HomeMy WebLinkAbout3603; EL CAMINO REAL AND ORION STREET; REPORT OF COMPACTION TEST DATA;/
UW
Client
Testing Engineers-San Diego, Inc. Established 1946
7895Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
Project Name
Project Number
REPORT OF COMPACTION TEST DATA
El
00 0 / ' 12 Test Date - Page of
Test # Material Structure Test Location and Elevation or Depth relative to...
Aci :: 71
14i
dyt? J. I 2t5'
dctSO
34S ' I C(f. .1 •-i-So
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill; SC = Sidewalk, Curb/Gutter, 0 = Other
Te1#. . 3 7(, 7 77 '33Q' .? 74 14 6 / "+ 's
Probe Depth (inches) ) /1 -_ _______ _______ . . ••••• ____•___ _
Wet Density (pcf)
Pry Density (pcf)
S'3''.1
.
14I, /7 I.A i31 14 )402 /7 iYJ2
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC ci' 5
Specified RM
: WA
Conformance (Yes/No) . S
Nuclear Gauge Model and Serial Number: ir '&'i 9LJ(? —i:; dç e.
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: / 41\o j-,'J M.'i ly/ Signature:
Client's or Contrator's Acknowledgement: Name: Signature:
White- Office : Yellow-. Contractor S Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name . j C4 /4'1p
Project Number d Test Date ' - Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to.....f
31L, At.. 4) 01 - -,
535
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other S :. Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 347 7I/0 )f 7f Jf f3 74 9x5
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
1c
0
't2 t )'\V\ lij
0
,, 1153 J 32.9 ç>, ) L ç )
Moisture
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%) ' I - -
- ' T'T
Specified RM (%)
Conformance (Yes/No) -
Nuclear Gauge Model and Serial Number: 1 e / 'IL ' 1$ 5 / 5597
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician:
Client's or Contractor's Acknowledgement:
White- Office
Name: Ar-rt,/ , - Signature:
Name:
5 .
- Signature:
Yellow- Contractor -
5 Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
S •7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 71575810
REPORT OF COMPACTION TEST DATA.
Project Name ef V D .
Project Number ov a a - -) Test Date 7 " Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to... (r V1 1 C /4 , '1 eA 1 &o .41411k ,
P IaL'i,1 5 -r47
_3 5
.5
\•
S J .
SI
)7 -r5
/75
4
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB= Aggrégàte Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other c
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other .
Test#
S
IcC ?5 7 S 17
Probe Depth (inches) 4.,'57 S
I1
S
Wet Density (pcf)
Dry Density (pcf) S
) )7_
S
,47 /
S
Moisture (%) S S
MDSCurveNumber S S S S
Maximum Density (pcf)
Optimum Moisture
Relative Compaction, RC
Relative Moisture,RM (%) S S S S S
SpecifiedRC
S SpecifiedAM (%) iv . - — - ___ ___ __•S___
Conformance(Yes/No) 5/ S
Nuclear Gauge Model and Serial Number: 1'•1 w_tiSj.0
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications
See accompanying Daily Report of description of work and observations S
S
TESD's Testing Technician: Name: Ofl //IIer Signature: (_A44 1"Ykj
Client's or Contractor's Acknowledgement: Name: . . Signature:
White- Office S Yellow- Contractor S Pink- Field Tech
Testing Engineers-San Diego, Inc Established 1946
7895 Convoy Court, Suite 18, San Diego, CA 92111
[858] 715-5800 Fax [8581'7157.'5810
REPORT OFICOMPACTION7EST DATA
Project Name C 1 1 . /
Project Number ' / c Test Date - Page of
Client . . . . . .
.Tëst# Material Structure Test Location and Elevation or Depth relative to... & I . (, • (• j v - t.-4
' A(-. f . c -J "4C
I J
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Bse, CTS = Cement Treated Soil .
LTS = Lime Treated Soil, 0 = Other.-
Structure: . P = Pavement Structural Section; F= General Fill, N= Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W= Wall Backfill, SC = Sidewalk,Curb/Gutter, 0 = Other .. .
Test# ?(.5
Probe Depth (inches)
Wet Density (pcf)........
Dry Density (pcf)
Moisture(%)
MD.Curve Number (CA) . ..... . . . ., . . . .. -
Maximum Density (pcf) . ., . . ..• . . . .
Optimum Moisture (%) . . . . .. . . . . . . . . . -
Relative Compaction, AC
Relative Moisture, AM (%) ., . . .' . . . . . .. ... . . . . -
Specified AC
Specified RM
Conformance (Yes/No)
NJuclearGauae Model and Serial Numher . (pd tt4• _4t (4 . 5 75 -
This report does not relieve the contractor or their responsibility for performance in accordance with the plans specifications and applicable
codes. The contractor-is responsible for schedulirigretesting of reworked areas that have previously failed to meet specifications.-
See accompanying Daily Report of descriptionof work and observations . . . . . . .
TESD s Testing Technician Name ' I fr1' i" Signature
Clients or Contrator s Acknowledgement Name Signature
White Office Yellow Contractor Pink Field Technician
Testing Engineers-San Diego, Inc.
Q
7895 ConvoyCourt, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 71-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name t I (. . e (• 4 t
Project Number '.' ) ) ( Test Date Page of
Client
Test# Material Structure Test Location and Elevation or Depth relative to... 0 r a,,, o ,, A -
IN'ID
r -rc J L
' /—rf' J L
33
.1 . . J
__
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F L General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST Storm Sewer,
U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/GUtter, 0 = Other
Test# , , 7•- )ç-• VC 3) '3 23' 35'
Probe Depth (inches) NA
Wet Density (pcf) j 31 ) / 3 I Y peia.o 1 1$' 9 I / i P JY ? I ) 3
Dry Density (pcf) .
Moisture (%)
MD Curve Number Pt
Maximum Density (pcf),. 1'b
Optimum Moisture
Relative Compaction, RC (%),
Relative Moisture, RM (%)
Specified RC (%)
SpecifiedRM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: To ___/_'f_(_4 o—P ç .i.. _fS'_c Vl
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations S
TESD's Testing Technician: Name: 4 _7¼ø ,-tf't\.k_s1 Signature:
JV
Client's or Contractor's Acknowledgement: • Name: • ' Signature:
White- Office • • Yellow- Contractor . Pink- Field Technician
F'
Testing Engineers-San Diego, Inc Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858]71 5-5800 Fax [858] 715-5810
'. REPORT OF COMPACTION TEST DATA
Project Name E / (a — ., e 0 r ic. i d (' c
Project Number 0 b D c I S 1 \ Test Date . I ' Page 2...... of 3
Client
Test Material Structure Test Location and Elevation or Depth relative to...
A_( 42 5jp)IZop,,h..4)
)I4 __
- j:
.• .L'.
. .
Material: S =Soil, AC =Asphalt Concrete ATB =Asphalt Treated Base AB Aggregate Base CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0.= Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0= Other ... :
Test !..,..114 '
0
.
_____
Probe Depth (inches)
Wet Density (pcf) _
--. I4JI J7 ./.4 0 ____ • -. ____
Dry Density (pcf)
Moisture (~) . . . .
______ : .
. ; .
MD Curve Number L4a ir '
Maximum Density (pcf) ,5'o • . . 0 • - - .
Optimum Moisture
Relative Compaction,. RC
Relative Moisture, RM (%) . .. - - . . . . • . . - . .
Specified RC (%).• cjj ______ . . - . . -. . _- ..-
0
Specified RM.(%)
Conformance_(Yes/No) _. N ______ 1 .. -.--
______ 0 -. •• . . eJ
Nuclear Gauge Model and Serial Number:
This report doe not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes The contractor is responsible for scheduling retesting of reworked arasthat4have previously failed to meet specifications.
See accompanying Daily Report. of description of work and observations
TESD s Testing Technician Name /\rTt_L)vs __fYi_'liii Signature 1
Client's or Contractor's Acknowledgement: Name: Signature: I
White- Office . Yellow- Contra ctor . Pink- Field -Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18 San DiegoCA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established. 1946
I
Project Name E / ei iv , /2 r4 1
Project Number .büt' '?/Pi'
Client
Or.
Test Date Page ..2. of __.
Test # Material Structure
-
Test Location and Elevation or Depth relative to...
o A f J',.)c Dv P0L11 y, 't8C !ç "
I1 s a Zi I.,
ID4 504,-7k Is ?I c lLLfAjIc-u4L g41-
,' - - -
, 7 ,, , ., C Soj.) /?.),, ..,.
Ji
00
111
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other .
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ,
— lo 2 164 /of Jo 6Io9 /o- /a )I Iii
Probe Depth (inches) 3 S
Wet Density (pcf) '14 32 A2.1 Nit 171. It 14 de. 14.).?' I ? " It'. 2 M6, / t
Dry Density (pcf)
Moisture (%)
MD Curve Number L 'IS fei
Maximum Density (pcf) j .57 '. -
Optimum Moisture (%)
Relative Compaction, AC qS ¶ $ . 3 £35. 1 L g
.
