HomeMy WebLinkAbout91-2; Geotechnical Investigation Marisol Project; Geotechnical Investigation Marisol Project; 1992-02-21GEOTECHNICAL INVESTIGATION
m MARISOL PROJECT
4519 ADAMS AVENUE
to CARLSBAD, CALIFORNIA
"* JOB NO. 92-1
M
FEBRUARY 21, 1992
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PHONE 746-3553
AREA CODE 619
423 HALE AVENUE
ESCONDIDO, CALIFORNIA 92O29
February 21, 1992
Mr. Stephen E. Brendle
Laguna Associates
c/o A.S.K.
120 Birmingham Drive, Suite 110
Cardiff-by-the-Sea, California 92024
Project: Job No. 92-1
Proposed Marisol Project
4519 Adams Avenue
Carlsbad, California
Subject: Report of Geotechnical Investigation
Mr. Brendle:
In accordance with your request, we have completed a geotechnical
investigation for the proposed project. We are presenting to you,
herewith, our findings and recommendations for the development of
this site.
The findings of this study indicate that this site is suitable
for the proposed development provided that the special preparations
and foundation recommendations presented in the attached report are
complied with.
If you have any questions after reviewing the findings and
recommendations contained in the attached report, please do not
hesitate to contact this office. This opportunity to be of
professional service is sincerely appreciated.
Respectfully submitted,
WESTERN SOIL AND FOUNDATION ENGINEERING, INC
Vince Gaby, ProjectGeologl.st
Dennis
VG/DEZ:kw
Attachments
Distribution:
CE 26676 GE 928
(4) Addressee
GEOTECHNICAL INVESTIGATION
MARISOL PROJECT
4519 ADAMS AVENUE
CARLSBAD, CALIFORNIA
Prepared For:
MR. STEPHEN E. BRENDLE
LACUNA ASSOCIATES
C/O A.S.K.
120 BIRMINGHAM DRIVE, SUITE 110
CARDIFF-BY-THE-SEA, CALIFORNIA 92024
JOB NO. 92-1
FEBRUARY 21, 1992
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
•» February 21, 1992 Page 1
m GEOTECHNICAL INVESTIGATION
MARISOL PROJECT
,. 4519 ADAMS AVENUE
CARLSBAD, CALIFORNIA
*" INTRODUCTION AND PROJECT DESCRIPTION
M
*» This report presents the results of our geotechnical invest-
igation performed on the above referenced site. The purpose of
this investigation was to evaluate the existing surface and subsur-
tm
face conditions from a geotechnical perspective in order to provide
ta recommendations for your proposed development.
,- The proposed project is the development of three, single-family
*" residences, as submitted by you in preliminary form on the site
""" plan included as part of and shown on Plate Number 1 of this
*M
report. A private drive will provide access to the dwellings from
Adams Avenue. Retaining walls will be utilized in the construction
_ of the roadway and dwellings. It is our understanding that the
•" proposed dwellings will be one or two-story wood-framed structures.
"* The foundations will be slab-on-grade with continuous and pad
spread footings.
A grading plan had not been prepared at the time of this
writing. However, it is anticipated that the proposed grading will
*• involve maximum cuts and fills on the order of 10 feet.
•" Should any future development deviate significantly from our
i^
understanding of the project as described above, we should be
consulted for further recommendations.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 2
The site configuration and exploratory trench locations are
shown on Plate Number 1.
PROJECT SCOPE
This investigation consisted of a surface reconnaissance
coupled with a detailed subsurface exploration. Representative
surface and subsurface samples were obtained from the site and
returned to our laboratory for testing. An analysis of the field
and laboratory data collected is submitted in this report.
Specifically, the intent of this analysis was to:
a) Explore the subsurface conditions to the depths that
could be influenced by the proposed construction,
b) Evaluate, by laboratory tests, the pertinent
engineering properties of the various soil and rock
stratigraphic units which could influence the
development of this land, including bearing capacities,
expansive characteristics and settlement potential,
c) Develop soil engineering criteria for site grading,
d) Determine potential construction difficulties and
provide recommendations concerning these problems,
e) Recommend an appropriate foundation system for the type
of structures anticipated and develop soil engineering
design criteria for foundation design.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 3
FINDINGS
SITE DESCRIPTION: The property site is located 4519 Adams Street,
in the City of Carlsbad, California. It can be found in the north
central portion of grid B-6, page 14 of the Thomas Brothers Guide
for San Diego County.
The property is nearly rectangular in configuration and
encompasses approximately 1.1 acres. It is bounded to the east by
a single family residence, to the west by the Carlsbad Boat Club
and to the south by Agua Hedionda Lagoon. Approximately 134 feet
front Adams Street along the northern property line.
The subject site is situated upon a southerly falling hillside.
The topography is moderately steep to gently inclined. Elevations
range from approximately 0 feet above mean sea level (M.S.L.) along
the lagoon shoreline to 46 feet (M.S.L.) along Adams Street. The
northern half of the property has been altered by minor grading.
This is suggested by a large pad area in this portion of the site.
In addition, a fill slope extends from Adams Street across the
north property line.
Drainage is by sheet flow into Agua Hedionda Lagoon. Water
directed by a street culvert east of the property, crosses the
eastern property line and flows along this boundary. This has
resulted in the erosion of a narrow gully which intersects and then
runs parallel to the eastern property line.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 4
No improvements were observed on site during our investigation.
At that time, the majority of the property was covered by sparsely
growing wild grasses.
SUBSURFACE CONDITIONS: The project site is underlain by
Quaternary age nearshore marine terrace sediments deposited on
Eocene age sandstone. These units have been mapped by Weber (1982)
as the Lindavista Formation and the Santiago Formation, respective-
ly. These formational deposits are mantled by Holocene colluvium,
recent beach deposits, and artificial fill. Each of these is
described from oldest to youngest.
