July 18, 1961
Kainar Construction Company - RE SMc 2-1473
3802 Adams Street Bali Hai Terrace
Carlsbad, California Carlsbad, California
SUBJECT Soils CQmpactton Tests on Sewer and Waterline Backfill & Street
Gentlemen-
This
report covers our soils compaction tests on roads, and sewer and water- -
-. - line backfill with the Bali Hai Terrace subdivision, Carlsbad, California.
I - • - _:-- -
The material tested conBisted of a reddish brown sandy soil which was placed
in accordance with standard procedure, and in-place fill of not less than 95%
A S T.M D-1557-58T standard was.,achieved
* LII i Basic nfor-matión is listèa-onthe following enclosures under STABILITY OF
SOILS /and REPORT OF FIELD DENSITY TESTS
Respctfully submitted,
\\ /7STE'SON, STRAJSS & DRSSELHAUS, INC
AdLO2Q9 /4 J2~24CW4
ONALD F. DRESSELHAUS R.C.E 7604
DFD EBS lc I
cc City f Carlsbad 1! 7
- -.
•-••-
--
• - - • -
-.- _-- - - •1 ' - •- - •• I_••- 4
4 -
4.
.•-44•_ - . - 4 1. - 4---- . •44 4 4 -. - 4 -
-• %_ .4
. - It. .:-: - 4 - 4 - - • .
4-
-, - 4
*
4-- - • • • - 4
4 •:-
-•
i!
S Z- Con t
Kamar Construction Company RE: SMc 2-1473
3802 Adams Street Hibiscus Circle
Carlsbad, California Soils Compaction Tests,
on Sewer & Water Back-
fill & Street
REPORT OF FIELD DENSITY TESTS
Date & Depth
Test No. Ft. Location
7-
17%urface
-
Sta-0150t Water Trench
Backfill
2 9Surface Sta. l+ lOt, Sewer Trench
Backfill
3 Surface Sta 01-80±, lO'tEly. of Wly.
Curb
4 Surface Sta 326 ± Sewer Trench
backfill
5 Surface Sta 3+30i Water Trench
D Backfill
6 Surface Sta 5+551-, Sewer Trench
Backfill
7 urface Sta. 5+60, Sewer Trench
Backfill
8 Surface Sta N/ly 818e of Cul-de-sac
Road
Respecfully submitted
STETSON, STRAUSS & DRESSELHAUS, INC.
.DFD: EBS : Ic
I
• Field Lab
Moisture Density Density Compaction
6.5 129.4 128.7 101.0
6.5 126.0 128.7 98.0
6.5 130.0 128.7 102.5
5.8 131.0 128.7 102.0
6.4 123.8 128.7 96.3
5.1 130.1 128.7 101.0
5.0 129.1 128.7 100.6
6.0 126.4 128.7 97 6
S1•9jJ. 3.-
U
LO
Ill
1
44
_____
_
[j
.
4)f
4$
4o
goo
.44 As
os
-I
--/
I
MbISTUREDISIrX'CUVE
;:..
. - A O STM, D-1557--58T -
/30 *O thi
iüD j t7 17. #T/'Cu FtT
-
. .. 'Optimum Moisture ig..0 r .
H
Optimum Density 1,29.7 #/Cu.-Ft. -
Optimum Moisture93%t
)_Optimum Denstty 116.5 #/Cu. Ft.
Optimum Moisture- 9.5 .76
0.
/
::/ ..
.. .\ .. .r :::... .......
/ -\-
- .• /..:\
.., \. .. .................IV-... .....---.-- .............
V / V / \ \ Kamar Ccnstrution company
\.L1...:.Ij. __.H S
.
Stetson, Strauss &
'CIO
\ Ciwl and Consulting Engiiieers
58 South Hil1Street.-
Oceanside, Califonia
:4 ...L-.L..
:.-4 J V V
/5 -
-
.. . . PERCENT MOISTURE ... . . . -: .........- •VV DONALD.F DRESSELHAUS i R.C,E07O4
-V
*.V.EK Cl .11 41,0 0 01' II)K I K 9011* 1*.. 9 .' *10 I*.. 9*0*. Kr*I14iVCr) I.. 0 ? 1 OK CC FVYK'K1 iFCI.*K*C V hbEI Q*(