Project No. 8751455R-SI02
GEOTECHNICAL INVESTIGATION
CANNON ROAD BRIDGE OVER
MACARIO CANYON
CARLSBAD, CALIFORNIA
Prepared for:
The Buie Corporation/Carlsbad
Development Company
Rancho Del Cerro Joint Venture
P & D Technologies
401 West 'A1 Street, Suite 2500
San Diego, California 92101
a/vbl
1550 Hotel Circle North
San Diego, California 92108
(619) 294-9400
Fax: (619) 293-7920
Woodward-Clyde Consultants
January 10, 1989
Project No 8751455R-SI02
P & D Technologies
401 West 'A' Street, Suite 2500
San Diego, California 92101
Attention: Mr. Lee Vance
GEOTECHNICAL INVESTIGATION
CANNON ROAD BRIDGE OVER MACARIO CANYON
CARLSBAD, CALIFORNIA
Gentlemen:
Woodward-Clyde Consultants is pleased to provide the accompanying report, which
presents the results of our geotechnical investigation for the project. This study was
performed in accordance with our proposal dated December 14, 1987, our Agreement for
Supplemental Soil Engineering Services, dated September 16, 1988 and authorization by
the Buie Corporation/Carlsbad Development Company and Rancho Del Cerro Joint Venture
of February 29, 1988, December 15, 1988, and January 5, 1989.
This report presents our conclusions and recommendations pertaining to the project, as well
as the results of our field explorations and laboratory tests.
If you have any questions or if we can be of further service, please give us a call.
Very truly yours,
WOODWARD-CLYDE CONSULTANTS
Vera Berger
G.E. 2054
X^E2*^VB/DLS/rig /^irar^;^
f/gfe^ '<:^::\
fa' No. 2054 \s!
David L. Schug
C.E.G. 1212
i.W CM1
Consulting Engineers. Geologists
and Environmental Scientists
Offices in Other Principal Cities
D
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
TABLE OF CONTENTS
PAGE NO.
PURPOSE AND SCOPE OF INVESTIGATION 1
DESCRIPTION OF THE PROJECT 2
FIELD AND LABORATORY INVESTIGATIONS 2
SITE CONDITIONS 3
Geologic Setting 3
Surface Conditions 3
Subsurface Conditions 4
Geologic Structure and Landslides 5
Local and Regional Faults 6
Groundwater 7
DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS 7
Potential Geologic Hazards 7
Groundwater 10
Site Grading and Earthwork 11
East Embankment 11
West Embankment 16
Pile Foundations 17
Lateral Earth Pressures 18
UNCERTAINTY AND LIMITATIONS 19
TABLES
1. Soil Properties Assumed in Slope Stability Analyses
2. Site Treatment Plans Summary
3. Estimated Pile Tip Elevations
4. Ultimate and Allowable Pile Load Capacities
FIGURES
1. Location Map
2. Site Plan
3. Generalized Geologic Cross-Section at Centerline Cannon Road
4. Liquefaction Potential Chart
5. Typical Side Berm Sections
a/vbl
Woodward-Clyde Consultants
Project No. 8751455R-SI02
TABLE OF CONTENTS (continued)
PAGE NO.
APPENDICES
A. Field Investigation
B. Laboratory Tests
ATTACHMENTS
1. Logs of Test Borings Sheet
a/vbl 11
Woodward-Clyde Consultants
Project No. 8751455R-SI02
GEOTECHNICAL INVESTIGATION
CANNON ROAD BRIDGE OVER MACARIO CANYON
CARLSBAD, CALIFORNIA
PURPOSE AND SCOPE OF INVESTIGATION
This report presents the results of our geotechnical investigation at the site of the proposed
Cannon Road Bridge over Macario Canyon. The site is located east of Agua Hedionda
Lagoon and west of Hidden Valley Road in Carlsbad, California.
This report has been prepared exclusively for the Buie Corporation/Carlsbad Development
Company, Rancho Del Cerro Joint Venture, P & D Technologies and their consultants for
use in evaluating the property and in project design. This report presents our conclusions
and/or recommendations regarding:
• The geologic setting of the site;
Potential geologic hazards;
• General subsurface soil conditions;
Groundwater conditions within the depths of our subsurface investigation;
• Stability of slopes;
• Grading and earthwork;
• Pile foundations;
Allowable and ultimate soil bearing pressures and uplift capacities;
• Negative skin friction;
• Settlements;
Design pressures for retaining walls; and
• Geotechnical data for seismic design.
a/vbl - 1 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
DESCRIPTION OF THE PROJECT
For our study, we have discussed the project with Mr. Lee Vance of P&D Technologies
and Mr. Mark Ashley of McDaniel Engineering, and we have been provided with a set of
drawings entitled "Plans for the improvement of Cannon Road Assessment District",
Sheets 1 through 10, prepared by VTN, undated; a bridge drawing entitled "Cannon Road
Bridge over Macario Canyon, General Plan," prepared by McDaniel Engineering, stamp-
dated December 19, 1988, and a drawing entitled "Plans for the Improvement and Grading
of Cannon Road Sta. 64+50 to Sta. 72+61.30" prepared by Crosby, Mead, Benton and
Associates, undated.
We understand that the proposed project will include construction of a five-span bridge
over the western portion of the Macario Canyon, and construction of a road fill up to 40
feet high with slope inclinations of 2 to 1 (horizontal to vertical) in the eastern portion of the
canyon. The bridge will be approximately 455 feet long and it will consist of two parallel
bridges. The bridge abutments and piers will be supported on piles.
The project vicinity map is presented in Figure 1. The location and layout of the bridge are
shown on the Site Plan (Figure 2).
FIELD AND LABORATORY INVESTIGATIONS
Our field investigation included making a visual geologic reconnaissance of the existing
surface conditions, making five exploratory borings between April 5 and 12, 1988, and
two exploratory borings on September 28, 1988 and obtaining representative soil samples.
Two of the borings made with large diameter bucket auger in the west abutment area were
downhole logged by a geologist from our firm. The borings were advanced to depths
ranging from 40.5 to 120.5 feet. The locations of the borings are shown on the Site Plan
(Figure 2).
A Key to Logs is presented in Appendix A as Figure A-l. Final logs of the borings are
presented in Appendix A as Figures A-2 through A-18 and on a Log of Test Borings Sheet,
Attachment 1. The description on the logs are based on field logs, sample inspection, and
laboratory test results. Results of laboratory tests are shown at the corresponding sample
a/vbl - 2 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
locations on the logs and in Appendix B. The field investigation and laboratory testing
programs are discussed in Appendices A and B.
SITE CONDITIONS
Geologic Setting
The site is located at the mouth of Macario Canyon, a major southeast - northwest trending
tributary canyon, which empties into Agua Hedionda Lagoon in coastal northern San Diego
County. The canyon is cut through tertiary sedimentary strata which are underlain at depth
by the granitic and metavolcanic bedrock which outcrops to the east. Presently, the canyon
is the site of deposition of alluvial soils and accumulation of slopewash soils from the
adjacent hillsides with periods of erosion during heavier seasonal rains.
Surface Conditions
The proposed bridge and road alignment stretches southwest to northeast across the mouth
of Macario Canyon. The eroded southwest hillsides of the canyon are the site of the
proposed western abutment of the bridge. These steep slopes are vegetated with a dense
growth of chaparral and grasses. Several overhead power lines and access roads for the
supporting poles and towers are present in the immediate vicinity.
The eastern abutment of the proposed bridge will be located near a fill slope to be
constructed out from the east edge of the canyon. The area within the proposed road
alignment on the east canyon bank presently includes undisturbed chaparral-covered
hillsides, fill slopes and a small filled-in basin. The canyon bottom itself is densely
vegetated with trees and brush on the eastern half and with low ground cover and isolated
trees for most of the western half. Thick reeds are present in the active stream course
located in the extreme west side of the canyon.
Several transients live within the canyon bottom in the immediate vicinity of the project
alignment. Piles of litter and makeshift dwellings are present throughout the canyon area.
a/vbl - 3 -
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
Subsurface Conditions
The project site is underlain by Quaternary age overburden soils including: fill, surficial
soils, slopewash, and alluvial deposits; and by Eocene age sediments of the Santiago
Formation. These soil units are described below. The geologic symbols are given after the
names of the units. Approximate stratigraphy for the site is shown on Generalized
Geologic Cross Section at Centerline Cannon Road (Figure 3). At least some of the
geologic contacts in the northeast portion of the canyon are inferred from the available
grading plans.
Fill
Fill soils were observed in the northeast portion of the canyon. Approximately 10 feet of
fill underlain by filter fabric and a layer of crushed rock approximately 2.5 feet thick were
encountered in our Boring 7. The fill soils in Boring 7 generally consist of pale brown
silty sands and pale gray and clayey sands with some zones of dark brown sandy lean clay.
Penetration blow counts of 11 and 7 blows per foot were recorded within the fill soils in
Boring 7. Presence of the filter fabric and the crushed rock suggest that the fill was
probably placed under the engineering observation. No record of fill placement was
available to us at the time of preparing of this report.
Surficial Soils
Natural surficial soils were observed overlying formational soils on the undisturbed
hillsides along the alignment. Based on our observations and experience, these surficial
soils generally consist of 0 to 2 feet of silty sand topsoil overlying 0 to 2 feet of residual
clay.
Slopewash (Qsw)
Slopewash soils cover a large portion of the lower hillsides on the southwest side of the
canyon. These soils, as encountered in Boring 4, consist of sandy clay and clayey sand,
which overlie natural alluvial deposits. Slopewash soils extended to a depth of nearly 5
feet in Boring 4.
a/vbl - 4 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
Alluvium(Qal)
A thick section of erratically interbedded clean, silty and clayey sands and lean clays
underlies the bottom of the canyon. Our test borings encountered the deepest alluvium of
up to approximately 110 feet thick in Boring 3. Approximately 58 and 41 feet of alluvial
soils were found in Boring 6 and Boring 1, respectively. Approximately 11 feet of
alluvium was encountered in Boring 4 below the slopewash soil; 22 feet of alluvium were
encountered in Boring 7 below the fill.
Sands comprise more than half of the alluvial soils encountered in our borings. The
alluvial sands are generally in a loose to medium dense condition throughout the entire
section. Numerous, relatively thin layers of lean sandy clay and occasional thin layers of
fat clay were encountered within alluvial soils in all borings located in the canyon bottom
area with the exception of Boring 1. Approximately 28 feet of clayey soils consisting of
interbedded lean clays and clayey sands were encountered in the upper portion of Boring 3.
