HomeMy WebLinkAboutCDP 01-41; Garfield Street Homes; Preliminary Soils Investigation; 2001-07-17PREUMINARY
SOILS
INVESTIGATION
Uloolsey Soil Classification
Garfield St. (A.P.N. 204-240-19)
Joh§ 015-855
July 17, 2001
GEORGE
SOILS TESTING
3208 CAROLYN CIRCLE, OCEANSIDE, CALIFORNIA 92054
J
SOILS TESTING
3208 Carolyn Circle • Oceanside • Califomia 92054
(760) 435-9534
Job#01S-855
July 16, 2001
Richard and Richard Construction
Attn: Mr. Richard Woolsey
4751 Oceanside Bl., Oceanside, Ca. 92054
Dear Mr. Woolsey:
In accordance with your authorization, on 7/5/01 an agent of our firm performed a
limited soils investigation of the subject property. We are pleased to submit herewith the
report of that mvestigation.
This report presents our findings Srom the investigation and our conclusions and
recommendations, based upon those findings.
Location: Vacant lot on East side of Garfield St. two lots North of Juniper Ave. in
Carlsbad, Ca. 92008 (A.P.N. 204-240-19)
Investigation: The investigation was conducted to classify soils at the base of the
proposed foundations. Bulk samples were removed fi'om the site and analyzed for Grain
Size Distribution and Expansion Index.
Conclusions and Recommendations: Soils of Type SC were found at foundation level by
sieve analysis with a safe bearing capacity of 1500 PSF per UBC Table 18A and an
Expansion Index of 21.9 (Low Potential Expansion). Our foundation and slab
recommendations for the proposed construction are contained herein. It is our opinion the
site is suitable for the proposed construction.
Geotechnical Engineering
Due to the high density of formational sandstone on site and the relatively deep
groundwater in tiie area, it is our opinion this site has a very low potential for seismically
induced soil liquefaction. Witii regards to tiie near-source factor in Seismic Zone 4, tiie
Rose Canyon fault, approximately 7 kilometers Soutiiwest of tiie site, appears to present
tiie greatest seisniic risk to tiie subject site. The following table contains site specific
seismic desiga criteria for tiie calculation of seismic base shear. The design criteria was
obtained fi-om die Uniform Building Code (1997 edition). A coefficient of fiiction of 4.0
times the dead load may be used between the bearing soils and concrete foundations,
walls, or floor slabs.
Parameter Value Reference
Seismic Zone Factor. Z 0 40 Table 16-1
SoUProglgTypg SQ Table 16-J
Seismic Coefficient Ca 0.40Na Table 16-0
Seismic Coefficient. Cv 0.56Nv Table 16-R
Near-Source Factor. Na TO Table 16-S
Near-Source Factor. Nv 1J2 Table 16-T
Seigmic Spurce Typg B Table 16-U
This report is for the samples tested only and tiiere are no guarantees eitiier stated or
implied relative to the stability ofthe site.
Should you have any questions regarding tiiis matter please feel fi-ee to contact our office.
Sincerely,
George i^^Kropotofl^ RCE233
Project Engineer
GK:kw
End.
cc: (1) Client; (1) FUe, (5) James Chinn, Architect
P.S. Site conditions may vary with time, hence this report is valid for one year only.
Geotechnical Engineering
FOUNDATION AND SLAB RECOMMENDATIONS FOR EXPANSIVE SOILS
1 Story Footings
2 Story Footings
3-t- Story Footings
Garage Door
Grade Beam
Occupied Area
Floor Slabs
Unoccupied Area
Floor Slabs
Pre-soaking of
Sub-Slab Soils
Expansion Index - 21-50 - Low Expansion
All footings 12 inches deep.
12" wide minimum. Width per
bearing capacity calcuktions.
Footings continuous.
1 no. 5 bar top and bottom
All footings 18" deep.
15" wide mioimum. Width por
bearing capacity cakulations.
