March 23, 2005
tract No. 79344
Subject: Laboratory Test Report No. 5
Project: Carlsbad - Hidden Canyon Park
Vancouver Street
Carlsbad, California
Dear Mr. Soileau,
Submitted herewith are the results of laboratory testing performed on an import material sample
proposed for use as fill at the above referenced project site.
The sample location and its respective classification are presented below:
I Sample
No.
I Date
Sampled
I Location I I Description
8 3/15/2005 Import: Stockpiled On site (Source Unknown) Dark Gray Sandy BASE
Maximum density and optimum moisture values determined in accordance with the ASTM D-
1557-91 laboratory test standard for subsequent compaction monitoring purposes were as
follows:
Sample Classification Max Dry I Optimum
No. (USCS) Density Moisture
(Pcf) /00'
8 Class II Base 140.5 7.0
It should be noted that test results contained herein are for geotechnical purposes and do not
reflect compliance with United States Environmental Protection Agency and State of California
regulations regarding environmental concerns.
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810
Offices Nationwide
38561A
Testing and subsequent approval of any import source applies only to the sample provided.
It is the contractor's responsibility to import materials that are consistent with the sample
tested. In any case, final approval is contingent upon the actual materials as hauled to the
site.
The laboratory test results indicate compliance with the project plans and specifications
excluding any exceptions, as noted under individual tables. These laboratory tests were
performed in accordance with generally accepted standards and do not constitute engineering
opinions or project control. It is the responsibility of the contractor to schedule retests or re-
inspections of any areas that do not meet project specifications as a result of the attached
information. TE-USL neither controls nor supervises the work at the site. We are not
responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the
work on schedule or carry it out in accordance with the project plans, specifications, and all
applicable codes.
Respectfully submitted,
TETING ENGINEERS U.S. Labs, Inc.
['6
Van W. Olin, GE 2578
Geotechnical Department Manager
Distribution: (1) Addressee
(1) NTD Stichler (Carl Larson)
(1) Field File
T:\Geotechnical Files'Projects\Contraet Nambers\79344 Carlsbad - Hidden Canyon Park\79344 tad, Reports\Lab Report No. 5doc
2
W U.S. LABS
City of Carlsbad - Inspection Division
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Attention: Duane Soileau
Subject: Laboratory Test Report No. 4
Project: Carlsbad - Hidden Canyon Park
Vancouver Street
Carlsbad, California
Dear Mr. Soileau,
December 16, 2004
Contract No. 79344
avcVIVED
DEC 2 72004
Submitted herewith are the results of laboratory testing performed on an on-site material sample
proposed for use as fill at the above referenced project site.
The sample location and its respective classification are presented below:
Sample I Date I Location Classification
No. Sampled (USCS)
7 12/3/2004 On site: Stockpile Greyish Olive Silty
SAND, SM
Maximum density and optimum moisture values determined in accordance with the ASTM D-
1557-91 laboratory test standard for subsequent compaction monitoring purposes were as
follows:
Sample Max Dry Optimum
No. Classification (USGS) Density Moisture
(pcf) %
7 SM 118.5 13.0
Expansion Index test results were performed in accordance with UBC Standard 18-2 are presented
below:
Sample
No.
Expansion
Index
Potential
Expansion (1)
53 (2) Medium
Based on table IN-1-B: 1997 UBC, page 2-49
Not suitable for use as fill under building slab areas
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810
Offices Nationwide
It should be noted that test results contained herein are for geotechnical purposes and do not
reflect compliance with United States Environmental Protection Agency and State of California
regulations regarding environmental concerns.
The laboratory test results indicate compliance with the project plans and specifications
excluding any exceptions, as noted under individual tables. These laboratory tests were
performed in accordance with generally accepted standards and do not constitute engineering
opinions or project control. It is the responsibility of the contractor to schedule retests or re-
inspections of any areas that do not meet project specifications as a result of the attached
information. TE-USL neither controls not supervises the work at the site. We are not
responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the
work on schedule or carry it out in accordance with the project plans, specifications, and all
applicable codes.
Respectfully submitted,
TESTING ENGINEERS U.S. Labs, Inc.
.