Clayey alluvial soils underlying the project site appear to be of soft to firm consistency.
Santiago Formation (Ts)
Sediments assigned to the Santiago Formation underlie the overburden soils in the general
site area. Our test borings indicate that these sediments consist of very dense silty sands
with interbeds of very dense silt and hard clay. Clayey portions of the Santiago Formation
are generally considered to be prone to landsliding. An upper portion of Santiago
Formation, approximately 18 feet thick encountered in Boring 4 appears to be highly
weathered.
Geologic Structure and Possible Ancient Landslides
Bedding attitude measurements taken within the west bridge abutment in our large diameter
Borings 2 and 5 indicate that sediments of the Santiago Formation dip at generally 4 to 13
degrees in a west or southwest direction. Some cross bedding dipping at up to 13 degrees
to the northeast was observed in Borings 2 and 5. Reviewed geologic literature indicates
that bedding on the northeast banks of the Macario Canyon dips at up to 15 degrees in a
west to northwest direction.
a/vbl - 5 -
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
Our preliminary review of aerial photographs suggested that the hillside underlying the
proposed west bridge abutment may be a portion of a large ancient landslide. Test borings
were made in this area to specifically address the possible existence of a landslide. Our
downhole observations in these test borings did not reveal slip planes, clay seams,
M brecciated zones or anomalous bedding which could indicate that ancient landslides are
present. No other landslides were indicated to be on or in the near vicinity of the site
during our site studies.
Local and Regional Faults
Faults or indications of faults were not observed in our site reconnaissance or in our test
borings. Our review of geologic literature and our experience in the area indicates that
several relatively discontinuous faults are mapped in areas south, north and east of the site.
The majority of these faults are mapped as trending between N60W and N20E with dips
1 north or south ranging from 40 degrees to near vertical. The nearest fault is mapped as
being approximately 1300 feet south of the west abutment of the proposed bridge. None of
the nearby faults is considered active.
The dominant local fault system is the Rose Canyon Fault zone projected offshore along the
cost approximately 6 miles south-southwest of the site. Although the Rose Canyon Fault
zone has been seismically quiescent through most of recorded history, a series of
PI earthquakes with events up to Richter magnitude 4.2 were attributed to the Rose Canyon
Fault zone in San Diego Bay in mid 1985. Studies on the geologic history and character of
D the Rose Canyon Fault zone indicate that it is capable of producing a moderate to large
earthquake up to the estimated maximum Magnitude 7.
Other known active fault systems where recurring seismic events of Richter magnitude 4.0
or greater have been recorded are within the Elsinore Fault zone and the Coronado Banks
Fault zone, located approximately 23 miles northeast and approximately 21 miles southwest
(offshore) of the site, respectively. Both of these systems are also considered capable of
producing a moderate to large earthquake. The most recent activity on local fault systems
included a series of earthquakes registering up to magnitude 5.3 on the Richter Scale which
occurred on the nearest portions of the Coronado Banks Fault zone in July of 1986.
a/vbl - 6 -
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
Groundwater
f1 Due to the low site elevations and the proximity to the coastline, groundwater is generally
present within one foot of the ground surface in most areas of the canyon bottom. The
observed groundwater levels correspond to elevations ranging from approximately 13 to 16
feet (Mean Sea Level Datum). Borings made on the adjacent hillsides also encountered
groundwater at similar elevations.
DISCUSSIONS, CONCLUSION AND RECOMMENDATIONS
The discussions, conclusions and recommendations presented in this report are based on
the information provided to us, results of our field and laboratory studies, analyses, and
professional judgement. We have observed only a very small portion of the pertinent soil
and groundwater conditions. The geotechnical recommendations made are based on the
assumption that soil conditions do not deviate appreciably from those found during our
field investigation. If the plans for site development are changed, or if variations or
undesirable geotechnical conditions are encountered during construction, we should be"
consulted for further recommendations.
Potential Geologic Hazards
Faults and Seismicity
Our field studies did not indicate the presence of faulting within the project site. Several
fault segments mapped in the general site area are not considered active and are typical of
other faults observed in the Carlsbad area. It is our opinion that these faults do not
represent a significant geologic hazard to site development. However, if on-site faults are
discovered during future site studies or site grading their impact on site development should
be evaluated by an engineering geologist.
As noted previously, known active fault systems exist to the northeast and southwest of the
site. Therefore, it is not unreasonable to anticipate that the site as well as the entire North
County Coastal area, could experience relatively strong ground shaking due to a nearby or
distant earthquake.
a/vbl - 7 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
U Landslides
{~1 Two large diameter test borings were made in the west bridge abutment area within
landforms suspected as being possible ancient landslides. Our downhole observation of
D the above borings indicated that a landslide is not present in that area. No other landslides
are indicated by our studies to be at the project site.
Seismic Ground Motion
We understand that seismic design of the proposed bridge will be performed in accordance
y with current CALTRANS standards, based on ultimate strength concepts and the maximum
credible rock acceleration. Based on the California Division of Mines and Geology Map
I Sheet 45 "Rock Acceleration from Maximum Credible Earthquakes in California," 1987 by
Lalliana Mualchin and Allen Lynn Jones, the maximum credible bedrock acceleration in the
[~~j proposed bridge area is approximately 0.38g. The maximum peak accelerations at the
^ ground surface level in the deep alluvium areas may be lower than 0.38g due to damping of
D the earthquake waves in unconsolidated soils. Based on the information presented in Seed
and Idriss, 1982 we estimate the peak ground acceleration of 0.23g at the ground surface in
the bottom of Macario Canyon area.Q Using selected shear wave velocity measurements done by our firm in the San Diego area,
D along with general information on the correlation between shear wave velocity and geologic
age and type of material, summarized in the Handbook of Engineering Geophysics 1977, it
is our conclusion that "rock-like" material, defined as a material having shear wave velocity
|j in excess of 2,000 feet per second, is located approximately from 10 to 80 feet from the
present ground surface at Abutment 1 and Pier 2 and approximately from 80 to 150 feet
from the present ground surface at Piers 3 through 5 and Abutment 6.
p. Liquefaction Potential
Based on the model developed by Youd and Perkins (1978), the liquefaction susceptibility
n of saturated soils can be assessed in a very general way in accordance with the age and type
^ of deposit. According to this model, the alluvial deposits are expected to have moderate to
D high susceptibility for liquefaction. The Eocene age Santiago Formation on the other hand,
is unlikely to experience seismic induced liquefaction. The liquefaction susceptibility of
a/vbl - 8 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
soils can vary substantially from one site to another, dependent on the amount of
cohesionless sediment and its density in each unit.
According to the results of our field investigation, a considerable portion of the alluvial
deposits underlying the subject site is composed of clean or slightly silty sands that are
known to pose much larger liquefaction hazards than, for instance, fine-grained soils (clays
and plastic silts) of the same geologic age and type of deposition.
To evaluate the liquefaction potential of the alluvial soils at the project site in more detail,
we have utilized the approach based on the correlation of the soil behavior during the past
earthquakes with the Standard Penetration Test (SPT) blow counts developed by Seed and
Idriss. In accordance with the established correlation procedures, all blow counts taken in
sandy soils of the alluvium located below the water table were corrected for the overburden
pressure, rod length and silt content. These blow counts are plotted versus depth below the
ground surface on the Liquefaction Potential Chart (Figure 4). Two liquefaction potential
cut-off lines corresponding to the maximum peak ground accelerations of 0.38g and 0.23g
respectively are also shown in Figure 4. The above accelerations correspond to the
maximum credible bedrock acceleration and the estimated maximum credible acceleration of
the top of deep alluvial deposits in the canyon. All blow counts located to the left of the
liquefaction potential cut-off lines represent liquefaction potential at a corresponding
location.
Figure 4 indicates that most of the blow counts for sandy soils at the subject site plot to the
left of both cut-off lines. Based on the results of our analyses, it is our opinion that sandy
portions of the alluvial soils underlying the project site may experience liquefaction during
the maximum earthquake. It is our opinion that slopewash materials and fill soils at the
subject site have low potential for seismic induced liquefaction because they are located
predominantly above the groundwater table. There is no potential for liquefaction of soils
of the Santiago Formation.
Based on the results of our subsurface investigation we estimate that approximately 50 to
60 percent of the alluvial soils at the project site are comprised of granular materials
susceptible to liquefaction. We further estimate that the maximum thickness of a
continuous layer of such material at a given location is likely to vary from 10 to 20 feet.
a/vbl - 9 -
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
Erratic nature of the alluvial soils at the project site may result in even thicker continuous
layers of liquefaction susceptible soils at some locations.
It is our opinion that portions of the subsurface profile that undergo liquefaction may
experience considerable reduction in soil strength. Recent studies by Seed, 1987 provide
correlation between the average corrected blow count, NI, and residual strength of
liquefied material. Using this correlation, we estimate that the residual strength of liquefied
soil at the project site may range from 400 psf to 800 psf.
Based on the time lag between the strongest impact on the structure and liquefaction of the
underlying soils observed in several major earthquakes, such as Niigata (1964) and Alaska
(1964), and inferred from numerous acceleration-time histories, it is our opinion that a
larger portion of the original soil strength than indicated above may be available to resist
earthquake loads.
Soil liquefaction if it occurs at the project site will most likely manifest itself in sand boils,
ground subsidence and differential settlement, as well as permanent lateral deformation in
slope areas. Subsidence of the alluvial soils around a pile foundation rigidly supported on
underlying formational soils will generate negative skin friction (downdrag force) on the
pile surface. Recommendations relative to downdrag forces are presented further in this
report under "Pile Foundations." Stability of slopes for seismic and liquefaction condition
is discussed under "East Embankment Slope Stability."
Whether or not there would be lateral flow of the soils during liquefaction, is unknown.
Severe damage over a broad area is to be expected if lateral flow occurs. Damage to the
bridge and road embankment in case of lateral flow probably would not be prevented by the
f1 design recommendation presented herein. In this regard, in our opinion, the subsurface
conditions at the subject site are similar to much of the San Diego County coastal areas.
Groundwater
The groundwater encountered in the test borings at approximate elevations of 13 to 16 feet
(MSL Datum) appears to be the approximate surface of the permanent groundwater table.
Based on our experience, we expect that the groundwater surface slopes down slightly
toward Agua Hedionda Lagoon and that the groundwater level will vary only slightly due
a/vbl -10-
Woodward-Clyde Consultants
Project No. 8751455R-SI02
to seasonal variations in precipitation and runoff. Our experience indicates that local zones
of perched water may be found at higher elevations in formational and overburden soils
where permeable granular sediments are underlain by impermeable fine grained soils.