SANTIAGO FORMATION: The Santiago Formation is represented on
site by very pale gray to white slightly silty medium to very
coarse grained sandstone. It is lithologically similar to Member B
of the Santiago Formation as described by Wilson (1972). It is
massively bedded, dense, and moderately well cemented. It is
composed primarily of subangular grains of quartz and feldspar with
minor lithic fragments. Within the sequence occur thin layered
interbedded sandy clays and silts. These fine grained beds range
in color from yellowish-gray to brown are very moist and stiff.
LINDAVISTA FORMATION: On this site the Santiago Formation is
unconformably overlain by beach/nearshore marine terrace deposits.
These deposits are composed of brown to orangish-brown, fine to
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 5
medium grained sand. They are moderately well indurated, massively
bedded and typically well cemented. The cement is ferruginous
giving these deposits their orange coloring.
In this area the Lindavista Formation is flat lying. However,
it's basal contact with the Santiago Formation dips very gently to
the southwest.
COLLUVIUM: The formational sediments are mantled by colluvium
which varies from 1 to 4 feet in thickness. For the purposes of
this study the term colluvium is used to describe both in-situ
developed soil as well as slope wash materials. It consists of
very dark brown sandy clay to clayey sand. It is generally porous,
and poorly consolidated. A sample of the clayey colluvium was
returned to our laboratory to determine its expansive potential.
Test results (Plate Number 9) indicate this material to have a
medium expansion potential.
BEACH LAGOON DEPOSITS: The southern one-third of the site is
covered with recent beach and lagoon deposits. These consist of
thinly bedded, silty to clean, fine, medium and coarse grained
sands and sandy silt. The sands are gray to brownish-orange and
the silts are very dark gray. These sediments are very moist to
saturated and unconsolidated. In exploratory trench T-5 they
extend beyond the limits of our investigation (Plate Number 7).
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 6
ARTIFICIAL FILL: Localized areas of artificial fill are present on
the subject site. These areas are indicated on Plate Number One.
Within the vicinity of our exploratory trenches the fill material
ranges from 2 to 4 feet in thickness. It appears to be derived from
the on-site formational and colluvial soils. It is composed of
poorly compacted, clayey and silty sand.
GROUNDWATER: Free groundwater was encountered in two of
our exploratory trenches. These were in trenches T-4 and T-5 at a
depth of approximately 8 and 7 feet, respectively. In addition,
water infiltration was observed in trench T-4 at the contact
between fill and formation. In this area and northward along the
eastern boundary it is recommended that a subdrain be installed as
described on Page 9 of this report. Fluctuations in the level and
flow of groundwater may occur in this area depending on annual
precipitation and irrigation.
GEOLOGIC HAZARDS
FAULTS AND SEISMIC HAZARDS: There are no known active or poten-
tially active faults on or in the immediate vicinity of the project
site. There are, however, several faults located in sufficiently
close proximity that movement associated with them could cause
significant ground motion at the site. The table below presents
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates
February 21, 1992
Our Job No. 92-1
Page 7
the probable maximum earthquake magnitudes and accelerations
anticipated at the site. These accelerations are based on the
assumption that the maximum probable earthquake occurs on specific
faults at the closest point on that particular fault to the site.
SEISMICITY OF MAJOR FAULTS
Fault
Rose Canyon
(Offshore)
Elsinore
San Jacinto
San Andreas
Distance
(Miles)
8
22
40
66
Maximum
Probable
Magnitude
(Richter)
6.0 - 7.0
L L
7.0
L
7.8
L
8.5
Probable
Bedrock
Acceleration*
(a)
0.28-0.42
0.20
0.15
0.1
L= Local Magnitude
*(From Schnabel and Seed, 1972).
LIQUEFACTION: Saturated, poorly consolidated, well sorted, fine
grained sands and silts will not exist under building pads if the
grading operation is performed in strict accordance with the recom-
mendations contained in this report. Therefore, it is unlikely
that liquefaction would affect the site.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 8
LANDSLIDES AND SLOPE STABILITY: No evidence indicating the
presence of deep seated landslides were observed on the project
site. However, it is highly recommended that as-built inspections
of all cut slopes be conducted by the Soil Engineer or Engineering
Geologist during grading.
We anticipate that the slopes proposed for this project will
be stable if constructed in accordance with the recommendations
contained in this report.
No evidence suggesting the presence of geologic hazards that
would preclude the development of this proposed project were
observed in our exploratory trenches. We did, however, encounter
poorly consolidated and expansive, near surface, soil material.
Recommendations concerning these conditions are presented in the
following sections of this report. During the grading operation,
a Registered Geotechnical Engineer from our firm must inspect the
site for adverse geologic conditions.
RECOMMENDATIONS AND CONCLUSIONS
SITE PREPARATION
EXISTING SOIL: We recommend that any existing fill, topsoil,
colluvium, and low density soil be removed to firm natural ground
from beneath any proposed fill pad areas in their entirety, so that
structures will be supported on firm material. Areas to receive
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 9
asphaltic or concrete pavements, slabs, driveways or sidewalks must
be treated similarly.
This soil may be replaced as a controlled fill recompacted to
at least 90% of its maximum dry density. All deleterious materials
and oversized debris encountered in this fill must be removed and
legally disposed of off-site.
Based on the findings of this study, the depth of removal will
range from 2.0 to 5.0 feet. Deeper removals or an alternate
foundation design may become necessary if the proposed construction
extends south of the location of exploratory trench T-4. This is
suggested by the absence of firm materials in trench T-5 (Plate
Number 7) at a relatively shallow depth. Table I of this report
presents anticipated removal depths in the area of our exploratory
trenches. If groundwater is encountered during the removal and
recompaction of the soil or difficulty is encountered in achieving
a minimum of 90 percent relative compaction, then this office shall
be consulted for further recommendations.
It is anticipated that groundwater and/or extremely saturated
soil may be encountered in the southern portion of the property.