-
I
- r~o -
Van W. Olin, GE 2578
Geotechnical Department Manager
Distribution: (1) City of Carlsbad - Inspection Division (Duane Soileau)
(1) NTD Stichier (Carl Larson)
(1) Field File
T:\Geotcchnical Files\Projects\Contract Numbers\79344 Carlsbad - Hidden Canyon Park\79344 Carlsbad - Hidden Canyon Park\Lab Report No. 4.doc
2
December 3, 2004
Contract No. 79344
City of Carlsbad - Inspection Division
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Attention: Duane Soileau
Subject: Laboratory Test Report No. 3
Project: Carlsbad - Hidden Canyon Park
Vancouver Street
Carlsbad, California
RECEIVED
DEC 152004
Dear Mr. Soileau, UIVIIUiN
Submitted herewith are the results of laboratory testing performed on on-site material samples
proposed for use as fill at the above referenced project site.
The sample locations and their respective classifications are presented below:
Sample I Date Location Classification
No. Sampled (USCS)
4 11/29/2004 On site: N.E.C. of Bldg. Pad Light Yellow Fine Silty
CLAY, CL
5 11/29/2004 On site: S.W.C. of Bldg. Pad Pink Fine Silty CLAY, CL
6 11/29/2004 On site: Trench Backfill Stockpile Light Gray Fine Slight
_______ _________ ________________________________ Silty SAND, SM
An evaluation of the grain-size distribution of selected soil sample(s) was performed in general
accordance with the latest version of ASTM D422. These test results were utilized in evaluating
the soil classifications in accordance with the Unified Soil Classification System. The results are
presented below:
Sample No.4 I Sample No.5 I Sample No.6
Sieve Size Percent Passing Percent Passing Percent Passing
#200 Wash 54.2 91.5 17.4
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810
Offices Nationwide
The results for sand equivalent testing based on California Test Method 217 are presented below:
Sample
No.
Sand
Equivalent
4 7
5 8
6 40
Expansion Index test results were performed in accordance with UBC'Standard 18-2 are presented
below:
Sample
No.
Expansion
Index
Potential
Expansion (1)
4 101.0 High
5 87.6121 Medium
6 ' 2.0. . Very Low
Based on table 18-1-B: 1997 UBC, page 2-49
Not suitable for use as fill
It should be noted that test results, contained,, herein are for geotechnical purposes and do not
reflect compliance with United States Environmental Protection Agency and State of California
regulations regarding environmental concerns.
2
The laboratory test results indicate compliance with the project plans and specifications
excluding any, exceptions, as noted under individual tables. These laboratory tests were
performed in accordance with generally accepted standards and do not constitute engineering
opinions or project control. It is the responsibility of the contractor to schedule retests or re-
inspections of any areas that do not meet project specifications as a result of the attached
information. TE-USL neither controls nor supervises the work at the site. We are not
responsible for errors and omissions of the contractor, nor 'for the contractor's failure to keep the
work on schedule or carry it out in accordance with the project plans, specifications, and all
applicable codes.
Respectfully submitted,
TESTING ENGINEERS U.S. Labs, Inc.
Van W. Olin, GE 2578
Geotechnical Department Manager
Distribution: (1) City of Carlsbad - Inspection Division (Duane Soileau)
(1) Nil) Stichier (Carl Larson)
(1) Field File
T:\Geotechnical Piles\Projects\Contract Numbcrs\79344 Carlsbad - Hidden Canyon Park\79344 Carlsbad - Hidden Canyon Park\Lab Report No. 3.doc
3
City of Carlsbad - Inspection Division
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Attention: Duane Soileau
December 1, 2004
Contract No. 79344
Subject: Laboratory Test Report No. 2
Project: Carlsbad - Hidden Canyon Park
Vancouver Street
Carlsbad, California
Dear Mr. Soileau,
DEC - 6 2004
Submitted herewith are the results of laboratory testing performed on on-site material samples
proposed for use as fill at the above referenced project site.