Site Grading and Earthwork
It is anticipated that site grading and earthwork will consist primarily of constructing of the
road embankments east and west of the proposed bridge in the Macario Canyon area. We
understand that all grading and earthwork will be done in accordance with applicable
portions of the Standard Specifications, State of California Department of Transportation.
The grading should be observed by and the compacted fills tested by a firm specializing in
soil testing services.
We recommend that all surface structures, pavements, vegetation, loose and/or porous
topsoils and slopewash materials, and large tree roots not removed by planned demolition
or grading, be excavated and removed from the planned fill areas. The exposed ground
surface should then be scarified, watered if required and recompacted to the required
density prior to placing fill. Debris and perishable material should be removed from the
site; topsoil may be stockpiled for future landscaping use, if desired.
In addition to the general earthwork recommendations described above, we recommend that
special procedures be used for construction of fill in the eastern portion of the Macario
Canyon. These procedures are discussed below.
East Embankment
Construction Options
Our subsurface investigation revealed that the east embankment area is underlain by a deep
section of alluvial soils consisting of erratically interbedded loose to medium dense sands
and soft to firm clays. We estimate that sliding slope failures are likely to occur if the
proposed embankment fill of up to 40 feet high is placed directly over the existing alluvial
soils. Soft clay materials with low shear strength, such as those found in Borings 3, 6 and
7, are especially prone to sliding failure. Mitigation of the slope stability failure in the east
embankment area can be done using one of the options described below.
a/vbl -11-
Woodward-Clyde Consultants
Project No. 8751455R-SI02
Option 1 - Construction of Embankment with Temporary Berms. This option requires
construction of temporary side berms around the proposed road embankment in the area
I underlain by alluvial soils (up to approximate Station 71+50). We recommend that 3 to 5
feet of especially compressible surficial alluvial soils be removed and a gravel mat wrapped
in filter fabric be placed over the embankment and the berms area prior to placement of the
earth fill. The gravel mat should have the minimum thickness of 3 feet and it may consist
of 3/4-inch or 1-inch crushed rock or of Caltrans Class II permeable material. The filter
fabric should be Mirafi 600X or equivalent. The gravel mat will facilitate placement of fill
below or in close proximity to the groundwater table, provide a relatively stable working
area, and it will also speed up consolidation of underlying alluvial soils.
We estimate that berms of approximately 20 feet high and 130 feet wide are required for an
embankment fill of 40 feet to prevent a sliding slope failure during or immediately after the
roadway construction. In our analysis we used a safety factor of 1.2 for sliding slope
failure at the time of embankment placement. We estimate that safety factor will reach a
value of 1.5 approximately one month later due to consolidation of soil with time under
embankment load.
A typical section showing the embankment configuration for Option 1 is presented in
Figure 5. The side berms shown in Figure 5 should be kept in place until underlying
alluvial soils attain strength needed to support the road embankment without a sliding
failure. We estimate that approximately 6 months will be required before the berms can be
removed. We recommend that settlement monitoring records be evaluated prior to berm
removal. Recommendations on settlement monitoring are presented further in the report
under "Settlement Monitoring."
Option 2 - Stage Construction. Stage construction option includes placement of the
embankment fill in two or more stages with waiting periods in between. The schedule of
stage construction is controlled by the strength of the underlying soils in their natural
condition and by the rate of soil strength increase under each increment of embankment
load. Results of our analyses for an example of a two-stage construction scheme indicate
that the alluvial soils in the east embankment area can support approximately 20 feet of
embankment fill if no side berms are constructed. In our calculations, we have assumed
that upper 3 to 5 feet of surficial material is removed and substituted with gravel and
a/vbl -12-
Woodward-Clyde Consultants
Project No. 8751455R-SI02
compacted fill as discussed above. We estimate that approximately 6 months will be
required until the alluvial soils attain strength sufficient to withstand a load from the
remaining 20 feet of embankment.
Option 3 - Stone Columns. This option includes reinforcement of alluvial soils within the
proposed east embankment area with stone columns extending down to competent
formational soil. Based on the subsurface profile in Figure 3, the depth of the stone
columns may reach over 100 feet in the toe of the slope area. Typical stone columns are 3
to 4 feet in diameter and are constructed at 6 to 8 feet on center. Our experience indicates
that installation of stone columns may be considerably more expensive than other
comparable site treatment alternatives. We recommend that the stone column option be
considered if project constraints preclude use of Options 1 and 2.
Estimated Settlement
We estimate that the total settlement of the east embankment due to consolidation of
compressible alluvial soils subjected to an embankment load may range from 24 to 36
inches. We estimate that it may take from 2 to 3 years for this settlement to achieve 80 to
90 percent of the above total values. The remaining estimated 2.5 to 7 inches of settlement
will, in our opinion, occur gradually over a relatively long period of time. The above
values assume a 40-foot high embankment placed in one stage. More time will be required
to achieve 80 to 90 percent of consolidation if a two-stage construction is selected.
Additional settlement may develop due to consolidation of compacted fill during its lifetime
II if the fill material increase in moisture. We estimate that such settlement may be up to 0.5
percent of the total fill height. Our experience indicates that fills with substantial amounts
of clayey soils are generally more settlement prone than fills composed of granular material.
Time and rate of this settlement (if it occurs) is unknown. It is our opinion, that settlement
due to compacted fill consolidation is a minor factor compared to settlement generated
within alluvial soils.
Procedures to Accelerate Settlement
Acceleration of the rate of settlement at the project site can be generally achieved by
installation of a vertical drain system and/or surcharging the site. Our experience indicates
a/vbl - 13 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
that wick drains are usually less expensive and they can be installed faster than other
vertical drain systems. A typical wick drain is a prefabricated strip with a core of flexible
polypropylene surrounded by a non-woven geotextile with high permeability. The drains
are inserted in the ground on a mandrel by a crawler-type crane or a backhoe. Usually, a
gravel or a sand blanket are laid over the site prior to drain installation to facilitate drainage
and construction operations.
A wick drain system can be used in combination with either Option 1 (Side Berms) or
Option 2 (Stage Construction) described above to accelerate consolidation of alluvial soils
and embankment settlement. Further settlement acceleration can be achieved by
surcharging the site. Surcharge can be also used without wick drains. Thickness of
surcharge fill and time of its placement is controlled by the time rate of consolidation of the
alluvial soils.
Settlements Monitoring
We recommend that settlement monuments be placed in the areas that have potential for
consolidation settlement prior to placing any fill, and the settlements be recorded by a
licensed surveyor on a weekly basis during grading and for the first month upon
completion of grading; readings may be made monthly thereafter. The location of the
settlement monuments will be determined in the field at the time of grading. We
recommend that settlement readings be forwarded to Woodward-Clyde Consultants for
periodic evaluation so that a time of surcharge removal can be established from the data.
Stability of Slopes
Stability of the east embankment slopes during the construction period was evaluated as a
part of our studies of construction options described above. Construction period is defined
in this report as a period of time required for the alluvial soils to reach 80 to 90 percent
consolidation. For the post-construction period we estimate that the east embankment with
slopes 40 feet high and inclination of 2 to 1 (horizontal to vertical) have a safety factor for
static conditions of 1.5 or greater.
During earthquake ground shaking, transient lateral seismic loads and the potential for soil
liquefaction may affect stability of the east embankment slopes. To evaluate seismic
a/vbl - 14 -
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
stability of those slopes, we used the simplified seismic stability and deformation analysis
approach presented by Makdisi and Seed (1977). A set of pseudo-static slope stability
analyses was first performed for the subject slope using Bishop method of slices modified
for use with composite failure surfaces. Computer program PC-SLOPE developed by
Geo-Slope Programming Ltd. (May 1985) was used in our computations; total stress
analysis method was used for all cases.
Soil strength parameters utilized in the slope stability analyses are summarized in Table 1.
The undrained residual shear strength of liquified sand was evaluated from a relationship
with SPT NI value (Seed, 1987). This relationship is based on parametric studies
performed for actual liquefaction induced slides. A conservative, 30th percentile blow
count value (Ni = 12) was used with this correlation which resulted in the undrained
residual shear strength of liquefied sand of 600 psf.
Results of the pseudo-static slope stability analyses were then used to evaluate permanent
displacement of the embankment in accordance with the above-mentioned Makdisi and
Seed procedures. Peak ground accelerations and earthquake magnitudes associated with
the maximum credible earthquake described above were used in our analysis.
Results of our analyses indicate that a permanent lateral deformation of up to 3 inches may
develop within the east embankment during the maximum credible earthquake if sandy soils
of alluvial deposits experience seismic-induced liquefaction.
Stability analyses require using parameters selected from a range of possible values.
Mathematical procedures used in slope stability analyses are based on several simplifying
assumptions. Therefore, there is a finite possibility that slopes having calculated factors of
safety as indicated above may become unstable and that permanent deformation larger than
those given above may develop during an earthquake. In our opinion, the probability of
slopes becoming unstable is low, and it is our professional opinion that the slopes can be
constructed as indicated above.
Protection From Slope Erosion
Fill slopes with 2:1 inclinations are susceptible to erosion and shallow sloughing in periods
of rainfall, heavy irrigation, and/or upslope surface runoff. Periodic slope maintenance
a/vbl - 15 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
may be required, including rebuilding the outer 1-1/2 to 4 feet of the slope. Erosion and
sloughing can be reduced by using inclinations flatter than 2:1, by overbuilding at least 3
feet and cutting back to the desired slope or by proper landscaping. To a lesser extent,
erosion and sloughing can be reduced by backrolling slopes at frequent intervals. As a
minimum, we recommend that fill slopes be backrolled at maximum 4-foot fill height
intervals. Additionally, we recommend that all fill slopes be trackwalked so that a dozer
track covers all surfaces at least twice.
Summary
Table 2 shows several examples of possible site treatment plans that may be used for the
east embankment area. For each of the plans, the table specifies one of the two
construction options: side berms or stage construction, and additional settlement
acceleration measures such as wick drains or surcharge. Total estimated waiting period
required to reach 80 to 90 percent consolidation is also presented in the table for each plan.
Information shown in Table 2 is intended as a guide for selection of a conceptual site
treatment plan. Combinations of site treatment measures other than those shown in Table 2
are possible. We will provide evaluation of feasibility and settlement estimates for other
plans of treatment if requested to do so.