This would present difficulty in achieving a minimum of 90%
relative compaction. In such cases it is recommended that rock may
be used to support the earthmoving equipment and to provide a base
on which to properly recompact soil fill material. The thickness
and size of rock would be determined in the field by the Soil
Engineer. As a preliminary estimate, a 2-foot thick layer of
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 10
6 to 8 inch minus rock would be placed in the bottom of the
excavation. The rock should be placed in (1) foot maximum thick
lifts. The voids in each lift should be completely filled with
granular material and sufficiently watered as directed by the Soil
Engineer prior to placement of the next lift.
SUBDRAINS: If fills are proposed for canyon areas or drainage
swales, a subdrain system shall be designed to alleviate potential
groundwater problems. The system shall carry water legally off-
site. These drains shall be placed in the center of the troughs
created by the natural drainage swales at the impervious contact.
The final determination for the location of the subdrains shall be
made by the Soil Engineer during grading of the site.
The subdrains shall consist of a trench at least 36 inches
deep and 24 inches wide. The lower 24 inches of the trench shall
be excavated into dense, natural soil material. The upper 12
inches will be installed in compacted fill. The drain shall have a
minimum one percent gradient. A four inch diameter perforated pipe
shall be placed in the trench with perforations down. The pipe
shall be ABS schedule 40 (ASTM-D1527) or SDR 23.5 (ASTM-D2751) or
approved equivalent. A minimum of 6 cubic feet of filter material
per linear foot of subdrain shall be placed in the trench.
Further, there shall be a minimum of 6 inches of filter material
under the pipe. The pipe shall be centered in the trench
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 11
horizontally. Filter material shall comply with CalTrans Class 2
filter material. The last 20 feet of pipe shall be non-perforated
with eight feet inside the filter material. Drains should connect
to an appropriate storm drain inlet or drainage system.
In lieu of Class 2 filter material, 3/4-inch rock wrapped with
Mirafi 140N non-woven geotextile, or approved equal, may be used.
The geotextile shall lap at least 18 inches on top of the rock.
EXPANSIVE SOIL: Detrimentally expansive soils (expansion index of
51 or greater) were encountered in our subsurface exploration
(Plate Number 9). These consisted of the near surface clayey sands
and sandy clays observed in trenches T-l through T-3 (Plate Numbers
3 through 5). All expansive materials shall be kept at least three
feet below the proposed finish subgrade. Expansive soils
encountered on cut pads shall be completely removed to a depth of
at least three feet below finish subgrade and replaced with
granular non-expansive soil. A limited amount of granular non-
expansive soil is available both in the terrace deposits and Eocene
sandstone on site.
IMPORTED FILL: Imported fill, if required at this site, should be
examined by our office to determine their suitability prior to
importing these materials.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 12
SURFACE DRAINAGE: Surface drainage shall be directed away from
structures. The ponding of water or saturation of soils cannot be
allowed adjacent to any of the foundations. Surface water must not
be allowed to drain in an uncontrolled manner over the top or face
of any slope.
EARTHWORK: All earthwork and grading contemplated for site
preparation must be accomplished in accordance with the attached
Specifications for Construction of Controlled Fills. All special
site preparation recommendations presented in the sections above
will supersede those in the Standard Specifications for Construc-
tion of Controlled Fills. All embankments, structural fill, and
fill shall be compacted to a minimum of 90%. All utility trench
backfill must be compacted to a minimum of 90% of its maximum dry
density. The maximum dry density of each soil type shall be
determined in accordance with A.S.T.M. Test Method D1557-78.
Prior to commencement of the brushing operation, a pregrading
meeting shall be held at the site. The Developer, Surveyor,
Grading Contractor, and Soil Engineer should attend. Our firm
should be given at least 48 hours notice of the meeting time and
date.
CUT AND FILL SLOPES: We recommend that cut and fill slopes be
constructed with a slope ratio of 2.0:1.0 (horizontal .'vertical) or
flatter, to a maximum height of 10 feet.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 13
Cut slopes shall be constructed in dense natural soil or rock
material. All cut slopes must be inspected for adverse geologic
conditions during the grading operation by a representative of our
firm.
Fill slopes shall be keyed into dense natural ground. The key
shall be a minimum of 2 feet deep at the toe of slope and fall with
5% grade toward the interior of the proposed fill areas (Plate
Number 11).
All keys must be inspected by the Soil Engineer or his
representative in the field.
Slopes shall be planted as soon as feasible after grading.
Slope erosion including sloughing, riling, and slumping of surface
soils may be anticipated if the slopes are left unplanted for a
long period of time, especially during rainy seasons. Erosion
control and drainage devices must be installed in compliance with
the requirements of the controlling agencies.
RIPPABILITY: The materials encountered within our exploratory
trenches are rippable by conventional means to the depths
investigated.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 14
FOUNDATIONS
GENERAL: Structures should be supported on continuous or pad
spread footings bearing in dense natural ground or nonexpansive
soil material recompacted in accordance with the recommendations
contained in this report. Footings must be designed with the
minimum dimensions and allowable dead plus live load bearing
values given in the table below:
FOOTING PARAMETERS
Type
Number of of
Stories Footing
1
2
1 or 2
Continuous
Continuous
Pad
Minimum
Depth
(inches)
12
18
24
Minimum
Width
(inches)
12
15
30
Allowable Soil
Bearing Value
(p.s.f .)
2000
2500
3500
The minimum depth given shall be below finish subgrade (bottom
of sand cushion). All continuous footings shall contain at least
one Number 4 reinforcing bar top and bottom to provide structural
continuity and to permit spanning of local irregularities.
The soil load bearing values presented above may be increased
by one-third for short term loads, including wind or seismic. The
allowable soil bearing value of import soil material shall be
determined after its selection.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 15
Settlement under building loads are expected to be within
tolerable limits for the proposed structures.
Concrete slabs-on-grade may be supported on compacted
on-site soil or dense natural ground. Three inches of clean
washed concrete sand shall be placed beneath the slab for curing.
Slab reinforcing shall be provided in accordance with the an-
ticipated use of and loadings on the slab.
In areas where moisture sensitive floor coverings are to be
utilized and in other areas where floor dampness would be un-
desirable, we recommend consideration be given to providing an
impermeable membrane (6-mil visqueen or equal) beneath the slabs.
