HomeMy WebLinkAbout3673; POINSETTIA LANE REACH C; PHYSICAL PROPERTIES OF SOILS & AGGREGATE; 2003-11-120 1 .3 / 3 v1
Testing Engineers - San Diego, Inc. Established 1946
Date November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A ( NoC59908 Report No: 6275 Exp./thiIo3
ENGINEER: CHAD DAVIS, CIVIL ENGINE R 0.0
FC REVIEWED ME AD MAC ~OLOU, STAFF GEOLOG
Lab No: 10337
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/7/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 1117/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: P.M. SAMPLE WESTBOUND STA 158+50
Sieve % Passing
Size Accumulative * Stecification
1" 100 100
3/4" 94 90-100
1/2" 73
3/8" ' 61 50-80
NO. 4 45 35-60
8 39
16 32** 10-30
30 25
50 19
100 13
200 8.8 2-9
RECEIVED
DEC -9 2003
Jesting Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [8581 7 15-58 10
-----
Testing Engineers - San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 30 25 MIN. Calif 217-
Durability Index, Coarse 80 35 MIN. Calif 229-
Durability Index, Fine 40 35 MIN. Calif 229-
R-Value 85 78 MIN. Calif 301
*SPECIFICATION/COMMENTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55• ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENTS PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LANE WESTBOUND STA 158+50
SAMPLE DESCRIPTION CLASS 2 AGGREGATE BASE
SAMPLED BY TESD ________________________
TESD PROJ. NO. 51003 DATE RECEIVED 11/712003
LAB NUMBER 10337
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
350 350 350
6.7 7.1 6.3
125 2 124.8 115.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi) .
R-Value (corrected)
0.07. 0 0.13
0.22 0.231 0.19
286 2101 470
85 841 87
EXPANSION PRESSURE
2.0
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
EXUDATION PRESSURE
w 100
80
60
LU 40
w 20 Ix U 0
CHAD MICHAEL
DAVIS
No. C
Exp/ ?I,?
kciv(i.
0 50 100 150 200 250 300 350 400 450 50
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R-VALUE BY EXPANSION
R-VALUE AT EQUILIBRIU
4:5. ENGINEER: CHAD DAVIS, CIVIL
ENGINEER
N/A Reviewed
________
85 MEHRZAD MAHSOUDLOU,
STAFF GEOLOGIST
Testing Engineers - San Diego, Inc. Established 1946
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER
- RECYCLED Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6274
ENGINEER: CHAD DAVIS CIVIL N ER
REVIEWED: MEHRZAD'MAGSO OU, STAFF G
CHAD MICHAEL
DAVIS
No. C 599Q8
Ewl
cIft
Lab No: 10336
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/7/03 By: TESD Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/7/03 By: TESD Source of Material: WYROC, SAN MARCOS
Location Sampled: A.M. SAMPLE EASTBOUND STA 160+50
Sieve % Passing
Size Accumulative * Specification
1" 100 100
3/4" 93 90-100
1/2" 75
3/8" 64 50-80
NO.4 51 35-60
8 44
16 35** 10-30
30 28
50 21
100 15
200 9.6 ** 2-9
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858:1 715-
5
8
1
0
Testing Engineers - San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 29 25 MIN. Calif 217-
Durability Index, Coarse 82 35 MIN. Calif 229-
Durability Index, Fine 48 35 MIN. Calif 229-
R-Value 84 78 MIN. Calif 301
*SPECIFICATION/COM]y.4NTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55. ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
lesting Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810.
_____ ----- ----- ----- ----- ----- ----- ----- -----
---
-----
____. -- ----- ----- ----- ----- -----
----- ----- ----- ----- ____. ----- _____ ----- ----- ____. ----- ----- _____ ----- ____.
----- ----- ----- ----- ____. _____ ----- _____ ----- ____. ----- ----- ----- ----- ____.
----- -----
----- ----- ----- _____ _____ ----- ----- V
_____ ----- ----- ----- ---------- ----- ----- ----- -----
----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- _____
----- ----- ----- n---- ----- ----- ----- -----
R VALUE BY EXPANSION
Testing Engineers - San Diego, Inc. Established 1946
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6278 Ac))
ENGINEER: CHAD DAVIS, CIVIL EN INE DAVIS
fl No. REVIEWED: MEHRZAD MAGSOUDL , STAFF GEOLOGIS
Lab No: 10346
..
6w
Project: POINSETTIA LANE - REACH C FCA
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/10/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/10/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: POINSETTIA WESTBOUND N. CURB STA 150+90 (A.M.
SAMPLE)
Sieve % Passing
Size Accumulative * Snecification
1" 100 100
3/4' 94 90-100
1/2" 75
3/8" 66 50-80
NO.4 52 35-60
8 43
16 33** 10-30
30 25
50 19
100 12
200 7.9 2-9
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego, CA. 92 I I [858] 715-5800 Fax [858] 715-5810
-
Testing Engineers - San Diego, In~,, Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-358573675
SAMPLE LOCATION POINSETFJA LANE WESTBOUND, NORTH CURB, STA 150+90
SAMPLE DESCRIPTION CLASS 2 AGGREGATE BASE - - -
SAMPLED BY TESD ________________________
TESD PROJ. NO. 51003 DATE RECEIVED 11/10/2003
LAB NUMBER 10346
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pci)
350 3501, 350
6.4 6.9 6.1
136.2 136.9 136.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0 0 0.17
0.23 0.25 0.22
4.10. 230 650
85 83 85
EXPANSION PRESSURE
2.0
Lu 1.5
ca >-- uJ
w 0 1.0 >dt. o
0.5
U)
0.0
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
Testing Engineers - San Diego, Inc. Established i946 .
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6279
ENGINEER: CHAD DAVIS, CIJL ENGINEER CHAD WdCHAEL
DAVIS
No. C AW
2 Exp. 1O3
10347 1AC
POINSETTIA LANE - REACH C
CARLSBAD, CALIFORNIA
Date: 11/10/03 By: TESD
CLASS II BASE AGGREGATE
Date: 11/10/03 By: TESD
WYROC, SAN MARCOS
POINSETTIA WESTBOUND N. CURB STA 159+00 (P.M.
SAMPLE)
REVIEWED:
Lab No:
Project:
Location:
Sampled:
Type of Material:
Submitted:
Source of Material:
Location Sampled:
,ST
Sieve % Passing
Size Accumulative * Snecification
1" 100 100
3/4" 92 90-100
1/2" 73
3/8" 64 50-80
NO.4 50 35-60
8 42
16 33** 10-30
30 26
50 19
100 13
200 8.6 2-9
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [8581 715-5810
715-5800 Fax [858] 7 15-58 10
Testing Engineers - San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 35 25 MIN. Calif 217-
Durability Index, Coarse 71 35 MIN. Calif 229-
Durability Index, Fine 44 35 MIN. Calif 229-
R-Value 82 78 MN. Calif 301
*SpECIFICATION/COMMENTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55• ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
Testing Engineers - San Diego, Inc. . Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water -Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETFIA LANE WESTBOUND NORTH CURB STA 159+00
SAMPLE DESCRIPTION CLASS 2 AGGREGATE BASE
SAMPLED BY TESD
TESD PROJ. NO. 51003 DATE RECEIVED 11/10/2003
LAB NUMBER 10347
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pc
350 350 350
.6.6 7.1 6.2
.137.1' 136.7 137.3
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
013 007 0.23
0.25 0.26 0.2
3701 2201 590
83 821 86
EXPANSION PRESSURE
EXUDATION PRESSURE
Ui 100
80
60
lu 40
Ui 20 ix C.) 0
CHAD MICHAEL
DAVIS
No. C P998
1_I
kVtL
0 100 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX .'4:5 ENGINEER: CHAD DAVIS CIVIL
R-VALUE BY EXUDATION 82. ENGINEER 4;,,~~
R-VALUE BY EXPANSION 85 . Reviewedl
R-VALIJE AT EQUILIBRIUM 82 MEHRZAD M HSOUDLOU,
STAFF GEOLOGIST
Testing Engtheers - Sanmego,In Established 1946
Date: November 4, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6219 A57CHADMICNAEC
ENGINEER: CHAD DAVIS, CIVIL E INEER fr2f DAVIS
Lab No: 1028 C r. E!5;~ -A xp/Z/3
Project: POINSETTIA LANE - REACH C \P,áVIL/
Location: CARLSBAD, CALIFORNIA FCA Sampled: Date: 10/30/03 By: TESD
Type of Material: LIGHT BROWN CRUSHED AGGREGATE BASE
Submitted: Date: 10/30/03 By: TESD
Source of Material: RANCHO SANTA FE ROAD
Location Sampled: EAST SIDE STOCKPILE
Sieve % Passing
Size - - Accumulative * Snecification
1.511 100
3/4" 100 90-100
1/2" 90
3/8" 81 ** 50-80
NO. 4 58 ** 35-55
8 42
16 30 10-30
30 21
50 16
100 12
200 9.4 ** 2-9
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [858] 715-5810
Established 1946
L I66'(t
TEST STANDARDS ARE ASTM (unless otherwise noted)
TEST RESULT SPECIFICATION TEST STD
Sand Equivalent Value 40 50 MIN. Calif 217-
Durability Index, Coarse 73 Calif 229-
Durability Index, Fine 54 Calif 229-
*SPECIFJCATION/COMMENTS:
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 9211 [858] 715-5800 Fax [8581 71558 10
.Testing Engineers - San Diego, Inc. Established 1946
Date: November 4, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A (
Report No: 6220 ff' CHAD MICHAEL
ENGINEER: CHAD DAVIS, CIVIL NU NEE. EQ AVIS
No. C59908
Lab No: 10282
Project: POINSETTIA LANE - REACH C IL
Location: CARLSBAD, CALIFORNIA OFCM '
Sampled: Date: 10/30/03 By: TESD
Type of Material: LIGHT BROWN CRUSHED AGGREGATE BASE
Submitted: Date: 10/30/03 By: TESD
Source of Material: RANCHO SANTA FE ROAD
Location Sampled: WEST SIDE STOCKPILE
Sieve % Passing
Size Accumulative * Specification
1.5" 100
3/4" 100 90-100
1/2" 86
3/8" 71 50-80
NO.4 45 35-55
.8 31
16 21 10-30
30 15
50 11
100 19
200 6.7 2-9
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [8581 715-5810
Testing Engineers - San Diego, Inc.
TEST STANDARDS ARE ASTM (unless otherwise noted)
TEST RESULT SPECIFICATION TEST STD
Sand Equivalent Value 43 50 MIN. Calif 217-
Durability Index, Coarse 76 Calif 229-
Durability Index, Fine 61 Calif 229-
Established 1946
*SpECIFICATION/COMNTS:
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 921 I I [858] 715-5800 Fax [858] 715-5810
PITYSICAI
Date: October 14, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
ADDRESS: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Application: N/A
Report No: 6129
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No.: 10009
'Project: Project No. 3673-3585-3675
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 10/6/03 By: TESD
Type of Material: TYPE III-B3 AR4000
Submitted: Date: 10/6/03 By: TESD
Source of Material: VULCAN CARROLL CANYON
Location Sampled:
----------------------------------------------------------------------------------------------------------------
STA 2 1+00
TPST STANDARDS ARE ASTM (unless otherwise specified)
RESULT SPECIFICATION TEST TEST
STD
LAB COMPACTED UNIT 144.6 D1561 &
WT., PCF (HVEEM) . D2726
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6278
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEI{RZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10346
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/10/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/10/03. By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: POINSETTIA WESTBOUND N. CURB STA 150+90 (A.M.
SAMPLE)
Sieve % Passing
Size Accumulative * SDecification
1" 100 100
3/4" 94 90-100
1/2" 75
3/8" 66 50-80
NO.4 52 35-60
8 43
16 33** 10-30
30 25
50 19
100 12
200 7.9 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 37 25 MIN. Calif 217-
Durability Index, Coarse 74 35 MIN. Calif 229-
Durability Index, Fine 43 35 MIN. Calif 229-
R-Value 84 78 MIN. Calif 301
*SPECIFICATION/COMllNTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55• ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6279
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10347
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/10/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/10/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: POINSETTIA WESTBOUND N. CURB STA 159+00 (P.M.
SAMPLE)
Sieve % Passing
Size Accumulative * Soecification
1" 100 100
3/4" 92 90-100
1/2" 73
3/8" 64 50-80
NO.4 50 35-60
8 42
16 33** 10-30
30 26
50 19
100 13
200 8.6 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 35 25 MIN. Calif 217-
Durability Index, Coarse 71 35 MIN. Calif 229-
Durability Index, Fine 44 35 MIN. Calif 229-
R-Value 82 78 MIN. Calif 301
*SPECIFICATION/COMNTS: R-VALUE IS WAIVED IF SAND EQUIVALENT 1> 55. ** DOES NOT
FALL WITIIIN SPECIFIED LIMITS.
Date: November 7, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Pan Number: N/A
Permit: N/A
Report No: 6237
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No:
Project:
Location:
Sampled:
Type of Material:
Submitted:
Source of Material:
Location Sampled:
10318
POINSETTIA LANE - REACH C
CARLSBAD, CALIFORNIA
Date: 11/4/03 By: TESD
CLASS II BASE AGGREGATE
Date: 11/4/03 By: TESD
WYROC, SAN MARCOS
STOCKPILE
Sieve % Passing
Size Accumulative * Specification
1" 100 100
3/4" 94 90-100
1/2" 72
3/8" 61
NO. 4 50 35-60
8 44
16 35
30 27 10-30
50 19
100 13
200 8.9 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 32 25 MIN. Calif 217-
Durability Index, Coarse 70 35 MIN. Calif 229-
Durability Index, Fine 38 35 MIN. Calif 229-
*SPECIFICATION/CO14Jt4ENTS:
Date: November 7, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6238
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No:
Project:
Location:
Sampled:
Type of Material:
Submitted:
Source of Material:
Location Sampled:
10319
POINSETTIA LANE - REACH C
CARLSBAD, CALIFORNIA
Date: 11/4/03 By: TESD
CLASS II BASE AGGREGATE
Date: 11/4/03 By: TESD
WYROC, SAN MARCOS
STOCKPILE
Sieve % Passing
Size Accumulative * SDecification
1" 100 100
3/4" 93 90-100
71
3/8" 62
NO.4 52 35-60
8 46
16 37
30 28 10-30,
50 20
100 13
200 8.8 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 31 '25 MIN. Calif 217-
Durability Index, Coarse 66 35 MIN. Calif 229-
Durability Index, Fine 37 35 MIN. Calif 229-
*spEcIFIcATIoN/co4ENTs:
COMPACTION TEST REPORT
Curve No.: 3
Project No.: 51003 Date: 11/4/03
Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: NOT SUBMITTED
Elev./Depth:
Remarks: TESD NO. 10318
MATERIAL DESCRIPTION
Description: CLASS H BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>314 in. = 5.7% %<No.200=
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density = 146 pcf
Optimum moisture 5 %
144.5 pcf
5.5%
150 T = = = Test specification:
- - - - ASTM D 1557-91 Procedure C Modified
- - - 4 Oversize correction applied to each point
_\ 140 -- ---l-
--- _\
130 100% SATURATION CURVES
- FOR SPEC. GRAV. EQUAL TO:
2.8
COL 120 26
11111111111 2.7
_0 NIL
110 iii
100---.= = = = = = = = = = = = = = = = = = = =
90
-
80 — — - 44-
-
= =11 5 10 15 20 25 30 35 40 =E
Water content, %
Plate
TESTING ENGINEERS
=
COMPACTION TEST REPORT
Curve No.: 4
Project No.: 51003 Date: 11/4/03
Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: WYROC QUARRY-TWIN OAKS SAN MARCOS STOCKPILE
Elev./Depth:
Remarks: TESD NO. 10319
MATERIAL DESCRIPTION
Description: CLASS H BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>314in. = 6.5% %<No.200
ROCK CORRECTED TEST RESULTS
150 = = = - Test specification:
- - - - ASTM D 1557-91 Procedure C Modified
- - - - ~\\ LN Oversize correction applied to each point
;01 140 --
-S \
130 100% SATURATION CURVES
\ FOR SPEC. GRAy. EQUAL TO:
-c- -2.8
111111111
26
iI NIL
------
100 -
90
80
01
-
I = 5
10 15 20 25
: 1!
