SOIL &TESTING,INC. Indio 83-740 Citrus Avenue
A California Certified Small Business Enterprise (SBE) 760.775.5983 Suite G
Indio, CA 92201-3438
Riverside 1130 Palmyrita Avenue
951.965.8711 Suite 330-A
Riverside, CA 92507
Toll Free
877.215.4321 www.scst.com
AS-GRADED
GEOTECHNICAL REPORT
AND SUMMARY OF
IN-PLACE DENSITY TESTS
SANTA FE II RESERVOIR DRAINAGE
AND CRIBWALL IMPROVEMENTS
CONTRACT No. 50311
COAST AVENUE
SAN MARCOS, CALIFORNIA
RECEIVED
CITY OF CARLSBAD
APR 24 2O1
TRANSPORTATION DEPARTMENT
CM&i DIVISION
PREPARED FOR:
MR. CASEY ARNDT
PUBLIC WORKS AND ENGINEERING
CITY OF CARLSBAD
5950EL CAMINO REAL
CARLSBAD, CALIFORNIA 92008
PREPARED BY:
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 RIVERDALE STREET
SAN DIEGO, CALIFORNIA 92120
Providing Professional Engineering Services Since 1959
San Diego
619.280.4321
Indio
760.775.5983
Riverside
961.966.8711
Toll Free
877.216.4321
6280 Riverdale Street
San Diego, CA 92120
83-740 Citrus Avenue
Suite G
Indio, CA 92201-3438
1130 Palmyrlta Avenue
Suite 330-A
Riverside, CA 92607
www.scst.com
SCS&T No. 1311039PN-1
Report No. I
I
i Q.. SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
A Call for nia Certified Small Business Enterprise (SBE)
I
I
April 23, 2013
Mr. Casey Arndt
Public Works and Engineering
City of Carlsbad
5950 El Camino Real
Carlsbad, California 92008
Subject: AS-GRADED GEOTECHNICAL REPORT AND
SUMMARY OF IN-PLACE DENSITY TESTS
SANTA FE RESERVOIR II DRAINAGE AND CRIBWALL IMPROVEMENTS
COAST AVENUE
SAN MARCOS, CALIFORNIA
CONTRACT NO. 5031 PLAN DRAWING NO. 474-2
References: 1.) 'City of Carlsbad, San Diego County, California, Contract Documents, General
Provisions, Supplemental Provisions, and Technical Specifications for Santa Fe II
Reservoir Drainage and Cribwall Improvements, Contract NO. 50311, Bid No.
PWS13-03UTIL' prepared by The City of Carlsbad, Revised March 21, 2012.
2.) "Construction Plans for Santa Fe II Reservoir Drainage and Cribwall
Improvements, Contract NO. 50311"; prepared by The City of Carlsbad, dated July
24, 2012.
Dear Mr. Arndt:
1. PROJECT DESCRIPTION AND SUMMARY
In accordance with your request, Southern California Soil and Testing, Inc. (SCS&T) prepared this
report to present the results of field observations and compaction tests performed for the subject
project. The subject project consisted of the construction of a cribwall located along the north side of
the Santa Fe II Reservoir. The Santa Fe II Reservoir is located along Coast Avenue in the city of San
Marcos, California. In general, the wall backfill operations consisted of excavation and replacement
of the upper 4 feet of the existing cribwall. This report presents a summary of SCS&T observations
between March 22, 2013 and April 5, 2013. PAL General Engineering, Inc. of San Diego, California
performed the work. To assist in determining the locations and elevations of our field density tests,
The City of Carlsbad provided SCS&T with a grading and drainage plan dated July 24, 2012.
City of Carlsbad, Public Works and Engineering April 23, 2013
Santa Fe Reservoir // Drainage and Cribwall Improvements SCS&T No. 1311039PN-1
San Marcos, California Page 2
1.1. SITE PREPARATION
1.1.1. Primary Equipment
The primary equipment used included:
1 —Water truck 1 —Volvo L18OG
2 - Handwackers 1 - Bobcat 7300
1—Volvo SD115
1.1.2. Clearing and Grubbing
Site preparation began with disassembling the existing cribwall and excavating the upper 4
feet of soil behind the wall. The existing cribwall material and excavated soil remained on site
for reconstruction.
