf)
. - ....
Moisture (%)
MD Curve Number
Maximum Density (pcf) y
Optimum Moisture
Relative Compaction, RC
Relative Moisture, RM (%) 3
Specified RC %)
--
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: J2c i'97ä
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESDs Testing Technician: Name: -igna-tu- re-
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor -- Pink- Field Technician
.17
/
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name c...-. `-'o i
Established 1946
Project Number - /.55'c Test Date Page ..L.of±
Client—
Test # Material Structure Test Location and Elevation or Depth relative to...
(' \•ç/
- / — 2
/
,., I le
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
:4 - ................ ... __-
Dry Density c
Moisture (%) 3'.
Wet Density (pcf).//.3,J3!................
..
/7/7
......... --........._ ......-.
MD Curve Number
Maximum Density (pcf) //CJ s- —'
Optimum Moisture (%)
. - - .. .. .........
Relative Compaction, RC
Relative Moisture, RM (%) ",7)5' -' f
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 7(3_1 MeY _5/i 3Tc)(O7-
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: — —
Client's or Contractors Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
O Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name -'sT2- Z,,-4----V i2,_72AL.O, -'• -'C.—
Project Number - / YC Test Date '/,-i/c, Page _.s2. of
Client
Test # Material Structure Test Location and Elevation or Depth relative /•_-
C
5
4
33
)
Z 3 ' '
•
7'crJ ' 3
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other f
Probe DepthDepth (inches)
WetDensity(pc..-- .
Dry Density (pcf) .......... ............zz.c
Moisture (%)
. .
MD Curve Number
Maximum Density L.....
Optimum Moisture
Relative Compaction, AC (%)
Relative Moisture, RM (%)
77 7f 75
,j7ç Q
- -- .--
Specified RM
Specified AC
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: t'-1
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Test # Material Structure Test Location and Elevation or Depth relative to...
, --.,s'--" ,ed c
7 ) S• 41
_____ - e.-' 'j " 3o c -' •/ - —•.—'c (A-c
9'
,t,,_,,
O
Testing Engineers-San Diego, inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number Test Date _______________ Page _.
Client c;._ --—'e:
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Probe Depth (inches)
Wet Density(pcf) 1L Q71 L..0 z 7 -_..--._ ...
Dry Density (pcf) ........_._......... zc //.!....... /i.L z.z /2iz
Moisture(%)
MD Curve Number
Maximum Density (pcf) )/c7 5_
Optimum Moisture (%)
Compaction,Relative .........Z7 . ....
Relative Moisture, RM (%)
Specified RC(%)
Specified RM (%)
._..j.
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: (.---- -/*7Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
O
Testing Engineers-San Diego, Inc. Established 1946
CA.- 7895 Convoy Court, Suite 18, San Diego, C 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name -—'e
Project Number / - / Vo Test Date Q tc/r- Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative
C r?cf)
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
Ii = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
. - ............
Moisture (%)
MD Curve Number
Maximum Density (pci)
Optimum Moisture
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: C'-'- ,-71C' ' '-3-'
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name: Signature: '
White- Office Yellow- Contractor Pink- Field Technician
Material
Structure: Structure:
O
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project
Client
Number Number 2-'o/. Test Date Page of
Test# Material Structure Test Location and Elevation or Depth relative to...é
/c. 1- ' 1
3
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
............
WetDensity(pcf)
-
Dry Density Densy(pc.)
---- ............
Moisture (%)
IQ2
75_ c
____
.
____ ____ ____ ____ ____
MD Curve Number
Maximum Density (pcf) - -
Optimum Moisture
- .- -
Relative Compaction, RC(%)
- ......
Relative Moisture, RM (%)
.._.
Specified RM (%)
Specified RC
.......
Conformance (Yes/No) y'e ,>'2.x y -., /e
Nuclear Gauge Model and Serial Number: ---' '2C.2' TC)/c 7
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: -
Client's or Contractor's Acknowledgement: Name: Signature: 4i !,.& /1
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
LK
Established 1946
Project Name
Project Number )ec/ — /9.O Test Date _2Z -/A0 Page.__of__.
Client cr,i-'r c / /'r'jd
Test # Material Structure Test Location and Elevation or Depth relative to...
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
I
Probe Depth (inches)
Wet Density (pcf)
- ----------------------------S
, m ---.-.--._ ---------.-. -----
Dry Density (pCf)
--.-------., 5-. --------------
Moisture (%) -
LLc3----
-
..
MD Curve Number 2
------------
Maximum Density (pcf)
Optimum Moisture (%)
- ---
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%)
-.
