HomeMy WebLinkAbout3667; PAVEMENT OVERLAY 2002; LABORATORY TEST REPORTS, FIELD COMPACTION, AND INSPECTION; 2002-03-18- ....:.-..:
- Testing Engineei s-San Diego Inc EI1bIlJ1Ld 1946
2
RECEIVED
APR 012002
City of Carlsbad ENGINEERING March 18, 2002
Attn: Dale Schuck DEPARTMENT TESD Job No. 2001-2097
5950 El Carnino Real
Carlsbad, California 92009
Job Name: CITY OF CARLSBAD YEARLY PAVEMENT
AC/SOIL
Address: Carlsbad, California
The following pages present TESD's field compaction, inspection, and/or laboratory test
reports for the above referenced project for work performed through 02/22/02.
These reports cover the locations of work inspected and tests performed in accordance
with generally accepted standards and do not constitute engineering opinions or project
control. It is the responsibility of the contractor to schedule retests or reinspections of
any areas that do not meet project specifications. TESD neither controls nor supervises
the work at the site. We are not responsible for errors and omissions of the contractor, nor
for the contractor's failure to keep the work on schedule or carry it out in accordance with
the project plans, specifications and all applicable codes.
We appreciate the opportunity to provide services on this project. Should you have any
questions regarding the accompanying information, please contact our office at (858)
715-5800.
Respectfully submitted,
Testing Engineers - San Diego, Inc
Lcwry CLcwk'/wtsv
Larry Clark
Vice President of Engineering
Tcs t inc Eninecrs -San Die,o. Inc.. 7895 Convoy Court . Suite IS San Diego. CA. 92 1II [858] 715-5800 Fax [858] 715-5810
CL'sting Engineers - San Diego(c.
Established 1946
ON 7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of 1
San Diego, CA 92111 Fax. (858) 715-5810 Date: O c-' —O'
Field Report 0 Notice to Comply
Job Name: 4 c- (.rVsL ()-e- Job No. a-eM -
Address: /
General/Subcontractor:
- r.'-\.t ,4
_oil Concrete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing Waterproofing Roofing
Engineering Observation __.L. Other
Inspection Check List: Soils Report Plans Specs. ...............RFI Codes
Permit #: Plan File #:
Material Description: ze
Sample Type: 0 Tests Performed (see attached)
A -MI#. ISPW 1s4 1 test
-frv( fCf$S6,61<_1-:k 1rt
cf jt Pr( (. \t tQ( ' t rt Sm 11"€yO14 .1r1 N%i4 Le. jr fa'L(
SLAin an i-A.rk On 't( f)te Cr\4U &L
(te t4-C) ArL9uir4 (4vii )1 I '4.. p Cj~rm T \ Ac1
120 cVA 4-- vti r4. \ll4-. s1 s Cc-cL
it ci-vtr
Ij
j inlk octtr oie '-
e.uerj *(4t 1i r=14 TIM (eci.o Tu4
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, sin
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the ontractor shall schedule TESD for
reinspection or retesting. /
Start Stop Reg. Hrs. OT Hrs.
7: cn :c - I 5.
Note: All inspections are based on 4 and 8 hour minimums. In d ilion, any i pecti extending pa :00 p.m. (noon) will be billed an 8 hour minimum.
Inspector's Signature/Name .J~~VAtj / . Cert. No. C
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
Form# 0034-
.:- ting Engineers - San Diego c.
Established 1946
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of .5
San Diego, CA 92111 Fax. (858) 715-5810 Date: .2110 i lo z
0 Field Report 0 Notice to Comply
Job Name: c7/y , C5p/j,,J )A-./,' /-'r-,,' -'e,/,'
Address:
JobNo. cDI-co97
GeneraVSubcontractor:
Type of Service Performed:
Inspection Check List:
Permit #:
Material Description:
_. Soil Concrete
Structural Steel Fireproofing
- Engineering Observation
_2i Soils Report 11c Plans 11 Specs.
Plan File#:
/1.
Prestress Concrete Masonry
Waterproofing Roofing
Other
RFI Codes
Sample Type: 0 Tests Performed (see attached)
'JD,' /e -:J-? 'if /c"
1 aca 7J'_e
/C
/
'-
3
7
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the contractor shalt schedule TESD for
reinspection or retesting.
Start Stop Reg. Hrs. OT Hrs.
c/ 75ç
Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum. 1t 7r'e I
Inspectors Signature/Name Cert . No. >-—
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
'o:?3/' //e 7
Forrn, 003.A
Cj ting Engineers - San Diegojc.
àj Established 1946 02
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page/ of
- San Diego, CA 92111 Fax. (858) 715-5810 Date: __________________
Field Report 0 Notice to Comply
Job Name: c/y CR,/c,&/ )4..-./y /-/'
Address: /i,ujj s e c . ,'' g e Z
Job No. 6) /-?7
y
General/Subcontractor:
Type of Service Performed:
Inspection Check List:
Permit #:
Material Description:
-I
ZL Soil Concrete
Structural Steel Fireproofing
Engineering Observation
... Soils Report /`C _._?f Specs.