West Embankment
Estimated Settlement
We anticipate that west embankment fills in the area of the west bridge abutment will be
placed over dense to very dense sands, silts and hard clays of the Santiago Formation. It is
our opinion that settlement of the foundation of those fills will be mostly instantaneous in
nature, and they will be essentially complete as the embankment is brought to specified
grades. We do not recommend a settlement waiting period for the west embankment. We
estimate that total post-embankment construction settlement will range from approximately
1 to 2 inches. It may take several years for this settlement to occur.
a/vbl - 16 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
Slope Stability
It is our opinion that west abutment slopes composed of compacted fill placed over soils of
Santiago Formation in accordance with the above grading recommendations and having
inclinations of 2:1 (horizontal to vertical) should have a calculated factor of safety for deep-
seated failure in excess of 1.5 for static conditions. This safety factor assumes that all
loose and/or compressible overburden soils are removed from the embankment as
recommended above under "Grading and Earthwork" and that no adverse geologic
condition exist in the slope area. We recommend that an engineering geologist examine
slope areas undercut for placement of compacted fill for possible adverse geologic
conditions such as out-of-slope bedding or water seeps during grading.
Pile Foundations
It is our opinion that steel H-sections and concrete-filled, steel-cased piles are more
appropriate than prestressed, precast concrete piles for highly seismic areas, especially
where there is a potential for soil liquefaction. Potential for steel corrosion may be
evaluated using local soil and water corrosivity data and results of our soil corrosivity test
presented in Appendix B.
It is our opinion that all piles supporting the subject bridge should be embedded in soil by a
minimum of 20 feet and they should be embedded at least 10 feet into unweathered soils of
the Santiago Formation. Estimated pile tip elevations based on the above recommendations
for each abutment and pier location are summarized in Table 3. The above elevations are
applicable to the current bridge layout available to us at this time. The pile tip elevations
should be adjusted if location of bridge supports is changed. The actual pile tip elevations
may vary at each pile group location and provisions should be made to allow cut off or
adding on to piles.
We recommend that ultimate and allowable pile load capacities be calculated using unit end
bearing and skin friction resistance values summarized in Table 4. The above values are
applicable to unweathered soils of the Santiago Formation. Both, end bearing and skin
friction resistance within the Santiago Formation can be used to calculate the downward
pile load capacities. Only friction resistance is available to withstand uplift loads.
a/vbl - 17 -
Project No. 8751455R-SI02
We further recommend that negative skin friction (downdrag force) associated with
potential for soil liquefaction be applied to each pile at Piers 3, 4, 5 and Abutment 6 for
seismic conditions. We estimate a downdrag force of 50 tons for a 12xl2-inch square pile.
The downdrag force can be prorated for other pile sizes proportionate to the pile surface
area.
We recommend that actual pile capacities be verified in the field by a suitable pile driving
formula at the time of driving. No reduction for group action is required if piles have a
minimum center to center spacing of at least three times the butt width. We recommend that
abutment piles not be driven until the abutment fills have stabilized and settlement is
essentially complete. It is estimated that long-term settlement due to pile loads will be less
than 1 inch.
Local experience indicates that predrilling or jetting may be required to advance
displacement piles through the dense soils underlying the bridge site. We recommend that
all piles be driven a minimum of 5 feet below the deepest point of jetting or predrilling.
Lateral Earth Pressures
It is recommended that retaining structures with level backfills, or with sloping backfills of
up to an inclination of 3:1 (horizontal to vertical), be designed for an earth pressure equal to
an equivalent fluid pressure of 36 pcf; retaining structures with sloping backfills with
inclinations from 3:1 to a maximum of 2:1 should be designed for an earth pressure equal
to an equivalent fluid pressure of 45 pcf. The above values are for backfill composed of
nonexpansive granular soil. All walls should be provided with backfill drainage to relieve
hydrostatic pressures.
It is recommended that a friction value between soil and concrete equal to 0.35 be used to
resist lateral pressures. If additional resistance is needed, it is recommended that a passive
pressure equal to an equivalent fluid pressure of 300 pcf be used for design. This pressure
assumes that the ground in front of the wall is level for a minimum distance of 10 feet or
twice the depth of the footing or key, whichever is greater. The upper 1 foot of material
should be neglected unless it is protected by paving. The above friction coefficient and the
passive equivalent fluid pressure incorporate a safety factor of 1.5
a/vbl - 18 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
UNCERTAINTY AND LIMITATIONS
We have observed only a very small portion of the pertinent soil and groundwater
conditions. The recommendations made herein are based on the assumption that soil
conditions do not deviate appreciably from those found during our field investigation. We
recommend that Woodward-Clyde Consultants review the foundation and grading plans to
verify that the intent of the recommendations presented herein has been properly interpreted
and incorporated into the contract documents. We further recommend that Woodward-
Clyde Consultants observe the site grading, subgrade preparation under concrete slabs and
paved areas, and foundation excavations to verify that site conditions are as anticipated or
to provide revised recommendations if necessary. If the plans for site development are
changed, or if variations or undesirable geotechnical conditions are encountered during
construction, we should be consulted for further recommendations.
M This report is intended for design purposes only and may not be sufficient to prepare an
accurate bid.
California, including San Diego, is an area of high seismic risk. It is generally considered
economically unfeasible to build a totally earthquake-resistant project; it is, therefore,
possible that a large or nearby earthquake could cause damage at the site.
Geotechnical engineering and the geologic sciences are characterized by uncertainty.
Professional judgements presented herein are based partly on our understanding of the
proposed construction, and partly on our general experience. Our engineering work and
judgements rendered meet current professional standards; we do not guarantee the
performance of the project in any respect.
Inspection services allow the testing of only a small percentage of the fill placed at the site.
Contractual arrangements with the grading contractor should contain the provision that he is
[J responsible for excavating, placing, and compacting fill in accordance with project
specifications. Inspection by the geotechnical engineer during grading should not relieve
the grading contractor of his primary responsibility to perform all work in accordance with
the specifications.
a/vbl - 19 -
Woodward-Clyde Consultants
Project No. 8751455R-SI02
This firm does not practice or consult in the field of safety engineering. We do not direct
the contractor's operations, and we can not be responsible for the safety of personnel other
than our own on the site; the safety of others is the responsibility of the contractor. The
contractor should notify the owner if he considers any of the recommended actions
presented herein to be unsafe.
a/vbl - 20 -
Project No. 8751455R-SI02
TABLE 1
Soil Properties Assumed in Slope Stability Analyses
Soil Unit <{) (degrees) c'(psf) y(pcf)
Compacted Fill 34 100 125
Alluvium 10 1,000 125
Alluvial Sand, Liquefied 0 600 125
Santiago Formation 35 300 125
a/vbl
&Cr*j
3
CO
CN v>
fJ J
>-J OHCQ ~g s
a
£
4—1
c^
4-*CJ •/-™**bo 5 C
.S o ° -2 ««'is "•-•' *5 'cS "£
t>- "O ^"O C
|| ol E
oo ^
c.2+-•
o
flj
Q
on_C
(-, C
Q'u g
-^ Q,*^
.^ CO
0) V2
bo g
co H
4—*
^4—i (^
N
c/5
t^o
r§
^
CN
« S
S s
1|
IS ^^
f— (Dbo
4_(
CO
§ 6E Z
vo O O\
CO CO VO CO OOo o o o o
*-"*-» 4-* 4-1 4-*
^ OO >O VO f»CN ^H CN
D D ai
0 C vo C vo
X— H X— t (^!
I S | - |
t^o
« C
co a
- 1^ oc ^ o o CJ D DS CN CN CN „ C C•a 83 o o
0 c8 Z Z
S CO
co
^ O O O D 4)
CO CO CO C C
•— I T-H T-H O Oz ^
O O O £? c?
0 0CN CN
O O O O O•* "t ^f CN (N
< CQ U < pq
•~ ' •— ' r- ' CN CN
c/5
JD
-oC
SSrt
^ -' S
(U t) <UW) bJ3 ^3 •
2 2 *"* Soo c^ b ^
<4_i VH V3 t3JO
C^ C^3 r^ oj
^ j2 c co
C c R •£o o c -5:g g vo ?
VO CO "g "g
fl_i fli ^ ^" u la, "&,
.— « t_^ ^5 y^
Qj O • i-H • ^H
on t/j <U D• rH -^H &J) b-0
<N CN £ fe
(U D XI X!bo fcO JJ o
SI co do co co 2
Project No. 8751455R-SI02
TABLE 3
Estimated Pile Tip Elevations
Estimated Tip Elevation, feet
Bridge Support (MSL Datum)
Abutment 1 +40
Pier 2 +3
Pier 3 -67
Pier 4 -112
Pier 5 -102
Abutment 6 -72
TABLE 4
Ultimate and Allowable Pile Load Capacities
Unit Capacities, tsf
Ultimate Allowable
End Bearing 140 70
Skin Friction 2 1
a/vbl
OJECT^TE
CONTOUR INTERVAL 20 FEET
LOCATION MAP
MACARIO CANYON BRIDGE
CHECKED BY: l/^ [ PROJECT NO: 8751455R-SI01J PATE: 9~7~88 | FIGURE NO: 1
WOODWARD-CLYDE CONSULTANTS
-t-><D
r®C*-l
0)Oa
tMS-t
en
T3C3O
&
0)r-*
-(->
(^;~?
Ot-t
JZ-t->
0!
Q
DRAWN
N1 , blows per foot
10 20 30 40 50
0 III..
10 _
20 .
30 _
40 .
50 -
60 _
70-
80 _
90-
100-
110-
120-
0 o
•1
• 1
• o /
• /. o /A _. /• O | //• /
• / /- •/ ° // . // /
• / // /./ /• / /
A • 1
\\ 1
I II
' 1•
\
LEGEND :
o Blow counts from Boring- 1 • Blow counts from Boring 6
• Blow counts from Boring 3 A Blow counts from Boring 7
Liquefaction Potential Cut-off Lines:
for amax = 0.38g-
for amax = 0.23g-
Note: Blow counts, M^ shown for soil classifications SP, S.M , SC
(due ;to mixed soils presence of ML and CL in soriie samples
can no be precluded)
LIQUEFACTION POTENTIAL CHART
MACARIO CANYON BRIDGE
BY: Cb CHECKED BY: l//^ I PROJECT NO:8751455R-SI01 DATE:9-7-88 1 FIGURE NO: 4
WOODWARD-CLYDE CONSULTANTS
i-zUJ
CQ
LU
Q
<
Oo:
Q
UJt/>OQ.
Oo:o.
i/)to
u
zo
H
U
UJto
a:
I-D
Oi
UJ
toOa.