Specified AM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: ,,
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: %7ñ '-'' Signature: :
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name co
Project Number ccJ - Test Date /—o Page of
Client
,--
Test # Material Structure Test Location and Elevation or Depth relative to... ,70
/ 5 W - _ — — c c<22 - C4c
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# /
Probe Depth (inches)
WetDensity(pcf)
-
Dry Density (pcf) '/3 _5•_
Moisture(%)
MD Curve Number 3
Maximum Density (pcf)
Optimum Moisture (%) //
Relative Compaction, RC (%)
Relative Moisture, RM
Specified RC (%)
Specified RM
Conformance (Yes/No)
Nuclear Gauge-Model and Serial Number: C',) ,"C3 -/' 7r
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1.946
j
7895 Convoy Court, Suite 18, San Diego, CA. 92111
- [858] 715-5800 Fax [858] 715-5810
' REPORT OF COMPACTION TEST DATA
Project Name
Project Number '5' Test Date _?Z' c) Page of.5_
Client —
Test # Material Structure Test Location and Elevation or Depth relative to
.3o.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
..........
Moisture (%)
MD Curve Number
..........
Maximum Density (pc f)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified AC
Specified AM (%) , ' ._.-
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 3 r '-, 9-/Q'7.S-
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: ,i
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number c/ /> Test Date ,''_
Client
Test # Material Structure Test Location and Elevation or Depth relative to...cc',r/_
___
______ -- ___ -' ,•, _,_______ 3' 'J ,—
-
____ ____ ____ - '•. .;
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
,4erfr ,Ej7
Test#
Probe Depth (inches)
Dry Density (pcf) ------------------------_LZ.'3l ly
Wet Densiy(pcf)
-------
Moisture (%)
T'i7
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) 4;1...,-
.-....- ...........— . ...... ........
-
Relative Compaction, AC (%)
Relative Moisture, AM (%)
7 - 7 7 7
Specified AC (%)
Specified AM (%)
7 -
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: L7 '/'///J `-
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: ,'7--,-',7gnature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
ON— Testing Engineers-San Diego, Inc. Established 1946
-
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number I II/cJ Test Date - . Page of........
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
5 . c 7' /j —%;,,c ,--
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fitt, N = Native Soil, WL = Waterline, 55 = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf)
,- 3
Dry Density (pcf) '/3
Moisture (%)
MD Curve Number
Maximum Density (pcf)
. .........
Optimum Moisture (%)
Relative Compaction, RC (%)
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%) 7
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: 'Signature: ______________________________
Client's or Contractor's Acknowledgement: Name: signature4/)"k€,h__ t7'
White- Office Yellow- Contractor Pink- Field Technician
()I'--
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
11 -IL /75c' I jw:t &s-/S,M / a b 7o
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
-j L.
Probe Depth (inches)
Wet Density (pcf)
-..-..........................!___.____...............
Dry Density (pcf) q /22.1
Moisture
MD Curve Number 4 z-f-
Maximum Density (pcf)
Optimum Moisture (%) 9,15-1
Relative Compaction, RC
-
Relative Moisture, RM (%)
Specified RC (%) 9?, O
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: -f?U'..JJJ2i -I//7/S_27c Z/,#n. /90y/oS71
This report does not relieve the contractor or their responsibility for perforrance in accordance with the ans, specificationfand applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously tailed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: A,4 Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
140
130
120
E.
COMPACTION TEST REPORT
Curve No.: 4
Project No.: 01-1840 Date: 1/16/02
Project: Poinsettia Lane Overhead Widening - Geo T&1
Location ADJACENT TO RAILROAD TRACKS BELOW BRIDGE
yj?
')
Remarks: TESD NO. 3235
5
MATERIAL DESCRIPTION
Description: BROWN SILTY SAND (SM)
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%> 3/8 in. = 4.9 % % < No.200 =
I TEST RESULTS
Maximum dry density = 130.5 pef
[Optimum moisture =9.5% S
0 5 10 15 20 25 30 35 40
Water content, %
Plate
—TESTING ENGINEERS
(L
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [8581715-5810
REPORT OF COMPACTION TEST DATA
Project Name - 4r\k i Z- r7 L i7 M t U
Project Number ____________________________ Test Date 2.-ir~7-.'0 I Page _L_ot_L_.
Client
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LIS = Lime Treated Soil, 0 = Other -
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# _J. z
Probe Depth (inches) 3
Wet Density (pcI)
Dry Density (pcf)
Moisture (%)
MD Curve Number 5
Maximum Density (pcl) t.J? two
Optimum Moisture (%) ,
Relative Moisture, AM (%)
Relative Compaction, RC
Specified RC
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: tL.t')'-L1! (__. V I ¶'//l__I
This report does not relieve the contractor or their responsibility for performance 6n accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously tailed to meet specifications.