11q 417-11
Relative Moisture, AM
Specified AC (%) 95
,
Specified AM
__ _______
Conformance (Yes/No) 4c5 N Ali, ,) c5 ye; iV,i Vci N6 A/
Nuclear Gauge Model and Serial Number: - 'i'/ 0 '1 1 — 7 55 '
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Reportof description of work and observations
TESD'sTesting-Technicia: . Name: Signature:
Client's or Contractor's Acknowledgement: Name: Signature: ._-
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name L I £ v 'w/1, 0 i o ' \k I
Project Number 003 — I i Test Date 5 1Y Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
AC I'No g e O('.b (?t'J
91
_ ___ ç; , .L J.
IV 0 0, 7
ell 40
N go 4
100
/o li . Not- r ti
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities; W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #. '3. 14 S qr 9 loo /0)
Probe Depth (inches)
Wet Density (pcf) ) 439' / 44) 14 3 S I j lo 4 751 '1 / "ill 14 S__3 I 154
Dry Density (pcf)
Moisture (%)
MD Curve Number L _
'Maximum Density (pcf)
- I5o_ ---'-- -
Optimum Moisture (%)
Relative Compaction,RC (%) 4 S 9 (, 94 016 '1 Io94 q ( 94 1 T
Relative Moisture, RM (%)
Specified RC(%)
-
5 - ---5' — - —
Specified RM
Conformance (Yes/No) )!t_5 't Y_ s W o /_cs 'it'_ç M V C5. l ye,37 -i
Nuclear Gauge Model and Serial Number: 0 IP_( _55'1
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: . Name: A_Y' 1*1 ____ISignature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office . .;Yéllow- Contractor . .
Pink- Field Technician
Testing Engineers-San Diego, Inc.,
7895 ConvoyCourt, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name
Project Number
Client 4'
Li Pciil i•
OO 0 - Test Date ?0. Page _L.. of 4_.
Test # Material Structure Test Location and Elevation or Depth relative to... .
1044 A P
lola
•
IIOç CCY7"/ JC -i'75
fIfJJ/
gc /Verr4i;e _JL 66
' 4
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# Io4o JOj M /Drc. ho, 1 1 14 c1. c7t Iiç
Probe Depth.(inches)
Wet bensity(pcf) 7 I_4g.; I43S I'1?.'3 I3dj,o I4.S' l'ti1) _____ _____
Dry Density (pcf)
Moisture (%)
MD Curve Number L.j3 415c1
MaximumDensity(pcf). if'
Optimum Moisture (%)
Relative Compaction, RC (%)
Relative Moisture, RM (%)
Spe cified RC (%)
Specified RM' (%)
Conformance (Yes/No) No (1D y's Vef -No I yo'- I
Nuclear Gauge Model and Serial Number: 4"_I_e_-1 5J'1 ri
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have 'previously failed to meet specifications.
See accompanyingDaily Report of description of work and observations
TESD's Testing-Technician: Name: A-r"_..H)_; III , Signature: _ '9 _/lit//.,,
Client's or Contractor's Acknowledgement: Name: _ (4_ _,"
White- Office. Yellow- Contractor Pink- Field 1'ehnician
150
140
130
120
110
100
COMPACTION TEST REPORLii\
Curve No.:16
Project No.: 00-218B
Project El Camino Real and Orion Street Geo. T&I
Location STA 27+00 REVIEW 'j of F
Elev./Depth:
SHIR! Remarks: NO. 4693 DA TE.
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%> 3/4 in. = % % < No.200 =
TEST RESULTS
Maximum dry density = 141.5 pcf
Optimum moisture = 6.5 %
Water content,
Plate TESTING ENGINEERS
COMPACTION TEST REPORT
Curve No.: 14
Project No.: 00-218B Date: 5/21/02
Project: El Camino Real and Orion Street - Geo. T&I
Location: STA 28+00
Elev./Depth:
Remarks: TESD NO. 4648
MATERIAL DESCRIPTION
Description: LIGHT YELLOW-BROWN LIME TREATED CLAY
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
.Liquid Limit = Plasticity Index =
%>3/4in. 3.0% %<No.200=
TEST RESULTS
140
130
120
CUL 110
Cn
90
Maximum
Optimum
dry
moisture
density = 122 pcf
= 12 %
Test specification:
ASTM D 1557-78 Method C Modified
- -
1/o SATURATION CURVES
FOR SPEC. GRAV. EQUAL TO:
2.8
26
=
- - - - - - - -
--
70K__4 IL E -E
7--
_5 _ 10 15 20 25 30 35 40
Water content, %
Plate TESTING ENGINEERS___________________________________
COMPACTION TEST REPORT
Curve No.: 15
Project No.: 00-218B Date: 5/21/02
Project: El Camino Real and Orion Street - Geo. T&I
Location: STA 29+50 /
Elev./Depth:
Remarks: TESD NO. 4649
MATERIAL DESCRIPTION
Description: YELLOW-BROWN LIME TREATED CLAY
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit=
1 Plasticity Index =
% > 3/4 in. = 1.50% % < No.200 =
I TEST RESULTS
140
130
120
90
Maximum
Optimum
100-
1111111 -i1jiI11111I111-
dry
moisture
density = 121 pcf
12.5 %
Test specification:
ASTM D 1557-78 Method C Modified
-
100% SATURATION CURVES
FOR SPEC. GRAV. EQUAL TO:
2.8
1 = iiT\ 4St -41 1 1 1
1111I
80
70
0 5 10 15 20 25 30 35 40
Water content, %
Plate TESTING ENGINEERS
COMPACTION TEST REPORT
Curve No.: 12
Project No.: 00-218B . Date: 5/10/02
Project: El Camino Real and Orion Street - Geo. T&I
WE03 Location: STAI4+75 REV/E
04 M
Remarks: NO 4544
MATERIAL DESCRIPTION
Description CLASS II BASE AGGREGATE
Classifications -. USCS:. . AASHTO:
Nat. Moist. = . .. Sp.G. =
Liquid Limit= . . .. . . Plasticity Index .
%>'3!4 in. = % %<No.200
TEST RESULTS
140
130
CL
90
80
-
-
Maximum
Optimum
dry
moisture
density= 139 pcf
= 6.5 %
Test specification:
ASTM D 1557-91 Procedure C Modified
. 100% SATURATION CURVES
- - - FOR SPEC. GRAy. EQUAL TO:
2.8
2.6
Fi-
1 = I
!_
-
120=1=1=1
- - - - - - - - .-
TT110----
if
11111111111111111 1111111111111 111I
70
111111
5 10 15 - 20 - 25, . 30 . 35 40 0
Water content, %
- . . Plate
TESTING ENINFFRS____________________________________
COMPACTION TEST REPORT
Curve No.:. 13
Project No.: 00-218B Date: 5/10/02
Project: El Camino Real and Orion Street- Geo. T&I
Location: STA24+86
Elev./Depth:
Remarks; TESD NO. 4545
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE AND RECYCLED BASE MIXED
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit =
• Plasticity Index =
%> 314 in. = % % < No.260 =
TEST RESULTS
140
130
120
90
-
Maximum
Optimum
a 100--
drydensity
moisture
= 139.5 pef
= 6.5 %
Test specification:
155791 Procedure C Modified
100% SATURATION CURVES
FOR SPEC. GRAV. EQUAL TO:
2.8
2.7
J
80
n_I 70 —t=
0 5 10 15 20 25 30 35 40
- Water content, %
Plate TESTING ENGINEERS
Testing Engineers-San Diego, Inc. Established 1946.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858].715-6.810,.,
REPORT OF COMPACTION TEST DATA
Project Name L: (L,
Project Number 000 - ' !., Test Date L / 3 . Page of
Client ' . .. .
Test # Material' Structure Test Location and Elevation or Depth relative to... '
1?c? S P El en a cut fV ,r ii P/ Iir 3-,e
Material S = Soil AC = Asphalt Concrete ATB = Asphalt Treated Base AB = Aggregate Base CTS = Cement Treated Soil
LTS = Lime Treated Soil, O,='Other . Structure P = Pavement Structural Section F = General Fill N = Native Soil WL = Waterline SS = Sanitary Sewer ST = Storm Sewer U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other '
Test#
Probe Depth (inches)
Dry Density (pcf) '
Wet Density (pcf)
1 10,1
Moisture
MD Curve Number
Maximum Density (pcf) '
, ., ' . . _______
- •
Optimum Moisture (%)
Relative Compaction RC (%)
Relative Moisture, RM (%)
Specified RC (%)
Specified RM (%)
Conformance (Yes/No) . .
Nuclear Gauge Model and Serial Number: ./V d , This report does not relieve the contractor or,their responsibility for performance in accordance.with the, plans, specifications and applicable
codes The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications
See accompanying Daily Report of description of work and observations.
TESD's Testing Technician: - 'Name:'
y: (VII ilfr( Signature:
'Client's or Contractor's Acknowledgement: Name: ' ''Signature: .
White Office Yellow Contractor Pink Field Achnician
150
140
130
'I- 0 120 ci
>.'
C')
a,
o 110
100
90
COMPACTION TEST REPORT
Curve No.: 17
/ Project No.: 00-218B Date: 6/3/02
Project: El Camino Real and Orion Street - Geb. T&I
#17
Remarks: TESD NO. 4777 LIM
MATPPIAI fl(PiPTiñM
Description: CLASS II BASE AGGREGATE
Classifications USCS AASHTO
Nat. Moist. = Sp.G. =
Liquid Limit= . Plasticity Index
%>3!41n. = 3.9% . %<No.200 = 11.4%
TEST RESULTS
Maximum dry density = 142 pcf
Optimum moisture = 6.5 %
10 15 20 25 30 35 40
Water content, %
Plate
TESTING ENGINEERS
Testing Engineers - San Diego, Inc. Established 1946
0.