°UJ
Oi
UJ
H
1-
<
UJ
CQ
toto
UJ
Qia
Ou
u
LLI
D_toLU
i±
LU
Q.
Q.
si
uj
LU
I-o
to
Is
u-LU Qi
tO CQ
S Zcs: oUJ >.
CQ z
S3
to O
_I QL
< <
U U
^
i
ooi
DATEROJECT NO:8751U55R-SI 02a
Oui
Uui
U
CQ
DRAWN
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
APPENDIX A
FIELD INVESTIGATION
Seven exploratory borings were advanced at the approximate locations shown on the Site
Plan (Figure 2). The drilling was performed between April 5 and 12, 1988 and on
LJ September 28, 1988 under the direction of a geologist from our firm. Borings 1, 3 and 4
were done using 8-inch diameter hollow-stem auger, Borings 2 and 5 were done using 30-
inch diameter bucket auger and Borings 6 and 7 were done using rotary-wash technique
and a 4-7/8-inch bit. Samples of the subsurface materials were obtained from the borings
using a modified California drive sampler (2-inch diameter and 2.5-inch outside diameter)
with thin brass liners, or a Standard Penetration sampler (1 3/8-inch diameter and 2-inch
outside diameter). The sampler was generally driven 18 inches into the material at the
bottom of the hole by a 140-pound hammer falling 30 inches; thin metal liner tubes
containing the sample were removed from the sampler, sealed to preserve the natural
moisture content of the sample, and returned to the laboratory for examination and testing.
The location of each boring and the elevation of the.ground surface at each location were
estimated by available grading plan.
a/vbl A-l
Project: MACARIO CANYON BRIDGE KEY TO LOGS
Date Drilled:
Type of Boring:
Q
8a.
to
CO Blows/ftWater Depth: Measured:
Type of Drill Rig: Hammer:
Material Description
|f o £* <n "oQ § a-Q
h_ •
s|
Surface Elevation:
°-
5-
10-
15-
20-
-
-
25-
30^
/.
I
I
-^
-—
-
/
,/
•,N
\-\/ s
DISTURBED SAMPLE LOCATION
Sample obtained by collecting auger cuttings in a plastic bag.
LOCATION OF DRIVE SAMPLE OBTAINED WITH
MODIFIED CALIFORNIA SAMPLER
Sample with recorded blows per foot was obtained with a
Modified California drive sampler (2" inside diameter, 2.5"
outside diameter) lined with sample tubes. The sampler
was driven into the soil at the bottom of the hole with a
1 40 pound hammer falling 30 inches.
LOCATION OF DRIVE SAMPLE OBTAINED WITH
STANDARD PENETRATION SAMPLER
Sample with recorded blows per foot was obtained with a
standard split spoon sampler (1.375" Inside diameter, 2"
outside diameter). The sampler was driven into the soil at
the bottom of the hole with a 140 pound hammer falling
30 inches and the sample placed in a plastic bag.
Fill
Sand
Clay
Silt
Sand/Clay
GS - Grain Size Distribution Analysis
PI - Plasticity Index
LL - Liquid Limit
SDS - Slow Direct Shear Test
DCS - Unconfined Compression Test
CT - Consolidation Test
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
•«
Figure: A-1
Project: MACARIO CANYON BRIDGE
Date Drilled: 4-5-88 Water Depth: 7"
Type of Boring: 8" HSA Type of Drill Rig: CME 550
* see Key to Logs, Fig. A-1
j£H.i:<D
0
in<D
0.
(0to Blows/ftLog of Boring No: 1
Measured: At time of drilling
Hammer: 140 Ibs. at 30" drop
Material Description
MoistureContent,%^£*'<o "o
Q g °-
Q
5 *<"•B «6,2
Surface Elevation: Approximately 17'
0
-
5-
10-
15-
20-
25-
30^
1-1
1-2
1-3
1-4
1-5
1-6
X
II
I
I
I
I
Push
18"
2
7
7
22*
19
22
Loose, moist to wet, light brown to light gray, silty medium to
fine sand (SM) ALLUVIUM
Loose, wet, very dark gray, very silty medium to fine sand with
some clay (SM) ALLUVIUM
Loose, wet, pale olive, clayey medium sand (SC) to silty sand
(SM) ALLUVIUM
"On rock
Medium dense, wet, light gray, silty medium to fine sand (SM)
ALLUVIUM
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
—
—
—
.
—
-
31
20
22
87
109
106
GS
GS
GS
GS
Figure: A-2
Project: MACARIO CANYON BRIDGE
'5-i:
Q
30"
35-
-
40-
-
45-
50-
55-
60-
65^
00CD
Q.
CO
1-8
1-9
1-10
1-11
1-12
1-13
1
I
\/\
*
s
n Blows/ft21
20
22
837
5"
507
3"
100
Log of Boring No: 1 (Cont'd)
Material Description
(Continued) medium dense, wet, light gray, silty medium to
fine sand (SM) ALLUVIUM
Very dense, moist, pale olive, siity medium sand (SM)
SANTIAGO FORMATION
'Bottom of Boring at 56 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
-
-
-
-
2 +s
22
17
&* U> 15"""^ C Q,
0)Q
104
114
-c to
SDS
Figure: A-3
Project: MACARIO CANYON BRIDGE Log of Boring No: 2
Date Drilled: 4-12-88 Water Depth: 42' Measured: At time of drilling
Type of Boring: 30" bucket auger Type of Drill Rig: ED-45L Hammer: --
* see Key to Logs, Fig. A-1
Q
o
Q.
03 Blows/ftMaterial Description
MoistureContent,%£•"</> t3
Q
t__ «
<D W-C (/)
Surface Elevation: Approximately 56'
0
-
5-
-
10-
_
-
15-
-
20-
25-
30^
2-1
2-2
2-3
2-4
2-5
2-6
^
z
/
1_
2
Very dense, moist, pale olive, very silty fine sand (SM)
SANTIAGO FORMATION
Contact attitude N21'W 10'S at 5.5'
U Hard, olive, fat clay (CH)
Contact attitude N25'W 6'S on a 5" layer of silt at 9'
Contact attitude N25'W 4'S on a 5" layer of silt at 13.5'
Very dense, moist, pale gray brown with light reddish brown
mottles, silty fine sand (SM)
SANTIAGO FORMATION
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants ^
-
—
-
—
_
-
-
"
-
—
—
-
Figure: A-4
Project: MACARIO CANYON BRIDGE Log of Boring No: 2 (Cont'd)
<B "*~
30^
-
35-
-
40-
45-
-
50-
55-
r r\ .bU
65^
CO
CD
"Q.
co
CO
2-7
2-8
2-9
2-10
2-11
2-12
2-13
2-14
2
7_
I
7
I
I
7_
/Blows/ftMaterial Description
\
\
'//,
(Continued) very dense, moist, pale gray brown with light reddish
brown mottles, silty fine sand (SM)
SANTIAGO FORMATION
Contact attitude N25'W 5'S on a irregular 6" layer of silt at 32.5'
Very dense, moist, gray brown, silty fine sand (SM) with some
discontinuous thin lenses of hard, dark brown, silty lean
clay and very dense, fine sandy silt (ML)
SANTIAGO FORMATION
Contact attitude N25'W 6'S at 50'
Very hard, moist, brown with olive brown mottles, silty lean
clay (CL) SANTIAGO FORMATION
Very dense, moist, gray brown, fine sandy silt (ML)
SANTIAGO FORMATION
Very hard, moist, olive brown, fat clay (CH)
SANTIAGO FORMATION
h very hard, moist, olive brown, silty lean clay (CL) "
SANTIAGO FORMATION
Bottom of Boring at 65 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
—
-
—
—
-
-
-
;MoistureContent,%&* (rt O*™\ c o1~1 CD
O
CD »>
Figure: A-5
Project: MACARIO CANYON BRIDGE Log of Boring No: 3
Date Drilled: 4-6-88 Water Depth: 8" Measured: At time of drilling
Type of Boring: 8" HSA Type of Drill Rig: CME550 Hammer: 140 Ibs. at 30" drop
* see Key to Logs, Fig. A-1
.
CD "~
$
O.
COCO
*;01
0
CD
Material Description
2 —•"
'5 o °2 O
s;
Q c Q.CD
Q
w_ *
CD £
6 H
Surface Elevation: Approximately 16'
0
_
-
5-
w
10-
-
-
_
15-
_
20-
"
25-
_
30^
3-1
3-2
3-3
3-4
3-5
3-6
3-7
y_j
ilLJ
. ;
i
y
^
1
1
I push
18"
1/18"
9
9
9
9
18
\ \s sX Xf SX Xy sX X^ sX Xf /X X
X Xf Sx xf S
s /
Vxf SX X/ s
s sx xy /X Xf f
s sX X
x xf SX X
X Xf /
X Xf Sx x
x xf S
X Xf /X Xf Sx xf Sx x
f SX X^ sX X
X X
X X^ sX X^ sX X
Vxf /
X Xf SX Xf SX X/ /X X
X Xf SX Xf SX X
f SX Xf SX X/ sX Xf /X X/ s
X Xj' SX Xy /X Xy sX X/ /X X^ /X X
^x x
X X
X X
x x
X X
X X
x x
x x
X XsX X
jTx x
X Xf /X Xf SX X
f SX X/ sX X
Loose, wet, gray brown, silty medium sand (SM)
""x^ ALLUVIUM ^
Loose, wet, gray, clayey fine to medium sand (SC) and sandy
lean clay (CL) ALLUVIUM
Firm, wet, dark gray, sandy lean clay (CL) and loose, wet, dark
gray, very clayey fine sand (SC)
ALLUVIUM
Firm, wet, gray, sandy lean clay (CL) and loose, wet, gray,
very clayey fine sand (SC) with some interlayers of gray.
silty medium to fine sand (SM)
ALLUVIUM
Interbedded, loose, wet, light brown, poorly graded sand (SP)
and medium dense, wet, mottled, light brown and light gray,
clayey medium to fine sand (SC) and sandy clay (CL)
ALLUVIUM
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
_
-
—
~
—
-
-
_
—
_
—
-
~"
__
-
«.
