Loading...
HomeMy WebLinkAbout8-56; LINMAR VILLAGE; STABILITY TEST OF SOILS; 1959-06-11• L YYflcVY DRESSELHAUS ENGINEERS, Consulting Civil Engineers .528 SOUTH HILLSTREET U OCEANSIDE, CALIFORNIA .8 SARATOGA 2-2126 June 11, 1959 E.J. Hale Company . P.O. Box 305 . .Imar Village Subdivision Holtville,, California Carlsbad, California Sibdivision Street STABILITY. TEST. OP SOILS LABORATORY COMPACTION TEST - A.A.S.H.O. Modified TRIAL N00 . . Moisture Density 1 . . 4% . l08.5 2 9 125.8 3 . . 11% . 125.6 4 . 15% . 115.0 Qptimum Density 126,0 # Optimum Moisture iC$ REPORT OF. FIEL DENSITY TESTS Top 6" (base course) was tested, June 109 1959. LOCATION FIELD MOISTURE DRY. DENSITY., OPTIMUM DENSITY % COMPACTION Northerly end of . 5.1 121.5 126,0 96.5 subdivision street, .. Middle of subdivision 4.4 126.8 . 126,0 100,5 street. Southerly end of 5945 134.5 126.0 106.5 subdivision . . street, . Respectfully submitted, . . . ,. DRESSELHAUS ENGINEERS DONALD F** DRESSELHAUS D :pmf KAMPTNER AND HOLLY SURVEYORS 529 ELM AVENUE • PARKWAY 9-1695 CARLSBAD, CALIFORNIA July 22, 1959 City Engineer City of Carlsbad 2960 Pio Pico Drive Carlsbad, California Dear Sir: I certify that all monuments have been set in Linmar Village Subdivision, Map No. 1.i-129 in the City of Carlsbad, County of Sari Diego, according to themonumentation certificate on said map, with the. following exception: Set four chiseled marks on manhole rim at the intersection of the center line of Linmar Lane and the-.center -line of Tamarack Avenue, Very truly yours, Kamptner and Holly ustav J. ptner / GJK/mh . . V.,,