PHYSICAL PROPERTIES OF SOIL & AGGREGATE
Date: June 6, 2002
Job No: 2000-218B
Job Name: EL CAMINO REAL AND ORION STREET - GEO. T&I
Address: Carlsbad, California
Plan Number: N/A
Permit: (79 N1A
Report No: 4039,
ENGINEER: BENJAMI1jSHIRER STAFF ENGINEER
Lab No: 4777
Project: EL CAMINO REAL AND ORION STREET
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 6/3/02 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 6/3/02 By: TESD
Source of Material: HANSON, SAN MARCOS
Location Sampled: SAMPLE #17
TEST STANDARDS ARE ASTM (unless otherwise noted)
TEST RESULT SPECIFICATION TEST STD
Sand Equivalent Value' 40 25 MINIMUM Calif 217-
Testing Engineers - San Diego, I n c., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 15-58O0 Fax [858] 715-580
COMPACTION TEST REPORT
Curve No 18
Project No.: 00-218B . . Date: 6/3/02
Project: El Camino Real and Orion Street - Geo. T&I
Location: SAMPLE #18
Elev./Depth: EWED8 BE
DA Remarks TESD NO 4778
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications USCS AASHTO
Nat. Moist. = : Sp.G. =
Liquid Limit= Plasticity Index =
%>314 in. = 3.6% % ~c No.200 A0.9%
TEST RESULTS
C0
cn
150
130
120
-
Maximum
Optimum
140
AA
100
dry density = 142.5 pcf
moisture 6 %
Test specification
ASTM D 1557-78 Method C Modified
- - 100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
2.7
2.6
-NIL N
-
-
- - - -
I 25 335 40
I 80 i
Water content, %
Plate
TESTING ENGINEERS
...'•
Established 1946
PHYSICAL PROPERTIES OF SOIL & AGGREGATE
Date June 6, 2002
Job No: 2000-218B
Job Name: EL CAMINO REAL AND ORION STREET - GEO. T&I
Address: Carlsbad, California
Plan Nun3br: N/A
,9 Permit:( N/A
Report No: 4040, 14'i5L'2&2.
ENGINEER: BENJAMV SHIRER, STAFF ENGINEER
Lab No: 4778
Project: EL CAMINO REAL AND ORION STREET
Location CARLSBAD, CALIFORNIA
Sampled: Date: 6/3/02 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted Date 6/3/02 By TESD
Source of Material: HANSON, SAN MARCOS
Location Sampled: SAMPLE #18
--------------------------------------------------------------------------------------------------
TEST STANDARDS ARE ASTM (sinless otherwise noted)
TEST RESULT SPECIFICATION TEST STD
Sand Equivalent Value 30 25 MINIMUM Calif 217-
Testing Engineers San Diego Inc 7895 Convoy Court Suite 18 San Diego CA 92111 [88) 7.15-5800 Fax [858] 715-5810
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name £ 1 rvi tv o r' i.1
Project Number ' 2 Test Date 1' 6 ? Page of °
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
:e L-rc P ci C f7471 Jo "'z '
/ t v
- - P--t cp
- - L 1 171 1 'cL7/ e '1 / -3 too
Noo ti çIle P
i?c25-tcc
/93 5 /J J 9 / jc s p I (L 1Cc f\3 p
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other ________________________________________
Test# I1 f1qQ 1ci !1 L:T@,_ 113 "'5
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
137 /j
)
).3')
/I9.0
(4
Ib1. Io.o
!;i1.,
j4
I.)!I
I0L'9
l7) cc'
i/
i25
122?
Moisture (%) I ). . I ,$ I I 7 1 ( 1 /71 / ' /) / / ) )9.
MID Curve Number & .t j_ /1 1 '1
Maximum Density (pcf) pits ffl5 ic /jci.S //, )).5_
Optimum Moisture (%) )\ 5 J ( 11 .5 I(, I & ç it - SD / /4 0 10. <
Relative Compaction, RC (%) 19 ç c1
, c1 q
Relative Moisture, RM (%) f I.
Specified RC (%) 9
Specified RM
Conformance (Yes/No) .
Nuclear Gauge Model and Serial Number: C /9/t/ fY ' 1 01 (?
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: t') i Y ./1r" Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
c
C)
0
a
• • COMPACTION TEST REPORT _---- RECI
Curve No.: 19 -I
ProjectNo.: 00-218B Date 13i02
Project: El Camino Real and Orion Street - Geo. T&I &'
/ R -
Location: STA 327+00 NEXT TO EL CAMINO REAL /
Remarks: TESD NO. 4873
MATERIAL DESCRIPTION
Description: LIGHT GRAY-BROWN SILTY CLAY
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index=
%> No.4 = 2.9 % % < No.200 =
TEST RESULTS
140
a100
Maximum
Optimum
dry
moisture
density = 119.5 pcf
11 %
Test specification:
ASTMD 1557-78 Method A Modified
.
NF
100% SATURATION CURVES
FOR SPEC. GRAV EQUAL TO:
IT 2
110
•
= = = =N.N N
I .._.\
130
-
.
12O=_I________
:
70RF!LE=4T_ T-7
0 5 10 15 20 25 30 35 40
Water content, %
Plate
TESTING ENGINEERS
Testing Engineers-San Diego, Inc.
QP
;7895'Coiiv6y Court, Suite 18, San Diego, CA; 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number - I Test Date
Client
Established 1946
Page of ..3_
Test # Material Structure Test Location and Elevation or Depth relative to...f __
4 Q3f1rtt'
32y -r ?
()
p it,
; _'-(c
I
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, O.= Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches) v"_-
2,)b
- ------
Wet Density (pcf)ICU,
Pry Density (pcf)
' _ 1'i ' J7)_
Moisture(%) /0. ( I!. 6
MD Curve Number
Maximum Density (pcf) ..... ç ___.
OptiM1Jmr Moisture (%) 10 _5 s-
Relative Relative Compaction, AC Cl 6' 5 9 5 9_6
Relative Moisture, AM(%) - 1 -- -L - _
C) -t _____ ______ ______
Specified AC
_____
Specified AM
- — -.
Conformance(Yes/No) \f J
Nuclear Gauge Model and Serial Number: 3t'c_99_17d_,
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet speCifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: A -L_1(1 Signature: ('I ,,_4_,IA_ii
Clients or Contractors Acknowledgement Name Signature
White- Office Yellow: Contractor Pink- Field Technician
—
Testing Engineers-San Diego, Inc. Established 1946 j
7895 Convoy Càurt, Suite 18, San Diego, CA. 92111
[858].715-5800 Fax [858] 715-5810
S /•.''%''•, -
REPORT OF COMPACTION TEST DATA
Project Name E-iCo t 2 -
Project Number p p — ITestDate
Client
Test # Material Structure Test Location and Elevation or Depth relative to... / f .,.. p. )
A. !B P
.• .
,, 3 r7 Cp --i 13 &
IcC 3 -
RIP.
.
Y.25tI-I i" .L -
2 t, .—t e. -1 2 ? /3
[...it .L4 AP) (7.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other . -
Structure: . P = Pavement Structural Section, -F = General Fill, N = Native Soil, WL= Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 =Other
Test #
Probe Depth (inches)- -• : ---- — _______ _______ _______ - .
Wet Density (pci)
'
Dry Density(pci) . . . -
i1°'JiL
;'3
Moisture (%) . .
),',5
j5LS
11 9,A
i9 3A
ii I,,
g do,) i)l.1?
I-o',j
'3,5
\(t.p Id
I3t1
MD Curve Number
Maximum Density (pcf) •-•p:?.c• ______ . - ______ ______ ______ ______ ______
Optimum Moisture (%)
Relative compaction, RC (%) - '1 91 ? ' 21 .95 95. 9 (.
Relative Moisture, RM (%) 73 • f 7.1
Specified RC (%) g . _____
.
Specified RM
Conformance (Yes/No)
Page Of
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for perforFñance in accordance witthe
codes. The contractor is responsible for scheduling retesting of reworked areas that have previouslfail
See accompanying Daily .Reporof description of work and observations
TESD'sTesting Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: . Signature:
plans, specifications and appli
ad to rn,et specifications.
--
White- Office Yellow- Contractor Pink- Field Technician
4q SJ'S ,,4
Project Name
Project Number
Client
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
El (
I Y I . Test Date - ' Page of
Test # Material Structure Test Location and Elevatiori or Depth relative to... .
Orovi.__t
I! tov' 2c c,
3s1. lAiaJ
I it5a __
-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# . . c9
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf) I11,1) it1.r )l(A ii.s Cl
Moisture (%) 11,1.. 11,4 10.1 1a? 11.1 9 21 7 /&,C
MD Curve Number
Maximum Density (pci) . - - -.--- -
Optimum Moisture (%)
Relative Cdmpaction; AC (%) 9 S 5 95 5 9_f . _ 9._S 9_4
Relative Moisture,RM (%) + I,t .. • 1.c, -.9- "I. -r .