35 40
Water content, %
Plate
TESTING ENGINEERS
UNCORRECTED
Maximum dry density = 145.5 pcf 144 pcf
Optimum moisture 5.5 % 5.5 % =
Date: November 10, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6251
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10331
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/6/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/6/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: P.M. SAMPLE, POINSETTIA E. BOUND STA 157+50
Sieve % Passing
Size Accumulative * Snecification
1" 100 100
3/4" 94 90-100
1/2" 77
3/8" 68 50-80
NO.4 55 35-60
8 46
16 38** 10-30
30 30
50 22
100 16
200 10.5 ** 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 30 25 MIN. Calif 217-
Durability Index, Coarse 80 35 MIN. Calif 229-
Durability Index, Fine 48 35 MIN. Calif 229-
R-VALUE 86 78 MIN.
*SpECIFICATION/COMNTS: R-VALUE IS WAIVED IF SAND EQUIVALENT /> 55• ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
Date: November 10, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6252
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: ME}{RZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10332
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/6/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/6/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: A.M. SAMPLE, POINSETTIA E. BOUND STA 153+50
Sieve % Passing
Size Accumulative * Snecification
1" 100 100
3/4" 87** 90-100
1/2" 62
3/8" 52 , 50-80
NO.4 41 35-60
8 34
16 '28 10-30
30 22
50 17
100 12
200 8.1 ' 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 30 25 MIN. Calif 217-
Durability Index, Coarse 82 35 MIN. Calif 229-
Durability Index, Fine 48 35 MIN. Calif 229-
R-VALUE 82 78 MIN.
*SPECIFICATION/COMMENTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55• ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
2.0
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LN EASTBOUND STA 157+50 (9.M. SAMPLE)
SAMPLE DESCRIPTION CLASS II AGGREGATE BASE
SAMPLED BY TESD
TESD PROJ. NO. 51003 JDATE RECEIVED 11/6/2003
LAB NUMBER 10331
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcI)
350 350 350
7.9 7:1 6.5
137.6 137.9 137.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
,R-Value (corrected)
0 0.13 0.2
0.29 0.22 0.2
140 230 640
80 85 86
EXPANSION PRESSURE
EXUDATION PRESSURE
= ----- ----- ----- ----- ----- ---- ----,
----- ----- ----- ----- ----- ----- ---- === === ===== ==== ===== ==== ===
III ----- ----- ----- ----- ----- ----- I ----- ----- ----- ----= ---- ----- ---------------------------
____----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- sr ____----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
'
34IJ.yj
;SUMED TRAFFIC INDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL
VALUE BY EXUDATION 86 ENGINEER
VALUE BY EXPANSION 86 Reviewed By:
VALUE AT EQUILIBRIUM 86 CHAD DAVIS
CIVIL ENGINEER
2.0
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
(4) Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LN EASTBOUND STA 153+50 (A.M. SAMPLE)
SAMPLE DESCRIPTION CLASS II AGGREGATE BASE
SAMPLED BY TESD
TESD PROJ. NO. 51003 DATE RECEIVED 11/6/2003
LAB NUMBER 10332
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
350 350 350
'7.3 6.6 6.2
133.2 137.7 138.4
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0.03 0.03 0.13
0.35 0.26 0.2
180 290 590
76 82 86
EXPANSION PRESSURE
EXUDATION PRESSURE
w 100
80
60
40
Ui 20
0 C.) 0
0 100 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL
R-VALUE BY EXUDATION 82 ENGINEER
R-VALUE BY EXPANSION N/A Reviewed By:
R-VALUE AT EQUILIBRIUM 82 CHAD DAVIS
CIVIL ENGINEER
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6274
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10336
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/7/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/7/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: A.M. SAMPLE EASTBOUND STA 160+50
Sieve % Passing
Size Accumulative * St,ecification
1" 100 100
3/4" 93 90-100
1/2" 75
3/8" 64 50-80
NO.4 51 35-60
8 44
16 35** 10-30
30 28
50 21
100 15
200 9.6 ** 2-9
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD. TEST RESULT
Sand Equivalent Value 29 25 MIN. Calif 217-
Durability Index, Coarse 82 35 MIN. Calif 229-
Durability Index, Fine 48 35 MIN. Calif 229-
R-Value 84 78 MIN. Calif 301
*SPECIFICATION/COMNTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55. ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
Date: November 12, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A•
Permit: N/A
Report No: 6275
ENGINEER CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10337
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/7/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/7/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: P.M. SAMPLE WESTBOUND STA 158+50
Sieve % Passing
Size Accumulative * Specification
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 30 25 MIN. Calif 217-
Durability Index, Coarse 80 35 MIN. Calif 229-
Durability Index, Fine 40 35 MIN. Calif 229-
R-Value .85 78 MIN. Calif 301
*SPECIFICATION/COJNTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55. ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
411
LU 1.5
co W >--
tu 0 1.0 >=h:. O
0.5
U)
0.0
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LANE EASTBOUND STA 160+50
SAMPLE DESCRIPTION CLASS 2 AGGREGATE BASE
SAMPLED BY TESD
TESD PROJ. NO. 51003 DATE RECEIVED 11/7/2003
LAB NUMBER 10336
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
350 350 350
7.2 6.3 6.8
139.5 139.2 139.5
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0 0.2 0.07
0.33 0.19 0.22
100 460 340
77 87 85
EXPANSION PRESSURE
EXUDATION PRESSURE
w 100
80
60
LU 40
LU
20
0 C.) 0
0 50 100 150 200 250 300 350 400 450 500
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL
R-VALUE BY EXUDATION 84 ENGINEER
R-VALUE BY EXPANSION 87 Reviewed By:
R-VALUIE AT EQUILIBRIUM 84 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
2.0
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LANE WESTBOUND STA 158+50
SAMPLE DESCRIPTION CLASS 2 AGGREGATE BASE
SAMPLED BY TESD
TESD PROJ. NO. 51003 DATE RECEIVED 11/7/2003
LAB NUMBER 10337
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
350 350 350
6.7 7.1 6.3
125.2 124.8 125.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0.07 0 0.13
0.22 0.23 0.19
280 210 470
85 84 87
EXPANSION PRESSURE
EXUDATION PRESSURE
W 100
80
60
Ui 40
Ui 20
0 00
0 50 100 150 200 250 300 350 400 450 500
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R-VALUE BY EXPANSION
R-VALUE AT EOUILIBRIIJ
4.5 ENGINEER: CHAD DAVIS, CIVIL
85 ENGINEER
N/A Reviewed By:
85 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
COMPACTION TEST REPORT
Curve No.: 3
Project No.: 51003
Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: NOT SUBMITTED
Elev./Depth:
Remarks: TESD NO. 10318
Date: 11/4/03
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>3/4 in. = 5.7% %<No.200
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density = 146 pcf
Optimum moisture = 5 %
144.5 pcf
5.5%
150
140
130
Test specification:
ASTM D 1557-91 Procedure C Modified
Oversize correction applied to each point
EWED BY: EHRLADMAGHSOUDL
DATE: //-,'-3
100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
2.7
2.6
110
100
Ml
5 10 15 20 25 30 35 40
Water content, %
Plate TESTING ENGINEERS
Testing Engineers - San Diego, Inc. S Established 1946
Date: November 7, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6237
ENGINEER: CHAD,DAVIS CIVIL ENGINEER
REVIEWED: 1(9AD MAGSOUDLOU, STAFF GEOLOGIST
Lab No:
Project:
Location:
Sampled:
Type of Material:
Submitted:
Source of Material:
Location Sampled:
10318
POINSETTIA LANE - REACH C
CARLSBAD, CALIFORNIA
Date: 11/4/03 By: TESD
CLASS II BASE AGGREGATE
Date: 11/4/03 By: TESD
WYROC, SAN MARCOS
STOCKPILE
Sieve % Passing
Size Accumulative * Specification
1" 100 100
3/411 94 90-100
1/2" 72
3/8" 61
NO.4 50 35-60
8 44
16 35
30 27 10-30
50 19
100 13
200 8.9 2-9
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego, CA. 92 1 1 1 [858] 715-5800 Fax 18581 715-58 1()
p..
Testing Engineers - San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise noted)
TEST RESULT SPECIFICATION TEST STD
Sand Equivalent Value 32 25 MIN. Calif 217-
Durability Index, Coarse 70 35 MIN. Calif 229-
Durability Index, Fine 38 35 MIN. Calif 229-
* SPECIFICATION/COMMENTS:
Testing Engineers - San Dietso. inc., 7895 Convoy Court, Suite IS San Diego, CA. 9211 1 [8581 715-5800 Fax [8581 7 15-58 10
COMPACTION TEST REPORT
Curve No.: 4
Project No.: 51003 Date: 1 1/4/03
Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: WYROC QUARRY-TWIN OAKS SAN MARCOS STOCKPILE
Elev./Depth:
Remarks: TESD NO. 10319
MATERIAL DESCRIPTION
Description: CLASS II BASE AGGREGATE
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = . Plasticity Index =
%>314in. = 6.5% %<No.200=
ROCK CORRECTED TEST RESULTS UNCORRECTED
Maximum dry density= 145.5 pcf
Optimum moisture = 5.5 %
144 pcf
5.5%
150 Test specification:
ASTM D 1557-91 Procedure C Modified
Oversize correction applied to each point
140 RE VIE WED BY: MEHRZJD MAScO1]
DATE: 3 J 130 100% SATURATION CURVES
FOR SPEC. GRAy. EQUAL TO:
2.8
_ -
C) 110
100
801 I I I I 1 I 1 1 I 1 I II I I 1 1 1I I I I I I I I I I 0 5 10 15 20 25 30 35 40
Water content, %
Plate
TESTING ENGINEERS
Testing Engineers - San Diego, Inc. Established 1946
Date: November 7, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A
Permit: N/A
Report No: 6238
ENGINEER: CHAD DAVIS, CIVIL ENGINEER
REVIEWED: MEMAGSOUDLOU, STAFF GEOLOGIST
Lab No:
Project:
Location:
Sampled:
Type of Material:
Submitted:
Source of Material:
Location Sampled:
10319
POINSETTIA LANE - REACH C
CARLSBAD, CALIFORNIA
Date: 11/4/03 By: TESD
CLASS II BASE AGGREGATE
Date: 11/4/03 By: TESD
WYROC, SAN MARCOS
STOCKPILE
Sieve % Passing
Size Accumulative * Specification
1" 100 100
3/4" 93 90-100
1/2" 71
3/8" 62
NO.4 52 35-60
8 46
16 37
30 28 10-30
50 20
100 13
200 8.8 2-9
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 92111 8581 75-5800 Fax [858] 715-580
- ------ -.,.,. ..,- -. -----.--. ..--- - ..-. .-' -.--.,-.------..
Testing Engineers - San Diego, Tnc. Established 19 . 46
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 31 25 MIN. Calif 217-
Durability Index, Coarse 66 35 MIN. Calif 229-
Durability Index, Fine 37 35 MIN. Calif 229-
* SPECIFICATION/COMMENTS:
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 921 1I [858] 715-5800 Fax [858] 71 5-5810
Testing Eng ineers San Diego, Inc. Established 1946
Date: November 10, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A 4/ CHAD MICHAEL
fo Permit: N/A DAVIS
4oC599O8
Report No: 6251 EXP.
ENGINEER: CHAD DAVIS, CIVIL ENGINEER C1
REVIEWED: MEHAD MAGSOLOU, STAFF GEOLOGIST
Lab No: 10331
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/6/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/6/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: P.M. SAMPLE, POINSETTIA E. BOUND STA 157+50
Sieve % Passing
Size Accumulative * Specification
1" 100 100
3/411 94 90-100
1/211 77
3/811 68 50-80
NO.4 55 35-60
8 46
16 38** 10-30
30 30
50 22
100 16
200 10.5 2-9
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [8581 7 15-58 10
Testing Engineers San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 30 25 MIN. Calif 217-
Durability Index, Coarse 80 35 MIN. Calif 229-
Durability Index, Fine 48 35 MIN. Calif 229-
R-VALUE 86 78 MIN.
*SPECIFICATION/COMMENTS: R-VALUE IS WAIVED IF SAND EQUIVALENT =1> 55• ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
Testing Engineers - San Diego, Inc., 7895 Convoy Court, Suite 18 San Diego, CA. 921 1I [858] 715-5800 Fax [858] 715-5810
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LN EASTBOUND STA 157+50 (9.M. SAMPLE) -
SAMPLE DESCRIPTION CLASS II AGGREGATE BASE
SAMPLED BY TESD
TESD PROJ. NO. 51003 JDATE RECEIVED 11/6/2003
LAB NUMBER 10331
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
350 350 350
7.9 7.1 6.5
137.6 137.9 137.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0 0A3 0.2
0.29 0.22 0.2
140 230 640
80 85 86
EXPANSION PRESSURE
2.0
LU
CO W
>::t. -
-
0.5-
U)
0.0 L'
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
ILi 100
-J < 80
60
LU 40
LU 20
0 U o
=
-L-
0 100 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
CHAD MlCHAE
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R-VALUE BY EXPANSION
R-VALUE AT EOUILIBRJU
4.5 I ENGINEER: CHAD DAVI
86' I ENGINEER
86, Reviewed
86 I CHAD DAVIS -
CIVIL ENGINEER
Testing Engineers - San Diego, Inc. Established 1946
Date: November 10, 2003
Job No: 51003
Job Name: POINSETTIA LANE-REACH C. DOMESTIC WATER - RECYCLED
Address: Poinsettia Lane
Carlsbad, California
Plan Number: N/A N Permit. N/A NAD 1VilCHi
Report No: 6252 DAVIS
ENGINEER: CHAD DAVIS; CIVIL ENGINEER No. C9908
REVIEWED: MEHRZAD MAGSOUDLOU, STAFF GEOLOGIST
Lab No: 10332
Project: POINSETTIA LANE - REACH C
Location: CARLSBAD, CALIFORNIA
Sampled: Date: 11/6/03 By: TESD
Type of Material: CLASS II BASE AGGREGATE
Submitted: Date: 11/6/03 By: TESD
Source of Material: WYROC, SAN MARCOS
Location Sampled: A.M. SAMPLE, POINSETTIA B. BOUND STA 153+50
Sieve % Passing'
Size Accumulative * 'SDecification
1" ' 100 100
3/4" 87 ** 90-100
1/2" 62
3/8" 52 50-80
NO.4 41 35-60
8 34
16 28 10-30
30 22
50 17
100 1.2
200 8.1 2-9
Testing Engineers - San Diego, Inc., 7995 Convoy Court, Suite 18 San Diego, CA. 92111 [8581 715-5800 Fax [8581 715-5810
Testing Engineers - San Diego, Inc. Established 1946
TEST STANDARDS ARE ASTM (unless otherwise noted)
SPECIFICATION TEST STD TEST RESULT
Sand Equivalent Value 30 25.MIN. Calif 217-
Durability Index, Coarse 82 35 MIN. Calif 229-
Durability Index, Fine 48 35 MIN. Calif 229-
R-VALUE 82 78 MIN.
*SPECIFICATION/COMMENTS: R-VALUE IS WAIVED IF SAND EQUIVALENT /> 55. ** DOES NOT
FALL WITHIN SPECIFIED LIMITS.
Testing Engineers - San Diego, Inc.. 7895 Convoy Court, Suite 18 San Diego, CA. 92111 [858] 715-5800 Fax [$581 715-5810
EXUDATION PRESSURE
-I
OWN a=
LU 100
80:
>
60
.