The membrane shall be placed mid-height within the sand to protect
it during construction. The sand shall be lightly moistened just
prior to placing the concrete. Care shall be taken not to puncture
the membrane. All joints (laps) in the membrane should be a
minimum of 6 inches in width and sealed with an approved sealer.
TRANSITION AREAS: Foundations supported partially on cut and
partially on fill are not recommended. The tendency of cut and
fill soils to compress differently can frequently result in unequal
structural support and subsequent cracking to portions of the
structure. Therefore, in transition areas, we recommend that
the entire cut area be over excavated and replaced with soils
compacted to a minimum of 90%. This over excavation or under-
cutting shall be carried to a depth of 2 feet below the bottom of
the deepest proposed footing.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 16
LATERAL RESISTANCE: Resistance to lateral loads may be provided by
friction at the base of the footing and by passive pressure against
the adjacent soil. For concrete footings in compacted or dense
natural soil, an allowable coefficient of friction of 0.35 may be
used. An allowable passive uniform pressure of 200 pounds per
square foot per foot of depth acting against the foundations may be
used in design.
If footings are proposed adjacent to slope areas, we recommend
that the footings be deepened to provide a minimum horizontal
distance from the outer edge of footings to the adjacent slope face
equal to one-half the height of the slope. This horizontal
distance shall be no less than 6 feet and no more than 10 feet.
RETAINING WALLS: Retaining walls must be designed to resist
lateral earth pressures and any additional lateral loads caused by
surcharge loads. We recommend unrestrained walls be designed for
an equivalent fluid pressure of 38 pounds per cubic foot (pcf)
where backfill is level. We recommend restrained walls be designed
for an equivalent fluid pressure of 38 pcf plus an additional
uniform lateral pressure of 6H pounds per square foot where H = the
height in feet of backfill above the top of the wall footing.
Wherever walls will be subjected to surcharge loads, they should be
designed for an additional uniform lateral pressure equal to one-
third the anticipated surcharge pressure in case of unrestrained
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 17
walls, and one-half the anticipated surcharge in the case of
restraining walls.
The preceding design pressures assume there is sufficient
drainage behind the walls to prevent the build-up of hydrostatic
pressures from surface water infiltration. Adequate drainage may
be provided by means of weep holes with permeable material
installed behind the walls or by means of a system of subdrains.
Expansive soils (greater than 5.0 percent swell or an expansive
index of 50) shall not be used as retaining wall backfill material.
Backfill placed behind the walls shall be compacted to a
minimum degree of compaction of 90% using light compaction
equipment. If heavy equipment is used, the wall shall be ap-
propriately temporarily braced during the compaction process.
FOOTING OBSERVATIONS: All footing excavations shall be inspected
by the Soil Engineer prior to placing reinforcing steel and
concrete.
FIELD EXPLORATIONS
Five subsurface explorations were made on February 14, 1992
at the locations indicated on Plate Number 1. These explorations
consisted of trenches excavated by a Case 455 trackhoe. The
trenches were each logged using standard geological techniques. The
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 18
field work was conducted by our geology and soil engineering
personnel.
The logs are presented on Plate Numbers 3 through 7. The soils
are described in accordance with the Unified Soils Classification
System as illustrated on the attached simplified chart (Plate
Number 2). In addition, a verbal textural description, the wet
color, the apparent moisture and the density or consistency are
presented. The density of granular material is given as either
very loose, loose, medium dense, dense or very dense. The
consistency of silts or clays is given as either very soft, soft,
medium stiff, stiff, very stiff or hard. Samples of typical and
representative soils were obtained and returned to our laboratory
for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the American
Society for Testing and Materials (A.S.T.M.) test methods or
suggested procedures. Test results are shown on Plate Numbers 8
and 9.
PLAN REVIEW
Western Soil and Foundation Engineering, Inc. should review
the grading plans prior to the start of grading.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 19
LIMITATIONS
The recommendations presented in this report are contingent
upon our review of final plans and specifications. The soil
engineer should review and verify the compliance of the final plans
with this report and with Chapter 70 of the Uniform Building Code.
It is recommended that Western Soil and Foundation Engineering,
Inc. be retained to provide continuous soil engineering services
during the earthwork operations. This is to observe compliance
with the design concepts, specifications or recommendations and to
allow design changes in the event that subsurface conditions differ
from those anticipated prior to start of construction. Western
Soil and Foundation Engineering, Inc. will not be held responsible
for earthwork of any kind performed without our observation,
inspection and testing.
The recommendations and opinions expressed in this report
reflect our best estimate of the project requirements based on an
evaluation of the subsurface soil conditions encountered at the
subsurface exploration locations and the assumption that the soil
conditions do not deviate appreciably from those encountered. It
should be recognized that the performance of the foundations and/or
cut and fill slopes may be influenced by undisclosed or unforeseen
variations in the soil conditions that may occur in the inter-
mediate and unexplored areas. Any unusual conditions not covered
in this report that may be encountered during site development
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates Our Job No. 92-1
February 21, 1992 Page 20
should be brought to the attention of the soil engineer so that he
may make modifications, if necessary.
This office should be advised of any changes in the project
scope so that it may be determined if the recommendations contained
herein are appropriate. This should be verified in writing or
modified by a written addendum.
The findings of this report are valid as of this date. Changes
in the condition of a property can, however, occur with the passage
of time, whether they be due to natural processes or the work of
man on this or adjacent properties. In addition, changes in the
State-of-the-Art and/or Government Codes may occur. Due to such
changes, the findings of the report may be invalidated wholly or in
part by changes beyond our control. Therefore, this report should
not be relied upon after a period of one year without a review by
us verifying the suitability of the conclusions and recommenda-
tions.
