HomeMy WebLinkAbout3667-4; 2000-2001 PAVEMENT OVERLAY; COMPACTION TEST REPORT; 2002-04-11140
130
120
100
KC
70
V MPACTION TEST REPORT
Curve No.: 3
Project No.: 0I-2097C
Project: City of Carlsbad - Soils, Concrete and Lab
Location: SUBGRADE ON SITE
Elev./Depth:
Remarks: TESD NO. 4286
MATERIAL DESCRIPTION
Description: OLIVE-BROWN-YELLOW SILTY SAND
Date: 4/11/02
,J444INSHi
DATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%>3141n.= 4.9% % < No.200 =
TEST RESULTS
Maximum dry density = 120.5 pcf
Optimum moisture = 13.5 %
Water content, %
Plate
TESTING ENGINEE
F.
qw MMPACTION TEST REPORT
Curve No.: 4
Project No.: 01-2097C Date: 4/11/02
Project: City of Carlsbad - Soils, Concrete and Lab
Location: STOCKPILE REVIEWED 8Y
Remarks: TESD NO. 4287
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%> 3/4 in. = % % < No.200 =
TEST RESULTS
140
130
120
100
Maximum
Optimum
dry
90
moisture
density = 139 pcf
= 7 %
Test specification:
ASTM D 1557-91 Procedure C Modified
-
\ 100% SATURATION CURVES
FOR SPEC.GRAV EQUAL TO:
2.8
2.7
--- I
= JeL\
-
- =
--
--H-
--c
80 -77
II1
IT
I
0 5 10 15 20
Water content, %
Plate TESTING ENGINEERS___________________________________
140
130
120
o 100
90
EI
7C
COMPACTION TEST RE5i5 -)
Curve No.:4 I I
Project No.: 2001-2097 1 P4I4R 4e2O2Jj9/02
Project: City of Carlsbad Yearly Pavement Overlay - AC/Soil
CIIY Oi~
6qE SAD Location: 300' WEST OF VALENCIA AVE ON PARK DRIVE
Elev./Depth: .-_---...-- ----
Remarks: TESD NO. 3655 WEDBy.
I d Sfl/
MATERIAL DESCRIPTION DA
Description: OLIVE-BROWN WELL GRADED SAND (SW)
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%> No.4 = % % < No.200 =
TEST RESULTS
Maximum dry density = 130.5 pcf
Optimum moisture = 9.5 %
Water content, %
Plate
TESTING ENGINEERS
-
140
130
120
'4- 0 110 CL
100
01
8C
7(
Water content, %
TESTING ENGINEERS
Plate
COMPACTION TEST REPORT
Curve No.: I
Project No.: 2001-2097 Date: 2-19-02
Project: City of Carlsbad Yearly Pavement Overlay - AC/Soil
/
Location: EL FUERTE ST. CROSS WITH CORTE DE LA VISTA @ 0-6" / Y:
Elev./Depth:
Remarks: TESD NO. 3628
MATERIAL DESCRIPTION
Description: OLIVE/ LIGHT GRAY SILTY FINE SAND WITH CHUNKS OF A.C. & GRAVEL
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit Plasticity Index =
%> No.4 = 4.3% %< No.200 =
TEST RESULTS
Maximum dry density = 121 pcf
Optimum moisture = 12 %
COMPACTION TEST REPORT
Curve No.: 2
Project No.: 2001-2097 Date: 2-19-02
Project: City of Carlsbad Yearly Pavement Overlay - AC/Soil
Location: EL FUERTE ST. CROSS W/CORTE DE LA VISTA @6-12
Elev./Depth: /kfyjswri5
Remarks: TESD NO. 3629
MATERIAL DESCRIPTION
Description: GRAY BROWN CLAYEY SAND WITH GRAVEL
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit= Plasticity Index =
%> 3/4 in. = 4.8 % % < No.200 =
TEST RESULTS
Maximum dry density = 127 pcf
Optimum moisture = 10 %
Test specification: 140
ASTM D 1557 -91 Procedure C Modified
130
WO
-
120 = 100% SATURATION CURVES
FOR SPEC. GRAV EQUAL TO:
14
2.8
-J 110 2.6
I100jjL 11 i i
9 0
80
70
0 5 10 15 20 25 30 35 40
Water content, %
Plate
TESTING ENGINEERS
150
140
130
110
100
1i
Date: 2/11/02
COMPACTION TEST REPORT
Curve No.: 3
Project No.: 2001-2097
Project: City of Carlsbad Yearly Pavement Overlay - AC/Soil
Location: STOCKPILE
I Elev./Depth: I iL
Remarks: TESD NO. 3636
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
% > 3/4 in. = % < No.200 =
TEST RESULTS
Maximum dry density = 140.5 pcf
Optimum moisture = 6 %
5 10 15 20 25 30 35 40
Water content, %
Plate TTIM( MII!JDQ
O Testing-Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 4LJLA AI-GA '26A
Project Number 01 - 0c5 cl 7 C Test Date 0 'Ii Co Page .of
Client /T CASA!
