Loading...
HomeMy WebLinkAbout3667; PAVEMENT OVERLAY 2002; LABORATORY TEST REPORTS, FIELD COMPACTION, AND INSPECTION; 2002-03-18- ....:.-..: - Testing Engineei s-San Diego Inc EI1bIlJ1Ld 1946 2 RECEIVED APR 012002 City of Carlsbad ENGINEERING March 18, 2002 Attn: Dale Schuck DEPARTMENT TESD Job No. 2001-2097 5950 El Carnino Real Carlsbad, California 92009 Job Name: CITY OF CARLSBAD YEARLY PAVEMENT AC/SOIL Address: Carlsbad, California The following pages present TESD's field compaction, inspection, and/or laboratory test reports for the above referenced project for work performed through 02/22/02. These reports cover the locations of work inspected and tests performed in accordance with generally accepted standards and do not constitute engineering opinions or project control. It is the responsibility of the contractor to schedule retests or reinspections of any areas that do not meet project specifications. TESD neither controls nor supervises the work at the site. We are not responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the work on schedule or carry it out in accordance with the project plans, specifications and all applicable codes. We appreciate the opportunity to provide services on this project. Should you have any questions regarding the accompanying information, please contact our office at (858) 715-5800. Respectfully submitted, Testing Engineers - San Diego, Inc Lcwry CLcwk'/wtsv Larry Clark Vice President of Engineering Tcs t inc Eninecrs -San Die,o. Inc.. 7895 Convoy Court . Suite IS San Diego. CA. 92 1II [858] 715-5800 Fax [858] 715-5810 CL'sting Engineers - San Diego(c. Established 1946 ON 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of 1 San Diego, CA 92111 Fax. (858) 715-5810 Date: O c-' —O' Field Report 0 Notice to Comply Job Name: 4 c- (.rVsL ()-e- Job No. a-eM - Address: / General/Subcontractor: - r.'-\.t ,4 _oil Concrete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing Waterproofing Roofing Engineering Observation __.L. Other Inspection Check List: Soils Report Plans Specs. ...............RFI Codes Permit #: Plan File #: Material Description: ze Sample Type: 0 Tests Performed (see attached) A -MI#. ISPW 1s4 1 test -frv( fCf$S6,61<_1-:k 1rt cf jt Pr( (. \t tQ( ' t rt Sm 11"€yO14 .1r1 N%i4 Le. jr fa'L( SLAin an i-A.rk On 't( f)te Cr\4U &L (te t4-C) ArL9uir4 (4vii )1 I '4.. p Cj~rm T \ Ac1 120 cVA 4-- vti r4. \ll4-. s1 s Cc-cL it ci-vtr Ij j inlk octtr oie '- e.uerj *(4t 1i r=14 TIM (eci.o Tu4 CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, sin conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the ontractor shall schedule TESD for reinspection or retesting. / Start Stop Reg. Hrs. OT Hrs. 7: cn :c - I 5. Note: All inspections are based on 4 and 8 hour minimums. In d ilion, any i pecti extending pa :00 p.m. (noon) will be billed an 8 hour minimum. Inspector's Signature/Name .J~~VAtj / . Cert. No. C Approval Signature/Name/Company (Verification of on-site Hours ONLY) Form# 0034- .:- ting Engineers - San Diego c. Established 1946 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of .5 San Diego, CA 92111 Fax. (858) 715-5810 Date: .2110 i lo z 0 Field Report 0 Notice to Comply Job Name: c7/y , C5p/j,,J )A-./,' /-'r-,,' -'e,/,' Address: JobNo. cDI-co97 GeneraVSubcontractor: Type of Service Performed: Inspection Check List: Permit #: Material Description: _. Soil Concrete Structural Steel Fireproofing - Engineering Observation _2i Soils Report 11c Plans 11 Specs. Plan File#: /1. Prestress Concrete Masonry Waterproofing Roofing Other RFI Codes Sample Type: 0 Tests Performed (see attached) 'JD,' /e -:J-? 'if /c" 1 aca 7J'_e /C / '- 3 7 CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the contractor shalt schedule TESD for reinspection or retesting. Start Stop Reg. Hrs. OT Hrs. c/ 75ç Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum. 1t 7r'e I Inspectors Signature/Name Cert . No. >-— Approval Signature/Name/Company (Verification of on-site Hours ONLY) 'o:?3/' //e 7 Forrn, 003.A Cj ting Engineers - San Diegojc. àj Established 1946 02 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page/ of - San Diego, CA 92111 Fax. (858) 715-5810 Date: __________________ Field Report 0 Notice to Comply Job Name: c/y CR,/c,&/ )4..