CARLSBAD BOULEVARD STORM DRAIN
REPLACEMENT PROJECT
Project No: 3624
CITY OF CARLSBAD
HYDROLOGY
ANALYSIS
Prepared by:
EE Harils & Associates EE
750 B Street, Suite 1800
San Diego, CA 92101
(619) 236-1778
DECEMBER 2008
CARLSBAD BOULEVARD STORM DRAIN
REPLACEMENT PROJECT
Project No: 3624
HYDROLOGY ANALYSIS
Prepared under the supervision of:
Robert Sutherlin Jr.
Project Manager
R.C.E 38819
DECEMBER 2008
Tab
Purpose
Existing Drainage Facilities
Hydrology and Hydraulic Analysis
Proposed Improvements
Appendices
10-year Hydrology Calculation
100-year Hydrology Calculation
100-year Hydraulic Calculations
Enclosure
Hydrology Map
I A. Purpose
I .
The 'purpose of the Carlsbad Boulevard Storm Drain Replacement project is to replace an existing
corrugated metal pipe near the intersection of Carlsbad Boulevard and Mountain Avenue with a new ' -
concrete pipe system. This hydrology report provides the flows and hydraulics for the proposed system.'
I
The street has curb and gutter along both sides of the street. .
The proposed improvements for this system require replacement of the 1P RCP and CMP system with an
I
...elliptical reinforced concrete pipe and a section of reinforced box culvert, construction of a new inlet ,
- - along Carlsbad Boulevard, and a new outlet within the North County Transit District's right-of-way along
the railroad.
I
- 3:T 40
— I IlocOft
-''
-
I
At-
- . ' :'.ç - V - . ' s-- .-.,-•' ' I . , •
,. - - ..' ..
..-, #J. .l .. •.•L4 r; /
'f' \r Iii) Ill
/
c'ci.-' \\ L. ?"•
I \
1 •xt'
' ' Puoposd ç - Replacement \ -1 Pipe
I \
,)
)•/
•,::
V
I r
-
--
:
•-.. :
I'..' .
It
-
-
' Figure 1- Vicinity Map ... . '. • ,. '
I
I .. ,. - -.. . . - - .• -. '•4 U -There are several constramts associated with construction of this replacement system. - There is an
, e*isting 12" high pressure transmission gas line that runs north arid south within the North County Transit "
I District's right of-way that must be crossed New construction must maintain at least an 18" clearance in
- all directions This site clearance drastically affects the size of pipe that can be used for replacement
There are also several existing buildings that must be protected in place The proximity of the building
walls to the proposed pipe alignment also affect the size of the pipe
With upstream inlets in sump condition, city guidelines require that 100-protection be maintained in the
I
underground storm drain pipe system '
+
p. -4 - I..
Existing Drainage Facilities (Refer to the Hydrology Map in the map pocket)
Drainage is mainly from south to north and towards Carlsbad Boulevard along both sides of the road. A
high point exists just north of Christiansen Way and sump conditions occur just south of Mountain
Avenue at the northern boundary limits. There are three inlets that currently collect runoffs. The first is a
24" x 36" grated inlet on the west side of the street (Node 150) within the driveway. The second is in the
median (Node 160) and collects runoff with the curb and gutter of the median. The third inlet is a 4'
opening Type C inlet on the east side of the street. These inlets convey runoff to the east within an 18"
pipe system of alternating CMP and RCP materials. The CMP portions of the system is damaged and
corroded and in need of replacement
Hydrology and Hydraulic Analyses
With a basin watershed of approximately 11.65 acres, runoff flows mainly from south to north toward
Carlsbad Boulevard, where runoff then flows north toward several inlets just south of Mountain Avenue.
Type "B" soil and several different development types were used to estimate the surrounding
development. The 10- and 100-year flow rates are 20.5 and 29.6 cubic feet per second (CFS) respectively
at the system outlet located east of Mountain Avenue. The 10-year and 100-year hydrology calculations
are included in Appendices 1 and 2.
The Water Surface Pressure Gradient (WSPG) program is used to determine the water surface elevation
I in the proposed pipeline. Using downstream control, the computations show that the selected sizes of
pipe will carry the runoff from the upstream inlets to the outlet east of the gas line without overtopping
the ground elevations. Riprap is being place at the downstream end of the outlet structure to dissipate the ' velocity of the runoff. Outlet velocities are shown in the range of 12 feet per second, although because of
the shape of the outlet, the depth is less than 4 inches and the energy can easily be dissipated. The WSPG
run and the proposed storm drain plans are included in this report.
I D. Proposed Improvements
I Based on the hydrology computations, the existing 18" RCP is not large enough to carry the runoff.
Since the inlets in Carlsbad Boulevard are in sump condition, it is necessary per city standards to intercept
the 100-year runoff. In order to meet this criteria, the pipe size must be increased.
The chosen alignment for the pipe also has several constraints that impact the vertical alignment. There is
a 12" high-pressure gas transmission line within the NCTD right-of-way that require at minimum 12" of
I cover over the top of the line and at least 18" clearance away from the sides of the line. Because of the
shallow elevations required to drain the system, we have designed for the minimum 12" clearance over
the top and the required side wall of the cleanout structure is 4' from pipe centerline. The section selected
I
to go over the gas line is a 2' x 4' RCB.
There are also two existing buildings (Scandia Inn) that have only about 6' between them. We have used
an elliptical section to provide the largest hydraulic section while minimizing the width of disturbance
I and to meet height requirements. The selected size of the remaining pipe is therefore 19" x 30" elliptical
RCP.
The sump inlet on the east side of Carlsbad Boulevard has been widened to account for the larger pipe
size, the grated inlet in the driveway on the west side at this point has been doubled in size to collect the
amount of water reaching this point, and a new inlet has been added just south of the driveway on the
I west side to collect the flow that is carried within the gutter along the west side of the roadway.
The sump inlet has 6.1 cfs reaching this point and city standards allow 2 cfs/fl of opening for a depth of 6
I inches in the gutter. The current opening has been increased from 3' to 4' which will allow the
anticipated flow to enter the system.
The inlet on the median has not been changed. The flow along the center of the street is 1.3 cfs and can
easily be handled by the existing inlet.
The grated inlet within the driveway entrance on the west side of the roadway has been increased from a
Type G-1 inlet to a Type G-2. This will allow double the capacity of this inlet which will help with the
inlets' ability to drain assuming 50% clogging.
A additional inlet has been added at this driveway's southern return. The amount of water flowing in this
gutter is approximately 11.8 cfs. Computations show that a 21.8' foot opening is required to intercept this
amount of flow. Therefore a 22' opening has been designed at this location. Interception of this flow at
the gutter will also relieve the depth of flooding that has been experienced in the grated inlet within the
driveway in the past.
APPENDICES
10-year Hydrology Calculation
100-year Hydrology Calculation
100-year Hydraulic Calculations
10-year Hydrology Calculations
I
San Diego County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2005 version 7.5
Rational method hydrology program based on
San Diego County Flood Control Division 2003 hydrology manual
I
Rational Hydrology Study Date: 12/09/08
City of Carlsbad - Carlsbad Boulevard Storm Drain Replacement
Project No 3624 H&A No 062 0340 05
10- year storm event
I
Prepared by Bob Sutherlin 12-9-2008 Filename: ScandialO ------------------------------------------------------------------------
Hydrology Study Control Information
------------------------------------------------------------------------
Program License Serial Number 6032
------------------------------------------------------------------------
Rational hydrology study storm event year is 10.0
English (in-lb) input data units used
.iap data precipitation entered:
6 hour, precipitation(inches) = 1.800
24 hour precipitation(inches) = 3.000
P6/P24 = 60.0%
San Diego hydrology manual 'C' values used
Process from Point/Station 100.000 to Point/Station 110.000
INITIAL AREA EVALUATION
BASIN 1
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type
(General Commercial ) Impervious value, Ai = 0.850
Sub-Area C value = 0.800
Initial subarea total flow distance = 50.000(Ft.)
Highest elevation = 62.000(Ft.)
Lowest elevation = 61.000(Ft.)
Elevation difference = 1.000(Ft.) Slope = 2.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.00 %, in a development type of
General Commercial
In Accordance with Figure 3-3
Initial Area Time of Concentration = 3.71 minutes
TC = [1.8*(1.1_C)*distance(Ft.)A.5)/(% slopeA(1/3)]
TC = [1.8(1.1-0.8000)*( 75.000A.5)/( 2.000A(1/3)]= 3.71
Calculated TC of 3.712 minutes is less than 5 minutes,
resetting TC to 5.0 minutes for rainfall intensity calculations
Rainfall intensity (I) = 4.743(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.800
Subarea runoff = 0.190(CFS)
Total initial stream area = 0.050(Ac.)
Process from Point/Station 110.000 to Point/Station 120.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 2
Top of street segment elevation = 61.000(Ft.)
End of street segment elevation = 56.500(Ft.)
Length of street segment = 270.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
width of half street (curb to crown) = 30.000(Ft.)
Page 1
scandi alO . out
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.S00(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
manning 's N from gutter to grade break = 0.0150
manning 's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 1.445(CFS)
Depth of flow = 0.278(Ft.), Average velocity = 2.409(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 7.054(Ft.)
Flow velocity = 2.41(Ft/s)
Travel time = 1.87 mm. TC = 5.58 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[MEDIUM DENSITY RESIDENTIAL ] (7.3 DU/A or Less ) Impervious value, Ai = 0.400
Sub-Area C value = 0.510
Rainfall intensity = 4.418(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.522 CA = 0.632
Subarea runoff = 2.601(CFS) for 1.160(Ac.)
Total runoff = 2.791(CFS) Total area = 1.210(Ac.)
Street flow at end of street = 2.791(CFS)
Half street flow at end of street = 2.791(CFS)
Depth of flow = 0.326(Ft.), Average velocity = 2.791(Ft/s)
Flow width (from curb towards crown)= 9.473(Ft.)
Process from Point/Station 120.000 to Point/Station 130.000
'' STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 3
Top of street segment elevation = 56.500(Ft.)
End of street segment elevation = 50.000(Ft.)
Length of street segment = 340.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(in.)
Manning 's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning 's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.479(CFS)
Depth of flow = 0.361(Ft.), Average velocity = 3.286(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.227(Ft.)
Flow velocity = 3.29(Ft/s)
Travel time = 1.72 mm. TC = 7.30 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[LOW DENSITY RESIDENTIAL I (2.0 DU/A or Less ) Impervious value, Ai = 0.200
Sub-Area C Value = 0.380
Rainfall intensity = 3.714(In/Hr) for a 10.0 year storm Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.425 CA = 1.635
Subarea runoff = 3.281(CFS) for 2.640(Ac.)
Page 2
scandi alO . out Total runoff = 6.071(CFs) Total area = 3.850(Ac.)
Street flow at end of street = 6.071(CFs)
Half street flow at end of street = 6.071(CFS)
Depth of flow = 0.391(Ft.), Average velocity = 3.534(Ft/s)
Flow width (from curb towards crown)= 12.711(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 130.000 to Point/station 140.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 4
Top of street segment elevation = 50.000(Ft.) End of street segment elevation = 43.500(Ft.) Length of street segment = 560.000(Ft.)
Height of curb above gutter flowline = 6.0(In.) Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
slope from gutter to grade break (v/hz) = 0.020
slope from grade break to crown (v/hz) = 0.020
street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(m.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning 's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 7.204(CFs)
Depth of flow = 0.437(Ft.), Average velocity = 3.048(Ft/s)
streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 15.037(Ft.)
Flow velocity = 3.05(Ft/s)
Travel time = 3.06 mm. TC = 10.37 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[MEDIUM DENSITY RESIDENTIAL
(7.3 Du/A or Less ) Impervious value, Ai = 0.400
Sub-Area C value = 0.510
Rainfall intensity = 2.963(In/Hr) for a 10.0 year storm Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.456 CA = 2.782
Subarea runoff = 2.173(CFS) for 2.250(Ac.)
