San Marcos Blvd. Transmission Line Replacement.
'Report Date: 3122/07. .'
RECEIVED
'APR O.22007
Project Number 3063SD1 Report Number 8 NOLTE ASSOCIAT
Project San Marcos Blvd Transmission Line Replacement
Client Nolte Associates
Address: : •. 43620 Ridge Park Drive
San Marcos, CA . . . .
Attn: Lori
INC.'
FIELD TEST CONDITIONS AND RESULTS (A
Location of Sample:,Wall-Apr 173+000-173+25
TICKET INFORMATION . • .. FIELD TEST DATA
Date Sampled: 2/22/2007 • Water Added: 6 gal.
Supplier: Palomar ,, Slump: 3 14"
Truck Number 599 Air Content NA
Tiàket Number: 216347 . ' , -Ambient Temp: 68
Mix-Number: 304002 Concete Temp: 70
Design Sffèngth: 4000 •, Sampled By: N. Toma
Time Batched: 9:16 Time Sampled:-10:25
Batch Size' 3.0 äy . Time Emptied: 10:35
Placement Method: Direct Time In Mixer:
Date Delivered to Lab: 2/23/2007 Weather:
(flMPRFIflN TFST RFSIILTS (ASTM r'q
Specimen
Test
Date . Age Load Diamete Area Strength
Percent of
Design
Type of
Fracture
6237A 3/1/2007 7 118900 600 2827 4210 105% E
6237B .3/22/2007 28 137800 6.00 . 28.27 4870 • . 122% C
6237C 3/22/2007 28 141200 600 2827 4990 125% C
6237H 4/19/2007 56
Meets Specified Strength:,
: Yes U N : ' • .
28-day Average Strength 4870 TYPES OF FRACTURE
E z 11' [H. Remarks I
A B C. D E
Cone Cone & Cone & Shear Columnar ,
* Split Shea
Reported by
Dave Cliff