See accompanying Daily Report of description of work and observations
TESDs Testing-Technician: Name: A_AL_1__ Signature:
Client's or Contractor's Acknowledgement: Name: Signature: (
White- Office Yellow- Contractor Pink- Field Technician
COMPACTION TEST REPORT
Curve No.:
Project No.: 01-1840 Date: 121/19/01
Project: Poinsettia Lane Overhead Widening - Geo T&I
Location: WEST SIDE UPPER LEVEL PARKING AREA
Elev./Depth:
Remarks: TESD NO. 2805 DEC
MATERIAL DESCRIPTION -.
-
Description: LIGHT YELLOW-BROWN SILTY FINE SAND (SM)
Classifications - USCS: AASHTO:
Nat. Moist. = Spa =
Liquid Limit = Plasticity Index =
%>3181n. 3.7% %<No.200=
TEST RESULTS
Maximum dry density = 126 pcf
Optimum moisture = 10 %
140 = = TT \ '{1\ Test specification:
- - - - - ASTM D 1557-91 Procedure B Modified
VIjEDLZ(F 130
+H+ I 50 01
1_1000-
120 -- 100% SATURATION CURVES
- FOR SPEC. GRAV. EQUAL TO:
28 11 11111 liii XI 27
110 2.6
'
U)
CU
-I---
- -
' 100-1111 11L11 111 1111111111_
44
! 80
_
± 1111 H 11 II
70! _I 1LiiThiI I:
0 5 10 15 20 25 30 35 40
Water content, %
Plate
TCTIM(
COMPACTION TEST REPORT
Curve No.: 2
ProjectNo.: 01-1840 Date: 11/19/01
Project: Poinsettia Lane Overhead Widening - Geo T&I
Location: EAST SIDE UPPER LEVEL ON STREET
Elev./Depth:
Remarks: TESD NO. 2806
MATERIAL DESCRIPTION
Description: YELLOW SILTY FINE SAND (SM)
Classifications - USCS: AASHTO:
Nat Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
% > 3/8 in. = % < No.200 =
TEST RESULTS
140
-
120
Maximum
Optimum
dry
130
O(f
moisture
density = 119.5 pcf
= 12.5 %
Test specification:
- ASTM D 1557-91 Procedure B Modified
rr r(n• I(''
kY.'
100%S 100%SATURATIONCURVES
- FOR SPEC. GRAy. EQUAL TO:
2.8
2.6
2.7
IIfIIi = I
-
- - -
- _1_\ —-—-——
~14
-++ 114
L
90
TT -IT-
80
U
—F.—F— I I
___
1+—TF1 T-7177
0 5 10 15 20 25 30 35 40
Water content, %
Plate
TFSTIM( FN(IIJFFRS____________________________________
COMPACTION TEST REPORT
Curve No.: 3
ProjectNo.: 01-1840 Date: 11/19/01
Project: Poinsettia Lane Overhead Widening - Geo T&I
Location: EAST SIDE LOWER LEVEL IN FIELD
Elev./Depth:
Remarks: TESD NO. 2807
MATERIAL DESCRIPTION
Description: YELLOW-BROWN SILTY FINE SAND (SM)
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>No.4 % %<No.200
I TEST RESULTS
co
140 =
130
120
110
Maximum
Optimum
dry
100T-
moisture
density = 120 pcf
= 11 %
Test specification:
ASTMD 1557-91 Procedure A Modified
100% SATURATION CURVES ow
FOR SPEC. GRAV. EQUAL TO:
2.8
2.7
2.6
= S iT\
:: 'E
M 70 =#1
15 20 25 30 35 40
Water content, %
Plate
TESTING ENGINEERS
U
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Acf77?> Zv,- ,)t'7Zf*/ t2X
Project Number Test Date i.2~ -_C- ó'/ Page / of
Client V
Test # Material Structure Test Location and Elevation or Depth relative to...
I Ecr -','- ,144.'/€
Z ' _ç
Jo i" t ,) 7
3 f I -4-t7 4n1/k2/c-
J ,111 / £f'4.ff /tj7-'d )Zi fi7J ,2.Z6,'."l f-7
.i ...c p
._
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
.rs• :ri A- -7
Probe Depth (inches)
Wet Density (pcf) - /.>14 fZ6 /2J 117q In-0 I U_ 1ijq
Dry Density(pcf) . i& .0 / i Gj.i ,.., j c.q ,& uo
Moisture (%) /L f.'7 ,3 zO 9. c).g ,i.3 1c.5
MD Curve Number — 3 a. 2 1 z..
Maximum Density (pcf) it.c !C 111 5' itl5
Optimum Moisture (%) i/ '/ 1/ /0 1/ 0 /2.5 /.. ,.
Relative Compaction, RC(%) —. '7f. qjj el jq '?/.0 5 ¶(, 0.3
Relative Moisture, RM (%) 2.c' 'J'.L .-( (.0 c) -u-
Specified RC (%) q% 5?