-./y /-/' Address: /i,ujj s e c . ,'' g e Z Job No. 6) /-?7 y General/Subcontractor: Type of Service Performed: Inspection Check List: Permit #: Material Description: -I ZL Soil Concrete Structural Steel Fireproofing Engineering Observation ... Soils Report /`C _._?f Specs. Plan File#: 4C Prestress Concrete Masonry Waterproofing Roofing Other - RFI Codes Sample Type: 0 Tests Performed (see attached) '/O / c2 7.~ •/ 77 3 3iS ) 7& ' 73 70 7 e,277y ,,27c) > ' ('ri) 112 '/=- CERTIFICATION OF COMPLIANCE; All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the contractor shall schedule TESD for reinspection or retesting. Start Stop 'Reg. Hrs. OT Hrs. Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum. Inspector's (' '-- ,7 Cell. No. Approval Signature/Name/Company (Verification of on-site Hours ONLY) ('t' Jting Engineers - San Diego c. Established 1946 3 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page/of .5 San Diego, CA 92111 Fax. (858) 715-5810 Date: ____________ Field Report 0 Notice to Comply Job Name: Address: i/rju.i /r// Vet / 'ee /m /.S e t' Job No. c')/ ô17 General/Subcontractor: Type of Service Performed. Inspection Check List: Permit #: Material Description: Soil Concrete Structural Steel Fireproofing Engineering Observation Soils Report . Plans Specs. Plan File #: e'J / Prestress Concrete - Masonry Waterproofing Roofing Other RFI Codes Sample Type: 0 Tests Performed (see attached) 7 /0 9' /3 . ii / 7__-5 - CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For.any non-conforming items the contractor shall schedule TESD for reinspection or retesting. Start Stop Reg. Hrs. OT Hrs. Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum. Inspector's Signature/Name Cert. No. Approval Signature/Name/Company (Verification of on-site Hours ONLY) ,LM/Jy Form4 003-A Qc ting Engineers - San Diego. Established 1946 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page/of -5 San Diego, CA 92111 Fax. (858) 715-5810 Date: &/& Field Report 0 Notice to Comply Job Name: Ciy . ? A/ /K..-/, Address: - / Job No. &o 97 General/Subcontractor: , Soil Concrete Type of Service Performed: 111.._ Structural Steel Fireproofing Engineering Observation — Inspection Check List: Soils Report S_ Plans .-.4. Specs. Permit #: Plan File Material Description: Prestress Concrete Waterproofing Other — RFl Masonry Roofing Codes Sample Type: 0 Tests Performed (see attached) a27C — • — " .' 7 /0 .31F ?'f /3 c26j/ Iv (4je/r)') ,Ar ,-.— t)sec/ / 7gcA —J ( Jo () )L -'r 2? ''—' 7ry •77i; ' 77 'e -// 7 c -/tdr e CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, in conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the contractor shall schedule TESD for reinspection or retesting. Start Stop / Reg. Hrs. OT Hrs. Note: All inspections are based on 4 and B hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum. Inspector's Signature/Name Ceri. No. Approval Signature/NamelCompany (Verification of on-site Hours ONLY) /,)4',' ;.•, Fnrm (Ct3A Tel. (858) 715-5800 Page/I' of .) Fax. (858) 715-5810 Date: Notice to Comply Ting Engineers - San Diego, 01-1t. Established 1948 7895 Convoy Ct., Suite 18 San Diego, CA 92111 Field Report 0 Job Name: Xdc-e,-- . - Address: - /.s :' Job No. a / - '?' 77 General/Subcontractor: Soil Concrete Type of Service Performed: Structural Steel Fireproofing Engineering Observation Inspection Check List: Soils Report ,,_. Plans . Specs. Permit #: Plan File #: Material Description: Prestress Concrete Waterproofing Other _RFI Masonry Roofing Codes Sample Type: 0 Tests Performed (see attached) ._1 /,- s- A ,— i/, —'/ -j,',' -/ - 7c9 ,'7 i-', >. 3 71" fzt ,-J '•' —'• ,4_,'_, _-,/ "/_c '/c'- , c J -" a / - CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the contractor shall schedule TESD for reinspection or retesting. Stan Stop Reg. Hrs. OT Hrs. Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum. 1',- 1 -2 Inspector's Signature/Name Cert. No. Approval Signature/Name/Company (Verification of on-site Hours ONLY) ,,. •. g/' / Form# 003.A Ting Engineers - San Diego,(). j Established 1946 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of ') San Diego, CA 92111 Fax. (858) 715-5810 Date: Fk:o 2fl1 2C)c2. Field Repoit 0 Notice to Comply Job Name: Lirq or Cf,3,) YAcq PE 0T(4.