40
Lu
20
0 :
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
- CLIENTS PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION POINSETTIA LN EASTBOUND STA 153+50 (A.M. SAMPLE)
SAMPLE DESCRIPTION CLASS II AGGREGATE BASE
SAMPLED BY TESD
________________________ TESD PROJ. NO. 51003 DATE RECEIVED 11/6/2003
LAB NUMBER 10332
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
350 350 350
7.3 6.6 6.2
133.2 137.7 138.4
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0.03 0.03 0.13
0.35 0.26 0.2
180. 290 590
76 82 86
EXPANSION PRESSURE
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0 100 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX . 4.5, ENGINEER: CHAD DAVIS, R-VALUE BY EXUDATION . 82 , ENGINEER
R-VALUE BY EXPANSION .' N/A Reviewed By R-VALUE AT EQUILIBRIUM 82 CHAD DA'1
CIVIL ENGINEER
0 MICHAEL
DAVIS
2.0
LII
S
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION STATION 158±50 (#3).
SAMPLE DESCRIPTION LIGHT BROWN SANDY CLAY WITH OLIVE SILT
SAMPLED BY TESD _________________________
TESD PROJ. NO. 2003-0455 DATE RECEIVED 7/19/2003
LAB NUMBER 9137
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
60 40 105
.. . 15.2 . 16.6 13.8
112.8 109.9 117.1
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
,R-Value (corrected)
. 0.23 . 0.13 0.5
1.31 1.35 1.22
330 180 560
. . 9'. 6 15
EXPANSION PRESSURE
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
Ui 100
80
60
LU 40
Ui
20
0 00
11 100 200 300 400 500 600
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R-VALUE BY EXPANSION
R-VALUE AT EOUILIBRIU
4.5 ENGINEER: CHAD,'1S, CIVIL
8 ENGINEER
N/A Reviewed By: I
8 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
10
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-358573675
SAMPLE LOCATION STATION 153+50 (#4)
SAMPLE DESCRIPTION BROWN SANDY SILTY CLAY
SAMPLED BY TESD ________________________
TESD PROJ. NO. . 2003-0455 . DATE RECEIVED 7/19/2003
LAB NUMBER 9138
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
MoistureatCompaction(%)
Compacted Density (pcf)
115 . . 55 . 4210
. . 12.8 14.1 . ... 11.5
. .' 120.6 . 116.8 . 124.7
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
. .. 0 0 0.9
1.21 . 1.3 0.99
... - 990 180 490
. . . 16 10 . 31
EXPANSION PRESSURE
2.0
Ui 1.5 >-I- cow
uj 0 1.0 > -Oco
0.5
U)
0.0
0.0 0.5 1.0 . 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
LU 100
80 >
60
UJ 40
LU
20
0 00
0 1 200 400 600 800
EXUDATION PRESSURE (psi)
1000 1200
ASSUMED TRAFFIC INDEX .•. 45
R-VALUE BY EXUDATION 14
R-VALUE BY EXPANSION . N/A
R-VALUE AT EQUILIBRIUM 14
ENGINEER: CHAD DAM Z, CIVIL
ENGINEER 1/ /
Reviewed By: /47
MEHRZAD MAI-tSO'UDLOU,
STAFF GEOLOGIST
1 --
177771
--------.. _:.i_.
—
-
—--- ----
---
-- -----
- - - -- ,---- -- - -.
---
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION TATION 16 1+00 @ -3'(#6)
SAMPLE DESCRIPTION BROWN SANDY SILTY CLAY -:
SAMPLED BY TESD
TESD PROJ. NO. 2003-0455 DATE RECEIVED 7/18/2003
LAB NUMBER 9208
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
100 180 350
16.5 15.1 13.8
111.8 115.2 118.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0.17 0.3 0.93
1.27 1.12 0.85
220 340 610
12 22 41
EXPANSION PRESSURE
EXUDATION PRESSURE
-------
----------
..--------------- -. -. ........
--
*_
Lii 100
-J 80
60
40
Ui 20
0 00
0 100 . 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R-VALUE BY EXPANSION
R-VALUE AT EOUILIBRIU
4.5 ENGINEER: CHAD DAM
19 ENGINEER
40 Reviewed By:
19 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
IL
- - - -........... - -.-.- - - - - .-.-- - - - - -
--a—----
2.0
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water -_Recycled
CLIENTS PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION STATION 153+00 @ -3'(#5)
SAMPLE DESCRIPTION BROWN SANDY SILTY CLAY - -
SAMPLED BY TESD -
TESD PROJ. NO. 2003-0455 IDATE RECEIVED 7/18/2003
ILAB NUMBER 9207
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
105 65 240
12.7 14.0 11.4
121.2 116.1 124.2
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0.1 0.07 1.23.
1.2 1.3 0.99
350 210 500
17 10
EEE
31
EXPANSION PRESSURE
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
Ui 100
-j < 80
60
LU
40
Ui 20
0 o 0
t~~E ~~_
-I--
S
0 100 200 300 400 500 600
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 4.5
R-VALUE BY EXUDATION . 14
R-VALUE BY EXPANSION . 30
R-VALUE AT EQUILIBRIUM 14
ENGINEER: CHAD DAVIS, CIVIL
ENGINEER
Reviewed By:
MEHRZAD MAGHSOUDLOu,
STAFF GEOLOGIST
150
140
130
o 110
100
ME
COMPACTION TEST REPORT
Curve No.: 2
Project No.: 51003 Date: 10/6/03
Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: STOCKPILE @ STA 150+00
Elev./Depth:
Remarks: TESD NO. 10008
MATERIAL DESCRIPTION
Description: GREEN-GRAY GRAVEL WITH LITTLE FINES
Classifications - USCS: AASHTO:
Nat. Moist. Sp.G. =
Liquid Limit = Plasticity Index =
%>314in. % %<No.200=
TEST RESULTS
Maximum dry density = 141.5 pcf .
Optimum moisture = 6 %
Water content, %
Plate TESTING ENGINEERS
C
200 400 800 800 1000 1200
EXUDATION PRESSURE (psi)
100
80
60
40
w 20
0
08/26/2803 11:35 8587155818 TESTING ENGINEERS SD PAGE 82/05
- Testing Engineers -, San Diego, Inc. - -- Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recy1ed
CLIENTS PROJECT OR WORK ORDER NUMBER Project No, 3673-3585-3675
SAMPLE LOCATION STATION 153+50 (#4)
SAMPLE DESCRIPTION BROWN SANDY SILT? CLAY
SAMPLED BY TESD -.
TESD PROJ. NO. 2003-0455 IDATE RECEIVED 7/19/2003
LAB NUMBER 9138
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Coxnpacted Density (pcf)
315 55 210
12.8 14.1 11.5
120.6 116.8 124.7
Cover Thickness by Expansion Pressure (feet)
Cover Thic1cnts by Stabilometer (feet)
Exudation Piessurc (psi)
R-Value (corrected)
0 0 0.9
1.21 1.3 0.99
9901 180 490
161 tO 31
EXPANSION PRESSURE
•
! !!!! !
! -t
j
- - -- === -----
mamma -- - --
0.0 0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (set)
EXUDATION PRESSURE
ASSUMED TRAFFIC INDEX
R-VALUE BY EXUDATION
R..VALUE BY EXPANSION
4.5 ENGINEER: CHAD DAVIS, CIVIL
14 ENGINEER
N/A Reviewed By:
14 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
2,0
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet
0.0
0.0
08/26/2063 11:35 8587155816 TESTING ENGINEERS SD PAGE 03/85
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Line-Reach C. Domestic Water - Recycled CLIENTS PROJECT OR WORK ORDER NUMBER Proj!ct No. 3673-3585.3675 SAMPLE LOCATION STATION 153+00 SAMPLE DESCRIPTION BROWN SANDY SILTY CLAY - SAMPLED BY ThSD TESD PROJ. NO. 2003-0455 JDATE RBCEFBD - 7/18/20031
ABMJMBER 92071
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi) --
Moisture at Compaction (%)
Compacted Density (pcf)
105 _65 -__240
12.7 14.0 _. .. .11.4
121.2 ).16.1 124.2 Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabiloineter (feet)
tzudation Pressure (psi)
R-Value(con'ected)
0.1 007 . 1.23
1.2 1.3 0.99 -. 3501 210 500
171 20 - 31
EXPANSION PRESSURE
EXUDATION PRESSURE
Im 1oo
80
60
40
20
100 200 300 400 500 sm
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 45 ENGINEER: CHAD DAVIS, CIVIL R-VALUEBYEXUDATION 14 ENGINEER R-VALUE BY EXPANSION 30 Reviewed By R-VALUE AT EQUILIBRIUM 14 MEHRZAD MAGHSOUDLOU, -
STAFF GEOLOGIST
08/26/2003 11:35 8587155810 TESTING ENGINEERS SD PAGE 04/05
- Testing Engineers - San Diego, Inc.
.
-: Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENTS PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION TATION161+0Ot.3(#6) .. - ... SAMPI DESCRIPTION BROWN SANDY SILTY CLAY
SAMPLED BY TESD
TESD PROJ. NO. 2003.0455 JDATE RECEIVE!) 7/18/200-31
[LAB NUMBER 92081
LABORATORY TEST DATA 1 2
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
100 180 . 350
16.3 15.1 .13.8
111.8 .115.2 118.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabiloineter (feet)
Exudation Pressure (psi)
IR-Vajue (corrected)
0.17 0.3 . 0.93
1.27 1.12 - .0.85
220 340t 610
12 -. .. 22 Al
EXPANSION PRESSURE
2.0
0,5
0.5 1.0 1.5 2.0
COVER 8? EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
.,, I
INVER ..
Lsmw
map
l ir oil q -713 Sri MIN IN 1
o 100 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL R-VALUE BY EXUDATION 19 ENGINEER R-VALUE BY EXPANSION 40 Reviewed By: R-VALUE AT E UILIBRIUM 19 MEHRZAD MAGHSOUDLOu1
STAFF GEOLOGIST
0.0
0.0
2.0
0.5 1.0 1.6
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0 2.0
20
08/26/2003 11:31 8597155810 TESTING ENGINEERS SD PAGE 05/05
()
. Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic WaterI..
CLIENT'S PROJECT OR, WORK ORDER NUMBER PEOStNo. 3673-3585-3675
SAMPLE LOCATION - STATION 158+50 ()
SAMPLE DESCRIPTION LIGHT BROWN SANDY CLAY WITH OLIVE SILT
SAMPLED BY TESD
TESD PROJ. NO. . 2003-0455 DATE RECEIVED 7/19?2003
LAB NUMBER 9137
LABORATORY TEST DATA 1 - 2 3
Compactor Pressure (psi)
Moistire at Compaction (%)
Compacted Density (pçf)
.. 60 40 105
15.2 16.6 13.8
112.8 109.9 . 117.1
Cover Thckness by Expansion Pressure (feet)
Cover Thickness by Stahilometer (feet)
Exudation Pressure (psi)
R-Vluc (csnecte)
0.23 0.13 0.5
1.31 1.33 -. 122
3301 180 . 560
91 61 15
EXPANSION PRESSURE
EXUDATION PRESSURE
0 100 200 300 400 600 800
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL
R-VALUE BY EXUDATION S ENGINEER
K-VALUE BY EXPANSION N/A Reviewed y:
R-VALUE AT EQUILIBRIUM S MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
08/26/2003 11:31 8587155810 TESTING ENGINEERS SD PAGE @1/05
resting Engineers - San Diego Inc.
- environmental & geotechnical engineering -
construction materials testing & inspections -
established 1946
Transmittal Letter/Fax
* Bill From csro ..1
Co mpany: City of C.arIsadineerIrä'Iöat August 2O3
Fax No: 760.438. 4178
Project: Poinsettia Lane - Reach C
Subject: R-value test results
C
z:: 11II
COMMENTS
Bill,
Per your request TEST), has obtained four samples along the referenced prqject
alignment. R-value tests were performed on each sample; results are attached.
Please let me know if you require any further assistance.
Regards,
Carlos Acero
858,7155800
789S CONVOY COURT - SUITE 18
SAN DIEGO - CALIFORNIA - 92111
858.71S.800 / FAX 858.715.5810
200 400 600 800 1000 1200
EXUDATION PRESSURE (psi)
tu 100
-i 80
60
40
120
00
0
08/26/283 11:31 8587155810 TESTING ENGINEERS SD PAGE 02/05
Testing Engiiwcrs - Sao Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Prqject No. 3673-35&5-675 -
SAMPLE LOCATION STATION 153+50 (#4)
SAMPLE DESCRIPTION BROWN SANDY SILTY CLAY
SAMPLED BY . TEST)
TEST) PROJ. NO, 2003-045$ IDATE RECEIVED - 7/19/200J
ItAB NUMBER ... 91$J
LABORATORY TEST DATA - 1 2 3
Compactor Pressure (psi)
Moisture at Compaction ((/'*)
Coiipacred Density (p) ..
115 55 210
12.8 14.1 11.5
120.6 116.8 .. 124.7
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corretç) --
0 0 0.9
1.21 -1.3 0.99
990 220 -490
16 101 -31
EXPANSION PRESSURE
2.0
15
1.0
0.5
0.6 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
EXUDATION PRESSURE
0.0
0.0
ASSUMED TRAC INDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL
R-VALUE BY EXUDATION 14 ENGINEER
R-VALUE BY EXPANSION Reviewed Bj R-VALUE AT EQUILIBRIUM 14 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
0.5 1.0 1.5 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
09/26/2003 11:31 0597155810 TESTING ENGINEERS SD PAGE 03/05
() Testing Eiginccrs - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinscta Lane-Reach C. Domestic Water - Recycled
CLIENTS PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION
SAMPLE DESCRIPTION TBROWN SANDY SILTY CLAY
SAMPLED BY TESI)
TESI) PROJ. NO. 2003-0455 IDATE RECEIVED 7/18/2003
FLAB NUMBER . 9207
LABORATORY TEST DATA -- 2 3 -
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (pcf)
105 65 - 240
12.7 14.0 11.4
121.2 116.1 124.2
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Stabilometer (feet)
Exudation Pressure (psi)
R-Value (corrected)
0.1 0.07 1.23
1.2 -- 13 0.99
350 220 500
17 101 31
EXPANSION PRESSURE
EXUDATION PRESSURE
mr-magagam-WHEMN -!NORM
W~Nmlp~m --= RENEE === =
=IBM WE
=—
===—= ==—== === -= -
-
0 100 200 300 400 600 600
EXUDATION PRESSURE (psi)
SUMED TRAFFIC iNDEX 4.5 ENGINEER: CHAD DAVIS, CIVIL
VALUE BY EXUDATION 14 ENGINEER
VALUE BY EXPANSION 30 Reviewed y:
VALUE ATE 1JIU8RIUM 14 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
2.0
0.5 1.0 16 2.0
COVER BY EXPANSION PRESSURE (feet)
0.0
0.0
100 200 300 400 500 600 700
EXUDATION PRESSURE (psi)
100
80
eo
40
20
0 U 0
0
08/26/203 11:31 8587155810 TESTING ENGINEERS SD PAGE 04/05
Testing Engineers - San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled
CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673-3585-3675
SAMPLE LOCATION TATION 16I+00-3'(#6)
SAMPLE DESCRIPTION BROWN SANDY SILT?' CLAY
SAMPLED BY . TESD ______________________
TESD PROJ. NO, 2003.0455 ATE RECEIVED 7/18120031
1LAB NUMBER 920j
LABORATORY TEST DATA 1 1 2 3
Compactor Pressure (psi)
Mowure at Compaction (%)
Compacted Density (pcf)
_10.0 180 . 350
16.5 15.1 13.8
111.8 115.2 118.9
Cover Thickness by Expansion Pressure (feet)
Cover Thickness by Sabiometer (feet)
Exudation Pressure (psi)
R-Value (corrected) .