SpecifiedRM(%)
Conformance (Yes/No) )/ >-- X±'$ VCI( YC1~ '/e s' >f '/
Nuclear Gauge Model and Serial Number: 3'12c ..i Z.7
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Q
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
- [858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name L.-v L)iit7A
Project Number 2 r1
- Test Date i2 '1 Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
eJ,W sf.A ' er 'J. .i/ £c?4
I S .3 1 &JIY 2# i44 i,,- ,
JAI
/7 .1 'FJW
-?v7f?L '- 32. c
/-
____ ..c ,-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # /1/ ,- ± /7 f - -' Z?
Probe Depth (inches) .c'' .a " " ~" 'i" ''" " g" s'•'
Wet Density (pcf) j7 I.21
Dry Density (pcf) C i'31 _.' /L)F.1 //),,>_. /io.i
Moisture (%)
MD Curve Number 1 .1 I
Maximum Density (pcf) i>&V .
Optimum Moisture '/) ,, i ig
Relative Compaction, RC(%) r1p./ Tci.E '9.2.Q 'w' 'Io.9 F ) 12,".
Relative Moisture, RM (%) '-a., .O -c-t 'fr,•i ..1 0 j
Specified RC (%) a'/ tjc,.% %' 17v% To ''/o 92 'ic% q% 4c%
SpecifiedRM(%) -tZ/o L°/c !% % '' t% tZ% Z.% 7V t%
Conformance (Yes/No) Yes Yc Ye S 'YES 'S 1 YcJ Y -5 >' '/,S
Nuclear Gauge Model and Serial Number: 24'_C, -Z Z1Li
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
A" 3-
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number i' /''1
- Test Date / V Page Z. of _
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
if 2
J4_ e 7i3, ' Ji E/i
Z _)-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches) Y " .i. III
Wet Density (pcf) In..?
Dry Density (pcf)
Moisture (%) '/. /o.5 ,c. (C•~' _____ _____ _____ _____ _____ _____
MD Curve Number
MaximumDensity(pcf) ,/7ç iz. .Q
OptimumMoisture (%) ç j s' )i.
Relative Compaction, RC(%)
Relative Moisture, RM (%) '-• -c1 mc _____ _____ _____ _____ _____ _____
Specified RC y%9C % c)r;4:)
SpecifiedRM (%) ' % -r
Conformance (Yes/No) )'5 YJ5 I >'ç _ytrf
Nuclear Gauge Model and Serial Number: 2q1V >_7
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: ,lJC7J Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
0_,~__
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name I Ia.LZ
Project Number I - Test Date .12. -.r --ai Page _.L.....of........L..
Client
Test # ' Material Structure Test Location and Elevation or Depth relative to...
.
____ _c i7r _ — ,•— / , I
/A/ '
;•7.:.-%: /1 .4-)_
ii.. .S' c
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# S / It) ',
Probe Depth (inches) £' Y ' " g" g" g' ' 1' .g" s"
Wet Density (pcf) ~_c?
Dry Density (pcf) ,.CZ 7 J.IL1i ,/O. 1O ,o.i I'T i? 1i2.S'
Moisture (%) //..' (0.1 j),I jo.q
MD Curve Number
Maximum Density (pcf) 12.12 i.2.0 iô ,2C
Optimum Moisture (%) f>.g f.o 1.~..S 1Io s1O el. t) /1.0 if.) i/.C)
Relative Compaction, RC ,j % J) ' c/:i Sc* 9''
Relative Moisture, RM (%) c -e- -i - _ •
Specified RC 50. cj,i&./ 'f1. ii I7 (( i2..S
SpecifiedRM(%) 1.0 10 ?9t t.
Conformance (Yes/No) >'- 'j- Yç >c.!~ S -'
ytr 5 /S Y.rs Y
Nuclear Gauge Model and Serial Number: .r'/O.~rZ")~_I
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: '7J Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
0—
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Test Date Page L of
Test # Material Structure Test Location and Elevation or Depth relative to...
te // 41 /.Sc't.'J fft.t2'Lr4
f L i2 Z f '
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# I
Probe Depth (inches) '•' '
______ ______ ______ ______ ______ ______ ______
Wet Density (pcf)
Dry Density (pcf) 16 7. I,w'. r O' L/
Moisture (%) fo.
MD Curve Number 4711
Maximum Density (pcf)
Optimum Moisture (%) ,,,z ~ ,, ,,.
Relative Compaction, RC (%) c. Z o. <>~
Relative Moisture, RM (%) . . . ..f ,.
Specified RC (%) - 51 Z.
Specified AM (%) . /o Z /o
Conformance (Yes/No) xcs X65 Ye-S
Nuclear Gauge Model and Serial Number: .3'-/Iv ) ii
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: Signature: .