Total runoff = 8.245(CFS) Total area = 6.100(Ac.)
Street flow at end of street = 8.245(CFS)
Half street flow at end of street = 8.245(CFS)
Depth of flow = 0.454(Ft.), Average velocity = 3.150(Ft/s) Flow width (from curb towards crown)= 15.858(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 140.000 to Point/Station 150.000 STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 5
Top of street segment elevation = 43.500(Ft.)
End of street segment elevation = 43.000(Ft.)
Length of street segment = 20.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.) Distance from crown to crossfall grade break = 22.000(Ft.) Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020 street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.) slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150 Manning's N from grade break to crown = 0.0150
Page 3
I
Estimated mean flow rate at midpoint of street = 11.137(CFs)
Depth of flow = 0.444(Ft.), Average velocity = 4.530(Ft/s)
streetfiow hydraulics at midpoint of street travel:
HalfStreet flow width = 15.348(Ft.)
Flow velocity = 4.53(Ft/5)
Travel time = 0.07 min. TC = 10.44 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type ] (General commercial ) Impervious value, Ai = 0.850
Sub-Area C value = 0.800
Rainfall intensity = 2.950(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C
= 0.556 CA = 4.782
Subarea runoff = 5.862(CFS) for 2.500(Ac.)
Total runoff = 14.107(CFS) Total area = 8.600(AC.)
street flow at end of street = 14.107(CFS)
Half street flow at end of street = 14.107(CFS)
Depth of flow = 0.474(Ft.), Average velocity = 4.800(Ft/s) Flow width (from curb towards crown)= 16.842(Ft.)
Process from Point/Station 150.000 to Point/Station 160.000 PIPEFLOW TRAVEL TIME (Program estimated size)
upstream point/station elevation = 37.730(Ft.)
Downstream point/station elevation = 36.920(Ft.) Pipe length = 50.00(Ft.) Mannings N = 0.013 No. of pipes = 1 Required pipe flow = 14.107(CFS)
Nearest computed pipe diameter = 21.00(in.)
calculated individual pipe flow = 14.107(CFS)
Normal flow depth in pipe = 12.94(In.)
Flow top width inside pipe = 20.43(In.)
Critical Depth = 16.75(in.)
Pipe flow velocity = 9.07(Ft/s)
Travel time through pipe = 0.09 mm.
Time of concentration (Tc) = 10.53 mm.
+++++++.++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 160.000 to Point/station 160.000
CONFLUENCE OF MINOR STREAMS
Along Mfl Stream number: 1 in normal stream number 1
Stream flow area = 8.600(Ac.)
Runoff from this stream = 14.107(CFS)
Time of concentration = 10.53 mm.
Rainfall intensity = 2.933(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 162.000 to Point/Station 164.000
INITIAL AREA EVALUATION
I BASIN 6
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
I Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type ] (General Commercial )
Impervious value, Ai = 0.850
Sub-Area C Value = 0.800 I Initial subarea total flow distance = 70.000(Ft.)
Highest elevation = 53.500(Ft.)
Lowest elevation = 51.800(Ft.)
Elevation difference = 1.700(Ft.) Slope = 2.429 %
I Top of Initial Area Slope adjusted by user to 2.850 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 85.00 (Ft)
for the top area slope value of 2.85 %, in a development type of
General commercial
I Page 4
I
I
In Accordance with Figure 3-3
Initial Area Time of concentration = 3.51 minutes
U
TC = [1.8*(1.1_c)*distance(Ft.)A.5)/(% slopeA(1/3)]
TC = [1.8 (1.1_0.8000)*( 85.000A.5)/( 2.850A(1/3)1= 3.51
Calculated TC of 3.511 minutes is less than 5 minutes,
resetting TC to 5.0 minutes for rainfall intensity calculations
Rainfall intensity (I) = 4.743(In/Hr) for a 10.0 year storm
I
Effective runoff coefficient used for area (Q=KCIA) is C = 0.800
Subarea runoff = 0.076(CFS)
Total initial stream area = 0.020(Ac.)
+++++++++++++++++++++++++++++++++++++++++++++++++.++.++++++++++++++++.
Process from Point/Station 164.000 to Point/Station 160.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION '''
BASIN 7
Top of street segment elevation = 51.800(Ft.)
End of street segment elevation = 43.000(Ft.)
Length of street segment = 620.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 0.473(CFS)
Depth of flow = 0.215(Ft.), Average velocity = 1.845(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 3.924(Ft.)
Flow velocity = 1.85(Ft/s)
Travel time = 5.60 min. TC = 9.11 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type ]
(General Commercial )
Impervious value, Ai = 0.850
Sub-Area C value = 0.800
Rainfall intensity = 3.220(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.800 CA = 0.288
Subarea runoff = 0.852(CFS) for 0.340(Ac.)
Total runoff = 0.927(CFs) Total area = 0.360(Ac.)
Street flow at end of street = 0.927(CFS)
Half street flow at end of street = 0.927(CFS)
Depth of flow = 0.255(Ft.), Average velocity = 2.062(Ft/s)
Flow width (from curb towards crown)= 5.893(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 160.000 to Point/Station 160.000
CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.360(Ac.)
Runoff from this stream = 0.927(CFS)
Time of concentration = 9.11 mm.
Rainfall intensity = 3.220(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
NO. (Cr5) (mm) (In/Hr)
1 14.107 10.53 2.933
2 0.927 9.11 3.220
Qmax(1) =
Page 5
I
1.000 1.000 ' 14.107) +
0.911 * 1.000 * 0.927) + = 14.951
Qmax(2)
=
1.000 * 0.865 * 14.107) +
1.000 * 1.000 * 0.927) + = 13.132
Total of 2 streams to confluence:
Flow rates before confluence point:
14.107 0.927
Maximum flow rates at confluence using above data:
14.951 13.132
Area of streams before confluence:
8.600
0.360
Results of confluence:
Total flow rate = 14.951(CFS)
Time of concentration = 10.532 mm.
Effective stream area after confluence = 8.960(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 160.000 to Point/Station 170.000
PIPEFLOW TRAVEL TIME (Program estimated size)
Upstream point/station elevation = 36.850(Ft.)
Downstream point/station elevation = 36.380(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 14.951(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 14.951(CFS)
Normal flow depth in pipe = 16.73(In.)
Flow top width inside pipe = 16.90(In.)
Critical Depth = 17.19(In.)
Pipe flow velocity = 7.28(Ft/s)
Travel time through pipe = 0.11 mm.
Time of concentration (TC) = 10.65 mm.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I Process from Point/Station 170.000 to Point/Station 170.000
CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 8.960(Ac.)
Runoff from this stream = 14.951(CFS)
Time of concentration = 10.65 mm.
Rainfall intensity = 2.913(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 200.000 to Point/Station 210.000
INITIAL AREA EVALUATION
BASIN 8
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group 0 = 0.000
[COMMERCIAL area type ] (General Commercial ) Impervious value, Ai = 0.850
Sub-Area C value = 0.800
Initial subarea total flow distance = 50.000(Ft.)
Highest elevation = 62.500(Ft.)
Lowest elevation = 61.000(Ft.)
Elevation difference = 1.500(Ft.) Slope = 3.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 85.00 (Ft)
for the top area slope value of 3.00 %, in a development type of
General Commercial
In Accordance with Figure 3-3
Initial Area Time of concentration = 3.45 minutes TC = [1.8*(1.1_C)*distance(Ft.)A.5)/(% slopeA(1/3))
TC = [1.8*(1.1_0.8000)*( 85.000A.5)/( 3.000A(1/3)]= 3.45 calculated TC of 3.452 minutes is less than 5 minutes,
resetting TC to 5.0 minutes for rainfall intensity calculations
Rainfall intensity (I) = 4.743(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.800
Page 6
scandi alO . out
subarea runoff = 0.228(CFS)
I
Total initial stream area = 0.060(Ac.)
Process from Point/Station 210.000 to Point/Station 220.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
I BASIN 9
Top of street segment elevation = 61.000(Ft.)
End of street segment elevation = 57.000(Ft.)
Length of street segment = 265.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.025
Gutter width
= 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Mannings N from grade break to crown = 0.0150 Estimated mean flow rate at midpoint of street = 0.849(CFS)
Depth of flow = 0.247(Ft.), Average velocity = 2.078(Ft/s) streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 5.532(Ft.)
Flow velocity = 2.08(Ft/s)
Travel time
= 2.12 min. TC = 5.58 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type I (General Commercial ) Impervious value, Ai = 0.850
Sub-Area C Value = 0.800
Rainfall intensity = 4.420(In/Hr) for a 10.0 year storm Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.800 CA = 0.352
Subarea runoff = 1.328(CFS) for 0.380(Ac.)
Total runoff = 1.556(CFS) Total area = 0.440(Ac.) Street flow at end of street = 1.556(CFS)
Half street flow at end of street = 1.556(CFS)
Depth of flow = 0.286(Ft.), Average velocity = 2.354(Ft/s)
Flow width (from curb towards crown)= 7.472(Ft.)
Process from Point/Station 220.000 to Point/Station 170.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 10
Top of street segment elevation = 57.000(Ft.) End of street segment elevation = 42.000(Ft.)
Length of street segment = 900.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
width of half street (curb to crown) = 30.000(Ft.) Distance from crown to crossfall grade break = 22.000(Ft.) Slope from gutter to grade break (v/hz) = 0.020 slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.SOO(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning 's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning 's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 2.946(CFS)
Depth of flow = 0.331(Ft.), Average velocity = 2.826(Ft/s) streetflow hydraulics at midpoint of street travel:
Page 7
scandial0.out
Halfstreet flow width = 9.695(Ft.)
Flow velocity = 2.83(Ft/s)
Travel time = 5.31 min. TC = 10.88 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group c = 0.000
Decimal fraction soil group o = 0.000
[COMMERCIAL area type I (General commercial ) Impervious value, Ai = 0.850
Sub-Area C value = 0.800
Rainfall intensity = 2.871(In/Hr) for a 10.0 year storm Effective runoff coefficient used for total area
(Q=KcIA) is c = 0.800 CA = 1.480
subarea runoff = 2.694(CFS) for 1.410(Ac.)
Total runoff = 4.250(CFS) Total area = 1.850(Ac.)
Street flow at end of street = 4.250(CFS)
Half street flow at end of street = 4.250(CFS)
Depth of flow = 0.363(Ft.), Average velocity = 3.080(Ft/s) Flow width (from curb towards crown)= 11.302(Ft.)
Process from Point/Station 170.000 to Point/Station 170.000
CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 1.850(Ac.)
Runoff from this stream = 4.250(CFS)
Time of concentration = 10.88 mm.
Rainfall intensity = 2.871(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CES) (mm) (In/Hr)
1 14.951 10.65 2.913
2 4.250 10.88 2.871
Qmax(1) =
1.000 * 1.000 * 14.951) +
1.000 0.978 * 4.250) + = 19.108
Qmax(2) =
0.986 * 1.000 14.951) +
1.000 1.000 4.250) + = 18.989
Total of 2 streams to confluence:
Flow rates before confluence point: U 14.951 4.250
Maximum flow rates at confluence using above data:
19.108 18.989
Area of streams before confluence:
8.960
1.850
Results of confluence:
Total flow rate = 19.108(CFS)
Time of concentration = 10.646 mm.
Effective stream area after confluence = 10.810(Ac.)
Process from point/Station 170.000 to Point/Station 180.000
PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 36.180(Ft.)