The sample locations and their respective classifications are presented below:
Sample Date Location Description No. Sampled
2 11-23-04 On site Stockpile Off White Silty Sand
3 11-23-04 On site Stockpile Yellowish Olive Clayey Sand
An evaluation of the grain-size distribution of selected soil sample(s) was performed in general
accordance with the latest version of ASTM D422. These test results were utilized in evaluating
the soil classifications in accordance with the Unified Soil Classification System. The results are
presented below:
Sieve Size
Sample No.2. Sample No.3
Percent Passing Percent Passing
#4 100 100
#8 99 96
#16 94 78
#30 68 59
#50 30 41
#100 12 27
#200 6.6 17.5
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810
Offices Nationwide
Maximum density and optimum moisture values determined in accordance with the ASTM D-
1557-91 laboratory test standard for subsequent compaction monitoring purposes were as
follows
Sample Classification Max Dry Optimum
No. (USCS) Density Moisture
(pcf) %
2 SM 120.0 12.5
3 Sc 109.0 19.0
It should be noted that test results contained herein are for geotechnical purposes and do not
reflect compliance with United States Environmental Protection Agency and State of California
regulations regarding environmental concerns.
The laboratory test results indicate compliance with the project plans and specifications
excluding any exceptions, as noted under individual tables. These laboratory tests were
performed in accordance with generally accepted standards and do not constitute engineering
opinions or project control. It is the responsibility of the contractor to schedule retests or re-
inspections of any areas that do not meet project specifications as a result of the attached
information. TE-USL neither controls nor supervises the work at the. site. We are not
responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the
work on schedule or carry it out in accordance with the project plans, specifications, and all
applicable codes.
Respectfully submitted,
TESTING ENGINEERS U.S. Labs, Inc.
Van% W. Olin, GE 2578
Geotechnical Department Manager
Distribution: (1) City of Carlsbad - Inspection Division (Duane Soileau)
(1) NTD Stichier (Carl Larson)
T:\Geotechnical lrilcs\Projects\Contract Numbers\79344 Carlsbad - Hidden Canyon Park\79344 Carlsbad - Hidden Canyon ParkLab Report No. 2.doc
2
P
TE - USL
U.S. LABS
City of Carlsbad - Inspection Division
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Attention: Duane Soileau
Subject: Laboratory Test Report No. 1
______DJpntract
ovember 23, 2004
No. 79344
NOV 29 2004
Project: Carlsbad - Hidden Canyon Park
Vancouver Street
Carlsbad, California
Dear Mr. Soileau:
Submitted herewith are the results of laboratory testing performed on an on-site material sample
proposed for use as fill at the above referenced project site.
The sample location and its respective classification is presented below:
II Sample le I
I Date I
.. Location 1 Classification (USCS) No. I Sampled I I
1 1 I 11/12/04 I On site stockpile I Silty Sand (SM)
An evaluation of the grain-size distribution of selected soil sample(s) was performed in general
accordance with the latest version of ASTM D422. These test results were utilized in evaluating
the soil classifications in accordance with the Unified Soil Classification System. The results are
presented below:
Sieve Size
Sample No .1
Percent Passing
3hin. 100
%in. 99
3/8 in. 99
#4 99
#8 96
#16 87
#30 66
#50 . 45
#100 26
#200 15.8
Testing Engineers - U.S. Laboratories
7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 715-5810
Offices Nationwide
Maximum density and optimum moisture values determined in accordance with the ASTM D-
1557-91 laboratory test standard for subsequent compaction monitoring purposes were as
follows
Sample Max Dry Optimum
No. Description Density Moisture
(pcf) %
1 Silty Sand 123.5 11.0
(SM)
It should be noted that test results contained herein are for geotechnical purposes and do not
reflect compliance with United States Environmental Protection Agency and State of California
regulations regarding environmental concerns.
The laboratory test results indicate compliance with the project plans and specifications
excluding any exceptions, as noted under individual tables. These laboratory tests were
performed in accordance with generally accepted standards and do not constitute engineering
opinions or project control. It is the responsibility of the contractor to schedule retests or re-
inspections of any areas that do not meet project specifications as a result of the attached
information. TE-USL neither controls nor supervises the work at the site. We are not
responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the
work on schedule or carry it out in accordance with the project plans, specifications, and all
applicable codes.
Respectfully submitted,
TESTING ENGINEERS U.S. Labs, Inc.
Van W. Olin, GE 2578
Geotechnical Department Manager
JBG/VO
Distribution: City of Carlsbad - Inspection Division (Duane Soileau)
NTD Stichier (Carl Larson)
T:\Geotechnical Fiks\.Projects\Contract Numbers\79344 Carlsbad - Hidden Canyon Park\79344 Carlsbad. Hidden Canyon Park\Lab Report No. I .doc
2