Loading...
HomeMy WebLinkAbout3901; FIRE STATION 6; FIELD STRUCTURAL STEEL AND WIELDING INSPECTION REPORT; 2007-11-1613UDEK Field Structural Steel and Welding Inspection Report, TYPE OF WORK [] INSPECTOR LJTECHNICIAN AVAILABLE: SOILREPORT (Y) (N) SPECS (V) (N) Structural Steel, Welding & Shop Fabrications APPROVED PLANS ( (N) APPROVED SHOP DRAWINGS (Y) (N) CHITECT WEEK ENDING: PROJECT NO: WLC Friday, November 16, 2007 5225 REPORT NO. PG. OF K.13 Leung AndAssociates,Inc. 101507 CCNTRACTOR PLAN FILE NO: PERMIT NO: Edge Development, Inc. CB062002 SUB-CONTRACTOR PROJECT NAME: WhitesSteelInc. CarlsbadFireStation #6 INSPECTION ADDRESS ADDRESS OF PROJECT; 45534 Towne Street Indio Ca. 92201. 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Wide flange beams and Steel angle, Tube steel. W'eldors of record: Cesar Melchor, Luis Camacho, Ishmael Ayala, Juan Estrada. Welding of columns, Horizontal members. )' Checked fit-up. > Checked root opening. > Checked interpass cleaning. ) No preheat needed ambient temperature only due to the thickness of the tube steel. — >Checkedcoverpassesonsomeof the finished welds, they appear tobeacceptable. Building frames on this date, the columns indentifies frames and locations: > Frame 103A and 102B. > Frame 100B and 100A. - > Frame 101B and 101A. Weld Processes: > SMAWE7O1B. > FCAW NR 232. > Welding of single pass fillet welds. - > Full Penetration welding Per conversation with the project manger Mike with Whites steel, Whites has to rebuild frames that were tacked and ready to weld. New tube steel had to be ordered because the dimensions varied from the actual dimensions in the field on site. The new dimensions were given by Mike with Edge after measuring field conditions. Fabrication of column 105A in progress, the welding of the column was missed during fabrication of the other columns; thecolumnwillhavetobeUltraSonically testedwhentheframesarefinishedonFriday,November16,2007. All work and welding Appears to be being done visually acceptable per AWS D1.1, AISC to the best of my knowledge. SITE TIME START: 0530 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5Hours VERIFIED BY 1010 CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature - David W Goins Monday, _November 12,2007 CWI Stamp Date of Report SD City 937/ CWI 04060471/ ICC 5214617-85 DAVID W. GOINS CWI 04060471 UCI lxi'. 6/01170 DUDEK Field Structural Steel and Welding Inspection Report. TYPE OF WORK [] INSPECTOR "TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) Steel, Welding & Shop Fabrications - Structural APPROVED PLANS (V) (N) APPROVED SHOP DRAWINGS (V) (N) ARCHITECT WEEK ENDING: PROJECT NO: WLC Friday, November 16, 2007 5225 ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 CONTRACTOR PLAN FILE NO: PERMIT NO: Edge Development, Inc. CB062002 SUI3-CONTRACTOR PROJECT NAME: Whites Steel Inc. Carlsbad Fire Station #6 INSPECTION ADDRESS ADDRESS OF PROJECT: 45534 Towne Street Indio Ca. 92201. 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Wide flange beams and Steel angle, Tube steel. Weldors of record: Cesar Melchor, Luis Camacho, Ishmael Ayala, Juan Estrada. Welding of Columns, Horizontal members. Checked fit-up. ' Checked root opening. > Checked interpass cleaning. > No preheat needed ambient temperature only due to the thickness of the tube steel. -> Checked cover passes on some of the finished welds, they appear to be acceptable. Building frames on this date, the columns indentifles frames and locations: Frame 103A and 102B. > Frame IOOB and bOA. - > Frame I01B and LOlA. Weld Processes: SMAWE7O18. > FCAW NA 232. > Welding of single pass fillet welds. - > Full Penetration welding Whites Steel is requesting Ultra Sonic testing on Friday, November 16, 2007, @ 06:00 for the frames and column 105A. Fabrication of the stairs is tentative to start Wednesday, November 14, 2007. I did receive WPS's for the field welding and Weldors going to be welding on the project, the certifications appear to be current and up-to date. I told the shop foreman that no slugging of the weld joint is acceptable, slugging is a term that is used to fill larger welded joint than aloud. Only sharpie V notch filler material is allowed, no other foreign filler is acceptable per AWS D1.1 Section 