Plan File#:
4C
Prestress Concrete Masonry
Waterproofing Roofing
Other
- RFI Codes
Sample Type: 0 Tests Performed (see attached)
'/O / c2 7.~ •/
77
3 3iS ) 7& '
73
70
7 e,277y
,,27c) >
' ('ri)
112
'/=-
CERTIFICATION OF COMPLIANCE; All of the observed work, unless otherwise stated, is in
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the contractor shall schedule TESD for
reinspection or retesting.
Start Stop 'Reg. Hrs. OT Hrs.
Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum.
Inspector's (' '-- ,7 Cell. No.
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
('t'
Jting Engineers - San Diego c.
Established 1946 3
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page/of .5
San Diego, CA 92111 Fax. (858) 715-5810 Date: ____________
Field Report 0 Notice to Comply
Job Name:
Address: i/rju.i
/r// Vet /
'ee /m /.S e t'
Job No. c')/ ô17
General/Subcontractor:
Type of Service Performed.
Inspection Check List:
Permit #:
Material Description:
Soil Concrete
Structural Steel Fireproofing
Engineering Observation
Soils Report . Plans Specs.
Plan File #:
e'J /
Prestress Concrete - Masonry
Waterproofing Roofing
Other
RFI Codes
Sample Type: 0 Tests Performed (see attached)
7
/0 9'
/3 .
ii
/ 7__-5 -
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For.any non-conforming items the contractor shall schedule TESD for
reinspection or retesting.
Start Stop Reg. Hrs. OT Hrs.
Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum.
Inspector's Signature/Name Cert. No.
Approval Signature/Name/Company
(Verification of on-site Hours ONLY) ,LM/Jy
Form4 003-A
Qc ting Engineers - San Diego.
Established 1946
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page/of -5
San Diego, CA 92111 Fax. (858) 715-5810 Date: &/&
Field Report 0 Notice to Comply
Job Name: Ciy . ? A/ /K..-/,
Address: - /
Job No. &o 97
General/Subcontractor: ,
Soil Concrete Type of Service Performed: 111.._ Structural Steel Fireproofing
Engineering Observation —
Inspection Check List: Soils Report S_ Plans .-.4. Specs.
Permit #: Plan File
Material Description:
Prestress Concrete
Waterproofing
Other
— RFl
Masonry
Roofing
Codes
Sample Type: 0 Tests Performed (see attached)
a27C
— • — " .'
7
/0 .31F
?'f
/3 c26j/
Iv
(4je/r)') ,Ar ,-.— t)sec/ / 7gcA —J
( Jo () )L -'r 2? ''—' 7ry •77i; ' 77 'e -// 7 c -/tdr e
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, in
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the contractor shall schedule TESD for
reinspection or retesting.
Start Stop / Reg. Hrs. OT Hrs.
Note: All inspections are based on 4 and B hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum.
Inspector's Signature/Name Ceri. No.
Approval Signature/NamelCompany
(Verification of on-site Hours ONLY) /,)4',' ;.•,
Fnrm (Ct3A
Tel. (858) 715-5800 Page/I' of .)
Fax. (858) 715-5810 Date:
Notice to Comply
Ting Engineers - San Diego, 01-1t.
Established 1948
7895 Convoy Ct., Suite 18
San Diego, CA 92111
Field Report 0
Job Name: Xdc-e,-- . -
Address: - /.s :'
Job No. a / - '?' 77
General/Subcontractor:
Soil Concrete Type of Service Performed: Structural Steel Fireproofing
Engineering Observation
Inspection Check List: Soils Report ,,_. Plans . Specs.
Permit #: Plan File #:
Material Description:
Prestress Concrete
Waterproofing
Other
_RFI
Masonry
Roofing
Codes
Sample Type: 0 Tests Performed (see attached)
._1
/,- s- A ,— i/, —'/ -j,',' -/ - 7c9 ,'7 i-', >.
3 71" fzt
,-J '•' —'• ,4_,'_, _-,/ "/_c '/c'- , c J -" a
/ -
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the contractor shall schedule TESD for
reinspection or retesting.
Stan Stop Reg. Hrs. OT Hrs.
Note: All inspections are based on 4 and 8 hour minimums. In addition, any inspection extending past 12:00 p.m. (noon) will be billed an 8 hour minimum.
1',- 1
-2
Inspector's Signature/Name Cert. No.
Approval Signature/Name/Company
(Verification of on-site Hours ONLY) ,,. •. g/' /
Form# 003.A
Ting Engineers - San Diego,().
j
Established 1946
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of ')
San Diego, CA 92111 Fax. (858) 715-5810 Date: Fk:o 2fl1 2C)c2.
Field Repoit 0 Notice to Comply
Job Name: Lirq or Cf,3,) YAcq PE 0T(4.(
Address: ,'flfltti. ,.Tf .
Job No. cOfr2orJ
General/Subcontractor:
__L'Soil Concrete - Type of Service Performed: Structural Steel Fireproofing -
Engineering Observation -
Inspection Check List: Soils Report Plans Specs.