24
27
101
97
GS,
LL=35
Pl=16
GS,
LL=36
Pl=20
LL=35
Pl=19
CT
Figure: A-6
Project: MACARIO CANYON BRIDGE
_,_-
Q
30"
_
35-
™
_
40-
45-
<H
50-
-
55-
60-
-
-
-
65^
to<D
Q.
ro
CO
3-8
3-9
3-10
3-11
3-12
3-13
3-14
I
-
y
~
-
I_
I
I
I
,
7*
o
CD
10
13
35
18
16
6**
Log of Boring No: 3 (Cont'd)
Material Description
x xS fX Xf fX Xf fX Xf fX Xf SX XfX X
X X
X XsX XsX XsX X
x x
X XsX X
X X
X X
X X
X X
X X
X X
X XfX X
X X
X X
X XsX X
X X
X X
X Xy
(Continued) interbedded, loose, wet, light brown, poorly graded
sand (SP) and medium dense, wet, mottled, light brown and
light gray, clayey medium to fine sand
ALLUVIUM
(SC) and sandy clay (CL)
Medium dense, wet, light brown, silty medium sand (SM) and
poorly graded sand (SP)
ALLUVIUM
_
With interbeds of mottled light brown and gray and light gray,
silty fine sand (SM) and clayey sand (SC)
\ F
"Sand in sample liquified
/Interbedded, medium dense, wet, dark
/ (SW) containing particles of dark gray
gray, well graded sand \
claystone and siltstone, \
and dark gray, silty fine sand (SM), with layers of firm, wet, very
dark gray, fat clay (CH) or dark gray, fine sandy lean clay
(CL) ALLUVIUM
Project NO: 8751455R-SI02 Woodward-Clyde Consultants^
-
—
-
_
—
—
—
~
<D *J
^ §*- UJ rt
.<£. c 3s
O o20
19
si
£•"</> t3Q C Q.
Q
108
. •
<D »
-C to5,2
GS
GS
Figure: A-7
Project: MACARIO CANYON BRIDGE Log of Boring No: 3 (Cont'd)
.
<D *~Q
65^
-
70-
75-
80-
85-
90-
95-
100^
in
"5.
roCO
3-15
3-16
3-17
3-18
3-19
3-20
3-21
K
I
,
V
I
I
I
£c/>
0
CD
18
16
19
13
13
20
24
Material Description
x \f SX Xf SX Xf S
X Xf SX Xf SX X\\s sX Xf SX Xf SX Xf SX Xf SX X^ s
/ sX Xf SX Xf SX Xf SX V^ sX Xf SX X^ sX X^ sX X^ sX X^ sX Xf S
X X^ sX X
f SX Xf S
s s
X X^ s
s s
s s
s sX X/ s
s sX Xf S
/ s
s s
s s
s sX Xf /X X^ sX \f SX X^ sX X/ ss \^ sX Xf /, X X/ s
s /
s s, X X/ s
(Continued) interbedded medium dense, wet, dark gray, well
graded sand (SW) with layers of lean clay (CL) and fat clay (CH)
ALLUVIUM
^ — Sample predominantly clayey
^ — Sample predominantly sandy
Medium dense, wet, gray, silty medium sand (SM) with firm,
gray, lean sandy clay (CL)
ALLUVIUM
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
J
-
-
-
-
~-
CD «_r
^ c
5 8
28
si
0>Q
99
o> <2-c to
K
LL=32
Pl=16
GS
Figure: A-8
Project: MACARIO CANYON BRIDGE Log of Boring No: 3 (Cont'd)
0- ~0)
0
100 _
105-
110-
115-
120-
125-
130-
135^
ina>
a.
nsCO
3-22
3-23
3-24
3-25
X
I
I
F.Blows/ft17
17
99
SO/
1.5"
Material Description
x x' fX X' fX X' fX X' fX Xf fX Xf SX X
X X
X Xf SX Xf f
X X
X Xf SX X
X X
\ X
X X
X Xf fX Xf S
(Continued) medium dense, wet, gray, silty medium sand (SM)
with firm, gray, lean sandy clay (CL)
ALLUVIUM
Dense, moist, gray to dark gray, clayey fine sand (SC) with
many small dark gray, siltstone particles
SANTIAGO FORMATDN
Very dense, moist, olive gray, fine sandy silt (ML)
SANTIAGO FORMATION
Very dense, moist, pale olive gray, silty medium to fine sand (SM)
SANTIAGO FORMATION
Bottom of Boring at 120.5 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants ^
-
—
-MoistureContent,%Q
i_ *
-C UJ
GS
Figure: A-9
Project: MACARIO CANYON BRIDGE Log of Boring No: 4
Date Drilled: 4-5-88 Water Depth: 4' Measured: At time of drilling
Type of Boring: 8" HSA Type of Drill Rig: CME 550 Hammer: 1 40 Ibs. at 30" drop
* see Key to Logs, Fig. A-1
_£--
Q
CD
CL
CO
vt
0m
Material Description = 1to -j± S^is
>,^-
Q
5 ^2
5,2
Surface Elevation: Approximately 18'
0
™
5-
10-
15-
™
-
20-
-
25-
-
_
30^
4-1
4-2
4-3
4-4
4-S*T \J
4-6
4-7
y
^L_
VA
jyf\
i
n
V
/\l
I
u
I
10
10
10
8
181 O
30
54
////
V
y/
////
s sX Xs sX Xs sX \s sX Xs sX Xs sX Xs sX Xs sX Xs sX X
X X/• sX Xs sX Xs sX Xs sX Xs sX X
X Xs sX Xs sX X/ sX X
/ s
//
V
ty
//
V,
V/Ay/y/
s. Moist, gray brown, clayey fine sand >
^X^. CM 1 S^*<^ FILL /
Stiff, moist, dark gray brown, fine sandy lean clay (CL) porous
SLOPEWASH
Loose to medium dense, moist, gray brown, very clayey fine
sand to sandy clay (SC/CL)
ALLUVIUM
Medium dense, moist, pale brown, very silty fine sand (SM)
ALLUVIUM
Stiff, wet, olive brown, fat clay (CH) highly brecciated
WEATHERED SANTIAGO FORMATION
Dense, moist, pale olive, very silty fine sand (SM)
WEATHERED SANTIAGO FORMATION
Hard, moist, pale olive to olive gray, lean to fat clay
(CL-CH) WEATHERED SANTIAGO FORMATION
Very dense, moist, olive , fine sandy silt (ML)
WEATHERED SANTIAGO FORMATION
Very hard, moist, olive brown, lean clay (CL)
WEATHRED SANTIAGO FORMATION
Very dense, moist, pale olive, silty medium sand (SM) with some
reddish brown mottles and interbeds of olive, fine sandy silt
(ML) SANTIAGO FORMATION
Project NO: 8751455R-SI02 Woodward-Clyde Consultants 4r
—
31 92
GS
LL=41
Pl=26
GS
LL=63
Pl=33
UCS=
1170PSF
Figure: A-10
Project: MACARIO CANYON BRIDGE Log of Boring No: 4 (Cont'd)
-C~a.~o>
Q
30^
-
35-
40-
45-
50-
55-
60-
65^
CO
CD
Q.
roCO
4-8
4-9
4-10
)(
I
X Blows/ft77
50/4"
50/3"
Material Description
(Continued) very dense, moist, pale olive, silty medium sand
(SM) with some reddish brown mottles and interbeds of olive,
fine sandy silt (ML)
SANTIAGO FORMATION
Bottom of Boring at 41 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
—
—
-MoistureContent,%3^£" « t5
Q § °-
Q
k^ *<D co
-C t)6^5
Fgure: A-11
Project: MACARIO CANYON BRIDGE Log of Boring No: 5
Date Drilled: 4-12-88 Water Depth: 45' Measured: At time of drilling
Type of Boring: 30" bucket auger Type of Drill Rig: ED 45L Hammer:
* see Key to Logs, Fig. A-1
0.—
CD
Q
enCO
Q.
EroV)
„
5o
CD
Material Description
CO »-"
l|aR
O O2 O
-
E^'tn t3
Q
5 ^>jC (/)
6£
Surface Elevation: Approximately 58'
Q""
_
-
_
-
5-
10-
15-
20-
25-
30^
5-1
5-2
5-3
5-4
5-5
5-6
5-7
7
I
~L
7
1~
—,/
//
%
'//
//
Dense, moist, pale olive, silty fine sand (SM) with some clasts
of dark olive claystoneSANTIAGO FORMATION
Very hard, moist, olive, lean clay (CL) brecciated with some
lime infilling SANTIAGO FORMATION
Very dense, moist, pale olive gray, silty medium to fine sand (SM)
SANTIAGO FORMATION
Very dense, moist, olive brown, fine sandy silt (ML)
SANTIAGO FORMATION
Contact attitude N21 'W 5'S at 9.5'
Very dense, moist, pale olive, silty medium to fine sand (SM)
SANTIAGO FORMATION
Contact attitude N45'W 9'S at 19'
Firm to stiff, moist, olive brown, lean to fat clay (CL/CH)
. SANTIAGO FORMATION
Very hard, moist, olive brown with dusky red mottles, lean
clay (CL) SANTIAGO FORMATION
Very dense, moist, gray brown with dusky red mottles, very
silty fine sand (SM)
SANTIAGO FORMATION
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
_
-
_
-
—
-
LL=76
PI 40
Figure: A-1 2
Project: MACARIO CANYON BRIDGE
<D "~
Q
30"
—
35-
-
40-
45-
50-
55-
*
60-
M
••
65^
0>
Q.
(0co
5-8
5-9
2
7_
To
0m
Log of Boring No: 5 (Cont'd)
Material Description
//
(Continued) very dense, moist, gray brown with dusky red
mottles, very silty fine sand (SM)
SANTIAGO FORMATION
Contact attitude N29KW 13'S at 64'
Very hard, moist, olive brown, lean to fat clay (CL/CH)
SANTIAGO FORMATION
Project No: 8751455R-SI02 Woodward-Clyde Consultants ^
-
—
—
-
—
—MoistureContent,%£*'tn "o^ C Q,<B
Q
>» *
Figure: A-13
Project: MACARIO CANYON BRIDGE Log of Boring No: 5 (Cont'd)
_cf
0) **~
Q
65^
70-
75-
80-
85-
90-
95-
100^
ino>
Q.
(0
CO
5-9A
5-10
2
2 Blows/ftMaterial Description
' //
l
(Continued) very hard, moist, olive brown, lean to fat clay (CL/CH),
NS^ SANTIAGO FORMATION /
Very hard, moist, brown with olive brown mottles, lean clay
(CL) SANTIAGO FORMATION
Bottom of Boring at 72 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
—
-
—
—
-MoistureContent,%e~\ c. Q.<DQ
<D £>
6°
Figure: A-^H
Project: MACARIO CANYON BRIDGE Log of Boring No: 6
Date Drilled: 4-28-88 Water Depth: 4' Measured: At time of drilling
Type of Boring: 4.875" Rotary Type of Drill Rig: Mayhew 1 000 Hammer: 1 40 Ibs. at 30" drop
* see Key to Logs, Fig. A-1
j£
CD "~
Q
COCD
Q.