Test # Material Structure Test Location and Elevation or Depth relative to...
7cD G. c-z A tj C —1 AC.
\1 J l24. '.3 +o,*I' I'
Material: S =.Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0= Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Si4aIk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf) j •
CY Dry Density (pcf)
Moisture (%)
MD Curve Number
-- Maximum Density (pcf) Q
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%) ' —Cob
Specified RC
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: -4 C2 /'AI 7l G'
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESDs Testing Technician: Name: 74 cc.4e.-'44' Signature
Client's or Contractor's Acknowledgement: Name: Signature
White- Office Yellow- Contractor Pink- Field Technician
S S
Diego, Inc. Established 1946 Testing Engineers-San
a 7895 Convoy Court, Suite 18, San Diego, CA. 92111
- [858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name
Project Number -o\ ~7 C Test Date O Page .!L. of* ..J...
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
CA C'rt-
____ ____ -C rr Gktr y$t, c- c -i-7 5 1*\5 P-va
cvri- 'd. 742k S J~
Ciro V--7s .p
S S C ()rh
uA (;4l\t - A
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other ____________________________________________________________________
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
1__ 3 \j-
Probe Depth (inches) 6 ' - _______
Wet Density (pcf) j6-7.3.L±1 i2ñ_
Dry Density (pcf)l I°
-' ftJ
Moisture (%) C 414 17 i3L 14-d
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) tf Io.s
Relative Compaction, RC (%)
Relative Moisture, RM (%) .-f ;,. - - .-
95
+o
Specified RC
Specified RM ---------
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: J 3+'tI 5 ,, .50-.-t 6e~mt 15
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed L
iNq
meet specifications.
See accompanying Daily Report of description of work and observations ñ 4.1L-
TESD's Testing-Technician: Name: Inr- z Signat re:
Client's or Contractor's Acknowledgement: Name: So Signature* LhJ_.L
White- Office Yellow- Contractor Pink- Field Technician
. Testing Engineers - San Diego, Inc. —
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
S
E] Testing Engineers- Inland Empire
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732 Page 1 of _f.
Date: 2 '1 2ào
F
+c, C-r (s — 41-C. b-d Job No. j-O I - 2 O 7c-
/
Client/Contractor: C(Ty (6./s6i,4#, /
Field Report 0 Notice to Comply
Soil Concrete 0 Structural Steel 0 Waterproofing
Type of Service Performed: 0 Asphalt Concrete 0 Pre-stress Concrete 0 Fireproofing 0 Roofing
Cl Engr. Observation 0 Masonry 0 Other
Inspection Check List: 0 Soils Report 0 Plans 0 Specs. 0 RFI 0 Codes
Building Permit #: Plan File #: DSA #: OSHPD #:________________
)n-Site Equipment:
l Tests Performed (see attached) Sample Type:
r2'_7 7r/ /,I 7 77 /7 J
7k. 1t_J A,,_J ( 4J Q
t e-,- 1*— 77
d 4a4e C r t - j1 0J
eJ 4i,-v. T () 71 oi
- -,- —o .
ti 7eç7 /eyu23r.
) 4-r --e1 çJ7e iv 61;1 71a 7~f
,A7-4 (Q-zo-).
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and
the workmanship provisions of the applicable code. For any non-conforming items the contractor shall schedule TESO for reinspection and retesting.
Inspector's Signature/Name it'ei ifV,(a_ Cert. No.