Permit #: Plan File #:
Material Description: (L*L.iZE.o 4
Prestress Concrete ..._
Waterproofing
Other
- AFt
Masonry
Roofing
Codes
Sample Type: 0 Tests Performed (see attached)
-c'- i iciC jt -rri\E.cr.sTI.,-.-z1
tc v Qr1c . jpA7f.2 i''1OI1 t)%
L-j 7&k.W -J ir(1) ADIlM ft:•
T'vtAi ck /\j. CAUI )CL..C;L'CI i Awl".5 5-1W7
ivjtJ t-1QQk?. 4 & >iE.i Lf c)/LE 3e(&I ct-r(4(FcA
.41 L .IJTr'.".. I L 1e 1DtSi 5j''i- A tTk-1 ri$7-.Jc1 12 L_(/1D'
c VZM O ilr&L.Afl,tt -A.0)/'JL/S \Ji' 43
o Yc-1P. )t-r 5Pb'C/h)fAic.j TTi1p Al"/i24ft
I 2SF'
2 23SF ZG,7'f
4 S"F
5 7_cF2
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in EStar]t
conformance with the approved plans and specifications and the worknnship provis4is of
the applicable code. For any non-conforming items the contractor shall hedule TES or reinspection or retesting.
Stop Reg. Hrs. OT Hrs.
45 5 /5 (7 O
Note: All inspections are based on 4 and 8 hour minimums. In addition, any 2:00 p.m. (noon) will be billed an 8 hour minimum.
Inspectors Signature/Name CertNo. -i4F fjitJCZLJ"2
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
Form,' 33-A
QW
Testing Enginee - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
Project: (7i ru )F C1/42c5S'p&0
J FIELD RiRT
0 NOTICE TO COMPLY
Date .
/ I I Job Number
Permit Number Plan File Number
Address a (7 Ci'z
Page A of 3
AT Ti'jp,q
Lfop
or
_____ .4r L.cc,r7-ic,j Z 1 5n1c ILu€,i.4re' &E-.
LOA Ott 1-1/'- AT t'iZAO iiiP , tçz CLJ kAofl -Tittie
(2 ZSS',1 2-72. Z9 ZO-'F
14 23'F ii '2- --F 224 OP
15
_____ T LCN1CJJ T/k TLiP&flArCtj
Al S3tL1O AT 49LA1 t'J t LO TL.Li-' 3i€CflO 1LJ'1P -6-Y. 144 ü'/>'
21°F -
1 -
____ 20 2(V 2°F
21 2-at
Z7. ZCF 26;?4r 38
2i4d1 zc-_sr 311
zg 2 '1 40
i ui 41
lc4 '-Il
27 /C(.3'F IS
______ Zc1O 4
2C14 IT, ,c'7 -'P
- 7 4
For CC
Ad Testing Engineeic San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
TO: r (F
El FIELD R'RT
El NOTICE TO COMPLY
Date
1 13 2c 1 2 0€' Z
Job Number
- 1
Permit Number Plan File Number
Address .IDI
Page c3 of 3
Project: C/ft Cf ,?Aj) /)l/J1 Pi:1-,J7 Oti&'e1
142 Al- m;& -f-'-' 7?7 ' 9AAK
SI
(!JC1 O-4 A< ? Q. LAJ
_____ 1FXArL D- 14 - 2 Piw; i Th4 'E2SCt,. A-'O 7)Oi3CI PRAIrp IIVYI PI
jjj4. 4; i/)r-1 LTt4 DJOdf V1A7C1 4 _____
hOiM/1&t
FOrmOC
Jting Engineers - San Diego,€k
Established 1946
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Pagel of 3
San Diego, CA 92111 Fax. (858) 715-5810 Date: h. - -- o -'
Q Field Report 0 Notice to Comply
Job Name: t414 nen (.irfcU 'kcr ft&4 Job No.
Address: M- / Jc / j
General/Subcontractor:
Soil Concrete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing . Waterproofing Roofing
Engineering Observation - Other
Inspection Check List: Soils Report Plans Specs. - RFI Codes
Permit #: Plan File #:
Material Description:
Sample Type: Os fn6,6114-tv, B Tests Performed (see attached)
III -A NVruze-iU_,,% ¶ Vi; P4..
i N 4 (M kth
P4 Cc r %-Cr s ror 1fL Ct Apcs + L rfw4r'*\; .1
\r
fr
A- tv Gri<,4r 6,+ çr k
Pr 1-1- f ic 4j L J11 t4 c-1l Cr. IL 4(
P 1( b( tU4c vj itt, "r A%()
Ct4r 4 9k $(A.. 11t$t1
ow
1i rc/ iv t pLt. ce. r' y1w,t1L
frcrhfr tik 1L & -c) -
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in Start Stop Reg. Hrs. OT Hrs.
Fthe
conformance with the approved plans and specifications and workmanship provisions of
TESD or , applicable code. For any non-conforming items the contr, or shall schedule 7;to .o reinspection or retesting.
Note: All inspections are based on 4 and 8 hour minimums. In
Inspectors Signature/Name t- -
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
12:00 p. n) will be billed an 8 hour minimum.
- Cert. No. >' 5t\s
Fnrm. flfl-A
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Cç'L or— (rLL "Ycr-L c- pv€v*
Established 1946
Project Number Test Date_Dr— Page
Client
Test # Material Structure Test Location and Elevation or Depth relative to... Fri tlei-Jn.'n. A,. 'kirf,
1 k6 ? c- Vr,LA T A4d4i.