EcoC/3
0
5-
-
-
10-
-
1 KI O
20-
30^"
6-1
6-2
6-3
6-4
6-5
6-6
6-7
6-8
6-9
6-10 Blows/ftMaterial Description
MoistureContent,%Q
5 .2
f^ (/)
Surface Elevation: Approximately 18'
3
9
5
8
4
L
' 11
9
10
21
7
-
X
X
X
X
X
X
X
X
Moist, pale gray brown, clayey fine sand
FILL
Loose, moist, pale brown, poorly graded sand (SP) with some
thin layers (up to 2") of gray, fine sandy lean clay (CL)
ALLUVIUM
Loose, wet, mottled dark gray brown, very clayey medium to fine
sand (SC) and light brown, silty medium to fine sand (SM) with
occasional layers of lean clay (CL)
ALLUVIUM
Fat clay (CH) 10.5' to 11. 5'
Loose, wet, gray with some dark green mottles, clayey medium
to fine sand (SC) ALLUVIUM
Loose, wet, gray, silty medium and fine silty sand (SM)
ALLUVIUM
Loose to medium dense, wet, light brown, poorly graded sand
. and silty medium to fine sand (SC-SM) .
\ ALLUVIUM /
Loose, wet, gray to gray brown, slightly to very clayey medium
to fine sand (SC) and sandy lean clay (CL)
ALLUVIUM
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
-
-
—
-
6
26
39
10
31
99
82
GS
GS,
LL=25
Pl=7
LL=30
Pl=18
GS
GS,
LL=35
Pl=19
UCS=
865 psf
Fgure: A-15"
D
Project: MACARIO CANYON BRIDGE Log of Boring No: 6 (Cont'd)
.
a. ~<DQ
30"-
~
35-
-
-
40-
-
50-
55-
c noO
p cDO v
tnCD
"5.
Ero
6-11
6-12
6-13
6-14
6-15
6-16
6-17
6-18
6-19
6-20
6-21
6-22
5CO
o
m
10
19
14
24
16
14
22
38
21
55/3
62/
3.5"
75/6
Material Description
X Xt
sX XsX XsX XsX XsX X
f SX X^ sX Xf SX Xf S
y\
X Xf SX Xf S
X Xf SX Xf SX Xf SX X
'//
///
//•
^
(Continued) loose, wet, gray to gray brown, slightly to very
clayey medium to fine sand (SC) and sandy lean clay (CL)
ALLUVIUM
Medium dense, wet, gray brown with some dark reddish brown
mottles, clayey medium to fine sand (SC)
ALLUVIUM
Medium dense, wet, brown, slightly silty to poorly graded sand
(SM/SP) with some very clayey medium to fine sand (SC)
ALLUVIUM
Medium dense to firm, wet, gray brown to gray, very clayey
medium to fine sand (SC) and sandy lean clay (CL) with
interbeds (up to 8") of brown, silty to poorly graded sand
(SM/SP) ALLUVIUM
Medium dense, wet, light gray with some light yellowish brown
mottles, silty medium to fine sand (SM)
ALLUVIUM
Stiff, wet, gray to olive gray, fine sandy to silty lean to fat
clay (CL/CH) with some zones of clayey sand (SC)
ALLUVIUM
Very dense, moist, olive gray, very fine sandy silt (ML)
SANTIAGO FORMATION
Very dense, wet, pale olive gray, silty fine sand (SM)
SANTIAGO FORMATION
Bottom or Bormq at 64.5 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
~
—
-
-
—
-
-
D «-."
5 o2 O
23
21
si
^ <n "o
0)
Q
103
106
<D CO
-C «6£
GS,
LL=24
Pl=7
GS
GS
LL=42
Pl=25
Figure: A-16
D
Project: MACARIO CANYON BRIDGE Log of Boring No: 7
Date Drilled: 9-28-88 Water Depth: 7' Measured: At time of drilling
Type of Boring: 4.875" Rotary Type of Drill Rig: Mayhew 1000 Hammer: 1 40 Ibs. at 30" drop
* see Key to Logs, Fig. A-1
CO0>
Q.e
03CO
^^
^CO
o
m
Material Description
0) ~ii*
O o2 0
.
£•"« "o
Q
OJ W
-C CO
H
Surface Elevation: Approximately 20'
o"
5-
-
10-
15-
20-
25-
o r\30^
7-1
7-2
7-3
7-4
7-5
7-6
7-7
7-8
7-9
K
K
I
I
J
•^T
IJ_
i)
r
^_
y/>
11
7
10
14
18
14
13
10
12
iX X
X X
X Xf SX XX /
s /X Xjf S
/ /X X^ /XX /X XX XXf SxX /X XX XX^ s
s s
X^ s\.s s\.s /\s sXf SX^ s
s s
s s
s s
X^ sXf S\.s sx^ sXf SX/ fX/ s\.
Moist, pale gray, silty sand with some zones of fine sandy clay
FILL
Moist, pale brown, silty sand and pale gray, clayey sand with
some zones of dark brown, sandy lean clay
FILL
Wet, dark gray, poorly graded gravel (crushed rock)
FILL
Filter fabric at contact
Soft to firm, wet, dark gray, silty to fine sandy lean to fat clay
(CL/CH) ALLUVIUM
Medium dense, wet, gray to dark gray with brown mottles,
clayey medium to fine sand (SC) and lean sandy clay (CL)
ALLUVIUM
Medium dense, wet, light brown, silty sand (SM) and poorly
graded sand (SP)
ALLUVIUM
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
-
-
-
-
24
20 108
LL=32
Pl=19
GS
Figure: A-1 7
Project: MACARIO CANYON BRIDGE Log of Boring No: 7 (Cont'd)
<D "~Q
30"
-
35-
40-
45-
-
50-
55-
60-
65X
in<D"5.
ra
CO
7-10
7-11
7-12
7-13
7-14 Blows/ft29
50/6"
55/2"
55/3"
85/6
Material Description
(Continued) medium dense, wet, light brown, silty sand (SM) and
poorly graded sand (SP)
^^ ALLUVIUM ^
Medium dense, wet, gray brown with reddish brown zones,
clayey sand (SC) and silty sand (SM)
\ ALLUVIUM ^^
Very dense, wet, pale gray, silty fine sand (SM)
SANTIAGO FORMATION
Bottom of Boring at 55.5 feet
Project NO: 8751 455R-SI02 Woodward-Clyde Consultants^
-
—
—
—
-
<s _-
^ C
5 o2 O
^ C O<DQ
J__ *
-C (/)
Fgure: A-1 8
Woodward-Clyde Consultants
Project No. 8751455R-SI02
APPENDIX B
LABORATORY TESTS
The materials observed in the borings were visually classified and evaluated with respect to
strength, swelling, and compressibility characteristics; dry density; and moisture content.
The classifications were substantiated by performing grain size analyses and evaluating
plasticity characteristics of representative samples of the soils.
The strength of the soils was evaluated by performing unconfined compression tests and a
direct shear test on selected samples, and by considering the density and moisture content
of the samples and the penetration resistance of the sampler. Compressibility
characteristics were evaluated by performing consolidation tests. Soil corrosivity was
evaluated by a pH and resistivity tests. The results of the moisture content and the dry
density tests on drive samples, are shown with the penetration resistance of the sampler at
the corresponding sample location on the logs, Figure A-2 through A-19. The grain size
distribution curves and plasticity index test results are shown in Figure B-l through B-4
and B-7 through B-9. The results of the direct shear test are presented in Figure B-5. The
,-, results of the consolidation tests are reported in Figure B-6 and in Figures B-10 and B-l 1.
Results of the corrosivity test as submitted to us by Clarkson Laboratory and Supply, Inc.
L-' are shown in Figure B-12.
a/vbl B-l
UNIFIED SOIL CLASSIFICATION
COBBLES GRAVEL
COARSE FINE
U.3. tUKVK SIZE IN INCHES
SAND
COARSE] MEDIUM FINE
U.3. STANDARD SEVE No.
SILT OR CLAY
HYDROMETER
100
3/4 3/8 4 10 20 40 80 14O 200
0
20
O
fe
CJ
5
CO%o<
woPC:wPL,
ffi
woKW
20
100
GRAIN SIZE IN MILLIMETER
SYMBOL BORING
O 1-2
n 1-3-4
A 1-4
0 1-6-4
Remark :
DEPTH(ft) (SBJ DESCRIPTION
SILTY FINE SAND (SM)
SILTY FINE SAND (SM)
SILTY FINE SAND (SM)
SILTY FINE SAND (SM)
87551455R S101 MACAR10 CANYON BRIDGE
Woodward Clyde
Consultants
San Diego, CA
GRAIN SIZE DISTRIBUTION Figure NO. B i
c
UNIFIED SOIL CLASSIFICATION
COBBLES GRAVEL
COARSE 1 FINE
U.S. SIEVE SIZE IN INCHES
SAND
CtMRSEJ MEDIUM FINE
U.3. STANDARD SffiVE No.
S/£7* Q/J CLAr
HYDBOHETBR
100
20 40 60 14O 200
10s 10 10 1 1(T
GRAIN SIZE IN MILLIMETER
SYMBOL BORING
O 3-2-4
D 3-4-4
A 3-8-4
0 3-11-4
Remark :
DEPTH
(ft) J*J
35
36
fc) DESCRIPTION
16 FINE SANDY CLAY (CL)
20 CLAYEY FINE SAND (SC)
SILFY FINE SAND (SM)
SIL7Y FINE SAND (SM)
0
8751455R SI01 MACARIO CANYON BRIDGE
Woodward Clyde
Consultants
San Diego, CA
GRAIN SIZE DISTRIBUTION
AND PLASTICITY INDEX Figure No. B-2
UNIFIED SOIL CLASSIFIC
COBBLES GRAVEL
COARSE | FINE
U.S. ausYK SIZE IN INCHES
SAND
CtMRSEJ MEDIUM FINE
U.3. STANDARD SEVE No.