Client's or Contractor's Acknowledgement: Name: f\4g. PLw'iri;.'qsignature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers - San Diego, Inc. Established 1946
City of Carlsbad August 20, 2002
Attn: Mark Plotnikiewicz TESD Job No. 2001-1840
5950 El Camino Real
Carlsbad, CA 92009
Job Name: 3551 POINSETTIA LANE - OVERHEAD WIDENING
Geotechnical - Testing and Inspection
Address: Carlsbad; California
The following pages present TESD's field compaction, inspection, and/or laboratory test
reports for the above referenced project for work performed through 7/18/02.
These reports cover the locations of work inspected and tests performed in accordance
with generally accepted standards and do not constitute engineering opinions or project
control. It is .the responsibility of the contractor to schedule retests or re-inspections of
any areas that do not meet project specifications. TESD neither controls nor supervises
the work at the site. We are not responsible for errors and omissions of the contractor, nor
for the contractor's failure to keep the work on schedule or carry it out in accordance with
the project plans, specifications and all applicable codes.
We appreciate the opportunity to provide services on this project. Should you have any
questions regarding the accompanying information, please contact our office at (858)
715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc.
Lcirry Clrki/jc&
Larry Clark
Vice President of Engineering
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-58 10
Testing Engineers - San Diego, Inc.
7895 Convoy Cowl, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
O Testing Engineers - Inland Empire
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732
Page 1 of _&:
Est. 1946
Date:
Job Name: 5&f
lddress:
L ( Job No.
Client/Contractor:
f- Cr\d/ kerz --,'o-
. Field Report 0 Notice to Comply
Type of Service Performed:
Soil
Asphalt Concrete
0 Engr. Observation 0
Concrete
Pre-stress Concrete
Masonry
0 Structural.SteeI 0 Waterproofing
0 Fireproofing 0 Roofing
0 Other
Inspection Check List:
Building Permit #
On-Site Equipment: 4-e,
0 Soils Report J0 Plans
Plan File #
\i/4 'o vor, 'iei s\t
0 Specs.
(f'. \fltJ
DSA #
0 RFI 0 Codes
OSHPD
Tests Performed (see attached) Sample Type:
j - -L oy
Uj 79p 'L I75&
LIP,- ovic TL fflett'rit To c s#se, ic)l 4.eA 4
° ° v -c,br
L hU cccvj. i4 i4- 1s
k4 10+'IiAJ1&ii- ¶f - i4 (4 'r r)Sr HLf L)wV
ry)rA
il
CERTIFICATION OF COMPLIANCE: All of the observed qoj, unless
the workmanship provisions of Ie applicable code. For apfItion-conf
Inspectors Signature/Name ). \ijv
Approval Signature/Name/Company
TESD Form: 100-01
in conformance with the approved plans and specifications and
itrachall schedule TESD for reinspection and retesting.
Cert.No. (5,30" Is
Date: __________________
TestingEngineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name ___
Project Number OO I I
Client C*j °r CW -
Test Date _7.-b2_ Page_of2
Test # Material Structure Test Location and Elevation or Depth relative to...
1 AB S tce, j rj 4 5 7tW Pcj,',.sc.4b4 L4.1
Ak Apt 7g6+ -
L5 0,(
/
I.-
9 . sc 4 7S-oo 1 ell 5i- Lm—
¼.S IAeA .i+ 51,6, r 'c LA-.--
5*
Sc - I7- 7 M 'SC 4 NJ I 4 9'-'- 17 ii ,. Sc J4e Crce, - p .9)1r j?f'bo / LL Le -
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Dry Density (pcf)
Moisture (%)
t:.7
Wet Density (pcf)
iJThs
lf.-
&-
.s4' 33 3.,!~ '3 S
MD Curve Number r5 .
Maximum Density (pcf)
Optimum Moisture
Relative Moisture, RM (%)
Relative Compaction, RC
.o~ ._3 ...,9 o.q èdfr 't
Specified RM (%)
Specified RC(%)___--
Conformance (Yes/No) --
t N'
Nuclear Gauge Model and Serial Number: 'Tr--14,r 31 I / This report does not relieve the contractor or their responsibility for performance in accordance with the plane, speci
f
i
c
a
t
i
o
n
s
a
n
d
a
p
p
l
i
c
a
b
l
e
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed t me
e
t
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
See accompanying Daily Report of description of work and observations
i Z
TESD's Testing Technician: Name: Signature: AWI4
Client's or Contractor's Acknowledgement: Name: ._ Signature
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
Testing Engineers - Inland Empire
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732
Page 1 of 3—
Est. 1946
Date: 7-6-°'
lob Name: p se* t_tj GeoT .4.... Job No. I - I
Address: Ur G
Client/Contractor: f L fie'c 'i Gror
Field Report 0 Notice to Comply
El Soil o Concrete 0 Structural Steel 0 Waterproofing
Type of Service Performed: Asphalt Concrete o Pre-stress Concrete 0 Fireproofing 0 Roofing
Engr. Observation 0 Masonry 0 Other
Inspection Check List: 0 Soils Report ja Plans 0 Specs. 0 RFI 0 Codes
Building Permit #: Plan File #: DSA #: OSHPD #
On-Site Equipment: 0 t &N P&I &Yr kct 0) W7AAb C77 V ruw
19 Tests Performed (see attached) Sample Type: -. 1r'-4Cç 0p- !4" t.-'fOto
- cer
t vr- fl— o Lii-.. 4 J- LIL svJ tOth5W'
r KJ~l ~ - I c (Cr~ciU c f J4!