Downstream elevation = 32.640(Ft.) point/station
Pipe length = 200.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 19.108(CFS)
Nearest computed pipe diameter = 21.00(in.) U calculated individual pipe flow = 19.108(CFS)
Normal flow depth in pipe = 15.66(In.) Flow tO width inside pipe = 18.29(In.)
critical Depth = 18.92(in.)
Pipe flow velocity = 9.93(Ft/s)
Travel time through pipe = 0.34 mm.
Time of concentration (TC) = 10.98 mm.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I Page 8
I
scandi alO . out
Process from Point/Station 180.000 to Point/Station 180.000
SUBAREA FLOW ADDITION
BASIN 11
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group c = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type
(Neighborhod commercial )
Impervious value, Ai = 0.800
Sub-Area C value = 0.770
Time of concentration = 10.98 mm.
Rainfall intensity = 2.855(In/Hr) for a 10.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.618 CA = 7.197
Subarea runoff = 1.440(CFS) for 0.840(Ac.)
Total runoff = 20.547(CFs) Total area = 11.650(Ac.)
End of computations, total study area = 11.650 (Ac.)
Page
100-year Hydrology Calculations
P L
scandi a100. out
San Diego County Rational Hydrology Program
I CIVILCADD/CIVILDESIGN Engineering software,(c)1991-2005 Version 7.5
Rational method hydrology program based on
San Diego County Flood Control Division 2003 hydrology manual
I Rational Hydrology Study Date: 12/09/08
City of Carlsbad - Carlsbad Boulevard storm Drain Replacement
Project NO 3624 H&A No 062 0340 05
100-year storm event
Prepared by Bob Sutherlin 12-9-2008 Filename: scandialoo I ------------------------------------------------------------------------ ****** Hydrology study Control Information
------------------------------------------------------------------------
Program License 6032 serial Number
------------------------------------------------------------------------
Rational hydrology study storm event year is 100.0
I English (in-lb) input data units used
Map data precipitation entered:
6 hour, precipitation(inches) = 2.500
24 hour precipitation(inches) = 4.000
I P6/P24 = 62.5%
San Diego hydrology manual 'C values used
I Process from Point/station 100.000 to Point/Station 110.000
INITIAL AREA EVALUATION
- BASIN 1
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type ]
(General Commercial ) Impervious value, Ai = 0.850 sub-Area C Value = 0.800
Initial subarea total flow distance = 50.000(Ft.)
Highest elevation = 62.000(Ft.)
Lowest elevation = 61.000(Ft.)
Elevation difference = 1.000(Ft.) Slope = 2.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 75.00 (Ft)
for the top area slope value of 2.00 %, in a development type of
General Commercial
In Accordance With Figure 3-3
Initial Area Time of concentration = 3.71 minutes
TC = [1.8(1.1_C)*distance(Ft.)A.5)/(% slopeA(1/3)]
TC = [1.8(1.1-0.8000)( 75.000A.5)/( 2.000A(1/3)]= 3.71 Calculated TC of 3.712 minutes is less than 5 minutes,
resetting TC to 5.0 minutes for rainfall intensity calculations
Rainfall intensity (I) = 6.587(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.800
subarea runoff = 0.263(CFS)
Total initial stream area = 0.050(Ac.)
Process from Point/station 110.000 to Point/Station 120.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 2
Top of street segment elevation = 61.000(Ft.)
End of street segment elevation = 56.500(Ft.)
Length of street segment = 270.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
width of half street (curb to crown) = 30.000(Ft.)
Page 1
scandi aloo. out
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 2.068(CFS)
Depth of flow = 0.303(Ft.), Average velocity = 2.606(Ft/s)
streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 8.312(Ft.)
Flow velocity = 2.61(Ft/s)
Travel time = 1.73 mm. Tc = 5.44 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[MEDIUM DENSITY RESIDENTIAL
(7.3 DU/A or Less ) Impervious value, Ai = 0.400
Sub-Area C value = 0.510
Rainfall intensity = 6.239(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.522 CA = 0.632
subarea runoff = 3.677(CFS) for 1.160(Ac.)
Total runoff = 3.941(CFS) Total area = 1.210(Ac.)
Street flow at end of street = 3.941(CFS)
Half street flow at end of street = 3.941(CFS)
Depth of flow = 0.356(Ft.), Average velocity = 3.025(Ft/s)
Flow width (from curb towards crown)= 10.955(Ft.)
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++++++++++.
Process from Point/Station 120.000 to Point/Station 130.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 3
Top of street segment elevation = 56.500(Ft.)
End of street segment elevation = 50.000(Ft.)
Length of street segment = 340.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.SOO(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
manning N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 6.328(CFS)
Depth of flow = 0.395(Ft.), Average velocity = 3.569(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 12.925(Ft.)
Flow velocity = 3.57(Ft/s)
Travel time = 1.59 min. TC = 7.03 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[LOW DENSITY RESIDENTIAL
(2.0 DU/A or Less ) Impervious value, Ai = 0.200
Sub-Area C value = 0.380
Rainfall intensity = 5.289(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.425 CA = 1.635
Subarea runoff = 4.706(CFS) for 2.640(Ac.)
Page 2
I
I
I
I
Total runoff = 8.646(cFs) Total
Street flow at end of street = 8
Half street flow at end of street =
Depth of flow = 0.430(Ft.), Average
Flow width (from curb towards crown)=
scandi a100 . out
area = 3.850(Ac.)
.646(cFS)
8. 646 (CFS)
velocity = 3.849(Ft/s)
14 643 (Ft )
Process from Point/Station 130.000 to Point/Station 140.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 4
Top of street segment elevation = 50.000(Ft.)
End of street segment elevation = 43.500(Ft.)
Length of street segment = 560.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfail grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.SOO(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 10.279(CFS)
Depth of flow= 0.482(Ft.), Average velocity = 3.325(Ft/s)
Streettlow hydraulics at midpoint of street travel:
Halfstreet flow width = 17.289(Ft.)
Flow velocity = 3.32(Ft/s)
Travel time = 2.81 min. TC = 9.83 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[MEDIUM DENSITY RESIDENTIAL
(7.3 DU/A or Less ) Impervious value, Ai = 0.400
Sub-Area C Value = 0.510
Rainfall intensity = 4.258(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.456 CA = 2.782
Subarea runoff = 3.201(CFS) for 2.250(Ac.)
Total runoff = 11.847(CFS) Total area = 6.100(Ac.)
Street flow at end of street = 11.847(CFS)
Half street flow at end of street = 11.847(CFS)
Depth of flow = 0.503(Ft.), Average velocity = 3.433(Ft/s)
warning: depth of flow exceeds top of curb
Distance that curb overflow reaches into property = 0.11(Ft.)
Flow width (from curb towards crown)= 18.298(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 140.000 to Point/Station 150.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 5
Top of street segment elevation = 43.500(Ft.)
End of street segment elevation = 43.000(Ft.)
Length of street segment = 20.000(Ft.)
Height of curb above gutter flowline = 6.0(in.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Page 3
I
I
I
I
11
scandi al0O . out
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street= 16.033(CFS)
Depth of flow = 0.491(Ft.), Average velocity = 4.953(Ft/s)
streetfiow hydraulics at midpoint of street travel:
Halfstreet flow width = 17.705(Ft.)
Flow velocity = 4.95(Ft/s)
Travel time = 0.07 min. TC = 9.90 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type
(General Commercial ) Impervious value, Ai = 0.850
Sub-Area C value = 0.800
Rainfall intensity = 4.239(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.556 CA = 4.782
Subarea runoff = 8.427(CFS) for 2.500(Ac.)
Total runoff = 20.274(CFS) Total area = 8.600(Ac.)
Street flow at end of street = 20.274(CFS)
Half street flow at end of street = 20.274(CFS)
Depth of flow = 0.529(Ft.), Average velocity = 5.110(Ft/s) warning: depth of flow exceeds top of curb
Distance that curb overflow reaches into property = 1.16(Ft.) Flow width (from curb towards crown)= 19.616(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from point/Station 150.000 to Point/Station 160.000 PIPEFLOW TRAVEL TIME (Program estimated size)
Upstream point/station elevation = 37.730(Ft.)
Downstream point/station elevation = 36.920(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 20.274(CFS)
Nearest computed pipe diameter = 24.00(In.) Calculated individual pipe flow = 20.274(CFS)
Normal flow depth in pipe = 14.86(in.)
Flow toy width inside pipe = 23.31(in.)
Critica Depth = 19.39(in.)
Pipe flow velocity = 9.93(Ft/s)
Travel time through pipe = 0.08 mm.
Time of concentration (Tc) = 9.98 mm.
Process from point/Station 160.000 to Point/Station 160.000 ?** CONFLUENCE OF MINOR STREAMS
Along Main stream number: 1 in normal stream number 1
stream flow area = 8.600(Ac.)
Runoff from this stream = 20.274(CFS)
Time of concentration = 9.98 mm.
Rainfall intensity = 4.216(In/Hr)
I Process from Point/Station 162.000 to Point/Station 164.000
INITIAL AREA EVALUATION
BASIN 6
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
I Decimal fraction soil group D = 0.000
[COMMERCIAL area type
(General Commercial ) Impervious value, Ai = 0.850
— Sub-Area C value = 0.800
Initial subarea total flow distance = 70.000(Ft.)
I Highest elevation = 53.500(Ft.)
Lowest elevation = 51.800(Ft.)
Elevation difference = 1.700(Ft.) Slope = 2.429 %
Top of Initial Area Slope adjusted by User to 2.850 %
I
'
Page 4
11
scandi alOO . out
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 85.00 (Ft)
for the top area slope value of 2.85 %, in a development type of
General Commercial
In Accordance with Figure 3-3
Initial Area Time of Concentration = 3.51 minutes
TC = [1.8(1.1_C)*distance(Ft.)A,5)/(% slopeA(1/3)]
TC = [1.8(1.1-0.8000)( 85.000A.5)/( 2.850A(1/3))= 3.51
Calculated TC of 3.511 minutes is less than 5 minutes,
resetting TC to 5.0 minutes for rainfall intensity calculations
Rainfall intensity (I) = 6.587(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.800
Subarea runoff = 0.105(CFS)
Total initial stream area = 0.020(Ac.)
+ ++ + ++ + +++++ +++++++++ +++++++++ +++++++++++ ++ +++++ +++ ++.+++++++++++++++ +
Process from Point/Station 164.000 to Point/Station 160.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 7
Top of street segment elevation = S1.800(Ft.)
End of street segment elevation = 43.000(Ft.)
Length of street segment = 620.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning 's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 0.666(CFS)
Depth of flow = 0.235(Ft.), Average velocity = 1.940(Ft/s) streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 4.906(Ft.)
Flow velocity = 1.94(Ft/s)
Travel time = 5.33 min. TC = 8.84 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000 Decimal fraction soil group 0 = 0.000
[COMMERCIAL area type
(General Commercial ) Impervious value, Ai = 0.850
Sub-Area C Value = 0.800
Rainfall intensity = 4.561(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.800 CA = 0.288
subarea runoff = 1.208(CFs) for 0.340(Ac.)
Total runoff = 1.314(CFS) Total area = 0.360(Ac.)
Street flow at end of street = 1.314(CFS)
Half street flow at end of street = 1.314(CFS)
Depth of flow = 0.277(Ft.), Average velocity = 2.216(Ft/5) Flow width (from curb towards crown)= 7.003(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 160.000 to Point/Station 160.000
CONFLUENCE OF MINOR STREAMS '"'
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.360(Ac.)
Runoff from this stream = 1.314(CFS)
Time of concentration = 8.84 mm.