Specified RC (%),•. c /, - -
Specified AM (%) I i:? i- _____ _____ _____
-
-r -
Conformance(Yes/No)
Nuclear Gauge Model and Serial Number: L ,'_Iv,-)o'1C1'-' 56 d
This report does not relieve the contractor or thbirresponsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: r 'r'vr _I/ti' Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
COMPACTION TEST REPORT I jj32li02
Curve No.: 20 L.
Project No.: 00-2413 IFCA LSAD
Project: El Camino Real and Orion Street - Geo. T&I RE '--.-. L...- -
Location: STATION 11+00
Elev./Depth: D4 tE,
.Remarks: TESDNO.4896
MATERIAL DESCRIPTION
Description: YELLOW-BROWN SANDY CLAY WITH GRAVEL & LIME (LIME TREATED SOIL)
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>314 in. =
,. %<No200 ..
TEST RESULTS
Maximum dry density 124.5 pcf
Optimum moisture = 11.5 %
140 . Test specification:
ASTM D 1557-78 Method C Modified
130--
-
.
.
120 100%SATURATI0NCURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
2.7
CL
1 00
90
80
TT_
70
Water content, %
Plate TESTING ENGINEERS____________________________________
COMPACTION TEST REPORT
Curve No.: 21
Project No.: 00-218B Date: 6/17/02
Project: El Camino Real and Orion Street - Geo. T&I .
-RE"WED B.
Location: STATION 13+50 DA
Elev./Depth:
Remarks: TESD NO. 4897
MATERIAL DESCRIPTION
Description: GRAY-BROWN SILTY CLAY WITH GRAVEL & LIME (LIME TREATED SOIL)
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G.
Liquid Limit = Plasticity Index
%>314in. 1.3% %<No.200
TEST RESULTS
140
130
120
110
1::
90
Maximum
Optimum
dry
moisture
density = 111.5 pef
= 16.5 %
Test specification:
ASTMD 1557-78 Method C Modified
NA-
100% SATURATION CURVES
FOR, SPEC. GRAy. EQUAL TO:
2.8
2.7
= = =
- - - - - - -
-
--
-S
-
E
11111141111111111 1 ii" 7011
5 10 15 20 25 30 35 40
Water content, %
Plate
TESTING ENGINEERS___________________________________
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name tn
Project Number. 0 0 I <1' to Test Date C - I 0 Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
ii 5 P Li_t jViti 14 J2 'Qc1,17A J1 c ?;,
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture(%)
MD Curve Number
Maximum Density (pcf)
OptimumMoisture(%)
Relative Compaction, RC (%)
RelativeMoisture,RM(%)
Specified RC
Specified RM
AtoConformance(Yes/No)
Nuclear Gauge Model and Serial Number: O_A'_M_3_(V0_5Ô
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: y_(_fVlJ))e' Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field 19chnician
'I
Testing Engineers-San Diego, Inc.. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA 92111
. . . [858] 715-5800 Fä*'[88] 715-5810-
R PORT OF COMPKCTION TEST DATA
Project Name L I (A ,, o e
Project Number Test Date - 0 Page of
Client . . . . . . .
.
. .
Te.# Material Structure Test Location and Elevation or Depth relative to...
I1 ? £ /(L\ _.. ______. N._ I_s.,)_( 7 2 tlk (Z)_1(f IT 5
__ ..• L ?&s
)4Lc J .
Ife
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cemen'freated Soil LTS = Lime Treated Soil, 0 =.Other . _._._. Structure P = Pavement Structural Section F = General Fill N = Native Soil WL = Waterline SS = Sanitary Sewer ST = Storm Sewer
U = Other Utilities W = Wall Backfill SC = Sidewalk Curb/Gutter, 0 = Other
j1C
Test #
Probe Depth (inches)
Wet Density (pcf)___
I !Z1 I_"i )-O___1
Dry Density (pcf).. _. I'IiI !.114 go'3;. Io.Pj
Moisture (%). j LA ii____.
MD Curve Number
Maximum Density (pcf) J_)C)5 is°5 I9'S 11,
dptimumMoisture.('o)
Relative Compacti&1RC
RelativeMoisture,RM (%) '3 . 4
Specified RC
Specified RM (%) f _..., .
Conformance jJ
Nuclear Gauge Model and Serial Number: .(_P 'MI IC)O0 .(o?_______.,____.
This report does not relieve the contractor or their responsibility for, performance in accordance with the plans, specifications and applicable
codes. The contractor is respOnsible for scheduling retesting of reworked areas that have previously faiIei to meet specifications.
See accompanying Daily Report of descriptiortof work and observations . ,. . .
TESDs Testing Technician Name r 1lM M__ Signature __I_IiJt'ti..Q49
Client's or Contractor's Acknowledgement..... Name: . Signature:
White- Office . , Yellow- Contractor '\ .. Pink- Field Technician
.---tp_ 4r
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name L m I i ( 4 0 t i/i
Project Nuniber ID 0 C> 0( 4 Test Date Page ___of
Client .
Test # Material Structure Test Location and Elevation or Depth relative to...
P bot
1911q I I IC1 0
-
_._.,,
/ -s
..J i 'oo
.
/ 3!
L4/ _(5'.747 _?25-~-5 __
c s I .(->c-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Basej CTS = Cement'Treaied Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Nétive Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, .0 = Other
Test #' I1)' itc 1(Q Cl4! I5)\ /9-1 L! f7S
Probe Depth (inches)
WetDensity(pcf) ):7 ?'t /_34_/ )3.),q
Dry Density (pcf). )1 ))( 1 1.0 lti. Io10 io('.l I00 11.5 ii
Moisture (%) /2.7 1)5 11.7 IC,I /7.1 1t,9 j1.
MD Curve Number 'o '9 'i i / 1.C1 /i 4'•:
MaximumDensity(pcf) )_Ig_) /'r Idif-S 111.5 I!I$ 1/i..S )_).~ /1 .J // I ). 5
Optimum Moisture 5 (. //,3 I(,15 IG15 / . c it - I.. /f•e., ii.0 /0.(
Relative Compaction,Rt (%) 5 'j f'. 1C c q . q . 7_5
Relative Moisture,RM (%) t I. 1•I.b 2 -.i _ & f_ 49 11/ -r .~ F 1.7
Specified RC
Specified AM
Conformance (Yes/No) -1 I -tv Is4I ,,Y
Nuclear Gauge Model and Serial Number: C_/'A1_-iY't_11010 0 50?
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
Seeaccompanying Daily Report of description of work and observations
TESD's Testing Technician: • • Name: i _vl'I __/"7J.//1Signature: I_
Client's or Contractor's Acknowledgement: Name: . Signature:
_______ •
White- Office Yellow- Contractor Pink- Field Technician
r •'• - -. - - - -
Diego, Inc.Established Testing Engineers-San Diego, I Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111 -.
- [858] 715-5800 Fax [858]7,1.5-5810
- REPORT OF COMPACTION TEST DATA
Et
0 ü 0 - (8 L Test Date C / - 0 Page of
Project Name
Project Number
Client -
Test # Material Structure Test Location and Elevation or Depth relative ta...
Li, p_- 0y io 4/_5 TA 0 I It_ C)C,
S P El _Rj _N b0 _,)_.3 /-;
Material: S = Soil, AC = Asphalt Concre'te;ATB = Asphalt Treated Base, AB =0 Aggregate Base, CTS = Cement Treated Soil I
LTS = Lime Treated Soil, 0 ='ther 0
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ) lJ')€
Probe Depth (inches)
,0 J•_ 01 _______ -
_______ , _______ _______ _______ _______ 0
'Wet Density (pcf) l;-)-
Dry Density (pcf) I t, $,11
Moisture (%) r,,
MD Curve Number
Maximum De nsity (pcf)
Optimum Moisture 5 11._$ )I-o //
Relative Compaction, AC (%)0 5 -0 _9.5
RelativeMoisture,RM (%) 1C_.5 . 0 7'I--to ?7/
Specified RC (%) '$ --
SpecifiedRM(%) __
Conformance(Yes/No) I N I (Si '../
Nuclear Gauge Model and Serial Number: C Pf"-_41_1/1)q0_O_S ()
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractoris resporisiblefor scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations - 0
TESD'sTesting Technician: Name: A--ri4 ./fl/1pi -Signature:
Client's or Contractor's Acknowledgement: Name:
0
Signature: LI—e W-1
0 White- Office
,.
Yellow- Contractor Pink- Fieid Technicin
Test# . i71 / !&$ '4 ljt.c
Probe Depth (inches) V, .
Wet Density (pcf)
DryDensi,(pcf)
Moisture (%) . 1 5 1 / S-
MD Curve Number 1 • ______ _____
- PA
Maximum Density (pcf)
)..j . • - _______
Optimum Moisture
Relative Compaction, .RC (%) . '?"o 9 :3 • .
Relative Moisture, AM (%) ; j.9.,5 f? •
Specified AC (%) . ' • •
_______ 5 . . • _______ _______
Specified AM (%) I -) -t'? '- -k--- - •
Conformance (Yes/No)
Testing Engineers-San Diego, Inc Established 196
7895 Convoy Cu Suite 18 San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 1 ( '. :, P / <
Project Number ')Do (:) ' 4 Test Date I I 6p Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
I1c& 5 P (Jc t n ht A 71;,' Yt Op.