3 r No rc'ti frov'
Ac C' pj r— V.~e-%aa Ai;v~
A-C' r
P r4 (33I)
7 *331e Jd cL (7)
Material:
Structure:
'I
S = Soil, AC = Asphalt Concrete, ATS = Asphalt Treated Base, AS = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline. SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# t .- -.-- 9,- 5 6 1
Probe Depth (inches) -
- 6 '
Wet Density (pci) -4 _t3'M 135 1.7 I' 3I+
DryDensity(pc
- J.73 I -
Moisture (%) WA - 5.5 t't r. ,o 5,
MD Curve Number
Maximum Density (pcf) _____ _____
.-
Optimum Moisture (%) fA ' . 7(4
Relative Compaction, RC (%) 9'..- 9j i
Relative Moisture, AM
Specified RC (%)
Specified AM
Conformance (Yes/No) N N N J J sty i
____ y
Nuclear Gauge Model and Serial Number:r)Oef 3'+t 13 5 5 - .CaQ.tJt: i9/(rI
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: . Signature:
Client's or Contractor's Acknowledgement: Name: ' Signature:
White- Office Yellow- Contractor Pink- Field Technician
Established 1946
Project Number am I -
Client
Teting Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
(— CrrLU VrL Le4rnth
Test Date O -.0 41 Page .J3.. of
Test # Material Structure Test Location and Elevation or Depth relative to... t4Iw$ c1çre..fr
_p_
I't he,
1 rt C4'4c
('3c7)
I
---
t L (v)
I' kc '
I
J
kc
hr.( i
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #............i...
Probe Depth (inches) 6 11
P.. .J.LLIJL JZ.......
............._.....
Dry Density (pcf)
1!-3 ...
Moisture (%)
i!t'° 11.'j.
....- .....
MD Cury e Numbe r
Maximum Density(pcf)
Optimum Moisture (%) 7. -
it57
-
: -
Relative Compaction,RC(%)
Relative Moisture, AM (%) — —v.7 0,t
96
Specified RC (%)
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:' Pu'$ jvr 3'j t S- 96 ,cr' 'At"d tk ftft / 1j1 g•'.
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed meet specifications.
See accompanying Daily Report of description of work and observations fj -
TESD's Testing Technician: Name: Signature:
Client's or Contractor's Acknowledgement Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
1Jing Engineers - San Diego,.
Established 1946
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of
San Diego, CA 92111 Fax. (858) 715-5810 Date:
Field Report 0 Notice to Comply
Job Name: of- GrcLt trItf uie4 Job No.
Address: r. /i
General/Subcontractor:
1V/ boil Concrete Type of Service Performed: Structural Steel Fireproofing
Prestress Concrete Masonry
Waterproof, rl9 Roofing
Other
Engineering Observation
Inspection Check List: Soils Report Plans Specs. - RFI - Codes
Permit #: Plan File #:
Material Description: P Ot Z P,4" 'rri If- 1j
Sample Type: ftj. L1 14çU1 $ Tests Performed (see attached)
('r, S, D J+ n. $4tejQ. * ItO
w
A L 4i f jo" L s i
tjrLb P Cu.t &' iL 10 ' I0 s '(I
LJ L fer# ççflt. 5t iL
t.4 it feY Dcc. (fr rii _5,%, cJ)1 WM. CAi
(t+ J tci"1U M1rr e cj lfi i4s) (ev p , (1;LL csrLft
Cse 1 ci or\IjkcC)'j e sv *' o11 '4L
I
5%, 15' r,61.e L \tr C. D
1_ct e c,L . s444(P 4A srA KA,J-+ -19;A
w Or10, -•4 r
) r v1[, I C rcIvv- gv-a, e( $.J5r4L cwA
4 k\' tc v v,ci\ 1
-p r VLv.CA i
tcicl C --t.if h
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in Start Stop (Reg. Hrs. OT Hrs.
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the co tractor shall schedule TESS for
reinspection or retesting.
Note: All inspections are based on 4 and 8 hour minimums. In a ditn, any
Inspector's Signature/Name
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
past 12:0,pi. (noon) will be billed an 8 hour minimum.
Cert. No. SIr' .s;\,.
Fnrm# (1fl3-A
4 fiing Engineers-San Diego,
7895 Convoy Court, Suite 18, San Diego, CA
Established 1946
Project Name
Project Number
Client
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Test Date -_. 1-4r Page _rL_. of
Test # Material Structure Test Location and Elevation or Depth relative to...
1- I I'
h It
it
1$ 11
f I'it
10 fZ1 P
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ...i !.......
Probe Depth (inches)
Wet Dens ity(pcf) . ...........i Dry Density (pci)
Moisture (%)
....
(. 7.ô .7
Ii.7....t!o
8:%
J11.I
.
...1r.P'
1U.
...
J7L
MD Curve Number
Maximum Density (pci)
Optimum Moisture (%)
-
-
-
- -
- '-
- 7.5
Relative Compaction, RC(%)
Relative Moisture, AM (%)
.ji 1.1.........7
—3.S
_9...
Specified RC (%
Specified PM (%) -I,
..1t'.- -......... ..... .