Approval Signature/Name/Company Date:
/,TA-tt a2) TESD Form: 100.01
. S
Testing Engineers-San Diego, Inc. Established 1946
N' 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
I,
Project Name (1 I t'- ( C' -4L.( — '4- #-
Project Number Z-o t 2 'L7 .. Test Date 2 1 iJ--- ( 2- 2. Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
VI't-oO AI.j4 W
-S ?-S
3 3 :- j?est -f -o2-)
Lj P -i c ,4-(-
3 S -Sc-p..-5Sc I'
e -3cS 'I '67'?-S&3._/4 c—U.) " " ,/L/ 4I,c_
1? S P 5c. S1z.. StS I-e RD t ,T•C ,/S"
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # I - - 3 L/ _4 '7
Probe Depth (inches)
Wet Density (pcf) /13 I1LL I.7.4 133.0 I33
Dry Density (pcf) II 2. 3 1 2dL!L 12-1,8 11V1. 3 I LI. ? I 17.7 116. 8
Moisture (%) I7.1 ./. 3 I,o n 1'1.3 /3 C 1 13.1
MD Curve Number
Maximum Density (pcf) /i 0 t -i i i-r.1 o
Optimum Moisture (%) /Lf1,9, c i9. S /-o. S iq.
Relative Compaction, RC (%) ¶Lf 9S.8' 9 ' 1 57, ?$ 47
Relative Moisture, RM (%) ,. 3 ) 5 +1.
Specified RC
Specified RM (%)
Conformance (Yes/No) 7'2, ¶j '/&s I Y-' Y-
Nuclear Gauge Model and Serial Number: tf OY ('r 34 LI B 7S -
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's TestingTechnician: Name: K v i 1. A. Signature
Clients or Contractor's Acknowledgement: Name: Signature:
(N'zrT ,#%,
White- Office Yellow- Contractor Pink- Field Technician
Material
Structure:
O Established Testing Engineers-San Diego, IncT 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 7'( c#'
Project Number 01-cc9 5Y 7 C Test Date Q 4 16 C2 a Page _Q. of
Client I7 S&AF
Test # Material Structure Test Location and Elevation or Depth relative to... Ati 4- s,-J;:4 _AC
IS (5,ZA b<
c'- J J _•t,c / / ii
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil LTS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = SWawak Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
-
'# ,
Wet Density
Dry Density (pcf)
Moisture (%) q's
MD Curve Number CQ
Maximum Density (pcf) ia
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%) -q.
Specified RC (%)
Specified RM
Conformance (Yes/No) 1/1A).
Nuclear Gauge Model and Serial Number: C/-' C3 2-7c1 G This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable'
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: cc..44G=441 Signature
Client's or Contractor's Acknowledgement: Name: Signature
White- Office Yellow- Contractor Pink- Field Technician
S . Testing Engineers-San Diego--Inc. Established 1946
if 7895 Convoy Cowl, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Lcrtj (r ')
Project Number ,$-ot 7 C Test Date_°t )b Page jE_ of
Client 61 °r-
Test # Material Structure Test Location and Elevation or Depth relative to...
Sc c4t - s
G.iñ-t- 'br95 t7 - 9-o.A
3 SC- I CvCb Gu43r SrAt. 74 P
SC Giro 'c --r7 S .P\
G Ae r 11
6 <-_C,J 'n - (i1t'- jriJ •.r - Si-c 51 X
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches) 6;k
Wet Density (pcf)
Dry Density (pcf)
Moisture (%) ,7
MD Curve Number
Maximum Density (pcI)
- ii I eo ii2_ 112$
Optimum Moisture (%) Jtf lO' I°.s f•' 90
______ ______ _____ _____
Relative Compaction, RC (%)
Relative Moisture, RM(%)
jj
4 '-j.
_..
.....i.f40
Specified RC (%)
- /.-
Specified RM (%)
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failedo meet specifications.
See accompanying Daily Report of description of work and observations
qA-
ur
L i Aq TESD's TestingTechnician: Name: Signat re:
Client's or Contractor's Acknowledgement: Name: L)..QPJL.. Signat tiJtJt.L. 'JJI
White- Office Yellow- Contractor Pink- Field Technician
S Do Testing Engineers - San Diego, Inc.
