*y4f" DAILY REPORT OF
HELD OBSERVATION
DATE 1211/2011 DAY Thursday AUTHOR Julio C. Guzman
PROJ. NAME Storm Drain Repair . . PROJ. NO. 107238001
CLIENT City of Carlsbad
NO. 2
EQUIPMENT:
Cat 305C ME compact excavator.
Cat 287C skid steer loader .
CONTRACTOR HRS
FOREMAN Kevin
WEATHER Clear/650
PERMIT NO. 6607
CODE DESCRIPTION OF WORK PERFORMED
On-site @ 09:00 hrs at Mallorca Place in Carlsbad Ca, as requested to perform observation and relative
Compaction testing during backfill operations for 18" diameter PVC storm drain
r
e
p
l
a
c
e
m
e
n
t
.
T
h
e
5
4
'
linear feet section was located between the storm drain clean-out at station
1
1
+
2
7
t
o
t
h
e
p
o
i
n
t
o
f
connection at station 11+81. . . .
.
.
Upon arrival, contractor was observed placing 3/4" crushed aggregate in the pipe zone to ± 12" over the
top of pipe.
Excavated material from stockpile was placed as backfill. Material was placed in ±1
2
"
l
o
o
s
e
l
i
f
t
s
a
n
d
t
h
e
compaction efforts were applied utilizing a compaction wheel attachment mounted in
t
h
e
3
0
5
C
e
x
c
a
v
a
t
o
r
.
Contractor was observed placing metallic warning tape at ± 2' Over the top of pipe.
Performed four in-place density tests utilizing a Troxler® 3430 Moisture-Density
G
a
u
g
e
.
T
e
s
t
s
r
e
s
u
l
t
s
were in conformance with the project requirements of 90% relative compaction.
Tests data was as follows:
Station Elevation Dry Density Moisture %RC
11+40 196.0 103.3 20.0% 94%
11+60 198.2 99.3 20.7% 90%
11+50 . 206.0 103.4 19.4% 94%
11+72 202.0 . 102.4 . 19.8% 93%
FIELD TECHNICIAN . . HOURS
Julio C. Guzman 1 8.0
O.T. VISITORS
CLIENT REP
THE MATERIAL wAS 0 WAS NOT, SAMPLED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF T
H
E
Ciiv APPROVED DOCUMENTS.
THE TESTED MATERIAL DOES 0 DOES NOT, MEET THE REQUIREMENTS OF THE Crry APPROVED PROJECT DOCUMENTS.
Distribution: Project Architect, Structural Engineer, Project Inspector .