( Address: ,'flfltti. ,.Tf . Job No. cOfr2orJ General/Subcontractor: __L'Soil Concrete - Type of Service Performed: Structural Steel Fireproofing - Engineering Observation - Inspection Check List: Soils Report Plans Specs. Permit #: Plan File #: Material Description: (L*L.iZE.o 4 Prestress Concrete ..._ Waterproofing Other - AFt Masonry Roofing Codes Sample Type: 0 Tests Performed (see attached) -c'- i iciC jt -rri\E.cr.sTI.,-.-z1 tc v Qr1c . jpA7f.2 i''1OI1 t)% L-j 7&k.W -J ir(1) ADIlM ft:• T'vtAi ck /\j. CAUI )CL..C;L'CI i Awl".5 5-1W7 ivjtJ t-1QQk?. 4 & >iE.i Lf c)/LE 3e(&I ct-r(4(FcA .41 L .IJTr'.".. I L 1e 1DtSi 5j''i- A tTk-1 ri$7-.Jc1 12 L_(/1D' c VZM O ilr&L.Afl,tt -A.0)/'JL/S \Ji' 43 o Yc-1P. )t-r 5Pb'C/h)fAic.j TTi1p Al"/i24ft I 2SF' 2 23SF ZG,7'f 4 S"F 5 7_cF2 CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in EStar]t conformance with the approved plans and specifications and the worknnship provis4is of the applicable code. For any non-conforming items the contractor shall hedule TES or reinspection or retesting. Stop Reg. Hrs. OT Hrs. 45 5 /5 (7 O Note: All inspections are based on 4 and 8 hour minimums. In addition, any 2:00 p.m. (noon) will be billed an 8 hour minimum. Inspectors Signature/Name CertNo. -i4F fjitJCZLJ"2 Approval Signature/Name/Company (Verification of on-site Hours ONLY) Form,' 33-A QW Testing Enginee - San Diego, Inc. 7895 Convoy Court, Suite 18 San Diego, California 92111 Project: (7i ru )F C1/42c5S'p&0 J FIELD RiRT 0 NOTICE TO COMPLY Date . / I I Job Number Permit Number Plan File Number Address a (7 Ci'z Page A of 3 AT Ti'jp,q Lfop or _____ .4r L.cc,r7-ic,j Z 1 5n1c ILu€,i.4re' &E-. LOA Ott 1-1/'- AT t'iZAO iiiP , tçz CLJ kAofl -Tittie (2 ZSS',1 2-72. Z9 ZO-'F 14 23'F ii '2- --F 224 OP 15 _____ T LCN1CJJ T/k TLiP&flArCtj Al S3tL1O AT 49LA1 t'J t LO TL.Li-' 3i€CflO 1LJ'1P -6-Y. 144 ü'/>' 21°F - 1 - ____ 20 2(V 2°F 21 2-at Z7. ZCF 26;?4r 38 2i4d1 zc-_sr 311 zg 2 '1 40 i ui 41 lc4 '-Il 27 /C(.3'F IS ______ Zc1O 4 2C14 IT, ,c'7 -'P - 7 4 For CC Ad Testing Engineeic San Diego, Inc. 7895 Convoy Court, Suite 18 San Diego, California 92111 TO: r (F El FIELD R'RT El NOTICE TO COMPLY Date 1 13 2c 1 2 0€' Z Job Number - 1 Permit Number Plan File Number Address .IDI Page c3 of 3 Project: C/ft Cf ,?Aj) /)l/J1 Pi:1-,J7 Oti&'e1 142 Al- m;& -f-'-' 7?7 ' 9AAK SI (!JC1 O-4 A< ? Q. LAJ _____ 1FXArL D- 14 - 2 Piw; i Th4 'E2SCt,. A-'O 7)Oi3CI PRAIrp IIVYI PI jjj4. 4; i/)r-1 LTt4 DJOdf V1A7C1 4 _____ hOiM/1&t FOrmOC Jting Engineers - San Diego,€k Established 1946 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Pagel of 3 San Diego, CA 92111 Fax. (858) 715-5810 Date: h. - -- o -' Q Field Report 0 Notice to Comply Job Name: t414 nen (.irfcU 'kcr ft&4 Job No. Address: M- / Jc / j General/Subcontractor: Soil Concrete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing . Waterproofing Roofing Engineering Observation - Other Inspection Check List: Soils Report Plans Specs. - RFI Codes Permit #: Plan File #: Material Description: Sample Type: Os fn6,6114-tv, B Tests Performed (see attached) III -A NVruze-iU_,,% ¶ Vi; P4.. i N 4 (M kth P4 Cc r %-Cr s ror 1fL Ct Apcs + L rfw4r'*\; .1 \r fr A- tv Gri<,4r 6,+ çr k Pr 1-1- f ic 4j L J11 t4 c-1l Cr. IL 4( P 1( b( tU4c vj itt, "r A%() Ct4r 4 9k $(A.. 11t$t1 ow 1i rc/ iv t pLt. ce. r' y1w,t1L frcrhfr tik 1L & -c) - CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in Start Stop Reg. Hrs. OT Hrs. Fthe conformance with the approved plans and specifications and workmanship provisions of TESD or , applicable code. For any non-conforming items the contr, or shall schedule 7;to .o reinspection or retesting. Note: All inspections are based on 4 and 8 hour minimums. In Inspectors Signature/Name t- - Approval Signature/Name/Company (Verification of on-site Hours ONLY) 12:00 p. n) will be billed an 8 hour minimum. - Cert. No. >' 5t\s Fnrm. flfl-A Testing Engineers-San Diego, Inc. 7895 Convoy Court, Suite 18, San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810 REPORT OF COMPACTION TEST DATA Project Name Cç'L or— (rLL "Ycr-L c- pv€v* Established 1946 Project Number Test Date_Dr— Page Client Test # Material Structure Test Location and Elevation or Depth relative to... Fri tlei-Jn.'n. A,. 'kirf, 1 k6 ? c- Vr,LA T A4d4i. 3 r No rc'ti frov' Ac C' pj r— V.~e-%aa Ai;v~ A-C' r P r4 (33I) 7 *331e Jd cL (7) Material: Structure: 'I S = Soil, AC = Asphalt Concrete, ATS = Asphalt Treated Base, AS = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline. SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other Test# t .- -.