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: o 9
,.- This report does not relieve the contractor or their responsibility for performance in accordance with the plans, spec4ications and applicable
pecifications
See accompanying Daily Report of description of work and observations
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed ~ meet s
TESD's Testing Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: (. Signature:
White- Office Yellow- Contractor Pink- Field Technician
TJng Engineers - San Diego, .
Established 1946
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800
San Diego, CA 92111 Fax. (858) 715-5810 Date
0 Field Report 0 Notice to Comply
Page lof 2-
/brcy /ç2vtZ
Job Name: Cpi-k.I,c
Address: ( Ld
d
\) 1 (o i)ii
J9&4
cc
Job No.
k-),)I
General/Subcontractor: TI7pt I Q'f p
Soil Type of Service Performed: Structural Steel
Engineering Observation,,.'
IntionCheck List: Soils Report _( Plans spec
Permit#: Plan File #:
Material Description: c:3- L. C.j rc4
'kpL+
Concrete
Fireproofing
, -
_.j Specs.
ci 7. t2S7,.
Prestress Concrete
Waterproofing
Other
RFI
j
//7
Masonry
Roofing
Codes
Qct
Sample Type: V121 Tests Performed (see attac ed)
4pL+ p- X epojrs.
'cDMk1 C1. C rej A.e.
Cr O4t9-&) tv*& C4 d
g
I
4—frsed. eie4 tIp L d 1 c3oc*/i( iv
?J2eieI 4 -
y
- u2/1qi% c AA (&/4c- QJ
L (CrI€) zi p c/et I2er.
LZbIDkYy (V
2cio-y /JI J /èPt/iI~ 4- 1
h&, AJUIA ,
€/o7/cd r/4tiq A c — /cp/tf t
CERTIFICATION OF COMPLIANCE: All
conformance with the approved plans and
the applicable code. For any non-conforming
reinspection or retesting.
of the observd work, unle 'otherwise
specifications and the workmanship
items the contractor shall
stated, is/in
provisions of
schedule TESD for
I Start ' Stop Reg. Hrs. OT Hrs.
jr minimum.
Form# 003-A
UI%P
iecing Engineers-San Diego,Qc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Ly (adcb-zc/ i-/y erYi
Project Number - 77 Test Date /b-u ..9vy /.2'7..2cQ2_ Page _Z of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
I 4 1'J4bci. \pr 4 I
-
s A,
- Ar
5 A c P IcA \ /C jJ
,
Ac- z- e.- ) . I JC P Z 1\
7 Ac- / j I, ii 3,
I If' '.1 Material: S = Soil, AC = Asphalt Concrete, ATB Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
4s- rss &- AP R?j, ( ruic-s Pr ç7'
--
........................L '2 Test #.Ui
Probe Depth (inches)
Wet Density (pcf) IYI..9 /3 . S ( ./7 LL
Dry I3a'I Density (pcf)
/L .... .... ......../3I
Moisture (%)
MD Curve Number 3 .3 3 3
-
Maximum Density (pcf) Zc - L7Lt:.7I&.7 (Z11f7_
Optimum Moisture (%)
Relative Compaction, RC(%) /05
- -
Relative Moisture AM (%)
Specified RC -................ ?ST....?c. 1. S.c Specified AM
Conformance(Yes/No)
Nuclear Gauge Model ana Serial Number: 29
This report does not relieve the contractor or their responsibility for perfoimance in accordance with the plafs, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: Signature: \
Clients or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
TiJng Engineers - San Diego, LJ.
Established 1948
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of
San Diego, CA 92111 Fax. (858) 715-5810 Date: .-
Field Report 0 Notice to Comply
Job Name: °r cr U )1e44/ te4 eLt, Job No. 400 - 2ô97
Address: Cerr F rr S -rI -cc .rà 'cJ.0 tLr l-ve 0ieJ.-
General/Subcontractor: G4 4r TL4 Z%6 1A4.
oil CoAcrete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing Waterproofing
__
Roofing
Engineering Observation Other __________
Inspection Check List: Soils Report Plans Specs. RFI Codes
Permit #: Plan File#:
Material Description: ;34 " f(L 4i)
Sample Type: 0 Tests Performed (see attached)
'r 4thI.. s- sL (*cr t0 sL) If
e tm
t4rê * Ci
'
5-4 04 L*e+,, :p~-A rl~"* L q J
1
r 1 L IL k Tr . - ç Y.
CU Vi o4 c\ C
'' ro r 1 Ct L
''
4G-stc'-c
cleft cL.
C%
1i i4L" k14
J1\ J/j ' CL
F r'L per-c 11'r -1 6"
. 14Y/ 4t•
j. G-ei U
Ilk
r' fsr tc. or j s 1\4 fl2 L
flL'+ w TIE 9P41- CP j'Qj fl4,fr- jC . Lt?J e sL cL-. 1-
r Its ¶ Lr4 *i * t*"i( '*JY%)t
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in I Start I Stop Reg. Hrs. I OT Hrs.
conformance with the approved plans and specification and the workmanship provisions of I
the applicable code. For any non-conforming items the )ntractor shall schedule TESD for I 73p ,.o reinspection or retesting.
Note: All inspections are based on 4 and 8 hour minimums. I a di on, any ins~
_'-7Ai=
ction endin . (noon) will be billed an 8 hour minimum.