We will be responsible for our data, interpretations, and
recommendations, but shall not be responsible for the interpreta-
tions by others of the information developed. Our services consist
of professional consultation and observation only, and no warranty
of any kind whatsoever, expressed or implied, is made or intended
in connection with the work performed or to be performed by us, or
by our proposal for consulting or other services, or by our
furnishing of oral or written reports or findings.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Laguna Associates
February 21, 1992
Our Job No. 92-1
Page 21
It is the responsibility of the Client or the Client's
representative to ensure that the information and recommendations
contained herein are brought to the attention of the engineer and
architect for the project and incorporated into the project's plans
and specifications. It is further his responsibility to take the
necessary measures to ensure that the contractor and his sub-
contractors carry out such recommendations during construction.
Respectfully submitted,
WESTERN SOIL AND FOUNDATION ENGINEERING, INC.
Vince Gaby, Project Geologist
Dennis E. Zimmerman
VG/DEZ:kw
C26676 GE 928
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
ATTACHMENTS
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
SITE PLAN
PLATE NUMBER 1
(IN BACK POCKET OF THIS REPORT)
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION GROUP SYMBOL TYPICAL NAMES
I. COARSE GRAINED, More than
half of material is larger
than No. 200 sieve size.
GRAVELS CLEAN GRAVELS
More than half of
coarse fraction is
larger than No. 4
sieve size but
smaller than 3"
GRAVELS WITH FINES
(Appreciable amount
of fines)
SANDS CLEAN SANDS
More than half of
coarse fraction is
smaller than No. 4
sieve size. SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAINED, More than
half of material is smaller
than No. 200 sieve size.
SILTS AND CLAYS
GW
GP
GM
GC
sw
SP
SM
SC
ML
Liquid Limit
less than 50
SILTY AND CLAYS
Liquid Limit
greater than 50
HIGHLY ORGANIC SOILS
CL
OL
MH
CH
OH
PT
Well graded gravels, gravel-
sand mixtures, little or no
fines.
Poorly graded gravels, gravel-
sand mixtures, little or no
fines.
Silty gravels, poorly graded
gravel-sand-silt mixtures.
Clayey gravels, poorly
graded gravel-sand, clay
mixtures.
Well graded sand, gravelly
sands, little or no fines.
Poorly graded sands, gravelly
sands, little or no fines.
Silty sands, poorly graded
sand and silt mixtures.
Clayey sands, poorly graded
sand and clay mixtures.
Inorganic silts and very
fine sands, rock flour, sandy
silt or clayey-silt-sand
mixtures with slight plast-
icity.
Inorganic clays of low to
medium plasticity, gravelly
clays, sandy clays, silty
clays, lean clays.
Organic silty and organic
silty clays of low plasticity
Inorganic siltys, micaceous
or diatomaceous fine sandy
or silty soils, elastic
silts.
Inorganic clays of high
plasticity, fat
Organic clays of medium
to high plasticity.
Peat and other highly
organic soils
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NUMBER 2
H-
LU
UJ
U.
*•— '
X1-
0.
UJ
1 -
2 -
3 -
5 -
6 -
7 -
8 -
9 -
10 -
11 _
12 _
13 _
14
15 -
UJQ.
H
UJ
Q.
2
en
B
2
O
• O_ —
O it
CO COCO
o
:SC
'.* • •—
S-^;'.
•• • * -f
'•S'MT'* . •
T." •" "*
— * *» • 1
• -. '/ .
' • •
I•• -*:•
*• .'•• •
;T *-&•
JOB NUMBER
92-1
TRENCH NUMBER T-l
ELEVATION 26±
SAMPLING
METHOD CASE 455 TRACKHOE
DESCRIPTION
Dark Gray Clayey Medium to
Coarse Sand (Colluvium)
grades to
Brownish-Gray Silty Medium to
Coarse Sand
(Very Weathered Santiago Formation
Gray Sandy Clay
(Santiago Formation)
Pale Brown Clayey Medium to Very
Coarse Sand
(Santiago Formation)
BOTTOM OF TRENCH @ 7.5 FEET
MARISOL PROJECT
LACUNA ASSOCIATES
»~ QJ
I? f^
K |-
252
Q. O< s
Very
Moist
To
Wet
Very
Moist
Very
Moist
1- 0z z
UJ UJ
01 ^~
Q. V)Q- z< 0o
Loose
To
Medium
Dense
grades
Medium
Dense
To
)ense
Stiff
Dense
DATE LOGGED
2-14-92
l-
to _z u_
LU (J
0 Q.
tro
ai 5?ir -*
D >-
iii
0 Z
5 0
O
^0
UJ
K —
UJ g
fK ^
O
—
—
—
—
—
—
—
-
—
—
-
-
—
LOGGED BY
V.G.
SUBSURFACE EXPLORATION LOG PLATE NO. 3
\-
LU
LUu.
*~*
X
tr-
LU
P
1 -
3 -
4 -
c
6 -
7 -
-
8
—
9 -
—
10 -
1 i
12 _
13 _
14
15 -
LUQ.
£
LU
Q.
<in
C
(
. (__ —
O t
(/) If
V<
u.'••'. .-
£3
rf^l:/.sc
':;'.-^/
'.-.'.— ;"
•fSM
*.-'•' *j_
rr! • •
:'r',— -
rrf '-"'-" -
"- :"•••"•
4- SI*
• ' " ' ' '*• *
\T-/:v
'..•*."•' .
77- y" * * •' • * . •
SP.\
T o "**• •.'
SCi
' • '.TT
'.•••'.•
-rfe?
JOB NUMBER
92-1
TRENCH NUMBER f-2
ELEVATION 26±
SAMPLING
METHOD CASE 455 TRACKHOE
DESCRIPTION
Very Dark Brownish-Gray Very
Sandy Clay to Clayey Medium to
Coarse Sand (Colluvium
Brown Very Well Cemented Silty
Fine to Medium Sand
grades to
Brownish-Orange Moderately Well
Cemented Slightly Silty Fine to
Medium Sand
(Terrace Deposits)
Dark Gray Slightly Silty Medium
To Coarse Sand
grades to
Gray Clayey Medium to Coarse Sand
(Santiago Formation)
BOTTOM OF TRENCH @ 11.0 FEET
BEST ORIGINAL
MARISOL PROJECT
LACUNA ASSOCIATES
»- UJ
Z £
LO ^^
OL. }—
^X CO
Ov ™~Q. 0
< 5
Wet
Damp
Moist
To
Very
Moist
1- 0z z
LU LUtc J-< 52fl tn**• VJQ- Z< 0
U
Soft
To
Loose
Dense
Dense
DATE LOGGED
2-14-92
t-
Crt ^z u.