0.17 0.3 .0.93
1.27 1.12 0.85
220 340 610
12 . -....-221 41
EXPANSIOJ PRESSURE
EXUDATION PRESSURE
SUMED TRAFFIC iNDEX 4.5 - ENGINEER: CHAD DAVIS, CIVIL
VALUE BY EXUDATION 19 ENGINEER
VALUE BY EXPANSION 40 Reviewed By:
VALUE AT EQUJLJBRUJM 19 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
88/26/2883 11:28 8587155918 TESTING ENGINEERS SD PAGE 01/85
resting Engineers - San Diego Inc.
environmental & gcotechnical engineering -
- construction materials testing & inspections
estst,1lsl4 1946
Transmittal Letter/Fax
.......................................................-
Company: City of Carlsbad Engineering Dpt Date:
J August26, 2003
FaxN.0: ..60.438.
ProJect: Poinsettia Lane Reach C
.............. uJect .RvaIu.etest results
Cc;
COMMENTS:
Bill,
Per your request TESD, has obtained four samples along the referenced project
alignment. R-value tests were performed on each sample; results are attached.
Please let me know if you require any further assistance.
Regards,
Carlos Acero
858.715.5800
7899 CONVOY COURT'SUITE 18
SAN DIEGO - CALIFORM)A - 92111 8S8.115.5800 (FAX 858.715.58t0
From:
11:28 858715581 TESTING ENGINEERS SD PAGE @2/05
Testing Engineers. San Diego, Inc. Established 1946
R-VALUE TEST RESULTS
PROJECT NAME Poinsettia Lane-Reach C. Domestic Water - Recycled - CLIENT'S PROJECT OR WORK ORDER NUMBER Project No. 3673.3585-3675
SAMPLE LOCATION STATION 153+50 (#4)
SAMPLE DESCRIPTION BROWN SANDY SILTY CLAY
SAMPLED BY . TESD .. -.
TESD PROJ. NO. 003-0455 JDATE RECEIVED 7/19/203
LAB NUMBER 91381
LABORATORY TEST DATA 1 2 3
Compactor Pressure (psi)
Moisture at Compaction (%)
Compacted Density (psf)
115 55 210
12.8 14.1 11.5
120.6 1168 124.7
Cover Thickness by Expansion Pressure (feet)
Cover Thicicness by Sibi1ometer (feet)
Exudation Pressure (psi)
R-Value (çorrected)
0 0 0.9
1.21 1.j 0.99
990 ISO 490
16 tj 31
EXPANSION PRESSURE
0.5 1.0 1.5
COVER DY EXPANSION PRESSURE (feet)
2.0
EXUDATION PRESSURE
100
80
40
20
0 200 400 800 800 1000 1200
EXUDATION PRESSURE (psi)
ASSUMED TRAFFIC INDEX 4.5 ENGINEER: CHAD DAVIS. CIVIL R.-VALUE BY EXUDATION 14 ENGINEER R-VALUE BY EXPANSION N/A Reviewed By: It-VALUE AT E IThL1BRIIJM 14 MEHRZAD MAGHSOUDLOU,
STAFF GEOLOGIST
COMPACTION TEST REPORT
Curve No.: I
Project No.: 51003 RE11VED Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: STA 53+50 OCT s ü 2003
F
Elev./Depth:
Remarks: TESD NO. 9789 ______________________
CITY OF CARLSeAD
£NGINEE (IEM
MATERIAL DESCRIPTION
Description: LIGHT BROWN SILTY CLAYEY SAND
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity index =
%> No.4 = % % < No.200 =
TEST RESULTS
Maximum dry density = 133 pcf
Optimum moisture = 8 %
140 = = = = = Test specification:
- ASTM D 1557-91 Procedure A Modified
130 - - c 1 VIEW BY: MEHRZAD MAGHSOUDLOU
-.--
DATE 0--3
2ED
120 --- 100% SATURATION CURVES
FOR SPEC. GRAV. EQUAL TO:
8
--
- 27
110 1 NL 2.6
o00 -
--
--
90 --
---
--
-S
70
05 10 15 20 25 30 35 40
Water content, %
Plate
TETIN( ENC,INERS
c
TeS g Engineers-San Diego,•.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
e LA aC
S IO 2 Test Date ________
4j
___
C,y/ (Aj
Established 1946
Project Name
Project Number
Client
Page of
Test # Material' Structure Test Location and Elevation or Depth relative to...
/10 c P road, tA.,Ji @ 5T4 -r-. -c,-1-00 &;-rLJ /
11/ 5 P ruJ lAix\/ P S 1 --. /
SIA
-rb —i-; 0 /1 /4) 7L '5 /
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # / /0 j' At a 11 15
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf),
Moisture(%)
____ ? ____ ____
MD Curve Number I / 1 /
Maximum Density (pcf) 290,-5' )à.S ,'a-.s
Optimum Moisture (%) C3 ,5 S C3 S
Relative Compaction, AC (%) G 'D
Relative Moisture, AM
Specified AC
Specified RM(%) ' .) .
Conformance (Yes/No) (\J Alo 1 05 Its
Nuclear Gauge Model and Serial Number: C. P IV 7/0 L7 0 o 37 b .
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: / Name: / /121 Signature: 1
Client's or Contractor's Acknowledgement: Name: IM 44't1 L_ Signature:
White- Office Yellow- Contractor - - - Pink- Field Technician
I
Client - - Cr/C CA,j
Test # Material Structure Test Location and Elevation or Depth relative to.:.
IA, AY
/51 +o
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
p.-
Test#
Probe Dept"(inches)
Wet Density (pcf) J ( .5 / 9,3
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, AM (%)
Specified AC (%) 9.5 9 5
Specified AM (%) ' .)_ t ••,
Conformance (Yes/No) ', e c Y e5
Nuclear Gauge Model and Serial Number:' C.. V I" Yi'. ) 2
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: ,4i I 1i Signature:
Client's or Contractor's Acknowledgement: Name: WLL.%IM.4, O('H'. Signature:
White Office Yellow Contractorf. Pink Field Technician
Tesig Engineers-San Diego, a. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name c r '11i L A it, (A c t-'l 7./-
Project Number ,' — ( 4' S Test Date 7 1 4 - Page .....2.... of _.
Client C 7.,/ '' / / ci
Test # Material Structure Test Location and Elevation or Dept relative to... 5_)5)_A_
.1 5 LIJI LA'A-re'/;-(_ç7 .__
)51roo
IL , _j
? S ,IL Jfsp L, -I
5 cjI I / / C L) -t-co_&J_L
1) ç Li! J 1±L>
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
_
ç 7 - Cj /
Probe Depth (inches) 5 S ) r
Wet Density(pcf) )91.1 /1)7 /)4' /c) I'6 d;J; L J)) Jjç
Dry Density (pcf) I JI5'• Ji5.' . r I'_5.
Moisture (%) . 7. 7_4 7.7 ,j . T.77.
MD Curve Number A'Jr /VA ç j _( 6,o , S ,v4,,5 j,)p,_
Maximum Density (pcf) ))3 ) /)_7. Q 7.o /)3 p ia,.. ')3.c /)Jo
Optimum Moisture
Relative Compaction, RC (%). 4 9 C.9 g3 4 ' . ).
Relative Moisture, RM(%)
Specified RC 90 (7 'jo
Specified RM (%) - r ,) ) ' a —r) I -t :r
Conformance(Yes/No) ,/,_ 'l t .,it- r J..,,, I V e /, . V,-,r
Nuclear Gauge Model and Serial Number: (P_it,3JO _.
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: 4 1_/'i _il/V/I,/ Signature: /_/A
Client's or Contractor's Acknowledgement: Name: VALU6 L.oA.7 Signature:
White- Office Yellow- Contractor • Pink- Field Technician
I /
40 Test Engineers-San Diego, Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111 - [858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name 9)5 ( It 4 I A A , (. v1- r-' -7 , c A 7i
Project Number L1 4 (I Test Date ' /P" C' 3 Pageof_2_.
Client (A J / .0 1,
Test # Material Structure TestLocationandElevationorDepthrelativeto... ___)ç ,.4_)
1/ 5 l )(A(//f:4(-@_ç17.
J I _çP16;3_
J .)_J _iSf-f-j L
/ c J _J..1_/57i- _J_J
'N J- L ..I J
/1 1'l J_,_/_/—&0_'xL_
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# /If if ,1 1
Probe Depth (inches)
Wet Density (pcf) / I' I
Dry Density (pcf)
Moisture (%) 0 'Ii 1 /0 c
MD Curve Number tA NAA tw11_ T4 /ij- -
Maximum Density (pcf) 5, ,z,, ii, /)_2'., 177 o /,?3_ 1a3o /i'-' I
Optimum Moisture (%) D 9.a Cf.0 q,) Cf._0 9 ,0_ q. d
Relative Compaction, RC 2 '3 3 1 9_/ q I
RelativeMoisture,RM (%) -, - ),. 1. J, I J,
Specified RC (%) u.4 (0 CfLD 4 4, D
Specified AM (%) ' .1___ 4 -
Conformance (Yes/No) 4_e5 V_s
Nuclear Gauge Model and Serial Number: C.-/7 1"3_1 4'_t)c-L.)
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: A _ .Ij_/ Signature:
Client's or Contractor's Acknowledgement: Name:
,
N(LLV4S.-L,signature: 4E'J
, White- Office Yellow- Contractor Pink- Field Technician
COMPACTION TEST REPORT
Curve No.: I
Project No.: 03-0455 - - - -• REcPEV'E'D Project: CiuiaLane-Reach C. Domestic Water - Recycled
Location: STA 14+50 REACH C POINSETTIA LANE AUG 1 5 2003 Elev./Depth: I Remarks: TESD NO. 9102
CITY OF CARL SIMO
$NGINIRINGDEPARTMENT
MATERIAL DESCRIPTION
C&J&J DIVISION
Description: LIGHT BROWN CLAYEY SAND
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%> No.4 = 3.8 % % < No.200 =
TEST RESULTS
140
100
90
Maximum
Optimum
--
dry
moisture
density= 128.5 pcf
= 9.5 %
Test specification:
- ASTM D 1557-91 Procedure A Modified
1REVIEWED BY: EHDMAGHS0UöÜ1
_\
DATE
100% SATURATION CURVES
FOR SPEC. GRAV. EQUAL TO: IiI *\-2.7
- - S 26
EF
- _
III
--------------
= = -
130-----
--
IIIIIII
-
120---
11111 III
-
aiio--,
--
80 -70
0 5 10 15 20 25 30 35 40 Water content, %
TESTING ENGINEERS Plate____________________________________
COMPACTION TEST REPORT
Curve No.: 2
Project No.: 03-0455 Date: 7/11/03
Project: Poinsettia Lane-Reach C. Domestic Water - Recycled
Location: STA 20+00 REACH C POINSETTIA LANE
Elev./Depth:
Remarks: TESD NO. 9103
MATERIAL DESCRIPTION
Description: YELLOW-BROWN CLAYEY SILTY SAND
Classifications - USCS: AASHTO:
Nat. Moist. = Sp.G. =
Liquid Limit = Plasticity Index =
%>No.4= % %<No.200= I TEST RESULTS
CL
(I) C a)
-O
o
140
130
120
iio
100
90
=
Maximum
[Optimum
dry
moisture =
density= 123.5 pcf
10 %
Test specification:
- ASTM D 1557-91 Procedure A Modified
-
'c jEVIE\JED BY: ;1EHR7DMAGHSOLtDLOU
?-- j DATE
I T4 100% SATURATION CURVES
- FOR SPEC. GRAV. EQUAL TO:
28
- 27
- 26
-_
-
-
..., -c -
--S
--
= = = =VA
- -
= = = -
\ = =
-
j -- --
-
- ..,
-
- -8c--
70
0 5 10 15 20 25 30 35 40 Water content, %
Plate TESTING ENGINEERS
t.
"-'. •rr'r," , I
Tes•g Engineers-San Diego, 19C. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 115-5810
REPORT OF COMPACTION TEST DATA
Project Name foA L M e ( IA
Project Number ô 3 0 4 -~ Test Date _ 4 1) 3 Page of
Client . 1' 77 of (M If
Test # Material Structure Test Location and Elevation or Depth relative to...
, S Lu jS(f Li.:. of 4 ii'L
I' j J s,J '
5 1 I U .1 , , / 5C * I of $ ' t)
3. 5 Ui 1 /'Tti( Li,I. ( Y1A1y I52i5o ', I' 1 '•
33 5 £1 It" 17cC1.
') S 1 i, 51f SJ5i./
Material: S = Soil, AC = Asphalt Concrete, ATB =,Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, ,W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other •. . .
Test# . % 3%) 33 .'3
Probe Depth (inches)
/j, Wet Density (pcf) j3 3. ( 1. 3 1 I ' l,i / 2,I
Dry Density (pcf)
Moisture (%) 7.3 71 7.1
MDCurveNumber VP
,i..PP) j'nPs) .. (,,ve (..,v,
4,V5
('--
Maximum Density (pcf) J, 123o io 103o ll7o I 7.o
Optimum Moisture (%) ,
Relative Compaction, RC (%) g g
Relative Moisture, RM
Specified RC
_____
Specified RM (%)
Conformance (Yes/No) './. 5
Nuclear Gauge Model and Serial Number: £ f/V 'YI 0 0 o ía
This report report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that havereviously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
A . .
TESD's Testing Technician: Name: i'Y) I/tn I Signature: '
Client's or Contractor's Acknowledgement: Name: tPI(LLItc144,' L.41.P"L.. signature:
White- Office Yellow- Contractor Pink- Field Technician
i._
0.
Project Name
Project Number
Client
Te g Engineers-San Diego,..
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
('
Test Date
r C,14jJ
oo - oss
Ci T;
Established 1946
t'c 4r-
- Page Of
Test # Material Structure Test Location and Elevation or Depth relative to...
() 5
7? S J 155'
ioJ_J
$ s ______ ___L__
.1_J_ 15C -7oop/.,JL
fl_I_-f-O()
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # j ?C
Probe Depth (inches) " j 9 9 ç7- cy
Wet Density (pcf) Ohl ')i .0 j _? I_R 0 G. I_). 71_2 3 /? 17'i_.7'
DryDensity(pcf)
Moisture (%) (t) _' 3 , q X /1) _ / /,).3 /0 S 1/.
MD Curve Number
Maximum Density (pcf) )') jLJ /$( )7_ 035 /)7. /23S /27
OptimumMoisture (%) $ c , q,_$ /1)' /0.0 /).0 /) _() /c) _ I,).•)
Relative Compaction,RC (%) 9_ 9 q cj , ,, 9,, c
Relative Moisture,RM (%) t',(D t 31,
Specified PIC 2j q_0
Specified RM (%) 7" 2 -)- -± . T,)
Conformance(Yes/No) ()q I_c ) /_J )J "1_eS Ye ll 1 4C
Nuclear Gauge Model and Serial Number: I_A1J /0 9 21)5z ?
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that havd"$,eviously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: A .lit / Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
/
4 ,
Testg Engineers-San. Diego, I . Established 1946
.7895 Convoy Court, Suite 18, San Diego, CA. 92111 .. .
[858] 715-5800. Fax [858] 715-5810 . .
REPORT OF COMPACTION TEST DATA
Project Name PU' / S é 774 L A
Project Number 0 3 0 _$• Test Date , - . Page of
Client. . . . C ; y .
h J. ' . . .. . ...
Test #' . Material Structure Test Location and Elevation or Depth relative to... . .
35 fì I )i'57ee/ 1,-ti. c
3 Sf 1I /'5c7 ç4 ISbo ., J. Ji•• J i
.SJ' I ' /. S<iA
11
i ~57c:
5?5O
4D 5 L,
41 5' '/
ET
.
Material: .. S = Soil, AC Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS =Cement Treated Soil.
LTS -'Lime Treated Soil, 0 = Other . __. . . . . . ..
Structure: P = Pavement Structural Section, ,F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other, .
Test# . .•. 9
Probe
3,
Depth (inches)9' 7.
WetDensity(pcf) .