Inspector's Signature/Name Cert. No. 5r.
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
Form# 003-A
Ting Engineers - San Diego,ij. I
Established 1946 1?
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page .*'of *
San Diego, CA 92111 Fax. (858) 715-5810 Date:
Field Report 0 Notice to Comply
Job Name: 64j CrrLU 'ac.k j f Pqve1M91
Address: (rkLc '.fIk- rrv,j 4.
Job No. -a'7
General/Subcontractor: Crj or. C4r1 L (
/
DJev% Corr
Soil Corete Prestress Concrete Masonry Type of Service Performed: Structural Steel Fireproofing Waterproofing Roofing
Engineering Observation _.. Other A- &
Inspection Check List: Soils Report Plans Specs. AFt Codes
Permit #: Plan File #:
Material Description: tr5
Sample Type: b Jz tc . Test'Performed (see attached)
i6-(ec\ 1*c rv) u 1L c c'
ptnl rc4jta-'r\ 1tp 1t%-f. tii A..V4d
ri r -b w
ft'Nk Mum tr .Go° (A. L cLJs 1\4A. . crLL& To
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the
reinspection or retesting.
coractorshall schedule TESD for
I Start
I
Stop
I
Reg. Hrs. I
I
OT Hrs.
,OL I
Note: All inspections are based on 4 and 8 hour minimums. inspe, In a it , any n e ng past . p.m. (noon) will be billed an 8 hour minimum.
Inspector's Signature/Name Cert. No. -
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
Forrn 3.A
O Ting Engineers-San Diego, ,. Established 1946
j
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name of:: CA tLU IV4AA(L
Project Number 100 11 )- Cf 7 Test Date O. -
V Page of
Client Ct4 °r -
Test # Material TStructure I Test Location and Elevation or Depth relative to...
I j P
16
I65 ) 4L1- ' £L(r
______ _____ ________ • -
(,t 6.5 It
IX so I ,.5!.iS)
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Probe Depth (inches) 6"
3
s
(3
s
Wet Density (pcf)J Dry Density (pcf) .
Moisture Ltd. 3 ' t.t/e N/
.. .. -
...-
N/A
..---. -
MD Curve Number
Maximum Density (pcf)
Optimum Moisture
-
-
-
---------------
'
Relative Compaction, RC
Relative Moisture, RM (%) Pj4,, -
Specified RC(%)
Specified AM (%)
.
.-
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: tot £ t'f( 11;.)JIc
This report does not relieve the contractor or their responsibility for performance in accordance with the pl
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: . Name: . 1-5.S Signature: -
Clients or Contractor's Acknowledgement: Name: 'X Signature
White- Office Yellow- Contractor
specifications and applicable
meet specifications.
\• 2t1—/'
Pink- Field Technician
I -
Ting Engineers - San Diego,.
Established 1948
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page 1 of
San Diego, CA 92111 Fax. (858) 715-5810 Date: ---
Field Report 0 Notice to Comply
Job Name: L-1 '( 14U fM,mØv+ c#- Job No. -
Address:
General/Subcontractor:
Type of Service Performed: Soil Concrete Prestress Concrete Masonry Structural Steel Fireproofing Waterproofing Roofing
Engineering Observation 11171 Other &crhT
Inspection Check List: Soils Report Plans Specs. - AFI Codes
Permit #: Plan File #:
Material Description: "f000 /'t
Sample Type: 0 Tests Performed (see attached)
0' 4 - s -k e ç D:. L1
rr iL -- . - o' c4U V; Pk j?
€4 c\ 1L sL çi, tsL)e &iL ,
%hbr 1oJe1 S rôL trL't t ov.v- QVJsH r - itrvc Lc. i?efiT ct wc I tK
CA ri .A44 uWt,\ fir Moe*, too, '
L U, 1L c 1
No*• -L \
I A,- N
I'v fro 1 iiti 4;\ 1;'c:k
U1IF rri r-J' 1)L1 . pt's rvisr'
eick To G t 1t. rb'l4.
3i Cio.s,e+ T° '11e. 4'U. ee ctrsU j• c
LU t\ L M#Trt In€.
j .5p4 1L (pv CLrA
tsMi i;t (3tV M . s. PWf%oc or VlsJc4 -. kit i 4 So
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in Start Stop Reg. Hrs. OT Hrs.
conformance with the approved plans and specifications and the workmanship provisions of
- the applicable For items 3Q code. any non-conforming the co tractor shall schedule TESD for 7 p .0 reinspection or retesting. (l\
Note: All inspections are based on 4 and 8 hour minimums. In d1tkn, any inspec4- exte ing past 12:00 p.-t10on) will be billed an 8 hour minimum.
V inspector ignatureiniame r 1 kf1
1
I - uert. No. .)1 4 'zD
Approval Signature/Name/Company
(Verification of on-site Hours ONLY)
Firm
Co
Ting Engineers - San Diego,(j.