ewce 1ke1 Lr re tjy 'itLr f).Ct$ C Vil -4
-. tn tojL Lr. CAIex c4' (yr) (*rei * r..J -
46 wo fl (10* O 'two c1 0,w, Pkrc L J0
c
¶- rt-f-7 - 'T r> '1r— fc i' 'tt* 3 16 '1- e\-5 of
r- ItD tory fr IL je oCe4j
'
1 ert. Y or— wL&k
-
lj
54 L 'csy Oprti's c TL kL T$. To Ccr't\.
CERTIFICATION OF COMPLIANCE: All of the obs
the workmanship provisions of the applicable code.
Inspector's Signature/Name j. ¶E'i
Approval Signature/Name/Company
TESO Form: 100-01
work, unless otherwise stated, is in conformance with the approved plans and specifications and
iy "no
~-(zAl;`rIA
-conforming" items the contractor shall schedule TESD for reinspection and retesting.
/ Cert. No.
Date: 7l6—
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name I
Project Number — Test Date 7 Ic-.- b2.... Page __. of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
p - a I s)-- I7tcj
PçC P PçC ()1erickj ursej1 ~L31 ..ct* 1749 ttc P-si.i. L' e,
C,()p k-'A I7"f71-Q / Pn ç t L1
/c- P A C- v-lj (urcQ.-, E4-L4 (- .c4# t--i-tc / Picrii- Lrre
A-c, e .p Ove.,44tj Cot.iir'o- .. e+sr'tS L#At
G
tc
/
* /
P
6-4 P 4z
7 -c- kC Orr)cj (Aui,s +Lc Le J, 4 75J -o , p4Lae
A-& P -A-c Ovev- !t ( JVS , 7S)-t0, 1 ivi
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
.- - 't S6 IA * 7
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%) LIZ.,
Specified RM
Conformance (Yes/No)
-
- Nuclear Gauge Model and Serial Number: t0 / .5339- LjvJ_,-7o )/63R
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and appl
i
c
a
b
l
e
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed torieet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: . Signature:
Client's or Contractors Acknowledgement: Name: )(M'F?.OT7t)IIø'L4)kSignature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
S., REPORT OF COMPACTION TEST DATA
Project Name f?,1 fl9i flg L.c'cv, e, (co -.r 4
Project Number _____________ Test Date Page ..2_.of._._...
Client ('di c.p
Test # Material Structure Test Location and Elevation or Depth relative to...
frt P -A-c 0H urS&,. c'k I3+Do 4L / )e'I iSe)fA LNc~i
1' pt-c. ()-,e -q v b~ £urSe, tovi. Le,i 7sS4I7Sj-nc
Pc C OuerL Cr.cav L.re 4 .k , i7 g s iop Pc b4
PC N j."". ru -rs, E""A L*c l7S
Pcc, 1D ?r C(f)ve.r (5 U\ LA.±Z . J4- 757 t / 3&k
f3
ft PrC frc jc\Lu L4 4_, -j-oo / 4a Lt,
L5 A-C 9 A-C ()iew-) Gur&. JeIo Lp2, 5F7$' +0;
ck,.r GrS 1 ± ,. 17 f-c e irc&er{',yvi £irj., UJ 3LIL2,
Material:
Structure:
/
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 4 4 —U.-- J ' J-_ 5 —IL— JLZ_ Probe Depth (inches)
Wet Density (pcf) L.j-i. JJ L Jo 14 -L4- t3 ;36.t Dry Density Density ()
Moisture (%)
MD Curve Number
Maximum Density (pcf) ,
Optimum Moisture
Relative Compaction, RC
Relative Moisture, RM
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: roi.h t° , ''t, This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed
tokneet specifications. See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: - Signature:
Client's or Contractor's Acknowledgement: Name: x_frl iTJH4L4/IiZ. Signature:
White- Office Yellow- Contractor Pink- Field Technician
LX-
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Pp ,-1r Le
Project Number &oô_9-o Test Date 7_ -er.. Page Of
Client
Test # Material Strcture Test Location and Elevation or Depth relative to...
frc o\- -L a1 7S+Cr,
fl frC P i Dier I4 ~)4)o',/ 1e 1.. J7 +00. Pss$i L3,
? 1-c c4e Ger 1
/
cjs kZ, L* I7SC +00 Po215 t-**,
c4-L.1 C5d ( 44oivà. ii2, / 1ot
è ? t< Ov-1 Ift 44* 17 JR -I-0c
5* kG r Oe ( /
erLj Gir e z-,
f -C 2W-,. S' I7C+O, 9o%vct.