1,93 -)
.(_ ;i
DryDensity(pcf)
.2) '2L r f7
'3 )1'.9 I1!.' iiL1,Ct 1u
Moisture(%)
MD Curve Number / ' 4 l)' s,1.'$ ' r' 4
Maximum Density (pcf) • j I) Y / 3(? I I 'a)-. S / ç-. ç
Optimum Moisture (%) • . 9.0 2.0 9,0 q . q S , S
Relative Compaction, RC (%) '3 4j g . . i
Relative Moisture, RM (%) C. 9- ' — L Li ,
4r (, '
Specified RC (%) 0 90 '9 o Qo 7 O 9cD
Specified RM.(%)''
Conformance (Yes/No)
JP ( 'S
Nuclear Gauge Model and Serial Number: CPA! 910 f _•_____________.
This report does not relieve the contractor of their responsibility for performance in accordance, with the plans, specifications and applicable
codes. The contractor is 'responsible for scheduling retesting of reworked areas that have pviously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Teôhnician: . . Name: 'V?1 i( T Signature: L'1IL,
Client's or Contractor's Acknowledgement: Name: ILI . L Piji_ Signature:
:1
White- Office . . ' Yellow- Contractor . . . Pink- Field Technician
Teng Engineers-San Diego,tc. Established 1946 c, 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858],7.15-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name P0 5'c L A e L
Project Number ')\ O () ? ' . S Test pate . ) 3 . Page 2. of
Client c. / (a" /; eJ
Test U Material Structure Test Location and Elevation or Depth relative to...
S4 LJI I'_cref /_-rA_,__119 çD L'e/Q1'//jL /
45 ç t,ii
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 4~
Probe Depth (inches) 9 1'
WetDensity (pcf) 03(:; I"). 125.
Dry Density (pcf). )_I 2 /_/ C.I
Moisture(%)
____ 3 ____ ____ _____ ____ ____ _____ _____
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) c3,z,
Relative Compaction, AC (%) "
c0 9
Relative Moisture, RM (%)
Specified AC (%) C)0 3
Specified AM
Conformance(Yes/No) '/ _ Ve c i'
Nuclear Gauge Model and Serial Number: ,41 5'/i)qc.'5 z>
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: A'-rL,-j _/4 l/# / Signature: _
Client's or Contractor's Acknowledgement: Name: V -L.tC.4 (LPtfrZ._. Signature:
White- Office Yellow- Contractor Pink'. Field Technician
Teng Engineers-San Diegoc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111,
- [858] 715-5800 Fax [858] 715-5810
S REPORT OF COMPACTION TEST DATA
(1 f(Lti7 t -r Project Name __________________
Project Number 3oo3— b* S5
Client C444 O (,
Test # Material Structure Test Location and Elevation or Depth relative to...
e 1k4 4 .c-+tc'r Polo cp,.. L- cLM. 11
_pL
Material: S = Soil, At = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure:. P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Established 1946
t. nq, wit IV, -
Test Date Page :. of .
Test# 4-7
Probe Depth (inches)
Wet Density (pcf)
______
Dry Density (pcf) O n
Moisture (%) l .3 9',•) _______ _______ _______ _______ _______ _______ _______ _______
MD Curve Number I _4ii4,
Maximum Density (pcf)
Optimum Moisture (%) 9 9-0
Relative Compaction, RC (%) go
Relative Moisture, RM (%) . 0
Specified AC (%) ü0f jo y.
Specified RM (%) . 4411 ± '/
Conformance (Yes/No)
- i'r f33
specifications and applicable
meet specifications.
Pink- Field Technician
Nuclear Gauge Model and Serial Number.-] lrd)(Je. r 14 30 33\p I
This report does not relieve the contractorbof their responsibility for performance in accordance with the
codes: The contractor is responsible for scheduling retesting of reworked areas that have previously fai
See accompanying Daily Report for description of work and observatióhs.
TESD's Testing Technician: Name: - Signature: -
Client's.or Contractor's Acknowledgement: Name: ,
V'I1LLtAAL\ L? Z Signature:
White- Office Yellow- Contractor
"S.
Inc. Established 1946 4 Testing Engineers-San Die
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715.5810
REPORT OF COMPACTION TEST DATA
Project Name P0 / 2
Project Number Op 3 — O T--- Test Date_9' 2 ' Page of
Client C,' 7V o I /
Test # Material Structure Test Location and Elevation or Depth relative to...
/ ) )5Yi-$ r,i ,J 5XI
LI 70 LIA Ye r ('i /çi( ) i4 D f4j ft
S i 30c.'(,'e67j) (0 12J rA-if
5 I J Li I 3" S1e / GJA 7/ / I, R 74 7,)rl 5 3i I-?7A J
?ô" c7,/ icic j)L1j;,r cI t
54—----
N
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 5 tc 5
Probe Depth (inches) 9' ' 9_ ) '
Wet Density (pcf) /)C Q119 /(2c?f 09.c1 /27.7
Dry Density (pcf) 11 I Ow Ii Ii ' Ii "
Moisture (%) , 7, I J>. 3 V' .5 'i. 5
MD Curve Numer
"
Maximum Density (pcf) I 3. 1.) 7 1) 3. o / ) z,
Optimum Moisture (%) p7.,, , Q, ,, C1,
,
Relative Compaction, RC (%) 013 c '1
Relative Moisture, RM (%) - I 1, 9 - 5 -i s
Specified RC (%) 9
i
Specified RM (%) ± ) )
Conformance (Yes/No) v s / e ç )' C S / 5 /
Nuclear Gauge Model and Serial Number: •
/'1L' C/0,, 5' ,,
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Nam'è: ip. '1 44;),4" Signature 2 \ /
Client's or Contractor's Acknowledgement: Name: Lev, Signature
White- Office Yellow- Contractor Pink- Field Technician
:
I-
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name /,,f,riT74 /41. PI17'z ,
Project Number !'Ioo Test Date Page —2— Of ,
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
'DtJC.Qrr. _I 06*us40 L44 Sl.OeWAL$ S.t.
1Sru31.* StD tSo+S'o -
4EM %%a 4,gen,-
lm tsi* -
vA %4-óO -
5 -
161*00 p
-5-m-.
Material
Structure
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
Ii = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
_ 214 3.1S21, .
Probe Depth (inches) /1% 611
Wet Density (pet) ia''' 1213 I11PI 1-11015 INA
Dry Density (pcf) I'%i (J 111 S, Illo I tt.'I t3, 1
Moisture (%)
MD Curve Number
Maximum Density (pcf) V13 .1; 1 .•5 2.s
Optimum Moisture (%) 04 lo- d I04 10 4 Ick. $1
Relative Compaction, RC(%) g4I ' cl.3.i_ qA5 n.'4
Relative Moisture, AM (%) 4- 1,. # +44A < *.U
9o4 Specified RC (%) 'o4 qo# go, q04 D4
Specified AM (%) ± 2_ *'2= ±.z *•~. -* ±
____ ____ ____
Conformance (Yes/No) J ,/
Nuclear Gauge Model and Serial Number: '7.)(L F' '1/J-.8j 5't)2. ' M&
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name:' #Jtf c.Loi.&J9,E Signat Vie
Client's or Contractor's Acknowledgement: Name: . Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name ,,#Ve777il LN. e7'¼49 (.
Project Number Test Date gaA,— 0 3 Page _2. of
Client ^01= L54 j
Test # Material Structure Test Location and Elevation or Depth relative to...
_ s ,sr'A i.J 9i,VO J4L4. ia--S6 Si3 /Sø1-t'c r S Sc
i_ sc 47 1k
Material:
Structure:
S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 11 o all 222. 123 22'-4
Probe Depth (inches) (ØPK ( If e" I I
Wet Density (pcf)
Dry Density (pcf) i!Li I 123 itc._ t'.'3 lis.
Moisture (%) (I5 %.(9 Ii fO 99 49 o.3
MD Curve Number
Maximum Density (pcf) 123-S 1 UPS IIA5 113.1i 12.3.5
Optimum Moisture (%) /6 iøi' 4 to. ci' Iô, d, jo4 lb.
Relative Compaction, RC (%) q34 '%,(p qq,g cto q& T ?.S q 3A
Relative Moisture, AM (%) + Ii +.6 4. 4•c:j 1.2. —.(,o 4,1
Specified RC (%) jI 'io.# '7o4 qo. Iq
Specified AM (%) ±2 t2. 2. *2... t t 2.
Conformance (Yes/No) '?Y %_2 'S 1 I '
Nuclear Gauge Model and Serial Number: 3*4fl -.g /
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reforked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician:
Client's or Contractor's Acknowledgement:
White- Office
Name: jiL 5 Lo1JP.JE Sign7t(re:
Name: '4 I-t.aks.-.. L2/7_ Signature:
Yellow- Contractor Pink- Field Technician
)
11tfrT$ '7 'S F
\
TestingEngineers-San Diego;.J-nc.' EsbIished'1946,,,
7895 Convoy Court, Suite 18, San Diego, CA. 921.11..
[858] 715-5800 Fax [858] 715-5810
'
REPORT OF COMPACTION TEST DATA
1
Project Name 4U - ,2.4dJ
Project Number Test Date Page _±
Client d#r o I2i.S49/2
Test 4$ Material Structure Test Location and Elevation or Depth relative to...
tr towv
5
ii I i. LñSTAp '1vt' 4i*ø/' /c.i 4S.0 gaS4
/,Y 1 ri d,',v,' ,d.,ft9 /c3 ,'c EL ) 4
It
lIZ I14 /-Sr AofilWd 1440fr'4- EL SG
1ii3 I '' n'14hWpie /S"5o
'JA /QCES r. I
E$4
1900V
:
,.,c-•
_______
_-
Material: S = Soil: AC = Asphalt Concrete, ATB = Asphalt Trated Base, AB = Aggregate Base, CTS = Cement Treated Soil ,.
LTS = Linie Treated Soil,.O = Other
Structure: P = PaveméntStrucfüral Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, '
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
'4-.-
Test#' .• _. ;' W ilt 112 12.o /3 I44
Probe Depth (inches)
. \ g'
__ r " 'r"
'''
r" '
Wet Density (pcf) 2
Dry Density (pcf) • /, /?'/.8' 3,3 /o3. / 1.29'I "'1 '221 h2.'3 _____
Molre %) ,i/../ , o- ice 11.9 1, 3 /é. /0.3 ii, 'I
MD Curve Number
Maximum Density (pcf) f 7$ f f5 /.46 IAV-51 1.2r,S '5 /vV'Saro s
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC
SpecifiedRM(%) -12 2.. ±2_
Confonce (Yes/No) I f5 3 frit-25 WS1 A/I) V6 Yes 5r'5
Nuclear Gauge Model and Serial Number: - ..
This report does not relieve the contractor of their responsibility for performanceLin accordance with the p specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areasihathave previously failed to met specifications.
See accompanying Daily Report for description of work and observations /
TESD $ Testing Teciictan Name,
l
Client's or Contractor's Acknowledgement: Name: '' . Signature:
1 t -
l' White Office Yellow 4,tontrct& Pink Field Technician
. ;
"-
Testing Engineers-San Diego, Inc. i Estab1ihd 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111-
0.
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
- Project Name
Project Number /O . Test Date _/1 Page of
Client j / 7k' .
Test # Material Structure Test Location and Elevation or Depth relative to...
i A P Po4flr-/F crw /750
,f I LJ. 1E.ftSf 6O/NO OV1W. zi:5
cr 6 o
sc___
1$'NSt 5~107V _41W-0
i-M .S' ?9f7 IV,P. R s 4 y
A b,.'-ft 17 J4 ,i) 3T #',V SUTh' C4I
___
1
/5', A
'or
tL-q.. ci-//'l 5O ___
77A_Led. 93r ,,
Pro=
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
,- U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 =Other
Test#
!Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
' JVo.3 L'ii /VJ /9z ' LL3L2 11/0./ AleS 1390 3
Moisture (%) 3'' 4", ,.b 1,1.2
MD Curve Number
Maximum Density (pcf) ig7 JL/, f 1114P /3 106
Optimum Moisture (%)
Relative Compaction, RC gg
Relative Moisture, RM
4p;, . 1yØIrgy T, 2 9V
Specified RC (%)
. 95.' 5 9 5. 9 5 95
Specified RM
Conformance (Yes/No)
- Nuclear Gauge Model and Serial Number: 961 "
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
- codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: Ai#,ie&J
Client's or Contractor's Acknowledgement: Name: LLttA-.t. Le Signature:
White- Office Yellow- Contractor Pink- Field Technician
I .. .7 - -
.
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name F t M~EPr1A Jb.rJF E1& ,
Project Number I 003 Test Date % - 0 Page of
Client C. I1V • p(IA 10
Test # Material Structure Test Location and Elevation or Depth relative to...
Fot,E"r'A .I4. t3bUNO NsU*3 II AS j -2. si e4
Ib2— A€ C. 'ro n.3,Err1Pt L*4. s-r Bø,o . c.s- t5t-o ON I44. ST '0 t4.c4& '3 A e 5:_ 1 a -4 s11 t2-'co
Ibq Po' i-iF Lh3. EPS-r ou ..b . €it1b
kf, Sv-rk ISc
lbs AG
_
P6St4SE'rv,A f.'N. i- S' OtJAIl p4 Aa Iry +SO Fos a.3.scrr7iiL.4v. sr AiZ —w&4 -4V- Ca'(4
iq
A / ov Strr,A I- N: ST 430GI1V9 Al.
''" 5L
Pa'N3C71,A I" &sr 1N 4/. ci.t6
_ flI 1S3 4-o
i
___ _
c. Pøi'i# A' i%' Al £'i6 S' 50
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P #Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
Ii = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 16/ IL.(/
Probe Depth (inches) 41, / ,_/l 4,/I b " Ld 1' 6 ' i,', ./' -•
'
Wet Density (pcf) ivi /iJ(,j,.. /&/ /t-/( /yç"
Dry Density (pcf) j'.g jyj4 ,qo.0 ,9a.913Ct. R lqi.lt jqo. - 1'//.$ /go.'- !i/,L/
Moisture (%) 3,3 3. 3 '- ?-4 351 5.5 9.9 Y -3 3-4, 3
MD Curve Number -! 3 ; 3 1
Maximum Density (pcf) Jg4 146 411 1 416.4 i• 1U,.4 t'j *,146.4 1g,'.4 19,6,4
Optimum Moisture (%) q ç. s c c
Relative Compaction, RC (%) q. q31.5 q- 91 /1 q6c 9 3
Relative Moisture, AM (%)
Specified RC(%) 45 ' 97 57 95
Specified RM(%) ± 2 ±2. *2 *2. i'— ±'z. :17 ±z.
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: I
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: 7,n pJ/pt 14,E' Si e2 -
Client's or Contractor's Acknowledgement: Name: WaL(Jon..'i. Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA.
Project Name -en
Project Number /6o .' - Test Date 1/ - Page ... of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
p,4$7,-/4 j. &7dr Ia A13 S 1 4004So
i•3.' A sc. .
/g A .J
sri' I x-So
• . . 'OSEfl't A I.* s'r Jp)D ¶ - ,.g /Lit3 m 16 A-So •
/5 A. -
. I Pou.jcrri.A. fJJ. A3. Boci'JO ALA
iPfli J. uJ• j3,D .
10--.. 3, t,
PoM5UrIAPJ. tA3. 43.DCJ tJ P 5cJ'-.
sm 1S3i-5
/3A3 ,4, 3c s- IS +
/O /1d C
,t.cr,-iA tj.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, '
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other .
It
Test# 142 fl3. ,g\ 1 IS —/4,kp 171 14V I-EV7 do.
Probe Depth (inches) ,d) 1I (I) ,fl ,1) 1' (off 411 411
Wet Density (pcf) l54.3 J97'c
Dry Density (pcf) Ig4 Jqg3 /go.- I'll I lghs- Jgo. I'I .
Moisture (%) 1/., L/.9 3#1 3,g, .1_ ' c.96 4.'!
MD Curve Number 3" 3 . p 3 "3 3 3 3
Maximum Density (pcf)
-- iq&.46 /'iad ,'i&,4 p/4 ,L/6 /VØ' iq4 I'ii;ø
Optimum Moisture (%) 5:46cd s4 'rag <4 1 d c. a
Relative Compaction, RC (%) q L3 ? 94l y g,
Relative Moisture, RM (%)
Specified RC (%) g jç ç c 94 95 ,l_ 9ç
Specified RM (%) . + ± i. a t 1 2. 4 1
Conformance (Yes/No) .( Y ç' y.