___
I
I 7
•
)1 L1) P6 r ig, LL ('514-o 72>0
Material: S = Sdil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm-Se wer,I
- .- U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
1. . . .,
Nuclear Gauge Model and Serial Number: I(( "(f/3
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations .
TESD's.Testing Technician:. • • • .• • Name: • 04iA Signatu re: A A 1
Client's or Contractor's Acknowledgement:
:
Name.. • • Signature:
White- Office • Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc Established 1946
7895 Convoy Court, SUite 18, SanDiegO,CA. 92111
- [858] 715-5800 Fax [858] 115-5810
,' REPORT OF COMPACTION TEST DATA
Project Name t I ( ,- 1 0,' ..'c p' ,i
Project Number . h — I TI,- Test Date 3 — . / Page of
Client 0
Test # Material Structure TestLocation and Elevationor Depth relative to...
4' -is
4oi. Lrs .1 &c-vtr,' 5iL c'J 7'4,0 -
/r3 _.L .'N0-LL Co-çir1- 16-r5 . x ii" A6
- j 5.. 0 . . c : L ___ ___
4L' L• .
. :4 71
I ' :
Material: . S = Soil; AC =Asphalt Concrete, ATB =Asphalt.Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
'c. . LTS = Lime Treated Soil, 0 Other,_.• _S _-
Structure: P Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,.
U = Other Utilities, W = Wall Backfill;SC = Sidewalk, Curb/Gutter, O.= Other '...
Test # ,'. .5 7 4 j
Probe Depth (inches)
Wet Density (pcf)
.Dry Density (pcf). . S /ü&u I )4.(. lt.4 i/C3 j 17-f ja9'o I!s'K! • .
Moisture(%)
MD Curve Number
Maximum Density (pcf) .
0 ) 10, $ iLL / -5 - -4 -
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%) 95,
Specified RM (%) -)? S ----•.
Conformance (Yes/No) S y'c s I Vr5 Al Vc) V(e '/ ec
Nuclear Gauge Modeland Serial Number: . P11 lib TOO5'o5 ' S
This report does not relieve .the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: S ' Name: -11 ' i'4i / 49 I/(, Signature: ,L44lut_.
Client's or Contractor's Acknowledgement: Name: -. (kL,At /.Signature:
White- Office • . Yellow- Contractor .. . . S. Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number goo 0 "2 1 f /) Test Date s / Page of
Client
Test # Material Structure Test Location and Elevation oi Depth relative to...
51 4 5f7',' _Cccc CCt7r -
__ -r L
I V3-r4
57
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL =.Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #'. 3 54 ~.c' ç 4,$T:77
Probe Depth (inches)
Wet Density (pcf) '?2' I_'JJ. )_3t.D (3).0 M.
Dry Density (pcf) ! . i .4 iii . ."p,
Moisture(%) 14_C )_._- 4.4 IL.o
MD Curve Number
Maximum Density (pcf) J -
Optimum Moisture
Relative Compaction, RC
.Relative _Moisture, RM(%) p. )_3, J 7_
Specified _RC
SpecifiedRM(%) ).f'3 --
Conformance (Yes/No)
Nuclear Gauge-Model and Serial Number: C_PN _31 0 'i00So?
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD'sTestingTechnician: Name: A_lIft'Signature: _
Client's or Contractor's Acknowledgement: Name: (/lh4% Signature:
White- Office Yellow- Contractor Pink- Field Technician
'.
Testing Engineers-San Diego, Inc Establish J9A6--
7895 Convoy Court, Suite 18, San Diego, CA 92111
[858j,715-5800 Fax [858]7155810
- REPORT OF COMPACTION TEST DATA
Project Name 11 •l 41 .. L14-J, 41-
Project Number 1? 1) — IT 4. Test Date . '._ 0 - Page of
Client
Test # Material 'Structure Test Location and Elevation or Depth relative to... ___/Ma, .J_/_.__ 10 2 Sf /4
\j1. _ej ii_50 5i61,c1'A11..._3-<-t_
i? L , 71.
. • . . .
.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other.______________________________________________________________________
'Structure: P = Pavement Structural Section, F = Geheral Fill, N = Native Soil, WL =Waterline, SS ,= Sanitary Sewer, ST = Storm Sewer
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches) . I
Wet Density (pcf)• 2?.> / j, 9' 7'!., /)4j
_____ _____ _____ _____ _____ _____
Dry Density (pcf) ) oj /( $ 100.4
_
/o'1
Moisture (%) )_5' )_1 Old.(', N.
MD Curve Number
Maximum Density (pcf)
Optimum Moisture
Relative Compaction, RC clio_ cj_Sb
Relative Moisture, RM (%) IL J(,__5 o5 /34
Specified RC ---
Specified RM (%)
Conformance(Yes/No)
Nuclear Gauge Model and Serial Number: r V/V - - 7 0O.A00
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor'is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.'
See accompanying Daily Report of description of work and observations' • •
TESDsTesting Technician Name Y-' Signature:"A ,4 1JA
Client's or Contractor's Acknowledgement: Name: __ L.- Signature:
White- Office , • Yellow- Contractor' 0 ' Pink- Field Technician
Testing. Engineers-San Diego, Inc.
. 7895 Convoy Court, Suite 18, San DiegO, CA. 92111
[858] 715-5800 Fax. [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name 0
Project Number 0 0 c' -. •' I ;'4 -/ Test Date - fi . t Page _.4..... of _._3_.
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
JI 6I0i-r ;;41t
(,i,,, .
r4 I L 1' ic- .
Ti
'F L I ,. ' .
3 / j l~~-o i.
" it I C17d' /ct/. 1, jc•
1Ai(4
J SQLT c.')t 4. .1 4
Material: - S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS Lime Treated Soil, 0 = Other
Structure:. P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #— T a, S 7 . , 9
Probe Depth (inches) . . 9__ -fl--- .
------
Wet Density (pcf) 1 -70,7 1321 1717' 1 139' 172'
Dry Density (pcf) 11,42 )C _4 ) Ii 8 ( I I, 'i i 1 i.r .1_'ii, I__ j
Moisture (%) _. 1°_Y. ILi ii )J I' _ / /. )0,
MID Curve Number /11 / /o 1° /_
MaximumDensity (pcf). I 15 js Sf
Optimum Moisture
Relative Compaction, RC (%) c '$'I q 4,0 S $'o ' I i_1.0
Relative Moisture,RM (%) 44 3_i', lo_C,
Specified_RC (%) _.— — - - - -
Specified RM (%). - -r ---- '.-- . ,
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: ( P1V 7
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifiáations and applicable
codes. The contractor is responsible for scheduling retesting of reworkd areas that have previously failed to meet specifications. .
See accompanying Daily Report of description of work and observations
TESD'sTesting'Technician: Name: ii /21.il,' Signature: tL4.4./j4.2)-'.)I
Client's or Contractor's Acknowledgement: Name: V1'(,-frt#',1
White- Office . Yellow- Contractor Pink- Field Technician
Tesi# 7C
Probe Depth (inches) E'• q-"
Wet Density (pcf) 13 I j'3) I. I '3)i 1331 .
Dry Density (pcf) I )ç15# )_'1 )v 1)? 5 o '3
Moisture (%). . Co , 1i l?' )) 105 ,13.4 .Tc
MD Curve Number /0 Ia 1 0 /0 /0, t /0
Maximum Density(pcf) 1.2 I t5 S 1)i5 )'). '
Optimum Moisture (%) /0 / 0 o10 )o.L, 10,0
Relative Compaction, RC (%) q , .b
Relative I LL. Moisture, RM (%)
Il I )L,L O ,7 2o?,• I),i 11,5
Specified RC (%) ; .' 9 5'v
Specified AM (%) - - f ) - — _-'•• - -'- —4
Conformance (Yes/Na) -.
5'P )gt
4
I - ---
Project Name
Project Number
Client!
Tes1i.ng Engineers-San Diego, Inc.
-.7895COnoy Court, Suite 18, San Diego, CA. 92111
-
(858] 715-5800 Fax [858] 155810 .
\ REPORT J,OF COMPACTION TEST. DATA
51 2(?Ofl ?( L Test Date __LV D2
4r
4Estab1ished 1946
Page of -2—
Test # Material Structure Test Location and Elevation or Depth relative to...
? 1qi 7 '-• ?" Li&.
' 1" 13.•
7 — o;9LA../ 4'
D 3't
J
4 C1
cfr/1
50v7&, c,d3' J
___ __ __ 'i'• J1 Q4OD L
Material: S= Soil,'AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS= Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST= Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
-
Nuclear Gaug'e Model and Serial Number: (PA/" "70t) 7'2i 9.2 C
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable'
codesJhe contractor is responsible for scheduling rétestirig of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of desbription of work and observations . . •
TESD's Testing-Technician: Name: - It r Signature:fi ;i1(
Clients or Contractors Acknowledgement Name:' ame Wt'L.L1t'i. (Ps_. Signature
White- Office -' Yellow- Contractor -. - Pink- Field Technician
V '•
Testing Engineers-San Diego, Inc Established 1946
fr 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858],7115-1800 ,fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Pràject Name O. ro , . c .x 11 14
Project Number '. 01? o - ol / ' 4 Test Date•. 2 Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
() 3c-/-O7
.L j' .J •:. : J7-'25.