U oQ 0.
. *^
tra
121 .•;
UJ 5s
cc —
D >~
h~in £
0 Z
2 0
O
5.8
v£
UJ> 2
i —^ f~. o
UJ Q.o: zoo
—
—
—
—
—
_
—
—
—
—
—
—
—
—
-
—
LOGGED BY
V.G.
SUBSURFACE EXPLORATION LOG PLATE NO. 4
J-
UJ
UJu.
X
n
UJ
P
1 _
2 -
— .
3 -
4 ~
5 -
6 -
—
7 -
8 -
—
—
10 -
11 _
12 _
13 _
15 -
UJ#%Q.
£[
UJ_J
Q.
2
in
•MMMM
B
C
C
2C
<
0 t
V
**_lU
Tr--.^-:.';.
V"\v-:-— 7—*^-
'.'•'.'— ;,-•'.
P
•S C if
"i§S?'s^l
r. CM.'. • O 1 1 •
T- • -•'-'
fs'.w;
:'•'.'!: '.-:.
;.•.•".•'.;-:'•
•i^!/--
."•*"•-'•"
•/-•. ?"
.'••'"-" V
~T*.* ;,;
f ~'»
SPL* .*-•*
~. *"*
JOB NUMBER
92-1
»
> TRENCH NUMBER T~3
' ELEVATION 18± N >•
SAMPLING
METHOD CASE 455 TRACKHOE
DESCRIPTION
Brown Silty Fine Sand Interlayerec
with White Very Silty Sand
(Fill)
Very Dark Gray Sandy Clay to
Black Clayey Sand with Glass
Fragments (Fill)
. ' — •
~ Dark Brown Poorly Cemented Silty
Fine to Medium Sand, with Thin
Shelly Layer ,grades to
Orangish-Br own Slightly Silty
Fine to Medium Sand, Moderately
Well Cemented
grades to
Brownish-Orange Fine to Medium
Sand
(Terrace Deposits)
Pale Orangish-Gray Slightly Silty
Medium to Coarse Sand
(Santiago Formation)
BOTTOM OF TRENCH @ 10.5'
BEST ORIGINAL
MARISOL PROJECT
LACUNA ASSOCIATES
•* 111
2 £EUJ 3
2 12o_ o< S
1
Very
Moist
Very
Moist
To Wet
— — ^^— •
Moist
Damp
Damp
Moist
>_
K 0z z
UJ UJ
£ -Q" {/5Q- Z< 0o
Loose
Soft
To
Loose
Loose
To
Medium
Dense
Dense
Very
Dense
Dense
To
Very
Dense
DATE LOGGED
2-14-92
V) -^Z u.
UJ o
0 Q.
. ""
Ka
.^— -^— ^— •••
105.6
122.4
123.5
. 1 V?LU o-
CE ~
, z
cn £
5 z
2 0
O
•i^— ^— —
6.4
5.3
4.2
*
UJ> ^
1- —
^J ftCC 3P
o
"~"
—
~
—
—
—
—
—
—
—
-
™"
—:
—
-
LOGGED BY
V.G.
SUBSURFACE EXPLORATION LOG PLATE NO. 5
h-
UJ
UJu.
X
f\L^
UJP
1 -_
2 -
3 -
4 -
5 -
—
6 -
—
7 —
8 -
—
9 -
10 -
11
12 _
13 _
14
15 -
UJOL
l_
UJ
Q_
3.<CO
B
_
O
1-
(_
0 tfrt Cjwj v
<
u
?rr£i
''.'4.'.-
:-SC
"*-•••.—-'•".T--
.•••-.'/.i
'* . "_J,;••*.•:?SPvj-l
i'J*-'"
• *]'-!
•/."•••.*
V» • ' *
'*."•"*
t • *.>.*•>'£
?s'p:,
• ••"••"
••.•'•'•T-
• * • * •" •
* "*.*."•
*. • ,'t .
"•"*"*"•
|~ * ", • •
,-y-f ' J.•".'*"*!*#
||
-^ : :-?:'-;•.'.•
JOB NUMBER
92-1
TRENCH NUMBER T-4
ELEVATION 9±
SAMPLING
METHOD CASE 455 TRACKHOE
DESCRIPTION
Brown Clayey Silty Medium to
Coarse Sand, with Minor Fragments
of glass and asphalt
(Fill)\ •"• -1- -1- -1- /
(Surface Water infiltration
seeping at 2.0 Feet)
White to Very Pale Gray Slightly
Silty Medium to Very Coarse Sand
grades to
White Silty Medium to Coarse Sand
(Groundwater seepage at 7.75 Feet
(Santiago Formation)
Dark Yellowish Gray Very Silty
Very Fine to Fine Sand
(Santiago Formation)
BOTTOM OF TRENCH @ 11.0' FEET
BEST ORIGINAL
MARISOL PROJECT
LACUNA ASSOCIATES
H
Z (r
UJ o
2<2o_ o
< "£.
Wet
Very
Moist
3-1
Very
^oist
H- O
Z Z
UJ UJ5£
Q. z< oo
Loose
Dense
Dense
Dense
DATE LOGGED
2-14-92
t-
V) _
Z ulUJ (j
Q Q.
j_ ""*
£E0
125.7
UJ 5s
°" ^^ _
2 H
0 Z
5 O
O
11.1
vO
UJ
— OJ_ —50
UJ Q.
o
-
—
101.6
—
—
—
~~
•~—
—
—
—_
—
—
—
-
. .
—
—
-
—
LOGGED BY
V.G.
SUBSURFACE EXPLORATION LOG PLATE NO. 6
UJ
UJu.
~—I
Q.