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor of their responsibility for performance in accordance with the'plans, specifiations and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: PA,.H€1. 5,.
Client's or Contractor's Acknowledgement: Name: Signtur:
White- Office ,. - Yellow- Contractor , . Pink- Field Technician'
-- -
Testing ,Engineers-San Diego, Inc
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 7155800 Fax [858] 7155810
S REPORT OF COMPACTION TEST DATA
Established 1946
Project Name .PoM/5E777a4
Project Number Test Date /1 ID Page s. of .
Client C,71" J C.'ifL.Tt
Test # Material\ Structure Test Location and Elevation or Depth relative to...
l ow/ to*JMO c. c.(& -VIM
1
X5" 9951
/7'.. AZ SC
/13 44,4. L'.',) owD . sm sg4-ç)
/8"?' k' •
Pet g, ..) .
S1P t#
/c -ftB Sc Pøip.s,SErn IS Ioh1'ia0 o #sø
fb ,4 St17)* LJ'4. t-' 6oti'JO P• C4lR.
ott4SEarr LP-3 c3oitJ.p
Ar AS jbi r'rn LN.
15C i. .ocJ&1D N c, 6
b ,4rn4 , jo ,j• S .35 J -> 5ilt . I 3
ot71
/
154 LN. *J. B°c.. +50
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# / If 5' jq 1410
Probe Depth (inches) b II (lF ,I1 II
Wet Density (pcf) 1q95 igo, I 1q;, pp.1 /j /f• ( I'/.. 2 /4'Z,3
Dry Density (pcf) /i4, /)b .8 i.s 11 3J /W.( /4/0,3 /,1o4 //ô.i)
Moisture (%) 2- 1 5 /,4, ç ç 3 .1,q
MD Curve Number 3 3 3'
Maximum Density (pcf) /#4,. j 111.1,4 P/4. Vb.1 /4ji /l44 li'IL,.a
Optimum Moisture (%)
Relative Compaction, RC (%)
Relative Moisture, AM
'p;,
Specified RC (%) 95' c7 q5 9 `1435"
Specified RM (%) 4 2. - - ± i* '±2= - . +2. ±2-
Conformance (Yes/No) t.j.7 4/ LI (1 (yF
Nuclear Gauge Model and Serial Number: '
This report does not relieve the contractor of their responsibility for performance inccordance with the plans, specifications and applicable
codes. The contractor'rsponsible for scheduling retesting of reworked areas that have previously failed to meet specifications
See accompanying Daily Report for description of work and observations. -
TESD's Testing Technician: Name: Mi/7. 5. L. ,n.iC Signyr1'2
'
Client's or Contractor's Acknowledgement: Name: V'J '(-J L.t.Y'ui Siture,: /
White- Office . ' Yellow- Contractor — Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name ,asc1 7flA Lj. E?2cd1 ?.
Project Number SIOO'3 Test Date 11-116 Page 3_of 3___
Client (/7-V O,C A-PLLS ,414D
Test # Material Structure TesVocation and Elevation or Depth relative to...
s 4)L L/'J P S7* sb-f-9'4
s_ '' "7°
_193 p 02 5c
i —rn,'i 4,sJ. p
156+'a
%1 f412
po,sJs5-7,-rn (.N. frJ, .aa'V /V• YP? /-ic
f% # Po,i6-7$ Liv. J. 5oi.' c.'g.a 'rq i-Cj
At3 ,
'—
rot ,J %V A. IJJ. 13 fo jNO N. c. 4 ri /604-60
/19AA P0 POI 74 '
- ,
/q' A sc b iN$'Y71i?- ,ô #50
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
_ -. /9y Ar. 19r L9I
Probe Depth (inches)
Wet Density (pcf) 1m3 !.'i !, /4'L.8 /W.2 /W /'/5-S J'/62
Dry Density (pcf) /I?.2 LQJJ I'IO1' /2.5 /gi.' 131.2 /'Jo.2 jq 139.8.
Moisture 4,3
MD Curve Number / 3' 3 3 73 '3
Maximum Density (pcf) /,5 / '/(p. ji/,, jq,, IVb s ,Lis1q10.4 lqh J
Optimum Moisture (%) 9.5
Relative Compaction, RC (%)
Relative Moisture, RM (%)
2. 923 943 9. 29 ? I 9si1 96. A i V.
Specified RC (%) 10 95 qc.' qc 5 ç 951
SpecifiëdRM(%) 2.. ±2.. ±2..
Conformance (Yes/No) V.
Nuclear Gauge Model and Serial Number: '6/ S
This report does not relieve the contractor of their responsibility for performancei'n accordance with the plans, specifications and applicable
codes. The contractor is, responsible for scheduling 'retesting of reworked areas that have previously failed to meet specifications.
See accompanying DailyReport for description of work and observations. -
TESD's Testing Technician:' Name: Signat
Client's or Contractor's Acknowledgement: Name: tEi L Lt i&jftA Lctui_. Signature:
White- Office Yellow- Contractor Pink- Field Technician
JI - .'. .. .'. . :. .• . . - , . -,'. . -
- . Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-810
.,. -I. REPORT OF COMPACTION TEST DATA
Project Name Poa Si--t 0, t A - R4CM C...
Project Number S100 3 Test Date — 0 3 Page AL of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
i ct .&) t3ouJ0 3j
__40V& -Vript_ U') ,.4 l3iJt'JO oun4 ) 4 ••
ILl, POt4S -rn#r j.%A %,.J JtJO ZtOUTh JU.
5.4 STA /5sH,5 C INSCTTI*
.*
Lri 1..,) 8su £.? 50f)rrf WL8
4 e-
j.,j.aarno So.1774 c.i.c6
fj'pi$g r J (.J. do'/'V.O
• 'J'
sa.'nl
5* 6.."# N.aj/ e.v,tô Ez 1-
S f AA,r.*'rn4IAJ. AJ.
*04TH 4/As
132. 5 p g J. jy /5V4 so
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil,. 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# /2V / i - Z.2 ia' /3/ L3L
Probe Depth (inches) " L" h" 6 o il
Wet Density (pcf) 13.2 M? /'.' jgi.<. 1c, 1 133 1117 *5 /30 /g,
Dry Density (pcf)
-.- ifl: 12.1,3 ,j,t/ 12.2. /23,5 /2h,.'1 /0 i.acs'
Moisture (%) 11, 44 //.'1 /0.3 ,/ 4?,q 11.1 9,15 3- f, 2.
MD Curve Number
- / / / / / /
Maximum Density (pcf) /7•5 /fç /.285• /S /a2c i:.c /gç ,.iv /1
Optimum Moisture (%) 5 9, 9 _ 47,51 9.5, 9. 9,5' *1,5
Relative Compaction, RC (%) çj i4i '5./ 9 3 '?
Relative Moisture, RM (%)
pecifiedRC(%) gç q a)$. qc olS, fS 95 9c
Specified RM (%) t_2. t2. 2. 1 j 2.. 2 *2 2.. 2...
Conformance(Yes/No) '1. IY tt' ' 4..ç' 4*.# ly' /
Nuclear Gauge Model and Serial Number: L1_.J-9#V
This report does' not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling. retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: 5.Lo iAZ ItSignature
Client's or Contractor's Acknowledgement: Name: ' _______
/h7
White- Office Yellow" Contractor Pink- Field Technician
09--
Testing' Engineers-San 'Diego, Inc. ' Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
1 [858] 715-5800 Fax [858] 715-5810 -
REPORT OF COMPACTION TEST DATA
Project Name 'e,,.sE'rri,4 L.4 'I
'
Project Number r/00 3 Test Date //-- o k.
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
133 5 s-r 130i.j,.iO Po$Se'Tfl PS I,). EL - S. Gr,, P
si- i/,V# po,v$'7?7,9 L4/.
/3_"r 5 P 'm /,6z)+5'0
P f4r4w -. Po,'Jerri4 LN ç
SC. J3 3 '
eAN6 ez-. sm
/3 '
?Qrc,,1O Sc.
,4svNs#rA 4/. jpi '/A
13 0j. cc... ...
"" Ii
.€. 7I /SV"oc.'
j40 '
E0S1L1McJ i'.9M'j77?A L sJ. Ji7/
sç_. of4yatoolvo 4v3Jt7 L.1t' J.i,rH ciA4
-,. ,r "Oo
5C_ e'-' ,# Thn- W. 641 EL-c,4 J1
FA
,..Material:
Structure:
S = Soil; AC = Asphalt Concrete, ATB = Asphalt Treated Base: AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities/W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # '_-. /33 / . , , , ___ 2
Probe Depth (inches) , T" 4 ,1 T' r' " it T" FII II .lI
Wet Density (pcf) /3$2 /34. 134 1:7-V9 139.3 /37,71-34, /31,.9 /3'! i .!
Dry Density (pcf)
-
/,y9 /3,3 /a3.I ia9 /13.1 /3' /2'/;2 I?J.(o 1,24-1 1 /3.3
Moisture (%) V. 1 /Ø Ii. 2. lo.3 /* .'9 1,5 9, /6. - 9. / -.
MD Curve Number
Maximum Density (pcf).' /fl. c ',.s /1343.S i,s /i3 1-ITS
Optimum Moisture (%) 9• ' 9,5 9, ç. 9, 5 . 5 9, 5 , ç . 5 4.5 9-5
.Relative Compaction, RC(%)
.9L qs9 1c g6 96.3 .12,7 9&140 %. / %.
Relative Moisture, RM (%)
Specified RC (%) 95, gc, 96*. 5
SpecifiedRM(%). J. ±Z ±2t ±2 2.. 2 ti.. ±2..
Conformance (Yes/No)' .9
? • fr' ( L1
.f (
r.( iiy1
Nuclec3auge Model and Serial Number: ___________________________________________________________________
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areasthat have previously failed to meet specifications.
- See accompanying Daily Report for description of work and observations.
01
TESD's Testing Technician: Name: PofolleZ X i.a*'s2
Client's or Contractor's Acknowledgement: Name: Signature:
White; Office . Yellow- Confrtor Pink- Field Technician
.t4* 2; ., • r - -
£So Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST-DATA
S.,
.
Established 1946
)Project Name I
Project Number
Client
Test Date". Page 3... of 3
Test # Material Structure Test Location and Elevation or Depth relative to,..
n ?0/4$tC'7' 14V, ROVV 40S4.
jqq s p IWJ
P '" ". 4". Y" " '
, -5.4 ,-,i ,c 4(1C)
. p POVAO
i q-
j ? pe7—r,*
" . 4
6 p ?/v5 -M s.'v J• 9Vv' eq
,, 't7 /f/ +-0 a
;r A 44
.
2 i 7-7#T LI" . S
.45!S4
i- ,,N5ET74 Ls0J 4J. v",i#'5O JG
Silks p ft -rri.4 AFL Zs:r,
Material: S.= Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Bate, CTS = Cement Treated Soil I
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ; ,yy LY~I /4's' /'- jg yg 1,50 LL /52
Probe Depth (inches) V11 f'f' 711 T" T" 8" spit
-
Wet Density (pcf) /39 135' J3 JJ.4 13 l3'/. I 3S 436 g 135',2-1,37,1
Dry Density (pcf) / /22.9 /2 'j/2 tai* I23L/ I'S3 j it 5 19m ' 1a3.' i a3 .
Moisture (%) I/3 /,, t.. 9,9 g, 1 At/ v4 too 6 II. 2-19. 2. IS
MD Curve Number
Maximum Density (pcf) 1Q4 hV1 /27.5/t5 11_.49 /f.5/).t15 1)9.5 1,21.5
Optimum Moisture (%) 9,5 q, 5 ff, 5 g, ç g,ç 9, 5 9,5' q ' g,'
Relative Compaction, RC (%)
-- 9' 94 9f' 95-
Relative Moisture, RM (%)
Specified RC (%) 9' . qç 4' 9( 45' gc gç
Specified RM(%) 4- ±2.. 42 t tt 44" 4'2
Conformance (Yes/No) V "
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
.-
TESD's Testing Technician: Name: !,.,'Z'b Signatre"
Client's or Contractor's Acknowledgement: Name: tM I LL(I'1.- LOW Signature:
White- Office Yellow- Contractor Pink- Field Technician
- - v;
-
Te g Engineers-San Diego,o. Establishèd'i946 11
- J 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name A/Ml SK 7Th4 /A 427L4' e
Project Number /.T Test Date 3 Page ..
"OL_ of
Client
Test U Material Structure Test Location and Elevation or Depth relative to... -
o3 i1/ 11 QV"Ac~ #tt 7,49D,.S &.3i,c'
__ AlL ..•.. p I
S jiL 7' '4 ç al
--
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backf ill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# ol/6265
Probe Depth (inches) 'SI 1w" 8'
Wet Density (pcf) 13S 1344
Dry Density (pcf) I3. (' JL2185.2.
Moisture(%) /o.' q..
MD Curve Number
Maximum Density (pcf) )5
Optimum Moisture (%) 9_g=
Relative Compaction, AC (%) 9& _2. 4k
Relative Moisture, AM (%)
Specified RC C) 519's
SpecifiedAM(%) ±2. 43 ±2..
Conformance (Yes/No) 1'
Nuclear Gauge Model and Serial Number: Sii_. _
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations. *
TESD's Testing Technician: Name: ZM4&&Z S
Client's or Contractor's Acknowledgement: Name: Sigrture:
White- Office Yellow- Contractor Pink- Field Technician
M
Testing Engineers-San Diego, Inc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name /b,1v5c7774 LIV. ,'E2Cdl/ £.
Project Number .' DO 3 Test Date 11.2 V' 03 Page j. of
Client / ,1."
Test # Material Structure Test Location and Elevation or Depth relative to...
se 5Th IOøO
SrA 1914 COD El.-3,39
Z01(S StA i 5p +o &.- 3(o%
ocri S st sr & I + So EL -
.i -co sc-
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # .20 & p6 110
Probe Depth (inches) (t _k11 II
Wet Density (pcf) gp,( taq:L iaot 3 I30.5
Dry Density (pcf) II.I )tfs"(Q I%S
Moisture (%) , I '3 10 ' o?
MD Curve Number
Maximum Density (pcf)
Optimum Moisture (%) 91 9,' Ill-115 c ç
Relative Compaction, RC V6.2. 451/, / 'a i/ g2
Relative Moisture, AM (%) fl ,(o ) j, t "I " 3 3
Specified AC (%) ô 9 0 0 O 90
Specified AM (%) ± ± 2 '1.. 1 4-2- * I
Conformance (Yes/No) V I Y I 1-1' I ' I Y ,-
Nuclear Gauge Model and Serial Number: 1RMU.t'& 7901-8 i 4 103 '5 /
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: 4A/f2. r, 11""Ve'sicinaty
Client's or Contractor's Acknowledgement: Name: '&h L.L'St-i LO412..signat'ure: t1./Il&AI.t
White- Office Yellow- Contractor Pink- Field Technician
?'
Testing Engineers-San Diego Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name R,#A'E7fl4 I4' AEIIJ
Project Number CD 2 Test Date /1 /9 3 Page of
Client c 7"
Test # Material Structure Test Location and Elevation or Depth relative to...
bO -<-- IL 4' f 0 S,k 6 '- '
j S iL is ELtokJ
r1b2_ IS WL 4, sm SO,'°'
.