Material: S = Soil, AC= Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
, C C 5 ' . S
Relative Compaction, RC (%) . j. q .
Relative Moisture, RM
Specified RC (%)
Specified AM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This reportdoes not relieve the contractor or their responsibility for performance in accordancewith the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of réworkCd areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observation è .
-
TESDs testing Technician: Name I i/i' Snature JA g
Client's or Contractor's Acknowledgement: Name: Signature:.
U.., . . . . .
White- Office Yellow- Contractor Pink- Field Technician
Project Name
Project Number -
Client Ol
Test # Material Structure: Test
:
ing Engineers-San Diego, Inc. . täblished946
onvoy Court, Suite 18, SanDiegô, CA. 92111
[858] 715-58OOFax [858].715-5810
/
RTOF COMPACTION TEST-DATA/ 4 -
Test Date b3 - I kt Page A. of Or_
and Elevation or Depth relative to... .
'LA
- •
•0
+
.
.
.
- ,•.,, •1. •
I
•,, S
Material S = Soil AC = Asphalt Concrete ATB = Asphalt Treated Base AB = Aggregate Base CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other. . : . . •.
Structure: P = Pavement Structural Section F General Fil!,.N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities W = Wall Backfill SC = Sidewalk Curb/Gutter 0 = Other
Test#
Probe Depth (inches) i.. l
Wet Density (pcf) All
Dry Density (pcf) • : r nci ______ .
•;• ., . .
______ . .• - . :
Moisture(%) _,
. (• .•• •-•'. : . . ., . .
MID Curve Number : vO . . .. . . . .
,,.,-•.
.
Maximum Density (pcf)
Optimum Moisture (%)._.. . . . . • .
'. :..-:
Relative Compaction, AC (%) ____., .. . . .S -. . • . . . ._5• _______ _______
Relative Moisture RM (%)
Specified RC (%)
Specified RM (%)_: __. I ,. • .
Conformance(Yes/No) __-•: . ..• . . . . ,. .
Nuclear Gauge Model and Serial Numberlo.L._3II_,&+•t.ø_/-ç .
I • .., - This report does not relieve the contractor Jr their resp••
onsibility for performance in accordance with the plans specifications and applicable
codes The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications
See accompanying Daily Report of description of work and observations,,)
TESD'sTesting-echnician: 5 . . •Narne:. Signature: I .S
Client's or Contractor's Acknowledgement: . • Name: . • MJlL.Lt'4?'-. _LM'. Signature:
White- Office • 5 5 • Yellow- Contractor • S PinkFiêTd Technician
-, tg Engineers-San Diego,Tnc. .Established 1946
( 7895 Convoy Court, Suite 18,San Diego, CA. 92111
[858] 7155800 Fax [858].715-5810
REPORT OF COMPACTION TESTDATA
Project Name &v'p gtAA a%0,11 4ro.,+ Ct .
Project Number c-1X O Test Date 03'-.. Page of
Client c . . -
Test # Material Structure Test Location and Elevation or Depth relative to...
01
- TL ,jLç/\ t4- W4
AlL pr j-.c ~'
4WL Tytc ki\ WfWi 4A -fSn M"c
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other .
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # p . ..
Probe Depth (inches) 6
Wet Density (pcf) fti.l J173 1 07,o
Dry Density (pcf) 9 ç.c ,o p3
Moisture (%) . .
MD. Curve Number frD't-
Maximum Density (pcf).
Optimum Moisture
Relative Compactior{, RC
Relative Moisture, AM
Specified AC (%)
Specified AM (%) 4. .
Conformance (Yes/No) . .
Nuclear Gauge Model and Serial Numberfli-o\pi 4 S' 9 c..t r
This report does not relieve the c I ontractor.or their responsibility for performance in accordance with the plars, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed meet specifications.
See accompanying Report of description of work and observations
41 - . 15 \11
TESD'sTestindTechnicn: ' Name: 1' Signature: ADig ' 'Oz: 5~
Client's or Contractor's Acknowledgement: Name: tL.''*'— Signature
hite- Office Yellow-.' Contractor Pink- Field Technician
A
Established 1946
Test .5 6 . 7
Probe Depth (inches).
Wet Density (pcf). .
Dry Density (pcf)
) 3, I è' -3.
Moisture
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) 14,0 -
Relative Compaction; RC (%) jo too 100
Relative Mdisture, RM (%) • 3 - .,'4' S
Specified RC (%) • .. _-
Specified RM (%) • 4
Conformance (Yes/No)
Project Name
Project Number _j
Client
Tsting Engineers-San Diego, Inc.
i95Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
- .;)1\
7 C Test Date 03-14-0 Page 00 of
Cwt rI.c
Test # Material Structure Test Location and Elevation or Depth relative to... s -...
' $ ST cL c- s\- + cj
Sr
(jS()(b.f O(W\ 'r 4, 1 So
5 5 S ' Ov;" çp -4 + 5t eAp,i 330
'ST Drvv 4 +o
Sr" DrA f10 4 -So L
'F - Si Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = cement Treated Soil
ITS = Lime Treated Soil, 0 = Other
Structure: P =,Pavement Structural Section, -F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
11= Other/Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other /
-. /
Nuclear Gauge Model and Serill Number: 1 .ki 3't\
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed meet specifications.
See accompanying Daily Report of description of work and observations . S
TESD's Testing Tech nici an: . Name: • Signature: hII
Client's or Contractor's Acknowedgément: • Name:
S
Signature:
White- Office S Yellow-.Contractor , S Pink- Field- Technician
7.
'Established 1946
Page Dof
Non
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 7I5-5800 Fax [858] 7155810.
REPORT OF'COMPACTIQN TEST DATA
Projet'Nae eri
Project Number otr— 'r
,
' •' Test Date______________________
Wet Density (pcf)
Dry Density (pcf) 1 4.6
Moisture , .
MD Curve Number , , l'q' r'v' D ' _____ . ' • '
Maximum Density (pcf)
. ______ _____ _____ ______ ' ' • ''; _____
Optimum Moisture (%) t, • $ti 1i , • . • . ' '
Relative Compaction, RC (%) 9& g' ' . ' ,,. '
Relative Moisture, AM (%) •
' io..t - • o
Specified AC (%). ' 9'/c' 13 Y' 1 ' " ' ' ' ' ' '
,:
Specified AM (%) • ' ± ± .t ' ,. ' •
, ,
' ' '
Conformance'(Yes/No)
Nuclear Gauge Model and SenalNumber1r JV to( ii 5c\cl (m
This report does not relieve the contractor dr their responsibility for performance in accordance with the pL cifications and applicable
codes. The contractor is responsible for scheduling retesting of reorked areas that have previously.failê specifications.
See accompanying Daily Report of descriptionof work and observations
TESD's TestingTechnician: . 'Name: Signature:
Cliét's or Contractor's Acknowledgement:. ' '. Name: Signature:
" ' '"•• '•', ••i/'V'
White- Office • • ,•, Yellow- Contractor. ' Pink- Field Technician
Material: S = Soil,, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = 'Aggregate Base, CTS Cement Treited Soil
LTS = Lime Treated Soil, 0 = Other'
Structure: P = Pavement Structural Section, F General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST ='Storm, Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0=' Other
15
Test# '.•-' '. ' , ' : '
Probe Depth (inches)
____- ____ ____
(J
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111 JL [858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name :/ (c--t>A /
Project Number Test Date +' ' Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
L.i-c'
7Gf1 2O'
.1k
Pf It 7_Pa"9k'. O
/c- /L -7,- s
IT/ ipt_-3d-s _i50
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
ProbeDepth(inches) j, I
, I
Wet Density (pcf) 11 5-J
-s 35 e•i/'. j1Or
Dry Density (pcf) ioL. '3. 4q 136'
Moisture (%) ,'.0 ii_- , 3 (oar
MD Curve Number
MaximumDensity (pcf) —3 z >
Optimum Moisture (%) ,'O
Relative Compaction, RC(%) i 9,°7
Relative Moisture, RM (%)
Specified RIC 1 0 —
Specified RM(%).,( I
Conformance(Yes/No) ,41
1 Nuclear Gauge Model and Serial Number: 77_..)c f('-Q _( __k //
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Tech nician: Name: I
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name \. )rtr', ")hr,jT rl. brzt
Project Number ' Test Date __ Page .P_ of
Client
Test # Material Structure 'Test Location and Elevation or Depth relative to...
ço 5r4e. 4 )7+°o
S1. r ad f
Lc Yl~
.
SJ
.
r - J-13
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%) 1 '•91 p.
MD Curve Number iMD
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, Moisture, RM (%) 1- 110
Specified RC
Specified RM (%) t ±
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:J-. kr 'j- S t II(l
This report does not relieve the contractor or their responsibility for performance in accordance with the pt
tmeet
specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously faile specifications.
See accompanying Daily Report of description of work and observations .
TESD'sTesting' Tech nician: Name: ' /2 signature: \• i)'.