Rainfall intensity = 4.561(In/Hr)
Summary of stream data:
stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
Page 5
scandi aloo . out
1 20.274 9.98 4.216
2 1.314 8.84 4.561
Qmax(1) =
1.000 * 1.000 20.274) +
0.924 * 1.000 ' 1.314) + = 21.488
Qmax(2) =
1.000 * 0.885 20.274) +
1.000 * 1.000 ' 1.314) + = 19.260
Total of 2 streams to confluence:
Flow rates before confluence point:
20.274 1.314
Maximum flow rates at confluence using above data:
21.488 19.260
Area of streams before confluence:
8.600 0.360
Results of confluence:
Total flow rate = 21.488(CFS)
Time of concentration = 9.985 mm.
Effective stream area after confluence = 8.960(Ac.)
Process from Point/Station 160.000 to Point/Station 170.000
PIPEFLOW TRAVEL TIME (Program estimated size) ***
Upstream point/Station elevation = 36.850(Ft.)
Downstream point/station elevation = 36.380(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 21.488(CFS)
Nearest computed pipe diameter = 24.00(in.)
Calculated individual pipe flow = 21.488(CFS)
Normal flow depth in pipe = 19.24(in.)
Flow top width inside pipe = 19.14(In.)
Critical Depth = 19.89(In.)
Pipe flow velocity = 7.96(Ft/s)
Travel time through pipe = 0.10 mm.
Time of concentration (TC) = 10.09 mm.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 170.000 to Point/Station 170.000
CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 8.960(Ac.)
Runoff from this stream = 21.488(CFS)
Time of concentration = 10.09 mm.
Rainfall intensity = 4.188(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 200.000 to Point/Station 210.000
INITIAL AREA EVALUATION
BASIN 8
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type ]
(General Commercial )
Impervious value, Ai = 0.850
Sub-Area C Value = 0.800
Initial subarea total flow distance = 50.000(Ft.)
Highest elevation = 62.500(Ft.)
Lowest elevation = 61.000(Ft.)
Elevation difference = 1.500(Ft.) Slope = 3.000 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 85.00 (Ft)
for the top area slope value of 3.00 %, in a development type of
General Commercial
In Accordance with Figure 3-3
Initial Area Time of Concentration = 3.45 minutes
TC = [1.8*(1.1_C)*distance(Ft.)A.5)/(% slopeA(1/3)) TC = [1.8*(1.1_0.8000)*( 85.000A.5)/( 3.000A(1/3)]= 3.45
Page 6
I
calculated TC of 3.452 minutes is less than 5 minutes,
resetting TC to 5.0 minutes for rainfall intensity calculations
U Rainfall intensity (I) = 6.587(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is c = 0.800
subarea runoff = 0.316(cFs)
Total initial stream area = 0.060(Ac.)
I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 210.000 to Point/Station 220.000 **H STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
I BASIN 9
Top of street segment elevation = 61.000(Ft.)
End of street segment elevation = 57.000(Ft.)
Length of street segment = 265.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 1.224(cFS) Depth of flow = 0.270(Ft.), Average velocity = 2.236(Ft/s)
streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 6.670(Ft.)
Flow velocity = 2.24(Ft/s)
Travel time = 1.97 mm. TC = 5.43 min.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type
(General Commercial ) Impervious value, Ai = 0.850
Sub-Area C Value = 0.800
Rainfall intensity = 6.248(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.800 CA = 0.352
Subarea runoff = 1.883(cFs) for 0.380(Ac.)
Total runoff = 2.199(CFS) Total area = 0.440(Ac.)
Street flow at end of street = 2.199(cFS)
Half street flow at end of street = 2.199(cFS)
Depth of flow = 0.311(Ft.), Average velocity = 2.543(Ft/s)
Flow width (from curb towards crown)= 8.730(Ft.)
++++++ +++ + + ++ ++ + + +++++++++++++++++ +++++ ++++++++++++++++++++ + +++++++ ++ +
Process from Point/Station 220.000 to Point/Station 170.000
STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION
BASIN 10
Top of street segment elevation = 57.000(Ft.)
End of street segment elevation = 42.000(Ft.)
Length of street segment = 900.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 30.000(Ft.)
Distance from crown to crossfall grade break = 22.000(Ft
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 1.500(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning 's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Page 7
scandi alOO . out
Manning 's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.186(CFS)
Depth of flow = 0.361(Ft.), Average velocity = 3.069(Ft/s) streetflow hydraulics at midpoint of Street travel:
HalfStreet flow width = 11.232(Ft.)
Flow velocity = 3.07(Ft/s)
Travel time = 4.89 mm. TC = 10.31 mm.
Adding area flow to street
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type
(General Commercial ) Impervious value, Ai = 0.850
sub-Area C value = 0.800
Rainfall intensity = 4.129(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.800 CA = 1.480
Subarea runoff = 3.912(CFS) for 1.410(Ac.)
Total runoff = 6.111(CFS) Total area = 1.850(Ac.)
street flow at end of street = 6.111(CFS)
Half street flow at end of street = 6.111(CFS)
Depth of flow = 0.399(Ft.), Average velocity = 3.359(Ft/s) Flow width (from curb towards crown)= 13.102(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 170.000 to Point/Station 170.000 CONFLUENCE OF MINOR STREAMS
Along Main Stream number: 1 in normal stream number 2
stream flow area = 1.850(Ac.)
Runoff from this stream = 6.111(CFS)
rime of concentration = 10.31 mm.
Rainfall intensity = 4.129(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (mm) (In/Hr)
1 21.488 10.09 4.188
2 6.111 10.31 4.129
Qmax(1) =
1.000 * 1.000 * 21.488) + 1.000 0.978 6.111) + = 27.466
Qmax(2) =
0.986 * 1.000 * 21.488) +
1.000 * 1.000 * 6.111) + = 27.296
Total of 2 streams to confluence:
Flow rates before confluence point:
21.488 6.111
Maximum flow rates at confluence using above data:
27.466 27.296
Area of streams before confluence:
8.960 1.850
Results of confluence:
Total flow rate = 27.466(CFS)
Time of concentration = 10.090 mm.
Effective stream area after confluence = 10.810(AC.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 170.000 to Point/Station 180.000 PIPEFLOW TRAVEL TIME (Program estimated size) ***
Upstream point/station elevation = 36.180(Ft.)
Downstream point/station elevation = 32.640(Ft.)
Pipe length = 200.00(Ft.) Manning's N = 0.013 NO. of pipes = 1 Required pipe flow = 27.466(CFS) Nearest computed pipe diameter = 24.00(In.)
calculated individual pipe flow = 27.466(CFS)
Normal flow depth in pipe = 18.00(in.)
Flow top width inside pipe = 20.78(in.)
critical Depth = 21.81(In.)
Pipe flow velocity = 10.86(Ft/s)
Travel time through pipe = 0.31 mm.
Page 8
scandialOO.out
Time of concentration (TC) = 10.40 mm.
I ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 180.000 to Point/Station 180.000
SUBAREA FLOW ADDITION
BASIN 11
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
[COMMERCIAL area type ]
(Neighborhod Commercial )
Impervious value, Ai = 0.800
Sub-Area C Value
= 0.770
Time of concentration = 10.40 mm.
Rainfall intensity = 4.108(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.618 CA = 7.197
0.840(Ac.)
Subarea runoff
= 2.099(CFS) for
Total runoff = 29.565(CFS) Total area = 11.650(Ac.)
End of computations, total study area = 11.650 (Ac.)
I
II
I
I
1
1
1
I
I
I
Page 9
100-year Hydraulic Calculations
- - - - - - - - - - - - - - - - - - - cbrloopl USC .WSW
Ti Carlsbad Boulevard Replacement Project 0
T2 100-year Flow rate
T3 12-15-08 Filename: cbr100plusc
so 84.330 28.100 4
TS 89.000 28.190 8 .014 .000
R 93.500 28.28 8 .013 .000 .000 0
Wx 93.500 28.28 1 .013
R 97.500 28.42 1 .013
WE 97.500 28.420 5 .500
R 102.500 28.430 5 .013 .000 90.000 0 ix 102.510 32.350 6 .011
R 151.130 32.400 6 .000 .000 .000 0
JX 156.130 32.420 2 .014
R 173.350 32.870 2 .013 .000 .000 0
JX 178.350 33.000 2 .013 2.100 35.800 90.0 .000
R 238.370 34.610 2 .013 .000 .000 0 Jx 242.370 34.690 2 .013
R 276.920 35.39 2 .013 .000 .000 0
Jx 280.920 35.47 2 .013
R 315.760 36.180 2 .013 .000 .000 0
JX 319.760 36.380 2 6 .013 6.000 36.380 90.0 .000
R 343.840 36.860 2 .013 .000 .000 0
jx 347.840 36.91 2 6 .013 1.200 36.920 90.0 .000
R 395.040 37.730 2 .013 .000 .000 0
jx 399.040 37.76 3 .013 8.45 39.9 90.0
R 431.760 37.83 3 .013 .000 .000 0
WE 431.760 37.830 3 .500
SH 431.760 37.830 3
CD 1 4 1 .000 2.000 .000 .000 .000 .00
CD 3 4 1 .000 1.500 .000 .000 .000 .00
CD 4 2 0 .000 4.000 10.000 .000 .000 .00
CD 5 2 0 .000 6.000 4.000 .000 .000 .00
