HomeMy WebLinkAbout69-16; EL CAMINO MESA UNIT NO. 5; UTILITY BACKFILL TESTS; 1986-04-17WOODWARD CLYDE & ASSOCIATES
W CONSULTING SOIL AND FOUNDATION ENGINES AND GEOLOGISTS
346 Kurtz Street
San November 23, 1970 Diego -
California 92110 Project No. 67-214k
(714) 224.2911
Public -Works Department . NOV 25
City of Carlsbad .. . . . . .197 .
.1200 Elm Street . .. . . Cii-y OF CARL Carlsbad, California
ngineering
epa
SBAD ,.,,et
EL CAMINO MESA UNIT NO 5
UTILITY ACKFIL'L TESTS . . . . •. :
CARLSBAD, CALIFORNIA
Attached are the results of. fie.Td density tests taken at the. subject . .
project under the direction of Mr. N £ Westree, Public Works
Ispcctor, on t d,= 1rd ctcd ad at t'e locat1c1s q; Ain
LHeny,Projectvisor.
EHP/JLH/jm .. - . . . .
. .. .. . .
Attachment
(6)
COMPACTION TEST RESULTS
JOB NAME EL CAMINO MESA UNIT NO 5 (Utility Backfill Tests) DATEREPORTED 11-23-70
JOB NUMBER 67-214A .: ..
DATES COVERED November 16, 1970 PAGE 1 OF 1
DATE - TEST RETEST LOCATION - ELEVATION
HOITURE
CONTENT FIELD LABORATORY RELATIVE DENSITY DENSITY COMPACTION - NUMBER OP OF TEST % OBY WY. PCP PCP % OF LAB. ogp5
NOV 16 1. . SIERRA MORENA WATER . .
LATERAL LOT1 STA3+35 SG;-1.0' . 15.6 . 105.3 121.0 87.5 2 . SIERRA MORENA Lot 47
• STA 4+37 GAS SERVICE SG -l;O' - 14..3 103.6 121.0 85.9 35 SIERRA MOR-ENA LOT 6'.
STA7+59 SEWER LATERAL. SG -1.0' 10.5 102.5 120.5 . 85.2
WOODWARD CLYDE & ASSOCIATES
Consulting Soil and Foundation Engineers and Geo'ogists