1' Ac )i Gaur -,j S
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
jt2- LtL jO t1W) I4V1
rn
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC (%)
Relative Moisture, AM (%)
Specified RC (%)
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Nurnber:Tk 3,1t730 ,4 3Y3I / 7O
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed meet specifications.
I See accompanying Daily Report of description of work and observations
-
TESD's Testing Technician: Name: . EV.JS Signature:
Client's or Contractor's Acknowledgement: Name: 'C Wall NOMMionature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers- San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
Testing Engineers - Inland Empire Llk
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732
Page 1 ofE_....
Date: __________________
Est. 1946
Job Name: oic4;.
Address: , .5 4-a
-
LP4'e/,.. (LLL64.
Job No. t
Client/Contractor: /' (-1
AField Report 0 Notice to Comply
Spil
Type of Service Performed: N Asphalt Concrete El Engr. Observation
Concrete 0 Structural Steel 0 waterproofing
Pre-stress Concrete 0 Fireproofing 0 Roofing
0 Masonry 0 Other
Inspection Check List:
Building Permit #:
On-Site Equipment: PyM
0 Soils Report Plans 0 Specs. 0 RFI
Plan File #: DSA #:
Ka CC —S- C ks C1.-or
0 Codes
OSHPD
1 O .S /
Tests Performed (see attached) Sample Type: I u D s)10
(_)n c' 4T 1 1 - jr
agr i'i" *tt- -Ac1Lit fc Cc,v-ce_
(a- 1;cL
C 11e eov~ Tr - TL *So r II *rre.
4iee -.ç,? I DO UA,
_cTrvj CJ. wr tr° o r W4fr- iL çC s
1iL +lr L,1L i4rtL (JAj i. 4 P'flL cc cTTL 1 -Li jiL
A(4 LI P, cham-5 .Jtc erccs c-s4tA eiL in i-iL w4a.c -i
vlCtc 4 COI . jL rCe.c5 u)r P+ofTos.1t (15
et--k --tie fL4b rtfl n1 1r1T- .fr-i .4-L+ 4v GriL'.'j 1L r
\c1 IN'II Oi-&j*ti -ji " ci- k C'-
14)? ts T4 1 ur l'-o 0-Lt
A
CERTIFICATION OF COMPLIANCE: All of the obser'd work, f ess
the workmanship provisions of the applicable codef r)any 'noonf
Inspector's Signature/Name - Ev.c 7 t~~
Approval Signature/Name/Company L 4ml J~7 - " )3
TESO Form: 100-01
se stated, is in conformance with the approved plans and specifications and
items the contractor shall schedule TESD for reinspection and retesting.
Cert.No.
Date:
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number 410D Test Date 7 - 15- p Q. Page of
Client b-
Test # Material Structure Test Location and Elevation or Depth relative to...
r -Lft (e1 f1\-u- k.
1 firC' __I
PrC I?rLt £r9-i 4r 1757rbt / / oR.'ç4 k-e
3 •p —P745.$). I75±Ot, es—L Le.-'14 c4.
9. • sot sr2 , cJ-- tz-1-e, e-4t,vl I?•€l, S441
S A-(,
-_
C-r - ç -s4- 7-ç-ta efv1 \t'ee , 'fl rSc4i5 za
j734-V, We~.+L.,,,A _$-;. k- GSA- A
7 AC f c5Ltt- CtJ(S'/ , 7S;-j-Q , jes)-Lv Il,
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# j __ 5
Probe Depth (inches)
Wet Density (pcf) -(,.o jj.o
Dry Density (pcf)
j-cs th2- .J.1.o 1J!_ LUAL
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) ,
Relative Compaction, RC(%)
115
Relative Moisture, RM (%)
Sig
Specified RC (%)
Specified RM
Conformance (Yes/No) IV l
Nuclear Gauge Model and Serial Number:' 4 J, / .c i * This report does not relieve the contractor or their responsibility for performance in accordance with the plan, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed tcjtmeet specifications.
See accompanying Daily Report of description of work and observations J I A
TESD's Testing Technician:
Client's or Contractor's Acknowledgement:
Name: t~, V-P~ 5 Signature:
4'1 F1 -'771 i1617Signature: Name: _________________
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number
- J 29O Test Date 7 —LE -02- Page 63 _ofJ_.