7895 Convoy Court, Suite 18
San Diego, California 92111
phone: (858) 715-5800
fax: (858) 715-5810
D Testing Engineers - Inland Empire /
571-E Crane Street
Lake Elsinore, California 92530
phone: (909) 471-3500
fax: (909) 471-3732 Page 1 of _L._..
Date: 2'1 4,i 2Yo Est. 1946
Job Name: C1i-7
7/
C.'- (S ( -j — i4-p. to.-d Job No. 7,0z, I 2 01 7c-
64 Address: CLP., c
Client/Contractor: ChI5, (/s.ó1 / 7.e-rce.._ - cJ
19 Field Report El Notice to Comply
Soil o Concrete 0 Structural Steel 0 Waterproofing
Type of Service Performed: 0 Asphalt Concrete El Pre-stress Concrete 0 Fireproofing 0 Roofing
0 Engr. Observation 0 Masonry 0 Other
Inspection Check List: 0 Soils Report El Plans 0 Specs. El RFI DCodes
Building Permit #: Plan File #: DSA #: OSHPD #:_______________
)n-Site Equipment: .'4'it e-
2-Tests Performed (see attached) Sample Type:
fr4r,•vJC.- rX/e 24- a .71k
7hL Cc- Ad eyJ-1 J e,iV J
VA t(9 t ,- 1— 77- 0-,'e.-
t asJ ( te fi- *J
Xd 4e-
Q--- 12? (z) aye. Ô7
1,
OJ 6o g i --rd rci v
CERTIFICATION OF COMPLIANCE: All of the observed work, unless otherwise stated, is in conformance with the approved plans and specifications and
the workmanship provisions of the applicable code. For any "non-conforming' items the contractor shall schedule TESD for reinspection and retesting.
Inspector's Signature/Name jw y,1 Cert. No.
Approval Signature/Name/Company Date:
TESD Form: 100-01
I,
Testing Engineers-San Diego,
O
Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name i1*- 4 Cz.4sLJ -,445 .-
Project Number Z-60 I 2- 7 .. Test Date 2 4 Ai-1.1 ( 2- Page _L. of I
Client ) I
Test # Material Stiucture ITest Location and Elevation or Depth relative to...
J7O 6 A %. Lo,t 1,a.
2_ 5
cjet (t---ov) si- o,tü
S pc 4('-/
, s- S1-6f Xs- 4(O_U.) '
1 ? 5 P 5c 'I si 4& RaD "
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # 1 2- 3_ '1 (
Probe Depth (inches)
_
Wet Density (pcf) 3 2 /&f(), 1 13A 03 _,L 12 zk ,_1P /33°
Dry Density (pcf) 112., g 1 2-JLG I 2-h& 3 I I.'? 117,7_ 11
Moisture (%) I7,1 /.3 /0.0 Jjl 1'1.3 /3 0 13.1
MD Curve Number
Maximum Density (pcf) /l L!0 ii Izr. I 11. ° I2.0.- iO.S
Optimum Moisture (%) /t.f i, c o.S /-0S /Cf o 13..c 1• .c
Relative Compaction, RC (%) — 7L( qs. e 9 i 17.1 75.S q 7.4 '?6
Relative Moisture, RM (%) 3, 9 + 3 -o..$ -, 0. tf
Specified RC (%)
Specified RM (%)
Conformance (Yes/No) /a_ tf2 e.s
Nuclear Gauge Model and Serial Number: ( '> ('r t u & -s2. 7.!~
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: )<e Signature:
Client's or Contractor's Acknowledgement: Name: _________ Signature: j4 te
White- Office Yellow- Contractor Pink- Field Technician
'-0
Testing 'Engineers-San Diego, Inc..
a
7895 ConvojCourt, Suite 18,San Diego, CA. 92111
- . [858] 715-5800 Fax [858] .715.5810
REPORT OF COMPACTION TEST DATA
- r
Established 1946
Project Name L
- Project Number 3'to
Client
I Ii I
Test Date b - - -b Pageof__
Test #. Material Structu/e Test Location and Elevation or Depth relative to..
-ced '3SZ' W .e \f.LA V't -
C iSt AIL 't AVQ
A-(,Cfccd b0k O w€c oir- V-ciA fAVIA
"f k ____ )c 'r 6i r- VVCI
-c I' C. Cc U1, '' j- - #ve'
('L c4 ' 33z7
15 .