-- 9,- 5 6 1 Probe Depth (inches) - - 6 ' Wet Density (pci) -4 _t3'M 135 1.7 I' 3I+ DryDensity(pc - J.73 I - Moisture (%) WA - 5.5 t't r. ,o 5, MD Curve Number Maximum Density (pcf) _____ _____ .- Optimum Moisture (%) fA ' . 7(4 Relative Compaction, RC (%) 9'..- 9j i Relative Moisture, AM Specified RC (%) Specified AM Conformance (Yes/No) N N N J J sty i ____ y Nuclear Gauge Model and Serial Number:r)Oef 3'+t 13 5 5 - .CaQ.tJt: i9/(rI This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications. See accompanying Daily Report of description of work and observations TESD's Testing-Technician: Name: . Signature: Client's or Contractor's Acknowledgement: Name: ' Signature: White- Office Yellow- Contractor Pink- Field Technician Established 1946 Project Number am I - Client Teting Engineers-San Diego, Inc. 7895 Convoy Court, Suite 18, San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810 REPORT OF COMPACTION TEST DATA (— CrrLU VrL Le4rnth Test Date O -.0 41 Page .J3.. of Test # Material Structure Test Location and Elevation or Depth relative to... t4Iw$ c1çre..fr _p_ I't he, 1 rt C4'4c ('3c7) I --- t L (v) I' kc ' I J kc hr.( i Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other Test #............i... Probe Depth (inches) 6 11 P.. .J.LLIJL JZ....... ............._..... Dry Density (pcf) 1!-3 ... Moisture (%) i!t'° 11.'j. ....- ..... MD Cury e Numbe r Maximum Density(pcf) Optimum Moisture (%) 7. - it57 - : - Relative Compaction,RC(%) Relative Moisture, AM (%) — —v.7 0,t 96 Specified RC (%) Specified RM (%) Conformance (Yes/No) Nuclear Gauge Model and Serial Number:' Pu'$ jvr 3'j t S- 96 ,cr' 'At"d tk ftft / 1j1 g•'. This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed meet specifications. See accompanying Daily Report of description of work and observations fj - TESD's Testing Technician: Name: Signature: Client's or Contractor's Acknowledgement Name: Signature: White- Office Yellow- Contractor Pink- Field Technician 1Jing Engineers - San Diego,. Established 1946 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of San Diego, CA 92111 Fax. (858) 715-5810 Date: Field Report 0 Notice to Comply Job Name: of- GrcLt trItf uie4 Job No. Address: r. /i General/Subcontractor: 1V/ boil Concrete Type of Service Performed: Structural Steel Fireproofing Prestress Concrete Masonry Waterproof, rl9 Roofing Other Engineering Observation Inspection Check List: Soils Report Plans Specs. - RFI - Codes Permit #: Plan File #: Material Description: P Ot Z P,4" 'rri If- 1j Sample Type: ftj. L1 14çU1 $ Tests Performed (see attached) ('r, S, D J+ n. $4tejQ. * ItO w A L 4i f jo" L s i tjrLb P Cu.t &' iL 10 ' I0 s '(I LJ L fer# ççflt. 5t iL t.4 it feY Dcc. (fr rii _5,%, cJ)1 WM. CAi (t+ J tci"1U M1rr e cj lfi i4s) (ev p , (1;LL csrLft Cse 1 ci or\IjkcC)'j e sv *' o11 '4L I 5%, 15' r,61.e L \tr C. D 1_ct e c,L . s444(P 4A srA KA,J-+ -19;A w Or10, -•4 r ) r v1[, I C rcIvv- gv-a, e( $.J5r4L cwA 4 k\' tc v v,ci\ 1 -p r VLv.CA i tcicl C --t.if h CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in Start Stop (Reg. Hrs. OT Hrs. conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the co tractor shall schedule TESS for reinspection or retesting. Note: All inspections are based on 4 and 8 hour minimums. In a ditn, any Inspector's Signature/Name Approval Signature/Name/Company (Verification of on-site Hours ONLY) past 12:0,pi. (noon) will be billed an 8 hour minimum. Cert. No. SIr' .s;\,. Fnrm# (1fl3-A 4 fiing Engineers-San Diego, 7895 Convoy Court, Suite 18, San Diego, CA Established 1946 Project Name Project Number Client [858] 715-5800 Fax [858] 715-5810 REPORT OF COMPACTION TEST DATA Test Date -_. 1-4r Page _rL_. of Test # Material Structure Test Location and Elevation or Depth relative to... 1- I I' h It it 1$ 11 f I'it 10 fZ1 P Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other Test# ...i !....... Probe Depth (inches) Wet Dens ity(pcf) . ...........i Dry Density (pci) Moisture (%) .... (. 7.ô .7 Ii.7....t!o 8:% J11.I . ...1r.P' 1U. ... J7L MD Curve Number Maximum Density (pci) Optimum Moisture (%) - - - - - - '- - 7.5 Relative Compaction, RC(%) Relative Moisture, AM (%) .ji 1.1.........7 —3.S _9... Specified RC (% Specified PM (%) -I, ..1t'.- -......... ..... . Conformance (Yes/No) Nuclear Gauge Model and Serial Number: o 9 ,.