HomeMy WebLinkAbout3890; MAHR RESERVOIR; AS-GRADED COMPACTION REPORT; 2007-01-10••, . I 47 18028 City of Carlsbad January 10, 2007 5950 El Camino Real Contract No.: 131376 Carlsbad, CA 92008 Attention: Mr. John Maashoff .Subject: As-Graded Compaction Report Project: MAHR Reservdir East of Rancho Santa Fe Road Carlsbad, CA References: 1. "Geotechnical and Limited Environmental Evaluation, Encino Basin Phase II Recycled Water Distribution System, Stanley A. IvIAHR Reservoir, Carlsbad Califi)rnia," prepared by Ninyo and Moore, dated October 24, 2003. 2. Construction Plans/hr MAHR Reservoir Improvements, Contract No. 38901, prepared by CGvL Engineers, dated January 2005. Dear Mr. Maashoff: In accordance with your request, Testing Engineers San Diego (TESD) has conducted grading observations and compaction testing on the earthwork performed at the above referenced project site. Services described herein were provided by TESD from March 30, 2006 to November 17, 2006. A representative of this office observed the 6 foot over-excavation of the equipment building pad in general accordance with the above referenced geotechnical investigation. The exposed sub- grade of the over-excavation bottom was scarified a minimum of 8-inches, moisture conditioned, and compacted. A minimum of 90 percent of the maximum dry density was obtained per ASTM D1557 method 'at random spot locations prior to fill placement. Fill was moisture conditioned, placed, and compacted. A minimum of 90 perceiitof the maximum density was obtained at random spot locations. The parking area located east of the building pad was filled up to design sub-grade and tested fora minimum 95 percent of the maximum dry density in the upper I foot of sub-grade. It should be noted that compaction testing on the rock base section was not requested nor performed within the parking areas. Compaction operations on utility trench lines were also observed and tested for compliance with the project plans. Summaries of laboratory and field compaction test results are provided, in Appendix A, Tables I and 2, respectively. On site and import materials were used during the grading operations. The fill was placed, compacted, and tested for compliance with a miniil1um 90% and 95% relative compaction requirement, as applicable. Testing Engineers San Diego, Inc. A Bureau Veritas Company Main (858) 715-5800 7895 Convoy Court, Suite 18 Fax (858715-5810 San Diego, CA 92111 www.us.bureauveritas.com City Of Carlsbad Contract No.: 131376 MA}-IR Reservoir It should be noted that the precision of the field and laboratory maximum dry density test results are subject to variation inherent with Itesting procedures and heterogeneous material characteristics. Quantitative values of testing precision have been documented by the American Society of Testing and Materials. For example, results indicate the accuracy of the ASTM D- 1557 test to be plus or. minus 4 percent of the mean density. Based on this information, relative compaction results should be interpreted as approximate values subject to variations in lateral and vertical directions. Survey lines and elevations relative to grade modifications, final design grades, locations of various elements, etc., were established by others. Field Monitoring services provided by this office, consisting of visual observation of compaction operations and random in-place density test, are