5.0 on filler metals that are acceptable. I did call Canyon Testing @ 07:45 about UT on Friday, November 16, 2007, I left message to have Canyon Testing call me back ASAP. All work and welding Appears to be being done visually acceptable per AWS D1.1, AlSC to the best of my knowledge. SITE TIME START: 0530 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5 Hours VERIFIED BY i DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Tuesday, November 13, 2007 CWI Stamp Date of Report Signature David W Goins DAVID W. GOIHS SD City 937/ CWI 04060471/ICC 5214617-85 CWI 04060471 QC1 EXP. 6101110 DUDEK Field Structural Steel and Welding Inspection Report. TYPE OF WORK Ix INSPECTOR LJTECHNICIAN AVAILABLE: SOIL REPORT (V) (N) SPECS (V) (N) Structural Steel, Welding & Shop Fabrications APPROVED PLANS (V) (N) APPROVED SHOP DRAWINGS () (N) ARCHITECT WEEK ENDING: PROJECT NO: WLC Friday, November 16, 2007 5225 ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 COUTRACTOR PLAN FILE NO: PERMIT NO: Edge Development, Inc. CB062002 SUB-CONTRACTOR PROJECT NAME: Whites Steel Inc. Carlsbad Fire Station #6 INSPECTION ADDRESS ADDRESS OF PROJECT: 45534 Towne Street Indio Ca. 92201. 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Wide flange beams and Steel angle, Tube steel. Weldors of record: Cesar Melchor, Luis Camacho, Ishmael Ayala, Juan Estrada. Welding of columns, Horizontal members. > Checked fit-up. > Checked root opening. > Checked interpass cleaning. > No preheat needed ambient temperature only due to the thickness of the tube steel. > Checked cover passes on some of the finished welds, they appear to be acceptable. Building frames on this date, the columns indentifies frames and locations: > Frame 103A and 102B. > Frame 100B and 100A. > Frame 101B and 101A. Weld Processes: > SMAWE7O18. > FCAWNR232. > Welding of single pass fillet welds. > Full Penetration welding Loading of the first truck for shipping to site started this morning. I did talk to Canyon Testing @ 07:45 about UT on Thursday, November 15, 2007, Canyon Testing is working on moving up the date one day sooner, they told me that will back later in the day to confirm. All work and welding Appears to be being done visually acceptable per AWS D1.1, AISC to the best of my knowledge. SITE TIME START: 0530 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5 Hours VERIFIED BY:___________________________ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Wednesday, November 14, 2007 CWi Stamp Date of Report Signature David W Goins SD City 937/ CWI 04060471/iCC 5214617-85 DAVID W. GOIHS CWI 0406 0471 OC1 6101110 '- 1 DUDEK Field Structural Steel and Welding Inspection Report. TYPE OF WORK IX I INSPECTOR "TECHNICIAN AVAILABLE: SOIL. REPORT (Y) (N) SPECS (Y) (N) Steel, Welding & Shop Fabrications - Structural APPROVED PLANS m (N) APPROVED SHOP DRAWINGS M (N) ARCHITECT WEEK ENDING: T PROJECT NO: WLC - Friday, November 16, 2007 1 5225 ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 CONTRACTOR PLAN FILE NO: PERMIT NO: Edge Development, Inc. C8062002 SUBCONTRACTOR PROJECT NAME: WhitesSteelInc. CarlsbadFireStation#6 INSPECTION ADDRESS ADDRESS OF PROJECT: 45534 Towne Street Indio Ca. 92201. 7201RanchoSantaFeRoad,CarlsbadCa.92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Wide flange beams and Steel angle, Tube steel. Weldorsofrecord:CesarMelchor,LuisCamacho,lshmaelAyala,JuanEstrada. Welding of columns, Horizontal members. > Checked fit-up. Checked root opening. > Checked interpass cleaning. - No preheat needed ambient temperature only due to the thickness of the tube steel. Building frames on this date, the columns indentifies frames and locations: > Frame 103A and 102B. > Frame 100B and IOOA. - > Frame 10.IB and 101A. Canyon Testing completed all the ultra sonic testing in the shop conditions on this date. All the frames that were tested pass Ok with no rejects. The report from canyon tested will be forward to the Dudek office San Marcos. The structural steel fabrication is complete on this date to the best of my knowledge, only stairs and misc. items, periodic inspections needed from this point forward. WhitesSteelwillcontactmewhenstairsarereadytobeweldedprior togalvanizing. Weld Processes: > SMAWE7O18. > FCAWNR232. Welding