Client's or Contractor's Acknowledgement: Name: ''/,'r-signature:
White- Office Yellow- Contractor Pink- Field Technician
COMPACTION TEST REPORT ->
Curve No 5
Project No.: 00-218B \ \
Project: El Camino Real and Orion Street - Geo. T&I or
. \
Ik
- Location: NOT SUBMITTED /kEV1Ew6DT
Elev./Depth: IN SH
MATERIAL DESCRIPTION
Description: BROWN CLAYEY SAND WITH GRAVEL
Classifications - USGS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit ,= Plasticity Index =
%> 3/4 in. = % % < No.200 =
0
co
140 =
-
110 --
100
90
TEST RESULTS
density = 134.5 pef
= 8 %
Test specification:
ASTM D 1557-78 Method C Modified
100% SATURATION CURVES
17011
2.8
2.7
2.6
Nil-
moisture
-------
Maximum
Optimum
dry
= = JiI\
... . . -
120___==:=_:_
ILLr
80 i i i
701
0
1+IP
5 10 15 20 25 30 35 40
Water content, %
Plate
TFSTIPJ(
150
140
130
110
100
90
COMPACTION TEST REPORT
Curve No.: 6
Project No.: 00-218B Date: 4/9/02
Project: El Camino Real and Orion Street - Geo. T&I
Location: NOT SUBMITTED
R ESD NO. 4265
MATERIAL DESCRIPTION \
Description: CLASS II BASE AGGREGATE L
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%>3/4in. = 3.6% %<No.200
TEST RESULTS
Maximum dry density = 144 pcf
Optimum moisture =6 %
Water content, %
Plate
TESTING ENGINEERS
2.0
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
Testing Engineers - San Diego, Inc. Established
R-VALUE TEST RESULTS
PROJECT NAME El Carnino Real and Orion Street - Geo. T&I
CLIENT'S PROJECT OR WORK ORDER NUMBER 2000-218B
SAMPLE LOCATION SAMPLE #1 - STA 1400+00 @ -1'
SAMPLE DESCRIPTION V BROWN SANDY CLAY WITH GRAVEL
SAMPLED BY V TESD
TESD PROJ. NO. 2000-218B DATE RECEIVED 4/4/02
LAB NUMBER 4209
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcI)
50 185 100
15.8 13.2 14.5
114.3 121.1 116.7
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
,R-Value (corrected)
0 1 0.1
1.28 0.97 1.17
180 580 310
11 33 19
EXPANSION PRESSURE
EXUDATION PRESSURE
Ui 100
80
60
LU 40
LLJ
20
0 100 200 300 400 500 600 700
V EXUDATION PRESSURE (psi)
e.SSt..T1,'1:E1:) TRAFFIC 1II:)Ec
R-VALUE BY EXUDATION 18
R VALUE BY EXPANSION 33 Reviewed By L
R-VALUE AT EQUILIBRIUM 18 CARLOS ACERO, STAFF ENGINEER
Testing Engineers - San Diego, Inc. Established
R-VALUE TEST RESULTS
PROJECT NAME El Camino Real and Orion Street - Geo. T&I
CLIENT'S PROJECT OR WORK ORDER NUMBER 2000-218B
SAMPLE LOCATION SAMPLE #2- STA 1600+5 @ -2'
SAMPLE DESCRIPTION GRAY-BROWN SILTY SAND
SAMPLED BY TESD - - -
TESD PROJ. NO. 2000-218B DATE RECEIVED 4/4/02
LAB NUMBER 4210
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)'
Compacted Density (pcf)
270 150 100
19.6 21.0 21.9
116.6 113 110.5
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
1.37 0.57 0.3
0.68 0.94 1.08
570 320 220
53 35 25
EXPANSION PRESSURE
2.0
Ui >- 1.5 — UJ
Ui 0 1.0
>-j'.- 0 ai
0.5
U)
0.0
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
200 300 400
EXUDATION PRESSURE (psi)
500 600
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R-VALUE BY EXPANSION
R-VALUE AT EQUILIBRIUM 33
Reviewed By: oe\~
CARLOS ACERO, STAFF ENGINEER
Testing Engineers - San Diego, Inc. Established
R-VALUE TEST RESULTS
PROJECT NAME El Camino Real and Orion Street - Geo. T&I
CLIENT'S PROJECTOR WORK ORDER NUMBER 2000-218B
SAMPLE LOCATION SAMPLE #1 - STA 1600+5 @ -2'
SAMPLE DESCRIPTION AGGREGATE BASE
SAMPLED. BY TESD
TESD PROJ. NO. 2000-218B DATE RECEIVED 4/4/02
LAB NUMBER 4211
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%) .
Compacted Density (pcf)
350 350 350
8.1 7.2 7.7
133.7 133.4 133.2
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0 0.1 0.07
0.25 0.221 0.22
190 7601 400
83 851 85
EXPANSION PRESSURE
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
w 100
80
60
LU 40
w 20
C.) 0
0 100 200 300 400 500 600 700 800
EXUDATION PRESSURE (psi)
..SS1J1'VIED 'rR...A.:rFIC II']:)E)c
R VALUE BY EXUDATION 85
R VALUE BY EXPANSION N/A Reviewed By
R-VALUE AT EQUILIBRIUM 85 CARLOS ACERO, STAFF ENGINEER
/
. tabIishedi1946 Testing, Engineers-San Diego Inc.
if 7895 Convoy Court, Suite 18, San Diego, CA 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF'COMPACTION TEST DATA ;
. . c / . . . S Project Name L. i' c ., ...,
ProjectNumber . . TestDaté ' I 0 Page'. of
Client . •. . . . . . .
Test #. Material Structure . Test Location and Elevation or Depth relative to...0• ,' 0 .
?A& 'p . cAZ _/*'.•(4 "A) _(w
0 0• 0 • ' ' •0 ' 4
0 .7 00 ' •0•, - , 0 0 , 0' ' 0
____ ____ ____
0 _
"'
0 _'
0•
• . 4, , , .0 , ' . 0
______
' ' 0
. 0 0 -, 0 •,4 : '. • 0 ' 0 '
Material: S = Soil, AC-= Asphalt Concrete, ATB = Asphalt Treated Base,
,
-AB,= Aggregate Base,.CTS = Cèmerit.Treated Soil
LTS = Lime 'Treated Soil, 0 = Other 0 __0
,
0
•0,
•
Structure P = Pavement Structural Section F = General Fill N = Native Soil WL =Waterline, SS =Sanitary Sewer ST = Storm Sewer
U = Other Utilities W = Wall Backfill SC = Sidewalk Curb/Gutter, 0 = Other
O •,44 4
Aw Nuclear Gauge Model and Serial Number-'__C?,t"_I Q9__(0_.c0
This report does not relieve the contractor or their responsibility for performance in accordancewith the plans, specifications and applicable
codes The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications
See accompanying Daily Report of description of work and observations
TESD'sTesting Technician' . ,
•' Name: i M It'.Signature: .
Client's or Contractor's Acknowledgement: ' Name: • Signature:,
'
White Office Yellow Contractor Pink Field Technician
- 4
.Test#
Probe Depth' (inches)
.Wet Density (pcf)___
,• j__lrj I_"1 _3 '. ,
0
,
'.
, : ' ,.
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)'
' )41,o IAI,b .
0
0
OptimumMoisture (%)' C.S 4 ,= 0' ,
0 , , 0 '
RelativeCompaction,_AC
Relative Moisture, RM.(%)
Specified AC(%)'•,
______
0,,' 0 ' '4 ' , ' ' ' .: '
,0.
SpecifiedAM (%)
Conformane(Yes/No) r'+) !i) '
Testing Engineers-San Diego, Inc. ... stablishedJ946
7895 Convoy Court, Suite 18; San Diego,'CA'92111
[858] 715-5800 Fax [858] 715581O
REPORT OF COMPACTION TEST DATA
9) ( '-'c Test Date 5'- ) 19 ) Page of
Project Name
Project Number
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
c ct3 J I -i4 ( 13 T
0 . .
IV.,C ,t ( / A ¶A( 2 -t 5 I ?'W i ll
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS= Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other . .
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other.
Test # o 4
Depth (inches) -
IDensity (pcf) J4_7.
Dry Density (pcf) 14_O .L) ,.? I( 1 14. 1 74J
Moisture (%). 1.7 j$ 6.0 1
MD Curve Number
MaximumDensity(pcf) 14 I -
Optimum Moisture (%)
Relative Compaction, RC ô cj
Relative Moisture, RM
Specified RC(%)
-
------
Specified RM (%)
Conformance (Yes/No) . S
Nuclear Gauge-Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications:
See accompanying Daily Report of description f work and observations ,.
TESD's Testing-Technician: Name: A_r 6—n-1 AZ )/frSignatüre:
Client's or Contractor's Acknowledgement: .f. Name: Signature:--
S. '• 'a ..,
White- Office .. '. ,/ Yellow- Contractor . . Pink- Field Technician
140
130
120
'4- 0 CL .110
>.
EOR
I1.