Established 1948
7895 Convoy Ct., Suite 18 Tel. (858) 715-5800 Page lof 3
San Diego, CA 92111 Fax. (858) 715-5810 Date: O€,
El Field Report 0 Notice to Comply
Job Name: Cr1ti (c4'r. oI) .f'eA14. Job No. vkao 1 — 26 9 7
Address: C4tf v11i. 0:i,
General/Subcontractor C*j C1 LL r.1,)-e9 (-es
Soil Conci4te Prestress Concrete Masonry Performed: Type of Service Structural Steel - Fireproofing Waterproo Roofing
Engineering Observation ..._ Other
Inspection Check List: - Soils Report Plans Specs. RFI Codes
Permit #: Plan File #:
Material Description: -P-... 'jao i/C A C
Sample Type: a Tests Performed (see attached)
30 7r
r1i
Tbs
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in I Start Stop I Reg. Hrs. I OT Hrs.
conformance with the approved plans and specifications and the workmanship provisions of
the applicable code. For any non-conforming items the contractor shall schedule TESD for •7 30 . ' 0 ã reinspection or retesting.
Lition,y n )Note: All inspections are based on 4 and 8 hour minimums n Ctiinast 12:00 p.m. (noon) will be billed an 8 hour minimum.
Inspector's Signature/Name / 4jL5t. Cert. No.
Approval Signature/Name/Company - (Verification of on-site Hours ONLY)
Form# 003-A
ç FS!j 1ting Engineers-San Diegonc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number
Client
,9i 1 Test Date D'
V
Test # Material Structure Test Location and Elevation or Depth relative to...
I 1' - C -5i c\ 1A ro
44 A. oe
S %C P
f -c (ve Qh A& .4' td
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AS = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, 55 = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0= Other
Test#
.. 3 &,
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture
p,4
37.O40 3.34 1_3•l
MD Curve Number
Maximum Density (pcf) l9i.
Optimum Moisture (%)
Relative Compaction, RC (%) c' j<
- .... Relative Moisture, RM (%)
Specified RC (%)
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number,.-T(4 \ex 5# cji,, •9j -t G -- It / o
This report does not relieve the contractor or their responsibility for performance in accordance with the plar, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have ôreviously failed tmeet specifications.
See accompanying Daily Report of description of work and observations
, 1\
TESD's Testing Technician: Name: 'J4rt'b Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers -San Diego, Inc. Estiblished 1946
Date: March 7, 2002
Job No: 2001-2097
Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL
ADDRESS: Carlsbad, California
Plan Number: N/A
Permit: N/A
Application: N/A
fi~' Report No: 3713
ENGINEER: BENJAMI& SHIRER, STAFF ENGINEER
Lab No.: 3652
Project: CITY OF CARLSBAD PAVEMENT
Location: Carlsbad, California
Sampled: Date: 2120/02 By: TESD
Type of Material: 3/4' AR4000
Submitted: Date: 2/20/02 By: TESD
Source of Material: HANSON SAN MARCOS
Location Sampled:- CADENCIA STREET
SIEVF. ANALYSIS ASTMCfl.6
Sieve % Passing
Size Accumulative * Specification
3/4" 100
1/2' 86
3/8" 77
NO.4 55
8 39
16 30
30 23
50 16
100 ii
200 6.7
Testing En gineers - San Diego. Inc.. 7895 Convoy Court. Sui te IS San Diego. CA. 9211 1 [858) 71 5-5800 Fax [858] 7! 5-5S10
•.....:::
estingEngineers-San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise specified)
TEST RESULT SPECIFICATION TEST
STD
ASPHALT CONTENT % D6307
% OF TOTAL MIX 6.0
% BY WT. OF 6.3
AGGREGATE
Testine Engineers - San Diego. Inc.. 7895 Convoy.Couri. Suite 18 San Diego. CA. 9213 1 [858] 715-5S00 Fax S58J 7 15-58111
Testinc, En-Ineers -San Diego, Inc. Established 1946
Date: March 7, 2002
Job No: 2001-2097
Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL
ADDRESS: Carlsbad, California
Plan Number: N/A
Permit: N/A
-
App on: N/A
Report No: 3712
ENGINEER: BENJAM SHIRER, STAFF ENGINEER
Lab No.: 3637
Project: CITY OF CARLSBAD PAVEMENT
Location: Carlsbad, California
Sampled: Date: 2/19/02 By: TESD
Type of Material: 3/4" AR4000
Submitted: Date: 2/19/02 By: TESD
Source of Material: CCAC CARROLL CANYON
Location Sampled: 300' WEST OF VALENCIA AVE ON PARK
Sieve % Passing
Size Accumulative
1" 100
3/4" 99
1/2" 91
Al,78
NO.4 59
8 46
16 36
30 27
50 18
100 12
200 7.4
* Specification