S/£r 072 CL4r
HYDBOMETER
100
3/4 3/8 4 10 80 40 80 140 200
80
« 60
CO
40
o
20
0
103
SYMBOL BORING
O 3-19-4
D 3-22-4
5-6
10'10 1 KT1
GRAIN SIZE IN MILLIMETER
3-15-3
4-6-3
DEPTH(ft) (*J
76
35
32
63
DESCRIPTION
SILTY FINE SAND (SM)
SILTY FINE SAND (SM)
40
19
16
33
Remark :
ICT
£
W
CU
100
875U55R SI01 MACAR10 CANYON BRIDGE
Woodirard Clyde
Consultants
San Diego, CA
GRAINSIZE DISTRIBUTION
AND PLASTICITY INDEX Figure No. B-3
UNIFIED SOIL CLASSIFICATION
COBBLES GRAVEL
COARSE | FINE
U.S. SIEVE SIZE IN INCHES
SAND
COWSEJ MEDIUM FINE
U.S. STANDARD SIEVE No.
SILT OR CLAY
HYDROMETER
100
O
CO<!
DH
gwo«w(X,
3/4 3/8 4 10 20 40 60 140 200
T^t
GHTD BYRETPERCEM>ooGRAIN SIZE IN MILLIMETER
SYMBOL BORING
O 4-2-4
D 4-4
DESCRIPTION
41 26 FINE SANDY LEAN CLAY (CL)
SILT WFTH FINE SAND (ML)
Remark ;
87551455R SI01 MACARIO CANYON BRIDGE
Woodward Clyde
Consultants
San Diego, CA
GRAIN SIZE DISTRIBUTION Figure No. B-4
r r
5
CO
gK
62
28
10.0
5.0
.0 5.0 10.0 15.0
NORMAL STRESS IN KSF
20.0 25.0
10.0
(72
CO
5.0 4fi
r-i
H
o
oc
.00 .06 .12 .18 .24
HORIZONTAL DEFORMATION IN INCH
.30
DEPTH (ft)BORING/SAMPLE : 1-12-4
DESCRIPTION : SUY SAND (SM)
STRENGTH INTERCEPT (C) : 1.411 KSF
FRICTION ANGLE (PHI) : 47.8 DEC f oTOFK,rTHN
(PEAK STRENGTH^
SYMBOL
O
D
MOISTURE
CONTENT (s)
14.9
15.2
DRY DENSITY VOID
(pet) RATIO
118.4 .396
118.1 .400
NORMAL PEAK
STRESS (leaf) SHEAR (kef)
2.00
4.00
3.62
5.82
RESIDUAL
SHEAR (kal)
1.93
4.15
Remark :
8751455R SI01 MARCARIO CANYON BRIDGE
Woodward Clyde
Consultants
San Diego, CA
DIRECT SHEAE TEST Figure NO. B 5
CONSOLIDAIOrURAPH
X axis:Log of Pressure,tsf; Y axis:Uoid Ratio, e
(.35.
S.2&
S.17.
S.07.
5.93.
s.8*
5.7*
5.70.
5.60.
5.51.
5.32.
-S.32 — ' - 1 - 1 - 1 - 1 - 1 - 1 - 1-5.2S -3. €7 -2.01 -0.11 1 - 1 - 1 - 1 - 1 - 1 -
1.22 2.85 1.18 f.ll 10,-1
Sample 3-5-4
INITIAL DRY DENSITY, pcf
INITIAL WATER CONTENT, %
INITIAL SATURATION, %
FINAL DRY DENSITY, pcf
FINAL WATER CONTENT, %
FINAL SATURATION, %
102
24
97
109
21
100+
SPECIFIC GRAVITY OF SOLIDS
INITIAL VOID RATIO, 60
COMPRESSION INDEX. Cr
SWELL INDEX, C,.
EFFECTIVE OVERBURDEN PRESS, P'0, tsf
MAX. PAST PRESSURE, Pc, tsf
2.69
0.6-5
0.14
0.5
CONSOLIDATION TEST
MACARIO CANYON BRIDGE
DRAWN BY: cfa | CHECKED BY: | PROJECT NO: 8751455R-SI01 | PATE: 9-7-83 j FIGURE NO: B-6
WOODWARD-CLYDE CONSULTANTS
UNIFIED SOIL CLASSIFICATION
COBBLES GRAVEL
COARSE FINE
U.S. SIEVE SEE IN INCHES
SAND
COARSE MEDIUM FINE
U.S. STANDARD SIEVE No.
SILT OR CLAY
HYDROMETER
100
3/4 3/8 4 10 30 40 60 14O 200
0
1CP
GRAIN SIZE IN MILLIMETER
SYMBOL BORING
O
D
A
6-2-3
6-2-4
6-3
6-7
25
DESCRIPTION
SILTY FINE SAND (SM)
POORLY GRADED FINE SAND WITH SILT (SP-SM)
7 CLAYEY FINE SAND (SC)
CLAYEY FINE SAND (SC)
Remark :
8751455R SI02 MACARIO CANYON BRIDGE
Woodward Clyde
Consultants
San Diego, CA
GKAIN SIZE DISTRIBUTION Figure NO.B-7
UNIFIED SOIL CLASSIFICATION
COBBLES GRAVEL
COARSE | FINE
U.S. SIEVE SEE IN INCHES
COARSE
U.S.
SAND
MEDIUM | FINE
STANDARD SIEVE No.
SILT OR CLAY
HYDROMETER
100
3/4 3/8 4 10 20 40 60 140 200
« 60
to<3P-,
uKwPL,
20
0
10'
SYMBOL BORING
O 6-8-3
D 6-12-2
A 6-14-4
0 6-16-3
Remark :
10 10 1 10"1
GRAIN SIZE IN MILLIMETER
LL PI
fit) 60 DESCRIPTION
35 19 CLAYEY FINE SAND (SC)
24- 7 SILJY CLAYEY FINE SAND (SC-SM)
SILTY.CLAYEY RNE SAND (SC-SM)
CLAYEY FINE SAND (SC)
0
E-a
QW
Z
I
WoKW
PH
100
icr3
8751455R SI02 MACARIO CANYON BRIDGE
Woodward Clyde
Consultants
San Diego, CA
GRAIN SIZE DISTRIBUTION Figure NO. B-a
UNIFIED SOIL CLASSIFICATION
100
80
t-£0t— 1
« 60
»•— 4CO
S30.
£ 40
o04
PL,
20
0
1
SYMBC
O
Rem
rnaar pc1 GRAVEL
COARSE FINE
U.3. SIEVE SIZE IN INCHES
3 3/4 3/8 4
o* 10
)L BORING
7-9-4
ark :
2
D
SAND
COARSE MEDIUM FINE
U.S. STANDARD SIEVE No.
10 2O 40 60 14O 2x-\
^t
Y\
\
\1
\(i
S/X7* 07? CLAY
HYDROMETER
00
>V\,^-e-H* QD O) *^ N OO O O O OOPERCENT RETAINED BY WEIGHT10 i icr' I'CT^ icr3
GRAIN SIZE IN MILLIMETER
EPTH LL PI(ft) OO (*) DESCRIPTION
CLAYEY FINE SAND <SC)
\
8751455R SI02
Woodward Clyde
Consultants
San Diego, CA
MACAR10 CANYON BRIDGE
GRAIN SIZE DISTRIBUTION Figure NO. B-9
10
4
E-
ffi
W
ffi
5 8w
0
E-
O
20
Comp
Spec
Reir
COMPRESSIVE STRESS
1
\
>
\\
\V \
IN
^\
KSF
10
(
^\
BORING : 6-4-4 DESCRIPTION
DEPTH (ft) : LIQUID LIMIT
SPEC. GRAVITY : 2.80 PLASTIC LIMIT
MOISTURE DRY DENSITY
CONTENT («) (pcf)
INITIAL 38.7 81.6
FINAL 28.7 97.0
ression Index, Cc = 0.39
ific Gravity of Solids = 2.75
iark :
8751455R SI02
WOODWARD-CLYDE
CONSULTANTS
SAN DIEGO
\\\\
: FAT CLAY (CH)
PERCENT
SATURATION
95
100
10 2
1 I 1.146
. 1.060
. _ .976
O
1
Q1— «0
. . .889 >
- .803
.717
VOID
RATIO
1.146
.806
MACARIO CANYON BRIDGE
CONSOLIDATION TEST Figure NO. B-IO
COMPRESSIVE STRESS IN KSF
CHANGE IN HEIGHT*». to oi-*^ 6
o
wa,
8
10
•c-I
o^•- ."-•N.
>
^s
1
t \
\
10
1 \
^V\,\\\\\v\>
10 2
_i_J .590
BORING : 7-7-4 DESCRIPTION : CLAYEY SAND (SC)
.558
.528
O
1
0
O
.494 >
.462
.431
DEPTH (ft) : UQUID LIMIT : 32
SPEC. GRAVITY : 2.75 PLASTIC LIMIT : 13
MOISTURE DRY DENSITY PERCENT VOID
INITIAL
CONTENT (*)
20.0
(pcf)
108.0
SATURATION
94
RATIO
.590
FINAL 16.8 117.4 100 .463
Compression Index, Cc = 0.19
Specific Gravity of Solids = 2.67
Remark :
87514585R SI02
WOODWARD-CLYDE
CONSULTANTS
SAN DIEGO
MACAR10 CANYON BRIDGE
CONSOLIDATION TEST Figure NO. B-II
LABORATORY REPORT
Telephone (619) 425-1993 Established 1928
CLARKSON LABORATORY AND SUPPLY INC.
350 Trousdale Dr. Chula Vista, Ca. 92010
ANALYTICAL AND CONSULTING CHEMISTS
Date: 10-10-88
Purchase Order Number: Job Number 8751455R SI02
Account Nuirber: WOOX
To:
Woodward Clyde
1550 Hotel Circle North, Suite 200
San Diego, CA. 92108
Laboratory Number: S02045 Customers Phone No: 224-2911
Sample Designation:* *
One soil sample from Macoria Canyon Bridge
Job Number 8751455R SI02 mix of boring 7.
ANALYSIS: By Test Method No. Calif. 643-C October 2, 1972 State of
California Department of Public Works Division of Highways
Materials and Research Department Method for Estimating the
Service Life of Metal Culverts.
SAMPLE
pH 7.8
Water Added (ml) Resistivity (ohm-cm)
100 12640
50 8530
50 2720
50 1200
50 850
50 820
50 920
50 1010
The above results indicate 28 years to perforation for a 16 gauge
metal culvert, and 51 years to perforation for a 12 gauge.
Water Soluble Sulfate 0.02 %
Figure B-12
Wood ward-Clyde Consultants
Project No. 8751455R-SI02
ATTACHMENT 1
LOGS OF TEST BORINGS SHEET
a/vbl