- This report does not relieve the contractor or their responsibility for performance in accordance with the plans, spec4ications and applicable pecifications See accompanying Daily Report of description of work and observations codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed ~ meet s TESD's Testing Technician: Name: Signature: Client's or Contractor's Acknowledgement: Name: (. Signature: White- Office Yellow- Contractor Pink- Field Technician TJng Engineers - San Diego, . Established 1946 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 San Diego, CA 92111 Fax. (858) 715-5810 Date 0 Field Report 0 Notice to Comply Page lof 2- /brcy /ç2vtZ Job Name: Cpi-k.I,c Address: ( Ld d \) 1 (o i)ii J9&4 cc Job No. k-),)I General/Subcontractor: TI7pt I Q'f p Soil Type of Service Performed: Structural Steel Engineering Observation,,.' IntionCheck List: Soils Report _( Plans spec Permit#: Plan File #: Material Description: c:3- L. C.j rc4 'kpL+ Concrete Fireproofing , - _.j Specs. ci 7. t2S7,. Prestress Concrete Waterproofing Other RFI j //7 Masonry Roofing Codes Qct Sample Type: V121 Tests Performed (see attac ed) 4pL+ p- X epojrs. 'cDMk1 C1. C rej A.e. Cr O4t9-&) tv*& C4 d g I 4—frsed. eie4 tIp L d 1 c3oc*/i( iv ?J2eieI 4 - y - u2/1qi% c AA (&/4c- QJ L (CrI€) zi p c/et I2er. LZbIDkYy (V 2cio-y /JI J /èPt/iI~ 4- 1 h&, AJUIA , €/o7/cd r/4tiq A c — /cp/tf t CERTIFICATION OF COMPLIANCE: All conformance with the approved plans and the applicable code. For any non-conforming reinspection or retesting. of the observd work, unle 'otherwise specifications and the workmanship items the contractor shall stated, is/in provisions of schedule TESD for I Start ' Stop Reg. Hrs. OT Hrs. jr minimum. Form# 003-A UI%P iecing Engineers-San Diego,Qc. Established 1946 7895 Convoy Court, Suite 18, San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810 REPORT OF COMPACTION TEST DATA Project Name Ly (adcb-zc/ i-/y erYi Project Number - 77 Test Date /b-u ..9vy /.2'7..2cQ2_ Page _Z of Client Test # Material Structure Test Location and Elevation or Depth relative to... I 4 1'J4bci. \pr 4 I - s A, - Ar 5 A c P IcA \ /C jJ , Ac- z- e.- ) . I JC P Z 1\ 7 Ac- / j I, ii 3, I If' '.1 Material: S = Soil, AC = Asphalt Concrete, ATB Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other 4s- rss &- AP R?j, ( ruic-s Pr ç7' -- ........................L '2 Test #.Ui Probe Depth (inches) Wet Density (pcf) IYI..9 /3 . S ( ./7 LL Dry I3a'I Density (pcf) /L .... .... ......../3I Moisture (%) MD Curve Number 3 .3 3 3 - Maximum Density (pcf) Zc - L7Lt:.7I&.7 (Z11f7_ Optimum Moisture (%) Relative Compaction, RC(%) /05 - - Relative Moisture AM (%) Specified RC -................ ?ST....?c. 1. S.c Specified AM Conformance(Yes/No) Nuclear Gauge Model ana Serial Number: 29 This report does not relieve the contractor or their responsibility for perfoimance in accordance with the plafs, specifications and applicable codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications. See accompanying Daily Report of description of work and observations TESD's Testing Technician: Name: Signature: \ Clients or Contractor's Acknowledgement: Name: Signature: White- Office Yellow- Contractor Pink- Field Technician TiJng Engineers - San Diego, LJ. Established 1948 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of San Diego, CA 92111 Fax. (858) 715-5810 Date: .- Field Report 0 Notice to Comply Job Name: °r cr U )1e44/ te4 eLt, Job No. 400 - 2ô97 Address: Cerr F rr S -rI -cc .rà 'cJ.0 tLr l-ve 0ieJ.- General/Subcontractor: G4 4r TL4 Z%6 1A4. oil CoAcrete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing Waterproofing __ Roofing Engineering Observation Other __________ Inspection Check List: Soils Report Plans Specs. RFI Codes Permit #: Plan File#: Material Description: ;34 " f(L 4i) Sample Type: 0 Tests Performed (see attached) 'r 4thI.. s- sL (*cr t0 sL) If e tm t4rê * Ci ' 5-4 04 L*e+,, :p~-A rl~"* L q J 1 r 1 L IL k Tr . - ç Y. CU Vi o4 c\ C '' ro r 1 Ct L '' 4G-stc'-c cleft cL. C% 1i i4L" k14 J1\ J/j ' CL F r'L per-c 11'r -1 6" . 14Y/ 4t• j. G-ei U Ilk r' fsr tc. or j s 1\4 fl2 L flL'+ w TIE 9P41- CP j'Qj fl4,fr- jC . Lt?J e sL cL-. 