Footings continuous,
1 no. 5 bar top and bottom.
All footings 24" deep.
18" wide minimum. Width per
bearing capacity calcuktbns.
Footings continuous.
1 no. 5 bar top and bottooL
12 inches deep.
1 no. 5 bar top and bottont
4 inches thick.
6x6-6/6 wire mesh at nud-height.
2 mches gravel or sand base.
6 mil. visqueen moisture barrier phis
1 inch sand
4 inches thick.
6x6-6/6 wire mesh or quarter slabs.
Isolate fi-om stem wall footings.
2 inches rock, gravel or sand base.
No moisture barrier required.
Soak to 12 inches depth to 4%
above optimum moisture content.
NOTES: 1) AH depths are relative to slab subgrade.
2) All footings shouM be continuous.
Slab subgrade
Depth of
exterior ftg
I—III—I
Depth of
exterior ftg
m
*o m M
Concrete slab with
Welded wire fabric
Sand layer
Visqueen
Gravel or sand base if required
MIllllllllllHlilllilllllliHHflHiiliHIllllHM
Depth of
presoaked soil
Depth of
interior ftg
Footing and stem wall reinforcing
per structural design
r Floor diaphragm Joists
Clearance
Depth of
presoaked soil
Depth of
interior ftg
Footing and stem wall reinforcing
per structural design
/M_TERNATIVE
Foundation embedment and slab on grade
SOILS TESTING
3208 Carolyn Circle - Oceanside, Ca. 92054 - (760) 435-9534 Job No.(i?ls-855
Date ^/(Cg/oT
O
I
LJ-
m
o tn
1
IS
Q LU CD , .
ir ZJ OL
^1
o
DC
Z
o
§
O O
TEST PIT No. T.P.-1
DESCRIPTION
SC 21.S
Slightly Damp, Med. Beige,
Slightly Silty Rne to Med.
Sand with Organics
(Topsoil)
10-
Slightly Damp. Pale Reddish
Med. Brown, Fine to Med.
Sand
-End of Excavation-No Changes
GROUND ELEVATION: Exist. Grade METHOD OF EXCAVATION: Hond-Excovated
UJ Q
O
§ O
to
Qu X UJ
a
2 Q-
ZD
Zl Q_ =3 CD
O
O «
UJ
LU O Q Q-
>-
a:
zz. o
i
o o
TEST PIT No. T.P.-2
DESCRIPTION
SC
Slightly Damp, Med, Beige,
Slightly Silty Rne to Med.
Sand with Organics
(Topsoil)
5-
O L
10
Slightly Damp, Pale Reddish
Med. Brown, Fine to Med, Sand
-End of Excovatlon-No Changes
DATE OBSERVED: 7/5/01 LOGGED BY: KBW LOCATION: (A P N 204-940 10^
TEST PIT LOG
SOILS TESTING
3208 Carolyn Circle - Oceanside, Ca. 92054 - (760) 435 9534
SOILS TESTING
3208 Carolyn Circle - Oceanside, Ca. 92054 - (760) 435 9534 Job No.OIS-855
SOILS TESTING
3208 Carolyn Circle - Oceanside, Ca. 92054 - (760) 435 9534
Date 7/15/01
8
5
to
z < to
UJ
Is.
cn
^ S-
l/l
^5-
tn a ro-
CM
CM
8 8 S
HI
y'
t
/
J
/
o
8
o O oo o o to o in
ZS0ILS12
o
PERCENT PASSING
o o
CM
i
z
O S
in
%
o z
o
CD
0
0:1
GRAIN SIZE DISTRIBUTION
SOILS TESTING
3208 Carolyn Circle - Oceanside. Co. 92054 - (760) 435-9534
SOILS TESTING
3208 Carolyn Circle - Oceanside. Co. 92054 - (760) 435-9534 Job No.t?|S-855
SOILS TESTING
3208 Carolyn Circle - Oceanside. Co. 92054 - (760) 435-9534 Date ^llipl<>l
jn
"5
CO M
/
PLOT PLAN
SOILS TESTING
3208 Carolyn Circle - Oceanside. Ca. 92054 - (760) 435-9534
Job No.oi5-QS5
Date l^lllojol
J ABOUT YOUR ^
GEOTECHNICAL ENGINEERING REPORT
More construction problems are caused by site subsur-
face conditions than any other factor As troublesome as
subsurface problems can be. their frequency and e.xtent
have been lessened considerably in recent years, due in
large measure to programs and publications of ASFE/
The Association of Engineering Firms Practicing in
the Geosciences.