CD 6 3. 0 .000 2.000 4.000 .000 .000 .00
CD 7 2 0 .000 4.500 4.000 .000 .000 .00
CD 8 2 0 .000 4.500 4.500 .000 .000 .00
CD 2 6 0 .000 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00
PTS 232 .000 9.500 1.000 6.100 3.000 3.800 5.000 2.400 7.000 1.500
PTS 9.000 .800 11.000 .300 13.000 .100 15.000 .000 17.000 .100
PTS 19.000 .300 21.000 .800 23.000 1.500 25.000 2.400 27.000 3.800
PTS 29.000 6.100 30.000 9.500 29.000 12.900 27.000 15.200 25.000 16.600
PTS 23.000 17.500 21.000 18.200 19.000 18.700 17.000 18.900 15.000 19.000
PTS 13.000 18.900 11.000 18.700 9.000 18.200 7.000 17.500 5.000 16.600
PTS 3.000 15.200 1.000 12.900
Q 11.850 .0
Page 1
- - - - - - - - - - - - - - - - - - - cbrloOpl USC .OUT
0 FILE: cbrlOOplusc.WSW W S P G W - CIVILDESIGN version 14.06 PAGE
Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51
Carlsbad Boulevard Replacement Project
100-year Flow rate
12-15-08 Filename: cbrloOplusc *
Station
I Invert I Depth I Water I Q I vel vel I Energy Super ICriticaliFlow ToplHeight/IBase wtl INO wth
I Elev I (FT) I Elev I (CFS) I (FPS) Head I Grd.El.I Elev I Depth
-I-
I width IDia.-FTIor I.D.I ZL IPrs/Pip
L/Elem
-I- -I- Ich Slope I -I- I -I- -I-
I I
-I- -I-
SF Avel
-I-
HF ISE
-I-
DpthlFroude NlNorm Dp
-I- -I-
I N
-I-
X-Falll ZR
-I
IType Ch
I I******** I I I I I I I******** I****** I I I I I I
AT OUTLET DEPTH= .244 v(OUT)= 12.14
84.330 28.100 .244 28.344 29.60 12.14 2.29 30.63 .00 .65 10.00 4.000 10.000 .00 0 .0
TRANS STR STR
-I- -I-
.0193
-I- -I- -I- -I- -I- .0647 -I-
.30 .24
-I- -I-
4.33
-I- -I-
.014
-I-
.00 .00 RECTANG
89.000
I I
28.190 .549
I
28.739
I I
29.60
I
11.98 2.23 I 30.97 .00 I I 1.10 4.50 I I 4.500 4.500 II .00 0 .0
4.500
-I- -I-
.0200
-I- -I- -I- -I- -I-
.0334
-I-
.15 .55
-I- -I-
2.85 .64 -I- -I- .013 -I- .00 .00 I- RECTANG
93.500
-I-
I I 28.280
-I-
.541
-I-
I
28.821
-I-
I I
29.60
-I-
I
12.16 2.30
I
31.12 .00
I I
1.10 4.50
I
4.500
I
4.500 .00
I
0 .0
WALL EXIT EXIT -I- -I- -I- -I- -I- -I- -I- -I-
93.500
I
28.280 1.668 I 29.948 I I 29.60 I 10.57 1.74
I
31.68 .00
I I
1.86 1.49
I I
2.000 .000 .00 1 .0
2.503
-I- -I-
.0350
-I- -I- -I- -I- -I- .0161 -I- .04 1.67 -I- -I-
1.36 1.23
-I- -I-
.013
-I-
.00 .00
I- PIPE
96.003
I I
28.368 1.738
I
30.105
I I
29.60
I
10.21 1.62
I
31.72 .00
I I
1.86 1.35
I I 2.000 I .000 .00 I 1 .0
1.497
-I- -I-
.0350
-I- -I- -I- -I- -I-
.0152
-I-
.02 1.74
-I- -I-
1.23 1.23 -I- -I- .013 -I-
.00 .00 I- PIPE
97.500
-I-
I I 28.420
-I-
1.856
-I-
I I
30.276
-I-
I
29.60
-I-
I
9.73 1.47
I
31.75 .00
I I
1.86 1.03
I I
2.000
I
.000 .00
I
1 .0
ENTRANCE WALL ENTRANCE
-I- -I- -I- -I- -I- -I- -I- -I-
DROP STRUCTURE
WATER DEPTH = 4.6 FEET
97.500
I
28.420 4.627
I I
33.047 I 29.60 I 1.60 .04 I
33.09 .00
I I
1.19 4.00
I I
6.000
I
4.000 .00 0 .0
5.000
-I- -I-
.0020
-I- -I- -I- -I- -I- .0001 -I- .00 4.63 -I- -I- .13 1.57 -I- -I- .013 -I-
.00 .00
I- RECTANG
102.500
-I-
I I
28.430
-I-
4.618
-I-
I
33.048
-I-
I
29.60 I 1.60 .04 I 33.09 .00 I I 1.19 4.00 I I
6.000
I 4.000 .00
I
0 .0
JUNCT STR -I- -I- -I- -I-
4.62
-I- -I-
.13
-I- -I-
.011
-I-
.00 .00
I-
RECTANG
102.510 I I
32.350 1.194
I
33.544
I
29.60
I
6.20 .60
I
34.14 .00
I
1.19 4.00
I I
2.000
I
4.000 .00
I
0 .0
1.090
-I- -I- .0010 -I- -I- -I- -I- -I-
.0047
-I-
.01 1.19
-I- -I-
1.00 2.00
-I- -I-
.014
-I-
.00 .00
I-
BOX
0 FILE: cbrlOOplusc.WSW W S P G W - CIVILDESIGN version 14.06 PAGE 2
Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51
Carlsbad Boulevard Replacement Project
100-year flow rate
12-15-08 Filename: cbrloOplusc *
Invert I Depth I Water I Q I vel vel I Energy I Super ICriticalIFlow TopiHeight/IBase WtI INo Wth
Station Elev I (FT) I Elev I (cFS) I (FPS) Head I Grd.El .1 Elev I Depth I width IDia.-FTIor I.D. I ZL IPrs/Pip
Page 1
- - - - - - - - - - - - - - - - - - - cbr100p1usc .OUT
-I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I
L/Elem ICh Slope I I I I SF Avel HF ISE DpthlFrOUde NlNorm Dp I N I X-FallI ZR IType Ch * I*******
103.600 32.351 1.252 33.603 29.60 5.91 .54 34.15 .00 1.19 4.00 2.000 4.000 .00 0 .0
3.816 -I- -I- .0010 -I- -I- -I- -I- -I- .0041 .02 -I- -I- 1.25 .93 -I- 2.00 -I- -I- .014 -I- .00 .00 I- BOX
107.416
I
32.355
I I
1.313 33.668
I I
29.60 5.64 I .49 34.16 I I
.00 1.19 I 4.00 I
2.000
I 4.000 .00
I
0 .0
7.480 -I- -I- .0010 -I- -I- -I- -I- -I- .0034 .03
-I- -I-
1.31 .87 -I- 2.00 -I- -I- .014 -I- .00 .00 I- BOX
114.896 I I 32.363 I 1.377 33.740 I I 29.60 5.37 I .45 34.19 I I .00 1.19 I 4.00 I 2.000 I I 4.000 .00 I 0 .0
12.446
-I- -I-
.0010
-I- -I- -I- -I- -I-
.0029 .04
-I- -I-
1.38 .81
-I-
2.00
-I- -I-
.014
-I-
.00 .00
I-
BOX
127.342 I I 32.376 I 1.444 33.820 I I 29.60 5.12 I .41 34.23 I I .00 1.19 I 4.00 I 2.000 I I 4.000 .00 I 0 .0
19.275 -I- -I- .0010 -I- -I- -H -I- -I- .0026 .05 -I- -I- 1.44 .75 -I- 2.00 -I- -I- .014 -I- .00 .00 I-
BOX
146.617
I I
32.395 1.515 33.910 I I 29.60 4.88 I
.37 34.28
I I
.00 1.19
I
4.00
I
2.000
I I
4.000 .00
I
0 .0
4.513 -I- -I- .0010 -I- -I- -I- -I- -I-
.0025 .01 -I- -I- 1.51 .70 -I- 2.00 -I- -I- .014 -I- .00 .00 I- BOX
151.130
I I
32.400
I
1.528 33.928
I I
29.60 4.84
I
.36 34.29 I I
.00 1.19 I 4.00 I
2.000
I I 4.000 .00
I
0 .0
JUNCT STR .0040 .0013 .01 1.53 .69 .014 .00 .00
I-
BOX --------------------WARNING - Junction Analysis - Change in Channel Type ---------------
156.130 I 32.420 I
1.851 34.271
I I
29.60 1.34
I
.03 34.30
I
.00 .84
I
17.56
I I I
2
I
0 .0
2.161 -I- -I- .0261 -I- -I- -I- -I- -I- .0001 .00 -I- -I- 1.85 .21 -I- .515 -I -I- .013 -I- I- IR-COV
158.291 I I 32.476 I 1.792 I 34.269 I 29.60 1.40 I .03 34.30 I I .00 .84 I 17.30 I I I 2 I 0 .0
2.078
-I- -I-
.0261
-I- -I- -I- -I- -I- .0001 .00
-I- -I- 1.79 .22
-I-
.515
-I -I-
.013
-I- I-
IR-COV
0 FILE: cbr100p1u5c.WSW W S P G W - CIVILDESIGN version 14.06 PAGE 3
Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51
Carlsbad Boulevard Replacement Project
100 -year flow rate
* 12-15-08 Filename: cbrlooplusc
Station
I Invert I Depth I Water I Q I vel vel I Energy I Super ICriticalIFlow ToplHeight/IBase WtI INO Wth
I Elev I (FT) 1 Elev I (CFS) I (FPS) Head Grd.El .1 Elev I Depth I Width IDia.-FTIor I.D. I ZL
-I
IPrs/Pip
L/Elem
-I- -I-
ICh Slope I -I- I -I-
I
-I-
I
-I- -I-
SF Ave[ HF -I- -I- -I-
ISE DpthlFroude NiNorm Op
-I- -I-
I N I -I-
X-FallI ZR IType ch
I I
160.369 32.531
I
1.735
I
34.266 29.60 1.47
I
.03 34.30
I
.00 .84
I
17.05
I I I
2
I
0 .0
1.999 -I- -I- .0261 -I- -I- -I- -I- -I- .0001 .00 -I- -I- 1.74 .24 -I- .515 -I- -I- .013 -I- I-
IR-COV
162.368 I 32.583 I 1.680 I 34.263 I
29.60 1.55
I
.04 34.30
I I
.00 .84
I
16.80
I I I
2
I
0 .0 -I- 1.914 -I- .0261 -I- -I- -I- -I- -I- .0002 .00 -I- -I- 1.68 .26 -I- .515 -I- -I- .013 -I- I-- IR-COV
164.282
I I
32.633
I
1.627
I
34.260 I 29.60 1.62 I .04 34.30 I I
.00 .84
I
16.56
I I I
2
I
0 .0 -I-
1.836
-I-
.0261
I I
-I-
I
-I-
I
-I-
I
-I- -I- .0002 .00 -I- -I- 1.63
I I
-I- .27
I
.515
-I- -I-
.013
I I
-I-
I
I-- IR-COV
I
Page 2
- - - - - - - - - - - - - - - - - - - cbrloopl USC. OUT
166.118 32.681 1.575 34.256 29.60 1.70 .04 34.30 .00 .84 16.33 2 0 .0
1.753
-I-
.0261
-I- -I- -I- -I- -I- -I-
.0002 .00
-I- -I-
1.57
-I-
.29 .515
-I- -I-
.013
-I- I- IR-COV
167.871
I
32.727
I
1.525
I I
34.252
I
29.60
I
1.78 .05 34.30
I I
.00
I
.84 16.11
I I I
2
I
0 .0
1.676 -I- .0261 -I- -I- -I- -I- -I- -I- .0003 .00 -I- -I- 1.53 -I- .31 .515 -I- -I- .013
-I- I-
IR-COV
169.547 I 32.771 I 1.477 I I 34.247 I
29.60
I 1.87 .05 34.30 I I
.00
I .84 15.87 I I I
2
I
0 .0
1.601
-I-
.0261
-I- -I- -I- -I- -I- -I- .0003 .00
-I- -I-
1.48
-I-
.33 .515
-I- -I-
.013
-I- I- IR-COV
171.148
I
32.812
I
1.430
I I
34.242
I
29.60
I
1.96 .06 34.30
I I
.00
I
.84 15.60
I I
2
I
0 .0
1.529
-I-
.0261
-I- -I- -I- -I- -I- -I-
.0003 .00
-I- -I-
1.43
-I-
.35 .515
-I- -I-
.013
-I- I-
IR-COV
172.677 32.852 I I 1.385 I 34.237 I 29.60 I 2.06 .07 34.30 I I .00 I .84 15.34 I I I 2 I 0 .0
.673 -I-
.0261
-I- -I- -I- -I- -I- -I- .0004 .00
-I- -I-
1.38
-I- .37 .515 -I- -I- .013 -I- I- IR-COV
173.350 I 32.870 I I
1.365
I 34.235 I
29.60
I
2.10 .07 34.30 I I
.00
I .84 15.23 I I I 2 I 0 .0
JUNCT STR .0260 1.365 .385 .013 I- IR-COV
--------------------WARNING - Junction Analysis - Irregular Channel --------------------
o FILE: cbr100plusc.WSW W S P G W - CIVILDESIGN version 14.06 PAGE 4
Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51
Carlsbad Boulevard Replacement Project
100-year flow rate
12-15-08 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Filename: cbrlOOplusc
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * *
I Invert I Depth I Water I Q I vel vel I Energy I Super ICriticalIFlow TopiHeight/IBase wtl INo Wth Station I Elev I (FT) I Elev I (CFS) I (FPS) Head I Grd.El .1 Elev I Depth I Width IDia.-FTIor I.D. I ZL IPrs/Pip
L/Elem
-I- -I-
ICh Slope I
-I-
I
-I-
I
-I-
I
-I- -I-
SF Avel HF -I- -I-
ISE DpthlFroude
-I-
NiNorm Dp -I- -I-
I "N" I
-I-
X-FallI ZR -I IType Ch
I I********
I I
********* I********* I I I********* I I ***** I I I
I 178.350 33.000 I .498 33.498 I 27.50 I 8.75 1.19 34.69
I I
.00
I
.81 9.59
I I 2 0 .0
11.914 -I- -I- .0268 -I- -I- -I- -I- -I- .0260 .31 -I- -I- .50 -I- 2.69 .496 -I- -I- .013 -I- I- IR-COV
190.264
I I
33.320
I
.500
I
33.819
I
27.50
I
8.71 1.18 35.00
I I
.00
I
.81 9.60
I I I
2
I
0 .0
34.245
-I- -I-
.0268
-I- -I- -I- -I- -I- .0242 .83
-I- -I-
.50
-I-
2.68 .496 -I- -I- .013 -I- I- IR-COV
224.509
I I
34.238
I
.516
I
34.754
I
27.50
I
8.31 1.07 35.83
I
.00
I
.81 9.72
I I
2
I
0 .0
13.861 -I- -I- .0268 -I- -I- -I- -I- -I- .0210 .29 -I- -I- .52 -I- 2.51 .496 -I- -I- .013 -I- I- IR-COV
238.370 I 34.610 I
.532
I
35.142
I
27.50
I
7.92 .97 36.12
I I
.00
I
.81 9.86
I I I
2
I
0 .0
JUNCT STR -I- -I- .0200 -I- -I- -I- -H -I- .0194 .08 -I- -I- .53 -I- 2.35 -I- -I- .013 -I- I- IR-COV
--------------------WARNING - Junction Analysis - Irregular Channel --------------------
242.370 I I 34.690 I
.533 I 35.223 I 27.50 7.89 .97 36.19 I I .00 I .81 9.87 I I I
2 0 .0
-I-
3.857
-I-
.0203
-I- -I- -I- -I- -I-
.0193 .07
-I- -I-
.53
-I-
2.34 .528
-I- -I-
.013
-I- I- IR-COV
246.227
I I
34.768
I
.534
I
35.302 I 27.50 I 7.88 .96 36.27 I I
.00
I .81 9.87 I I I
2
I
0 .0
-I-
30.693
-I-
.0203
-I- -I- -I- -I- -I-
.0180 .55 -I- -I-
.53
-I-
2.34 .528
-I- -I-
.013
-I- I- IR-COV
Page 3
- - - - - - - - - - - - - - - - - - - cbrlOoplusc.OuT
276.920 35.390 .551 35.941 27.50 7.51 .88 36.82 .00 .81 10.01 2 0 .0
JUNCT STR -I- .0200 -I- -I- -I- -I- -I- -I- .0164 .07 -I- -I- .55
-I
2.19
-I -I- -I-
.013
I-
IR-COV
--------------------WARNING - Junction Analysis - Irregular Channel --------------------
U FILE: cbrloOplusc.WSw W S P G W - CIVILDESIGN version 14.06 PAGE 5
Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51
Carlsbad Boulevard Replacement Project
100-year flow rate
12-15-08 Filename: cbrlooplusc
I Invert I Depth I water I Q I vel vel I Energy I Super CriticaliFlow TopiHeight/IBase WtI
Width
INO Wth
Station I Elev I (FT) Elev I (CFS) I (FPS) Head I Grd.El.I Elev I Depth I IDia.-FTIor I.D.I ZL IPrs/Pip
L/Elem
-I-
ICh Slope
-I-
I
-I- -I-
I I
-I-
I
-I- -I-
SF Avel HF
-I- -I- -I-
ISE DpthlFroude NlNorm Dp
-I- -I- -I-
I "N" I X-FallI ZR
-I
IType Ch
I I I I*** I I I I I I I I I
I**** I*** I
I I I I
280.920
I
35.470
I
.555
I I
36.025
I
27.50 7.43 .86 36.88 .00 .81 10.04 2 0 .0
7.822 -I- .0204 -I- -I- -I- -I- -I- -I- .0155 .12 -I- -I-
.56
-I- 2.16 .527 -I- -I- -I- .013 I- IR-COV
288.742 I 35.629 I
.566
I
36.196
I 27.50 7.21 .81 37.00 I I
.00
I .81 10.13 I I I 2 I 0 .0
8.475 -I- .0204 -I- -I- -I- -I- -I- -I-
.0139 .12 -I- -I- .57 -I- 2.07 .527 -I- -I- -I- .013 I- IR-COV
297.217 I 35.802 I I .584 I 36.386 I 27.50 I 6.88 .73 37.12 I I .00 I .81 10.27 I I I 2 0 .0
5.754
-I-
.0204
-I- -I- -I- -I- -I- -I-
.0121 .07
-I- -I-
.58
-I-
1.94 .527 -I- -I- -I-
.013
I- IR-COV
302.971 I 35.919 I I .603 I 36.523 I 27.50 I 6.56 .67 37.19 I I .00 I .81 10.43 I I I 2 I 0 .0
4.169 -I- -I- .0204 -I- -I- -I- -I- -H .0105 .04 -I- -I- .60 -I- 1.82 .527 -I- -I- -I-
.013
I-
IR-COV
307.140 I 36.004 I I .623 I 36.627 I 27.50 I
6.25 .61 37.23 I I
.00
I .81 10.58
I I I 2 I 0 .0
3.121 -I- -I- .0204 -I- -I- -I- -I- -I- .0091 .03 -I- -I- .62 -I- 1.71 .527 -I- -I- -I- .013 I- IR-COV
310.261 I 36.068 I .643 I 36.711 I 27.50 I 5.96 .55 37.26 I .00 I .81 10.74 I I I 2 I 0 .0
2.364 -I- -I- .0204 -I- -I- -I- -I- -I-
.0080 .02
-I- -I- .64 -I- 1.60 .527 -I- -I- -I- .013 I- IR-COV
312.625 I I 36.116 I .664 I 36.780 27.50 I 5.68 .50 37.28 I I .00 I .81 10.91 I I 2 I 0 .0
1.793 -I- -I- .0204 -I- -I- -I- -I- -H
.0069 .01 -I- -I-
.66
-I- 1.50 .527 -I- -I- -I- .013 I-
IR-COV
314.418 I I 36.153 I .685 I
36.838
I 27.50 5.42 .46 37.29 I I
.00
I .81 11.08 I I 2 I 0 .0
1.342 -I- -I- .0204 -I- -I- -I- -I- -I- .0060 .01 -I- -I- .69 -I- 1.41 .527 -I- -I- -I- .013 I-
IR-COV
U FILE: cbrloOplusc.WSw W S P G W - CIVILDESIGN version 14.06 PAGE 6
Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51
Carlsbad Boulevard Replacement Project
100-year flow rate
12-15-08 Filename: cbrlooplusc *
Station I Invert I Depth I Water Q I vel vel I Energy I Super ICriticaliFlow ToplHeight/IBase WtI width INO Wth
I Elev I (Fr) I Elev I (CFS) I (FPS) Head I Grd.El.I Elev I Depth I IDia.-FTlor I.Dj ZL lPrs/Pip
L/Elem
-I- -I-
ICh Slope I
-I-
I -I- I
-I-
I
-I- -I-
SF Avel HF -I- -I- -I-
ISE DpthlFroude NlNorm Dp
-I- -I- -I-
N' I X-Falll ZR
-I
IType Ch
I I I********* I********* I I******* I********* I I I I******* I I***** I
Page
- - - - - - - - - - - - - - - - MM cbr100p1 USC. OUT
315.760
-I-
36.180 .707 36.887 27.50 5.17 .41 37.30 .00 .81 11.26 2 0 .0
JUNCT STR .0500 -I- -I- -I- -I- -I- -I- -I- .0114 .05 -I- .71 1.32 -I- -I-
.013
-I- -I- I- IR-COV --------------------WARNING - Junction Analysis - Irregular Channel --------------------
319.760 I 36.380
-I-
I I .491 36.871 I I I 21.50 7.00 .76 37.63 I I .00 .72 I 9.53 I I I 2 I
0 .0
7.630 .0199
I
-I- -I- -I- -I- -I- -I- -I- .0166 .13 -I- .49 2.17 -I- .475 -I- .013 -I- -I- I- IR-COV
327.390
-I-
36.532 I I .498
-I-
37.030 I I I 21.50 6.85 .73 37.76 I I .00 .72 I 9.58 I I I 2 I 0 .0
10.146 .0199
I
-I- -I- -I- -I- -I- -I-
.0150 .15
-I-
.50
-I-
2.11 .475
-I-
.013
-I- -I- I-
IR-COV
337.536
-I-
36.734
-I-
I I .514 37.248 I I I 21.50 6.53 .66 37.91 I I .00 I .72 9.71 I I 2 I 0 .0
6.304 .0199
I I
-I- -I- -I- -I- -I- -I- .0130 .08 -I- .51 -I- 1.97 .475 -I-
.013 -I- -I- I- IR-COV
343.840
-I-
36.860
-I-
I .530 37.390 I I I 21.50 6.22 .60 37.99 I I .00 I .72 9.84 I I I 2 I 0 .0
JUNCT STR .0125
-I- -I- -I- -I- -I- -I- .0147 .06 -I- .53 -I- 1.85 -I- .013 -I- -I- I- IR-COV --------------------WARNING - Junction Analysis - Irregular Channel --------------------
347.840
-I-
I I 36.910
-I-
I .477 37.387 I I I 20.30 6.90 .74 38.13 I .00 I .70 9.42 I I I 2 I 0 .0
2.218 .0174
I I
-I-
I
-I- -I- -I- -I- -I- .0174 .04 -I- .48 -I- 2.18 .477 -I- .013 -I- -I- I- IR-COV
350.058
-I-
36.949
-I-
.477 37.425
I I I
20.30 6.90 .74 38.17
I I .00 I .70 9.42 I I I 2 I 0 .0
44.982 .0174 -I- -I- -I- -I- -I- -I- .0182 .82 -I- .48 -I- 2.18 .477 -H
.013 -I- -I- I- IR-COV 0 FILE: cbr100p1usc.WSW W S P G W - CIVILDESIGN version 14.06 PAGE 7 Program Package Serial Number: 1773
WATER SURFACE PROFILE LISTING Date:12-17-2008 Time: 2:47:51 Carlsbad Boulevard Replacement Project
100 -year flow rate
12-15-08 Filename: cbrlooplusc
Invert Depth I Water I Q I vel vel I Energy Super ICriticaliFlow TopiHeight/IBase wtl INo Wth Station I
-I-
Elev I (Fr) I Elev I (CFS) I (FPS) Head I Grd.El.I Elev I Depth I width IDia.-FTIor I.Dj ZL lPrs/Pip
L/Elem ICh
-I- Slope I
-I-
I -I- I -I- -I- -I- -I-
SF Avel HF
-I-
ISE DpthjFroude
-H
NlNorm Dp -I- -I- I N I -I- X-Falll ZR -I IType Ch
I
I
I***
I
I
I I I I I******* I I I I
395.040
-I-
37.730
-I-
.468
-I-
38.198 I I 20.30 7.12 .79 38.98 I I .00 I .70 9.34 I I I 2 I 0 .0
JUNCT STR .0075 -I- -I- -I- -I- -I- .0153 .06 -I- .47 -H 2.27 -I- -I- .013 -I- I- IR-COV
GRATE INLET IN CROSS GUTTER
--------------------WARNING - Junction Analysis - Irregular Channel --------------------
- Junction Analysis - Change in
--
WARNING Channel Type ---------------
I 399.040
-I-
I 37.760
-I-
1.308 39.068 11.85 7.25 .82 39.88 .00 1.31 1.00 1.500 .000 .00 1 .0
1.723 .0021
I
-I- -I- -I- -I- -I- -I- .0113 .02 -I- 1.31 -H 1.00 1.50 -I- -I- .013 -I- .00 .00 I- PIPE
400.763
-I-
37.764
-I-
I 1.398 I 39.162 I I 11.85 6.91 .74 39.90 I I .00 I 1.31 .76 I I 1.500 I .000 .00 1 .0
6.349
I
.0021
I
-I- -I- -I- -I- -I- -I- .0114 .07 -I- 1.40 -I-
.81 1.50 -I- -I- .013 -I- .00 .00 I- PIPE
407.112 37.777 1.500 I 39.277 I I 11.85 6.71 .70 39.98 I I .00 I 1.31 .00 I I 1.500 I .000 .00 I 1 .0
Page 5
- - - - - - - - - - - - - - - - - - - cbrlOopl USC. OUT
24.648 .0021 .0123 .30 1.50 .00 1.50 .013 .00 .00 PIPE
WALL ENTRANCE
NEW TYPE B INLET (WEST SIDE OF STREET)
I I I I I I
431.760 37.830 1.761 39.591 11.85 6.71 .70 40.29 .00 1.31 .00 1.500 .000 .00 0 .0 -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- I-
0
-
Page 6
REPLACEMENT
LEGEND
DESCRIPTION STD. DWG. NO. SYMBOL
STREET CENTERUNE .