70
COMPACTION TEST REPOR
Curve No.: 7
Project No.: 00-218B
Project: El Camino Real and Orion Street - Geo. T&1
Location: STA 23+75
Elev./Depth: /
Remarks: TESD No. 4476
MATERIAL DESCRIPTION
Description: BROWN CLAYEY SILT WITH GRAVEL, MIXED WITH LIME
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%>3/4in. = 3.4% - %<No.200=
RECEIVED
I -- Date 3O;Ta
L_ -i CITY OF CARLSBAD
C:
TEST RESULTS
Maximum dry density = 110.5 pcf
Optimum moisture = 8%
-
. Water content, %
Plate -TESTING EN(INEFRS
COMPACTION TEST REPORT
Curve No 8
Project No Date 4/30/02
Project El Camino Real and Orion Street Geo T&I
Location: STA 16+50 REV/f WFfl
Elev./Depth: / iJAM/fi sfi Remarks TESD NO. 4477 4TF/V7>
MATERIAL DESCRIPTION
Description YELLOW BROWN SILTY CLAY, MIXED WITH LIME
Classifications USCS AASHTO
Nat Moist = SpG =
Liquid Limit =
-
Plasticity Index =
%>3/8in = F %<No200
TEST RESULTS
Maximum dry density= 113 pcf
Optimum moisture = 16%
140
130
120
.4- C-) 0 110
>-.
(0 C ci)
o 100
90
80
70
Water content %
TESTING ENGINEERS Plate
COMPACTION TEST REPORT
Curve No.: 9
Project No.: 00-218B Date: 4/30/02
Project: El Camino Real and Orion Street - Geo. T&I
Location: STA 19+00
Remarks: TESD NO. 4478 FREVIEWIED BY: 8 AMIN
MATERIAL DESCRIPTION
Description: BROWN CLAYEY SILT WITH GRAVEL, MIXED WITH LIME
Classifications USCS AASHTO
Nat Moist = Sp G =
Liquid Limit = Plasticity Index =
%>314 in. = 3.2% .. .... %<No.200=. .•.
TEST RESULTS
Maximum dry density = 106 pcf
Optimum moisture = 19.5 % •. .
140 -
.
Test specification
ASTMD1557-91 Procedure C Modified
- - J.. LN
130
120 - 100% SATURATION CURVES
- _T
-
FOR SPEC. GRAV EQUAL TO:
2.8
2.7
- L) CL
I
110 2.6
T
1
i:EL1
80 i t H H
70
0 5 10 15 20 25 30 35 40
Water content %
Plate
L
Testing Engineers-San Diego, 10c. Established 1946
7895 Cànvoy Court,.Suite 18, San Diego, CA. 92111 ...
[858] 715-5800 Fax (858] 715-5810•
REPORT OF COMPACTION TEST DATA
Project Name El (p io t0 6 n -
Project Number " ()o a,, Test Date ~ ') 0 'OG Page _. of
Client
Test # Material Structure Test Location and Elevation orDepth relative to...
6 . . . * / ,1,t IL1', _.o__5;::;
5T 6;
tO'1 Lr1O' Sc
130
I?! 4-' 1 J. •. ?cIOSz
+°t s;
(?y IL . 'J .
..
f
S,= Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
.LTS = Lime Treated Soil, 0 = Other .
Base, AB
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sever, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
.
.5
Test # _
-- . L —la (agr . lv. /_ / 3 i '33
Probe Depth (inches) . 7"--
.
-_______ _______ . _______ _______ _______ . -_-•
Wet Density(pcf)
Dry Density (pcf) 14. 1o'f 3 1_), I__ Ho.S Ilo,
Moisture (%) ;, q /7. _' 3_O .:7- J 4,/ , 5 12,3
MD Curve Number
Maximum Density (pcf). 1_4_o 115 . ----- I '.o I?LC
Optimum Moisture (%)
Relative Compaction,RC (%) O,T) C7o,
Relative Moisture, AM 1 1.3
SpecifiedRC (%) _. 90,0
Specified AM
Conformance (Yes/No) .) t_i 'Jrr V-' Ws I V ( c '/c i' . W/
Nuclear Gauge Model and Serial Number: .
(7/V _70c'_7
This report does not relieve the contractor or their responsibility for performance in accordance 'with the plans, specifications and applicable
codes. The contractor is responsible for scheduling rOtesting.of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: ,4'/ii,, Signature:
Client's or Contractor's Acknowledgerrient: Name: S Signature:
White- Office Yellow- Contractor Pink- Field Technician
Material:
jStructure:
- S
...jrr.. -'
.,,.
Testing Engineers-San Diego,
a
c. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number ' 0 O 0 - I r.17 Test Date $ - 0 Page __. of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
'3$ L S'. L :4 . .L.: •L • S
Material: S = Soil, AC = Asphalt Conárete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sevër, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other 4
Test# 74 )3l3
Probe Depth (inches) I .
WetDensity(pcf)
DryDensity(pcf) 7' ,jc_I
Moisture(%)
MD Curve Number #3
MaximumDensity(pcf)
Optimum Moisture
Relative compaction,RC
RelativeMoisture,RM(%)
Specified RC 900
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: CP(1-'JD 0__?'_7 .14
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible f6 scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of wK and observations -
TESD's Testing' Technician: Name: A_(1'h01l1 _/)i//P / Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- FiFd :Wc1hnician
Teig Engineers-San Diego Established 1946
' 7895 Convoy.Court, Suite 18, San Die0o,CA92111
[858]:715-5800-.Fax [858] 715-5810
REPORTOF.COMPACTiON TEST DATA. .
Project Nam e
Project Number - ) 3" Test Date ' - / - C) ) Page of
Client .. . . . .
Test # Material Structure Test Location and Elevation or Depth relative to...
ij_c s• 041L4../ 11'
. . .
_______ •1 . ..,. .
. ..
Material: S = Soil, AC = Asphalt Concrete, ATB =Asphalt Treated Base, AS Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other . _-
Structure:. P = Pavement Strücturàl Section, F= General Fill, N = Native Soil, WI = Waterline, SS =.Sanitary Sew'ér, ST = Storm Sewer
11= Other Utilities, W = Wall Baókfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #. _
... H-'• j/. j
Probe ,Depth (inches). .
Wet nsity(pcf)-.,. M.4 , ) 72 .2
Dry Density (pcf)
.Moisture(%) ______i I
I1.D
-MD Curve Number .
MaximumDensity(pcf) j '13-2,0 - .
Optimum Moisture (%) _. . . .
Relative Compaction, RC (%) . . .
Relative Moisture,RM
.Specified RC (%)•-
Specified RM(%)
Conformance(Yes/No) . . . . .
Nuclear Gauge Model and Serial Number: .(PAl _.71.0 1OtS"o
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable.
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed-to meet specifications.
See accompanying Daily Report of description of work and observations
TESD'sTestingTechnician: Name: f%1'l'l_ffli(ir Signature:
Client's or Coniractor's Acknowledgement: . Name: . Signature:
.. . . ..........................-.:.
. White- Office . . Yellow- Contractor Pink- Field Technician
'
îè. i.n..g ngineers-SanDiego, nc.
- 7895Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax, [858] 715-5810
REPORT OF COMPACTION TEST DATA
ProjectNarné E/ Cc&rv:,, 4
ProjectNumber_ Qbbo 'I'1 estD4 0?
Client
Established 1946
Page of
Test # Material Structure. Test Location and Elevation or Depth relative to...
l)L .O 51ç_ tJO'rT ç,J, /E
o •f49
1 Li . c1.1$
___ ___ - '
L.
Li I - '• ( c-1'qi> 9 'Sr. ___
s't1k 4 •
I AA
P J.OV '
Material: S = Soil, AC= AsphaltCàncrete, ATB = Asphalt Treated Base, AB = Aggr.egate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0= Other
Structure: P =.Pavement Structural Section, F =General Fill, N ='Native Soil, WL = Waterline, SS = Sanitary Séwer,ST=.Storm Sewer,
. U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 =Other
-. -
Test #'
. J(j l )- i4 1?5 II / J244 J25 /5
Probe Depth (inches) 7 ,, .—
WetDnsity(pcf) ;. . I (A 117.7 j 1 1 [Irg I 1 'er: /I/9
Dry Density(pcf) - 10.4. 6 I o) )o5' 1i;.' boA IiY3,'1'4.(.
Moisture (%) :. )) ' 11,11 Cl)l.', 111t. it S 1: II (7 133 1. 9' i,!
F1DCurve Number
Maximum Density (pcf)
Optimum Moisture (%) : i-So - -.
Relative C ompaction, RC % 90.0 C/ 'Ito ? o re . - 1L2i qoo q a. Cja,,
Relative Moisture, RM (k'0) I 11. I 1 1A fl, $' 1 1 4 1:3 1 10,17 la, ' I
Specified RC : . 90 q0 _____ . •
Specified RM (%) - 1 3 - S.,- • ____ S.
Conformance (Yes/Na) •V 6_• '(t,I D W v s 1 k.5 VP( IVU I Jpj-
Nuclear Gauge Model and Serial Number: 0 • . .
This report does not. relieve the contractor or their respbnsibilityfor performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworkedareas that have previously failed to meet specifications.
See accompanying Daily Report of description of.work and observations
TESD's TetingTechnician: Name A riL wi ,4'Za',signature: • 1'. 9'k'
Client's or Contractor's Acknowledgement: ' • Name: •
.
• Signature:
LZ
White- Office • • . • • Yellow- Contractor' Pink- Field Technician