intended as assistance to the owner/client in monitoring apparent reasonable compliance with 'the project earthwork specifications. The presence of our field representative during the work progress did not involve any direct supervision of the contractor/subcontractor. Technical advice and suggestions were provided upon request based upon the results of the tests and observations. In any case, no' warranty or responsibility for the contractor's performance is intended or implied. Based on the observations and testing made during construction by TESD representatives, it is our opinion that the equipment building and parking lot grading was constructed in general conformance with the approved project plans andspecifications, and is considered suitable for the intended use. If you should have any questions after reviewing this report, please do not hesitate to contact the undersigned at (858) 715-5800.; Respectfully 'submitted, TESD, Inc. Nick Tracy, EIT Staff Engineer NTIVO Attachments: Appendix A: Table I and Table 2 Distribution : (4) Addressee *Includes copies for Building Department submittal. / V- - (4'INN OAP ( No. C-600 No. GE-2578 76 \ Exp. 6/30/08 1 * ACE, RGE j• Van W. Olin, GE 25 Principal Geotechn e City of Carlsbad Contract No.: 131376 MAHR Reservoir Appendix A City of Carlsbad Contract No.: 131376 MAHR Reservoir TABLE! RESULTS OF MAXiMUM DENSITY TESTS (ASTM-D-1557) SAMPLE # DESCRIPTION MAXIMUM DRY OPTIMUM MOISTURE DENSITY (PCF) CONTENT (%) V On-site: Lt. Brown Silty SAND 130.5 V 9.5 2 import: Brown-Orange Silty SAND wi 126.5 9.0 Gravel 3 Import: Rock Base 145.0 5.5 4 Import: Red-Orange Silty SAND wl 131.0 9.5 Gravel Contract Number: 131376 Project Name: MAHR Reservoir Location: Carlsbad, California TABLE 2 REPORT OF COMPACTION TEST DATA Test I Test I Sample # I Date I Test Location I I I Moisture I I I EIe. I Dry Density (pcf) I Relative Compaction I I Conform I I I Non,-Conform Field I Opt. Field Maximum Obtained Required 1 1 51412006 west End of Equip bldg. Pad 594.4 15.67o 9.5'Vo 117.5 130.5 90% 90'Yo uontorm 2 1 5/4/2006 East End of Equip Bldg. Pad 594.6 14.7% 9.5% 119.8 130.5 92% 90% Conform 3 1 5/4/2006 Center of Equip -Bldg. Pad 592.7 13.5% 9.5% 120.8 130.5 93% 90% Confomi 4 1 5/12/2006 Center of Equip Bldg. Pad 594.2 10.4% 9.5% 1174 130.5 90% 90% Conform 5 1 5/16/2006 Electrical Trench, Center ofPad 594.4 9.9% 9.5% 120.4 130.5 92% 90% Conform 6 2 5/1.7/2006 West.Endofquip Bldg. Pad 596.0 10.6% 9.0% 115.2 126.5 91% 90% Conform 7 2 5/17/2006 . East End of Equip Bldg. Pad. 596.0 9.7% 9.0% 116.7 126.5 92% 90% Conform 8 2 5/18/2006 West End of Equip Bldg;Pad 597.0 10.1% 9.0% 117.5 126.5 . 93°k 90% Conform 9 2 5/18/2006 East End of Equip Bldg. Pad 597.0 10.2% 9.0% 118.5 126.5 94% 90% Conform 10 1 5131/2006 Parking-Area East Side of Keyway. 592.6 10.4% 9.5% 119.9 1305 92% 90% Conform 11 1 5/31/2006 Parking Area West Side of Keyway 592.4 10.2% 9.5% 119.4 130.5 91% 90% Conform 12 1 6/1/2006 Parking Area, West End 596.7 9.7% 9.5% 118.1 130.5 90% 90% Conform 13 1 6/1/2006 Parking Area, East End 596.0 9.9% 9.5% 118.9 130.5 91% 90% Conform 14 1 6/2/2006 Equipment Bldg Pad Slope West End 595.6 8:7% 9.5% 119.0 130.5 . 