- - - - - - STREET RIGHT-OF-WAY
PROPERTY. LINE -
EASEMENT LINE - -
CURB & GUTTER (EXISTING)
STORM DRAIN (EXISTING)
CONCRETE BROW DITCH
EXISTING GAS LINE - GAS - GAS
EXISTING WATER LINE V
DIISTTNG ELECTRICAL LINE -
RCP STORM DRAIN (PROPOSED) - -
CURB & GLITTER (PROPOSED)
CONCRETE (PROPOSED)
STORM DRAIN CLEANOIJT-TYPE A (PROPOSED) 0-9 FIM
CURB INLET-TYPE C (PROPOSED) 0-2
CURB INLET-TYPE B (PROPOSED) 0-3
CATCH BASIN-TYPE 'G (PROPOSED) D-8
- II - II II -
CITY OF CARLSBAD LOCAL DEPRESSION (PROPOSED)
PROPOSED FINISH GRADE ELEVATION .
DS-1
UMITS OF GRADING (PROPOSED)
32.80 FG
EXISTING GRADE ELEVATION (32.80)EG
CONSTRUCTION PLANS
FOR
CARLSBAD. BOULEVARD STORM DRAIN
PROJECT NO. 3624
CITY OF IARLSBAD
CARLSBAD, CALIFORNIA VILINII V MRfr'
NOT TO SCALE
WORK TO BE DONE
THE IMPROVEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
FOLLOWING DOCUMENTS. CURRENT AT THE TIME OF CONSTRUCTION, AS
DIRECTED BY THE CITY ENGINEER.
CARLSBAD MUNICIPAL CODE
CITY OF CARLSBAD ENGINEERING STANDARDS
THIS SET OF PLANS
THE STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION (GREEN
BOOK) LATEST EDITION, INCLUDING ALL SUPPLEMENTS.
THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND AS MAY BE
MODIFIED BY THE CITY OF CARLSBAD STANDARDS
ABBREVIATIONS
AC ASPHALT CONCRETE AB AGGREGATE BASE
= CENTERLINE
ELY = EASTERLY
ER. = EXISTING
F.S. - FINISHED SURFACE
N.T.S. - NOT TO SCALE
PROP PROPOSED
RCP. = REINFORCED CONCRETE PIPE
R/W = RIGHT OF WAY
SD = STORM DRAIN
ST STREET
TAC TRANSITE ASBESTOS CEMENT
WLY = WESTERLY
CLAUDEA. "BUD"LEWIS - MAYOR
ANN KULCHIN - MAYOR PRO TEM
MATT HALL - COUNCIL MEMBER
MARK PACKARD - COUNCIL MEMBER
KEITH BLACKBURN - COUNCIL MEMBER
LISA HILDABRAND
CITY MANAGER
GLENN P1RUIM
PUBLIC WORKS DIRECTOR
II
I
NCTD GENERAL NOTES
I. FOR ALL EMERGENCIES AFFECTING THE TRACK AND TRAIN
SAFETY, CALL NCTD'S 24 HOUR SECURITY OFFICE AT (760)
966-6700.
ALL PERSONNEL ENTERING THE RAILROAD RIGHT-OF-WAY
SHALL COMPLY PITH NORTH COUNTY TRANSIT DISTRICT
(NCTD) REQUIREMENTS. FAILURE TO COMPLY WILL BE
GROUNDS FOR TERMINATION OF WORK AND REVOCATION OF
THE RIGHT-OF-ENTRY (ROE) PERMIT.
PRIOR TO THE START OF CONSTRUCTION AND AT THE
CONTRACTORS EXPENSE. ALL PERSONNEL INCLUDING
SUBCONTRACTORS AND THIRD PARTIES SHALL COMPLETE
NCID'S CONTRACTOR SAFETY TRAINING COURSE. CONTACT
LEE KUHNS AT (760) 967-2851 TO ARRANGE TRAINING.
THE ROE PERMITTER SHALL PAY FOR ALL FLAGGING.
INSPECTiONS, AND REVIEW COSTS AS REQUIRED IN THE ROE PERMIT. WORK BEYOND THE HOURS OF 7 AM TO 5 PM.
MONDAY THROUGH FRIDAY, WU. BE CHARGED AT 1.5 TIMES
THE STANDARD HOURLY RATE.
THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS
SET FORTH BY NCTD, THE ROE PERMIT, PROJECT PLANS AND
SPECIFICATIONS, AND THE JOB SITE NCID
FLAGMAN/EMPLOYEE-IN-CHARGE(EIC). THE NCTD
FLAGMAN/tIC HAS SOLE RESPONSIBILITY TO PROTECT THE RAILROAD INFRASTRUCTURE AND OPERATIONS. AT ALL
TiMES, THE CONTRACTOR SHALL FOLLOW THE FLAGMAN/tICS DIRECTiON.
ALL PERSONS ENTERING THE RAILROAD RIGHT-OF-WAY
SHALL HAVE TAKEN THE NCTD SAFETY TRAINING COURSE
AND SHALL HAVE THE NCTD SAFETY STICKER AFFIXED TO
THEIR HARD HAT.
NO WORK SHALL BE PERFORMED WITHIN THE RAILROAD
RIGHT-OF-WAY WITHOUT A RIGHT-OF-ENTRY PERMIT, FLAG
REQUESTS SUBMITTED TO NCTD. AND A NCTD FLAGMAN PRESENT DURING ALL CONSTRUCTION AND RELATED
ACTIVITIES.
THE CONTRACTOR SHALL COMPLY WITH ALL ENVIRONMENTAL
AND THIRD PARTY PERMITS AS REQUIRED BY THE WORK.
THE CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR EACH EQUIPMENT OPERATOR TO HAVE
CONSTANT AND DIRECT RADIO CONTACT WITH THEIR
FOREMAN. THE FOREMAN WILL IN TURN HAVE CONSTANT
AND DIRECT CONTACT WITH THE NCTD FLAGMAN/tIC.
THE CONTRACTOR SHALL HAVE THE PERMITTED STAMPED
SET OF PLANS ON-SITE WORK WILL BE TERMINATED BY
NCTT) SHOULD NO STAMPED PLANS BE ON-SITE.
THE. CONTRACTOR SHALL CONTACT NCTD AT (760) 967-2851 48 HOURS IN ADVANCE FOR ANY INSPECTIONS REQUIRED IN
THE ROE PERMIT.
ALL WORK ON OR ADJACENT TO THE SEll DIEGO TROLLEY
SHALL ALSO ADHERE TO NCTD REQUIREMENTS.
THE MOVEMENT OF TRAINS IS UNPREDICTABLE. TRAINS MAY
APPROACH THE JOB SITE IN ANY DIRECTION. AT ANY SPEED.
AT ANY TIME. AND MAY STOP AND OCCUPY THE TRACK
WITHIN THE CONTRACTOR'S WORK ZONE FOR AN
UNDETERMINED PERIOD OF TIME-
NO PERSONNEL SHALL CROSS ANY TRACK IMTHOIJT THE
APPROVAL FROM THE NCTD FLAGMAN.
IS. ONLY THE NCTD FLAGMAN IS PERMITTED TO PERFORM
FLAGGING OPERATIONS WITHIN THE RAILROAD
RIGHT-OF-WAY.
SHEET INDEX
SHEET
NO. DESCRIPTION
TITLE SHEET, VICINITY MAP
AND LOCATiON MAP
2 PLAN & PROFILE
3 PLAN& PROFILE
I
II
II
NCTD NOTE.•
(760) 966-6700 - 24 HR RAILROAD EMERGENCY NO.
SHEET CITY OF CARLSBAD 3 1 - ENGINEERING DEPARUENT SHEETS
CARLSBAD BOULEVARD STORM DRAIN REPLACEMEN'Ti
TITLE SHEET, VICINITY MAP
AND LOCATION MAP
- j - APPROVED WIWAIA E. PLUMMER
DEPUTY CITY ENGINEER REE 28176 ES'. 03/31/10 DATE
- - DAN BY - RV PROJECT NO. DRAWING NO.
; BS 3624 461-2 REVISION DESCRIPTION IN
• & 2-03O.O5
Underground Service Alert Basis of Bearings: BENCH MARK: "AS BUILT" PREPARED BY:
NAD 83 (L991.35 EPOCH) QSB-129
FOR THIS SURVEY IS THE LINE BETWEEN: ELEV, 20.040'
RECORD OF SURVEY 17271
ego. CA:92
.
,&CO: TOLL M
1-800 3- SD DISK MON. IN TOP OF CONCRETE SIGNAL BASE. 500' NORTH P.E.
3- SAN DIEGO COUNTY
1 KING TRACKS. 14 FEET EAST OF TRACKS. IN THE IT BEFORE YOU
DIG6228351289'. NOS 17271. 15' OISC STAMPED WEST CURB rE =4 EUREXA ST. AT ANGLE
REARING BEING: N
...
OF COAST "TERSEcTION WITH RAILROAD227-2600 TRACKS. BEHIND CARLSBAD WATER FACILITY & %1YE
MONUM T IS IN THE TOP
HIGHWAY 101 INIERSECTION WITH RAILROAD
NOFACGNDE REVIEWED BY,
W BACK OF CARLSBAD WATER FACILITY INSPECTOR
EXP.
:::: (
ARRIS & ASSOCIATES
I:6 lgr
- 0.50-1N 2005601.527 6223329.986. 685 17271 RECORD OF SJRAEY 17271
1-800 2_SD COUNTY 0158 USIA. IN TOP OF CONCRETE 9588. BASE. 500 NORTH P.E. DIP. (j)
p
227-2600
OF COAST HIGHWAY 101 INTERSECTION 9TH RAILROAD TRACKS. 14 OF EAST A 0.58-121. 2003526.07X. 3" SAN DIEGO COUNTY 8191 MONUMENT IS IN THE TOP OF A CONCRETE IRADLIE BOARD CARLSBAD WATER FACILITY N E 6228352.589. ROS 17271. 2.5" DISC STAMPED 0.SB-120 LIE 6215" 8 SIGNAL BASF 500 FEET 800Th OF COAST REVIEWED BY
IWO WORKING DAYS BEFORE YOU DIG
WEST 0089 OPPOSITE 3334 EUREKA ST. AT ANGLE PT IN 0.168 AT 800Th END OF PARALLEL PARKING SPACES.
NORWAY 101 INTERSECTION VISA RAILROAD TRACKS. 14 FEET EAST OF TRASICS. IN THE
SAID BEARING 8080. N 8Y2131" w 8*0< OP CARLSBAD 8*101 FACILITY INSPECTOR DATE
M, tnz
400
PEP~RES 10
—17
___ ___ __
ji I!!