of single pass fillet welds. - > Full Penetration welding All work and welding Appears to be being done visually acceptable per AWS D1.1, AISC to the best of my knowledge. SITE TIME START: 0530 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5Hours VERIFIED BY I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRIJAL, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Signature - David W Goins Thursday, _November 15,2007 CWI Stamp Date of Report SD City 937/ CWI 04060471/ ICC 5214617-85 DAVID W. ODIflS MI 0406471 QCI RIP. 6JO1fle 390) ZIUDEK WORK Lxj INSPECTOR F-1 TECHNICIAN AVAILABLE: SOIL REPORT (V) (N) SPECS (V) (N) Structural Steel, Welding and high strength bolts. APPROVED PLANS ) (N) APPROVED SHOP DRAWINGS (Y) (N) ARCHITECT WEEK ENDING: PROJECT NO: WLC Friday, December 21, 2007 5225 I ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 CONTRACTOR PLAN FILE NO: I PERMIT NO: Edge Development, Inc. CB062002 SUB-CONTRACTOR PROJECT NAME: Whites Steel Inc. Carlsbad Fire Station #6 INSPECTION ADDRESS ADDRESS OF PROJECT; 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: Welding of #9 reinforcing bar Welding Inspection of detail: 121S-8.3 > Weldor of record on this date: Ropelio Cordova > Certification appears to be current and up to date. Checked mill certifications on the reinforcing bar that was welded. > The reinforcing bar that was installed appeared to be visual and verified Ok per the plans and specifications. > Need to get better copy of mill certification, the copy that was submitted was not readable, Tom with New Dimensions told me that he would get a more legible copy today. > The welding of the reinforcing bar appears to visually acceptable and of the correct size per plan and details to the best of my knowledge. Weld Processes: ) FCAW NR 232. ) Welding of single pass fillet welds. All work and welding Appears to be being done visually acceptable per AWS D1.1, AISC to the best of my knowledge. SITE TIME START: 0700 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .0 Time on site: 4 Hours - VERIFIED BY:___________________________ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND /OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. Monday, December 17, 2007 CWI Stamp Date of Report Signature David W Goins SD City 937/ CWI 04060471/ICC 5214617-85 .DAVID W.GOINS CWI 04060471 act EXP..6101114 tield Structural Steel and Welding Inspection Report. SPECS (Y) (N) Structural Steel, Welding and high strength bolts. APPROVED PLANS V) (N) APPROVED SHOP DRAWINGS () (N) ARCHITECT WEEK ENDING: --T-PROJECT NO: WLC 5225 Friday, November 30, 2007 ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 CONTRACTOR PLAN FILE NO: I PERMIT NO: Edge Development, Inc. I CB062002 SUB-CONTRACTOR PROJECT NAME: Whites Steel Inc. Carlsbad Fire Station #6 INSPECTION ADDRESS ADDRESS OF PROJECT; 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Steel angle, Tube steel. Inspection of exterior stairs: All welding and fabrication of the exterior stairs appear to be fabricated per submittals. With the exception of the RFI that was submittal for the anchor bolt misplacement. As soon as the RFI has been approved, we can fully accept the stairs for placement and erection. While I was in White Steel shop I had noticed that some of the steel tube was brought back to the shop? This steel needs to be reinspected for any changes or unacceptable damages that my occurred during removal of the steel tube headers that did not fit the conditions, and misplacement of the anchors. Any steel that comes back without said inspection will be rejected without special inspection reports. Weld Processes: SMAWE7O1B. FCAWNR232. > Welding of single pass fillet welds. > Full Penetration welding All work and welding Appears to be being done visually acceptable per AWS D1.1, AISC to the best of my knowledge. SITE TIME START: 0630 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5 Hours - VERIFIED BY:___________________________ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. CWI Stamp SignatiiF - David W Goins .DAVID W. 60flS CWI 04060471 OCI £XP4f01flO Friday, November 30, 2007 Date of Report SD City 937/ CWI 04060471/ICC 5214617-85 Field Structural Steel and Welding Inspection Report. ~TYPE OF WORK INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) IN DUDEK Field Structural Steel and Welding Inspection Report. TYPE OF WORK fJ INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) Structural Steel, Welding and high strength bolts. APPROVED PLANS ) (N) APPROVED SHOP DRAWINGS IV) (N) ARCHITECT WEEK ENDING: PROJECT NO: WLC 5225 Friday, November 30, 2007 ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 CONTFACTOR PLAN FILE NO: PERMIT NO: Edge Development, Inc. CB062002 SUB-CONTRACTOR PROJECT NAME: Whites Steel Inc. Carlsbad Fire Station #6 INSPECTION ADDRESS ADDRESS OF PROJECT; 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Steel angle, Tube steel. Inspection of exterior stairs: All welding and fabrication of the exterior stairs appear to be fabricated per submittals. With the exception of the RFI that was submittal for the anchor bolt misplacement. As soon as the RFI has been approved, we can fully accept the stairs for placement and erection. While I was in White Steel shop I had noticed that some of the steel tube was brought back to the shop? This steel needs to be reinspected for any changes or unacceptable damages that my occurred during removal of the steel tube headers that did not fit the conditions, and misplacement of the anchors. Any steel that comes back without said inspection will be rejected without special inspection reports. Weld Processes:, > SMAWE7O18. ) FCAWNR232. > Welding of single pass fillet welds. > Full Penetration welding All work and welding Appears to be being done visually acceptable per AWS D1.1, AISC to the best of my knowledge. SITE TIME START: 0630 SITE TIME FINISH: Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5 Hours - VERIFIED BY:___________________________ I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND I OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. CWI Stamp 'Signature David W Goins .DAVID W. GOINS CWI 04060471 OCI UP.d101fl0 Friday, November 30, 2007 Date of Report SD City 937/ CWI 04060471/ICC 5214617-85 DUDEK Field Structural Steel and Welding Inspection Report. TYPE OF WORK E] INSPECTOR TECHNICIAN AVAILABLE: SOIL REPORT (Y) (N) SPECS (Y) (N) Structural Steel, Welding and high strength bolts. APPROVED PLANS (V) (N) APPROVED SHOP DRAWINGS (Y) ) ARCHITECT WEEK ENDING: PROJECT NO: - WLC Friday, November 30, 2007 5225 ENGINEER REPORT NO. PG. OF K.B Leung And Associates, Inc. 101507 CONTRACTOR PLAN FILE NO: PERMIT NO: Edge Development, Inc. CB062002 SUBCONTRACTOR PROJECT NAME: Whites Steel Inc. Carlsbad Fire Station #6 INSPECTION ADDRESS ADDRESS OF PROJECT; 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 7201 Rancho Santa Fe Road, Carlsbad Ca. 92008 MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO. OR MATERIAL TEST REPORTS: HSS, Steel angle, Tube steel. Inspection of exterior stairs: All welding and fabrication of the exterior stairs appear to be fabricated per submittals. With the exception of the RFI that was submittal for the anchor bolt misplacement. As soon as the RFI has been approved, we can fully accept the stairs for placement and eirection. While I was in White Steel shop I had noticed that some of the steel tube was brought back to the shop? This steel needs to be reinspected for any changes or unacceptable damages that my occurred during removal of the steel tube headers that did not fit the conditions, and misplacement of the anchors. Any steel that comes back without said inspection will be rejected without special inspection reports. Weld Processes: SMAWE7O18. FCAWNR232. > Welding of single pass fillet welds. - > Full Penetration welding All work and welding Appears to be being done visually acceptable per AWS 01.1, AISC to the best of my knowledge. SITE TIME START: 0630 SITE TIME FINISH; Project Inspector: LUNCH PERIOD: .5 Time on site: 8.5 Hours VERIFIED BY I DO CERTIFY THAT I HAVE PERSONALLY OBSERVED ALL OF THE WORK LISTED ABOVE AND THAT THIS WORK COMPLIES WITH THE STRCUTRUAL, AND / OR THE APPROVED PLANS, SPECIFICATIONS AND APPLICABLE SECTION OF THE BUILDING CODE, UNLESS OTHERWISE NOTED IN THE DEFICIENCY REPORT. CWI Stamp Friday, November 30, 2007 Sgnalure Date of Report - David W Gains SD City 937/ CWI 04060471/ICC 5214617-85 DAVID W. 60114S CWI 04860411 QC1 W6JO/10