1.2. RETAINING WALL BACKFILL
The surface exposed at the bottom of the excavation was scarified to a depth of 12 inches, moisture
conditioned, and compacted until field density tests indicated at least 95% relative compaction. All
references to optimum moisture and relative compaction in this report are based on the ASTM D
1557 laboratory test method.
The surface exposed at the bottom of the excavation was covered with filter fabric. The backfill
material was placed in 6 to 8-inch lifts, moisture-conditioned and compacted to at least of 95%
relative compaction. Compaction was achieved primarily by means of a Volvo SD1 15 compactor with
a vibrating sheep's foot drum and 2 handwackers. Figure 1 shows the approximate locations of the
wall backfill tests. The retaining wall backfill in-place density tests have been labeled "WB".
2. FIELD OBSERVATIONS AND LABORATORY TESTS
An SCS&T representative performed observations and density tests during the cribwall backfill
operations. Figure 1 shows the approximate location of the tests. The density tests wereperformed
according to ASTM D 6938 (nuclear gauge) procedures. Figure 2 presents the density test results.
The accuracy of the in-situ density test locations and elevations is a function of the accuracy of the
survey control provided by other than SCS&T representatives. Unless otherwise noted, the locations
and elevations were determined by pacing and hand level methods and should be considered
accurate only to the degree implied by the method used.
As used herein, the term "observation" implies only that we observed the progress of work we were
involved with, and performed field density tests which, in conjunction with our observations, were the
base for our opinion as to whether the work was performed in substantial conformance with the
geotechnicat recommendations and the requirements of the applicable agencies.
City of Carlsbad, Public Works and Engineering April 23, 2013
Santa Fe Reservoir/I Drainage and Cribwa// Improvements SCS&T No. 1311039PN-1
San Marcos, California Page 3
Maximum dry density determinations were performed on representative samples of the soils used in
the compacted fill according to ASTM D 1557. Figure 2 presents the results of these tests used in
conjunction with the field density tests to determine the degree of relative compaction of the
I
compacted fill.
3. CONCLUSIONS
In our opinion, the compaction testing for the cribwall backfill is in accordance with the city of
Carlsbad documents Bid No. PWS13-03UTIL for Contract No. 50311 and Plan Drawing number 474-
2.
4. LIMITATIONS
This report covers only the services performed between March 22, 2013 and April 5, 2013. Our
opinions are based on our observations and the relative compaction test results and are limited by the
scope of the work that we agreed to perform. Our work was performed in accordance with the
currently accepted standard of practice and in such a manner as to provide a reasonable measure of
the compliance of the backfill operations with the project requirements. No warranty, express or
implied, is made or intended with respect to the work that we have performed, and neither the
performance of this work nor the submittal of this report should be construed as relieving the
contractor of its responsibility to conform with the project requirements.
Our work was generally performed on an "on-call" basis. Therefore, the in-place density tests
performed by our field representative can only be construed as representative of the areas tested as
shown on the attached figures.
Should you have any questions regarding this document, please contact us at 619.280.4321.
Respectfully Submitted,
SOUTHERN CALIFORNIA SOIL A G, INC.
rn UJ NO. 2762
9-30-14
ountain,
*
Vice President, Principal Geotec C@+
EK: G F: aw
Attachments: Figures 1 and 2
- (1) Addressee
(1) Addressee via e-mail at casey.arndt@carlsbadca.gov
Erich Kuchar, EIT 143759
Staff Engineer
~ I
CD CD CD CD r- m r- r- 90 g I ) ) - 0) < Cl) •. ___ o o 0 I III. 5- IlL CD /
IN-PLACE DENSITY TESTS Date: April, 2013
SOUTHERN CALIFORNIA By: EK.