MEN.1
MEN ME
•
ai a memo= EMNE
• maui u__u
.aa NENEEM
uau
•
MEOMMENNUMENMENNE ON mmmmmmmmmmmm=mm OEM m mMmMM rams ME ENMEMNMMMMMMMM
• MEN
.•
() REMOVE EXISTING 189 ClAP STORM DRAIN. 1
. j 2 TO THE CITY OF
() CONSTRUCT BRICK & MORTAR 8 3 1I S < CARAS8ADf - LI)
0 CONSTRUCT 18"0 RCP STORM DRAIN PER CRY OF CARLSBAD SID. DWG. S-5. ;
fl 3/4 GAS . - - - - 3 iX / REC._________CNJ
oo
CONSTRUCT STORM DRAIN CLEAJ'TOIJT TYPE A PER SDRSD D-9 I I g
I 6
CONSTRUCT STORM DRAIN CATCH BASIN TYPE G PER SDRSD D-8 I II; ( ---------- - -
STORM DRAIN — DATA TABEE
LINE LENGTH RADIUS BEARING/DELTA TYPE
22.72 86.99 6=195750" 18" 2700—D
10.00 - S03"3517"E 9530 018150 RIP _2791-0
( 47.70 - S87-25'08'W IN536 D.LJPT50 RIP_2791-0
24.72 - 8622240"E N"536• D.IJPT1CI RIP 2700-0
35.09 - 578"2008'N N"520" 018150 RIP 2000-0
34.55 - N7IT5107"W 01850 RIP 1091-8
(3 REMOVE EXISTING STORM DRAIN STRUCTURE.
CONSTRUCT CURB INLET TYPE C PER SDRSD 0-3 5 5 27
ABANDON EXISTING 18" ClAP AND SLURRY FILL WITH SAND SLURRY. ..
CONSTRUCT CONCRETE LUG PER SDRSD 0-63 --
-
0 RECONSTRUCT AC PALING PER CITY OF CARLSBAD STD DWG GS-25 < pC 4-09 04
0 REMOVE AND REPLACE SIDEWALK TO NEAREST JOINT PER SDRSD 0-7 \ R 15
@ CONSTRUCT LOCAL DEPRESSION PER CITY OF CARLSBAD OS—i -- -
" .37 .; C IB
(j) CONSTRUCT 19" X 30" ELLIPTICAL RCP STORM DRAIN PER CITY OF CARLSBAD CURB R
STA.
RN.
@
STO. DWG. .
CONSTRUCT CONCRETE CROSS GLITTER PER SDRSD 0-12 (EC)
CURB
() CONSTRUCT CURB RAMP TYPE A PER SDRSD 0-27 28 IA-I
() CONSTRUCT STORM DRAIN CURB INLET TYPE B PER SDRSD D-2 L=24
I' RELOCATE ELECTRICAL PULLBOX 21 VlA A
() REMOVE AND REPLACE CURB AND GUTTER PER SDRSD 0-2. . 7. -. C..\
1 13
TH ,OWNERS NAME:
t999 TRUST SITE Dim CL x WI b. 0- IT I I + CI
II d @) \.II . 1JI(3) [MI)LIflL73 .100W
1 ARLSBAD BLVD. (IaI
1
10
24
~2O CAUTION: REtURN 20 I I
I
3/4" GAS LINE IN .
*
30 BC) ! TRENCH. VERIFY
It CAUTION: LOCATION AND DEPTH
4" HIGH PRESSURE AND RELOCATE AS
GAS LINE IN TRENCH. NECESSARY
29, 22 VERIFY LOCATION
AND DEPTH AND ii
PRO CT IN P ACE.
23 41 GRAPHIC SCALE
so .11 .0 : r \ II
(I I)
(Dl FEET
LA
II
WV
SHEET II CITY OF CARLSBAD H II \\ I 2 II ENGINEERING DEPARMENT II SHEETS I
7 CARLSBAD\ \\ BOULEVARD
CARLSBAD BOULEVARD STORM DRAIN REPLACEMENT:
Underground Service Alert Basis of Beañngs: BENCH MARK: 'AS BUILT' NAD 8.3 (1991.35 EPOCH) 0.58-129 Call: TOLL FREE rc 1os DIjowy is tx uNEBETWEEN. DA m 9 ELEV.: 20.0401
PREPARED BY:
I .1 'VI I - - - - PLAN AND PROFILE
STA: 2+50.00 - STA: 4+65.28
HARRIS & ASSOCIATES _________________________________________________ AROTESS
_____________________________ 750 B 51901, Sollo 1800 APPROVED WIWAM E. PLUMMER
(LI 236—1778• TAX (619)
3611j_
0 TY CITY ENGINEER REX 28176 . 03/31/10 DATE
Son DIego, CA 92101
NO.
819
Ll v, 1 1414 I1:
t-- )IU!±L REVISION DE DATE INTTIAL DA SCRIPTION _ FIELD BY:
DAN BY: RV II PROJECT NO. II DRAWING NO. I
OF CII. CHAD BY: BS 3624 II 461-2 I BERT C.
_____ OP I oIlIER APPROVAL. CITY APPROVAL
15 EASEMENT REC. 7/7/19.31 \.,) \ \ APN: 203-051-04 T GAS TRANSMISSION ER 1339 MAIN, STAND13Y III K'\
12HHPREcciiRE
ED REQUIR SITE ADDRESS: 2550 CARLSBAD --
NIT
T\ \
11 BLVD.
PUBLIC UTUTIES
EAS \
8 EMEDERICATED I \\ TO THE CITY F
REMOVE SHED CARLSBAD
DOC.
PER I\ \ () .\ .
REMOVE EXISTING STORM DRAIN STRUCTURE .-
REC. \ \ .
REMOVE EXISTING WOOD FENCE AND GATE AND RECONSTRUCT TO MATCH IN KIND. 0 - 20 ' I '-
EXISTING TREES TO BE PROTECTED IN PLACE. 24 - - - 2
8 18 21 A2I \
BUSHES NEED TO BE REMOVED. REPLACE WITH NEW 5 GALLON PLANTS OF SAME SPECIES.
REMOVE AND REPLACE EXISTING LANDSCAPING AND IRRIGATION IN KIND. 61 m
8 p I
CONTRACTOR SHALL PROVIDE SHORING SYSTEM TO RETAIN EXISTING STRUCTURES. 10'
RECONSTRUCT AC PAVING PER COY OF CARLSBAD STD DWG GS-25 - I , •ksN•7L_
() REMOVE AND REPLACE SIDEWALK TO NEAREST JOINT PER SDRSD G-7.
®PROTECT IN PLACE.
CONSTRUC11ON NOTES EXIS11NG4 WIDE SDG&E'
() REMOVE EXISTING I80 CMP STORM DRAIN.
CONSTRUCT MODIFIED WING AND U TYPE HEADWALL PER SDRSD 0-34. LENGTH PER PLAN.
6 CONSTRUCT RIP RAP ENERGY DISSIPATOR PER SDRSD 0-40, FACING CLASS 1.4
THICK OVER 12 D.G.
CONSTRUCT —RM 'RAIN CATCH —IN 0
I STORM DRAIN DATA TABLE I I LENGTH I RADIUS I BEARING/DELTA TYPE Io•I3o• AS
I I I - I N7951'07W aW,yo.J I I I I 63.24 I - I N86483814 RCP BJPTICMJ TRUST
I I 40.63 I - I $46'53'39"y I 2A8 FIC121 I I I
4.00 - 503'06'21E 24 2000-0
I__
--
—----—
nu.u.uu MaIu IIIrnmuIlmIIsImIIInuu FEE _____________ IIIl
____ ava.uu. U. a u
U.ZII
RIC
\ RAIIJR
\WALL
CONSTRUCT 19 X 30 ELLIPTICAL RCP STORM DRAIN PER CITY OF CARLSBAD STD. (56G. 5-5. 0Li 2+00
i+b () CONSTRUCT 24 X 48 RCB
( .GIHEADWALL ) CONSTRUCT 240 RCP STORM DRAIN PER CITY OF CARLSBAD STD. DWG. 5-5.
REMOVE EXISTING RAILROAD TIE WALL
GRADE SLOPE AS SHOWN. ui
0
INSTALL FIBER ROLL AT BOTTOM OF SLOPE.
* GRAPHIC SCALE 'HOUSE
EROSION CONTROL: I
CRANED SLOPE SNAIL BE I () REMOVE SEDIMENT DEPOSITS FROM EXISTING CHANNEL I CONSTRUCT STORM DRAIN CLEANOUT TYPE A-5 PER SDRSD D-9 (MODIFIED).
HYDROGIEDED AND COIAIRED WIN
BIODEGRADABLE COCONUT FIBER I '-' T-8 CONSTANT WALL THICKNESS. REINFORCING #4 BARS G 6 INTERVALS.
31
(125BN) AND I
- . o BIODEGRADABLE STAKES BY NORDI I REMODEL SEWER CLEANOUT PER AMERICAN PUBLIC WORKS ASSOCIATION STANDARD
(APWA) PLAN NO. 223-1 HOUSE CONNECTION REMODELJNG. pv O\ \\ AMERICAN GREEN ER EQUAL I
23 \PHEET CITY OF CARLSBAD irn
(DI FED?)
IiNAAiO It.
Underground Service Alert Basis of Bearings: - BENCH MARK: "AS BUILT' HAD 83 (1991.35 EPOCH) O.SB-I29 QEV 20.040-
0-%-129.
N 2005601.527. E 6223329.060. ROS 17271 RECORD ST SJRWY 17271
Call: TOLL FREE FIN 1165 DJRWY IS THE LUlL BETWEEN: DATMI: NOW 29
1-800 rGOCLNJNTFEGD( 1IIN.DITINSTC01IINEILUINALBASL. 500'IlINTH P.E. ___. EXP. ______ DATE
6220352.309. RGO 17271. 23 DISC STAMPED 038-I20 L.S.6215 UI SINAI. BAR. 500 FELT NORTH ST COAST 227-2600 IRAQEL BEHIND CARI..GOAD WATER FACILITY & 0.38-121. N 2003526.075. E IJ014UMD1T It IN ThE TIN ST A CGI400EiE REVIEWED BY:
REST CORN OPPOSITE 3324 EUREKA ST. AT ARQ.L PT IN CURB AT NORTH HIGHWAY 101 INTERSECTION 9420 RAILROAD ______________
TWO WORKING BATS BEFORE YOU 010 040 ST PARAU.EI. PAURIING STAINS. RAINS. 14 FEET EAST ST IRAQIS. IN THE
SAID REARING BEING-. N 852131 N GAOl ST CARLSBAD WATER FACILITY INSPECTOR DATE
ENGINEERING DEPARMENT II SHEETS I
NCTD REQUIREMENTS:
RAILROAD PERMIT REQUIRED
I7iO11 NCID PRIOR To KIRK
Ill GIl/N RAILROAD R/W
CONIIAIIJAL FLAGGING 6FLL BE
REQUIRED.
NCTD NOTE.-
24 HR RAILROAD EMEROEJLCY NO.
-'7..-. (760) 966-6700
- LOCA11ON OF DISSIPATOR , \,-.>-STRUCnJRE TO BE FiNAL
s\' )'I&,fllE FiELD WITH NCTO
OF COAST HIGHWAY 101 INTERSECTION 94Th RAILROAD IRADEL 14 EAST OF r SAN DIEGO COUNTY 19011 _________________
___
MS.
PLAN CARLSBAD BOULEVARD STORM DRAIN REPLACEMENTi 1
PLAN AND PROFILE I SF _________________________ PREPARED STA: 0+79.21 - STA: 2+50.00
HARRIS & ASSOCIATES _ APPROVED WILLIAM E. PLUMMER - So Di o,CAN2IOI
6177 •F (619)2381 9
SLft)(ERUN JR.
7566 Street, Suite 000
AlE
DEPUTY DIN IN0O OIL 20176 OW. 03/31/I0 DAlE 1
0904 BY: RV II PROJECT NO. II DRAWING NO. I