,
I
L
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Othe"
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U =Other Utilities, W =Wall Backf ill, SC =Sidewalk, Curb/Gutter, 0 =Other
Test #
Probe Depth (inches) it g.si
Wet Density (pcf)
Dry Density (pcf)
._ /23:E.L1J± /.22.2
Moisture (%)
MD Curve Number
-.--
'
Maximum Density (pcf)
Optimum Moisture (%)
Relative Compaction, RC
Relative Moisture, RM
Specified AC (%) $_
Specified RM (%) 2. -2.. -
Conformance (Yes/No) 'f" ( t1,
Nuclear Gauge Model and Serial Number" b/3'
. This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
- codes. The cótrac(or is responsible for scheduling retesting of reworked areas that have previously failed to meet. specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name: 2.o_3 Signature: '.0
-
White- Office Yellow- Contractor .—Pink- Field rechnician
tin, gE'ngineers-San Diegnc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Po1 reA LAe R
Project Number U7 3 —0 ,9 .5' '.S Test Date
C) - U -3 Page of
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
53 S (.') Lrf11' _(c -re ,./)--#--r.'i ISotoc_"z..1r;I
L'A-t I,r,°(s —1 t /)2Pr otis;
—55 S i' c-i _I S,-r
5 S (,i/ c-7-I o -S '3 17
5 S (A/
5 (l r—reJLi_tIie
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 5 4 MI A 5 S'
Probe Depth (inches) 7' r ' Z( 7
Wet Density (pcf) 00 /;1,, _ 7 )9 J) /)9'
Dry Density (pcf) I03 /179 I1' /)5_ Jj4_J //(..1
Moisture (%) .I 10,_ /0,!
MD Curve Number
MaximumDensity (pcf) ~ )~' W5 I) 5 /? C c j
Optimum Moisture
Relative Compaction, RC (%) -q_/ 9a c/o
Relative Moisture, RM
Specified RC (%) 5 9 0 '30 ui 9_o
Specified RM (%)
Conformance(Yes/No)
a E~: 'I , Yes Y es —
Nuclear Gauge Model and Serial Number: Cf/Il 5I '5'C)d 5 0 .2
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: /Y)1//r Signature:
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
t..
Project Name
Project Number
Client
,
T•ing Engineers-Sn Diegc. \
7895 Convoy Court, Suite 18, San' Diego, CA. 921,11
[858] 715-5800 Fax [858 715-5810 715-5810 - - . - -
REPORT OF COMPACTION TEST DATA
paln5'e-frA LA /''-i
3 Jest Date /0 / — 3 Page _2 of
(1'y ol CS 15, 4.)
Established 1946
Test # Material Structure Test Location and Elevation or Depth relative to...
. .
_ctref 1 p>tiS CJ21,4
S-7 ; 1 51 L, (
- - I V V, - t• P 'X
_ F
I Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB =Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Stc Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Testi
-
_
- Io,
Probeepth(inches)(.
Wet Denity(p9j)"—'
dryDensity(pcf) _ ;4 Lily IV7 .7 Ii1.-
Moisture 1_3
MD CiiieNumber
Maximun1 Density (pcf)/).5 1)8.
OptimumMoisture(%)'I C
Relative Compaction, AC (%) f 9
Relative Moisture, AM
cii o go
Specified AM(%) - T' .1 '
Conformance(Yes/No)( '9_eç f ,
Nuclear Gauge Model and Serial Number: Cf_A)_9 /_I_,5' 0 )
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for descrStion of work and observations.
.\ TESD's Testing Technician: 'Pane: ._vvi'_. _.i_,,fli'ignature: 1L11_
9
1'h1if
\Cllent s'r Contractors Acknowledgement Name W (.t( 'r' ____2_ Signature
White- Office " . "tYellow Contractor Pink- Field Technician
'
)
(*
Termg Engineers-San Diego1c.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax (858] 715-5810
Established 1946
REPORT OF COMPACTION TEST DATA
Project Name P0:,Se-74rn Z Ac)e IQ to ck
Project Number cj 00 3 Test Date I -0 3 Page of
Client C1i ol
Test # Material Structure Test Location and Elevation or Depth relative to...
S 3d"_o/,S_c'1-714I_ir_51,r:'53i'-/t,/c/,'it/
( .S LAil )S _/L L%
7 S (A/I 9o"c1jrr '7w1i/C' _S1t_90 .
69 s g-
O (AJIcf S.1',S147 5.?-f-/_i.
/7
7- 3 LiI 3''L.i c_i_(1\(/0,kf.yt _51471i _Y-,-?o
3 5 L' ?)t'I S tt,71t1._(.L/ _y74,.1 X 7 --o __T/ _17t
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer; ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
6 & ' 7 c,
Probe Depth (inches) 9 7 PW c1
Wet Density (pcf) lc2V /o7 I7( /31.3 L.c( 130 l?4 /3!,!
Dry Density (pcf) ji'j1 J'3 )' 1)O.3 L±2d //4'7 _ 0.1
Moisture (%)
MD Curve Number fnp.Sc I i I / i
Maximum Density (pcf) /ç) i?o
Optimum Moisture (%) , j 5 S.S q,j q, s c,_ e,f
Relative Compaction, RC (%) G ' /-1
—7 7 95 cj I ç ' ¶7 C, 9/1
Relative Moisture, AM
Specified AC(%) 9D 90 S 90 C4 d
Specified AM (%) o? t o) ) 2 '
Conformance(Yes/No) / _c ljc .r Y ,,5 Yes I '/S Yes
Nuclear Gauge Model and Serial Number:'- __CPNY122_D
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: A yllrfl,)^(44 ;ifr
Client's or Contractor's Acknowledgement: Name: (tLUt LO/ Signature:
White- Office Yellow- Contractor Pink- Field Technician
- ,,. .. z.. cf:t' . )" ..: -
turigEngihéers-San Diegoc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name s e L a, 1 ( R
Project Number 5,1 0 0 3 Test Date -3 Page Of
Client
Test # Material Structure Test Location and Elevation or Depth relative to....'7)/,>)
D
3o" ,L A _i_fO.f, -hr /A/)P_T47,.,74z cA.h/,
/ S / 30" W1 L . _L s; 7A __
..S4 o
?o" Fi'Aq H $ 4tq 1A ,r 5 4
3o'(1J.t &tfl5(1 _I,i rii _cAAJ
5 L1 3 b'_c,'.f-"Ia Ir7:LA 5 7'4.r I
1l(eA/. _
'l7&.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# Ca i
ProbeDepth(inches)
Wet Density (pcf) 1_' ) P'i, )?I, /c2?,341 /_i1c /'
Dry Density (pcf) I_Y'3. 1153 flJ,7
Moisture(%)
MD Curve Number — rr ALI 6
Maximum Density(pcf) '3) ') 7 / 3 c, ,P30 1c '
Optimum Moisture % 9.0 . o Q.a L q. o , '9 o
Relative Compaction, RC (%) 9_'3
Relative Moisture, AM
Specified AC 50 ' o %
Specified AM (%) _ ,2
Conformance(Yes/No) y,,ç .C'5 Ye c /t c le. C-
Nuclear Gauge Model and Serial Number: C.I"uI_3/ )'() _.))
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: _ It e f_/ Signature:
Client's or Contractor's Acknowledgement: Name: cCu. Signature:
White- Office Yellow- Contractor Pink- Field Technician
dr-hTung Engineers-San Duegoc
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
Established 1946
REPORT OF COMPACTION TEST DATA
Project Name fO' ,2 J LA 4 (
Project Number L2.? 3 Test Date — I)' * 3 Page of
Client . C; ' (A A / /
Test # Material Structure Test Location and Elevation or Depth relative to...
4 S I 0 1(J f 5 ,r - J7r, " 11A —P '- 9 D
J S' Li1 0"tJf,S 61 ((1 ,fL Ji4-7,.
3d' t.i.I -ti f;-re ,' f17', "5'
ii ( 5 J c, . , 55 - 31,,/
'I of frro( L'L c,. 517;
70 S J 3'/1J tir,e (L,i ç;p, c/O -1
/ 1, 1f CLL ri, $4i.
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# j 7 K ;7 ;7 - ___
/
Probe Depth (inches)
- 9- 91 2 JP__ 9'
Wet Density (pcf) )'7 J)I) 17' /29 P9.1 1 -3), -1 3 d,t
Dry Density (pcf)
____
0 3,1 j )3J J]'7.( J L1 1)1,9/ lIJ I) - /)9' / /y".
Moisture (%) C
, 'J i4 o)• k I.) 1&1 /°i
MD Curve Number (u,
Maximum Density (pcf) I 7.o /) 7; /)
Optimum Moisture (%) 7 9 ) 5' ,ç 1 -55 ç 'j ç
Relative Compaction, RC (%) 9_ C 1Gj
Relative Moisture, RM (%) ' t, 3 / i4' ' i .1-' f 4ct civw
Specified AC (%) 0 0 9 6 9 u 17 0
Specified RM (%) ' -) * ) '+) '
Conformance (Yes/No) ) ,s Y o )( t $ p',';
Nuclear Gauge Model and Serial Number: L P1' 7/ b .2
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name:
White- Office
/ 4i ;(f/ Signature: (A.-cLvii. C\ uy'/4'1'-'\1
Signature:
Yellow- Contractor Pink- Field Technician
T•ing Engineers-San Diegnc.
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
o,57//2 LAia PiIL
Established 1946
Project Name
Project Number .fi0 ô Test Date /0 i2 6' '> Page of
Client 7- V o( CA r Is ba,-i
Test # Material Structure Test Location and Elevation or Depth relative to... . c I'a, I /(J/ 1 r,74
S P AY AAJe ( /)I(, AC 09
/)"
4I' )AffI/4L3i
15 A P p4" Lcr /,p
fl f3 4 fl
LA -r( I'p r c 2 I -,/- d I
" Ct/ A.-;-(p ( T'(( Of3
i1;((
/ C
t )4 'L7,,
)4" 'I c--7 L I)Q
/ f\ C, P /' (e 74" 4( @ 7A.7.7O
Material: S = Soil, AC = Asphalt Concrete, ATS = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil. 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
_ - 3-1 95 7-6 -7 5 97
Probe Depth (inches) 9- 2- ? :t.- 2- y t
Wet Density (pcf) 3 '1 39 ', / 4 3 /4i /9 ' / j ( /4 /)5
Dry Density (pcf) /::)V) I) 1.20 130'13(1 01.4 - - -
Moisture (%) -- ,'0, g 5 /3 , - - -
MD Curve Number 3 3
Maximum Density (pcf) )33/J 3? o 03o
Optimum Moisture (%) C7 - ' "t 4) - - - -
Relative Compaction, RC (%) 5 G
Relative Moisture, AM (%)
SpecifiedRC (%) c 5* 5 5 9 $• ç _5 5:c- 5
Specified RMW0) ? ±
Conformance (Yes/No) s J )v( 7 C1 5 1ff f4! - '.> (
Nuclear Gauge Model and Serial Number: /'/* J"
This report does not relieve the contractor of their responsibility for prformance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: A 41. ii, / signature: rIAj 4'
Client's or Contractor's Acknowledgement: Name: M IL U t-" LIW 1. Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. EstabIid 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name P0 i tq s rr i a U'. R.EP'. Ck C. D0CA as.L
Project Number IT 1 0 o3 Test Date I ,. — — 0 Page P. of j9
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
3-115 s i4o tAAtNLI CD
Z,ic%-I s-r -'4S
o S 4L 4 Jr
+ çm +t
C 1L 3b'
\ .
Material: S = Soil, AC = Asphalt Concrete, ATB Asphalt Treated Base. AB = Aggregate Base. CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Sectiñ, General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SG= Sidewalk, Curb/Gutter, 0 = Other
/
Test #
- _1111 __
Probe Depth (inches) dg.l t H U
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
MD Curve Number
Maximum Density (pcf) 91 13 101
Optimum Moisture (%) 45 41.5 I'S
Relative Compaction, RC (%) qç It.1 k 61 4 A
Relative Moisture, RM (%) 4 , +4 j 41, 1-13
Specified RC (%) qo q0 LA O 90
Specified RM
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: tXLt. 3' %! t- S
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and,applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name - bA i.tL S. tiEignatu,:
Client's or Contractor's 'Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Teic*iij,i=nirQriJfliairi Iri, Established 1Q4 U tIU IU UUU .PLlU U UI U. --
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
L*. -
Test Date t.—O2 Page _of_
oc eQLSAO .
Project Name
Project Number
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
.22 Ct S jJl
3o S b4L o 45 EL 'b2
) 3 L3L
k
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)03 I S
Wet Density (pcf) .. t36 b is'c 13 1 A
Dry Density (pcf)
Moture
MD Curve Number
Maximum Density (pcf) . '35ats !' Optimum Moisture (%)
Relative Compaction, RC (%) i4
Relative Moisture, RM (%)
Specified RC A64 C1 S°/0 lb.
Specified RM (%) '
Conformance (Yes/No) '1'
Nuclear Gauge Model and Serial Number: 1( (4'(?_. W'4 H 3 SCIU''ç bL3
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: - Name: i.4T . Lo_JQtnatue'!' Z.3.'
Client's or Contractor's Acknowledgement: Name: W'(.J.i.". LYi"3'JL Signature: .,'
White- Office Yellow- Contractor Pink- Feld Technician
O Test1ig Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name v L4-.e eeacl e F
Project Number Ob 3 0 Test Date d..40 Page _&_of_._.
Client a' 7/
Test # Material Structure Test Location and Elevation or Depth relative to..
2EEL
3o
S
S
LIt
CAI 1/?"
/'Sfcf LIt. 4rj_/5/7'0i'1 y,4
T(tI Vi r,4-n- ,J' ,f 4J
31
3
33
5
5
S
WIT
t'I
('i J'Yeel LI, I. *50 I' 7' 54'J ciJ
't b., 1.Jy /5 5o'I''fy,) S_&A4L
1 llct' uio /5fa
-:31 s L' I I4
JTt' /
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WI = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 29 3c, I 37 33
Probe Depth (inches) " 9' 9'91 ?
Wet Density (pcf) L3,( /21.3 jj /6:?c t'i.ç
Dry Density (pcf) (,.' i13!L2JI135l -3.1 iI21
Moisture (%) 3 7A 1, 4
MDCuve Numb err1" fA" n'5 pr%-
AtVc C..-..v&
'4'5
C.i
Maximum Density (pcf) Q'3,', 171 o / Q 3, o / a I 7.0
Optimum Moisture (%) 90 % % c, q
Relative Compaction, RC (%) Q 9_ c9
Relative Moisture, RM (%)
Specified RC (%) 9 90
'' 7 0 Clo ,
Specified AM
Conformance (Yes/No) ie s 'Ins .1,'s I ies I I c c _____ _____ _____ _____
Nuclear Gauge Model and Serial Number: £- PN 0ff o Ic' -01,
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: /Y) lie C Signature:
Client's or Contractor's Acknowledgement: Name: W(L(1iLi+4 L-P'L._ Signature:
White- Office Yellow- Contractor Pink- Field Technician
7895 Convoy Court, Suite 18, San Diego, CA. 92111
Testifig Engineers-San Diego, h. Established 1946
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name Pp 'ti S! 7'74 L4 eQc 1..
Project Number O 3 0 TestDate_?"o'2.c, _o 3 Page__of_._
Client C i / .,7e' Cq b
Test # Material Structure Test Location and Elevation or Depth relative to...
35
36
h
S-.4-
S'
LAJ ,i I
s o t. ' (f•
Lt LL-?/. i15 I
'1±, 1_(ft ,1c.cf75 j. L
e I
Y
°
4/
S
5
5'
1
CA/I
s-reti '-
IL1m5iei £Lim.. I~ . 51 co, '- A'- ,'
- j Sj tii. 1S3-&io S (-' "12 Ar 14
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test # 3c_2t
Probe Depth (inches) ' 9' 7 9'• " ' r
Wet Density (pcf) J3C$
. ( J 2 '3121,_ I '7' ffl7
Dry Density (pcf) 11 ) 1 7— .3 /J.9 Ii l.a' )_(.7 /I l0t /fl-, o
Moisture (%) 3 90#'j
M1. Curve Number *j' s4ns MA$ -
Maximum Density (pcf) J23
Optimum Moisture Moisture (%) q, S.
Relative Compaction, AC (%) 93 91 cjj 'IL
Relative Moisture, RM (%) L 9 - L -,1 4 ,
Specified AC (%) 0 90 90 o q0 9
Specified RM(%)
Conformance (Yes/No) jle i i es
Nuclear Gauge Model and Serial Number: ' / ' C PiV :.?J(_) 91oo
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work-and observations.