SOIL &TESTING, INC. SANTA FE II RESERVOIR Job No.: 1311039PN-1
San Marcos, California Scale: Not To Scale
44
I JOB NAME: SANTA FE II RESERVOIR JOB NUMBER: 1311039PN-1 '
I I IN PLACE DENSITY TESTS
TEST- REL.COMP. . ' ELEVATION MOISTURE DRY DENSITY SOIL I NO. DATE LOCATION (feet,MSL) (percent) (p.c.f.) TYPE (percent) *
; WALL BACKFILL
. W131 3/22/13 Station 2+35 . 705 • 12.8 114.7 1 97.5
I W132 3/22/13 Station 1+60 : 701 . 8.3 111.8 1' ., 95.1
W133 3/22/13 .' Station 0+75 . 698 12.9 112.6 . 1 95.7 :
I
W134
W135.
3/25/13
3/25/13 3/25/13
Station 2+25
Station 1+50
707
- 703
11.2 -
121
114.0 .
113.5
1
1
96.9
96.5
W136 3/25/13
,. Station 1+15 700 -. . 10.7 - 112.9. 1 'i',- 96.0
W137 3/25/13 Station 0+75 '' 702 , 11.7 112.5 . 1- 95.7
I . W683/26/13 Station 2+25 •- . 707 13.2 - '112.1
W139 .; 3/26/13 Station 1+75 703 .- 15.2 , 111.9. , ', 1 95.2
WB10 3/26/13 - Station 1+90 . . ' 705 . 11.2 '111.8 1 . 95.1
W13113/26/13 . . Station 2+10 -706 . 12.1 ' 112.0 .. .1'' 95.2 ;.. I WB12 3/27/13 . . Station 2+60 . 708 ' 9.1 " ' . ' 113.8 . . .1 , 96.8
WB13 3/27/13 . Station 1+80 - ' , 705 . 9.2 111.9 1 95.2
I
. WB14
WB15
3/27/13
3/27/1.
,. Station 0+50.
, Station 0+00
700
. '709
" 9.5
10.1,
. 112.6 -
111.8 ,
.' 1
: 1 .
95.7
95.1-
WB16 3/27/13 Station 1+25 . , 703 , 9.8 111.9 95.2
W1317. 3/27/13 . Station 0+80 - 701 •, . 12.1 .113.1. 1 ".-'96.2
I ,WB18
-
3/27/13 Station. 2+25
,
. . 708 - 10.9 . 113.3 .1 ' 96.3 .
W1319 3/27/13 Station 1+75 706 10 6 15.0 1 97.8
W1320. 3/27/13 . . Station 1+00 ' .- - 703 . -10.8 .. .115.5 1 98.2 -
WB21 3/27/13 - Station 0+40 . 701 10.2 114.7.. . 1 -.' '- 97.5 I WB22 3/27/13 Station 1+90 FG 707 10 .8, 115.4 1 98.1
WB23 3/27/13 4 Station 0+80 FG 703 10.1 1143 1 97.2
WB24 , 3/27/13 , Station 0+25 -
-
' FG 701 . 10.6 .114.1. - .1 -. . 970 I WB25 3/27/13 . , Station 2+15 . ' FG 708 9.7 . 115.1 ' 1 ' 97.9 -
WB26 4/5/13 -
, Station 0+50 ., - FG 702 ' 9.8' 112.3
-
.1 - 95.5 .
WB274/5/13 Station 1+25 . FG 705 . 8.9 - - 113.1 1 - -' 96.2
- WB28 . 4/5/13 . -- Station 1+75 . - - - FG 707 '.'. - 10.1 -112.7 1 '95.8
WB29 4/5/13 Station 2+25 FG 709 9.2 113.2 1 96.3
FG = Finish Grade
I 77. MAXIMUM DENSITY AND OPTIMUM MOISTURE SUMMARY (ASTM D1557) I
Soil Maximum .. - .. Optimum
Type : Soil Description - . . Density, pcf Moisture, %. I..
1 Brown Clayey Sand 117 6 11 3
I L
I
I
I
I
FIGURE 2