UJ
P
1 -
-
—
3 —
4 ~
5 -
6 -
__
7 -
8 -
9 -
-
10
11 _
_
12 _
13 _
14
15 -
UJQ.
i_i^
UJ
Q.
2
in
_
O
. (.— ' -_
0 i
CO CO
V
o
*,' • t'. '• ' '
"".'•' • •' ••
";.SC
'.'if^fr
f/s'p
• "_i_»>",V
fF;7£^sp;
%£s
•7-rJ-;
I'ML
7l>.l-
^-•^1^"
T-7^.
IrL^Ii
~-r-r7
-'T-^V
"L~J:
JOB NUMBER
92-1
TRENCH NUMBER T-5
ELEVATION 6±
SAMPLING
METHOD CASE 455 TRACKHOE
DESCRIPTION
Brown Silty Clayey Fine to
Medium Sand with Minor Refuse
(Fill)
Medium bedded Silty Fine to
Medium grained and Coarse Grained
O J •j_l_-C"l.i_"l* Jband with flat lying wood
fragmpnt « (Beach Deposits)
Brownish-Orange thin bedded fine
to Coarse Sand (Beach Deposits)
Very Dark Gray Sandy Silt^Slight
Organic Odor
TRENCH WALLS CAVING
groundwater seepage @ 6.75 Feet
(Recent Beach/Lagoon Deposits)
.BOTTOM OF TRENCH @ 10.0 FEET
Trench Terminated Due to Profuse
Caving
BEST ORIGINAL
MARISOL PROJECT
LACUNA ASSOCIATES
*- uiz crUJ 3
OL, ^
< CO
Q. 0
< 2
Wet
Wet
Wet
Wet
.V.
H 0z z
UJ UJa: >-< _
CL Z< Oo
Loose
Loose
Loose
Soft
DATE LOGGED
2-14-92
K
co _
Z u.
LU (jQ a.
DC
0
UJ o5
CC "~"
^ _
h~
CO UJ
O Z
2 0o
vO
UJ
— O}- —
^ U
UJ CLfy 2
O
—
—
—
~™
™~"~
—
—
—
—
—
—
—
—
—
—
-
-
:
LOGGED BY
V.G.
SUBSURFACE EXPLORATION LOG PLATE NO. 7
LABORATORY TEST RESULTS
Sample
Location
MAXIMUM DENSITY/OPTIMUM MOISTURE
Description
Maximum
Dry Optimum
Density Moisture
(pcf) (Percent)
T-4 <§ 2.5'White Slightly Silty Medium
to Very Coarse Sand
123.7 11.4
DIRECT SHEAR*
Sample
Location
Apparent
Cohesion
(psf)
Angle of
Internal Friction
(degrees)
Sampled from
Terrace Deposits
in Site Vicinity
*T-4 2.5'
50
200
33
34
* Sample remolded to 90% of maximum dry density at 3% over
optimum moisture content. All samples saturated prior to
testing.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NO. 8
MECHANICAL SIEVE ANALYSIS
Sample
Location
Percent Passing U.S. Standard Sieve
#4 #10 #40 #100 #200
T-4 @ 2.5' 98.1 88.2 39.7 22.1 15.8
EXPANSION INDEX*
Sample
Location
Expansion
Index
Initial
Moisture
Content
(Percent)
Final
Moisture
Content
(Percent)
Expansion
Potential
T-l @ 1.0 59 9.9 21.4 Medium
* Sample tested per UBC Standard No. 29-2
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NO. 9
TABLE I
TRENCH
NUMBER
DEPTH OF
SOIL REMOVAL BELOW
EXISTING GRADE (FEET)
T-l
T-2
T-3
T-4
T-5
4.0
2.5
5.0
2.0
10.0 +
NOTE: It should be recognized that variations in soil
conditions may occur between exploratory trenches
that will require additional removal. In areas
where fill slope toe keys are proposed, add a
minimum of 2.0 feet to removal depths presented
above.
The soil in the exploratory trenches encountered
in the removal process should be removed and
recompacted to 90 percent relative compaction.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PLATE NO. 10
FILL SLOPE KEY
NATURAL GROUND
PROJECTED PLANE
I TO I MAXIMUM FROM TOE OF
SLOPE TO APPROVED GROUND
FILL
8' MINIMUM BENCH
MINIMUM DOWNSLOPE
KEY DEPTH
COMPETENT EARTH
MATERIAL
TYPICAL BENCH
(HEIGHT VARIES}
BACKDRAINS MAY BE REQUIRED PER
RECOMMENDATIONS OF SOILS ENGINEER
MARISOL PROJECT
CARLSBAD, CALIFORNIA
JOB NO. 92-1 DATE 2-21-92
SOIl. AND FOUNDATION ENGINEERING INC.
PLATE NO. 11
APPENDIX I
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PHONE 746-3553
AREA CODE 619
423 HALE AVENUE
ESCONDIDO. CALIFORNIA 92029
SPECIFICATIONS FOR CONSTRUCTIOK OF CONTROLLED FILLS
GENERAL DESCRIPTION: The construction of controlled fills shall
consist of adequate preliminary soil investigations, and
clearing, removal of existing structures and foundations,
preparation of land to be filled, excavation of earth and rock
from cut area, compaction and control of the fill, and all other
work necessary to complete the grading of the filled area to
conform with the lines, grades, and slopes as shown on the
accepted plans.
CLEARING AND PREPARATION OF AREAS TO BE FILLED;
(a) All fill control projects shall have a preliminary soil
investigation or a visual examination, depending upon
the nature of the job, by a qualified soil engineer
prior to grading.
(b) All timber, trees, brush, vegetation, and other rubbish
shall be removed, piled and burned, or otherwise
disposed of to leave the prepared area with a finished
appearance free from unsightly debris.
(c) Any soft, swampy or otherwise unsuitable areas, shall
be corrected by drainage of removal of compressible
material, or both, to the depths indicated on the plans
or as directed by the soil engineer.