Testjn Enjncers - San Djeo. Inc.. 7595 Convoy Court. Suite 18 San Diego. CA. 921 1 1 [858] 7 5-5800 Fax [858] 7i 5-580
Testing Engineers- San Diego Inc.LIthII'hLd 1946
TEST STANDARDS ARE ASTM (unless otherwise specified)
TEST RESULT SPECIFICATION TEST
STD
ASPHALT CONTENT % D6307
% TOTAL MIX 5.3
% BY WT. OF 5.6
AGGREGATE
Testine Eninecrs San Diego. Inc.. 7895 Convoy Court. Suite IS San Diego. CA. 9211 1 [558) 715-5,800 Fax [858] 7I55SI
Test] ng Engi neers -San Diego, Inc. Established 1946
PHYSICAL PROPERTIES OF ASPHAIJIC CONCRETE
Date: February 28, 2002
Job No: 2001-2097
Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL
ADDRESS: Carlsbad, California
Plan Number: N/A
Permit: N/A
Application: N/A
Report No: 3705
ENGINEER: CARLOS ACERO, STAFF ENGINEER
Lab No.: 3719
Project: CITY OF CARLSBAD YEARLY PAVEMENT
OVERLAY - AC/SOIL
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 2/11/02 By: TESD
Type of Material: 3/4" AR4000
Submitted: Date: 2/11/02 By: TESD
Source of Material: HANSON SAN MARCOS
Location Sampled: NOT SUBMITTED
Sieve % Passing
Size Accumulative * Specification
3/4" 100
1/2" 90
3/8" 76
NO.4 56
8 41
16 31
30 22
50 14
100 9
200 5.4
Testir.2 Engineers San Diego. Inc.. 7895 Convoy Court. Suite IS San Diego. C.•\. 92 1 11 t5J 7155800 Fax SJ 71 5-5I15
Testing Engineers - San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless ntherwice specified)
TEST RESULT SPECIFICATION TEST
STD
ASPHALT CONTENT % D6307
% TOTAL MIX 5.3
% BY WT. OF 5.6
AGGREGATE
a
Testin2 Ennnecrs - San Di-,o. Inc.. 7895 Convoy Court. Suite IS San Diego. CA. 92 1 1 1 [858] 7 1 5-5S00 Fa [858] 7 1 5-5SI 0
Testing Engineers - San Diego, Inc. Established 1946
Date:
PHYSICAL PROPERTIES OF ASPHALTIC CONCRETE
February 27, 2002
Job No: 2001-2097
Job Name: CITY OF .CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL
ADDRESS: Carlsbad, California
Plan Number: N/A
Permit: N/A
Application: N/A
Report No: 3704 CL_
ENGINEER: CARLOS ACERO, STAFF ENGINEER
Lab No.: 3720
Project: CITY OF CARLSBAD YEARLY PAVEMENT
OVERLAY - AC/SOIL
Location: CARLSBAD, CA
Sampled: Date: 2/08/02 By:
Type of Material: 3/4' AR4000
Submitted: Date: 2/08/02 By:
Source of Material: CCAC MIRAMAR
Location Sampled: FROM 294.34 TONS OF 315 TONS
Sieve % Passing
Size Accumulative * Specification
I" 100
3/4" 98
1/2' 87
3/8" 69
NO.4 50
8 37
16 28
30 21
50 14
100 9
200 5.7
-------------------------------------------------------------------------------------------------------------------------
Tcstn Engnecrs -. San Diego. Inc.. 7895 Convoy Court. Suite IS San Diego. CA. 921 1 [858) 715-5800 Fax LSSS] 7 5-580
EsVibl;shcd 1946
TFST STANDARDS ARE ASTM (unless nthenis spified)
TEST RESULT SPECIFICATION TEST
STD
ASPHALT CONTENT% D6307
%OF TOTAL MIX 4.7
%BY WT. OF 4.9
AGGREGATE
TesiinQ En gineers - San Djeø. Inc.. 795 Convoy Court. Suite IS San Diego. CA. 92111 [858} 715-5800 Fax [858] 715-SS 10
Testing Engineers - San Diego, Inc. Established 1946
Date: February 27, 2002
Job No: 2001-2097
Job Name: CITY OF CARLSBAD YEARLY PAVEMENT OVERLAY - AC/SOIL
ADDRESS: Carlsbad, California
Plan Number: N/A
Permit: N/A
Application: N/A
Report No: 3702
ENGINEER: CARLOS ACERO, STAFF ENGINEER
Lab No.: 3603
Project: CITY OF CARLSBAD YEARLY PAVEMENT
OVERLAY - AC/SOIL
Location: CARLSBAD, CA
Sampled: Date: 2/14/02 By: TESD
Type of Material: 3/4" AR4000
Submitted: Date: 2/14/02 By: TESD
Source of Material: CCAC MIRAMAR
Location Sampled: VIA MARTA
Sieve % Passing
Size Accumulative * Specification
1-1/2" 100
1...99
3/4' 98
1/2" 85
3/8" 69
NO.4 53
8 39
16 29
30 21
50 14
100 9
200 5.6
------------------------------------------------------------------------------------------------------------------------- Tesng Engineers - San Die,-,o. Inc.. 7895 Convoy Court. Suite 18 San Diec. CA. 92 1 1 1 [858] 715-5800 Fax (858) 715-5810
:
Testing Engineers - San Diego, I n C'. Established 1940
TEST STANDARDS ARE ASTM (unless ntherwice specified)
TEST RESULT SPECIFICATION TEST
STD
ASPHALT CONTENT % D6307
%OF TOTAL MIX 5.1
% BY WT. OF 5.3
AGGREGATE
'I
Tcstinc Ennncers - San Die2o. Inc.. 795 Convoy Court. Suice IS San Diego. CA. 921 11 (858) 71
5
-
5
5
0
0
F
a
x
(
S
S
S
)
7 5-580