1- r Its ¶ Lr4 *i * t*"i( '*JY%)t CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in I Start I Stop Reg. Hrs. I OT Hrs. conformance with the approved plans and specification and the workmanship provisions of I the applicable code. For any non-conforming items the )ntractor shall schedule TESD for I 73p ,.o reinspection or retesting. Note: All inspections are based on 4 and 8 hour minimums. I a di on, any ins~ _'-7Ai= ction endin . (noon) will be billed an 8 hour minimum. Inspector's Signature/Name Cert. No. 5r. Approval Signature/Name/Company (Verification of on-site Hours ONLY) Form# 003-A Ting Engineers - San Diego,ij. I Established 1946 1? 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page .*'of * San Diego, CA 92111 Fax. (858) 715-5810 Date: Field Report 0 Notice to Comply Job Name: 64j CrrLU 'ac.k j f Pqve1M91 Address: (rkLc '.fIk- rrv,j 4. Job No. -a'7 General/Subcontractor: Crj or. C4r1 L ( / DJev% Corr Soil Corete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing Waterproofing Roofing Engineering Observation _.. Other A- & Inspection Check List: Soils Report Plans Specs. AFt Codes Permit #: Plan File #: Material Description: tr5 Sample Type: b Jz tc . Test'Performed (see attached) i6-(ec\ 1*c rv) u 1L c c' ptnl rc4jta-'r\ 1tp 1t%-f. tii A..V4d ri r -b w ft'Nk Mum tr .Go° (A. L cLJs 1\4A. . crLL& To CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the reinspection or retesting. coractorshall schedule TESD for I Start I Stop I Reg. Hrs. I I OT Hrs. ,OL I Note: All inspections are based on 4 and 8 hour minimums. inspe, In a it , any n e ng past . p.m. (noon) will be billed an 8 hour minimum. Inspector's Signature/Name Cert. No. - Approval Signature/Name/Company (Verification of on-site Hours ONLY) Forrn 3.A O Ting Engineers-San Diego, ,. Established 1946 j 7895 Convoy Court, Suite 18, San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810 REPORT OF COMPACTION TEST DATA Project Name of:: CA tLU IV4AA(L Project Number 100 11 )- Cf 7 Test Date O. - V Page of Client Ct4 °r - Test # Material TStructure I Test Location and Elevation or Depth relative to... I j P 16 I65 ) 4L1- ' £L(r ______ _____ ________ • - (,t 6.5 It IX so I ,.5!.iS) Material: Structure: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other Probe Depth (inches) 6" 3 s (3 s Wet Density (pcf)J Dry Density (pcf) . Moisture Ltd. 3 ' t.t/e N/ .. .. - ...- N/A ..---. - MD Curve Number Maximum Density (pcf) Optimum Moisture - - - --------------- ' Relative Compaction, RC Relative Moisture, RM (%) Pj4,, - Specified RC(%) Specified AM (%) . .- Conformance (Yes/No) Nuclear Gauge Model and Serial Number: tot £ t'f( 11;.)JIc This report does not relieve the contractor or their responsibility for performance in accordance with the pl codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed See accompanying Daily Report of description of work and observations TESD's Testing Technician: . Name: . 1-5.S Signature: - Clients or Contractor's Acknowledgement: Name: 'X Signature White- Office Yellow- Contractor specifications and applicable meet specifications. \• 2t1—/' Pink- Field Technician I - Ting Engineers - San Diego,. Established 1948 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of San Diego, CA 92111 Fax. (858) 715-5810 Date: --- Field Report 0 Notice to Comply Job Name: L-1 '( 14U fM,mØv+ c#- Job No. - Address: General/Subcontractor: Type of Service Performed: Soil Concrete Prestress Concrete Masonry Structural Steel Fireproofing Waterproofing Roofing Engineering Observation 11171 Other &crhT Inspection Check List: Soils Report Plans Specs. - AFI Codes Permit #: Plan File #: Material Description: "f000 /'t Sample Type: 0 Tests Performed (see attached) 0' 4 - s -k e ç D:. L1 rr iL -- . - o' c4U V; Pk j? €4 c\ 1L sL çi, tsL)e &iL , %hbr 1oJe1 S rôL trL't t ov.v- QVJsH r - itrvc Lc. i?efiT ct wc I tK CA ri .A44 uWt,\ fir Moe*, too, ' L U, 1L c 1 No*• -L \ I A,- N I'v fro 1 iiti 4;\ 1;'c:k U1IF rri r-J' 1)L1 . pt's rvisr' eick To G t 1t. rb'l4. 3i Cio.s,e+ T° '11e. 4'U. ee ctrsU j• c LU t\ L M#Trt In€. j .5p4 1L (pv CLrA tsMi i;t (3tV M . s. PWf%oc or VlsJc4 -. kit i 4 So CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in Start Stop Reg. Hrs. OT Hrs. conformance with the approved plans and specifications and the workmanship provisions of - the applicable For items 3Q code. any non-conforming the co tractor shall schedule TESD for 7 p .0 reinspection or retesting. (l\ Note: All inspections are based on 4 and 8 hour minimums. In d1tkn, any inspec4- exte ing past 12:00 p.