91% 90% Conform 15 1 6/2/2006 Equipment Bldg. Pad Slope East End 596.0 9.5% 9.5% 119.5 130.5 92% 90% Conform .16 1 6/5/2006 Equipment Bldg. Pad Slope West End 595.0 9.8% 9.5% 119.8 130.5 92% 90% Conform 17 1 6/5/2006 Equipment Bldg. Pad Slope East End 594.0 10.0% 9.5% 122.5 130.5 94% 90% Conform 18 1 6/6/2006 Equipment Bldg. Pad Slope West End 596.0 9.4% 9.5% 124.9 130.5 96% 90% Conform 19 1 6/6/2006 Equipment Bldg. Pad Sloe East End . 594.0 9.7% 9.5% 123.8 130.5 95% 95% Conform 20 1 617/2006 Equipment Bldg. Pad Slope Center 545.0 9.7% 9.5% 124.2 130.5 95% 95% Conform 21 1 6/8/2006 Radius Slopé@ Parking Area, NE 596.0 9.2% 95% 124.9 130.5 96% 95% Conform Radius 22 1 6/8/2006 Radius Slope @ Parking Area, NE 594.0 9.0% 9.5% 124.6 130.5 95% 95% Conform Radius 23 4. 8/21/2006 Conduit Bank Trench, top of Dam, Trench -5'SG 11.9% 9.5% 121.5 131.0 93% 90% Conform Bottom, North End of Trench 24 4 8/21/2006 Conduit Bank Trench, top of Dam, Trench -5'SG 13.8% 9.5% 122.6 131.0 94% 90% Conform Bottom, Center of Trench 25 4 8/21/2006 Conduit Bank Trench, top of Dam, Trench -5'SG 12.5% 9.5% 122.0 131.0 93% 90% Conform Bottom, South End of Trench Contract Number: 131376 Project Name: MAHR Reservoir Location: Carlsbad; California TABLE 2 REPORT OF COMPACTION TEST DATA Test # Sample Test Test Location Ele. Moisture I Dry Density (pcf) Relative Compaction Conform Date Field Opt. Field Maximum Obtained Required Non-Conform 26 4 8/21/2006 Conduit Bank, Face of Dam, 30' from Top -5'56 12.3% 9.5% 123.2 131.0 94% 901/0 Conform 27 4 8/22/2006 Conduit Bank, Face ofDam, 100'from -5' SG 11.5% 9.5% 121.7 131.0 93% 90% Conform Top 28 4 8/22/2006 Conduit Bank, Face of Dam, 40 From -5'SG 11:9% 9.5% 120.6 131.0 92% 90% Conform Base of Dam 29 4 8/22/2006 Conduit Bank, 20' N of Equip Bldg, Top-of -5SG 13.7% 9.5% 120:2 131.0. 92% 90% Conform Dam 30 : 4 8/24/2006 Conduit Trench, Top of Dam, South End -2'SG 12.4% .9.5% 120.6 131.0 92% 90% Conform 31 4 8/24/2006 Conduit.Trench, Topofbám, North End -2'SG 9.5% 9.5% 121.5 131.0 93% 90% Conform 32 4 8/24/2006 CànduitTrench, Face of Dam, 45' From -2'SG 11.5% 9.5% 120.4 131.0, 92% 90% Conform Top ofDam . 33 4 8/24/2006 Conduit Trench, Face of Dam, 35' From -2'SG 9.9% 9.5% 120:7 131.0 . 92% 90% Conform Base of Dam 34 4 9/26/2006 .10' N of Puilbox B, Top of Darn SG 6.0% 9.5% 118.2 131.0 90% 90% Conform 35 4 9/26/2006 15'.N of Pulibox C, Top of Darn SG 7.1% 9.5% 120.7 131.0 92% 90% Conform 36 4 9/26/2006 2_0'N of PullboxD, Top of Darn SG 7.5% 95% 118.5 1;3'1.0 90% 90% Conform 37 4 9/27/2006 Pipe Support Pedestal #6 Footing, Face 540.0 9.5% 9.5% 119.9 131.0 92% 90% Conform of Dam: . . 38 4. 9/27/2006 Pipe Support Pedestal #5 Footing, Face 545.0 8.7% 9.5% 118.2 131.0 90% 90% Conform of Dam 39 4 P9/27/2006 Pipe Support Pedestal #4 Footing, Face 550.0 10.7% 9.5% 121.2 131.0 93% 90% Conform of Dam 40 4 9/27/2006 :Pipe Support Pedestal #3 Footing, Face 558.0 9:1% 9.5% 121.8 131.0 93% 90% Conform of Dam V . . 41 4 97/2006 Pipe Support Pedestal #2 Footing, Face 562:0 11.1% 9.5% 122.1 131.0 . 93% 90% Conform of Dam . V. 42 4 9/27/2006 Pipe Support Footing, Face of Dam 568.0 10.7% 9.5% 120.0 131.0 92% 90% Conform 43 4 9/27/2006 Pipe Support Pedestal #5 Footing, Face 570.0 12.4% 9.5% 120.6 131.0 92% 90% Conform of Dam . Contract Number: 131376 Project Name: MAHR Reservoir Location: Carlsbad, California TABLE 2 REPORT OF COMPACTION TEST DATA Test Moisture Dry Density (pcf) Relative Compaction Conform Test Sample Test Location Ele. #_____________________________________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date, Field Opt. Field Maximum Obtained .'Required Non-Conform 44 4 ' 9/27(2006 North Sideot Conduit incasement, Face 547.0 7.9'b 9.5% ' 113.5 1.31.0 47o 30'% Conform of Dam 45 4 9/27/2006 'North Side of Conduit Incasement, Face 555.0 8.3% 9.5% 118.4 ' 131.0 90% 90% Conform of Dam 46 4 9/29/2006 Electric Trench Along Site Access'Road ' 11.1% 9.5% 124.3 131.0 95% 90% Conform 47 4 9/29/2006 Electric Trench Along Site Access Road 8.3% 9.5% 123.5 131.0 94% 906/6 Conform 48 4 9/29/2006 ElectricTrench Along Site Access Road 9.4% 9.5% 124.4 131.0 95% 90% Conform 49 4 10/2/2006 Electric Trench, Site Access Road, 7.1% 9.5% 124.2 131.0 95% 90% Conform Connection to Control Bldg. 50 4 10/2/2006 Electric Trench, Site Access Road, 11.5% 9.5% 125.3 131.0 96% 90% Conform Connection to Control Bldg. 51 4 10/4/2006 Electric Trench Along Site Access Road SG 8.3% 9.5% 124.1 ' 131.0 95% 90% Conform 52 4 10/4/2006 Electric Trench Along Site Access Road SG 9.1% 9.5% 120.1 1,31.0 92% 90% Conform 53 4 10/5/2006 Electric Trench Along Site Access Road SG 11.5% 9.5% 118.8 131.0 91% 90% Conform' 54 4 10/5/2006 Electric Trench Along Site Access Road SG 10.3% 9.5% 122.7 ' 131.0 94% 90% Conform 55 4 10/5/2006 Electric Trench Along Site Access Road SG 9.1% 9.5% 121.3 131.0 93% 90% Conform 56 4 10/6/2006 Ductile Iron Pipeline, Sta 42+00 -2'SG 8.3% '9.5% 122.0 131.0 93% 0% Conform 57 4 10/6/2006 Ductile Iron Pipeline, Sta 42+00 SG 10.3% 9.5% 123.8 131.0 95% 90% Conform 58 4 10/6/2006 Ductile Iron Pipeline, Sta 43+00 -2'SG 13.2% 9.5% 120.8 131.0 92% 90% Conform 59 4 10/6/2006 Ductile Iron Pipeline, Sta 43+00 SG 11.1% 9.5% 122.1 , 131.0 93% 90% Conform TABLE 2 REPORT OF COMPACTION TEST DATA Contract Number: 131376 Project Name: MAHR Reservoir Location: Carlsbad, California Test I Sample #1 II Test I I .. I Test Location I I I Ele. Moisture I Dry Density (pcf) I I _______________________________________________________ Relative Compaction I Conform Date j Field Opt. Field Maximum Obtained Required Non-Conform 60 4 10/10/2006 NW Slope, Control Bldg, Top of Slope 11.5% 9.5% 124.3 131.0 95% 90% Conform 61 4 10/10/2006 NW Slope, Control Bldg, Top of Slope 9.5% 9.5% 121.9 131.0 93% 90% Conform 62 4 10/1712006 Pipe Support Pedestal #1, Face of Dam .. 8.7% 9.5% 121.5 131.0 93% 90% Conform 63 4 .10117/2006 Pipe Support Pedestal #3, Face of Darn 7.9% 9.5% 120.6 131.0 92% 90% Conform 64 4 10/17/2006 Pipe Support Pedestal #6, Face of Dam 9.5% 9.5% 120.4 131.0 92% 90% Conform 65 4 10/18/2006 Pipe Support Pedestal #2, Face of Dam 7.1% 9.5% 122.5 131.0 94% 90% Conform 66 4 10/18/2006 Pipe Support Pedestal #5, Face of Darn 9.1% 9.5% 123.7 131.0 946% 90°k Conform 67 4 10/24/2006 Ductile Iron RCW Line, Sta 43+00 -3SG 10.3% 9.5% 121.2 131.0 93% 90% Conform 68 4 10/24/2006 Ductile Iron RCW Line, Sta 43+00 . SG 11.9% 9.5% 122.0 131.0 93% 90% Conform 69 4 11/1/2006 Ductile Iron RCW Line, Sta 41+40 -2SG 7.9% 9.5% 122.6 131.0 94% 90% Conform 70 4 11/1/2006 Ductile Iron RCW Line, Sta 41+40 SG 9.1% 9.5%' 124.6 131.0 95% 90% Conform 71 4 11/2/2006 South Side of ConduitBank,'Face of 8.7% 9.5% 121.5 131.0 93% 90% Conform Dam, 40 From Top of Dam 72 4 11/2/2006 South Side of Conduit Bank; Face of 10.7% 9.5% 124.1 131.0 95% 90% Conform Dam, 15' From Top of Dam 73 4 11/6/2006' 'Conduit Bank,, Face of Dam, 10' From 7.5% 9.5% 125.0 131.0 95% 90% Conform Top ofDam 74 4 11/17/2006 Electric Trénch45'Eof Entrance 9:5% 9.5% 123.3 1310 94% 90% Conform Driveway