The following suggestions and observations are offered
to help you reduce the geotechnical-related delays,
cost-overruns and other costly headaches that can
occur during a construction proiect.
A GEOTECHNICAL ENGINEERING
REPORT IS BASED ON A UNIQUE SET
OF PR0IECT-5PECIFIC FACTORS
A geotechnical engineering report is based on a subsur-
face exploration plan designed to incorporate a unique
set of proiect-specific factors. These typically include-,
the general nature of the structure involved, its size and
configuration: the location of the structure on the site
and its orientation-, physical concomitants such as
access roads, parking lots, and underground utilities,
and the level of additionai risk which the client assumed
by virtue of limitations imposed upon the exploratory
program. To help avoid costly problems, consult rhe
geotechnical engineer to determine how any factors
which change subsequent to the date of the report mav
affect its recommendations.
Unless your consulting geotechnical engineer mdicates
otherwise, your geotechnical euginecrifig report sluniUi mn
be used:
. When the nature of the proposed structure is
changed, for example, if an office building will be
erected instead of a parking garage, or if o refriger-
ated warehouse will be built instead of an unre-
frigerated one:
• when the size or configuration of the prcposed
structure is altered:
• when the location or orientation of the proposed
structure is modified:
• when there is a change of ownership, or
• for application to an adjacent site.
Ceofecfinical engmeers cannot accept responsibilitu lor problems
which mau deve'lov if they are mt consulted alter factors consid-
ered in their report's development have changed.
MOST GEOTECHNICAL "FINDINGS"
ARE PROFESSIONAL ESTIMATES
Site exploration identifies actual subsurface conditions
only at those points where samples are taken when
they are taken Data derived through sampling and sub-
sequent laboratory testing are extrapolated by geo-
technical engineers who then render an opinion about
overall subsurface conditions, their likely reaction to •
proposed construction activity and appropriate founda-
tion design. Even under optimal circumstances actual
conditions may differ from those inferred to exist,
because no geotechnical engineer, no matter how
qualified, and no subsurface exploration program, no
matter how comprehensive, can reveal what is hidden by
earth, rock and time. The actual interface between mate-
rials may be far more gradual or abrupt than a report
indicates. Actual conditions in areas not sampled may
differ from predictions. Nothing can be done to prevent the
unanticipated, but steps can be taken to help minimize their
impact. For this reason, most experienced owners retain their
geotechnical coiisultfltils through the construction stage, to iden-
tify variances, conduct additional tests which may be
needed, and to recommend solutions to problems
encountered on site.
SUBSURFACE CONDITIONS
CAN CHANGE
Subsurface conditions may be modified by constantly-
changing natural forces. Because a geotechnical engi-
neering report is based on conditions which existed at
the time of subsurface exploration, construction decisions
should not be based on a geotechmcal engineering report whose
adequacu mau have been afjected bu time. Speak with the geo-
technical consultant to learn if additional tests are
advisable before construction starts.