-t10on) will be billed an 8 hour minimum. V inspector ignatureiniame r 1 kf1 1 I - uert. No. .)1 4 'zD Approval Signature/Name/Company (Verification of on-site Hours ONLY) Firm Co Ting Engineers - San Diego,(j. Established 1948 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page lof 3 San Diego, CA 92111 Fax. (858) 715-5810 Date: O€, El Field Report 0 Notice to Comply Job Name: Cr1ti (c4'r. oI) .f'eA14. Job No. vkao 1 — 26 9 7 Address: C4tf v11i. 0:i, General/Subcontractor C*j C1 LL r.1,)-e9 (-es Soil Conci4te Prestress Concrete Masonry Performed: Type of Service Structural Steel - Fireproofing Waterproo Roofing Engineering Observation ..._ Other Inspection Check List: - Soils Report Plans Specs. RFI Codes Permit #: Plan File #: Material Description: -P-... 'jao i/C A C Sample Type: a Tests Performed (see attached) 30 7r r1i Tbs CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in I Start Stop I Reg. Hrs. I OT Hrs. conformance with the approved plans and specifications and the workmanship provisions of the applicable code. For any non-conforming items the contractor shall schedule TESD for •7 30 . ' 0 ã reinspection or retesting. Lition,y n )Note: All inspections are based on 4 and 8 hour minimums n Ctiinast 12:00 p.m. (noon) will be billed an 8 hour minimum. Inspector's Signature/Name / 4jL5t. Cert. No. Approval Signature/Name/Company - (Verification of on-site Hours ONLY) Form# 003-A ç FS!j 1ting Engineers-San Diegonc. Established 1946 7895 Convoy Court, Suite 18, San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810 REPORT OF COMPACTION TEST DATA Project Name Project Number Client ,9i 1 Test Date D' V Test # Material Structure Test Location and Elevation or Depth relative to... I 1' - C -5i c\ 1A ro 44 A. oe S %C P f -c (ve Qh A& .4' td Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AS = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, 55 = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0= Other Test# .. 3 &, Probe Depth (inches) Wet Density (pcf) Dry Density (pcf) Moisture p,4 37.O40 3.34 1_3•l MD Curve Number Maximum Density (pcf) l9i. Optimum Moisture (%) Relative Compaction, RC (%) c' j< - .... Relative Moisture, RM (%) Specified RC (%) Specified RM Conformance (Yes/No) Nuclear Gauge Model and Serial Number,.-T(4 \ex 5# cji,, •9j -t G -- It / o This report does not relieve the contractor or their responsibility for performance in accordance with the plar, specifications and applicable codes. The contractor is responsible for scheduling retesting of reworked areas that have ôreviously failed tmeet specifications. See accompanying Daily Report of description of work and observations , 1\ TESD's Testing Technician: Name: 'J4rt'b Signature: Client's or Contractor's Acknowledgement: Name: Signature: White- Office Yellow- Contractor Pink- Field Technician Testing Engineers -San Diego, Inc. Estiblished 1946 Date: March 7, 2002 Job No: 2001-2097 Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL ADDRESS: Carlsbad, California Plan Number: N/A Permit: N/A Application: N/A fi~' Report No: 3713 ENGINEER: BENJAMI& SHIRER, STAFF ENGINEER Lab No.: 3652 Project: CITY OF CARLSBAD PAVEMENT Location: Carlsbad, California Sampled: Date: 2120/02 By: TESD Type of Material: 3/4' AR4000 Submitted: Date: 2/20/02 By: TESD Source of Material: HANSON SAN MARCOS Location Sampled:- CADENCIA STREET SIEVF. ANALYSIS ASTMCfl.6 Sieve % Passing Size Accumulative * Specification 3/4" 100 1/2' 86 3/8" 77 NO.4 55 8 39 16 30 30 23 50 16 100 ii 200 6.7 Testing En gineers - San Diego. Inc.. 7895 Convoy Court. Sui te IS San Diego. CA. 9211 1 [858) 71 5-5800 Fax [858] 7! 5-5S10 •.....::: estingEngineers-San Diego, Inc. Established 1946 TEST STANDARDS ARE ASTM (unless otherwise specified) TEST RESULT SPECIFICATION TEST STD ASPHALT CONTENT % D6307 % OF TOTAL MIX 6.0 % BY WT. OF 6.3 AGGREGATE Testine Engineers - San Diego. Inc.. 7895 Convoy.Couri. Suite 18 San Diego. CA. 9213 1 [858] 715-5S00 Fax S58J 7 15-58111 Testinc, En-Ineers -San Diego, Inc. Established 1946 Date: March 7, 2002 Job No: 2001-2097 Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL ADDRESS: Carlsbad, California Plan Number: N/A Permit: N/A - App on: N/A Report No: 3712 ENGINEER: BENJAM SHIRER, STAFF ENGINEER Lab No.: 3637 Project: CITY OF CARLSBAD PAVEMENT Location: Carlsbad, California Sampled: Date: 2/19/02 By: TESD Type of Material: 3/4" AR4000 Submitted: Date: 2/19/02 By: TESD Source