TESD's Testing Technician: Name: qJp,'f I'll i' Signature:
Client's or Contractor's Acknowledgement: Name: 1. WV'L— Signature:
White- Office Yellow- Contractor Pink- Field Technician
C/ 7A
'4j
7895 Convoy Court, Suite 18, San Diego, CA. 92111
Testing Engineers-San Diego, .ac. Established 1946
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name pa; A ScfM LAri ,2 ac'L
Project Number 3 29 Test Date ?" 3 Page of
Client
Test # Material Structure Test Location and Elevation or-Depth relative to...
'1 4 (/( JKh P
az
45 c 'i ,m Li J j xts
_ 1]
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
ITS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WI = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 44' 4~
Probe Depth (inches) . .
Wet Density (pcf) )_2.3f I 125,3
Dry Density (pcf) jj ) K
Moisture
MID Curve Number _________ .1
Maximum Density (pcf) Ii c,
Optimum Moisture (%) - .t, 95
Relative Compaction, PC (%) 9' CIO
Relative Moisture, PM (%) ?
Specified RC I £7 1,
Specified RM (%)
Conformance (Yes/No) '/,ç
Nuclear Gauge Model and Serial Number: Pt' 310 gO c2 5 ?.
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: Aiso.( /'34'ii.i Signature:
Client's or Contractor's Acknowledgement: Name: tf_iCLL.Lt.i LP(PL. Signature:
White- Office Yellow- Contractor Pink- Field Technician
7)4
TesLing Engineers-San Diego, .ic. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name AT)
Project Number c3 Js5 Test Date Page of
Client C-k Crl
Test # Material Structure L Test Location and Elevation or Depth relative to...
__ JL 1e(le f oice- Lt-ne- :'•i-i
WL -e - çJ$crt + `t]
F
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches) G " &
Wet Density (pcf) aLL _1*4
Dry Density (pcf)
Moisture (%)
MD Curve Number I r4
Maximum Density (pcf) 15 13~)Jo ______
Optimum Moisture (%) cj5 (t'°
Relative Compaction, RC
Relative Moisture, RM (%) - .,)- 0 )
Specified RC
Specified RM (%) +
Conformance (Yes/No)
Nuclear Gauge Model and Serial Number: 30 , .ck-
This report does not relieve the contractor of their responsibility for performance in accordance with the
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously fai
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: Signature:
Client's or Contractor's Acknowledgement: Name: '4V'4tLL((M\. LtZ Signature:
specifications and applicable
meet specifications.,
White- Office Yellow- Contractor Pink- Field Technician
Icp7L
Testing Engineers-San Diego, Inc. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name _tTLA
Project Number RID ô — Test Date q 6 3 Page P of 2
Client OP Cai'/.o /
Test # Material Structure Test Location and Elevation or Depth relative to...
1 7' S Li I 99 '' I 7 t 5i sJ c,4
@,51Ar'o,1 1(Lif& rA-i)
5, r LA/I 3" ç /53 2 .54
3Sz.c/ 4'4g/' '-i+f ci-47 1
5 T,.T7t 'Jo' 'r
5-4- S i4
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
. Ii iI .i.11
Moisture (%) 7J 91 } 31 r15 tj
MID Curve Number 10 C_
Maximum Density (pcf) I 30 ) 70 I o 3,
Optimum Moisture (%) 9,0 9.0 9 tp
Relative Compaction, RC (%) C13 ±i_.
Relative Moisture, RM (%) - ( / 9 (2 5 5
Specified RC (%) 9
Specified RM (%) ± G' f
Conformance (Yes/No) fj j je /S ?'S
Nuclear Gauge Model and Serial Number: -
f'/'' Z'o Cl 0 2 JO
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: / ..qii. ?_)1W Signature:
Client's or Contractor's Acknowledgement: Name: V4tLtts Lf3 e vc Z, Signature:
White- Office Yellow- Contractor Pink- Field Technician
'T4
'k Ating Engineers-San DiegL Inc.
7895 Convoy Court, Suite 18, San
D
i
e
g
o
,
C
A
.
9
2
1
1
1
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Established 1946
Project Name Poll." Y e Aiii L4 K' e R e'ci c
Project Number V3?YT3'zS" S°"27Test Date 3 0 pageL..ot_2.
Client
Test # Material Structure Test Location and Elevation or Depth relative to...
53 S j &JA1t/'/,'/ e.(1/ )Y7-T'Di ISOfOt3 P o1' 51 S LJ I5i-$' 2Prs;, 55 S £,j! c( /çq
62P7 59. 5 (i/ $j j47J/y '7'Ar)Ov I () -,'. 0 4J Iè''7 t'4 ,
Material: S = Soil, AC = Asphalt Concrete, AID = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil ITS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F= General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer, Li = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 3 c4 $.5 s_I Probe Depth (inches) r
Wet Density (pcI)
Moisture (%) 'T. I 9-0 /011 /01j -fl:3 AS
i
t MD Curve Number
Maximum Density (pcf) )6 1cl?-C
Optimum Moisture
9,511,5 (5
,. 5, (35
Relative Compaction, RC (%) q / c1 90 go
Relative Moisture, RM(%)
Specified RC (%) C) C/o
J C) 90 qo Jjj Specified RM (%) ?.. D — è ! Conformance (Yes/No) 'J.S ..,jes 5 )I$ )(.$ )'e5 . I Nuclear Gauge Model and Serial Number: 'A' I This report does not relieve the contractor of their responsibility for performance in accor
d
a
n
c
e
w
i
t
h
t
h
e
p
l
a
n
s
,
s
p
e
c
i
f
i
c
a
t
i
o
n
s
a
n
d
a
p
p
l
i
c
a
b
l
e
codes. The contractor is responsible for scheduling retesting of reworked areas that ha
v
e
p
r
e
v
i
o
u
s
l
y
f
a
i
l
e
d
t
o
m
e
e
t
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
See accompanying Daily Report for description of work and observations.
TESD'S Testing Technician: Name: /124'/er Signature:
Client's or Contractors Acknowledgement Name: Signature:
White- Office -- Yellow- Contractor Pink- Field Technician
0
T6Jng Engineers-San Diego, 1C. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name O' 5 e #4L Uot /2 ,
Project Number 0 0 ? Test Date /9- Page of
Client C; 7/
Test # Material Structure Test Location and Elevation or Depth relative to... o'J-"
5C1 S Li / L. L7g ir .jA 144 f )44 4,
CV S Li / 3o"L'.j, L * A1- $,J... I4k 17 7 , L5:17'z) .c4.JJL4
30't,.), L.. L!I P'$c*4./sc,4e 53i'4 0 5744 4l,(-
___ 5 íi
3 5' t' I 3D" (,J, i... E-'c iUISC66 IAle-s--,- 'I2 ci) s(ii.
t 5' (All
?o" ?1,L tA 4W"60fr56rft4 16 11,e 147;o-S 4 440 o £ii sIJ.'.-
3bt*
L. L. f 1t1i PbhlJfr4 IAi 17D j
016i5e71'4 5rJi9or
Material: S = Soil. AC = Asphalt Concrete, ATB = Asphalt Treated Base. AS = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #_
Probe Depth (inches)
k'_ells
Wet Density (pcI)
Dry Density(pcf) J'i2 LL'3 LiiLLj I 1/
Moisture(%)
MD Curve Number -rr ,11A 1J 6-4-g/
Maximum Density (pcI) l'7t, Ii D )7.g I'2o / o
Optimum Moisture (%) 9 a '. 9.0 q. q a
Relative Compaction, RC (°") 1.L
Relative Moisture, RM (%)
.2 4 _ 9S
Specified BC 50 ',3o '9D 5 '90 p
Specified RM (%) ,l - -t t.
Conformance (Yes/No) ç y >'e ç / )(#f
Nuclear Gauge Model and Serial Number: / P ,'i/ 9/i)
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
f\ lt&O rcj ,/'/)/) Signature
V'.(t.Lu44, Signature 10100,09.
TESD's Testing Technician: Name:
Client's or Contractor's Acknowledgement: Name:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, .ic. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
ce ,.S 7Lm L
5- J 00 3 Test Date I ° 0 3 Page of
Ci7-7'
Test U Material Structure Test Location and Elevation or Depth relative to...
c S i 30"u/S_L7 _(j,&L _1 ''Sr
" (.1_5%, L-c1i S ,.r-f,1I...S '11 3 _SAJ i,
1 S _I 9o"c-j7 S_uP ___ tt Yij _5ir,_37/'_% i
j f 30"(lA/i ,S t.,.re f2 -f_e'a_' _•j _/
O 5 (jl 3oL,/j.,1 LS
________________
7- 5 Li ( 3o (.í?'ç_ _ c ' _Si-- _5.7&90
2) 5 L, ?Ot(...i(S -A CL&k.JIZt _;f7o3t
Material S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test #
Probe Depth (inches)
Wet Density (pcf)
Dry Density (pcf)
Moisture (%)
/1
/11
r.3
L?Li
I )'3 o
!itL I_?1.3
0)4 ))0 /2G0,
Li LJ
I
L31i
:ycc eLI qc1y C3
MD Curve Number M
JQ3 io Maximum Density (pcf) )&- ixP~ 22L 1TCJ L g ç IdIJ
Optimum Moisture (%) c.D q 9.5 ' S C7( q1s c._5 q.s
Relative Compaction, RC "3 C) .ft4 C1I I
Relative Moisture, RM (%)
Specified RC (%)90 90 ) 90 '1 .- C10 o go
Specified RM (%) ±c?- t t&: -.
Conformance(Yes/No) c / 3 V / _.c Y e $ )' ç '/ CS ) _ S _____ t:J
Nuclear Gauge Model and Serial Number:'C PAl 3/0 0 5"
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: ,4 v'rtL49F\'(/h;)i', Signature p
Client's or Contractor's Acknowledgement: Name: VtLU-t 4-- _LO/t_ Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, .ac. Established 1946
7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
Project Name i't' /4_i
Project Number Test Date — /1 o 3 Page of
Client 7' .01
Test U Material Structure Test Location and Elevation or Depth relative to...
?4 S (I "u1,S'
S 1 3o"f ,S it f fi#
1íi 1°" (il 9 olj\4-rt,.e tL J1T' ' n7' 5'
l"i '5 611
30" 1 51 3 bt4l.
)?O S &uf
'3 o'Wj
T3O"L1If5b?AL.
/ ci.7 557J S
a
1 t3D' L.t re
Material: S = Soil, AC = Asphalt Concrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test# 77p2c2- >i
Probe Depth (inches) (9/. 9 9' 9.... p. p_ 9—
Wet Density pc1 L2f J2L 122 /2 LII L3I) .1
Dry Density (pcf)
Moisture (%)
10I LL'T!L C, 3
j_iL
4 C) r
!r'IL4
IZQ 4A
IJ -j)9JJZ3
,o.f
MD Curve Number
Maximum Density (pcI) I . 7.o I L /2 / ,f /4.P $- /-)"'Y I )
Optimum Moisture (%) 19 0 j . .$' '3 .c '. S 1, 5
Relative Compaction, RC CJ cj
Relative Moisture, RM (%)
Specified RC (%) o '?b Q D 9 b 0 90
Specified RM (%) -1- ± 2. t.2
Conformance (Yes/No) JtJ '/f,s y'e> )C
Nuclear Gauge Model and Serial Number:
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: s ') / Ii p Vs Signature: Oj,
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office Yellow- Contractor Pink- Field Technician
Testing Engineers-San Diego, Inc. Established 1946
- 7895 Convoy Court, Suite 18, San Diego, CA. 92111
[858] 715-5800 Fax [858] 715-5810
REPORT OF COMPACTION TEST DATA
- p
Project Name Po, S e #4 I A,-) - (4( L
Project Number -57O(3 Test Date /0 / 7 2 Page 2_. of
Client
Test 4$ Material Structure Test Ldcation and Elevation or Depth relative to...
/02 r,q,) (L/ I 9€Y"Lti ,,. ' /6 5 A,7 5r44..
,3 cJ LI /) j( /6 3tb y)
/ 9 L' ( - 3b' ti , yq yp / 4 LI,L (, f) ci, I.:
I A rl A , S .)
Material: S = Soil, AC = Asphalt Concrete. ATB = Asphalt Treated Base, AB = Aggregate Base. CTS = Cement Treated Soil
LTS = Lime Treated Soil, 0 = Other
Structure: P = Pavert Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter, 0 = Other
Test#
_ - /oa )a3 /O9 /S
Probe Depth (inches) -91"
Wet Density (pcf)
Dry Density (pcf)
Moisture (%) /7
MD Curve Number
-.-
'1'5
Maximum Density (pcf)
Optimum Moisture (%) , 0/-0
Relative Compaction, RC (%) ¶ I 4 g
Relative Moisture, RM (%)
Specified RC (%) 9 9 .9 0
Specified RM (%) ) -ia-4, -+ +
Conformance (Yes/No) I V ($ -( p.5
Nuclear Gauge Model and Serial Number: (•_frl/j/ 7 / • )
This report does not relieve the contractor of their responsibility for performance in accordance with the plans, specifications and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed to meet specifications.
See accompanying Daily Report for description of work and observations.
TESD's Testing Technician: Name: Tt',,r/ Ad JIM Signature: (lAt,
Client's or Contractor's Acknowledgement: Name: Signature:
White- Office - Yellow- Contractor Pink- Field Technician
-. . ... - ... " . -,. .r . :.._,•, .. •. ,--.
-: •tr-
Test ngEngineets-San.Diego, Inc..
.7895 Cohvy Court; Suite 18,S4 Diego, CA. 92111
% . . .
[858] 715-5800 Fax'[858] 715-58.10
. - REPORT OF COMPACTION TEST 'DATA
'-,
- Project Name c\, 4/?.e.-
Project Number /0 N? . . Test Date_t4b.Q.c'
Client
Established 1946
Page Z. of 2.
Test # Material Structure Test Location and Elevation or Depth relative to...
fl S ___ i22sJi- J/4L/w
I' r2)Jr- /&1OO. 38
I' ' 1,'ez4-
ifIe4 of #73,, owb-o Q, /0— 9— t 3 r Prsu '&i&i ieh'a 1 . /// £—I. ;g)±
/.c4ç (pC4i' //1d tôn Ow ,Q)t
FkcL4Pc sSh -- (a of
-_.Jf( ?/ c. 15ii 7c 54 /5c/S,o
I f I '1
Material: S = Soil, AC = Asphalt Goncrete, ATB = Asphalt Treated Base, AB = Aggregate Base, CTS = Cement Treated Soil
LTS= Lime Treated Soil, 0 = Other
Structure: P = Pavement Structural Section, F = General Fill, N = Native Soil, WL = Waterline, SS = Sanitary Sewer, ST = Storm Sewer,
U = Other Utilities, W = Wall Backfill, SC = Sidewalk, Curb/Gutter,O.= Other •
PL -
'Test #
-- 91
Probe Depth (inches)
Wet Density (pcf)
Dry"Density(pcf)
_._ /11137 1/Ky /12 /f'5'1. 117Y
'Moisture (%) ' , f/c!17
MD Curve Number .,-' 1.—'; 1'
Maximum Density (pcf)
Optimum Moisture (%) q c .9. ç c/Ic
Relative Compaction, RC
Relative Moisture, RM (%)
Specified RC (%) D !3D 90 - go %t)
Specified RM (%)
Conformance (Yes/No) c (1 C I Afo (/,
Nuclear Gauge Model and Serial Number: f•b,\..Qj J(\\s= tf (oI
This report does not relieve the contractor offlheir responsibility for pertorrnane in accoance• with the plans, specifi&ations and applicable
codes. The contractor is responsible for scheduling retesting of reworked areas that have previously failed tee specifications.
See accompanying Daily Report for description of work and observations. .
TESD's Testing Technician: Name: Ab lQSSignatur(
Client's or Contractor's Acknowledgement: Name - SignatureJ
White- Office Yellow-, Co'htractor Pink- Field Technician
J /
- --