MfCAALct c(;
#( (I CIA cLr2 (33t)
A-qclaApk4 (3\")
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = ent Treated Soil
LTS = Lime Treated Soil, 0 = Other .. Structure: P = Pavement Structural Section, F =General Fill, N = Native Soil, WL = Waterline, SS = Sar Sewer, ST Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
9- (3 7 . U)
Probe Depth (inches)
Wet Density (pcf) ja 37laq.7 rn-. I 1.33. 3\-1 131.q.-
bry Density (pcf) pi/4 — )-73 j?-s. 4 ld-- .
Moisture.(%) ... - 5.5 tf.'f- .o .
MD Curve Number •. . . . -
Maximum Density (pcf)
Optimum Moisture (%)WA
Relative Compaction, RC 1i 0,
' 2i 16 U17
Relative Moisture, RM (%) . , . ' . - - . 5 .-e -1.0 _____
Specified RC
Specified RM (%)
Conformance (Yes/No)' N N p.' , at ) ,. $ )'
Nuclear Gauge Model and Serial Number:l')(\C( 3'4 1 5 It 02 14 5-rc mt. 19A/V&.
This report does not relieve the contractor or their responsibility for performancein accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: . tVIT. Signature:
Client's or Contractor's Acknowledgement: Name: . S Signature:
./ . • S
'White-, Office Yellow- Contractor S Pink- Field Technician
: S
-
•
I -
W
Testing Engineers-San Diego,1nc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name e4.11 fC..- c#t-4. 4PfM4 OvA
Project Number _o97 Test Date oè- a O—O Page 13_of_
Client c.4-
Test # Material Structure Test Location and Elevation or Depth relative to...
fl .lrfr P CL. (3)
__ P 1k55 Lcx, tA. (31 X0
P cL (3307)
(,) .•
(L.'cw ('7)
It
7 *e, (33,;)
( it utcc. C'"'[l0,(a3
covvce ce; (-'-J
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, U= Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
, ___ is 16 7
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
f3g
I-7, Ièt
I5(P3 %foo f37.ff6 3
Moisture (%) $,3; 5) J, p -
MD Curve Number - M -R--
Maximum Density (pcf)
Optimum Moisture (%) 7. 6
I57
Relative Compaction, RC(%) W9 c 1jIs C74
Relative Moisture, RM (%) —
Specified RC (%)
Specified AM (%).
Conformance (Yes/No) )3 Cf
Nuclear Gauge Model and Serial Number: ¶O')(ler 3sf tit, S 96t
-
S411 'IVI "W /lo g
This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed t meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing Technician: Name: Signature: j
'
Client's or Contractor's Acknowledgement: Name: %__ Signature:
White- Office Yellow- Contractor Pink- Field Technician
~_ 1 1. _~Jh w Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
C-4 LLJ Y(1 AflA
Test Date 5— 13 - 0 1 Page _3_. of
Ca%A
Test U Material Structure Test Location and Elevation or Depth relative to...
w 'e51-)I
A c. 2 ,4('J ir~9
A,( . , , ,4 C1
4 A S . r A '? "(1,L"t1Ca4 III t r ,(!,/e41-'1CJ cLe —yo,5 _x'
o Ac Ct A-C J ( '(
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
ITS = Lime Treated Soil, 0 = Other Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 2.
Probe Depth (inches) 0 0 g a
Wet Density (pcf) t ID, & l3iL J3. OI91. 1590
Dry Density (pcf) 1 93.4 '-g il t1 !3.J
_____ _____
Moisture (%)'.b
MD Curve Number
Maximum Density (pcf) ' '- - (jO ijf
Optimum Moisture (%) 7 '
' 7
Relative Compaction, RC(%) 5 3 '' 7 15 .13
Relative Moisture, RM(%) — I. . - -
SpecifiedRC (%) 91 ciz 'iT q 5
Specified RM (%) ± 2-
Conformance(Yes/No) )5 t,_ /tj C)
Nuclear Gauge Model and Serial Number: 'T~J x/'K This report does not relieve the contractor or their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report of description of work and observations
TESD's Testing-Technician: Name: tlelb-12_4 j' Signature:
Client's or Contractor's Acknowledgement: Name: Signature: J7_i,_?