Client °r 4w 2riAd
Test # Material Structure Test Location and Elevation or Depth relative to...
Pr e A-.crI4t Ct?urs''..i, s* i -ot / PpcuiJi , I
9 P f ( ,, 17 'i +- e 1Li-
,.
I'D P sL- 1717 +7 JisL -re. , ,-
t2,
A-b
o
if r I 79-oO L.\i- (wa. 75 *At WIPAIJAA
*Sp U 4A- %7 I-6 -f-St i scn -
,_ tPhSi'Lct-ft s-k- 74r7#5 I Poc1Fii 4'e , ,
4\t i'-.-'. 5 I71 -+S , -LuAc )re..i- /
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, LI = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 9 ID tvi- II IL 13 1If-. (51 Probe Depth (inches)
Wet Density (pcf) fl
Dry Density (pcf)
J35 JJ 1tf jf5 iiy f
Moisture (%) '- Wor
MD Curve Number MP
Maximum Density (pcf)
Optimum Moisture
Relative Compaction, RC (%)
Relative Moisture, AM (%) p4'/. i
c j (_ fJ5 17 C1•
Specified RC
Specified RM
Conformance (Yes/No)
______ 1 ______ ______ ______ ______ ______ ______ ______ ______
Nuclear Gauge Model and Serial Number: tt$e.r 69o\, /Uf /'J-4.A1 4 This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: - Signature:
Client's or Contractor's Acknowledgement: Name: ( ~4 Qr
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
"I-
CL
Established 1946
Project Number ótot) I 1 Sr Test Date 7 I5 0 a..- Page .J? of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
17 frC,P stq, fr-j- ,Erci-L
A- P -5L-i— (StJfWJf 5A- l7S5 -f--OU( 6A44ou't Iit* I. DlviSt*i4 f-re
T irji 75C fp EmAuA 6 4i 1, I'
Q0 -o P 54-4 !7'7 i-ot Itej /
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
Wet Density (pcf)
-
Dry Density (pcf)
I LJL
Moisture (%)
MD Curve Number MP --
Maximum Density (pcf)
Optimum Moisture (%)
J±t-
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RM (%)
Specified RC
Conformance (Yes/No)
____
Nuclear Gauge Model and Serial Number-
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: 5 Signature:
Client's or Contractor's Acknowledgement: Name: bC f" fL,irr111 L/UJiZeignature: Old 4
White- Office Yellow- Contractor Pink- Field Technician
(-}--- 0 Testing Engineers - Inland Empire
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732
Pagel of
Date: ____________
Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
Est. 1946
F_ddress:
Job No.Zc-1 - /8 /
'J.
lient/Contractor:
.5'
LIeld Report 0 Notice to Comply
0 Concrete 0 Structural Steel 0 Waterproofing Type of Service Performed: 0 Asphalt Concrete o Pre-stress Concrete 0 Fireproofing 0 Roofing
0 Engr. Observation 0 Masonry 0 Other
Inspection Check List: 0 Soils Report 0 Plans 0 Specs. 0 RFI 0 Codes
Building Permit #: Plan File #: OSA #: OSHPD #:_______________
On-Site Equipment: cp'it. Ae-i,/ 7Et
Performed (see attached) Sample Type:
-1 5 t~)cjS i' ' 7-t P ' 7 è'tj o 7J77
(j)
i,e -, c - see c, I,' j9) 4// 7' 7i
/c. ,e irX - s' crA1r,
rfr c%-' 9e9
12 in ,ji&,-/ - 4—Ai c A'c' A-Z e
A. '"'- ——' -' c -s /o c• —
L7
-7/
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and
the workmanship provisions of the applicable code. For any non-copforming items the contractor shall schedule TESD for reinspection and retesting.
Inspectors Signature/Name Cert.No. 7'7/7
Approval Signature/Name/Company Date:
TESD Form: 100-01
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Lk_
Established 1946
Project Name i? •-4Sc?7'74 /c90 e..
Project Number ,y.r)1 - t? liD Test Date 7 /t3/cã. of..
Client
Test # Material Structure ] Test Location and Elevation or Depth relative to...
I- / t- -• z
4-
X,
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches) i' LI I
Wet Density (pcf) ,if/ / %'90 Dry Density (pcf) L?3'Z IlLi I314 /_0.7
Moisture (%) ct 6 -V 6-i' MD Curve Number
-
- - — -
Maximum Density (pcf) ijj..c ----
Optimum Moisture (%) j . 5
_____ _____ _____ _____ Relative Compaction, RC (%)
Relative Moisture, RM (%)
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: c/?) ,2c3
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: i#T t&)/inature:
Client's or Contractor's Acknowledgement: Name:
White- Office Yellow- Contractor Pink- Field Technician