(d) The natural ground which is determined to be
satisfactory for the support of the filled ground shall
then be plowed or scarified to a depth of at least six
inches (6") or deeper as specified by the soil
engineer, and until the surface is free from ruts,
hummocks, or other uneven features which would tend to
prevent uniform compaction by the equipment to be used.
(e) No fill shall be placed until the prepared native
ground has been approved by the soil engineer.
(f) Where fills are made on the hillsides with slopes
greater than 5 (horizontal) to 1 (vertical), horizontal
benches shall be cut into firm undisturbed natural
ground to provide lateral and vertical stability. The
initial bench at the toe of the fill shall be at least
10 feet in width on firm undisturbed natural ground at
the elevation of the toe stake. The soil engineer
shall determine the width and frequency of all
succeeding benches which will vary 'with the soil
conditions and the steepness of slope.
page 2
(g) After the natural ground has been prepared, it shall be
brought to the proper moisture content and compacted to
not less than 90% of maximum density, A.S.T.M. D1557-78.
(h) Expansive soils may require special compaction
specifications as directed in the preliminary soil
investigation by the soil engineer.
(i) The cut portions of building pads in which rock-like
material exists may require excavation and recompaction
for density compatibility with the fill as directed by
the soil engineer.
MATERIALS: The fill soils shall consist of select materials
graded so that at least 40 percent of the material passes the No.
4 sieve. The material may be obtained from the excavation, a
borrow pit, or by mixing soils from one or more sources. The
material used shall be free from vegetable matter, and other
deleterious substances, and shall not contain rocks or lumps
greater than 6 inches in diameter. If excessive vegetation,
rocks, or soils with unacceptable physical characteristics are
encountered, these materials shall be disposed of in waste areas
designated on the plans or as directed by the soil engineer. If
soils are encountered during the grading operation which were not
reported in the preliminary soil investigation, further testing
will be required to ascertain their engineering properties. Any
special treatment recommended in the preliminary or subsequent
soil reports not covered herein shall become an addendum to these
specifications.
No material of a perishable, spongy, or otherwise unstable nature
shall be used in the fills.
PLACING, SPREADING AND COMPACTING FILL MATERIAL:
(a) The selected fill material shall be placed in layers
which shall not exceed six inches (6") when compacted.
Each layer shall be spread evenly and shall be
thoroughly blade-mixed during the spreading to insure
uniformity of material and moisture in each layer.
(b) When the moisture content of the fill material is below
that specified by the soil engineer, water shall be
added until the moisture content is near optimum as
determined by the soil engineer to assure thorough
bonding during the compacting process.
(c) When the moisture content of the fill material is above
that specified by the soil engineer, the fill material
shall be aerated by blading and scarifying, or other
satisfactory methods until the moisture content is near
optimum as determined by the soils engineer.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
page 3
(d) After each layer has been placed, mixed and spread
evenly, it shall be thoroughly compacted to not less
than the specified maximum density in accordance with
A.S.T.M. D1557-78. Compaction shall be by means of
tamping or sheepsfoot rollers, multiple-wheel
pneumatic-tired rollers, or other types of rollers.
Rollers shall be of such design that they will be able
to compact the fill to the specified density. Rolling
of each layer shall be continuous over its entire area
and the roller shall make sufficient passes to obtain
the desired density. The entire area to be filled
shall be compacted to the specified density.
(e) Fill slopes shall be compacted by means of sheepsfoot
rollers or other suitable equipment. Compacting
operations shall be continued until the slopes are
stable but not too dense for planting and until there
is no appreciable amount of loose soil on the slopes.
Compacting of the slopes shall be accomplished by
backrolling the slopes in increments of 3 to 5 feet in
elevation gain or by other methods producing
satisfactory results.
(f) Field density tests shall be made by the soil engineer
for approximately each foot in elevation gain after
compaction, but not to exceed two feet in vertical
height between tests. The location of the tests in
plan shall be spaced to give the best possible coverage
and shall be taken no farther than 100 feet apart.
Tests shall be taken on corner and terrace lots for
each two feet in elevation again. The soil engineer
may take additional tests as considered necessary to
check on the uniformity of compaction. Where
sheepsfoot rollers are used, the tests shall be taken
in the compacted material below the disturbed surface.
No additional layers of fill shall be spread until the
field density tests indicate that the specified density
has been obtained.
(g) The fill operation shall be continued in six inch (6")
compacted layers, as specified above, until the fill
has been brought to the finished slopes and grades as
shown on the accepted plans.
SUPERVISION; Supervision by the soil engineer shall be made
during the filling and compacting operations so that he can
certify that the fill was made in accordance with accepted
specifications.
The specifications and soil testing of subgrade, subbase, and
base materials for roads, or other public property shall be done
in accordance with specifications of the governing agency.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
page 4
SEASONAL LIMITS: No fill material shall be placed, spread, or
rolled during unfavorable weather conditions. When the work is
interrupted by heavy rain, grading shall not be resumed until
field tests by the soil engineer indicate that the moisture
content and density of the -fill are as previously specified. In
the event that, in the opinion of the engineer, soils
unsatisfactory as foundation material are encountered, they shall
not be incorporated in the grading, and disposition will be made
at the engineer's discretion.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
APPENDIX II
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
REFERENCES CITED
m Kennedy, Michael P., 1975 Geology of The San Diego Metropolitan
Area, California: California Division of Mines and Geology,
m Bulletin 200.
m Singh, Awtar, 1970, Shear Strength and Stability of Man-Made
Slopes: Journal of the Soil Mechanics and Foundation Division, ASCE
m SM6, (November 1970,) pp. 1879-1892.
m
m Weber, F. Harold Jr., July 1, 1982, Recent Slope Failures, Ancient
Landslides, and Related Geology of the North-Central Coast Area,
** San Diego County, California, CDMG Open-File Report 82-12.
«M
m Wilson, Kenneth L., December 1972, "Eocene and Related Geology of a
Portion of the San Luis Rey and Encinitas Quadrangles San Diego
KM County, California", Masters Thesis, U.C. Riverside.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.