Loading...
HomeMy WebLinkAboutCDP 02-35; HENDRIX SECOND DWELLING UNIT; HYDROLOGY STUDY AND DRAINAGE CALCULATIONS; 2003-03-06• ENGINEERING Peter S. Geissler Civil Engineer Lie. C44320 Contractor Lie. A464570 f'lastino Building, Suite 230 2533 South Coast Highway 101 Cardiff-by-the-Sea, CA 92007 Office 760 -633 -4252 Fax 760 -633 -4259 Mobile 760 -815 -5054 HYDROLOGY STUDY & DRAINAGE CALCULATIONS Date: 6 March 2003 Submitted to Department of Engineering City of Carlsbad, California For and on behalf of Edward A. Hendrix 470 Chinquapin Avenue Carlsbad, CA Project: Proposed Grate for Catch Basin 470 Chinquapin Avenue Carlsbad, CA Ref: Client: Geissler Engineering Project No. 03-454-1 Edward A. Hendrix 470 Chinquapin Avenue Carlsbad, CA HYDROLOGIC CALCULATIONS Peak Runoff (50-year storm) = 4.0 inches per hour Runoff Coeffic)(mt, C = 0.55 (vegetative hillside) Tributary Drainage Area: Area of Tributary Drainage Area (existing uphill residential hillside= 72,900 sq~ Page 1 of 2 • [Ref: City of Carlsbad Orthophoto Ma ping dated September- October 1988, Copyright 1991] [Note: No change in tributary drainage area is proposed. No additional pavement is proposed. This study is an evaluation of the adequacy of the existing catch basin to control surface runoff at the proposed development site.] Peak Flow Requirement= (4.0) (0.55) (72,900) I ((12) (60) (60)) = 3.7 cu ft per second The required .Q/A, discharge rate/ grate area, may be evalu_ated from the empirical equation, as follows. QI A= {5.37) -JH = {5.37) .J(o.5) = 3.8 Where H = Depth (maximum) of at intake grating= 6 in= 0.5 ft A= Required (net) Area at of at intake grating Q = Peak flow (50-year storm)= 3.7 cu ft/sec Calculation of Grate Size Required Clear Area= (3.7) I (3.8) = 0.21 sq ft Required Gross Area= (0.21) I (0.5) = 0.42 sq ft Proposed Intake Grate= (1'-5") (111-611 = (1.42) (1.5) = 2.13 sq ft Minimum cross-sectional area of intake grating = 0.42sq ft Page 2 of 2 1.09 < 14 O.K. 0.42 < 2.13 0.K.