of Material: CCAC CARROLL CANYON Location Sampled: 300' WEST OF VALENCIA AVE ON PARK Sieve % Passing Size Accumulative 1" 100 3/4" 99 1/2" 91 Al,78 NO.4 59 8 46 16 36 30 27 50 18 100 12 200 7.4 * Specification Testjn Enjncers - San Djeo. Inc.. 7595 Convoy Court. Suite 18 San Diego. CA. 921 1 1 [858] 7 5-5800 Fax [858] 7i 5-580 Testing Engineers- San Diego Inc.LIthII'hLd 1946 TEST STANDARDS ARE ASTM (unless otherwise specified) TEST RESULT SPECIFICATION TEST STD ASPHALT CONTENT % D6307 % TOTAL MIX 5.3 % BY WT. OF 5.6 AGGREGATE Testine Eninecrs San Diego. Inc.. 7895 Convoy Court. Suite IS San Diego. CA. 9211 1 [558) 715-5,800 Fax [858] 7I55SI Test] ng Engi neers -San Diego, Inc. Established 1946 PHYSICAL PROPERTIES OF ASPHAIJIC CONCRETE Date: February 28, 2002 Job No: 2001-2097 Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL ADDRESS: Carlsbad, California Plan Number: N/A Permit: N/A Application: N/A Report No: 3705 ENGINEER: CARLOS ACERO, STAFF ENGINEER Lab No.: 3719 Project: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL Location: CARLSBAD, CALIFORNIA Sampled: Date: 2/11/02 By: TESD Type of Material: 3/4" AR4000 Submitted: Date: 2/11/02 By: TESD Source of Material: HANSON SAN MARCOS Location Sampled: NOT SUBMITTED Sieve % Passing Size Accumulative * Specification 3/4" 100 1/2" 90 3/8" 76 NO.4 56 8 41 16 31 30 22 50 14 100 9 200 5.4 Testir.2 Engineers San Diego. Inc.. 7895 Convoy Court. Suite IS San Diego. C.•\. 92 1 11 t5J 7155800 Fax SJ 71 5-5I15 Testing Engineers - San Diego, Inc. Established 1946 TEST STANDARDS ARE ASTM (unless ntherwice specified) TEST RESULT SPECIFICATION TEST STD ASPHALT CONTENT % D6307 % TOTAL MIX 5.3 % BY WT. OF 5.6 AGGREGATE a Testin2 Ennnecrs - San Di-,o. Inc.. 7895 Convoy Court. Suite IS San Diego. CA. 92 1 1 1 [858] 7 1 5-5S00 Fa [858] 7 1 5-5SI 0 Testing Engineers - San Diego, Inc. Established 1946 Date: PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE February 27, 2002 Job No: 2001-2097 Job Name: CITY OF .CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL ADDRESS: Carlsbad, California Plan Number: N/A Permit: N/A Application: N/A Report No: 3704 CL_ ENGINEER: CARLOS ACERO, STAFF ENGINEER Lab No.: 3720 Project: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL Location: CARLSBAD, CA Sampled: Date: 2/08/02 By: Type of Material: 3/4' AR4000 Submitted: Date: 2/08/02 By: Source of Material: CCAC MIRAMAR Location Sampled: FROM 294.34 TONS OF 315 TONS Sieve % Passing Size Accumulative * Specification I" 100 3/4" 98 1/2' 87 3/8" 69 NO.4 50 8 37 16 28 30 21 50 14 100 9 200 5.7 ------------------------------------------------------------------------------------------------------------------------- Tcstn Engnecrs -. San Diego. Inc.. 7895 Convoy Court. Suite IS San Diego. CA. 921 1 [858) 715-5800 Fax LSSS] 7 5-580 EsVibl;shcd 1946 TFST STANDARDS ARE ASTM (unless nthenis spified) TEST RESULT SPECIFICATION TEST STD ASPHALT CONTENT% D6307 %OF TOTAL MIX 4.7 %BY WT. OF 4.9 AGGREGATE TesiinQ En gineers - San Djeø. Inc.. 795 Convoy Court. Suite IS San Diego. CA. 92111 [858} 715-5800 Fax [858] 715-SS 10 Testing Engineers - San Diego, Inc. Established 1946 Date: February 27, 2002 Job No: 2001-2097 Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL ADDRESS: Carlsbad, California Plan Number: N/A Permit: N/A Application: N/A Report No: 3702 ENGINEER: CARLOS ACERO, STAFF ENGINEER Lab No.: 3603 Project: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL Location: CARLSBAD, CA Sampled: Date: 2/14/02 By: TESD Type of Material: 3/4" AR4000 Submitted: Date: 2/14/02 By: TESD Source of Material: CCAC MIRAMAR Location Sampled: VIA MARTA Sieve % Passing Size Accumulative * Specification 1-1/2" 100 1...99 3/4' 98 1/2" 85 3/8" 69 NO.4 53 8 39 16 29 30 21 50 14 100 9 200 5.6 ------------------------------------------------------------------------------------------------------------------------- Tesng Engineers - San Die,-,o. Inc.. 7895 Convoy Court. Suite 18 San Diec. CA. 92 1 1 1 [858] 715-5800 Fax (858) 715-5810 : Testing Engineers - San Diego, I n C'. Established 1940 TEST STANDARDS ARE ASTM (unless ntherwice specified) TEST RESULT SPECIFICATION TEST STD ASPHALT CONTENT % D6307 %OF TOTAL MIX 5.1 % BY WT. OF 5.3 AGGREGATE 'I Tcstinc Ennncers - San Die2o. Inc.. 795 Convoy Court. Suice IS San Diego. CA. 921 11 (858) 71 5 - 5 5 0 0 F a x ( S S S ) 7 5-580