Construction operations at or adiacent to the site and
natural events such as floods, earthquakes or ground-
water lluctuations may also affect subsurface conditions
and. thus, the continuing adequacy of a geotechnical
report. The geotechnical engineer should be kept
apprised of any such events, and should be consulted to
determine if additional tests are necessary
GEOTECHNICAL SERVICES ARE
PERFORMED FOR SPECIFIC PURPOSES
AND PERSONS
Geotechnical engineers reports are prepared to meet
the specific needs of specific individuals. A report pre-
pared for a consulting dvil engineer may not be ade-
quate for a construction contractor or even some other
consulting civil engineer Unless indicated otherwise,
this report was prepared expressly for the client involved
and expressly for purposes indicated by the client. Use
by anv other persons for any purpose, or by the dient
for a different purpose, may result in problenis. No indi-
vidual other than the client should apply tfiis report for its
intended purpose without f\rst conjernng with the geotechnical
engineer No person should applu this report for any purpose
other than that originally contemplated without first conferring
with the geotechmcal engineer
A GEOTECHNICAL 0IGINEERING
REPORT IS SUBIECT TO
MISINTERPRETATION
Costly problems can occur when other design profes-
sional? develop their plnns based on misintcrpr'^tnrions
of .T geotechnical engineering report Tb help nvnid
Mipr:e problems, the geotechnical er-igineer itmiild b"
retained to work with other appropriate d^nipn prole-,
"ionnis to e.xpiain relevant geotechnical fiiKlinrr •HKI IO
rpvi^w the ndequacv of their plans and sperilifniirMi'-;
relative to geotechnical issues
BORING LOGS SHOULD NOT BE
SEPARATED FROM THE
ENGINEERING REPORT
Hnal boring logs are developed by geotechnical engi-
neers based upon their interpretation of field loen
lassembled by site personnel) and laboratorv evaluation
of field samples. Only final boring lops customarily are
induded in geotechnical engineering reports Tfif.<:r logs
'hould not under any circumstances be redrawn fpr inclusion in
'irchitectural or other design drawings, becnus" rlralt^rs
rnay commit errors or omissions in the transfer process
.•Mtfiough photographic reproduction eliminates this
problem, it does nothing to minimize the possibility of
contractors misinterpreting the logs during bid prepara-
fion When this occurs, delays, disputes and unantici-
pated costs are the all-too-frequent result
To minimize the likelihood of boring log misiriterprrt.-i-
tion. give contractors ready access to the complete gcrlahntcal
enaineering report prepared or authorized for their use
Those who do not provide such access may proceed un-
der the tyu^en impression that simply disdaiming re-
sponsibil^ifor the accuracy of subsurface information
al-A/ays insulates them from attendant liability Providing
the best available information to contractors helps pre-
vent costly construction problems and the adversarial
attitudes which aggravate them to disproportionate
scale
READ RESPONSIBILITY
CLAUSES CLOSELY
B^caur;e RTitechnicnl engineering is based extensively
on judgment and f-)piriion. it is Iar less exact than other
design disciplines. This situation has resulted in wholly
unwarranted daims being lodged against geotechnical
consultants lb help prevent this problem, geotechnical
engineers have developed model clauses for use in writ-
ten transmittals. These are nol exculpatory clauses '
designed to foist geotechnical engineers' liabilities onto
someone else Rather they are definitive dauses which
identify where geotechnical engineers responsibilities
begin and end. Their use helps all parties involved rec-
ognize their individual responsibilities and take appro-
priate action Some of these definitive dauses are likely
to appear in your geotechnical engineering report, and
you are encouraged lo read them dosely Your geo-
technical engineer will be pleased to give full and frank
answers to your questions
OTHER STEPS YOU CAN TAKE TO
REDUCE RISK
Your consulting geotechnical engineer will be pleased to
discuss otfier techniques whicfi cnn be employed to mit-
igate risk. In addition. ASFE has developed a variety of
materials which may be beneficial. Contact ASFE for a
complimentary copy of its publications directory
rtiHr.lini hu
mE ASSOCIATION
OF EMGIHEERING FIRMS
PRACnCING IN THE GEOSCIENCES
8811 Col°9yille Road/Suit'-' •.K)^ '^,ilv-r Spiiiip,. Mntyland .VVin/l WW -A--27•^^l